HomeMy WebLinkAboutWalker ltr Denis Law Mayor City Clerk-Jason A.Seth,CMC March 6, 2018 John Walker Teutsch 1610 Broadmoor Dr. E. Seattle, WA 98112 Subject: Hearing Examiner's Final Decision RE: Merrill Gardens at Renton Addition (LUA-17-000827) Dear Mr. Walker: Enclosed please find the Hearing Examiner's Final Decision dated March 5, 2018. This document is immediately available: • Electronically online at the City of Renton City Clerk Division website at old.rentonwa.gov/cityclerk. Click the "Hearing Examiner Decisions" link on the right side of the screen located under the section titled, "Helpful Links." The Hearing Examiner Decisions are filed by year and then alphabetical order by project name. I can be reached at (425) 430-6510 or jseth@rentonwa.gov. Thank you. Sincerely, Jason A. Seth, CMC City Clerk cc: Hearing Examiner Matthew Herrera,Senior Planner Jennifer Henning, Planning Director Brianne Bannwarth, Development Engineering Manager Craig Burnell, Building Official Katie Buchl-Morales,Secretary,Planning Division Julia Medzegian,City Council Liaison 1055 South Grady Way,Renton,WA 98057 • (425)430-6510/Fax (425)430-6516 • rentonwa.gov 1 2 3 4 5 6 7 8 BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON 9 ) 10 RE: Merrill Gardens at Renton Addition ) FINAL DECISION 11 Site Plan and Street Modification 12 ) LUA17-000827, ECF, SA-H, MOD ) 13 ) ) 14 15 Summary 16 The applicant has applied for site plan approval, a parking modification and a street improvement 17 modification. The proposed project is an addition to the existing Merrill Gardens assisted living facility located at 104 Burnett Avenue S. in the Center Downtown zone. The proposed addition 18 would be six stories and would provide an additional 30 units as assisted living and 24 memory care units. There will also be common areas, exterior upper floor amenity spaces and ground floor 19 amenity spaces. An existing 11,657sf warehouse on site would be demolished. The applicant 20 requests a street modification from RMC 4-6-060 standards along Williams Avenue S. to maintain the existing curb line. The applicant has requested a parking standards modification from RMC 4-4- 21 080 to utilize the existing assisted living facility's 92-space parking garage in lieu of providing additional off-site parking. The site plan, parking modification and street improvement modification 22 are approved with conditions. 23 Testimony 24 25 Matt Herrera, Renton Senior Planner, summarized the Staff Report. In response to examiner 26 questions regarding the fact that on-site parking is restricted to employees and residents, Mr. Herrera responded that the City's parking standards for the proposal don't apply to guest parking, that on- SITE PLAN,PARKING MODIFICATION& STREET MODIFICATION 1 1 street parking is used for that purpose. The parking restricted to employees on the project site 2 complies with City parking standards. 3 In response to examiner questions, Shelly Thompson, applicant representative, responded that current 4 off street parking is open to guests but rarely used by guests. 5 Exhibits 6 The February 13, 2018 Staff Report Exhibits 1-22 identified at Section B of the Staff Report were 7 admitted into the record during the hearing. In addition, the following exhibits were admitted during the hearing. 8 Exhibit 23 City of Renton PowerPoint 9 Exhibit 24 City of Renton COR maps 10 Exhibit 25 Google aerial maps of project site Exhibit 26 2/13/18 Staff report 11 Findings of Fact 12 13 Procedural: 14 1. Applicant. MGP 47, LLC, as represented by John Walker of Teutsch Partners, 1610 15 Broadmoor Dr E, Seattle, WA 98112 16 2. Hearing. The Examiner held a hearing on the subject application on February 13, 2018 in the 17 City of Renton Council Chambers. 18 Substantive: 19 3. Project Description. The proposed project is an addition to the existing Merrill Gardens 20 assisted living facility located at 104 Burnett Avenue S. in the Center Downtown zone. The proposed 60,000sf addition would be six stories and would provide an additional 30 units as assisted living 21 and 24 memory care units. There will also be common areas, exterior upper floor amenity spaces and ground floor amenity spaces. The addition will front the Williams Avenue S. right of way, though no 22 public access will be provided on the ground floor of the addition. Primary access to the facility 23 would remain on the Burnett Ave S frontage with vehicle access within the public alley. Vehicle access to the site is provided via a mid-block alley accessed from S. Tobin St between Burnett Ave S 24 and Williams Ave S. The alley has an easterly return to Williams Ave S approximately 470-feet south of S Tobin St. An existing port cochere is also provided on the Burnett Ave S frontage. 25 Existing access would remain unchanged. 26 An existing 11,657sf warehouse on site would be demolished as would eight exiting vehicle parking SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 2 1 spaces. Two (2) non-significant trees would be removed. Additional mature trees and vegetation 2 would remain near and around the existing Merrill Gardens building. 3 The applicant has submitted a parking modification request to utilize the existing assisted living 4 facility's 92-space parking garage to accommodate the proposed building addition and thereby providing no new off-site parking with the application. 5 The applicant also submitted a street modification request to maintain the current curb line along the 6 Williams Ave S frontage. New public improvements include a new sidewalk, street trees, and fire hydrant along the property's Williams Ave S frontage. 8 The subject property is located within a High Seismic Hazard Area and the eastern portion of the site is within Wellhead Protection Zone 1. Approximately 1,000 cubic yards of material would be 9 excavated on site for footings and elevator pits. The City issued a SEPA MDNS on January 8, 2018 10 with two mitigation measures. The SEPA determination was not appealed. 11 The existing use at the site is an assisted living facility and warehouse space. The site is surrounded by Center Downtown (CD) zoned properties in Commercial Mixed Use designated areas. Properties 12 surrounding the subject are a mix of uses. To the north are office, duplex, single-family homes and a social service organization. To the east are single-family and multi-family homes and offices. To the 13 south are surface parking and warehouse/retail space. To the west are multi-family units and vacant 14 land. 15 4. Adequacy of Infrastructure/Public Services. The project will be served by adequate infrastructure and public services as follows: 16 17 A. Water and Sewer Service. The site is served by the City of Renton for all utilities. The plan as proposed will provide for adequate water service. There is an existing 12-inch 18 ductile iron water main in Williams Ave S that can deliver 5,300gpm. The existing 19 warehouse structure is served by a one-inch domestic water service line and 6-inch fire service line from the main in Williams Avenue S'. 