HomeMy WebLinkAboutCO 37CHANGE ORDER
Owner
COR Form Architect
retain an original) contractor
(This form is to be executed in triplicate and each party is to
Project Name: RENTON SENIOR HOUSING Date: February 26, 1993
Projezt Address: 3151 NE 16th Street Change Order No.: Thirty-seven (37)
Contractor Name: KIRTLEY-COLE_ ASSOCIATES ORB Project No.: 9007
✓i Address 1002 - 10th Street COR Project No.: CAG 095-91
Snohomish, Washington 98290 Contract For., General Construction
Contract Date: October 31, 1991
The Contract is hereby amended as follows:
1. Per ORB Proposal Request #39, 613192 and Kirtley-Cole Modification Proposal Subtract (42,245.80)
#93R #3, 2/10193 (copies attached): "Delete snow melt pad installation.'
2. Per ORB Architect's Supplemental #39, 1129/93 and Kiriley-Cole Modification
Proposal #136, 219193 (copies attached): 'Cover exposed exhause ducts in Add 320.31
Laundry Room 155."
3. Per Kirtley-Cole Modification Proposal #137, 219193 (copy attached): 'Provide Subtract (•239.94)
credit for Owner-fumished Radon Monitors.'
4. Per COR Proposal Request #74R, 2110193 and Kirtley-Cole Modification
Proposal #138, 2124193 (copies attached): 'Delete (3) site roadway speed bumps.' Subtract (-272.00)
TOTAL CONSTRUCTION CC ST IMPACT OF THIS CH NNGE ORDER:.......,..,...........................Subtract 52,437.43
The Change Order shall include all Contractor(s) labor, material, overhead, profit, and all direct and/or indirect costs associated
with the Change in Scope of Work.
This Change Order is not valid unless signed by the Ovnter, Architect, and Contractor.
...... $4,620.765.00
Thi Original Contract Sum was............._.................................................................................................
......,.. ..705,095.10
.......................................................................
Nc! Change by previously authorized Change Order(s) was .,.5,325.,860.10
The Contract Sum prior to this Change Omer was...........................................................................................
........ (2,437.43)
.................................................,...
The Contract Sum will be revised by th;s Change Order in the amount a 22.67
The new Contract Sum incorporating this Change Order will be.............................................................................. 5,3.2323,4days
The Contract Time will be changed by ........................................
The Substantial Completion Date including this Change Order is ..................................................... I ......... . February 9, 199
(See Change Orders #12, 18, 19, 33, 34 8 36 for TBD items.)
NOTE: The above summary does not include any changes In the Contract Sum or Contract Time which have been approved
by ORE Form 301 - Construction Change Directive or Owner's Field Directives.
Pr
THE ORB ORGANIZATION, INC
607 SW Gfady Way, Suite 210
liam, A1A
Date
KIRTLEY-COLE ASSOCIATES
1002 - 10th Street
Snohomish, Washington 98290
Gordon Cole
Date
CITY OF RENTON. P 8 R DE
200 Mill Avenue South
Renton, Washington 98055
Vincent Lee
3 -to
Date
z
0
-i
0
rn
=4 ;fi
Qm
�d
m
�n
0r
mm
0
2
r_1
in
0 _n
m
O�
n Fn
C N
K0
�0
z
z
0
1
0
m
~ MODIFICATION PROPOSAL NO- 93
KIRTLEY
COLE a Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC Fcbrva+ ro rg93
gencr, Date:
contractors
p.o. boa 1179 T0: THE ORB ORGANIZATION, INC.
1003 - 10th
snobomish
wash. 99290 Initiated by: ARCHITECT
(206) 369-3175
Modification Proposal: Delete the SNOW MELD PAD Installation as per PR#39:
Rob's Electric, Inc. 7,2V5' -
Subtotal
Z$•
Subtotal..................... .... *.2,Z�S Cha
Total ....... Sr so
Reason for Modification::::fj J �7q
Cost:
Additional: S-0- Credits: Net: '—
Change In Calendar Days: -0-
Approved Reject
Recommendation: for C.O.
Architect ki ha
General Contractor
�r
Owner
hiodireation Proposal Incnrporated Into Change Order Number: 37
AttacluneMs: as per Rob's Electric Change Order tr2206, dated 8128!92.
No action will be taken regarding this item until we rtceive written authorization directing us to do so.
