Loading...
HomeMy WebLinkAboutR-426807SECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M. 00 (.fl N 1 O I W I- VN♦ BEES W Z IN- Ii Q a I- U) W r N 1 n 0 I I� CV O CV cc O v L� 0 N CD I w w U) 0 CN 0 n GO / 0 DocuSign Envelope ID; 6EECF5B6-6G,2A-4E4A-8436-A317AA638878 ❑ocuSign Envelope IG: 6EEGF5B6-602A4E4A-B436-A317AA63S878 DocuSign Envelope IQ: 6EEGF5B6-602A-4E4A-B436-A317AA638878 � 3'•37, SEE NOTE 2.3 ROLL SPA DEPEND$ TYPE ANT STEEPNP: \ \' EDIMENT, ORGANIC MATTER. ND NATIVE SEEDS ARE APTURE D BEHIND THE ROLLS STRAW RDI-LS MUST BE PLACED ALONG SLOPE GONTOURS ADJACENT ROLLS SHALL TIGHTLY ASU7 NOTES: I. CONDITIONS OF 115E 1-1- INSTALL ON DISTURBED AREAS THAT REQUIRE IMFAED1A7E EROSION PROTECTION. 1Z USE ON SLOPES REQUIRING STABILIZATION UNTIL PERMANENT VEGETATION CAN &F ESTA13LI&. 1-3. CAN BE USED ALONG THE PERIMETER OF A PROJECT. AS A CHECK DAM 114 UNLINED DITCHES AND AROUND TEMPORARY STOCKPILES. 1.4. WATTLES CAN BE STAKED TO THE GROUND USING WILLOW CUTTINGS FOR ADDED REVEGETATION. 1.6. PALLING CAN OCCUR BENEATH AND BETWEEN WATTLES EF NOT PROPERLY ENTRENCHED- ALLOWING WATER TO PASS BELOW AND BETWEEN WATTLES 2. DESIGN AND INSTALLATION SPECIFICATHAS 2-1- IT IS CRITICAL THAT WATTLES ARE INSTALLED PERPENDICULAR TO THE FLOW OIRECTION AND PARALLEL TO THE SLOPE CONTOUR. 2-Z KAPJ40W tRENCHIES tiHOULD BE DUG ACROSS THE SLOPE, ON CONTOUR. TO A DEPTH OF a TO 9INCHE5 ON CLAY MLS AND SOBS wITH GRADUAL SLOPES ON LOOSE SOILS, STEEP SLOPES, AND DUMNi3 HIGH RAINFALL EVENTS. THE TRENCHES SHOULD BE OUG TO A nEPTH OF 51,07 II,ICJ-TES, OR iR TO 213 Or THE THICKNESS OF THE WATTLE 28. START CONSTRUCTION OF TRENCHES AND INSTALLING WATTLES FROM THE BASE OF THE SLOPE AND WORK UPHILL. EXCAVATED MATERIAL SHOULD BE SPREAD EVENLY ALONG THE UPHILL SLOPE AND COMPACTED USING HAND TAMPING OR OTHER METHOD, CONSTRUCT TRENCHES AT CONTOUR 1NTERVALS OF 3 TO 30 FEET APART DEPENDING ON THE STEEPNESS OF THE SLOPE, SOIL TYPE. AND RAINFALL. THE STEEPER THE SLOPE THE CLOSER TOGETHER THE TRENCHES SHOULD BE CONSTRUCTED VERTICAL DISTANCE BETWEEN WATTLES IS N07 TO EXCEED 1D FEET. 2-4. INSTALL THE WATTLES SNUGLY INTO THE TRENCHES AND ABUT TIGHTLY ENO TO END. DO NOT OVERLAP THE ENDS- 2 5. INSTALL STANCES AT EACH ENb aF THE WATTLE, AND AT 4 FOOT CENTERS ALONG TwE ENTIRE LENGTH OF THE WATTLE 2.6. IF REQUIRED. INSTALL PIM T HOLES FOR THE STAKES USING A STRAIGHT BAIT TO DRIVE HOLES THROUGH THE WATTLE AND INTO THE $OIL. 2 7, AT A MINIMUM, WOODEN STANES SHOULD BF APPR(WIMA.TELY 34 K 8+4 X 24114CHES WILLOW CUTTINGS OR 318-INCH REPAR CAN ALSO BE LIBEQ FOR STAKES 26. STAKES SHOULD -BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE, LEAVING 2 TO 9INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. 3. MAINTENANCE STANDARDS 3-1. INSPECT WATTLES PRIOR TQ FOR€CASTE➢ RAIN), DAILY DURING EXTENDED RAIN EVENTS, AFTER RAIN EVENTS, WEEKLY DURING THE WET SEASON. AND AT TWO WEEK INTERVALS AT ALL OTHER TIDIES OF THE YEAR 3.2. REPAIR OR REPLACE SPLIT, TORN. RAVELING, OR SLUMPING WATTLES 3.3. REMOVE SEDIMENT ACCUMULATK)NS WHEN EXCEEDING lit THE HEIGHT BETWEEN THE TOP OF THE WATTLE AND THE GROUND SURFACE UN LESS"Y RWESE NOT[13-E3RAWING ISNOTTO SCALE(NTS1 51'b- KAN - 213.40 f PUBLIC WORKS DEPARTMENT STRAIN WATTLES GAZ 9/28/2018 I nArl r10' MAX. CO , 2" r • -i-• 4 X POST DIA. NOTE: 8'-0" TALL FENCE UNLESS OTHERWISE NOTED. :45 AN 8' MIN. 8' MIN. MOVEABLE CONCRETE BLOCKS (TYP. ) CHAIN LINK FENCE JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS. OR EQUIVALENT TO ATTACH FABRIC TO POSTS 2'x2. 14 GAUGE WIRE, OR EQUNALENT, IF STANDARD STRENGTH FABRIC USED - FILTER FABRIC --I ------------ II G' MAX. 12">,"IN PAST SPACING MAY 9E tNCREASEO TO8' IF WIRE BACKING IS USED I I 47x4' MIN. TRENCH I BACKF ILL TRENCH WITH NATIVE SOIL 1 OR 314" TO 1.V2' WASHED GRAVEL 2'x4' WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.) NOTES: 1- CONNDIFIONS OF USE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS- 1.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTEXULE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE AOB )A$TM D1751 I 2D-100 SIEVE SIZE {B.FiB.4.15-) FOR SILT FILM 50-i00 SIEVE SIZE (D,3Q.