20 21 The applicant proposes to have a separate domestic water service line from the existing Merrill Gardens building. The utility plan (Ex. 13) identifies a 3-inch domestic water 22 meter in a vault for the new addition. The domestic water service line is connected to the 23 existing 12-inch water main in Williams Avenue S. near the southern end of the addition. COR Std. Plan 320.4 defines the requirements for design and installation of the service 24 line and meter vault. The applicant proposes to have a separate fire service line from the 25 existing Merrill Gardens building. The utility plan identifies a 6-inch fire service line 26 The existing warehouse will be demolished. SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 3 1 connected to the existing 12-inch water main in Williams Avenue S. near the southern end 2 of the building addition. 3 Sewer service is provided by the City of Renton. The plan as proposed will provide for 4 adequate sewer service. There is an existing 8-inch ductile sewer main in Williams Ave S. 5 City mapping indicates three (3) 6-inch side sewers connected to this main along the property's frontage. 6 7 The applicant's utility plan identifies the reuse of two existing 6-inch side sewers along the project frontage. The plan calls for removal of the existing cleanouts in the sidewalk 8 for these side sewers and installation of new cleanouts at the same location. The plan then 9 shows new side sewers upstream of the new cleanout to the building. Reuse of the existing side sewers are permitted as they are PVC. However, reuse of existing side sewers is 10 subject to inspection of the side sewers in the field. 11 B. Fire and Police. Police and Fire protection are provided by the City of Renton. Adequate 12 services and facilities exist to service the proposed redevelopment provided the applicant 13 provides Code required improvements and pays the applicable fees. The 2018 Fire Impact 14 Fees are $718.56 per assisted living unit and$3.92 per square foot for medical care facility (Memory Care Units). Fire Impact Fees are due at the time of building permit issuance. 15 16 C. Drainage. Drainage from the site will be controlled via a new storm drain that connects to the City's existing system. There is an existing 8-inch storm drain along the eastern 17 frontage of Williams Avenue S. east of the site that flows from south to north. There is an 18 existing Type 1 catch basin located along the western frontage of Williams Avenue S. that captures right of way drainage in front of the proposed building and routes it to the 8-inch 19 storm drain referenced above. 20 A new 8-inch storm drain is proposed for the alley north of the addition as the existing 21 storm drain located in the parking lot north of the existing warehouse building will be 22 removed for construction of the addition. The new storm drain flows east to the existing 8- inch public storm drain in Williams Avenue S. Section 4.2.1.1 of the 2017 RSWDM 23 require new storm drains in public right of way to be 12-inches. A new 12-inch storm 24 drain connection is proposed from the building to an existing type 2 catch basin on the 8- inch storm drain in William Avenue S (COR Facility ID 166512). The applicant has also 25 proposed a proprietary green roof tray system on the landscape plan (Ex. 7) for areas 26 surrounding the rooftop amenity that should provide some flow control of roof drainage. SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 4 1 D. Parks/Open Space. City development standards do not require any set-asides for parks and 2 open space. The applicant must pay a Park Impact Fee at the time of building permit 3 issuance. The 2018 Park Impact Fee is $1,858.95. 4 E. Access. Access to the site would remain via the public alley abutting the subject property. 5 No changes to access or new curb cuts are proposed. The applicant submitted a street modification request. The street modification request would alter the cartway width of the 6 street section (per RMC 4-6-060) to a modified minor arterial street section that would 7 maintain pedestrian features of the street. The applicant proposes a new curb in the existing curb location. A 12-foot sidewalk with trees in tree grates is proposed directly 8 behind the curb line. A right of way dedication of 2.25-feet is proposed to accommodate 9 the full width of the 12-foot sidewalk. New curb, sidewalk, street trees, and all other frontage improvements along the Williams Avenue S. frontage would be designed and 10 installed in accordance with the City's adopted Downtown Streetscape Design Standards 11 and Guidelines (Ex. 22). 12 F. Transit and Bicycles. Access to the transit center located approximately one (1) block 13 south on S. 2nd and Burnett Ave S is provided via public sidewalk and the applicant provides van and town car services for residents. Per RMC 4-4-080F.11.a bicycle parking 14 spaces are required at 10% of the number of required off-street parking spaces. The 15 applicant has proposed on-street bicycle parking to meet Downtown Streetscape 16 Standards, however no new bicycle parking meeting off-street standards is proposed or evidence provided that existing off-street bicycle parking is already located in the Merrill 17 Gardens building. A condition of approval will require the applicant to provide details of 18 off-street bicycle parking (existing or proposed) for review and approval by the Current Planning Project Manager prior to building permit approval or request a formal 19 modification from the minimum bicycle parking requirements per RMC 4-9-250D2 prior 20 to building permit approval. 21 G. Parking. The subject property currently contains 92 structured parking spaces and eight(8) 22 surface parking spaces. The surface parking spaces would be removed to accommodate the proposed building addition. The 92 structured parking spaces are located on the ground 23 floor of the existing Merrill Gardens building and accessed via the abutting alley. The 24 applicant would provide one (1) bus parking space between the existing building and the proposed addition that would likely be obscured from public view by the addition's 25 location. 26 SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 5 1 Assisted living facilities are required to provide a minimum/maximum if one(1) space per 2 residential unit plus dedicated parking spaces for facility fleet vehicles. The memory care 3 units (convalescent center) are required to provide a minimum/maximum of one (1) space for every two (2) employees plus one (1) space for every three (3) beds (RMC 4-4- 4 080(F)(10)). Per RMC 4-4-080(B)(1)(a)(ii), only the area exceeding the area of the 5 original structure shall be used to calculate required parking for building additions within the Center Downtown zone. The applicant has requested a parking modification to provide 6 no additional off-street parking with the proposed addition, but instead utilize the existing 7 parking garage's excess capacity to satisfy the parking demand. See FOF No. 5M for a discussion of the proposed parking impacts. 