HomeMy WebLinkAboutMFP24000316.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP24000316
IVR Number: 24000316
Permit Information
Permit Name: JB0001631491 USA GREENBUILDERS
Address/Location:01/22/2024Application Date:7229300005Parcel Number: 108 S TOBIN ST
Permit Type:04/01/2024Issue Date:Franchise
Permit Work Class:04/01/2025Expiration Date:Minor Utility
Job Number: JB0001631491Franchise Type:Cable
Description: JB0001631491 COMCAST PROPOSES PROOF & PULL 48 CT FIBER 60LF
OVERLASH 48 CT FIBER 212LF
RISER UP EXISTING POLE 1
TIE IN TO EXISTING SPLICE CASE 1
Contacts
Name Address PhoneTypeBilling
Ashley Kiehn 4610 Tacoma Avenue
Sumner, WA 98390
ApplicantX
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
Mastec North America Inc 800 S Douglas Road, 1200
Coral Gables, FL 33134
Contractor
Business License Number: 51687Construction Contractor: MASTENA991KJ
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Emergency
Contact
DREXEL INVESTMENTS LLC PO BOX 40238
BELLEVUE, WA 98015
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 3/18/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/18/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2.The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
▪Include map(s) showing the location of the project and work area.
▪Be legible lettering and clear, contrasting, symbols of viewing or printing.
▪Must indicate street names, and north arrow and scale.
▪Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
-Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From ____________ To ____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
(253)264-9898
4610 Tacoma Ave Sumner, WA 98390
9:00am 3:30pm
USA GREENBUILDERS
108 S TOBIN ST, RENTON, WA 980572/22/24 3/22/24
MasTec North America INC
TOAN VU
JB0001631491 COMCAST PROPOSES PROOF AND PULL 48CT FIBER 60LF OVERLAST 48CT FIBER 212LF, RISER UP EXISTING POLE TIE IN TO EXISTING CASE
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED
MFP24000316
4/1/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 3/18/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
•Must have approved Traffic Control Plan (TCP) prior to commencing the work.
•Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
•WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•All permit conditions shall be met.
NOTES:
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
•In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 3/18/2021
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Jessica Bucholtz
1/22/2024
AAAAFOCFOCFOCFOCFOCFOCFOCFOCFOCSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOC FOC FOC FOC FOCFOCFOCFOCFOCFOCFOCFOCSWSWSWSWSWSWSWSWSW SW SW SWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSW
SW
FOCFOCFOCFOCFOCFOCFOCFOCFOCFO
F
S TOBIN STS TOBIN STLAKE AVE S
LAKE AVE S
POLE-2POLE-1REVISIONSDATE DESCRIPTION INITIAL1ADVANCED WARNING SIGN SPACINGROAD TYPE SPEEDDISTANCE BETWEEN ADVANCEDWARNING SIGNSXXXXFREEWAYS & EXPRESSWAYS55/75 MPH1500 ±1500 ±1500 ±1500 ±RURAL HIGHWAYS 60/65 MPH800 ±800 ±800 ±800 ±RURAL ROADS45/55 MPH500 ±500 ±500 ±500 ±RURAL ROADS & URBANARTERIAL35/40 MPH350 ±350 ±350 ±N/ARURAL ROADS, RESIDENTIAL &BUSINESS DISTRICTS25/30 MPH200 ± (2)200 ± (2)200 ± (2)N/AURBAN STREETS25 MPH ORLESS100 ± (2)100 ± (2)100 ± (2)N/A(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,AT-GRADE INTERSECTIONS, AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.LONGITUDINAL BUFFER SPACE =LBSSPEED (MPH)20 25 30 35 40 45 50 55 60 65 70DISTANCE (FT)115 155 200 250 305 360 425 495 570 645 730TAPER LENGTH IN FEET=L (FEET)LANEWIDTH(FEET)POSTED SPEED LIMIT (MPH)25 30 35 40 45 50 55 60 65 7010 105 150 205 270 450 500 550---11115 160 225 295 495 550 605 660--12125 180 245 320 540 600 660 720 780 8401Know what'sRUSA