STORMWA TER POLL UT/ON PREVENT/ON NOTES
1. NO LIQUIDS INCLUDING PETROLEUM PRODUCTS, FUEL, SOL VENTS,DETERGENTS, PANT, PESTIC/DES, CONCRETE ADMIXTURES,
FORM OILS, ETC. SHALL BE STORED ON SITE.
2. ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS, THAT OCCUR ON -SITE DURING CONSTRUCTION
SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER.
3. ALL FUELING SHALL BE PRO1/IDED BY A FUELING TRUCK. NO FUEL SHALL BE STORED ON SITE.
4. ALL 1/EH/CLE MAINTENANCE AND REPAIRS SHALL BE DONE OFFS1IF
5. CONCRETE WASTE SHALL BE HANDLED AS LISTED. -
A. UNUSED CONCRETE REMAINING /N THE TRUCK AND PUMP SHALL BE RETURNED TO ORIGINATING BATCH PLANT FOR
RECYCLING.
9 CONCRETE TRUCK CHUTES, PUMPS, INTERNALS, HAND TOOLS INCLUDING, BUT NOT LIMITED TO,, SCREEDS, SHOVELS,
RAKES, FLOATS, AND TROWELS SHALL BE WASHED OFF ONLY INTO FORMED AREAS AWAITING INSTALLATION OF
CONCRETE OR ASPHAL T.
C. EQUIPMENT THAT CANNOT BE EAS/L Y MOVED, SUCH AS CONCRETE PA VfRS, SHALL ONL Y BE WASHED /N AREAS THAT
DO NOT DIRECE Y DRAIN TO NATURAL OR CONSTRUCTED STORMWA TER CONVEYANCES.
D. WHEN NO FORMED AREAS ARE AVAILABLE, CONCRETE WASTE SHALL BE DISCHARGED TO A PA1/ED OR LINED SUMP.
SEE THESE PLANS FOR LOCATION OF THE SUMP. WASTE WATER WITHIN THE SUMP SHALL EITHER BE NEUTRALIZED
PR/OR TO DISCHARGE TO THE SEDIMENTATION FACILITY OR DISPOSED OF IN A MANNER THAT DOES NOT VIOLATE
GROUNDWATER OR SURFACE WATER QUALITY STANDARDS.
6. SLURRY, CUTTINGS, AND PROCESS WATER FROM SAWCUTTING AND SURFACING SHALL BE DISCHARGED TO FORMED AREAS
AWAITING INSTALLATION OF CONCRETE OR ASPHAL T OR TO PA VED OR LINED SUMP. WASTEWA TER FROM CONCRETE SLURRY
WASH SHALL NOT BE DISCHARGED INTO THE SURFACE WATER, SEDIMENT RETENTION SYSTEM, OR THE VAULT.
7. WHEEL WASH, OR TIRE BATH WASTEWATER, SHALL BE DISCARDED TO THE SEDIMENTATION FACILITY OR TO THE SANITARY
SEWER.
8. APPLICATION OF AGRICULTURAL CHEMICALS, INCLUDING FERTILIZERS AND PESTICIDES, SHALL BE CONDUCTED /N A MANNER
AND AT APPLICATION RATES THAT WILL NOT RESUL T IN LOSS OF CHEMICAL TO STORMWA TER RUNOFF. MANUFACTURERS'
RECOMMENDATIONS SHALL BE FOLLOWED FOR APPLICATION RATES AND PROCEDURES.
9. THE CONTRACTOR SHALL DESIGNATE A PERSON AS THE RESPONSIBLE REPRESENTATIVE IN CHARGE OF EROSION CONTROL
AND MAINTENANCE OF ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION FACILITIES.
DUST CONTROL
WHEN EXPOSED SO/L SURFACES ARE EXPOSED TO THE POINT THAT W/ND TRANSPORT /S POSSIBLE, THE EXPOSED SOILS SHALL
BE SPRA YED UNTIL WET, BUT RUNOFF SHALL NOT BE GENERA TED BY SPRA Y/NG.
