HomeMy WebLinkAboutMFP24000055.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP24000055
IVR Number: 24000055
Permit Information
Permit Name: Comcast Cable Franchise Permit-JB0001247540
Address/Location:01/03/2024Application Date:7227801026Parcel Number: 2725 NE SUNSET BLVD
Permit Type:02/05/2024Issue Date:Franchise
Permit Work Class:02/04/2025Expiration Date:Minor Utility
Job Number: JB0001247540Franchise Type:Cable
Description: Comcast JB0001247540. TIE INTO EXISTING SPLICE CASE SP.WAKV.0085. PROOF & PULL (1) 24CT FIBER
THROUGH EXISTING CONDUIT. PROOF & PULL (1) 24CT FIBER THROUGH EXISTING RISER. OVERLASH (1)
24CT FIBER ON EXISTING AERIAL STRAND. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF
RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
ApplicantX
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contact
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contractor
Business License Number: 20838Construction Contractor: CANNOCL791JK
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Emergency
Contact
2725 SUNSET LLC C/O INVESTC 1302 PUYALLUP ST #A
SUMNER , WA 98390
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP24000055
Scott Warlick 2/5/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2.The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
-Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
WA 98371
MFP24000055
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 2/5/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
NO
SCALE
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Christopher White
(P): (253) 348-9733
(E): cwhite@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUNSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 01/03/24
TC - GENERAL COVER
CW TH KB
1 4
TRAFFIC CONTROL NOTES:
1. The designed traffic controls contained within this TCP will not be implemented until approved by the public
authority having jurisdiction
2. The contractor is advised that all lane closures shall be kept to a minimum. Local jurisdictions will approve
only those lane and roadway closures determined to be necessary for the contractor to accomplish a specific
task. No lane or roadway closures will be permitted without prior approvals.
3. The contractor shall keep all traffic lanes and shoulders clear of equipment and materials during non-working
hours. Equipment and materials shall not be stored on the streets. The contractor's employees and agents
shall not park private vehicles along the roadway or median.
4. All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal
manual on uniform traffic control devices (m.u.t.c.d).
5. Cities and various municipalities may have also adopted specialized guidelines for traffic control within their
jurisdiction. It is the responsibility of the on-site traffic control personnel to verify if any special conditions exist.
6. Traffic control equipment shall maintain a minimum 15' clearance from railroad tracks.
7. Recessed steel plates shall be placed over open trench during non-work hours. W8-24 signs shall be placed
as advanced warning to vehicles.
8. Will coordinate with any businesses that will be affected by construction
9. Access to driveways must be maintained at all times.
10. No park signs to be placed 72 hours prior to construction.
11. Signs within roadway will be protected by channelization devices
12. All traffic control devices used for night work must be retroreflective
PEDESTRIAN & BICYCLE NOTES:
1. Bike lane traffic must be maintained with a minimum of 2' clearance throughout work area.
2. Pedestrian traffic must be maintained with a minimum of 4' clearance within crosswalk.
3. Pedestrian traffic must be maintained with a minimum of 4' clearance within sidewalk.
4. Flagger/spotter to direct and assist pedestrians around work area unless otherwise noted.
5. All work will stop while pedestrians are escorted through work zones
ADDITIONAL NOTES:
1. Contact property owner(s) 72 hours prior to start of work to alert owner(s) to possible driveway closures and
alternate access when applicable.
2. Contractor shall coordinate work hours with local school bell schedule. no traffic control equipment shall be
placed until after school is in session when applicable.
3. Notify fire station 72 hours prior to start of work. access for emergency vehicles shall be maintained at all
times when applicable.