GREENBUILDERS108 S TOBIN STRENTON, WA 98057JB0001631491REVISIONSDATE DESCRIPTION INITIALCOMCASTSHEET OFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:COMCAST JOB NUMBER: STAMPDRAWN BY:JDS1/19/2024WARNING SIGNREGULATORY SIGNTRAFFIC CONEFLAGGER STATIONPATROL CARPOLICE OFFICERWORK VEHICLELIT INTERSECTIONUNLIT INTERSECTIONSPOTTER STATIONKEEPRIGHTTCP DEVICE LEGENDFLASHING ARROWFLASHING DOUBLE ARROW(MERGE LEFT OR RIGHT)FLASHING CAUTION1. AN ARROWBOARD SHALL MEET THE MINIMUM SIZE,LEGIBILITY DISTANCE, NUMBER OF ELEMENTS ANDOTHER SPECIFICATIONS SHOWN.2. LENGTH OF ARROW EQUALS 48", WIDTH OFARROWHEAD EQUALS 24".3. TYPE A, B AND C ARROW BOARDS SHALL HAVESOLID RECTANGULAR APPEARANCES. A TYPE DARROW BOARD SHALL CONFORM TO THE SHAPE OFTHE ARROW.4. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES5. SIDEWALK ARE EITHER OPEN OR NOT OPEN. ASIDEWALK IS CLOSED IF A MINIMUM 5' PATH CANNOTBE MAINTAINED MEASURED FROM PROPERTY LINE,OR 5.5' IF CREATED FROM FACE OF CURB.(PEDESTRIAN PATH PROVIDED WHERE REQUIRED)AND WILL BE MONITORED BY A SPOTTER TOENSURE FLOW AND SAFETY DURING WORK UNLESSOTHERWISE NOTED. A SPOTTER SHALL NOT DIRECTTRAFFIC.6. NO EXCEPTION TAKEN- CONTRACTOR ISRESPONSIBLE FOR ADA COMPLIANCE.7. ALL CONTROL SET-UP, SIGN SPACING ANDPROCEDURES. WILL CONFORM TO SPECIFICATIONSSTATED IN THE FEDERAL MANUAL ON UNIFORMEDTRAFFIC CONTROL DEVICES (M.U.T.C.D).8. CITIES AND VARIOUS MUNICIPALITIES MAY HAVEALSO ADOPTED SPECIALIZED GUIDELINES FORTRAFFIC CONTROL WITHIN THEIR JURISDICTION. ITIS THE RESPONSIBILITY OF THE ON-SITE TRAFFICCONTROL PERSONAL TO SEE IF AND ANY SPECIALCONDITIONS EXIST.9. FLAGGERS SHALL BE USED IN ACCORDANCE WITHWAC 468-95-302.10. IF ONLY ONE LANE IS OPEN IN A DIRECTION,THATLANE SHALL BE A MINIMUM OF 11' WIDE, UNLESSSPOTTER/FLAGGERS ARE USED, IN WHICH CASETHE LANE CAN BE A MINIMUM OF 10'.11. ALL ROW WORK MUST YIELD TO SCHOOL TRANSIT,EMPLOYEES AND CHILDREN. WHILE PASSENGERLOADING/UNLOADING, STOPPED OR SLOWING:CEASE WORK, YIELD. WHEN SCHOOL TRANSIT,AND/OR PEDESTRIANS, DEPART COMMENCE WORK.NXXXXXXXXXXXXXXXXTRAFFIC CONTROL PLAN NOTES1.OPPOSING CONES SHALL BE 12 SPACING.2. FLAGGERS SHALL STOP TRAFFIC WHILE AERIALXING INTERSECTS NOTED ROW. OTHERWISE,LANE SHIFT SHALL RESUME AS NOTED.3. ADJACENT BUSINESSES AND/OR RESIDENT'SWILL BE NOTIFIED IN WRITING 72 HRS INADVANCE OF PLACEMENT OF "NO PARKING"SIGNS.4. ALL ROW WORK MUST YIELD TO SCHOOLTRANSIT, EMPLOYEES AND CHILDREN. WHILEPASSENGER LOADING/UNLOADING, STOPPEDOR SLOWING: CEASE WORK, YIELD. WHENSCHOOL TRANSIT, AND/OR PEDESTRIANS,DEPART: COMMENCE WORK.25 20 25MFP24000316
SEFNCOCOMMUNICATIONSPROPOSED UNDERGROUND & AERIAL FIBER INSTALLATIONCOMCASTUSA GREENBUILDERS108 S TOBIN ST, RENTON, WA 98057JB0001631491MFP24000316
POLE-2POLE-1Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.USA GREENBUILDERS
108 S TOBIN ST
RENTON, WA 98057
JB0001631491REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS1/19/2024CONTACTSPG#SHEET INDEX1COVER SHEET2VICINITY MAP, CONTACTS & SHEET INDEX3GENERAL NOTES4LEGEND5SITE-PLAN5DESCRIPTION OF WORKTOTALPROOF & PULL 48 CT FIBER60LFOVERLASH 48 CT FIBER212LFRISER UP EXISTING POLE1TIE-IN TO EXISTING SPLICE CASE1TOTAL:272LFVICINITY
MAP2PERMITTINGASHLEY KIEHN4610 TACOMA AVESUMNER, WA 98390PHONE: (253) 999-2271EMAIL: ASKIEHN@SEFNCO.COMCOMCASTSEFNCO OPE95 S TOBIN STRENTON, WA 98057ENDNTSJESSAMIN SANTOS410 VALLEY AVEPUYALLUP, WA 98371PHONE: (253) 256-8843EMAIL: Jessamin_Santos@cable.comcast.comTOAN VU4610 TACOMA AVESUMNER, WA 98390PHONE:N/AEMAIL: TVU@SEFNCO.COM108 S TOBIN STRENTON, WA 98057BEGINMFP24000316
Know what'sbelow.CallR81148 HOURS BEFORE YOU D
IGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.USA GREENBUILDERS
108 S TOBIN ST
RENTON, WA 98057
JB0001631491REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS1/19/2024GENERAL NOTES5GENERAL