430 r ----1 430
6' BERM (TYP)
160'
EL. = 424.46
1 MAX 3.• 1 MAX
\ \ � EL. = 420.96 j�
I\
420
\
WRE-BACKED S/L T FEN E
420
\ STAKED HA YBALES WRA OPED
\ WITH FIL TER FABRIC OR
2:1 MAX
EQUIVALENT D114VER
TESL AA
HOR/Z. SCALE. 1 "=30'
VERT. SCALE- 1" 5'
0+50
1+00 1+50
2+00 2+25
CREST OF
EMERGENCY SPILL WA Y
6' BERM (TYP)
430
430
2.1 MAX - EL. = 424.46 1 '
2:1 MAX
3.1 MAX
^ 3.1 MAX
OUTLET PIPE
EL. = 420.96
420
420
Tf -MPORARY CONTROL STRUCTURE.
SEE DETAIL THIS SHEET
SECURE TANDP/PE /N CONCRETE
PAD OR TO METAL PLATE TO
PREVEN T FL 0TA T/ON.
TES BB
HOR/Z. SC LE.• 1" 30'
VERT. SCALE- 1" 5'
0+50 1+00
UNDERGROUND LOCATOR SERVICE
CALL BEFORE YOU DIG.
811
DEWA TERING CONTROL
ANY RUNOFF GENERATED BY DEWATER/NG SHALL BE TREATED BY DISCHARGE TO SEDIMENTATION FACILITY. IF DEWATER/NG
OCCURS FROM AREAS WHERE THE WATER HAS COME INTO CONTACT WITH NEW CONCRETE, THE pH OF THE WATER MUST BE
MONITORED AND MUST BE NEUTRALIZED PRIOR TO DISCHARGE. A DEWA TER/NG PLAN MUST BE SUBMITTED AND APPR01/ED BY THE
CITY OF RENTON PRIOR TO DEWATERING ACT/Y/T/ES.
GENERAL STOCKPILENOTES
STOCKPILE AREAS TO BE COVERED WITH 1/ISQUEEN PLASTIC (MIN/MUM 6 MIL.), WHEN NOT IN USE. WSQUEEN /S TO BE HELD /N
PLACE BY A MIN/MUM OF 10 LB. SAND BAGS PLACED EVERY 15 FEET ALONG THE EDGE AND ACROSS THE PILE. STOCKPILE
HEIGHT NOT TO EXCEED 8 FEET.
CONSTRUCTION SEQUENCE
10 SCHEDULE AND A TTEND A PRE -CONSTRUCTION CONFERENCE W/TH THE CITY OF RENTON.
20 FLAG THE LIMITS OF CLEARING, INSTALL F/L TER FABRIC FENCE WHERE SHOWN ON PLANS. INSTALL E/THER 42" ORANGE
SAFETY FENCE OR F/L TER FABRIC FENCE ALONG ALL OTHER LIMITS OF CLEARING WHERE F/L TER FABRIC FENCE /S NOT
DELINEATED. CONTRACTOR TO COORDINATE WITH CITY TO WALK CLEARING LIMITS (AND TREE PROTECT/ON) PR/OR TO
CLEARING OF THE SITE TO ENSURE ADJUSTMENTS DO NOT NEED TO BE MADE TO PROTECT TREES AND Vf'GETAT/ON TO
REMAIN.
O3 CONSTRUCT THE TEMPORARY ROCK LINED CONSTRUCTION ENTRANCE.
40 CLEAR THE AREA SHOWN ON SHEET C2.01 FOR THE INSTALLATION OF TEMPORARY SEDIMENT POND. CONSTRUCT
TEMPORARY SEDIMENT POND. TEMPORARY SED/MENT POND CAN BE REMOV0 ONCE DETENTION VAUL T /S FULL Y
CONSTRUCTED.
O5 CONSTRUCT THE DETENT/ON VAUL IS, CONTROL STRUCTURE, AND OUTLET P/PE. SEE SHEETS C4.31 & C4.32 FOR DETA/LS.
INSTALL FILTER FABRIC PROTECT/ON ON NEWLY CONSTRUCTED CATCH BASINS AND EXISTING CATCH BASINS AS DESIGNATED
ON SHEETS C2. 01-C2. 02.