8 9 5. Adverse Impacts. There are no significant adverse impacts associated with the project. Adequate infrastructure serves the site as determined in Finding of Fact No. 4. The SEPA MDNS 10 mitigation measures in the Environmental Report(Ex. 21) are adopted as Conditions of Approval. All other adverse impacts discernible from the record are also fully mitigated. Impacts are more 11 specifically addressed as follows: 12 A. Structure Placement and Scale. As conditioned, the structure placement and scale are not 13 expected to create undue adverse impact on the adjacent residences. The building addition provides privacy and noise reduction as it is stepped back from the existing Merrill 14 Gardens building. The residential/memory care units will be elevated from the street. The 15 step back also provides solar exposure between the addition and the existing structure. Storefront glazing and weather protection provide for an improved pedestrian environment 16 over the existing conditions of the surface parking and a windowless warehouse. The new addition will abut adjacent commercial and multi-family developments along the Williams 17 Avenue S. frontage. Though the new addition will be significantly taller than adjacent structures, the pedestrian scale landscaping and window treatment will improve the 18 existing streetscape from the perspective of the ground level and will provide similar 19 massing to the existing structure. 20 B. Views. Upper story views from adjacent properties to Lake Washington should be maintained following construction of the building addition. No obstruction of other 21 existing views of natural features are anticipated. 22 Existing view corridors should not be impacted.New views to Lake Washington, Cascade 23 and Olympic mountain ranges, and Seattle and Bellevue skylines may be possible from the upper stories and roof top of the building addition. 24 25 C. Lighting. Exterior lighting would be provided via sconces on the building addition storefront and new public street lighting would also be provided. Excessive brightness or 26 glare offsite is not anticipated with the sconce style fixtures. SITE PLAN, PARKING MODIFICATION & STREET MODIFICATION 6 1 Further details are needed to ensure weather protection and ornamental lighting meet 2 design intent. A condition of approval will require the applicant to provide cut-sheet details of the proposed ornamental lighting sconces located near the building's entrance 3 and along the street façade with the building permit application. The ornamental lighting 4 fixtures shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 5 D. Building Entries. The building addition's entry is clearly marked as it is recessed along 6 the street façade. A metal canopy provides weather protection and is approximately 12- 7 feet above the ground elevation. Sconces are provided on the north and south side of the recessed entrance. Planters and foundational landscaping are provided. 8 Further details are needed to ensure weather protection and ornamental lighting meet 9 design intent. A condition of approval will require the applicant to provide specifications 10 for the metal canopy that confirms the weather protection extends at least 4.5-feet from the building's façade. The specifications shall be provided with the building permit 11 application for review and approval by the Current Planning Project Manager prior to approval. 12 E. Ground Level Details. Ground level windows are proposed to contain clear glazing. 13 However, typical storefront activities as it relates to retail would not occur as the space 14 would be used as community room and fitness center space. To maintain the appearance of a storefront within the property's Downtown Business District Overlay and meet the 15 ground level detail intent of ensuring that all sides of a building within near or distant public view have visual interest, a condition of approval will require the applicant to 16 maintain visual accessibility along the ground level during typical business and daytime 17 hours. Between the hours of 8am and 7pm storefront windows shall not be covered with blinds or other visual obstructions. 18 Additionally, as shown on the east elevation along Williams Ave S frontage (Ex. 8), a 19 blank wall is located on the southern portion of the ground floor façade greater than six (6) 20 feet in height and 15-feet in length where the water/fire room (Ex. 6) is located. The elevation plan indicates the applicant proposes a metal green screen to be located in this 21 area. A condition of approval will require the applicant to provide an alternative method to treat the blank wall as the landscape plan does not provide the vegetation suitable for the 22 green screen and that it is unlikely a climbing species would thrive in this location due to 23 the overhead weather protection and limited natural light the plant would receive. The revised blank wall treatment may include but is not limited to artwork, clerestory glazing, 24 aesthetically improved door, and additional architectural detailing. The revised blank wall treatment shall be shown on elevation plan and submitted with the building permit 25 application for review and approval by the Current Planning Project Manager prior to permit issuance. 26 SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 7 1 F. Building Materials. The building contains a combination of brick, large storefront 2 windows, and fiber cement lap siding and trim. The existing Merrill Gardens building contains similar material variations with the addition of panel siding resulting in three (3) 3 material variations; brick, lap, and panel. To maintain consistency and provide a level of 4 material variation that is commensurate with the size and scale of the addition, a condition of approval will require the applicant to submit revised elevation sheets with the building 5 permit application that incorporates at least one (1) additional cladding material. The revised elevations shall be reviewed and approved by the Current Planning Project 6 Manager prior to building permit approval. To further ensure the exterior cladding is made 7 from quality materials, a condition of approval will require the applicant to submit a materials board providing sample materials and colors for the building exterior cladding. 8 The materials board shall be submitted with the building permit application for review and approval by the Current Planning Project Manager prior to permit approval. 9 10 G. Screening. The applicant did not provide sufficient details of roof or surface mounted equipment and/or screening identified for such equipment with the land use application. 11 Therefore, a condition of approval will require the applicant to submit a separate detailed plan set identifying the location and screening provided for all surface and roof top 12 utility/mechanical equipment with the building permit application. The plan shall be reviewed and approved by the Current Planning Project Manager prior to building permit 13 approval. 14 H. Fencing and Retaining Walls. The applicant's landscape plan(Ex. 7) identifies an eight(8) 15 foot tall fence located on the edge of the Level 2 memory care deck and Level 3 transitional care deck. The fencing provides safety and privacy for residents of the 16 development that require a heightened level of care. A condition of approval will require 17 the applicant to submit fencing details with the building permit application. Fencing surrounding the exterior deck spaces shall be made of high quality material that 18 complements the architecture of the building. Fencing details shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 19 20 I. Refuse and Recycling. The applicant has proposed to utilize the existing Merrill Gardens refuse and recycling deposit area within the existing buildings parking garage to 21 accommodate the needs of the building addition. However, details of the existing area and its potential capacity for additional usage were not provided with the land use application. 