HomeMy WebLinkAboutPre-design Workshop Meeting #2 Agenda with JD CommentsCity of Renton
Well 5A Water Treatment Improvements - Pre-design
Workshop Meeting #2 - February 27, 2007
Agenda
Attendees:
1. Workshop Objectives
• Determine most appropriate / preferred method of chlorination
• Establish / confirm standby generator requirements
• Determine most appropriate / preferred enclosure configuration for the
treatment vessels
• Discuss treatment building layout options
2. Method of Chlorination
Commercial (12.5%) hypochlorite
On-site hypochlorite generation Ch6
3. Standby Generator
Mobile unit, ~500 kW in size
Enclosure requirements and considerations
4. Treatment Vessels Enclosure Configuration
Number of vessels and sizes
Inside of treatment building - c-orrtpletely^ndosed
Outside of treatment building - surrounded by secure screen walls
Treatment Building Layout
General orientation on the site
Access and security requirements
Height considerations
Architectural features
Next Steps
Items needing follow-up for key decisions (if any)
Next workshop - time and main topics
Jt f
VT
4, ^
\