Minor Franchise Permit: MFP24001692
IVR Number: 24001692
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:04/01/2024Application Date:1432600055Parcel Number: 15782 116TH AVE SE
Permit Type:04/11/2024Issue Date:Franchise
Permit Work Class:04/11/2025Expiration Date:Minor Utility
Job Number: 101151836Franchise Type:Electric
Description: Puget Sound Energy Electric AT SW#X351, Grid# 317089 1665676 install 3 Siemens Fusesaver.
Install stirrups with hot taps and all jumpers will be insulated. NO HS CUTS
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101151836
15782 116TH AVE SE
KEVIN POPICH 253-208-0000
MFP24001692
Monday - Friday
Scott Warlick CED 4/11/2024
9:00am 2:00pm
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
DRIVEWAYDRIVEWAY
DRIVEWAY
DRIVEWAY
P01
SE 160TH ST
SE 20TH PL
ONE LANEROADAHEADROADWORKAHEAD
ROADWORK
AHEAD
117TH AVE SESE
1
6
0
T
H
S
T
BEPREPAREDTO STOP
ONE LANEROADAHEAD
ROADWORKAHEAD
SPEEDLIMIT
30 200'+/-200'+/-200'+/-200'+/-SPEEDLIMIT
30
116TH AVE SE116TH AVE SEROADWORKAHEAD
100'+/-100'+/-SPEEDLIMIT
25
SPEEDLIMIT25ROADWORKAHEAD
Pedestrian Escort: Stop work, securepassable ADA compliant pedestrian accesson existing sidewalk (4' min.). Clear zonemust be free of overhead hazards whenpedestrians are moving through the work zone.
MANDATORY
Closure affects resident
driveway.
Property owner permissionrequired to block driveway.
Notify affected residents of
work times and dates.
100'+/-
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 10' lanes
3. Maintain local access
4. Notify Transit Authority
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
OFFICE: 800-343-4049
DIRECT: 425-923-9086
WATCP@KNDSERVICES.NET
CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
KEVIN POPICH
253-208-0000
03/01/24
DESIGNED BY: WHITNEY PATERNO
WSTCS#012693
11713662
...
15782 116TH AVE SE
RENTON, WA 98058
PLACE SPOTTER AT ANY OPEN DRIVEWAY OR
ENTRANCE LOCATED WITHIN THE WORK ZONE TO
ASSIST TRAFFIC OUT OF WORK ZONE.
MAINTAIN DRIVEWAY ACCESS, IF UNABLE TO NOTIFY
HOMEOWNERS OF TEMPORARY CLOSURE.
MAINTAIN ACCESS TO CROSSWALK. SPOTTER TO
ASSIST PEDESTRIANS AROUND WORK ZONE.
MAINTAIN ACCESS TO BUS STOP. IF UNABLE TO
COORDINATE WITH METRO 15 DAYS IN ADVANCE OF
WORK TO CLOSE OR MOVE BUS STOP TEMPORARILY
Legend
Cone
Flagger
Pole
SpotterBEPREPAREDTO STOP W3-4 Be Prepared To StopROADWORKAHEADW20-1 Road Work Ahead
ONE LANEROADAHEAD W20-4 One Lane Road Ahead
W20-7a flagger
Work Area
www.invarion.com
MFP24001692
N
Vicinity Map
Thomas Guide Page XX
101151836ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
ROL-16 SW X351 3FSGENERAL SPECIFICATIONS
Scope of Work
Electric Project Scope Document
Project Information:
Project Name: 2305E083 ROL-16 sw X351 3FS 116th Ave SE
Notification Number: 11713662
Project Summary:
At SW#X351, Grid # 317089-166576 install 3 Siemens Fusesavers.
Install stirrups with hot taps and all jumpers will be insulated.
Note, capacity issue being looked at by Planners.
Non-storm customer minute interruptions saved: 29,640
Non-storm customer interruptions saved: 494
Non-storm outages saved: 0.7
Project Justification:
In PSE's service territory, it is projected that 60% of the outages on overhead systems
are temporary in nature, such as a limb falls through the primary line making contact
along the way. Fusesavers are devices that when placed in series with fused cutouts
will provide an instantaneous operation and then after a period of time reclose. If the
fault is temporary then customers will see the brief drop and pick, but if permanent it
will allow the fuse to blow.
Construction Criteria:
Use temporary jumpers around existing fuses to keep system in service and avoid the
need for customer outages during the installation of the Siemens Fuse Savers.
Install grid number boards on PSE poles where they're missing.
Install new OH switch number boards if not present.
Replace LB cutouts with LI cutouts and fuse at 100T.
Provide Planner with preliminary and final work sketches and notify Planner when the
project is scheduled, then complete. Keep Planner notified of correspondence with
ROW.
General
-All work is to be completed per PSE Standards & Practices. Copies of all PSE
Standards are available upon request.
-Work sites shall be kept clear of debris and all construction materials; equipment
and packing shall be removed daily.
-Return all unused and removed poles, transformers and hardware to PSE,
storeroom. All copper shall be coiled and returned the day it is removed from the
poles. Remove all unused pins and insulators.