O6 BEGIN CLEARING AND GRADING WHILE EXTENDING TEMPORARY INTERCEPTOR SWALES. BRING THE SITE TO SUBGRADE,
INSTALL UT/L/TIES. HYDROSEED AS SOON AS PRACTICAL.
70 STAB/L/ZE ALL AREAS ONCE FINAL GRADES ARE ESTABLISHED BY SUITABLE APPL/CAT/ON OF BMPS BY HYDROSEED, SOD, OR
SIMILAR METHOD.
80 REMOVE EROSION CONTROL FACILITIES EXCEPT INLET F/L TERS. (ONL Y WHEN APPROVED BY CITY INSPECTOR)
90 PA VE ROADWA YS.
10 REMOVE INLET F/L TERS WHEN THE POTENTIAL FOR ON -SITE EROSION HAS PASSED.
11 CLEAN STORM SYSTEM PR/OR TO USE. DO NOT FLUSH CLEAN/NG WATER DOWNSTREAM.
12 TEMPORARY BMP'S CAN BE REMOVE-D ONL Y AFTER PROJECT /S COMPLETE AND RISK OF S/L T LADEN WATER LEA V/NG THE
SITE HAS PASSED.
WET WEA THER CONSTRUCTION NOTE. -
ALL PROJECTS WORKING UNDER A DRY SEASON TESC MANAGEMENT PLAN SHALL BE SUBSTANTIALL Y COMPLETE BY SEPTEMBER 30TH
TO A VOID IMPLEMENTA TION OF RA/NY SEASON CONSTRUCTION REQUIREMENTS. PROJECTS THA T W/LL NOT BE SUBSTANT/ALL Y
COMPLETED BY SEPTEMBER 30TH SHALL SUBMIT A SEASONAL SUSPENSION PLAN AND/OR WET WEA THER PLAN PREPARED /N
ACCORDANCE WITH THE GENERAL STANDARDS FOR RA/NY SEASON CLEARING / GRADING, FOR APPROVAL BY THE CITY OF RENTON.
AN APPROVED PLAN MUST BE AVAILABLE BY SEPTEMBER 1ST. ALLOW 7 WORKING DAYS FOR EACH REVIEW PER/OD. THE APPR01/ED
PLAN MUST BE IMPLEMENTED BY SEPTEMBER 15TH. IF NO PLAN HAS BEEN APPROVED BY SEPTEMBER 1ST, THEN STOP WORK AND
SECURE THE SITE AGAINST EROSION, NO FURTHER WORK W/LL BE PERM/TTED UNTIL MAY 1ST WHEN THE DRY SEASON RETURNS.
Docu51gn Envelope ID; 6EECF5B6-642A-4E4A-8436-A317AA538878
SANDEA0 0"P.1
10' lrlA%
Ili
TOE IN SHEETING IN I i�'•"'' .� I - .
4' ■ 4- MkN TRENCH
�11
PROVIDE ENERGY DISSIPATION
AT TOE. IF EROSION 18 LDLELY
10'MAX
NOTES:
1. C0 0910%5 OF USE
1.1 PLAST2 COVERING MAY BE USED ON DISTURBED AREAS THAT F1EOL11RE COVER ►IEA$UREB FOR LESS THAN 30 DAYS
1.2. PLASTIC IS PARTWULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES.
1-2- CLEAR PLASTIC SHE ETR-1G MAY BE USED OVER NEWLY-WEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH.
CLEAR PLASTID SHOULD NOT BE USED FOR THIS PURP05E DURING THE SUMMER MOKTHS.
1,4- THIS METHOD SHALL NOT BE U$!Eb UPSLOPE OF AREAS THAT MIGHT BE AOVER5rt-Y IMPACTED BY KtUNOFF- SUCH AREAS INCLUDE STEEP AND
UNSTABLE SLOPES.
L DESIGN AND INSTALLATK)N SPECIFICATIONS
2-1 PLASTIC SHEETING 5HCULD HAVE A MINIMUM THICKNESS OF D.06 MILLUETER5
2.2- IF EROSION AT THE TOE OF A SLOPE IS Li KELY. A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SMALL BE IN87ALLEDAT THE TOE
OF THE SLOPE IN DRDER TO REDUCE THE VELOCITY OF RUNOFF.