22 Therefore, a condition of approval will require the applicant to submit detailed specifications of the existing refuse and recycling area to confirm compliance with the 23 code. The specifications shall be reviewed and approved by the Current Planning Project 24 Manager prior to building permit approval. 25 J. Natural Features and Landscaping. As noted in FOF No. 3, limited cutting and filling is proposed on the site as it is virtually flat. Existing vegetation on this portion of the subject 26 property will be removed including two non-significant trees, however the development. SITE PLAN, PARKING MODIFICATION & STREET MODIFICATION 8 1 will result in additional street trees and new foundation landscaping along the building on 2 the western foundation and along the Williams Ave S frontage. Elevated plantings on decks and the roof top is also proposed. Landscaping on the existing Merrill Gardens 3 property that includes cedar, rhododendron, and flowering cherry trees along with 4 numerous shrubs and groundcover plantings would remain. 5 The applicant's submitted landscape plan (Ex.7) provides for the preservation of one (1) existing street tree and planting three (3) new street trees in 4'x8' tree grates abutting the 6 sidewalk curb. The applicant's utility plan (Ex. 13) proposes a new fire hydrant 7 immediately abutting a new street tree. To maintain appropriate spacing between the fire hydrant assembly and street tree infrastructure, a condition of approval will require the 8 applicant to submit revised utility and landscape plans with the construction permit application that relocates the fire hydrant away from the current location near the 9 building's entrance and places it further south near the water/fire room. The revised plans 10 shall be reviewed and approved by the Current Planning Project Manager prior to construction permit issuance. 11 The existing street tree contains an obsolete 4'x4' tree grate no longer meeting the current 12 size or design standards. For aesthetic consistency, a condition of approval will require the applicant to replace the existing street tree grate with a grate matching the three (3) new 13 street trees that are required by the Downtown Streetscape Design Standards and 14 Guidelines. The replaced grate shall be shown on the final landscape plan submitted with the construction permit application to be reviewed and approved by the Current Planning 15 Project Manager prior to construction permit issuance. 16 The applicant proposes foundation level landscaping along the building's street side 17 frontage and planters located near the entry, which thereby improve the pedestrian experience along the sidewalk. Additional at-grade planting is located behind the building 18 along the west façade and creates potential for stormwater infiltration in an area that would otherwise be paved with asphalt. Planters are located on the second, third, and 19 rooftop levels providing trees, shrubs, and groundcover further enhancing the building's 20 amenity areas. The existing surface parking lot would be removed and not replaced; therefore, no parking related landscaping would be required. 21 The applicant would be required to submit a Detailed Landscape and Irrigation Plan with 22 the building permit submittal that provides location, size, quantity, planting details, and 23 other applicable items as set forth in the RMC 4-8-120 submittal requirements. 24 K. Traffic Impact. No significant increase in traffic is anticipated as a result of the project. The applicant submitted a Trip Generation and Parking Study memo prepared by Transpo 25 Group dated December 6, 2017 (Ex. 16). The memo provides Trip Generation data for the proposed 30 assisted living units and 24 memory care units. 54 dwelling units of this type 26 produce 10 AM peak hour trips and 14 PM peak hour trips. A traffic impact analysis is SITE PLAN,PARKING MODIFICATION& STREET MODIFICATION 9 1 only required when estimated vehicular traffic generated from a proposed development 2 exceeds 20 vehicles per hour in either the AM (6:00 — 9:00) or PM (3:00 — 6:00) peak periods. As the 20 vehicle per hour threshold is not triggered, no further traffic analysis is 3 required. City staff is in agreement with the trip generation findings of this memo and has 4 not required any further studies. 5 The proposal has passed the City's Traffic Concurrency Test per RMC 4-6-070.D (Ex. 6 17), which is based upon a test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, and future payment of 7 appropriate Transportation Impact Fees. 8 Increased traffic created by the development would be mitigated by payment of 9 transportation impact fees. Currently this fee is assessed at $1,464.90 per senior housing unit and $893.23 per nursing home bed. This fee increases each year and the applicable 10 fee is paid at the time of building permit issuance. 11 L. Stormwater. No impacts from stormwater are anticipated. The applicant submitted a 12 drainage plan and Technical Information Report (TIR) (Ex. 12 and 14) prepared by DCG dated December 1, 2017. The site is subject to the City's Peak Rate Flow Control Standard 13 (Existing Site Conditions). The site is in the Lower Cedar River drainage basin. The TIR 14 was completed in accordance with the standards found in the 2017 Renton Surface Water Design Manual (RSWDM). The project qualifies for full drainage review. All nine core 15 and six special requirements were addressed. The project proposes a net impervious area reduction of approximately 500 square feet. 16 17 The landscape plan (Ex. 7) identifies approximately 1,830sf of vegetated roof using a proprietary tray system. Vegetated roofs are not required to meet the small lot Best 18 Management Practices (BMP) requirements found in Section C.1.3.1. of the RSWDM. 