4. Contact transit authority 72 hours prior to start of work for temporary relocation of bus stop when applicable.FLAGGERSPOTTERLEGEND
Work Vehicle Truck Mounted Attenuator Work Area
Flagger Spotter Traffic Safety Cone/Drum
WT WT
MFP24000055
WORK AREA
WT XXXROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4W20-7A
FLAGGER
NE 10TH ST
NE SUNSET BLVDNE 10TH ST
6 DEVICE MIN
50'-100'XXX
ROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4 W20-7A
FLAGGER
B50'-100'NE SUNSET BLVDPOLICE
OFFICERXXXROAD
WORK
AHEAD
W20-1
BE
PREPARED
TO STOP
W3-4
W20-7A
XXXROAD
WORK
AHEAD
W20-1
BE
PREPARED
TO STOP
W3-4
W20-7A
SPEED
LIMIT
POSTED
SPEED LIMIT
25 R2-1
SPEED
LIMIT
POSTED
SPEED LIMIT
35 R2-1
NO
SCALE
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Christopher White
(P): (253) 348-9733
(E): cwhite@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUNSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 01/03/24
TRAFFIC CONTROL
CW TH KB
2 4
N
S
EW
MFP24000055
EOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPNE 10TH ST
INDEX AVE NEWT
XXX
ROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4 W20-7A
50'-100'B
FLAGGER
WORK AREA
XXXROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4
W20-7A
FLAGGER XXXROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4W20-7A
6 DEVICE MIN
50'-100'
FLAGGERXXXROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4
W20-7A
FLAGGER
SPEED
LIMIT
POSTED
SPEED LIMIT
25 R2-1
SPEED
LIMIT
POSTED
SPEED LIMIT
25 R2-1
NO
SCALE
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Christopher White
(P): (253) 348-9733
(E): cwhite@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUNSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 01/03/24
TRAFFIC CONTROL
CW TH KB
3 4
N
S
EW
MFP24000055
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPXXXROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4W20-7A
XXX
ROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4 W20-7A
50'-100'
WT
B
6 DEVICE MIN
50'-100'
FLAGGER
FLAGGER
WORK AREA
SPEED
LIMIT
POSTED
SPEED LIMIT
25 R2-1
INDEX AVE NE
NO
SCALE
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Christopher White
(P): (253) 348-9733
(E): cwhite@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUNSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 01/03/24
TRAFFIC CONTROL
CW TH KB
4 4
N
S
EW
MFP24000055
Cannon Construction LLC.
406 Porter Way
Milton, WA 98354
1/3/2024
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JB0001247540
To whom it may concern:
Cannon Construction has been contracted to design and engineer this project on behalf of
Comcast Cable Communications Management. Comcast is applying for a variance request in
order to upgrade their existing facilities.
Comcast proposes to TIE INTO EXISTING SPLICE CASE SP.WAKV.0085, PROOF & PULL (1) 24CT FIBER
THROUGH EXISTING CONDUIT, . PROOF & PULL (1) 24CT FIBER THROUGH EXISTING RISER, OVERLASH (1) 24CT
FIBER ON EXISTING AERIAL STRAND at 2725 NE SUNSET BLVD, RENTON, WA 98056.Comcast is requesting
that the City of Renton approve this variance request based on the fact that the requirements
for undergrounding this proposed over-lash on existing plant will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction
roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand.
2. Risk of potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over-lashed spans as
necessary and identify and remove any existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased
construction costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare.
Comcast does agree to participate in future underground improvements for its
proportionate share of the undergrounding costs, waiving the obligation into the future
when all other utilities are undergrounded to prevent an undue hardship against
Comcast currently.
Upon the granting of the variance, Comcast will coordinate construction and traffic control as
per your requirements. Comcast and their contractors want to cooperate at the highest level
and agree to adhere to all provisions and requirements set forth by the City of Renton to insure
safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Christpher White 253-
348-9733
Thank you for your consideration in this matter.
David Standring
Permit Coordinator
Cannon Construction Inc.
o 253-922-2787 | permitting@teamcannon.com
February 5, 2024
David Standring
Cannon Construction Inc.
406 Porter Way
Milton, WA 98354
Via Email: Permitting@teamcannon.com
SUBJECT: Request for Undergrounding Exemption (JB#1247540, MFP24000055, 2725 NE Sunset Blvd)
Dear Mr. Standring:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction Inc overlash new fiber for a total of approximately 348
lineal feet to existing Puget Sound Energy (PSE) poles along NE 10th St and Index Ave NE within the City.
