Loading...
HomeMy WebLinkAboutLUA16-000727_Report 1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT -------•Renton 8 DATE: PROJECT NUMBER: PROJECT NAME: PROJECT MANAGER: OWNER: APPLICANT: PROJECT LOCATION: PROJECT OESCRIPTION: SEC-TWN-R: LEGAL DESCRIPTION: (King County Assessor) PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT September 30, 2016 LUA16-000727, SME Springbrook Trail Repair Mona Davis, Senior Planner Mark Clement PO BOX 3707 MS lW-09 Seattle, WA 98124 Todd Black 1055 S Grady Way Renton, WA 98057 1301 SW 16TH ST The applicant is requesting approval of a Shoreline Exemption for the proposed renovation and repair of the Springbrook Trail where it commences approximately llO feet west of the intersection of Oakesdale Ave SW and SW 16th Street and proceeds south for 1,450 linear feet. The trail has numerous cracks and upheavals due to adjacent large tree root systems. The project will remove approximately 3,300 square feet of the 8.5-foot wide asphalt trail and replace it with compacted gravel and three inches of asphalt paving. The tree roots below the trail and up to a foot from the trail will be cleanly cut and removed as part of the renovation project. This project is considered to be a normal maintenance and repair of existing development. Work is anticipated to occur between October 3-14, 2016. No other permits are required for this work. SE24-23-4 TAX PARCEL 2423049022 AKA PCL 1 BOEING SUR V 85 P 27-27A REC #920ll69002 OAF -POR GL 14 & GL 8 STR 24-23-4 ANO POR NW 1/4 OF SEl/4 SD SEC 24 ANO POR NE 1/4 OF SE 1/4 SO SEC 24 OAF -BEG SW COR OF NE 1/4 OF SE 1/4 OF SO SEC 24 TH ALGE LN SO GL 14 S 00-56-17 W 68.96 FT TON LN OF HENRY A MEAOER'S DC "46 TH ALG SON LN N 87-13-57 W 1462.38 FT TH N 00-22-llE 1022.22 FT TO SLY R/W LN 1-405 TH ALG SLY R/W IN & S R/W LN SW 16TH ST FROM TAN BRNG N 62-52-57 E ALG ARC OF CRVTO R RAO 543.14 C/A 26-45-00 ARC LNGTH 253.58FTTH TAN TO PRECEDING CRV N 89-37-57 E 1079.63 FT TH TAN TO PREV COURSE ALG ARC CRVTO LRAO 1940.08FT C/A 02-52-00 97.07 FTTH TAN TO PREV CRV N 86-45-57 E 4.56 FT TH TAN TO PREV COURSE ALG ARC CRV TOR RAO Page 1 of 3 City of Re11to11 Deportmetlt of Commu11ity & Eco11omi Springbrook Troif Repoir lopment Certific Exemption from Shoreline Substontiol Developmetlt WA16-000727, SME WATER BODY: 1880.08 FTC/A 01-32-55 ARC LNGTH 50.81 FT TO NW COR OF PCL CONVEYED CITY OF RENTON UNDER AF# 8911030810 TH ALG BORY LAST SDPCL S 08-35-56 W 42.7 FT & N 79-13-48 E 58.77 FTTO W R/W WHITE RIVER DRAINAGE DITCH #1 SCO #32912 TH ALG SD W R/W LN S 00-25-33 E 47.35 FT TH 5 01-48-32 W 44.26 FT TH 5 07-14-42 E 48.28 FT TH S 19-25-58 E 66.5 FT TH S 20-05-30 E 40.14 FT TH S 30-55-50 E 51.32 FT TH S 39-53-54 E 32.19 FT TH S 30-06-16 E 76 04 FT TH S 27-12 E 34.56 FT TH S 31-19-50E 41.01 FT TH S 36-00-41 E 74.11 FT TH S 31-50-12 E 42.02 FT TH S 42-05-27 E 47.21 FTTH S 40-19-57 E 47.67 FTTH S45-25-52 E 59.32 FTTH S 50-37-12 E 39.63 FT TH S 51-16-55 E 68.16 FT TH S 81-36-50 E 62.75 FT TH N 86-59-20 E 94.92 FT TH S 55-04-26 E 53.26 FT TH S 48-31-30 E 45.85 FT TH S 39-25-24 E 49.84 FT TH S 36-49-16 E 46.76 FT TH S 44-53-21 E 48.07 FT TH S 29-35-20 E 35.41FTTH530-48-41 E 46.69 FT TH S 20-07-49 E 85.72 FT TH 5 24-18-59 E 68.77 FT TO S LN OF NE 1/4 OF SE 1/4 SD SEC 24 TH ALG LAST SD SL N 87-26-45W 918.35 FT POB LESS PORTION FOR SW 16TH ST & LESS PROJECT NO 97027-21, OAKESDALE AVE R/W RECORDING NO 9803250371 Springbrook Creek EXEMPTION JUSTIFICATION: An exemption from a Shoreline Management Substantial Development Permit is hereby Approved on the proposed project in accordance with RMC 4.9.190C 'Exemption from Permit System' and for the following reasons: Subsection 3: Maintenance and Repair: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements: a. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. b. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, e,cept where repair causes substantial adverse effects to the shoreline resource or environment. c. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including, but not limited to, its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment The proposed development is: Consistent with the policies of the Shoreline Management Act. Not Applicable to the guidelines of the Department of Ecology where no Master Program has been finally approved or adopted by the Department. Consistent with the City of Renton Shoreline Master Program. Cicy of Renton Department of Community & Econami Springbrook Trail Repair SIGNATURE & DATE OF DECISION: lopment ~ bJ ~w~(J_l Jennifer Henning);ianningOirector G Certific Exemption from Shoreline Substantial Development LUA16-0fJ0727, SME Date RECONSIDERATION: Within 14 days of the decision date, any party of record may request that the decision be reopened by the approval body. The approval body may modify his decision if material evidence not readily discoverable prior to the original decision is found or if he finds there was misrepresentation of fact. After review of the reconsideration request, if the approval body finds sufficient evidence to amend the original decision, there will be no further extension of the appeal period. Any person wishing to take further action must file a formal appeal within the 14 day appeal time frame. APPEALS: The administrative land use decision will become final if not appealed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057 on or before 5:00 pm, on October 14, 2016 (RCW 43.21.C075(3); WAC 197-11-680). RMC 4-8-110 governs appeals to the Hearing Examiner and additional information regarding the appeal process may be obtained from the Renton City Clerk's office, Renton City Hall -7th Floor, (425) 430-6510. EXPIRATION: Two (2) years from the date of decision (date signed) Attachments: Vicinity/Neighborhood Detail Map DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT --------~entoii e DATE: PROJECT NUMBER: PROJECT NAME: PROJECT MANAGER: OWNER: APPLICANT: PROJECT LOCATION: PROJECT DESCRIPTION: SEC-TWN-R: LEGAL DESCRIPTION: (King County Assessor) PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT September 30, 2016 LUA16-000727, SME Springbrook Trail Repair Mona Davis, Senior Planner Mark Clement PO BOX 3707 MS lW-09 Seattle, WA 98124 Todd Black 1055 S Grady Way Renton, WA 98057 1301 SW 16TH ST a CONCURfNCE DATE q-4 u~r "" ,.,,L/OATE ' 1:.....[L/ ~ "'-/J~t,~ ~-t)J?'"""~ <..\11~~ rtnt. ~,i~ .. ~. The applicant is requesting approval of a Shoreline Exemption for the proposed renovation and repair of the Springbrook Trail where it commences approximately 110 feet west of the intersection of Oakesdale Ave SW and SW 16th Street and proceeds south for 1,450 linear feet. The trail has numerous cracks and upheavals due to adjacent large tree root systems. The project will remove approximately 3,300 square feet of the 8.5-foot wide asphalt trail and replace it with compacted gravel and three inches of asphalt paving. The tree roots below the trail and up to a foot from the trail will be cleanly cut and removed as part of the renovation project. This project is considered to be a normal maintenance and repair of existing development. Work is anticipated to occur between October 3-14, 2016. No other permits are required for this work. 5E24-23-4 TAX PARCEL 2423049022 AKA PCL 1 BOEING SUR V 85 P 27·27A REC ;9201169002 OAF· POR GL 14 & GL 8 STR 24-23-4 AND POR NW 1/4 OF SEl/4 SD SEC 24 AND POR NE 1/4 OF SE 1/4 SD SEC 24 OAF· BEG SW COR OF NE 1/4 OF SE 1/4 OF SD SEC 24 TH ALGE LN SD