19 Vegetated roofs should meet the design requirements found in Section C.2.15.1 if used towards meeting the on-site BMP requirements The TIR makes no mention of the 20 proposed vegetated roofs. The TIR claims exemptions from offsite analysis, flow control, 21 and water quality due to no change in rate, volume, duration, or location of discharges to and from the project site. The applicant must demonstrate compliance with the RSWDM 22 in the final TIR. 23 M. Parking Impacts. The applicant submitted a Trip Generation and Parking Summary dated 24 December 6, 2017 prepared by Tranpo Group (Exhibit 16). The analysis provided parking 25 demand data from January 2014 to October 2017 for the existing Merrill Gardens 154 unit assisted living facility. The peak number of spaces rented over this period was 34 and the 26 peak number of staff at the facility during any given time is 18 employees. The analysis SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 10 1 identifies a peak demand of 52 parking spaces during maximum staffing levels and the 2 highest level of historic resident parking that results in a parking rate of 0.34 spaces per 3 dwelling unit. 4 The analysis then extrapolates from the historical parking data to determine demand for 5 the proposed 30 assisted living unit and 24 memory care unit building expansion. The 30 assisted living units were assigned the existing facility's 0.34 per unit demand rate 6 resulting in approximately 11 spaces. Memory care parking was determined using only 7 staff demand as memory care residents will not be driving. The demand rate of 0.12 spaces per unit was used for memory care as this is the staff rate for the existing facility, resulting 8 in three (3) spaces. Using the historical data for the Merrill Gardens facility, the analysis 9 provides a parking count of 14 spaces that would be needed to accommodate the proposed building addition. 10 11 The applicant's analysis also provided data from the Institute of Transportation Engineers (ITE) Parking Generation (4th Edition, 2010). Parking demand for the assisted living units 12 was estimated at 0.41 spaces per dwelling unit or 12 spaces for the 30-unit addition. 13 Memory care demand for the staff was estimated at 0.14 spaces per memory care unit or 14 three (3) spaces for the 24 memory care units. The total ITE estimated demand for the addition would be 15 parking spaces. 15 16 Both historical data from the existing Merrill Gardens facility and data from the ITE result in similar parking demands for the proposed building addition of 14 and 15 parking 17 spaces, respectively. Data and analysis provided by the applicant's transportation engineer 18 results in a peak parking demand for the existing facility of 52 parking spaces with the proposed addition creating a need for 14-15 parking spaces or a total of 67 spaces for the 19 completed project. The existing parking garage capacity of 92 parking spaces should then 20 accommodate the demand for both the existing facility and proposed addition with a surplus of up to 25 spaces. 21 22 City staff received one (1) comment letter via email dated December 15, 2017 (Ex. 19) expressing concern regarding the lack of existing on-street parking along Williams Ave S 23 and potential additional impacts of no new off-street parking for the Merrill Gardens 24 proposal. The applicant provided a response to the comment letter on February 2, 2018 (Ex. 20). 25 26 Guests of the facility would not have access to the parking garage and would likely park on abutting surface streets or in the City's multi-level parking structure located V2 block to SITE PLAN,PARKING MODIFICATION& STREET MODIFICATION 11 1 the south at S 2nd St and Burnett Ave S. The applicant states that guests to the facility that 2 would park on the surrounding streets would likely prioritize Burnett Ave S and S Tobin 3 St as these streets are near the entrance. The building addition would not have a public entrance and therefore Williams Ave S would not be the most convenient area for short 4 term parking. 5 N. Critical Areas. No impacts to critical areas are anticipated. The site is within a High 6 Seismic Hazard Area. The applicant's geotechnical engineer recommends the use of 7 aggregate piers to support the building's spread footings. SEPA mitigation measures were included with the environmental threshold determination that the project comply with the 8 recommendations of the geotechnical report and any updated reports and that the 9 geotechnical engineer reviews the construction and building plans to verify the recommendations and specifications are consistent with the geotechnical report. The 10 SEPA mitigation measures are included as conditions of approval. 11 The far eastern portion of the property is located in a Wellhead Protection Zone 1 due to 12 its proximity to the City's source of drinking water. The site's proposed residential and 13 convalescent care use is not indicative of a type of use that would potentially harm the City's groundwater. The City's grading and excavation regulations require imported fill in 14 excess of 50 cubic yards within a Zone protection have a source statement certified by a 15 qualified professional or confirm the fill was obtained from a WDOT approved source. 16 Conclusions of Law 17 18 1. Authority. RMC 4-9-200(B)(2)(a) requires site plan review for all development in the CD 19 zone. RMC 4-9-200(D)(2)(b) defines this project as a Large Project Scale subject to review and approval by the hearing examiner The project will result in a cumulative of over 100 attached 20 residential units (RMC 4-9-200(D)(2)(b)(i) and a building in excess of four stories or sixty feet in 21 height (RMC 4-9-200(D)(2)(b)(iv)). The site plan is classified as a Type III permit by RMC 4-8- 080(G). RMC 4-8-080(G) classifies modifications, deviations and alternatives of various code 22 standards, such as the street standard modification request in this proposal, as Type I permits, which 23 are administratively approved by Staff with no required hearing. The applicant requested a parking modification to utilize the existing assisted living facility's parking garage and a street modification 24 to maintain the current curb line along Williams Ave. S. All three of the aforementioned permits have 25 been consolidated. RMC 4-8-080(C)(2) requires consolidated permits to each be processed under"the highest-number procedure." The site plan has the highest numbered review procedures, so all three 26 permits must be processed as Type III applications. As Type III applications, RMC 4-8-080(G) grants SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 12 1 the Examiner with the authority to hold a hearing and issue a final decision on them, subject to closed 2 record appeal to the City Council. 3 2. Zoning/Comprehensive Plan Designations. The subject is located in the Center Downtown 4 (CD) zone. The Comprehensive Plan Land Use Designation is Commercial Mixed Use (CMU). Overlay districts include: Design District A; Downtown Business District; and City Center Sign 5 Regulation Area. 6 3. Review Criteria. Site plan review standards are governed by RMC 4-9-200(E)(3). Street 7 modifications are governed by RMC 4-6-060(Q)(1). Parking modifications are governed by RMC 4- 8 4-080(K)(2). All applicable criteria are quoted below in italics and applied through corresponding conclusions of law. 9 Site Plan 10 11 RMC 4-9-200(E)(3): Criteria: The Administrator or designee must find a proposed project to be in compliance with the following: 12 a. Compliance and Consistency: Conformance with plans, policies, regulations and approvals, 13 including: 14 i. Comprehensive Plan: The Comprehensive Plan, its elements, goals, objectives, and 15 policies, especially those of the applicable land use designation; the Community Design Element; and any applicable adopted Neighborhood Plan; 16 ii. Applicable land use regulations; 17 18 iii. Relevant Planned Action Ordinance and Development Agreements; and 19 iv. Design Regulations: Intent and guidelines of the design regulations located in RMC 4-3- 100. 