Loading...
HomeMy WebLinkAboutPre-design Workshop Meeting #2 Agenda with JD CommentsCity of Renton Well 5A Water Treatment Improvements - Pre-design Workshop Meeting #2 - February 27, 2007 Agenda Attendees: 1. Workshop Objectives • Determine most appropriate / preferred method of chlorination • Establish / confirm standby generator requirements • Determine most appropriate / preferred enclosure configuration for the treatment vessels • Discuss treatment building layout options 2. Method of Chlorination Commercial (12.5%) hypochlorite On-site hypochlorite generation Ch6 3. Standby Generator Mobile unit, ~500 kW in size Enclosure requirements and considerations 4. Treatment Vessels Enclosure Configuration Number of vessels and sizes Inside of treatment building - c-orrtpletely^ndosed Outside of treatment building - surrounded by secure screen walls Treatment Building Layout General orientation on the site Access and security requirements Height considerations Architectural features Next Steps Items needing follow-up for key decisions (if any) Next workshop - time and main topics Jt f VT 4, ^ \