GL 14 S OO-S6-17 W 68.96 FT TON LN OF HENRY A MEADER'S DC ;46 TH ALG SD N LN N 87·13·57 W 1462.38 FTTH N 00-22-llE 1022.22 FTTO SLY R/W LN 1-405 TH ALG SLY R/W IN & S R/W LN SW 16TH ST FROM TAN BRNG N 62-52-57 E ALG ARC OF CRVTO R RAD 543.14 C/A 26-45-00 ARC LNGTH 253.58FTIH TAN TO PRECEDING CRV N 89-37-57 E 1079.63 FTTH TAN TO PREV COURSE ALG ARC CRVTO LRAD 1940.0SFT C/A 02-52-00 97.07 FT TH TAN TO PREV CRV N 86-45-57 E 4.56 FT TH TAN TO PREV COURSE ALG ARC CRV TOR RAD Page 1 of3 City of Renton Deportment of Community & Econom,.lopment Springbrook Trail Repair Certifi, Exemption from Shoreline Substantial ~11elopment LUA16-000727, SME WATER BODY: 1880.08 FT C/AOl-32-55 ARC LNGTH 50.81 FTTO NW COR OF PCL CONVEYED CITY OF RENTON UNDER AF# 8911030810 TH ALG BORY LAST SDPCLS 08-35-56 W 42.7 FT & N 79-13-48 E 58.77 FTTO W R/W WHITE RIVER DRAINAGE DITCH #1 SCO #32912 TH ALG SD W R/W LN S 00-25-33 E 47.35 FT TH S 01-48-32 W 44.26 FT TH S 07-14-42 E 48.28 FT TH S 19-25-58 E 66.5 FT TH S 20-05-30 E 40.14 FT TH S 30-55-50 E 51.32 FT TH S 39-53-54 E 32.19 FT TH S 30-06-16 E 76 04 FT TH S 27-12 E 34.56 FT TH S 31-19-SOE 41.01 FT TH S 36-00-41 E 74.11 FT TH S 31-50-12 E 42.02 FT TH S 42-05-27 E 47.21 FT TH S 40-19-57 E 47.67 FT TH S 45-25-52 E 59.32 FT TH S 50-37-12 E 39.63 FT TH S 51-16-55 E 68.16 FT TH S 81-36-50 E 62.75 FT TH N 86-59-20 E 94.92 FT TH S 55-04-26 E 53.26 FT TH S 48-31-30 E 45.85 FT TH 5 39-25-24 E 49.84 FT TH S 36·49-16 E 46. 76 FT TH S 44-S3-21 E 48.07 FT TH S 29-35-20 E 35.41 FT TH S 30-48-41 E 46.69 FT TH S 20-07-49 E 85. 72 FT TH S 24-18-59 E 68.77 FT TO S LN OF NE 1/4 OF SE 1/4 SD SEC 24 TH ALG LAST SD SL N 87-26-45W 918.35 FT POB LESS PORTION FOR SW 16TH ST & LESS PROJECT NO 97027-21, OAKESDALE AVE R/W RECORDING NO 9803250371 Springbrook Creek EXEMPTION JUSTIFICATION: An exemption from a Shoreline Management Substantial Development Permit is hereby Approved on the proposed project in accordance with RMC 4.9.190C 'Exemption from Permit System' and for the following reasons: Subsection 3: Maintenance and Repair: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements: a. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. b. "Normal repair'' means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to the shoreline resource or environment. c. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including, but not limited to, its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment The proposed development is: Consistent with the policies of the Shoreline Management Act. Not Applicable to the guidelines of the Department of Ecology where no Master Program has been finally approved or adopted by the Department. Consistent with the City of Renton Shoreline Master Program. City of Renton LAND USE PERMIT MASTER APPLICATION PROPERTY OWNER(S) PROJECT INFORMATION NAME: The Boeing Company PROJECT OR DEVELOPMENT NAME: Springbrook Trail Repair ADDRESS: 1301 SW 16"' St PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE: Comer of Oakesdale Ave SW and SW 16"' St CITY: Renton ZIP: 98057 TELEPHONE NUMBER: 425-430-6600 KING COUNTY ASSESSOR'S ACCOUNT NUMBER($): 2423049022 APPLICANT (if other than owner) NAME: City of Renton EXISTING LAND USE(S): Incorporated City COMPANY (if applicable): PROPOSED LAND USE(S): EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: ADDRESS: 1055 S. Grady Way Employment Area CITY: ZIP: 98057 Renton PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable) EXISTING ZONING: TELEPHONE NUMBER: co CONTACT PERSON PROPOSED ZONING (if applicable): NAME: Todd P. Black SITE AREA (in square feet): 3,300 SF SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE COMPANY (if applicable): City of Renton DEDICATED: N/A SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: ADDRESS: SIA N/A PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET CITY: ZIP: ACRE (If applicable) NIA TELEPHONE NUMBER AND EMAIL ADDRESS: NUMBER OF PROPOSED LOTS (if applicable) N/A H:\PARKS PLANNlNG\Capital Project Coordinator\Projects A-Z\TRAII .S-various project'i\Spri.ngbrook Trail -Boeiog\Pennits\SpringbrookTrailRepair- LandUseApp.doc -I -03/l l • I , UlL / ! /\l\Q-, 2, ~ rT p-L}J ( V) / • 1425-430-6571 lblack@rentonwa.gov NUMBER OF NE~v DWELLING UNITS (if applicable): N/A H:\PARKS PLANNING\Capital Project Coordinator\Projects A-2\TRAlLS-various projects\Springbrook Trail -Boeing\Pcrmits\SpringbrookTrailRepair· LandUseApp.doc . 2 . 03/11 NUMBER OF EXISTING DWELLING UNITS (if applicable): PR..,JECT INFORMATION (continued) ~--'-----'-'-L-----------~ PROJECT VALUE: NIA $59,111.00 SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS (if applicable): N/A IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): SQUARE FOOTAGE OF EXISTING RESIDENTIAL BUILDINGS TO REMAIN (if applicable): N/A SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): N/A Q AQUIFIER PROTECTION AREA ONE Q AQUIFIER PROTECTION AREA TWO Q FLOOD HAZARD AREA 3,300 sq. SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): N/A NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (if applicable): NIA NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if applicable): NIA fl. Q GEOLOGIC HAZARD Q HABITAT CONSERVATION X SHORELINE STREAMS & LAKES a WETLANDS LEGAL DESCRIPTION OF PROPERTY ___ sq.ft. ___ sq.ft. 3,300 sq. ft. so. ft. tAttach lenal descrintion on seoarate sheet with the followlna information included\ SITUATE IN THE _SE QUARTER OF SECTION _24_, TOWNSHIP _23N_, RANGE _4E_, IN THE CITY OF RENTON, KING COUNTY, WASHINGTON AFFIDAVIT OF OWNERSHIP I, (Print Name/s) Tadd Black , declare under penalty of perjury under the laws of the State of Washington that I am (please check one) __ the current owner of the property involved in this application or _X_ the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing statements and answers herein contained and the information herewith are in all respects true and correct to the best of my knowledge and belief. Date Signature of Owner/Representative STATE OF WASHINGTON ) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that : -·.r ,:; ', (.I.Ck:.- signed this instrument and acknowledge it to be his/her/their free and voluntary act for the uses and purpose mentioned in the in!!:1~'-1 : 1 , .• : ... ~ ·-9• J '1;< ..:;."::. ~;4.t,.1·, ...... • l .. , ' ' c, -/ c.' 2-C I 1 : "<>~>;;~;;;;;· ·· .'"0,p' ---'-I....:....:._ I __ \O"'-_ _,,-,_ ~:: · ~\·' ., <t~4 -·,. 7~~ .,_(1 '"''f' ~·\ • • ' ,J. ,., / ~ J '·' .... -';; 1 ,:{J),i /.,:.. r :'. I Dated Notary Public in and for~ State of Washington Date -:,; -~ \ U:·, ... :-·· ,_:· ;.~ • ..::-..., Q A Vi --j we.:_("' ', ·:>. •,, B.. .. , ., J C, Notary (Pnnt): _ __,_1 =-'-)=-Vl.:..,.;,:LI...:...,:'':.....""· ·L...;,·....,c.;:_....,c ______ _ I; ~ 11;1 I "~ 1 • ....... ~. /.._ 11,\ ,.,, __ 1·11,,,,1· .• -,\..:·'~-~C· .. : ,,, ·/.. '"A"-'"'' "' I ··f'°r-J;,,•CI I~ tp, ~ · ·· ' ;o..,,-M'Y appointment expires: __ ..::(Oe::....:.._c....:£.,f.):....:c.!....J. __________ _ ;\\.