2.3. TIRES. SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC
Z4, SEAFAS BETWEEN SHEETS MUST OVEW APA MINIMUM Of 12 INCHES AND BE WEIGHTED OR TAPED
L IIIIAdNTENANCE STANDARDS
31 TORT! SHEETS MUST BE REPLACED AND OP EN SEAMS REPAIRED.
3.2- IF THE PLASTFC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATIDN. 1T MUST BE COMPLETELY REMOVED AND REPLACED
3.3- W HEN THE PLASTIC i5 NO LONGER NEEDED, FT SHALL HE COMPLETELY REMOVED -
UN LESS OT-101%g5E NOTFP, DRAVOUn I5 7JOT TO W-At£ INF51
STD, PLAN • 213.30
'R PUBLIC PLASTIC COVERING aK 9/26/2019 1
DEPAARTMENTMENT GAZ
4 5 AM
TEMPORARY COVER
1. FROM MAY 1 TO SEPTEMBER 30 ANY DISTURBED AREA /N WHICH NO ADDITIONAL WORK W/LL BE PERFORMED WITHIN 7
DAYS SHALL BE PROTECTED BY STRAW MULCH, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING, CRUSHED ROCK, OR
OTHER APPROVED METHODS.
2. PREFERRED MULCH, HAY, OR STRAW
A. DEPTH OF THE APPLICATION A MIN/MUM OF 2 INCHES.
B, APPL/CA TION RA TE 75 TO 100 POUNDS (TWO TO THREE BALES) PER 1, 000 50. FT. 1. 5 TO 2.5 TONS (90 TO 120
BALES) PER ACRES
3. IN AREAS 2:1 OR STEEPER, ALL WINDBLOWN AREA MULCH MAY NEED TO BE ANCHORED DOWN WITH THE NETTING, KEPT
MOIST, OR BE AN EQUIVALENT APPROVED METHOD.
PERMANENT COVER
O
O
N
0
N
v
I
CONSTRUCTION ACCEPTANCE W/LL BE SUBJECT TO A WELL ESTABLISHED GROUND COVER THAT WILL FULFILL THE
REQUIREMENT OF THE APPROVED CONSTRUCTION PLAN.
2.
ALL DISTURBED AREAS, SUCH AS RETENTION FACILITIES, ROADWAY BACKSLOPES, ETC., SHALL BE SEEDED WITH A
O
PERMANENT GROUND COVER OR AS DIRECTED BY CITY INSPECTOR TO M/N/M/ZE EROSION. GRASS WILL BE DONE USING AN
APPROI/ED HYDROSEEDER OR OTHERWISE APPROVED BY ENGINEER.
THE
FOLLOWING BMPS SHALL APPL Y TO ALL GRADING AND CLEARING ACTIVITY PERFORMED BETWEEN OCTOBER 1 AND MARCH 31:
O
I
GRADING AND CONSTRUCTION SHALL BE TIMED AND CONDUCTED /N STAGES TO MINIMIZE SOIL EXPOSURE.
O
2.
EXPOSED SOILS SHALL BE COVERED W/TH/N 2 DAYS USING DAM MULCH, SOD, HOG FUEL, PLASTIC OR OTHER APPROVED
nN
`
PROTECTED COVER.
V
3
INSPECT AND MAINTAIN SED/MENT CONTROL MEASURES DAIL Y.
A. REPLACE ANY DAMAGED BMPS AND UPGRADE BASED ON WEATHER CONDITIONS.
V
B. REMOVE SED/MENT ACCUMULATION ONCE DEPTH EXCEEDS 6 INCHES.
4.
INSTALL CO/R LOG, ROCK OR STRAW BALE CHECK DAMS EVERY 100 FEET ON CENTER ALONG ALL DRAINAGE INTERCEPTOR
DITCHES.
5.
EROS/ON CONTROL MATERIALS ARE TO BE STOCKPILED ON SITE PR/OR TO ANY SITE ACTIVITY.
6.