All contract warts will proceed on its normal schedule. PROPOSAL NO.
z
m
am
m
m
d
C
m
O
a►
0
mrn
R fit
rn
z
O
n
m
-ko "-1ECTRKvELEGTRIGAt CONTRACTORS �c, H A N G E ORDER
mipmoNE SU,69U
TO Kirtl*y Cole Associates
1002 10th St.
Snohomishr Ha. 98290
VYe hereby eg,se to marcs the Chen96(ill speclilad below:
Alternate *7 Snow melt pad to be de1etad Credit as fcllous
f 2305.00) 1
Snow Melt pad ( # 80.00) i
400' - 10/2 Romex .204 per ft. f; 284.00}
8 hours of labor 6► $35,00 per hour � S 69.20
4 _ 2 pole 30 amp breakers @r $17.30 s,a. fout)nstailed? S 350
10 hours of labor @ $35.00 per hour fLay
S 1245.8
Total Credit +
4'950.00
Alternate 7 gid
4of
NOTE: This Changs Order WOMAS Darl pf and in CanformanCa with the e>bling tpnlraCl.
W& AaFtIN hereby To make the change(s) sPlIclfled above at this price 1
s
PnviouS CONTRACT AMOUNT $
All
ACC910T14 _ The above price, and sPeClllcalions o!
1t+le Chancre older are g iorrl&Cj0ry and are ned under ggmg Igrmf d
I&A All work id be W - unless oihet•
REVISFt) CONTRACT TOTAL 1$
oats al &cc*Planes
Sipnelure �wNR�r
cep
eondrkone gg aDeCIlbd In original Con". _
wigs ,Ilpul,led.
FagM UNIT$0 lLIC 252 3133 :. 3.t773 15 19
UNITED EUCTRIC SUPPLY
PVNRILTT Phonal 9364310 MT, LAK* TI FIRACt Phone: TTI -4926
V. 1
Quix-OUOTE
MUMt,R1110N o 2367
WO OAT�E• r
TQt r
PROJECT@.�—
�.
...�. -�"r•"'w— ! YROT11k'IJ. coMTaACtOe
�� •+ CLCOTMau t11a1M[!tl On ~ta0r L
eifllUttae tICaCIIIFtiarl .w � . YMIt Toy"
L A SG
;1A�y�Dr
{. DeAvery schedules aro aaaa on nefeM1sl eondllfons. WO w1n not "sums napJnelblllly lot delays caused by
atAltes, eealNnls, shortage of Materials, or acts of Oos.
!. Unless otherwise gWMsd, .bars pr+a9a 111m ler .._ dsye aeoeplance.
11. WOMAN abM are 9119M n our beat hitarprelMhon of the epeilllaillons. Thle dace not guarantee final
aMoptablity by the approving authority.
Voltage: Ig 30
p►lltpht P.O.t. --- Tase Off By, �.
/eltmiled omtvery _ days from resarpt.1 ardor.
a9cwt(yl
M
PROPOSAL RCH�
REQUEST U>� CO NiRl1C'0 R
"�•K fli:LD
A!A DOCUMENT 0709 OTHER
PROJECT: RI"..`i'"%CN S2 11= HOUSLaG PROPOSAL REQUEST NO: 39
(ns�mt+ slddrsesll 3151 RE 16th Street
Renton WA 98056
OWNER. City of Ringo DATE: .June 3, 1992
(Contncmd Ci is Contract No: CAG 095-91
f— —i ZlIEC1 PROIEGT NC:9007
1002 - 10Th St_eet CONTRACT FOR: General Construction.
Snohomish, WA 96240
J CONTRA,:. DATED- October 31, 1992
Pleur submit an Itemized auctadon for changes in the COMIC Sum endlor Time incidental to proposed modifica-
tions m the C^ntnc Documents eescnbed herein.
THIS IS NOT A VANC£ ORDER NOR A DIREC710N TO PROCZED WITH THE WORK OESCRIBED HEREIN.
Desclption; nv"M dwoww o+ r. —M
Delete the SNOW MELT PAIL Installation
(Raf: bid item Alternate 07)
As requested by Renton Housing Authority.
This is confirmation of original deletion notification circulated on May 21, 1992.
Attltlsments: tun mamas s.a.+++a tti wwon "Omm"
Copy of 5/21/92 FAX mos©age.