NOTES3 THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. SEFNCO HEREBY DISCLAIMS ANYRESPONSIBILITY TO THIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREACOVERED BY THIS DRAWING MUST CONTACT THE STATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THELOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEEDSITE WORK STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LOCAL JURISDICTIONREGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEENTHESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARDSHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTED AND APPROVED BYTHE LOCAL JURISDICTION INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BEPROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTINGUTILITIES, AS SHOWN ON THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED UPON ASBEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THECONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTIONPOINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TORELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESEPLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLEAGENCIES. THE CONTRACTOR SHALL NOTIFY THE LOCAL JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIORTO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLICIMPROVEMENTS IF REQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE LOCAL JURISDICTION AND ALL UTILITYCOMPANIES WITH REGARD TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURINGCONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUMDISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIESAFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THEAPPROPRIATE STANDARDS AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSIONAGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO:EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HISSUBCONTRACTORS, OR OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOTIDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEERIMMEDIATELY.8.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD,UNLESS SPECIFICALLY STATED OTHERWISE.9.FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE LOCAL JURISDICTION, THE CONTRACTORSHALL SUBMIT A TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL.PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALLBE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAIDPLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH LOCALJURISDICTION.10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THECOMPLETION OF THE INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BEPROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.11.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE ANDCLEAR OF ALL CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORDDRAWINGS KEPT AT THE CONSTRUCTION SITE AND AVAILABLE TO THE LOCAL JURISDICTION INSPECTOR AT ALLTIMES.13.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONALINFORMATION CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14.ALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OFCONSTRUCTION PRIOR TO GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED INGOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITHHARD SURFACE OR LANDSCAPING.15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE LOCAL JURISDICTIONENGINEERING DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.16.ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNINGOF TRUCKS, EARTH MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATEDEQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVED BY THE LOCAL JURISDICTION.17.CALL THE "CALL BEFORE YOU DIG" NUMBER 48HRS IN ADVANCE AT 1-800-424-5555 PRIOR TO DIGGING.NTSMFP24000316
Know what'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.
