Loading...
HomeMy WebLinkAboutMFP24001549.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24001549 IVR Number: 24001549 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:03/26/2024Application Date:7231502415Parcel Number: 430 BURNETT AVE S Permit Type:04/10/2024Issue Date:Franchise Permit Work Class:04/10/2025Expiration Date:Minor Utility Job Number: 101170635Franchise Type:Electric Description: Puget Sound Energy Electric We are to replace two vault lids to anti skid lids along the eastside of Burnett Ave S between S 4th and 5th Street. We will also be relocating a transformer/j box combo vault that is currently in the driveway of 416 Burnett Ave S, Renton, WA 98057 to a new location in the planter in front of this address. This will require us to reroute the existing primary cable to this new transformer/j box combo vault as well as rerouting the service used to provide power to 416 Burnett Ave S. Potential for night and/or weekend work depending on feedback from City/city contractor. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101170635 BURNETT AVE S BETWEEN S 4TH & 5TH ST DUSTIN WELLER 206-379-4347 MFP24001549 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 4/10/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 410 Burnett Ave S Renton WA 98057 USA 416 Burnett Ave S Renton WA 98057 USA 406 Burnett Ave S Renton WA 98057 USA J01 11 11 BURNETT AVE SS 4TH ST S 5TH ST FROM TO TOW AWAY AREA PHONE 684-5444 NAME OF FIRM XXX-XXX-XXXX NO PARKING RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE W21-7UTILITY WORK AHEAD RIGHT SHOULDER CLOSEDW21-5aRUSE MAXIMUM AVAILABLE SPACE FOR SIGNS V01 N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Matlock Highbarger (808) 375-4152 Matlock.Highbarger@PSE.com 1 OF 3416 Burnett Ave S, Renton, WA 1 11917606 03/12/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of RENTON standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRONARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP UG/BOX/VAULTVAULT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425 MFP24001549 416 Burnett Ave S Renton WA 98057 USA 426 Burnett Ave S Renton WA 98057 USA J02 V01 11 11BURNETT AVE SS 5TH ST FROM TO TOW AWAY AREA PHONE 684-5444 NAME OF FIRM XXX-XXX-XXXX NO PARKING RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE S 4TH ST W21-7UTILITY WORK AHEAD RIGHT SHOULDER CLOSEDW21-5aRUSE MAXIMUM AVAILABLE SPACE FOR SIGNS Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Matlock Highbarger (808) 375-4152 Matlock.Highbarger@PSE.com 2 OF 3416 Burnett Ave S, Renton, WA 1 11917606 03/12/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of RENTON standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRONARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP UG/BOX/VAULTVAULT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425 N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MFP24001549 426 Burnett Ave S Renton WA 98057 USA 428 Burnett Ave S Renton WA 98057 USA 430 Burnett Ave S Renton WA 98057 USA J03 11 11 S 5TH STBURNETT AVE SS 4TH ST FROM TO TOW AWAY AREA PHONE 684-5444 NAME OF FIRM XXX-XXX-XXXX NO PARKING RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE W21-7UTILITY WORK AHEAD RIGHT SHOULDER CLOSEDW21-5aRUSE MAXIMUM AVAILABLE SPACE FOR SIGNS Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Matlock Highbarger (808) 375-4152 Matlock.Highbarger@PSE.com 3 OF 3416 Burnett Ave S, Renton, WA 1 11917606 03/12/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of RENTON standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRONARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP UG/BOX/VAULTVAULT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425 N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MFP24001549 N Vicinity Map 101170635UNIVERSAL CIRCUIT MAP (A2305E067/072) SCALE: NONE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. SCALE: NONE OVERHEAD CIRCUIT MAP (D2305E076/088) No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" BURNETT AVE S SIDEWALK RETROFIT RELOCATE J-BOX & ADJUST (2) VAULT LIDS PSE CAPITAL PROJECT GENERAL SPECIFICATIONS Scope