HomeMy WebLinkAboutCO 30CHANGE ORDER
Ower
Architect
COR Form
{This form is to be executed in Iriaiicate and each party is to retain an original.)
y
Cantrado-
Project Name: RENTON SENIOR HOUSING
Change OntPr Na.:
Cha
December d, , �C92
ThiAy (30)
Project Address: 3151 NE %th Street
Contractor Name: KIRTLEY-COLE ASSOCIATES
ORB Project IJc.:
COR Project No.:
9007
CAG 095-91
r3 Address 1002 - 10th Street
Snohomish, Washinglen 98290
Contract For.
General Construction
Contract Data"
October 31, 1991
The Contract is hereby amended as follows:
Per Kirtley-Cole Modification proposal #73R, 11!24/92 (copy attached): Add $250.24
`Additional clearing ref. tree remov,-1 and catch basin relocatlun.`
Per COR Proposal Request #58R, 10121/92 and Kirtley-Cote Modirication.
Proposal No. 110, 11/4102 (copies allached): "Delete (14) 1" Cat. Marshall Ash Add $499.55
Trees: add (10) 1.5" Prunus Padus (Mayday) trees."
Per Kirtloy-Cole Modification Proposal #114, 11r24/92 (copy attached): Add $1,382.43
"Add (4) Tire alarm zones for now valves per Fire Marshal.'
TOTAL CONSTRUCTION COST IMPACT OP THIS CHANGE c;RDER:....................
overhead, profit, i. -d all diad and/or indirect costs associated
......Add $2,132.22
The Change Order shall include all Contrador(s) labor, material
with the Change in Scope of Work.
This Change Order is not valid unless signed by the Owner, Architect, and Contractor.
. #4,620,785.00
The Original Contract Sum was ... ............. .................. .......... ........... .........,........,.......................,........................ 663,808.03
Nei Change by previously authorized Chang^ Order(-,) was ............... .... .... ............................5,284.573.03
The Contract Sum prior to this Change Order was ....... ............. .... ..............................................
.....
.............
2,132,27.
The Contract Sum will be revised by this. Change Order in the amount of ............................................
....................
...............•................................................
5,288,705.25
The new Contract Sum incorporating this Change Order will ............ SEE ' BELOW.............. . + 1 day
The Contract Time Oil be changed by ............. . Janurry 27. 1993
The ,vubstantial Completion Date including ttii-- Change Order is . see e.e-............Order......s ..ff...12,...18 8 19 for TB.....T............
( Change D items.)
NOTE: The above summary does not include any changes in the Contract Sum or Contract Time wNch have been applroved
by ORB Form 301 - Construdion Change Direciive or Owner's Field Directives. 8 R DEPT
THE ORB ORGANIZATION, INC.
607 SW Grady Way, Suite 210
Renton,. Washington 98055
, AIA
KIRTLEY-COLE ASSOCIATES
1002 - i01h Street
Snohomish, Washington 98290
71Gordan Cole
CITY OF RENTON, r-
200 Mill Avenue South
Renton, Washington 98055
Vincent Lee
✓ ..n _/S /2/ Z
Date
Dale ate
•,1�OTE: Acceptance of the additional days on this Change Order is conditional pending receipt of K.C.'s critical path method
schedule review.
—4E
�I m
Qaj
52
MODIFICATION PROPOSAL NO. 73 RE'V'ISED
KIRTiEY
COLE • Project'. RENfON SENIOR HOUSING - Jas 1315
ASSOCIATES, INC
t♦i1� m Dom: November 24, 1992
eonttractms
p.o. box 1179 To: THE ORB ORGANIZATION, INC.
1002 - 10th
srrohoea4ah
wash. "M Initiated by:
(M 569.3175
Modification Proposal: Additional clearing performed not in original scope of work:
A.L. Reicon, Inc.
WSST on equipment ($83.79 X 8.2%)
Subtotal
Overhead tit Profit 0 15% .. . • .. • • ... .
Bonding a 2% ... ... ... ............
Total...... I ............ ............
Rrason for Mod'if'ication:
Coat: Additional: 3254.24 Credits: S-0- Net:
Chance in Calendar Days: -0-
Approved Reject
Recamtnendatlon: for C.O.
Architect
General Contractor
Owner,
ModiiPaation Praposal InrorpomW Into C1wWe Order Number.
Attachments: A. L. Reicon. Inc. - ALR 01135.13
No action wiU be taken mprding thu ircm until wr receivc written a,xho-ization directing us to do so.