AT STORM EVENT, NO ACTIVITY WILL OCCUR ON SITE, EXCEPT WORK ON EROS/ON CONTROL.
MAINTENANCE
o
1.
MAINTENANCE AND REPAIR OF EACH TEMPORARY AND PERMANENT EROSION AND SED/MENT CONTROL BMP SHALL BE
O
CONDUCTED AS NEEDED TO ENSURE DES/RED FUNCTION.
0
2.
VISUAL MONITORING OF ALL BMPS INSTALLED W/LL BE CONDUCTED AT LEAST ONCE EVERY CALENDAR WEEK AND WITHIN 24
CV
HOURS OF ANY STORMW,4 TER OR NON-STORMWA TER DISCHARGE FROM THE S17F IF THE SITE BECOMES /NACT VE AND /S
N
TEMPORARY STABILIZED, THE INSPECT/ON FREQUENCY MAY BE REDUCED TO ONCE EVERY CALENDAR MONTH.
3.
PERMANENT BMPS INSTALLED FOR THE CONTINUED USE OF STORMWA TER CONTROL SHALL BE EXAMINED AND RESTORED TO
FULL OPERATING COND/T/ON. IF SEDIMENT ENTERS THESE BMPS, THE SED/MENT SHALL BE REMOVED.
BERM EL= 426.46 - - �-
EMERGENCY
OVERFLOW SPILL WA Y
EL= 425.46
1
REVISED PER CITY COMMENTS
MJS
7/26/23
HHH
SUIRVEYED:
BY OTHERS
2
REVISED PER CITY COMMENTS
KEL
9/12/23
HHH
DESIGNED:
ROLL/ HEAVR/N
3
REVISED PER CITY COMMENTS
KEL
10/11/22
HHH
DRAWN:
MARY MOORE
CHECKED:
ROLL/ HEA VR/N
NO.
REVISION
BY
DATE
APPR
ROLL/ HE l/R/N
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
BERM OVERFLOW
RISER 0Vf-RFL0W
RISER EL= 424.46 _
TO OUTFALL
JJ' 426
AL TERNA P PEL Y, METAL
STAKES AND W/RE MAY
BE USED TO PRE I/ENT
FLOTAT/ON
RISER PIPE (PRINCIPLE SPILLWAY)
OPEN AT TOP WITH TRASH RACK
PRO VVE ADEQUATE
STRAPPING
POL YETHYLENE CAP
15"
-_____-
PERFORATED POL YETHYLENE
CORRUGATED
--___--
DRAINAGE TUBING, DIAMETER
METAL RISER
-------
MIN. 2" LARGER THAN
-----
DEWA TERING ORIFICE.
-----
TUBING SHALL COMPL Y WITH
L`)
-------
ASTM F667 AND AASHTO M294.
WATERTIGHT -------
COUPLING -------
-----
DEWA TERING ORIFICE,
TACK
.;''
SCHEDULE 40 STEEL STUB
WELD
` '
DIAMETER= 3-5/8"
EL= 420.96
6" M/N
`-------------- {-
WIRE -BACKED S/Z T FENCE,
STAKED HA YBALES WRAPPED
CONCRETE BASE
WITH FIL TER FABRIC OR
EQUIVALENT DIWDER.
20" MIN
TEMPORARYSEDIMENT POND RISER 10/11 /23
CIVIL ENGINEERING
VERTICAL• NAVD 1988
HORIZONTAL- NAD 1983/1991
DATU M
NO SCALE
CITY OF
RENTON
Planning/Building/Public Works Dept.
LANDSCAPE ARCHITECTURE
C;L)fm PLANNING
�zw� DESIGN SURVEYING
12100 NE 195th St, Suite 300 Bothell, Washington 98011 425.885.7877
R-425510
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
Fi•
DEVELOPMENT ENGINEERING
yqi 12/06/2023
TOWNS ON 12TH
3916 & 3926 NE 12TH ST, RENTON, WA 98056
TEMPORARY EROSION & SEDIMENTA TION
CONTROL NOTES
N
DATE:
F,0/111202J
ELOBo
PAGE
DRAWING NO:
C2.31
SHEET: OF:
10 93