of Work PSE WILL BE RELOCATING A COMBO JBOX AS WELL AS ADJUSTING LIDS TO GRADE AND INSTALLING ANTI-SKID LIDS WHERE NECESSARY. General -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. -Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles & Structures - Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. - All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. - Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. - Install grid numbers on all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. - Treat all field-drilled poles with copper napthenate wood preservative. - Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600 amp switch jumpers. Install tree wire conductor for jumpers on all poles that are double deadended with tree wire. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. - Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. UNDERGROUND CONSTRUCTION Excavation -Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for primary conductors and 24” of cover for secondary conductors. -Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for all conductors or as required by the permitting Agency. -All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover. -No rocks larger than 6” shall be included in backfill. -Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. -Restore all excavated areas to original condition. - If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be installed around the conduits to a depth of six inches above and to the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140. Vaults & Handholes - Refer to PSE standard 6775.0040 “Vault and Handhole Installation” - Vaults shall be placed level and 2” above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 “PVC Conduit Installation”. - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - All “spare” conduits shall be capped at each end. Owner / Developer Contact Info officeATTN: CITY OF RENTON 1055 S GRADY WAY RENTON, WA 98057 JONATHAN CHAVEZ 425-430-7288PHONE CABLE TV 11917606 101170635 N/A N/A N/A 584051149 N/A N/A N/A 108153187 PROJECT PHASE PWR NOTIF#ORDER# Superior UG Expense Removal OH Expense N/A 594158708 UG Expense OH Expense E-Mail: Cell Phone: Project Manager Contact Information: Manager:DUSTIN WELLER 206-379-4347 DUSTIN.WELLER@PSE.COM UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DUSTIN WELLER 206-379-4347 M/D/YY DAVID SANTIAGO 425-738-8705 M/D/YY N/A N/A N/A DAVID SANTIAGO 425-738-8705 M/D/YY N/A RENTON BURNETT AVE S SIDEWALK RETROFIT RELOCATE J-BOX & ADJUST (2) VAULT LIDS 410-430 BURNETT AVE S, RENTON, WA 98057 N/A N/A N/A 101170635 AS NOTED 1 / 2 KING N/A N/A CSPFEPI SE-18-23-05 N/A N/A A2305E067/072 D2305E076/088 R2305E072SE/NE GRA-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) LEGEND CONDUIT RISER OVERHEAD TRANSFORMER JUNCTION VAULT/JUNCTION BOX NEW CONDUCTOR AND OR TRENCH LINE DISCONNECT - FUSED PULL VAULT OR SPLICE VAULT EXISTING POLE DOWN GUY DISCONNECT - UNFUSED NEW POLE PADMOUNT TRANSFORMER SECONDARY HANDHOLE EXISTING CONDUCTOR TO BE REMOVED OR ABANDONED STREET LIGHT TOTAL UNDERGROUND TRANSFORMER ENERGY CUSTOMER DEMAND POINT OR OR OR OVERHEAD JUMPER CONNECTION PREL I M I N A R Y NOT F O R C O N S T R U C T I O N POTELCO JOB SITE JOB SITE JOB SITE MFP24001549 TRAINTRACKSEXIST REMV EXIST "428 BURNETT AVE S""430 BURNETT AVE S""426 BURNETT AVE S""416 BURNETT AVE S""416 BURNETT AVE S""410 BURNETT AVE S""406 BURNETT AVE S"NEWNOTE: VAULT WILL NEED TO MAINTAIN 1' OF CLEARANCE FROM GAS TO THE WEST & 6" OF CLEARANCE FROM TELECOMMUNICATION TO THE EAST. NOTE: VAULT TO REMAIN. CHANGE OUT LID TO AN ANTI-SKID LID. NOTE: VAULT TO REMAIN. CHANGE OUT LID TO AN ANTI-SKID LID AND ADJUST/RESET VAULT TO CITIES FINAL SIDEWALK GRADE.BURNETT AVE S"707 S 4TH ST"EXIST EXIST GRA-151/0 ALABCGRA-151/0 ALABCGRA-151/0 ALABCTELCAB"434 BURNETT AVE S""438 BURNETT AVE S"BURNETT AVE SEXIST S 5TH ST EXIST GRA-151/0 AL ABC GRA-151/0 ALABCGRA-151/0 ALABCBURNETT AVE SNEW REMV EXIST EXIST S 5TH ST EXISTING 1-4" EXISTING 1-4" EXISTING 1-4" EXISTING 1-4" NEW 1-4" NEW 1-4" EXISTBURNETT AVE SNEW REMV EXIST EXIST S 5TH ST EXISTING 1/0 AL JKT