AU contract work wdl proceed on its normA schoduk.
PROPOSAL NO, 11YUMLiSJ
206.46
6.87
3213.33
532.00
54.91
S250.24
0
M
II
1
A. 1,, Ill:irurl, IT I;t)ICI'iy1t1171:(J
Munroc, Wnsh. 9827E
z
O
0
m
=i *fi
rn
m
0
m
0
�z
oO
WF
�N
0
T
N
z
O
0
m
Modification Proposal lt>Icorporated Into Change Ordr Nu nber: 30.
,tttachtneltt,q: Olympic Underg=round - proposal dated 10129192
No action will be taken regarding this iters until Yn receive written authorization directing us to do so.
All contract work will proceod on iU normal schedule.
PROPOSAL NO. 9�J
il.ems -
MODIFICATION PROPOSAL NO. 110
KIRTLEY
COLE •
Project: RENTON SENIOR HOUSING -106 +x315
ASSOCIATES, INC
genera
Date: November 4, 1992
contractors
p.o. box 1179
To: THE ORB ORGANIZATION, INC.
1002 - loth
snobomuh
wash. 98290
Initiated by: Architect
(206) 568-3175
Modification Proposal: Delete (14) Cal. Marshall Ash trees, add (10) 1,5" Prunus Padus (Mayday trees):
z
0
-j
0
M
-945.00
1.339.75
N
2
WSSP on materials (5379.50 X 8.2%)
31.1 2
vrn
M 0
0C
Subtotal ... ................ .....
-
$425,87
rn M
D
Overhead & Profit 0 15%................................
$63.88
� z
59.80
d
5i
Bonding a 296 .. .. . .................
Total ... ................ ...
$499.55
�
O
'n
091
Reason for Modification: as per PROPOSAL REQUEST a58 REVISED
Cost: Additional: 549n.55 Credits: S-0-
Net:
5499.55
Change In Calendar Days: -0-
Approved
Reject
Recommendation:
far C.O.
Architect
t"
General Contractor
qyM
Owner
m
Modification Proposal lt>Icorporated Into Change Ordr Nu nber: 30.
,tttachtneltt,q: Olympic Underg=round - proposal dated 10129192
No action will be taken regarding this iters until Yn receive written authorization directing us to do so.
All contract work will proceod on iU normal schedule.
PROPOSAL NO. 9�J
il.ems -
l S'K'I ---
RAY
�'1 GOR©Y
0040 ESTIMATOR
Per 4 / ARCHITECT --
SUPERINTENDENT rte'
ACCOUNTING
DEBBIE v
DIANE
'rr .D_ - COMMENTS
1 J L�k-
OLYWIC
I.JNDERGROLTmD & LANDSCAPE
NN., INC.
176i6 15TH AV. S.E. SUITE 103-8, O THELL, WA. 98012
pHs (206) 481-8016 / 1=AX` (206) 481-6202
FAX BID COVER SHEET
I ' , DATE I�r2?'9c
a � ; PRO-lEG'I' hSH
1
TOR E-,, COMPAH7 NAME Kn"njLri-COLE
PHONE;— FAX $ 277-y591 3NOCQ 5+5&7919
XOFE OF WORK i ^;ErmoNS BID FRop REQ'ST*58 RE7'ISED
!AYD CAPE DEDUCTS- 14 1,I ` CAL. MARSHALL� 9 $67. 0 F & I EA.
LE SS WSSI' F _ R :A TIL OF
L-AmsCAPE ADDS 10 1 1.5' PRUIgUS PADUS tl $133.97 F & I FA_
LES59ro"SI'ON HATFORATTLGF 44 , ?�-2-VEA. $1,339.75
MI SC. -H Fri GREG AND DEB BM-sORRY I CAN'T BE MORE EyJiUA-,rM HUT I'M
A13 0jj'2 47EEKS 0ERM ON MT WHOLE LEMI11111111111
QUES ol4 r r : r i '� T7iII►I GALL ME MD Mp +WA.� iiNG EMYONEi' S M4E I I I1
NUMBER OF FAAE3 HQNt3 SENTTNN REPLY NET�L'DY
RE'1-Y REOUES i'FD
EM MATOR ROBTREED
a.:)I,t A10 WET Z6, 6Z Tao
I '.a
z
0
m
vm
mQ
-40
0"
c
�T.
0�CJ
i
0 'n
mm
W
CEn
K
N
Z-4
in
z
0
r�
m
r