See the enclosed Site Plan showing the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720
grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below,
through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton.
Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service
providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service
provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are
underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well. Comcast is required to obtain all necessary private utility easements
for work on private property.
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Comcast Job JB#1247540
Page 2 of 2
February 5, 2024
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical clearance
of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in
the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other
utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a
franchisee within the Project Reach, in which case the Applicant shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City of Renton Community
and Economic Development Administrator or designee, from the first event triggering the
requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, February 19, 2023. Appeals must be
submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor
Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will
be collected at a future date if your appeal is submitted electronically. The appeal submitted in person
may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed
by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City
Clerk’s Office, cityclerk@rentonwa.gov.
Sincerely,
Justin Johnson, PE
Interim Development Engineering Director
cc: Brianne Bannwarth, Interim CED Administrator
Nathan Janders, Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Engineering Specialist III
Franchise Permits
Enclosures: Site Plan
Justin Johnson
5
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUBSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 12/21/23
SS KB 3/20/2024
COVER SHEET
SS KB KB
1 6
410 Valley Ave NW
Puyallup, WA 98371
COMCAST CABLE COMMUNICATION LLC
CLIENT
CONTACT: Casey Brown
PHONE: (425) 263-5345
EMAIL: Casey_Brown2@cable.comcast.com
VICINITY MAP
406 Porter Way
Milton, WA 98354
CANNON COMPANIES
CONTACT: Christopher White
PHONE: (253) 348-9733
EMAIL: cwhite@teamcannon.com
METRO-E RETAIL
1 -COVER SHEET
2 -GENERAL NOTES
3 -LEGEND
4 -DETAIL
5-6 -CONSTRUCTION PLAN
NO
SCALE
SCOPE OF WORK
1.TIE INTO EXISTING SPLICE CASE SP.WAKV.0085
2.PROOF & PULL (1) 24CT FIBER THROUGH EXISTING CONDUIT
3.PROOF & PULL (1) 24CT FIBER THROUGH EXISTING RISER
4.OVERLASH (1) 24CT FIBER ON EXISTING AERIAL STRAND
5. INSTALL (1) NEW 2" RISER AND PULL (1) 24CT FIBER THROUGH
6. TRENCH AND PLACE (1) 2" CONDUIT AND PLACE (1) 24CT FIBER
N
S
EW
POLE COUNT =
TRANSMISSION =
DISTRIBUTION =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
POLE INFORMATION
2
0
2
0
0
BILL OF MATERIALS *ALL FOOTAGES AND
MATERIALS ARE ESTIMATED
OVER-LASH =FT
NEW AERIAL =FT
PROOF & PULL =FT
NEW UNDERGROUND =FT
RISER =FT
TOTAL ROW FOOTAGE =FT
RIGHT OF WAY FOOTAGES*:
=FT=FT+ 20% STORAGE
MATERIAL FOOTAGES*
175
0
147
52
(1)50
424
24CT 424508
SHEET INDEX
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTONS COMPANIES INC.