USA GREENBUILDERS
108 S TOBIN ST
RENTON, WA 98057
JB0001631491REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS1/19/20245LEGEND
4LEGENDTELECOMMUNICATIONSANITARY SEWERGAS LINEWATERSTORM DRAINRECYCLED WATERPOWERPARCEL LINERIGHT OF WAYDITCH LINECENTER LINEEDGE OF PAVEMENTFACE OF CURBPROPERTY LINELIP OF GUTTERGUARDRAILSDSDWWSSSSGGTTLIPD/LEOPFOCRWRWBUILDING OUTLINEPFLFOG LINESIDEWALKSWSWTRENCHDIRECT BOREPROPOSED AERIAL STRAND APROOF/PULLPROPOSED OVERLASHMINOR ARTERIALCOLLECTOR ARTERIALINTERSTATE FREEWAYACCESS STREETPRINCIPAL ARTERIALBUILDINGR/WWARNING SIGN PLACEMENT (W/ PART #)TRAFFIC BARRELHYDRO-VAC TRENCHKEEPRIGHTREGULATORY SIGN (W/ PART #)LIMITSPEEDR2-125SPEED LIMIT CALLOUTSIGN PLACEMENT / DIRECTIONTRAFFIC CONEFLAGGER STATIONFLAGGER STATIONPATROL CARUNIFORMED POLICE OFFICERWORK VEHICLEFENCESTREET LIGHT HANDHOLETELECOM MANHOLETELECOM HANDHOLETELECOM CABINETTRAFFIC SIGNAL MANHOLETRAFFIC CABINETTRAFFIC SIGNAL PEDESTALSTREET LIGHT POLETRAFFIC SIGNAL HANDHOLECATV MANHOLECATV HANDHOLECATV PEDESTALTRAFFIC SIGNAL POLESTORM MANHOLEWATER VALVEWATER METERTELECOM PEDESTALSTORM INLETSTORM DRAIN UNKNOWN D?SISEWER VALVESSEWER VAULT SSSEWER UNKNOWN S?STORM DRAIN VAULT SDSEWER CLEANOUTSEWER MANHOLESCSEWER CATCH BASIN SSSTORM ACCESS POINTBASE LAYERSEXISTING UTILITIESROAD HATCH CLASSIFICATIONROW WORK LINETYPECOMCAST UNDERGROUND SYMBOLSEXISTING UTILITY SYMBOLSTRAFFIC CONTROL SYMBOLSSTORM CATCH BASIN SDTRAFFIC SIGNAL VAULTGAS METERTEST VALVEPEDESTAL UNK UTILITYFIRE HYDRANTGAS VALVEGAS TEST POINTGAS MANHOLEWATER PUMPGGGWATER AIR CONTROL VALVEWATER WELLWATER SAMPLING STATIONPOWER HANDHOLEPOWER MANHOLEPOWER CABINETPOWER VAULTPOWER PEDESTALPPOWER UNKNOWN PPPPPP?SIGN POSTCULVERTTRANSIT STOPBUSSTOPDRIVEWAY (FOC OR EOP)SDSSANCHORSIDEWALK ANCHOR & GUY(P) FIBER & COUNTF48(P) .625 COAX(P) .875 COAXCOMCAST AERIAL SYMBOLSPROPOSEDEXISTINGWRECKOUTPOLE W/O RISERRISERARMVERTICAL GROUNDSLACK SPANOVERHEAD GUYTANGENT ATTACHMENTDEAD-ENDDOUBLE DEAD-END(E) FIBER & COUNTF48(E) .625 COAX(E) .875 COAXSLSLTSTSTSTSCCCTTTTTSTS?PUMPFWELLTREE TRIMLIGHT/MEDIUM/HEAVYLMH//WRECKOUTVAULTSPLICE CASEMANHOLEPEDESTALPPPAMINIBRIDGERTTTAATAPAMPLIFER POTHOLEBORE PIT / EXCAVATIONMMMPROPOSEDEXISTINGWRECKOUTNODEABCDSTORAGE LOOPX'X'LIT INTERSECTIONFASFLASHING ARROWSEQUENTIAL ARROWSEQUENTIAL CHEVRONFLASHING DOUBLE ARROW(MERGE LEFT OR RIGHT)FLASHING CAUTIONORFLASHING DIAMOND CAUTIONARROWBOARD PLACEMENT (SEE BELOW)CHANNELIZING DEVICES / MIN DIMENSIONSNOTE(S):1.AN ARROWBOARD SHALL MEET THE MINIMUM SIZE, LEGIBILITYDISTANCE, NUMBER OF ELEMENTS AND OTHERSPECIFICATIONS SHOWN.2.LENGTH OF ARROW EQUALS 48", WIDTH OF ARROWHEADEQUALS 24".3.TYPE A, B AND C ARROW BOARDS SHALL HAVE SOLIDRECTANGULAR APPEARANCES. A TYPE D ARROW BOARDSHALL CONFORM TO THE SHAPE OF THE ARROW.ARROWBOARD TYPE MIN LEGIBILITYDISTANCEMIN SIZE MINIMUM# OFELEMENTSABCD48"×24"60"×30"96"×48"NONE12 MILE1 MILE34 MILE12 MILE121315125FT MIN4FT MIN8-12"45°TYPE 3 BARRICADE3FT MIN45°2FT MIN8-12"TYPE 1 BARRICADE3FT MIN8-12"2FT MIN45°TYPE 2 BARRICADE3-4"6"2"4"28'-36" MAXSPEED < 45MPHNIGHT AND/OR FREEWAYMORE THAN 36"4-6" TYPCONECONESPEED ≥ 45MPHDIRECTION INDICATOR BARRICADE12"8"36" MIN 24" MIN45°UNLIT INTERSECTIONDBTRENCHAVAC-TSPOTTER STATIONALL TRAFFIC CONTROL DEVICES / ANNOTATIONS PER MUTCDAMPLIFIER PICTURETAP PICTUREEquipmentNTSMFP24000316
AAAAFOCFOCFOCFOCFOC FOC FOC FOCSWSWSWSWSWSWSWSWSWSWSWSW SW
SW SW SW SW SWSWSWSWSWSWSWSWFOC FOC
FOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCFOCSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWSWFOC FOC FOCFOCFOCFOCFOCFOCS TOBIN STS TOBIN STLAKE AVE SLAKE AVE SPOLE-2POLE-1SITE PLAN CONSTRUCTION NOTES12OVERLASH 48CT FIBERPROOF & PULL 48CT FIBER3TIE-IN TO EXISTING SPLICE CASE4RISER DOWN EXISTING POLE2431Know what
'sbelow.CallR81148 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERTCALL TOLL FREEDIGALERTbefore you dig.USA GREENBUILDERS
108 S TOBIN ST
RENTON, WA 98057
JB0001631491REVISIONSDATEDESCRIPTIONINITIAL COMCASTSHEETOFDATE:EXCEPT AS MAY BE OTHERWISE PROVIDED BY CONTRACT,THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN THEPROPERTY OF SEFNCO COMMUNICATION, INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANY PURPOSEWITHOUT SPECIFIC WRITTEN PERMISSION.SITE NAME:SCALELOCATION ADDRESS:
COMCAST JOB NUMBER: STAMPDRAWN BY:SEFNCOCOMMUNICATIONSJDS1/19/20245SITE PLAN
5NMFP24000316
MasTec North America INC
4610 TACOMA AVE
SUMNER WA, 98390
3/11/2024
To whom it may concern:
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JB0001631491
