HomeMy WebLinkAboutP_LivAway Hotel_Post Permit Revision 1 Change Summary_2400410_v1LivAway Hotel
Post Permit Revisions #1
4/10/2024
Sheet Change Log
Sheet No.
D-2.0
C-1.1
C-1.2
C-1.10
C-2.0
C-3.0
C-3.1
C-4.0
C-4.1
C-5.0
C-5.1
C-6.0
C-6.1
Description
Revised temporary chain link fence location along western property line
Added building canopies, columns, adjusted trash enclosure and revised east building entry and sidewalk
Revised Accessible Sign detail to include column mounted sign, revised ADA parking stall detail to show column mounted signs
Adjusted trash enclosure and concrete pad size
Adjusted grading at trash enclosure and east building entry walk
Added roof downspouts, roof drain collection system and adjusted storm drainage system as required to accommodate roof drains
Adjusted profiles per roof drainage updates
Revised pressure relief pipe discharge location and water meter size
Revised storm crossing and water domestic service profile
Adjusted sewer cleanout to accommodate new roof drains
Updated sewer profiles and crossings to accommodate new roof drains
Adjusted transformer and power line location to accommodate new roof drains
Revised crossings per storm and sewer updates