T23N R5E S9
2725 NE SUBSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 12/21/23
SS KB 3/20/2024
GENERAL NOTES
SS KB KB
2 6
NO
SCALE
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36"
WITH A MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUBSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 12/21/23
SS KB 3/20/2024
LEGEND
SS KB KB
3 6
NO
SCALE
MHMHMHMH
V
NEW
V
TH
NEW
TH
CAB
NEW
CAB
DH
NEW
DH
P
NEW
P
LINE TYPES
FL FL
EOP EOP
ROW ROW
S/W S/W
D/W D/W
X X
U U U U U U U U
P P
PARCEL LINE
BUILDING OUTLINE
LANE LINE
CENTERLINE / STATION LINE
FOG LINE
EDGE OF PAVEMENT (EOP)
RIGHT OF WAY (ROW)
SIDEWALK (S/W)
DRIVEWAY (D/W)
FENCE
GUARDRAIL
CROSSWALK
RAILROAD
POWER
TS TS TRAFFIC SIGNAL
F/O F/O FIBER OPTIC
T T TELECOMMUNICATION
S S SEWER MAIN
SS SS SANITARY SEWER
D D DRAIN MAIN
DD DD DRAINAGE DITCH
G G GAS
OIL OIL OIL
STM STM STEAM
W W WATER
UNK UNK UNKNOWN UTILITY
TRAFFIC CONES
STRAW WATTLES
A A EXISTING AERIAL
A A NEW AERIAL
C C EXISTING/PROOF & PULL CONDUIT
PROPOSED CONDUIT
SYMBOLS
HATCH PATTERNS
CONCRETE ASPHALT
CONCRETE PANELS
LANDSCAPELIMITS OF RESTORATION
GRAVEL
BRICK/COBBLE
ROWIP ALLEY / TRAVEL LANE WZ
ROWIP PARKING / BIKE LANE WZ
ROWIP SIDEWALK WZ
OH OH OVERHEAD UTILITIES
#VAULT
(EXIST / NEW)
SIZE MAY VARY
MANHOLE
(EXIST / NEW)
DOGHOUSE
(EXIST / NEW)
TIGERHOUSE
(EXIST / NEW)
NODE CABINET
(EXIST / NEW)
PEDESTAL
(EXIST / NEW)
R R
UTILITY POLE
(EXIST / NEW)
UTILITY RISER
(EXIST / NEW)
200'
EXISTING SPLICE CASE
NEW SPLICE CASE
NEW MAT. STORAGE
NEW COAX TAP
UTILITY POTHOLE
POLE ANCHOR
/ DOWN GUY
CB CATCH BASIN
CATCH BASIN
W/ SOCK
CW CROSSWALK SIGNAL
SL STREET LIGHT
FH
FIRE HYDRANT
M WATER METER
V UTILITY VALVE
TREE
SHRUBBERY
N
S
EW
STREET SIGN
MAP COMPASS
339'FOOTAGE NOTE
LANE DIRECTION INDICATOR
BUS STOP LOCATION
MARK-UP NOTATIONS
#
#
PHOTO LOCATOR/ORIENTATION
CALLOUT
CONSTRUCTION NOTE CALLOUT
POLE # CALLOUT
STA 0+00 DISTANCE STATION
A
#
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION SHEET #
#WORK
LOCATION PHOTO NOTE CALLOUT
#DISTANCE DIMENSION
ADA RAMP
CB
#VAULT # CALLOUT
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUBSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 12/21/23
SS KB 3/20/2024
LEGEND
SS KB KB
4 6
NO
SCALE
TRENCH - SOFT SURFACE
STANDARD DETAIL
PROPOSED CONDUIT6"-12"
18"
18"
36"
EXISTING SOFT
SURFACE MAGNETIC LOCATOR TAPE
(ENTIRE TRENCH LENGTH)
BACKFILL COMPACTED TO
95% OF MAXIMUM
RELATIVE DENSITY OR
STONEWAY MIX 1004.
