Loading...
HomeMy WebLinkAboutP_LivAway Hotel_Post Permit Revision 1 Change Summary_2400410_v1LivAway Hotel Post Permit Revisions #1 4/10/2024 Sheet Change Log Sheet No. D-2.0 C-1.1 C-1.2 C-1.10 C-2.0 C-3.0 C-3.1 C-4.0 C-4.1 C-5.0 C-5.1 C-6.0 C-6.1 Description Revised temporary chain link fence location along western property line Added building canopies, columns, adjusted trash enclosure and revised east building entry and sidewalk Revised Accessible Sign detail to include column mounted sign, revised ADA parking stall detail to show column mounted signs Adjusted trash enclosure and concrete pad size Adjusted grading at trash enclosure and east building entry walk Added roof downspouts, roof drain collection system and adjusted storm drainage system as required to accommodate roof drains Adjusted profiles per roof drainage updates Revised pressure relief pipe discharge location and water meter size Revised storm crossing and water domestic service profile Adjusted sewer cleanout to accommodate new roof drains Updated sewer profiles and crossings to accommodate new roof drains Adjusted transformer and power line location to accommodate new roof drains Revised crossings per storm and sewer updates