HomeMy WebLinkAboutWell 5A - Hydraulic Project Approval.pdfDEPARTMENT OF FISHERIES
HYDRAULIC PROJECT
APPROVAL
R.C.W. 75.20.100
R.C.W. 75.20.103
0 February 2, 1988
(applicant should refer to this date in all corresponde%eery OF REN TON
Engineering Dept.
WEtt. $`
P4"117
DEPARTMENT OF FI
GraC�]adms trati 98504
(206)1 753-6650
PAGE 1 OF 1 PAGES
10 LAST NAME FIRST 18 CONTACT PHONE(S)
Ron Olson 235-2631
LJ CONTROL NUMBER
00-37057-01
19 STREET OR RURAL ROUTE
City Hall, Renton
Public Works Dept.
STATE ZIP
WA 98055
7 IT 19 I WRIA
08.unkn
14 17
CITY
Renton
12 WATER TRIBUTARY TO
unknown Lake Washington
11 TYPE OF PROJECT
Well Testing
13 QUARTER SECTION TOWNSHIP RANGE(E-W) COUNTY
SECTION NW 5 23N 5E King_•
TIME LIMITATIONS:
5 THIS PROJECT MAY BEGIN
Immediately
16 I AND MUST BE COMPLETED BY
May 1, 1988
THIS APPROVAL IS TO BE AVAILABLE ON THE JOB SITE AT ALL TIMES AND ITS PROVISIONS FOLLOWED BY THE PERMITTEE AND OPERATOR PERFORMING
THE WORK.
ON REVERSE SIDE OF APPROVAL
entering creek.
stream.
shall be
that the City of
the stream during
fish passage
potential for coho,
24th St., Renton
SEE IMPORTANT GENERAL PROVISIONS
1. Flow energy shall be dissipated prior to water
2. No sediment laden water shall enter the flowing
3. After test is complete, the stick dam, as described,
completely removed.
NOTE: This permit is issued with the understanding
Renton conduct a stream improvement project on
summer 1988. The primary need is to provide better
through the lower sections. This stream has good
and trout production.
LOCATION: Approximately - Jones Ave NE, and NE
SEPA: Exempt
REGIONAL HABITAT MANAGER - Kurt Buchanan
PATROL - Swatfigure
APPLICANT - WILDLIFE - READER PATROL - HAB. MGR. - WRIA
--
/
DEPARTMENT OF FISHERIES /�"/ - %-6.4.-e-v, % DIRECTOR
N`
THIS APPROVAL IS TO BE AVAILABLE ON THE JOB SITE
AT-ALLITIMES AND ITS PROVISIONS FOLLOWED BY THE
f,PERMYTTEE AND OPERATOR PERFORMING THE WORK.
THE PERSON(S) TO WHOM THIS APPROVAL IS ISSUED MAY BE HELD LIABLE FOR
ANY LOSS OR DAMAGE TO FISHLIFE OR FISH HABITAT WHICH RESULTS FROM
FAILURE TO COMPLY WITH THE PROVISIONS OF THIS APPROVAL.
FAILURE TO COMPLY WITH THE PROVISIONS OF THIS APPROVAL COULD
RESULT IN A CIVIL PENALTY OF UP TO ONE HUNDRED DOLLARS PER DAY OR
A GROSS MISDEMEANOR CHARGE, POSSIBLY PUNISHABLE BY FINE OR
IMPRISONMENT.
ALL HYDRAULIC PROJECT APPROVALS ISSUED PURSUANT TO RCW 75.20.100 ARE
SUBJECT TO ADDITIONAL RESTRICTIONS, CONDITIONS, OR REVOCATION IF THE
DEPARTMENT OF FISHERIES OR DEPARTMENT OF WILDLIFE DETERMINE THAT NEW
BIOLOGICAL OR PHYSICAL INFORMATION INDICATES THE NEED FOR SUCH
ACTION. THE PERMITTEE HAS THE RIGHT PURSUANT TO CHAPTER 34.04 RCW TO
APPEAL SUCH DECISIONS. ALL HYDRAULIC PROJECT APPROVALS ISSUED
PURSUANT TO RCW 75.20.103 MAY BE MODIFIED BY THE DEPARTMENT OF
FISHERIES OR DEPARTMENT OF WILDLIFE DUE TO CHANGED CONDITIONS AFTER
CONSULTATION WITH THE PERMITTEE: PROVIDED HOWEVER, THAT SUCH
MODIFICATIONS SHALL BE SUBJECT TO APPEAL TO THE HYDRAULIC APPEALS
BOARD ESTABLISHED IN RCW 75.20.130.
THIS APPROVAL PERTAINS ONLY TO THE PROVISIONS OF THE FISHERIES AND
WILDLIFE CODES. ADDITIONAL AUTHORIZATION FROM OTHER PUBLIC AGENCIES
MAY BE NECESSARY FOR THIS PROJECT.
Appeals - General Information
If you wish to appeal denial or conditions of an HPA, there are informal
and formal appeal processes available.
A.Informal Appeals - An informal appeal (WAC 220-110-340) consists of
contacting the Regional Habitat Manager and discussing your concerns.
Most problems are resolved at this level, but if not, you may elevate
your concerns to the Chief of the Habitat Management Division in Olympia.
The Habitat Management Division Chief.s decision shall be approved or
disapproved by the Director or designee. If you are not satisfied with
the results of this informal appeal, a formal appeal may be filed.
B.Formal Appeals - 1) For all civil penalty appeals and for other HPA
appeals which are not associated with irrigation or stockwatering
diversions, a written appeal request must be filed with the department
that issued or denied the approval or levied the civil penalty you are
appealing (WAC 220-110-350).
2) For appeals of denial or conditions of an HPA associated with
irrigation or stock watering diversions other than civil penalty
appeals, a written appeal request must be filed with the Hydraulic
Appeals BoardperWAC- 259-04-: -The mailing address of -the -Appeals -Board
is: Environmental Hearings Office, Building Two -Rowe Six, Lacey,
Washington 98504; Telephone 206/459-6327.
3) Failure to appeal within 30 days of the date of action you are appealing
results in forfeiture of all appeal rights.