-Return all streetlights, area lights and floodlights to Sumner yard.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a
minimum of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in
red on Foreman's copy of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading
requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of
each work day, or as otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with
local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been
re-established or disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
OVERHEAD CONSTRUCTION
Poles & Structures
-Poles are to be installed or relocated as staked. Unless otherwise noted, all pole
location measurements are from the center of the pole.
-All new poles set shall be the class indicated on the sketch, or better. Do not set a
lower class pole than specified.
-Install ground plate assembly on all new poles. Install Switch Ground Assembly per
standard specification 6014.1000 at new gang operated switch locations.
-Install grid numbers on all new and existing poles as shown on sketch.
-Straighten existing poles as indicated or as necessary.
-Treat all field-drilled poles with copper napthenate wood preservative.
-Remove old poles after communication companies have transferred off and return to
PSE storeroom. Fill and crown pole holes and restore area similar to adjacent
landscaping.
Conductors & Equipment
- Transfer all overhead and underground primary, secondary and service conductors
and guys to new poles set, unless otherwise indicated on this sketch.
- Transfer existing transformers to new poles unless otherwise indicated on this sketch.
- Use stirrups to connect all overhead and underground primary taps, and all
transformers. Install at all sites being worked within the scope of the project where
they are currently missing.
- Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600
amp switch jumpers. Install tree wire conductor for jumpers on all poles that are
double deadended with tree wire.
- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.
- Connect primary taps and transformers to same phase as existing unless otherwise
shown on the drawing.
- All neutral connections to be made with solid compression connectors. Connect all
pole grounds to common neutral.
- Use Load-interrupter cutouts (with arc shields) on all primary overhead and
underground taps with fused protection above 40T.
- Install Wildlife Protectors on all transformers.
Owner / Developer Contact Info
officeATTN:
N/A
N/A
N/A
DALE ROBINSON 360-475-7025PHONE
CABLE TV
11713662 101151836
N/A 583....
N/A 584....
N/A
N/A
N/A 108....
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Removal
OH Expense 593251051
594....
UG Expense
OH Expense
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:KEVIN POPICH
206-716-2712
KEVIN.POPICH@PSE.COM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
K.POPICH 206-716-2712
A.CRAWFORD 425-559-5721
N/A N/A N/A
ACT-KF 602-833-6730 11/2/2023
N/A RENTON
ROL-16 SW X351 3FS
INSTALL 3 FUSESAVERS
317089-166576, 116th Avenue Southeast & Southeast 160th Street, Renton, WA
N/A N/A
N/A 101151836
AS NOTED 1/1
SOUTH KING N/A N/A QCSOKE
SW 21-23-05 N/A 211-084
2305E088 2305E088 2305E088 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LEGEND
CONDUIT RISER
OVERHEAD TRANSFORMER
JUNCTION VAULT/JUNCTION BOX
NEW CONDUCTOR AND OR TRENCH LINE
DISCONNECT - FUSED
PULL VAULT OR SPLICE VAULT
EXISTING POLE
DOWN GUY
DISCONNECT - UNFUSED
NEW POLE
PADMOUNT TRANSFORMER
SECONDARY HANDHOLE
EXISTING CONDUCTOR TO BE REMOVED
OR ABANDONED
STREET LIGHT
TOTAL UNDERGROUND TRANSFORMER
ENERGY CUSTOMER DEMAND POINT
OR
OR
OR
OVERHEAD JUMPER CONNECTION
JOB SITE*
PLAN VIEW
SCALE: 1" = 50'
Installed at site:
Grid Number:
Company ID#:
Primary phase connected to:
Material ID#:
Foreman to redline the following information
FUSE SAVER TRIP SAVER
INSTALLATION SCALE: 6" = 1 Mile SCALE: N.T.S.
OVERHEAD CIRCUIT MAP - AfterOVERHEAD CIRCUIT MAP - Before
JOB SITE *
SITE SPECIFIC NOTES
P01: 317089-166576
TRANSMISSION POLE 0/14
-IF NECESSARY, REPLACE (3) LI C/O'S (DLS315F) & (3) 100T FUSES (MID 3412700) PER STD 6022.1060, SEE WAIVER DETAIL 2-24C
-INSTALL ON SOURCE SIDE OF PRIMARY ARM
-INSTALL (3) ARM MOUNT FUSESAVERS (FUS3AM) PER STD 6022.1060, SEE WAIVER DETAIL 2-24N X 2
-INSTALL ON LOAD SIDE OF PRIMARY ARM
-INSTALL SW# X351FS (FUSESAVER)
-INSTALL SW# X351 100T
Installed at site:
Grid Number:
Company ID#:
Primary phase connected to:
Material ID#:
Foreman to redline the following information
FUSE SAVER TRIP SAVER
INSTALLATION
Installed at site:
Grid Number:
Company ID#:
Primary phase connected to:
Material ID#:
Foreman to redline the following information
FUSE SAVER TRIP SAVER
INSTALLATION
X351 100T
X351FS
X351 100T
X351FS
ROL
16
ROL
16
ROL
16
425.559.5712 1/18/2024
MFP24001692