HomeMy WebLinkAboutTowns on 12th Questions CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Good Morning Yong.
I have a contractor going through the plans for bidding and they brought up a few questions regarding pipe material that I wanted to clarify.
I’ve attached a few sheets from our plans for reference to the questions.
Overall the questions surround the pipe materials being called out.
If you could please review my questions on the attached and let me know I’d greatly appreciate it!
Thanks!
Holli H. Heavrin, P.E.
Principal, Engineering Technical Manager
Office: 425.885.7877 | Cell: 206.697.9474 | www.coredesigninc.com <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C02%7Cyqi%40rentonwa.gov%7Cc5f67d
dcabd24899802308dc20f6338f%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638421489404502342%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdat
a=jdk6UTrfRCFZOMldM6uiIzWMm8k%2BQeszNf86CU%2BdOUI%3D&reserved=0>