SURFACE RESTORATION
CONTRACTOR TO VERIFY
SPECIFICATION WITH LOCAL
JURISDICTION
2UTILITY POLE RISER -
STANDARD DETAIL
(1) 10' PVC CONDUIT
SECTIONS
15" HDG POLE BRACKET W/
PIPE CLAMP (B2017 BY
POWER-STRUT OR EQUAL) 4"
MIN OFFSET FROM POLE.22' (TYP)(1) 10' PVC CONDUIT
SECTIONS
EXISTING SURFACE24' (TYP)PROPOSED CABLE
EXISTING AERIAL
POWER
EXISTING UTILITY POLEVARIES
#1
R
O
W
R
O
W
R
O
W
R
O
W
R
O
W
ROW
ROWROW
ROWROW
R
O
W
R
O
W
R
O
W
R
O
W
R
O
W
R
O
W
R
O
W
R
O
W
2804
2801
N
E
1
0
T
H
S
T
S/W
S/
W
S/
W
S/
W
S/
W
S/
W
E
O
P
EO
P
E
O
P
E
O
P
E
O
P
E
O
P
EOP
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
EOP
EO
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
E
O
P
EO
PEOP EOPEOP
FL
FL
FL
FL
FL
FL
FL
FL S/W
S/W
A
C
C
C
C
14
7
'
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:1 PSE
318519 - 166739
COMCAST #1 22 10 N N/A
TELCO #1 21 0 N N/A
D
R
25'
DH
2
1
1
3NE SUNSET BLVDSTA 10+00STA 10+50STA 11+00STA 11+50STA 12+00STA 12+50MATCHLINE SHEET6
1
CONSTRUCTION NOTES:
TIE INTO EXISTING SPLICE CASE
SP.WAKV.0085
PROOF & PULL (1) 24CT FIBER
THROUGH EXISTING CONDUIT
PROOF & PULL (1) 24CT FIBER
THROUGH EXISTING RISER
OVERLASH (1) 24CT FIBER ON
EXISTING AERIAL STRAND
INSTALL (1) NEW 2" RISER AND PULL
(1) 24CT FIBER THROUGH
TRENCH AND PLACE (1) 2" CONDUIT
AND PLACE (1) 24CT FIBER
RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF
RENTON SPECIFICATIONS
2
3
4
5
6
1R
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUBSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 12/21/23
SS KB 3/20/2024
CONSTRUCTION PLAN
SS KB KB
5 6
0'10'20'
N
S
EW
G ROWR
O
W
R
O
W
R
O
W
RO
W
R
O
W
RO
W
R
O
W
R
O
W
R
O
W
R
O
W
R
O
W
E
O
P
EO
P
EO
P
EOP
EOPEOPEOPEOPG
G
G
G
W
S/
W
S/
W
S/
W
S/
W
S/
W
S/
W
S/
WS/WS/WS/WS/WS
S
S
S DW
WWWWWWWWWW
W
W
2901
2725
S/
W
S/
W
S/
W
EOPEOPEOPEOPEOPE
O
P
E
O
P
E
O
P
SSSSSSSSWWEOPE
O
P
E
O
P
EO
P
D
D
A
A
A
17
5
'
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:2 PSE
318508-166750
COMCAST #1 25 3 N N/A
TELCO #1 24 1 N N/A
D
N
E
1
0
T
H
S
T
R25'
S
FH
MV
V
V
V
W
V
W
W
W
V
MV
V
D
D
D
D CBCB
2
INDEX AVE NE4
5
6STA 12+50STA 13+00STA 13+50MATCHLINE SHEET5
STA 12+841R
9'
7'
8'
7'
5'
2'52'1
CONSTRUCTION NOTES:
TIE INTO EXISTING SPLICE CASE
SP.WAKV.0085
PROOF & PULL (1) 24CT FIBER
THROUGH EXISTING CONDUIT
PROOF & PULL (1) 24CT FIBER
THROUGH EXISTING RISER
OVERLASH (1) 24CT FIBER ON
EXISTING AERIAL STRAND
INSTALL (1) NEW 2" RISER AND PULL
(1) 24CT FIBER THROUGH
TRENCH AND PLACE (1) 2" CONDUIT
AND PLACE (1) 24CT FIBER
RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF
RENTON SPECIFICATIONS
2
3
4
5
6
1R
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
ALBERTSONS COMPANIES INC.
T23N R5E S9
2725 NE SUBSET BLVD, RENTON, WA 98056
JB0001247540
--------
CW TH 12/21/23
SS KB 3/20/2024
CONSTRUCTION PLAN
SS KB KB
6 6
0'10'20'
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
SW CHARLESTOWN ST & 49TH AVE SW
N
S
EW
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP24000055
Engineering
1 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
3 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
4 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
Page 1 of 1