To whom it may concern,
SEFNCO Communications has been contracted to design and engineer this project on behalf of Comcast
Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities.
Comcast proposes to proof and pull 48CT fiber 60LF, overlash 48CT fiber 212LF, riser up existing pole, tie
in to existing splice case.
Comcast is requesting that the City of Renton approve this variance request based on the fact that the
requirements for undergrounding this proposed over-lash will not cause substantial adverse impacts to
other person or entities in the immediate area and will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction roughly
15-25 times the amount of an aerial over-lash on the existing Comcast strand.
2. Potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over-lashed spans as
necessary and identify and remove any existing dead cables along this route.
4. The variance is necessary to prevent and undue hardship due to the increased construction
costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare because
Comcast does agree to underground the cable system, but they are waiving the obligation
into the future when all other utilities are underground to prevent an undue hardship
against Comcast currently.
Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your
requirements. Comcast and their contractors want to cooperate at the highest level and agree to
adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and
maintenance of the proposed facilities.
If you have any further questions regarding this project please contact Toan VU at tvu@sefnco.com
Thank you for your consideration in this matter.
Ashley Kiehn
Permit Area Manager
SEFNCO Communications, Inc.
o 253 999-2271 | e askiehn@sefnco.com
Attachments:
1. Application for ROW permit
2. 11” x 17” Site plan
3. 11” x 17” Design plan
4. Traffic Control Plan
April 1, 2024
Ashley Kiehn
SEFNCO Communications, Inc.
4610 Tacoma Avenue,
Sumner WA 98390
Via Email: askiehn@sefnco.com
SUBJECT: Request for Undergrounding Exemption (JB#1631491, MFP24000316, 108 S Tobin St)
Dear Mrs. Kiehn:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction Inc overlash new fiber for a total of approximately 212
lineal feet to existing Puget Sound Energy (PSE) poles along S Tobin St within the City. See the enclosed
Site Plan showing the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720
grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below,
through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton.
Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service
providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service
provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are
underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well. Comcast is required to obtain all necessary private utility easements
for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Comcast Job JB#1631491
Page 2 of 2
April 1, 2024
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical clearance
of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in
the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other
utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a
franchisee within the Project Reach, in which case the Applicant shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City of Renton Community
and Economic Development Administrator or designee, from the first event triggering the
requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, April 15, 2024. Appeals must be
submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor
Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will
be collected at a future date if your appeal is submitted electronically. The appeal submitted in person
may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed
by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City
Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Justin Johnson, PE
Interim Development Engineering Director
cc: Brianne Bannwarth, Interim CED Administrator
Nathan Janders, Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Engineering Specialist III
Franchise Permits
Enclosures: Site Plan
Justin Johnson
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP24000316
Engineering
1 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
2 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
3 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
Page 1 of 1