HomeMy WebLinkAboutW-392501wi,
—Ek A
A KING COUNTY RIGHT OF WAY
PERMIT /S REQUIRED
FOR THIS PORTION OF WORK
MAINTAIN 30* MIN
COVER
3
EXISTING 36" SPU WATER
M�
PENTON, WA 9805 7 RENTON. WA 98057
PHONE (4251)251-0665 P�-YOIVE' (206)304-,3,'516)7
Cl TY OF SEA TTLE N 0 TE S
Contoct SPU Crew Chief Kothi 111mon at 206-402-2187 a minimum 72 hours prior to
any construction in proximity to SPU water mains.
The locations of the SPU waterline were osbuilted during the construction of /Ogs PAO
2001 Contractor potholed the SPU line to confirm vertical eAevotion and horizontat
locations. see profile view for the nota*/0 n of the tor,, of the 36 pipe. contractor to
utility and top elev, of the deeper utility and uqihere to SpU V#rtic-01 separation
requirements or refereto crossing detail on sheet I of j
U PIPIE City of Seattle SPU contact informotion
Pa j Hwang, P,E
Senior Civil Engineer Cathodic, Protection Progrorn
Engineering & Technical Services, Division
Project Delivery & Engineering Branch / Seattle Pob!i('Utilities
PO Box 34018 1 Seattle, WA 98724---4078
'Tel (206) J86-4198 ri Email'- PojHwoog@seott1e,9ov
CGNCRETE S00)
WA TER NO TE- S
I. Utility Covers in the restoration arp_o are, to be flush with the final paved surface,
May require, aqjustrnent of the cover�'-" following the Paving,
IL 5r; - 2
(A DA T
IAS—BIJIL7� NOTE:
IAS—SUILT" RASED ON A ACT UAL FIE-LD SURVEK
8K
SATE
BY TOOMA �--;IVGINEERS AN[) INFOPMA77ON SLIPPl,,/E-l� 470
Is' T ,DT
B)- CON TRAtTOR. Ry. 11A Tr