Loading...
HomeMy WebLinkAboutPre-design Workshop Meeting #3 Agenda with JD Commentsr G D5PvC<»Tffo ® > PutikJ^k^LlJ' City of Renton Well 5A Water Treatment Improvements - Pre-design Workshop Meeting #3 - April 13, 2007 Agenda Attendees: 1. 2. 3. 4. 5. Workshop Objectives L. 1^5^5513 Determine preferred scheme for disposal of process waste streams- ^ Determine treated water pump sizes and configuration Review the preliminary P&IDs Determine the preferred layout for the treatment building Review the preliminary stormwater control plan Review the preliminary site plan Process Waste Streams Disposal ~'• hfl S'iKi\OOy/ Backwash water recovery and disposal fa,, 5.5 Treated water disposal 1 Domestic sanitary waste and misc. gray water ^ Finished Water Pumps / 1 Full redundancy ^ (^v^^pumps( z v^^pumi ItFCh - PoviSk, js PoojL ? VFDs Preliminary P&IDs — Lt'j i. Need to finalize P&IDs for fluoride and AquaMag Tom Reid to review 'reatment Building Layout and Code Requirements Layout configuration Occupancy ratings for IBC compliance Building floor elevation Architectural considerations Structural considerations Preliminary Stormwater Control Plan jc? 7. Preliminary Site Layout 8. Schedule iA i'fZ)IPMJ- Pff -Vn ,, a .' r^a / C3 C: V P W w o r k i n g \ S E A \ c l m s 8 3 1 9 3 \ 0 0 C 0 D l . i J w B . OD C O D l , 4/ 1 1 / 2 0 0 7 2: 4 4 : 2 6 PM . mn a s a m a t tM Cn *r r oc f %7 €c T ■o C9 I T C c u ii ! fo g 2 2^ : 1 3 I. j Is i E is 5 z "n ff l r t? , 10 8 T H A AV E SE ^ vn V h9 > ^ ^71 Ti r o- ^ fi i 7^ (T ^ 5 \J \ (0 ^ C3 . ^ ^ ?o r F x< vi S- A ■p r>1/5' 7 jO <r ?D © 0 0 s s I 65'-4"14'-8" t T— CD APPROX l/16"=1'-0 d a o a o CHLORINE CONTACT BASIN BACKWASH BASIN a -p S3 CO KR Kennedy/Jenks Consultants City of Renton Renton Well 5A Possible Building Layout DATE March, 2007 \ P«vi^Li5 P«o|.5 ^ -^OP Do Vf V Rftv flOj ff«ON/i<?sr ?J^AC I fri-fi^G> 100'-0" MECH. ROOM CHEMICAL [J AREA o Q WELL PUMP/BLOWER ROOMJfS"Ti^oT )T STANDBY GENERATOR -1ATK DUCTOR CONTROL ROOM Zl PIPE GALLERY EXTERIOR FILTERS GS ^ GAG ELECT. ROOM -^<5, BACKWASH PUMPS/STORAGE <p - lOri N^TSSiS^-S APPROX 1/16 =1-0 Kennedy/Jenks Consultants City of Renton Renton Weil 5A Possible Building Layout March, 2007 SKYLIGHT PREFINISHED A METAL/ROOFIN EAST ELEVATION rx'Ttc'cirxniex: CMU WALLS NORTH ELEVATION APPROX l/l6"=l'-0" Kennedy/Jenks Consultants City of Renton Renton Well 5A Elevations Alternate A April, 2007 A2 WEST ELEVATION SOUTH ELEVATION APPROX l/l6"=l'-0" ¥D3. Kennedy/Jenks Consultants City of Renton Renton Well 5A Elevations Alternate A April, 2007 A3 GRADE / DESIGN GROUND WATER ELEV BAGKWASH BASIN GHLORINE GONTACT BASIN GHLORINE GONTAGT BASIN GHLORINE GONTAGT BASIN 10-0 JtH fiH. ' >1 /-\" 10-10 GS EILTER 17-6" P PE GALLERY GHEM GAL AREA 12'-0" Kennedy/Jenks Consultants City of Renton Renton Well 5A Structural Transverse Section (Alt. B) April, 2007 S1 100-0 12'-8"17'-4"13'-4" MECH ROOMCHEMICAL ^ AREA ^PUMP/BLOWER ROOM AIR EDUCTOR STANDBY GENERATOR Ci U> f c=' / vv. PIPE GALLERY CONTROL ROOM e)^RI0RnLTER5 ELECT. ROOM APPROX 1/16 =1 -0 i 51?^^City of Renton Renton Well 5A Architectural Building Plan April, 2007Kennedy/Jenks Consultants FIGURE GRADE aooR EL-245.B0 TTTTTTt:' OVERaOW Ei:=243 PLACE BENTONRE GRClfT SEAL COLOR UNDER SLAB EXCAVATION SECTION SCALE; 1°-20'H. T^lOV I ~ I EDGE OF NEW BUILDING iWALL IN FRONT —12'(» OVERFLOW IE=241.5p (TYP) a-2[40.50 CTYP ^ RETAINING WALL ■—IE=237.V8 12" OUT a=234.3D 12" OUTFALL £-238.50tOVERaOW IE-234.50 1 a-23B.80 •—IE-236.98 12" IN £-236.88 12" OUT PROPOSED GRADE PROPOSED AIR GAP ANDSTORM DRAIN SECTION ^ SCALE: 1"-2a'H. T-IOV I ~ 1 FG EL=241.3241.50 SCHED 40 SS SUPPORT PIPING FROM WALL (2) PLACES RIM-24a.S0 SEE STORM DWGS REF. SEE STRUC1URALS DRAWING FF EL=231.5± •12" CSTC WSDOT 9-03.9 (3) © 9551 ASTW D1557 MODIRED AIR GAP STRUCTURE SECTIONSCALE: NTS I 7 I KR PROJECT MANAGER Greg Plerson —Planning/Building/Public Works Dept. Renton City Hall- 5lh FloorCITY OF 1055 South Grady Way RENTON Renton. WA BB005 Renton Well 5A Water Treatment Facility SITE SECTIONS AND DETAILS Daaign J. C. EAST CAD M. A. NAGAMATSU Q 1" 2"FILENAME 00C0Q2.dwg DWG J.QQ2 ISSUE DATE DESCRIPTION Contract No. PRDJECT NUMBER DOaOOOOOOOxxxxx 1 BFiES 01/11/ 1 SCALE 1"=2Q'H. r=iov SHEET X |OFxx SKYLIGHT r:zJ?REFiNlSHED(f^ETAL ROOFIN^ CMU WALLS EAST ELEVATION ;C_L NORTH ELEVATION APPROX l7i6"=l'-0" Kennedy/Jenks Consultants City of Renton Renton Well 5A Elevations Alternate B April, 2007 FIGURE A4 WEST ELEVATION SOUTH ELEVATION 16 APPR0XT716"=1'-0" Kennedy/Jenks Consultants City of Renton Renton Well 5A Elevations Alternate B April, 2007 A5