HomeMy WebLinkAboutAddendum - 1UTB 1296 AMENDMENT No. 1 Utility Construction Agreement Work by WSDOT -City Cost CAG-19-294, Adden #1-24 This Amendment No. 1 is entered into between the Washington State Department of Transportation (WSDOT) and the City of Renton (CITY): collectively referred to as the "Parties" and individually referred as the "Party". A.The Parties entered into Utility Construction Agreement UTB 1296 on October 22, 2019 which provided for scope of work (Work) be included in the 1-405 Renton to Bellevue Corridor Widening and Express Toll Lanes Project (Project). B.WSDOT executed Contract 9242 with a Design-Builder to design and construct the Project, that includes the Work. WSDOT agrees that the Work shall be designed and constructed consistent with Contract 9242, Project Request for Proposal (RFP), first published on January 7, 2019 and all published addendums. C.During the Project design review by the Parties, the Design-Builder proposed a change to the UTB 1296 scope of Work in Contract 9242. The CITY and the Design-Builder agreed to the change in the Contract 9242 scope of Work in a Letter dated July 24, 2021 and WSDOT agreed to proceed with a change order. The Parties worked with the Design-Builder and agreed to the City of Renton Water Main Change Order (CO 138). WSDOT signed CO 138 with the Design-Builder on December 15, 2023. D.The Parties determined additional changes were necessary as related the Work under this Agreement and worked with the Design-Builder to develop the Renton Water UI 1541 Change Order (CO 89). The CITY agreed to CO 89 added Work in writing on August 9, 2022 and WSDOT signed CO 89 with the Design-Builder on March 16, 2023. E.It is necessary to amend UTB 1296 to reflect CO 138 and CO 89 terms agreed to by the Parties. Now therefore, pursuant to Revised Code of Washington (RCW) 47.01.210 and chapter 47.44 and in consideration of the terms, conditions, covenants and performances contained herein and above as if fully set forth below, as well as attached Exhibit A Attachment 2.1, Exhibit B1, Exhibits C1-C8, Exhibit D and Exhibit E, which are incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: 1.The dollar amount of $366,500 in "Estimated Agreement Amount" and "CITY Share" in the table on Page 1 of UTB 1296, are hereby replaced with $796,678. 2.The terms under "Project Title/Location" in the table on Page 1 of UTB 1296, is hereby replaced in its entirety with the following: 1-405, Renton to Bellevue Widening and Express Toll Lanes MP 5.4 -Relocate 12-inch water mains in Houser Way N & Lake Washington Boulevard N UTB 1296 Amendment No. 1 Page 1 of 4 3/15/2024