OWNER:
AEA oocUmvgT t:; v! ' IRO?CSAI REQVEIT • Ap%IL TM MMOM • AIAO • 611M • THI ONl PAGE
AmUUCAN INSiTr= Of A1011TIC'3, MS NtW YORK AVL. N.W.. WASi1IMG:ON, O.G 2=&
Y
ltcl,.Il --
LI
ARCHITECT'S Owner Q
SUPPLEMENTAL INSTRUCTIONS Architect ❑
Consultant 13
Contractor ❑
Field ❑
AIA iaOCUMENr 0710 (instructions on reverse side) Other ❑
PROJECT: Renton Senior Housing ARCHITECT'S
IRS RUCTIONS SUPPLEMENTAL
(39)
(name, address)
OWNER: City of Renton DATE OF ISSUANCE: January 29, 1993
TO: ARCHITECT: The ORB Organization, Inc.
(Contractor) Kirtley-Cole
CONTRACT FOR: General Construction COR pITECT'S PROJECroject NO: T NO: 9007
AG 095-91
The Work shall be carried out in accordance with the following supplemental instructions issued in accord-
ance with the Contract Documents without change in Contract Sum or Contract Time. Prior to proceeding I
in accordance with these instrut.tions, indicate your acceptance of these instructions for minor change to
the Work as consistent with the Contract Documents and return a copy to the Architect. i
Description: In Laundry Room 155, install 2 x framing and MDO plywood panel to
cover up exposed exhaust ducts between dryer and folding table. MDQ to be placed
approxi,tately 12" from backwall and be approxilantely 3' wide by 61 high, and shall
return 12" to wall of end of folding table.
Paint to match adjoining MDQ soffit -
Attachments: (Hi, In,rt rl,rinr of document, IAiI ,uppan drrcriplron 1
ISSUED: ACCEPTED:
By Doug Pede
Architect
a
BY
Contractor Due
AIA DoCUMENT C,71d ARCHITECT'S SUPPItMINTAI INSTRUCTIONS - MARCH 1979 EDITION • AIAO
01979 - THE AMIRICAN INSTITUTE OF ARCHITECTS, 1733 NEW YORK AVE., N.W,, WASHINGTON, D.C. 2DO06
G710 —1979
11�1 MODIFICATION MiPOSAL NO. 137
KIRTLEY Project: RENTON SENIOR HOUSING - JOB 9313
COLE •
ASSOCIATES, INC
Date: February 9, 1993
ren
oontreatnn
p.o. boa 1179 To: THE ORB ORGANIZATION, INC.
1042 - 10th
Iaehomish
wuh. 98290 Wtiated by:
(206) SW3175
Modification Proposal: Credit for owner furntshad (32) Radon Monitors:
(32) U. 0 6.93
WSST on materials (S-221.76 X 8.2%)
Subtotal .......................
Total
Reason for Modification:
Cost: Additional: 50.04 Cradiu: $239.94 Nat:
Chanp In Calendar Hare: -0-
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
hlodll'cation Proposal Incorporated Into Change Order Number: 37
Attachments: City of Renton - P.O. 970208
No acdon will be takan regrrding this item until we receive wriae t sutwriration directing us to do to,
Ail corurhrct work wi71 proceed on Wul schedule.
PROPOSAL NO, ONE HUNDBED-M
-221.76
.18.18
S-239.94
S -x39.94
$-239.94
fa':'.
iZF gN PAPS' Z TEL No .27755:3........... -Feb' ..4 . Z' .1 :42 No .005r P .02
City of Renton
200 MITI Avenue South
Renton, Washington 98065
200.277-5527
Vince Lee, Project Manager
Purchase Order #74208
Cavelier Corporation
8820 44th Street
Spokane, WA 99206
1-800-323-3853
(FAX 1-509-928-t3689)
Qty; (32) 3 -Month Etched Trach Radon Monitors
Price: $6.93 ea.
plus sales tax
Account #: 3191COOi20.596.91.65,01
U4/Zi/as UO! *d �p�unannrvta �•� ltChi�Cd aK llati �uulitil3
MODIFICATION PROPOSAL NO. 138
KIATLEY .�
COLE • project: RENTON SENIOR HOUSING - )OB 1315
ASSOCIATES, INC
gemal Date: February 24, 133
oontrteprs
p.e. bo: 1179 To, THE ORD ORGANIZATION, INC.
1OC2 - I"
jnohflnYllh
with. 91290 Inidated by: Architaet
(Iva) 568-3175
Madirleatiun Proposal: Deleio the requirement for Installation of roadway speed bumps as per Proposal Request
#70 Revlted:
rA.A. Segale, Inc.
