Loading...
HomeMy WebLinkAbout04249 Renton WA.Rpt.0004.2024-04-01.Concrete Observation.GREENCONCRETE OBSERVATION REPORT Report Number:M7241122.0004 Service Date:04/01/24 20225 Cedar Valley Rd Ste 110 Report Date:04/03/24 Lynnwood, WA 98036-6365 Task:Reinforced Concrete 425-742-9360 Client Project Chick-fil-A Inc Chick-fil-A #04249 Renton, WA (T) Attn: Kari Teresa 375 Rainier Ave S 5200 Buffington Road Renton, WA 98055 Atlanta, GA 30097-3508 Project Number: M7241122 Services: Special Inspections / Materials Testing Terracon Rep.: AJ Frasieur Reported To:Jim Hibbard with ESI Contractor:ESI Report Distribution: See attached distribution list. Reviewed By:____________________________________ Myndi Kraft Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM004,04-29-22, Rev. 6 Page 1 of 1 Permit No: C23000412 General Information Jim Hibbard with ESI requested Terracon be on site for concrete observation and sampling of the following elements: Sidewalk. These elements are being constructed by ESI. The results of observation(s) for today were reported to Jim Hibbard with ESI. The construction documents referenced for this inspection include: Structural plans. Reinforcing Steel Concrete is not reinforced. Pre-Pour Review Formwork was reviewed and was observed to be in general accordance with project drawings identified above. Concrete Placement Terracon observed concrete placement as follows: Element Location Yardage Supplier Mix ID Mix Description Sidewalk (1) Approach ramp sidewalk on Rainier Ave 10 Corliss C4000A Normal Weight, 4000-psi, air-entrained concrete Placement Method: Chute Consolidation Method: Not Consolidated Protection Method: Not Observed Tests Performed The following tests were performed and were in accordance with project specifications: Slump, Air Content, Temperature.A total of four compressive strength specimens [1 Set] for lab curing were fabricated. Additional Comments Concrete delayed until 10:00. Compliance Statement Based on our observations, cast-in-place concrete construction activities at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications. Photo Log Report Number:M7241122.0004 Service Date:04/01/24 20225 Cedar Valley Rd Ste 110 Report Date:04/03/24 Lynnwood, WA 98036-6365 Task:Reinforced Concrete 425-742-9360 Chick-fil-A IncAttn: Kari Teresa CT0001, 10-16-13, Rev.10 Page 1 of 1 (P1) Approach sidewalk being poured Report Date: Service Date: Report Number: Task: M7241122.0004 04/01/24 04/03/24 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360Reinforced Concrete Distribution List Distribution Page (1) Chick-fil-A Inc, Kari Teresa (1) Barghausen Consulting Engineers, Inc., Alex Bell (1) City of Renton WA, Development Engineering (1) ESI Construction Inc, Eric Quevedo (1) ESI Construction Inc, Jim Hibbard (1) Jones Lang Lasalle, Agustin Solaberrieta (1) Jones Lang Lasalle, Maggie Nuckols (1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Myndi Kraft