HomeMy WebLinkAbout5719.05 S 2024 0301Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 5719.05 Page 1 of 3 Report ID 5719.05 S 2024 0301 Date Fri 3/1/2024 Weather 45°F Cloudy Arrival/Departure Time(s) 9:45AM; 10:15AM Travel Time (hr)1.0 Project Name Solera Location 2902 NE Sunset Blvd, Renton ESNW Rep., CESCL No., Phone No. & Report Statement Willem Scherwin, ECO-3-2282208, (206) 793 8569 “This report is true, accurate, and complete to the best of my knowledge and belief.” Client Info/Contact Heartland Construction, LLC | Mike Vaughan, Benham Hansen Permit No(s). WAR310291 Reviewed By MLP Initials/Date N/A Field Supervisor Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. Type of visit:  Weekly  Monthly  Post–Storm Event Precipitation since last inspection (approximate): 0.32 inches Precipitation in last 24 hours (approximate): 0.01 inches Phase of active construction (check all that apply): Pre-construction Clearing, demolition, or grading Infrastructure or roads Concrete pours Vertical construction Utilities Off-site improvements Site temporarily stabilized Final stabilization Was water quality sampling part of this inspection? Yes No If “Yes”: •Record results in the table below. •Hanna Turbidity Meter No. 34 Monitoring Point Monitoring Location Turbidity (NTU) pH Description of Discharge Notes Report ID 5719.05 S 2024 0301 Page 2 of 3 Earth Solutions NW, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas • Silt Fence G N Silt fences are in good condition. 2. Establish Construction Access • Fabric; Quarry Spalls • Wheel Wash • Sweeper Truck F Y Construction entrance composed of quarry spalls. Site has preexisting asphalt in parking area, and new asphalt in SW construction entrance. Track-out observed on both construction entrances. Replenish quarry spalls on main construction entrance and sweep west entrance. 3. Control Flow Rates • Stormwater Vault or Facility • Straw Wattles • Check Dams G N Straw wattles around onsite stormwater catch basin in the construction parking area 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw • Sediment Ponds, Traps & Filters • Treatment • Water Truck G N Silt fences installed as needed. Temporary sediment ponds installed near southern construction entrance, and another was constructed near the northern construction entrance. 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass • Plastic Sheeting • Stockpiles - - N/A 6. Protect Slopes • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors - - N/A 7. Protect Drain Inlets • Catch Basin Inserts G N CB inserts along NE 12th St as well as on site sandbag and straw wattles around catch basins. Sandbags placed along construction limits adjacent to Harrington Pl. 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets G N Check dams installed on south end of site near temporary sediment pond along the drainage channel. 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling - - N/A 10. Control Dewatering - - N/A 11. Maintain BMPs F Y See action item below. 12. Maintain SWPPP & Site Logbook G N Available upon request. 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement - - N/A Do existing BMPs need to be modified or removed, or do other BMPs need to be installed?  Yes  No List the action items in the table below: Element # Description and Location Action Required Completion Date 2 Track-out observed on both construction entrances. Replenish spalls on main entrance and sweep west entrance. Report ID 5719.05 S 2024 0301 Page 3 of 3 Earth Solutions NW, LLC BMP LEGEND TEMPORARY SEDIMENT POND/ TRAP CONSTRUCTION ENTRANCE VEGETATIVE COVER CONCRETE WASHOUT CATCH BASIN INSERT WATTLE DITCH HIGH VISIBILITY FENCE CHECK DAM Some track-out observed