-172.00
Subtotal -5-272.0(}
S-271.00
Total
Reason for Modillemdon: o;ea/'o.pjrc. -V0eT7-* 70,e
Cost: Additional: $0.00 Credlu: $272.170 Net:
Change In Calendar Days: -0-
Rowmmendation:
Architect
General Contractor
Owner
IModinLadlun Proposat 11"rparatcd Into Change Order Number: .37
AttrclanentV M.A. Seyaic, Inc. - Proposal dated 2115193
Nn arlicn will be Laken raaardinj dAS Ism until wo rucclva wriUm au:hori►Blinn directing uK Ln do an.
All contract work will ivocobd on its normal schedule, •�
PROP03AL NO. 9149 HU14-DBED
S-272.00
ADDIT► RIVAL WORK AUTHUAIZATION
M. A. SEGALE, INC. / ASPHALT DIVISION
P.O. Box U050 • 18500 8outhce ! T Prrkwsy
TukwI1M, Welhxnyton 011186 - {2061670.0150
OWNER'@
NA14"
Kirtley - Cole Associates, Inc.
OATxt
February 161 1993
xTRSiT,
PO Box 1179
J09NAMCI
Panton SWor Housing
CITY1tTATit
Snohomish, SIA 48290
wMepTh
91.61 KE 16th. Street
"'ON'1
558-3175
olty/VA.Ia
Renton
CIN-DATEt
for NO.r
8301
You tare hwelQy outherixed to Neri'erm the fellevving specifltally dwerlbed imW109W ww6
PROPOSAL REQUEST 070 REVISED
DELETE a SPEED RMS
Labor*--+-�•-__.--__�.r«.............($119.00)
Materials Ill Equipment—woo-----------($142.00)
Tax w-rw--.1- --------------------------- ($ 12.00)
ADDITIONAL CHARGE FOR ABOVE WORK IS $ (5272.00
PAYMENT WILL Bi MAPS AS FOLLOWS,
ABOVC ADDITIONAL WORK TO be PCIRFORMED UNDER SAME CONDI rICNS AS SPECIFIED IN ORIGINAL CONTRACT UNLESS
OTHERWISE STIPULATED,
D111 110— Authotlilnts"Sturs
MON
N I9NI1!lMil
WS
HER["
AQA IRE Nk NOR A MATERIALI UTI I DANCE WITH THS AeOV6 9PECIFICATIONS,
AT ABOVE GTATE RICO.
Aumotlted Slpnitutl Olte 14
1Q HTRACT*A 23ONI HIREI
THIS IS CHANGE ORDER NO.
NOTE: "41 Rwnlsn Mtiynu ",I of, and 1n 4"Ief"wM with, Me 40411011 "mrov.
T
10
PROPOSAL
REM,; EST
Omg+ct Name: RLNTON SENIOR HODS$ 3 PROPOSAL REGUEST NO.: 70 Rev.
Pro]act Addreae: 3151 NE pith t;treel
Renton, Washington 98050
OWNER: City of Renton DATE: February 5, 1693 Rnv. February 10, 1993
TO: {Contractor) K'RTLE-Y-COLE ASSOCIATES COR CON i PACT NO.: CAG 095-91
1002 - 10th Street ORB project No.: 9007
Snohomish, Washington 93290 Contract For. General Coristructicr,
Contract Date: October 31, 19111
Please submit an Itemized quotation for changes In thrt Contract Surn andlor Time mcldental to proposed modifications to the
Contract Documents described herein.
THIS IS NOT A CHANGE ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN.
Descriptiarr. (Written description of the work.)
Delete the requirement for Installation of roadway speed bumps as listed below:
e (2) speed bumps In parking lot area . see Exhibit'A Revised.
speed bump In'ioop' road - see Exhibil'B'
0
Attachments: (Ust attached documents that support description.)
Exhibit'A' - sketch [Revised)
Exhibit 'B' - sketch
OWNER. City of Renton
BY:
...... • .. t 1J;• �,' ��r ;'• l' , ^fir^�.r..•. ' . • "�...�ht�.^•... - , •..p►..-.r....r,�; •,'fir- .. . ".""'�*"�+T7�"r''.'tT..t _"`�..�.....
rn
+LL
plCDr'GGrlr�'t�i
�T PW
• ,t .�
I
FWCJK P'ih vN ., f
1
rTVmcno4 �.ur
_„�,,• t-Cft�Yafw
AI
-vc GC
)KM G
fLAGKlrE
DE5(—' KJI' OL
C
�°PasA�. ur av.
0
€r
BY
NI �
I
azo
I
�r
v �
2014
.4
N
!Adden. 036-93