20 4. As discussed in Conclusion of Law No. 4, as conditioned, the proposal is consistent with the 21 City's comprehensive plan, as well as development and design regulations. The proposal does not 22 qualify as a Planned Action Ordinance. The Staff Report Findings of Fact and Conclusions of Law are adopted and incorporated by reference as if set forth in full. 23 24 RMC 4-9-200(E)(3)(b): Off-Site Impacts:Mitigation of impacts to surrounding properties and uses, including: 25 i. Structures:Restricting overscale structures and overconcentration of development on a 26 particular portion of the site; SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 13 - 1 ii. Circulation:Providing desirable transitions and linkages between uses, streets, walkways 2 and adjacent properties; 3 iii. Loading and Storage Areas:Locating, designing and screening storage areas, utilities, 4 rooftop equipment, loading areas, and refuse and recyclables to minimize views from surrounding properties; 5 iv. Views:Recognizing the public benefit and desirability of maintaining visual accessibility 6 to attractive natural features; 7 v. Landscaping: Using landscaping to provide transitions between development and 8 surrounding properties to reduce noise and glare, maintain privacy, and generally enhance the appearance of the project; and 9 10 vi. Lighting: Designing and/or placing exterior lighting and glazing in order to avoid excessive brightness or glare to adjacent properties and streets. 11 5. As described in FOF No. 5A, the addition will be set back from the main building. Ground 12 level landscaping, entries and window treatments will reduce the overall appearance of the bulk of the building. Additionally, there will be open space at the ground level to soften the appearance. No 13 driveways or curb cuts are proposed to service the addition; as such, no changes to vehicular 14 circulation are anticipate. Access to the existing parking garage is via the property's abutting alley. As noted in FOF No. 5B, no views are affected, though some may be created in the addition's upper 15 stories. Landscaping, as described in FOF No. 5J, will provide street trees in grates and other planting that will soften the streetscape. Deck and rooftop plantings will also be provided. Lighting will be 16 provided via sconces on the building addition storefront and new public street lighting would also be 17 provided. Excessive brightness or glare offsite is not anticipated with the sconce style fixtures. As proposed and conditioned, no off-site impacts are anticipated. 18 RMC 4-9-200(E)(3)(c): On-Site Impacts:Mitigation of impacts to the site, including: 19 20 i. Structure Placement:Provisions for privacy and noise reduction by building placement, spacing and orientation; 21 ii. Structure Scale: Consideration of the scale of proposed structures in relation to natural 22 characteristics, views and vistas, site amenities, sunlight,prevailing winds, and pedestrian 23 and vehicle needs; 24 iii. Natural Features:Protection of the natural landscape by retaining existing vegetation and soils, using topography to reduce undue cutting and filling, and limiting impervious 25 surfaces; and 26 SITE PLAN,PARKING MODIFICATION& STREET MODIFICATION 14 1 iv. Landscaping: Use of landscaping to soften the appearance of parking areas, to provide 2 shade and privacy where needed, to define and enhance open spaces, and generally to enhance the appearance of the project. Landscaping also includes the design and protection 3 of planting areas so that they are less susceptible to damage from vehicles or pedestrian 4 movements. 5 6. As noted above in COL No. 5, the structure placement and scale will provide for privacy and noise reduction by placing the addition a step back from the bulk of the existing building while 6 providing for ground level open space amenities. There are no existing natural features to protect and 7 cut and fill are minimal. As noted above in COL No. 5, landscaping will soften the appearance of the building along the street at ground level. Further plantings along decks and the rooftop will provide 8 enhancement of open spaces. Street trees will be located in grates to protect them. There is nothing in the record to reasonably suggest that the scale, spacing and orientation of the project could be 9 modified to provide for more privacy and noise reduction within the project site without unreasonably interfering with the objectives of the facility. The scale of the facility will not create any adverse on- 10 site impacts. In addition, there is nothing in the record to reasonably suggest that the on-site scale of 11 the project is incompatible with sunlight, prevailing winds or natural characteristics. The comments by Staff on this criterion, at Finding No. 22, are adopted by this reference and incorporated as if set 12 forth in full. This criterion is satisfied. 13 RMC 4-9-200(E)(3)(d):Access and Circulation:Safe and efficient access and circulation for all 14 users, including: 15 i. Location and Consolidation:Providing access points on side streets or frontage streets 16 rather than directly onto arterial streets and consolidation of ingress and egress points on the site and, when feasible, with adjacent properties; 17 ii. Internal Circulation:Promoting safety and efficiency of the internal circulation system, 18 including the location, design and dimensions of vehicular and pedestrian access points, 19 drives,parking, turnarounds, walkways, bikeways, and emergency access ways; 20 iii. Loading and Delivery:Separating loading and delivery areas from parking and pedestrian areas; 21 22 iv. Transit and Bicycles:Providing transit, carpools and bicycle facilities and access; and 23 v. Pedestrians: Providing safe and attractive pedestrian connections between parking areas, buildings,public sidewalks and adjacent properties. 24 25 7. The proposal provides for adequate access and circulation as required by the criterion above for the reasons identified in Finding of Fact No. 4E and 5K and 5M. 26 SITE PLAN, PARKING MODIFICATION & STREET MODIFICATION 15 1 RMC 4-9-200(E)(3)(e): Open Space: Incorporating open spaces to serve as distinctive project 2 focal points and to provide adequate areas for passive and active recreation by the occupants/users of the site. 3 8. Other than the required landscape buffers in setbacks, the City has not proposed incorporating 4 open space. However, the applicant will provide common areas, exterior upper floor amenity spaces 5 and ground floor amenity space on the Williams Avenue S. frontage. This criterion is satisfied. 6 RMC 4-9-200(E)(3)(f): Views and Public Access: When possible, providing view corridors to shorelines and Mt. Rainier, and incorporating public access to shorelines. 8 9. There are no view corridors to shorelines or Mt. Rainier affected by the proposal. As noted in FOF No. 5B, no views are affected,though some may be created in the addition's upper stories. 9 RMC 4-9-200(E)(3)(g): Natural Systems: Arranging project elements to protect existing natural 10 systems where applicable. 11 10. As described in FOF No. 5N, there are no anticipated impacts to the Wellhead Protection 12 Area. There are no other natural systems at the site or that would be affected by the proposal. 