-D,150" FOR OTHER FABRICS WATER PERMATTIVLTY OSTMI 54491) a.D2 SECT MINIMUM GRAB TENSILE STRENGTH (ASTM 046321 1N10 LBS. MIN. FOR EXTRA STRENGTH FABRIC 106 LBS. MIN. FOR STANDARD STRENGTH FABRIC GRAB TENSILE ELONGATION (ASTM 04532) OQ%MAX (WOVEN) uLTRAVIOLFT RESISTANCE IA5TM D43551 70%MIN. 2.2 STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE WIRE BACKING OR CLOSER POST SPACING MAYBE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCGE WARRANTS A 67ROIN5ER FENCE. 2.3. WHERE THE PI=NICE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1 V 2,4. IF ATYPICAL SILT FENCE IS USED, THE STANDARD 4'X4' TRENGS MAY BE RL_OUGED AS LONG AS THE BOTTOM B INCHES OF THE SILT FENCE FABRIC IS WELLBURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS DR UNDERMINE THE SILT FENCE 2.5. FILTER FASRIG FENCES SHALLBE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE. 3- MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIREO IMMEDIATELY. 3.2. IF CONCENTRATED FLDWS ARE EVIDENT UPHILL OF THE FENCE, THEY MOST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 3.3, IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FDR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAU9INC CHANNF1,LZATtCN OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLPrETHE FENCE OR REMOVE THE TRAPPED SEDIMENT. 3.4. .SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH. 3-5. IF THE F ILTER FABRIC KGECTEXT'ILE) HAS DETERIORATED OUE TO ULTRAVIOLET BREAKDOWN, FT SHALL BE REPLAULD- UNLESS 4't►[FRWI5E NOTT0. PRAWYM; IS NDt T4 SCALE [NTg1 STD, PLAN - 214.00 Vrn URIPUBLIC WORKS SILT FENCE PR 'atz�lzal$ DEPARTM ENT GAZ PATF :45 M EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL HE INCORPORATED IN THE ENGO 3ION AND SEDIMENT CONTROL (ESC) PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEAEAY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE EEC STANDARD PLAN NOTES. 1 SEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON. HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF FT IS REQUIRED FOR THE PROJECT- THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONETORING REPORTS PROVIDED TG ECOLOGY ASSOCIATED WITH THE CONSTRUCTLDP! STORMWATER GENERAL PERMIT. 3. THE ESC PLANT SET SHALL INCLUDE AN ESG CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS. AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLANS, SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D CF THE CI7Y OF RENTON SURFACE WATER DESIGN MANUAL {RENTON SWDMI PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING UMITS SHALL BE MAINTAINED BY THE APPLICANTIESC SUPERVLSOR FOR THE DURATION OF CONSTRUCTIQN- 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAYED AREAS ARE KEPT CLEAN AND TfiACK-OU7 TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY- OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS 4K THE SLATE. S, WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAI NS OR OPEN DITCHES. ON SITE PUMPING OF E)CCF;95 CONCRETE SHALL ONIY OCCUR IN DESIGNATED CQNCRErE WASHOUTAREAS. 7 ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING ANWIDR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING ANTIAaR CONSTRUCTION IS COMPLETEAND POTENTAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLE7W AND THE SITE HAS BEEN STAmuzED TO ENSURE POTENTIAL FOR ON -SITE ERCSIQN DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMEWr. ENHANCEMENT, AND REMOVAL OF EEC BMPS SHALL HE THE RESPONSIBILITY OF THE APPLICANT e. ANY HAZARDOUS MATERIALS OR UQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9- THE ESC BMPS DEPICTED ON THIS DRAWING ARE 1NTEN➢ED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITION 3, AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION- IT SHALL BE THE OBLIGATION AND RESPCNSIBWTY OF THE APPLICANT TO ADDRESS ANY NEW GONDFTIONS THAT MAYBE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FSC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NJEEDEII, To PROTECT