Loading...
HomeMy WebLinkAbout04249 Renton WA.Rpt.0003.2024-03-29.Concrete Observation.GREENCONCRETE OBSERVATION REPORT Report Number:M7241122.0003 Service Date:03/29/24 20225 Cedar Valley Rd Ste 110 Report Date:03/29/24 Lynnwood, WA 98036-6365 Task:Reinforced Concrete 425-742-9360 Client Project Chick-fil-A Inc Chick-fil-A #04249 Renton, WA (T) Attn: Kari Teresa 375 Rainier Ave S 5200 Buffington Road Renton, WA 98055 Atlanta, GA 30097-3508 Project Number: M7241122 Services: Special Inspections / Materials Testing Terracon Rep.: Edward Smith Reported To:Jim Hibbard with ESI Contractor:ESI Report Distribution: See attached distribution list. Reviewed By:____________________________________ Myndi Kraft Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM004,04-29-22, Rev. 6 Page 1 of 1 Permit No: C23000412 General Information Jim Hibbard with ESI requested Terracon be on site for reinforcing steel and concrete observation of the following elements: curb and gutter, drive entry approach slab and light pole bases. These elements are being constructed by ESI. The results of observation(s) for today were reported to Jim Hibbard with ESI. The construction documents referenced for this inspection include the Structural and Civil drawings. Reinforcing Steel Terracon observed reinforcing steel detailed below for the following items (as applicable): Grade, Configuration, Size, Lap Length, Quantity, Spacing, Tying, Clearances, Steel Condition and Embedded Items. Element Location Referenced Documents Status Comments 2 Light pole bases (1) North center and west center of parking area.Sheet S603 Detail B4 Complies Concrete did not place this date at the light pole bases. Pre-Pour Review Formwork was reviewed and was observed to be in general accordance with project drawings identified above. Concrete Placement Terracon observed concrete placement as follows: Element Location Yardage Supplier Mix ID Mix Description Curb and Gutter South and west side of north and west drive lane. 8 Corliss Resources C4000A Normal Weight, 4000-psi, air-entrained concrete Approach Slab North drive entry at Rainier Ave.7 Corliss Resources C4000A Normal Weight, 4000-psi, air-entrained concrete Placement Method: Chute Consolidation Method: Finishing Protection Method: Not Observed Tests Performed A total of 4 compressive strength specimens [1 Set] for lab curing were fabricated by Ed Smith. Compliance Statement Based on our observations, cast-in-place concrete construction activities at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications. Report Date: Service Date: Report Number: Task: M7241122.0003 03/29/24 03/29/24 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360Reinforced Concrete Distribution List Distribution Page (1) Chick-fil-A Inc, Kari Teresa (1) Barghausen Consulting Engineers, Inc., Alex Bell (1) City of Renton WA, Development Engineering (1) ESI Construction Inc, Eric Quevedo (1) ESI Construction Inc, Jim Hibbard (1) Jones Lang Lasalle, Agustin Solaberrieta (1) Jones Lang Lasalle, Maggie Nuckols (1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Myndi Kraft