13 RMC 4-9-200(E)(3)(h): Services and Infrastructure: Making available public services and 14 facilities to accommodate the proposed use. 15 11. The project is served by adequate services and facilities as determined in Finding of Fact No. 16 4. 17 RMC 4-9-200(E)(3)(i): Phasing: Including a detailed sequencing plan with development phases and estimated time frames,for phased projects. 18 12. No further phasing is proposed. 19 Street Modification 20 21 RMC 4-9-250(A)(3): Modification: To modify a Code requirement when there are practical difficulties involved in carrying out the provisions of this Title when a special individual reason 22 makes the strict letter of this Code impractical. 23 RMC 4-9-250(D)(2): Decision Criteria: Whenever there are practical difficulties involved in 24 carrying out the provisions of this Title, the Department Administrator may grant modifications for individual cases provided he/she shall first find that a specific reason makes the strict letter of this 25 Code impractical, that the intent and purpose of the governing land use designation of the 26 Comprehensive Plan is met and that the modification is in conformity with the intent and purpose of this Code, and that such modification: • SITE PLAN,PARKING MODIFICATION& STREET MODIFICATION 16 1 a. Substantially implements the policy direction of the policies and objectives of the 2 Comprehensive Plan Land Use Element and the Community Design Element and the proposed modification is the minimum adjustment necessary to implement these policies and 3 objectives; 4 b. Will meet the objectives and safety, function, appearance, environmental protection and 5 maintainability intended by the Code requirements, based upon sound engineering judgment; 6 c. Will not be injurious to other property(ies) in the vicinity; 7 d. Conforms to the intent and purpose of the Code; 8 e. Can be shown to be justified and required for the use and situation intended; and 9 f Will not create adverse impacts to other property(ies) in the vicinity. 10 11 13. The applicant is requesting a modification from RMC 4-6-060 in order to modify the minor arterial street section classification for Williams Ave S. The code required minimum width for minor 12 arterials streets is 91-feet consisting of four (4) 11-foot vehicle lanes, two (2) 5-foot bike lanes with curb, gutter, and two (2) 12-foot wide sidewalks with street trees. The current right-of-way width for 13 Williams Ave S is 60-feet with approximately 39-feet of paved roadway and 10-foot sidewalks. The applicant has proposed a modified minor arterial street standard containing a right of way width of 14 approximately 65-feet. The modified street would contain two (2) 12-foot travel lanes, two (2) 8-foot 15 parking lanes, and 12-foot sidewalks with 0.5-foot curb with street trees in tree grates on both sides of the street. A right-of-way dedication of 2.25-feet is proposed to accommodate the full width of the 16 12-foot sidewalk. The existing curb line would remain in its current alignment with the modification. 17 City staff from transportation and planning divisions have reviewed the portion of Williams Avenue 18 S. adjacent to the site and support the modified minor arterial street section as maintaining the existing curb to curb pavement width is more suitable for this location of Williams Avenue S. 19 The modification complies with the City's Comprehensive Plan Land Use Element and Community 20 Design Element for the reasons described in FOF 26 of the Staff Report, herein adopted as if fully set 21 forth. Specifically, keeping the existing roadway width and widening the sidewalk, as proposed in the modification request, provides a compact, pedestrian oriented streetscape consistent with Goal L-B. 22 Maintaining the existing roadway section of two (2) parking lanes and two (2) travel lanes instead of the minor arterial standard of four(4)travel lanes reduces the transportation-related impact of growth, 23 also consistent with Goal L-B. The sidewalk and streetscape improvements as proposed are also 24 consistent with the City's Downtown Streetscape Design Standards and Guidelines. 25 The modification promotes safety by maintaining the existing curb cuts which are aligned with other curb cuts along this roadway section while providing increased pedestrian functionality by providing 26 a wider sidewalk than existing. There will be less environmental impact because there will be less disturbance wo the existing right of way.No impacts to other properties or the public health, safety or SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 17 1 welfare are anticipated as the existing roadway profile will be maintained with the exception of wider 2 sidewalks,which are beneficial. 3 The modification conforms to the intent and purpose of the code in that the wider roadway standards 4 for a minor arterial anticipate higher speeds and volumes. The actual function of the roadway in this location is much more neighborhood in scale. There are single family residences on both sides of the 5 street. Additionally, the Traffic Impact Report (Ex. 16) demonstrated that the anticipated project impact is negligible. This criterion is satisfied. 6 Parking Modification 7 8 RMC 4-9-250(A)(3): Modification: To mod a Code requirement when there are practical difficulties involved in carrying out the provisions of this Title when a special individual reason 9 makes the strict letter of this Code impractical. 10 RMC 4-9-250(D)(2): Decision Criteria: Whenever there are practical difficulties involved in 11 carrying out the provisions of this Title, the Department Administrator may grant modifications for 12 individual cases provided he/she shall first find that a specific reason makes the strict letter of this Code impractical, that the intent and purpose of the governing land use designation of the 13 Comprehensive Plan is met and that the modification is in conformity with the intent and purpose of this Code, and that such modification: 14 15 a. Substantially implements the policy direction of the policies and objectives of the Comprehensive Plan Land Use Element and the Community Design Element and the 16 proposed modification is the minimum adjustment necessary to implement these policies and 17 objectives; 18 b. Will meet the objectives and safety, function, appearance, environmental protection and maintainability intended by the Code requirements, based upon sound engineering judgment; 19 20 c. Will not be injurious to other property(ies) in the vicinity; 21 d. Conforms to the intent and purpose of the Code; 22 e. Can be shown to be justified and required for the use and situation intended; and 23 f Will not create adverse impacts to other property(ies) in the vicinity. 