ADJACENT PROPERTIES AND WATER PLIAL17Y OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL aF THIS PLAN IS FQR ESC ONLY. FT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NDR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMLYATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILTNES SHALL BE SUBMITTED TO THE CRY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EAPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (CCTOSER 1ST THROUGH APR IL 30TH) OR SE VEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER VTH) SHALL 9E IMMEDIATELY STABILIZED WITH THE APPROVED ESc COVER METHODS (E.G.. SMOING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIx D OF THE RENTON SWDM. 13. WET SEASON ESC REOUIREM ENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 36TH. UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTIAN, SHALL BE ADDRESSED WTHIN SEVEN (7) DAYS 15 THE E9C BMPS ON INACTIVE SITES SHALL FIE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, GA7CH BASIN INSERTS PER THE CRY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 50o FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY HTINOTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2A3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FAGIL1 Y LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AHD SMALL PROVIDE ADEQUATE STORAGE CAPACITY: IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM 1N ITS PERMANENT STATE, THE TEMPORARY FACILITY SMALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILTFY. 19. AREAS DESIGNATED ON THE FLAN(S) CONTAINING EXISTING STORMWATER FACILITIE5 OR ONSITE BMPS (AMENDED 5-DIL3, BIORFTENTION, PERMEABLE PAVEMENT. ETC,) SHALL BE CL7=ARLY FENCED AND PROTECTED USING ESC EMF'5 TO AVO10 SEDIMENTATION AND COMPACTION DURING CONSTRUCTIQTN, 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OOTD3ER SST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDEµTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON AN EXHIBIT OF THOSE AREAS TO BE SCDOED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT 51TE, ALL ESC BMPS SHALL BE REMOVED, AND STORMVYATER CONVEYANCE SYSTEMS, FAClLFTIE5, AND D"fTE BMPS SHALL 13E RESTORED TO THEIR FULLY FUNCTIONING CONNQF7kON- ALL DISTURBED AREAS OF THE PROJECT SITE SHALL E E VEGETATED OR OTHERWISE PERMANENTLY STABILIZED, AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MQLCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OGTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILRATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAANING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF' -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS- ROCKERIES Ot MDE Of ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUiLOING CODE UNtEsi 4ri[TRWISE N01-�{S, PRAwING IS Not T4 SCALE [NTsI t'."GAZ D. PLAN - 268.00 PUBLIC WORKS EROSION AND SEDIMENT CONTROL 1f� DEPARTMENT 9/28/20191 STANDARD PLAN NOTESaici PATE :45 M NAVIX SITE I CIVIL 11235 s.e. 6th street I suite 150 bellevue, wa 98004 t: 425.453.9501 1 f: 425-453-8208 www.navixeng.com I 41872 �s"ONAL /2/07/ZQZ3 R-426807 N.T.S. I % IN COMPLIANCE WITH CITY OF RENTON STANDARDS r O 00 N O O 1 M N to /� w O O O O 1 M N Q J LO/� w M O O O 1 N W r.1 DEVELOPMENT ENGINEERING yqi 12/20/2023 01 W Z H DC a 5 CIVIL CONSTRUCTION PERMIT COMMENTS NAVIX 12.07.23 JET SURVEYED: SCALE: Z.NALL VERTICAL: NAVD DALE: ,BBB WEST77 PARTNERS 12.07.2023 li 4 CIVIL CONSTRUCTION PERMIT COMMENTS NAVIX 10.20.23 JET HORIZONTAL: NAD 1983/1991 JSGREEN/D.RIDDLE[!%;Rl ITV F LIVAWAY HOTEL FIELDBOOK: 0 3 CIVIL CONSTRUCTION PERMIT APPLICATION NAVIX os.o2.23 JET RENTON H DRAWN: PAGE: 0 2 SITE PLAN REVIEW RESUBMITTAL NAVIX 03.03.23 JET JAWN: D.RIDDLE PARK AVENUE NORTH DRAWING NO: '^ ONE INCH DATU M V 1 INITIAL SITE PLAN REVIEW SUBMITTAL NAVIX 02.10.23 JET CHECKED: AT FULL SCALE RENTON WA 98057 D-2.1 J.TAFLIN J.GREEN IF NOT ONE INCH Planning/Building/Public Works Dept. %� W NO. REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY T,E,S.C. DETAILS SHEET: OF: J.TAFLIN 7 41 300