\\\\\\\' H:\PARKS PLANNING\Capital Project Coord.inatot..Projects A-Z\TRAILS-various projects\Springbrook Trail -Boeing\Permits\SpringbrookTraiLRepair- l.andUseApp.doc -J -OYJ I Springbrook Trail@ Longacres Park None 0 256 0 128 256 Feet 'M3S _ 1984 _ Web _Men::ator_Auxiliary _ Sphere CityofR:eJf(Ofl ,fi Finance & IT Division Legend City and County Boundary ""'" [:J CilyofRentoo Addresses Parcels lnfonnatlon Technolog)' . GIS A:entooMapSupport@Rentonwa.gov 813112016 This map ·» a YSe< ger.erale·j statoc o.itp .. t fr·~ an Internet mapping site ant 1s :er reterer«1 on1y Oata layers that appear on tl'ls map rnay or may 1\Ct tie ao:.Jrate cucrent. cr otne<wcse rehat:le THIS MAP ISNOT TO BE USED FOR NAVIGATION SHORELINE EXEMPTION SUBMITIAL September 19, 2016 Project Name: Project Location: Project Size: Springbrook Trail Renovation Commences at 110 feet west of the intersection of Oakesdale Ave SW and SW 161h St and proceeds south 3,300 square feet Project Description: The existing portion of the Springbrook Trail which starts at the project location noted above and heads south for 1,450 linear feet has numerous cracks and upheavals due to adjacent large tree root systems. This project will remove approximately 3,300 square feet of the 8.5 foot wide asphalt trail, and replace it with compacted gravel and three inches of asphalt paving. The demolished trail material will be disposed of properly. The tree roots below the trail, and up to a foot from the trail edge, will be cleanly cut and removed. This project type is considered to be a normal maintenance or repair of existing structures or developments. Work is anticipated to occur between October 3, 2016 and October 14, 2016. No other permits are required for this work. The trail is a part of the paved Springbrook Trail, which intermittently connects the Black River Riparian Forest and SW 43rd Street. There are no special features of this site, and its location ranges from approximately ten feet above and five feet from the ordinary high water mark of Springbrook Creek under the Oakesdale Ave SW bridge, and between two to four feet above and a few feet from the ordinary high water mark of adjacent wetlands along one portion of the trail. The entire trail is shown as within the Critical Areas plan of the City of Renton's COR Maps. The trail is located within an easement on Boeing Aircraft property at Longacres Park. No trees will be removed, and there will no increase in the amount of impervious surfaces. Most of the trail renovation is within the 100 year special flood hazard area of the Springbrook Creek and wetlands. The total construction cost for this project is $59,111.49, including WSST. Submitted by: Todd Black, Parks Planning and Natural Resources Division SHORELINE TRACKING WORKSHEET City of Renton Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site? D Yes X No; If yes, fill out table below. If no see "Site Conditions" Section 2 below , ' What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard · Materials: ' Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, wood; Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials furtherer inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1" floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). N/A 3. If any part of the structure is within 100 ft. of the waterline, list its distance to the water. List each item separately and include buildings as well as hard surfaces like patios, parking areas, and decks. N/A . 1 . 09/16 4. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings should not be counted. Shrubs, English Ivy, Cottonwood Trees, Alder Trees. 5. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings should not be counted. N/A IN WATER AND OVER WATER STRUCTURES 6. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)? D Yes X No; If yes, fill out the table below. Describe the in and over water structures on your site Type Surface Area Light Penetrating Materials (e.g. dock, float, bridge, (in square feet, if (the percentage of the mooring pile, boat lift, etc.) applicable) surface area that is made of material that allows light to reach the water) Existing structures to remain Existing structures that will be removed Proposed structures . 2. 09/16