AØ-30502 BØ-30503 CØ-30504 NEW 1/0 AL JKT AØ-XXXXX BØ-XXXXX CØ-XXXXX NEW 1/0 AL JKT AØ-XXXXX BØ-XXXXX CØ-XXXXX EXISTING 1/0 AL JKT BØ-EHX818 EXISTING 1/0 AL JKT AØ-AGE911 NEW 1/0 AL JKT AØ-XXXXX BØ-XXXXX CØ-XXXXX EXISTING 1/0 AL JKT AØ-UNK BØ-UNK CØ-UNK EXIST SITE PLAN 101170635SCALE: 1" = 20' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DUSTIN WELLER 206-379-4347 M/D/YY DAVID SANTIAGO 425-738-8705 M/D/YY N/A N/A N/A DAVID SANTIAGO 425-738-8705 M/D/YY N/A RENTON BURNETT AVE S SIDEWALK RETROFIT RELOCATE J-BOX & ADJUST (2) VAULT LIDS 410-430 BURNETT AVE S, RENTON, WA 98057 N/A N/A N/A 101170635 AS NOTED 2 / 2 KING N/A N/A CSPFEPI SE-18-23-05 N/A N/A A2305E067/072 D2305E076/088 R2305E072SE/NE GRA-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CABLE REMOVAL TABLE CABLE NO.Location Wire Size & Type Length (per conductor)RemarksFromTo AØ-30508 BØ-30509 CØ-30510 J01 J02 1/0 AL JKT 105' AØ-30505 BØ-30506 CØ-30507 J02 J03 1/0 AL JKT 115' AØ-UNK BØ-UNK CØ-UNK J02 TO TUT IN J02 1/0 AL JKT 5' TOTAL 675 FEET (1/0 AL JKT). ACTUAL __________ FEET REMOVED SERVICE RELOCATIONS AND CONVERSIONS NAME AND ADDRESS Meter Number Old Point of Delivery New Point of Delivery Service Notes VFW 1263 416 BURNETT AVE S, RENTON, WA 98057 P149157354 J02 J02A TUT XFMR/VAULT RELOCATION Vault & Equipment Table Site Working Space Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) MATERIAL INFORMATION ASBUILT INFORMATION Foreman-Complete LB DC J01 EXISTING 317731 166035 575 J-BOX/TUT COMBO VAULT 75 KVA TUT XFRM 120/240V 3 -INSTALL 3-ELB10J J02 REMOVE 317721 166035 575 J-BOX/TUT COMBO VAULT 3X25 KVA TUT XFMR 120/208V WYE/WYE --- J02A NEW 317728 166041 4'8"X7'X7'8" Deep HH & Adj Cover w/ Two 3' Square Anti-skid Doors Mat ID: 9996333 J-Box below grade w/3-4pos bus Mat ID: 7625900 3X25 KVA TUT XFMR 120/208V WYW/WYW Mat ID: 6235000 9 3 JBOX3AS (STD 6055.1030) INSTALL 9-ELB10J INSTALL 3 DC-7630600 TUT3LRA 6045.7050 J03 EXISTING 317711 166034 644 J-BOX/TUT COMBO VAULT 25 KVA TUT XFRM 120/240V 3 -INSTALL 3-ELB10J J04 EXISTING 317696 166033 5106 J-BOX VAULT J-BOX --EXISTING SITE SPECIFIC NOTES J01 (317731-166035) EXISTING -INSTALL (1) 575 ADJ. COVER W/TWO 3' SQ ANTI-SKID DOORS (MID: 9996170) J03 (317711-166034) EXISTING -INSTALL (1) 644 COVER W/TWO 3' SQ ANTI-SKID DOORS (MID: 9996200) -ADJUST/SET VAULT TO MATCH FINAL GRADE OF (MID: 9996191) SIDEWALK USING BRICK, SHIM, AND GROUT AS NECESSARY IP1 -EXPOSE AND INTERCEPT EXISTING 1-4" AND EXTEND SOUTH TO J02A IP2 -EXPOSE AND INTERCEPT EXISTING 1-4" AND EXTEND NORTH TO J02A IP3-IP4 -EXPOSE AND INTERCEPT EXISTING 1-4" ON BOTH ENDS TO BYPASS EXISTING J02 SP1 -REROUTE EXISTING SERVICE FROM "416" TO NEW XFRM AT J02A MATCHLINE SEE RIGHT AA MATCHLINE SEE LEFT AA SITE PLAN SCALE: 1" = 20' CONDUIT ONE LINE DIAGRAM SCALE: NONE CABLE ONE LINE DIAGRAM SCALE: NONE Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage J02 317721-166035 3X25KVA 120/208V Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (TUT) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information J02A 317728-166041 3X25KVA 120/208V 2-55x230 Primary Conduit Table (Foreman to Complete) LOCATION CONDUIT AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs)DB120 HDPE SCH 80 90°45°22°11°Actual Amount Installed (Conduit & Cable) J02A IP1 4 1 12 X 2 J02A IP2 4 1 10 X 2 IP3 IP4 4 1 15 X 4 Primary Cable Table (Foreman to Complete) LOCATION PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY Check applicable box A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed (Conduit & Cable) J01 J02A 1/0 AL JKT 70 XX XX XX J02A J03 1/0 AL JKT 155 XX XX XX J02A TUT IN J02A 1/0 AL JKT 5 XX XX XX 2-45x2 2-57x15 2-55x225 2-36x37 2-49x37 TOTAL UNITS ON PAGE: 2-36x37 2-45x2 2-49x37 2-55x455 2-57x152" Excavation - 30.5 cubic yards 8'-4" Crushed 6" Rock TOP VIEW 9' 11' SIDE VIEW 7'-0" 6'-0" 8" 4'-8" 1' 577 HH & ADJ COVER EXCAVATION DETAIL SCALE: NONE NOTE: For installation in land scaped/un-paved surfaces only Final Grade (2) 3' Square Anti-skid Diamond Plate DoorsCover 2180 lbs 7'-8" UPGRADE EXISTING LID TO http://www.fogtiteinc.com/i mages/_15a_J-11_Type_1 _Non_Skid.pdf MFP24001549