Loading...
HomeMy WebLinkAboutMFP24001396.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24001396 IVR Number: 24001396 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:03/18/2024Application Date:9202500160Parcel Number: 2813 NE 23RD PL Permit Type:04/04/2024Issue Date:Franchise Permit Work Class:04/04/2025Expiration Date:Minor Utility Job Number: 101153329Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT V01 (318985 166736). ASPLUNDH TO TRIM TREES AS NEEDED. NO HS CUTS. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101153329 2813 NE 23RD PL JENNY CHAU 253-208-9480 MFP24001396 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 4/4/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 2813 NE 23rd Pl Renton WA 98056 USAVLTV01FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCEOF TEMPORARY DRIVEWAY CLOSUREUTILITYWORKAHEADW21-7100'100'SHOULDERWORKW21-515151717S/WCLOSEDR9-9S/WCLOSEDR9-9NE 23RD PLHARRINGTON PL NE TEMPORARY TRAFFIC CONTROL PLANWORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV09/07/2022 5114927230 2813 NE 23RD PL, RENTON, WA 98056 Jose Rodriguez(425) 424-6425jose.rodriguez@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. If used, place NO-PARK signs 72 hours inadvance of the day that the work is to be done.MFP24001396 2826 2817 2728 2722 2820 28142808 2802 2809 2813 2805 2303 2713 NE 23RD PL HARRINGTON PL NER/W 50'HIG 15 R/W 50' 318985-166736 50KVA 120/240V 100kVA 120/240V (C) 90° R=48" CUSTOMER SUPPLIED & INSTALLED 2-3" SCH'L 40 DISCONTINUOUS PVC CONDUIT ± 60' 7' X 7' WORK PIT POTELCO SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED PSE INST. 2-RUN 350 INSULATED COPPER UG TPX ± 60' SITE PLAN N Vicinity Map 47.5122, -122.1807 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 6/11/2021 171 158 125 --10.39 171 158 135.39 Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Jenny Chau 253-208-9480 jenny.chau@pse.com SCALE: 1" = 50'101153329THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101153329 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Jenny Chau 253-208-9480 2/28/2022 Ray Reynolds 253-262-7409 2/28/2022 N/A N/A N/A Ray Reynolds -2/28/2022 RW-124180 RENTON MITCHELL MURRAY UPGRADE XFMR UG CONDUCTOR, 800A METER 2813 NE 23RD PL RENTON, WA. 98056 N/A N/A N/A 101153329 AS NOTED 1 OF 1 KING N/A N/A CSPSKEPM NW 4-23N-05E N/A N/A 2305E014 2305E040 2305E014 HIG-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 513280502 SITE SPECIFIC NOTES V01 GRID# 318985-166736 REPLACE:3-12, 2-60 REMOVE EXISTING 50KVA TRANSFORMER AND VAULT INST 48" X 48" X 38" VAULT W/ 21" X 60" HH UNI MIN1ULR, 6045.1010 SET 100KVA, 120/240V PM XFMR (MID:6257200) INSTALL (1) ELBOW KIT ELB10J, 6041.1000 INSTALL (1) DUST CAP (MID:7630600) INSTALL (3) 8-POS SECONDARY CONNECTOR BLOCKS (MID:4842102 ) INSTALL GRID # RECONNECT SERVICES M01 EXISTING: REMOVE EXISTING 200A METER INSTALL NEW METER ON 800A METERBASE SPAN SPECIFIC NOTES SEE SITE PLAN, TABLES, AND ONE-LINES Perm. Service POWER GENERAL NOTES - RESIDENTIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foreman's Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. CUSTOMER NOTES Customer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound Energy Standards & Local Municipality (See PSE Electric Service Handbook for more details). 1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 4.Roads shall be paved or have a compacted , crushed rock base in place. 5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 6. All work is to be done in accordance with local municipal and county permit requirements as applicable. 7.Inclement weather conditions may cause delays in construction times and dates. 8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice 0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdiction requirements. (Local jurisdiction may have additional requirements including notes detailing where erosion or sediment control structures are to be installed, cross section details of the typical erosion structures, & special requirements for work in sensitive areas.) 10.Customer is required to have meter inspected and approved by L&I/City prior to construction. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks (larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. and DB120 for secondary span CUSTOMER-SUPPLIED SERVICE TRENCH FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 PSE Locates Req'd Developer Locates Req'd Yes No Yes NoFlagging Req'd Outages Req'd Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 318985-166736 50kVA Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 100kVA 120/240v 6247200 V01 318985-166736 SECONDARY CABLE & CONDUIT TABLE Work Location Cable Conduit Voltage Drop Voltage Flicker As Built Information Size Length Design (ft) Size Length Design (ft) Bends Foreman - Complete FROM TO (1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) V01 M01 SEC 350 COPPER INSULATED UG TPX 60'3"50'2 0 0 0 1.7%0.5% V01 M01 SEC 350 COPPER INSULATED UG TPX 60'3"50'2 0 0 0 1.7%0.5% Owner / Developer Contact Info officeATTN: MITCHELL D. MURRAY 2813 NE 23RD PL RENTON, WA 98056 MITCHELL MURRAY 425-228-2288 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE VAULT DETAIL @ V01 NOT TO SCALE STD 6775.0030 EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 CABLE ONE LINE SCALE: 1"=50' CONDUIT ONE-LINE SCALE: 1"=50' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2500 800A ELECTRIC 71.074KW 80A 1.7% 0.5% CIRCUIT FEET ADDED: 0' 00 1"2" 00 50'100' CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01. TRENCHING & CONDUIT. -INSTALL ± 50' OF 2-3" SCH'L 40 GREY PVC CONDUIT FROM PROPERTY LINE TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEES WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . JOB SITE JOB SITE kWh Mtr Elec. Mtr Base 12" Min 36" Typical 24" to 36" Max Conduit Depth Power Cable Conduit Customer Provided 3" Schedule 40 Grey PVC Regulator Vent Utility-Provided Gas Meter Assembly Min 36" Customer Provided Conduit Stakes 48" 48" Top View 4' 3" Conduit Service Riser from Gas Service Lines 12" Minimum Clearance Customer Provided Drainage Pipe Work Pit Dimensions Electric & joint Utility 4' MTR BASE DETAIL SCALE: NONE 101144872511492723 XFMR Removal 584048570 Removal 108133472 Meter Set 512131675 3001712215 FORMAN NOTES: CUSTOMER TO STOP TRENCH AT "2617" PROPERTY LINE. POTELCO TO DIG WORKPIT 7'X7' AROUND V01 TOP VIEW 18" MIN 3' MIN WORKING SPACE 18" MIN 3' MIN 4' MIN6' MAX 5' PREFERRED 6" MIN6' MAX 3' MIN 3' MIN Neare s t S i d e W a l l or Ob s t r u c t i o n An y O b s t r u c t i o n Ab o v e M e t e r CT E n c l o s u r e Working SpaceCT Clearances SCALE: NONE Fabian Gomez 10/2/2023 18" MIN 18" MIN 4' MIN6' MAX 5' PREFERRED 6" MIN 6' MAX 3' MIN 3' MIN TOP VIEW 3' MIN WORKINGSPACE 3' MIN MFP24001396 RESTORATION PER CITY OF RENTON STANDARDS