24 14. As discussed in Findings of Fact 4G and 5M, the applicant is requesting a modification to 25 street requirements of RMC 4-4-080(F)(10) in order to reduce the minimum required parking spaces for the proposed 30 assisted living units and 24 memory care units. The applicant wishes to use the 26 currently unused capacity in the existing parking garage. The modification complies with the City's Comprehensive Plan Land Use Element and Community Design Element for the reasons described in . SITE PLAN,PARKING MODIFICATION& STREET MODIFICATION 18 rrr.. 1 FOF 25 of the Staff Report, herein adopted as if fully set forth. As the applicant has demonstrated the 2 existing parking garage has sufficient capacity to accommodate more than the proposed parking impact and as visitors are likely to preferentially use parking near the exiting entry rather than on the 3 more challenged side along Williams Avenue South, the examiner finds the modification will meet 4 the objectives, safety, function, appearance, environmental protection and maintainability intended by the Code requirements. No impacts to other properties in the vicinity are anticipated as a result of the 5 modification. The proposed modification will meet the intent and purpose of the code by ensuring that adequate off-street parking exists while not creating an oversupply of underutilized spaces. The 6 modification can be justified because the typical user of the facility does not drive, and Merrill 7 Gardens provides private bus and town car transportation for its residents that reduces the need for vehicle ownership. This criterion is satisfied. 8 Decision 9 10 As conditioned below, the site plan, parking modification and street standards modification are approved subject to the following conditions: 11 1. The applicant shall comply with the following mitigation measures issued as part of the 12 Determination of Non-Significance Mitigated, dated January 8, 2018. 13 a. The project shall comply with the recommendations of the geotechnical report, prepared 14 by PanGeo Incorporated dated November 27, 2017, and future addenda. 15 b. The applicant's geotechnical engineer shall review the project's construction and 16 building permit plans to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a sealed letter stating that he/she has reviewed the 17 construction and building permit plans and in their opinion the plans and specifications meet the intent of the report(s). 18 2. The applicant shall submit revised utility and landscape plans with the construction 19 permit application that relocates the fire hydrant away from the current location near the 20 building's entrance and proposed street tree planting and places it further south near the water/fire room. The revised plans shall be reviewed and approved by the Current 21 Planning Project Manager prior to construction permit issuance. 22 3. The applicant shall replace the existing street tree grate along the property frontage with 23 a grate matching the three (3) new street trees as required by the Downtown Streetscape Design Standards and Guidelines. The replaced grate shall be shown on the final 24 landscape plan submitted with the construction permit application to be reviewed and approved by the Current Planning Project Manager prior to construction permit issuance. 25 26 4. The applicant shall submit a separate detailed plan set identifying the location and screening provided for all surface and roof top utility/mechanical equipment with the SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 19 Ark 1 building permit application. The plan shall be reviewed and approved by the Current 2 Planning Project Manager prior to building permit approval. 3 5. The applicant shall submit detailed specifications of the existing refuse and recycling 4 area to confirm compliance with the code. The specifications shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 5 6. The applicant shall submit fencing details with the building permit application. Fencing 6 surrounding the exterior deck spaces shall be made of high quality material that 7 complements the architecture of the building. Fencing details shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 8 7. The applicant shall provide specifications for the metal canopy that confirms the weather 9 protection extends at least 4.5-feet from the building's façade. The specifications shall be 10 provided with the building permit application for review and approval by the Current Planning Project Manager prior to approval. 11 8. The applicant shall provide cut-sheet details of the proposed ornamental lighting sconces 12 located near the building's entrance and along the street façade with the building permit application. The ornamental lighting fixtures shall be reviewed and approved by the 13 Current Planning Project Manager prior to building permit approval. 14 9. The applicant shall maintain visual accessibility along the ground level during typical 15 business and daytime hours. Between the hours of 8am and 7pm the ground floor storefront windows shall not be covered with blinds or other visual obstructions. 16 17 10. The applicant shall provide an alternative method to the metal green screen to treat the water/fire room exterior blank wall. The blank wall treatment may include but is not 18 limited to artwork, clerestory glazing, aesthetically improved door, and additional architectural detailing. The revised blank wall treatment shall be shown on the elevation 19 plan and submitted with the building permit application for review and approval by the 20 Current Planning Project Manager prior to building permit approval. 21 11. The applicant shall submit revised elevation sheets with the building permit application that incorporates at least one (1) additional cladding material. The revised elevations 22 shall be reviewed and approved by the Current Planning Project Manager prior to building permit approval. 23 24 12. The applicant shall submit a materials board providing sample materials and colors for the building's exterior cladding. The materials board shall be submitted with the building 25 permit application for review and approval by the Current Planning Project Manager prior to permit approval. 26 SITE PLAN, PARKING MODIFICATION & STREET MODIFICATION 20 1 13. The applicant shall submit revised elevations with the building permit application that 2 provides additional sconce lighting along the north storefront façade at intervals consistent with the Williams Ave S frontage. The additional lighting shall be reviewed 3 and approved by the Current Planning Project Manager prior to building permit approval. 4 14. The applicant shall provide details of off-street bicycle parking(existing or proposed) for 5 review and approval by the Current Planning Project Manager prior to building permit approval or request a formal modification from the minimum bicycle parking 6 requirements per RMC 4-9-250D2 prior to building permit approval. 7 DATED this 5th day of March, 2018. 8 9fir..--- - Phi A.Olbrechts 10 City of Renton Hearing Examiner 11 12 Appeal Right and Valuation Notices 13 14 As consolidated, RMC 4-8-080(G) classifies the applications subject to this decision as 15 consolidated as Type III applications subject to closed record appeal to the City of Renton City Council. Appeals of the hearing examiner's decision must be filed within fourteen (14) calendar 16 days from the date of the decision. A request for reconsideration to the hearing examiner may also be filed within this 14-day appeal period. 17 18 Affected property owners may request a change in valuation for property tax purposes notwithstanding any program of revaluation. 19 20 21 22 23 24 25 26 SITE PLAN, PARKING MODIFICATION& STREET MODIFICATION 21