Loading...
HomeMy WebLinkAboutR-425510Z ti O Z O N v STORMWA TER POLL UT/ON PREVENT/ON NOTES 1. NO LIQUIDS INCLUDING PETROLEUM PRODUCTS, FUEL, SOL VENTS,DETERGENTS, PANT, PESTIC/DES, CONCRETE ADMIXTURES, FORM OILS, ETC. SHALL BE STORED ON SITE. 2. ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS, THAT OCCUR ON -SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER. 3. ALL FUELING SHALL BE PRO1/IDED BY A FUELING TRUCK. NO FUEL SHALL BE STORED ON SITE. 4. ALL 1/EH/CLE MAINTENANCE AND REPAIRS SHALL BE DONE OFFS1IF 5. CONCRETE WASTE SHALL BE HANDLED AS LISTED. - A. UNUSED CONCRETE REMAINING /N THE TRUCK AND PUMP SHALL BE RETURNED TO ORIGINATING BATCH PLANT FOR RECYCLING. 9 CONCRETE TRUCK CHUTES, PUMPS, INTERNALS, HAND TOOLS INCLUDING, BUT NOT LIMITED TO,, SCREEDS, SHOVELS, RAKES, FLOATS, AND TROWELS SHALL BE WASHED OFF ONLY INTO FORMED AREAS AWAITING INSTALLATION OF CONCRETE OR ASPHAL T. C. EQUIPMENT THAT CANNOT BE EAS/L Y MOVED, SUCH AS CONCRETE PA VfRS, SHALL ONL Y BE WASHED /N AREAS THAT DO NOT DIRECE Y DRAIN TO NATURAL OR CONSTRUCTED STORMWA TER CONVEYANCES. D. WHEN NO FORMED AREAS ARE AVAILABLE, CONCRETE WASTE SHALL BE DISCHARGED TO A PA1/ED OR LINED SUMP. SEE THESE PLANS FOR LOCATION OF THE SUMP. WASTE WATER WITHIN THE SUMP SHALL EITHER BE NEUTRALIZED PR/OR TO DISCHARGE TO THE SEDIMENTATION FACILITY OR DISPOSED OF IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE WATER QUALITY STANDARDS. 6. SLURRY, CUTTINGS, AND PROCESS WATER FROM SAWCUTTING AND SURFACING SHALL BE DISCHARGED TO FORMED AREAS AWAITING INSTALLATION OF CONCRETE OR ASPHAL T OR TO PA VED OR LINED SUMP. WASTEWA TER FROM CONCRETE SLURRY WASH SHALL NOT BE DISCHARGED INTO THE SURFACE WATER, SEDIMENT RETENTION SYSTEM, OR THE VAULT. 7. WHEEL WASH, OR TIRE BATH WASTEWATER, SHALL BE DISCARDED TO THE SEDIMENTATION FACILITY OR TO THE SANITARY SEWER. 8. APPLICATION OF AGRICULTURAL CHEMICALS, INCLUDING FERTILIZERS AND PESTICIDES, SHALL BE CONDUCTED /N A MANNER AND AT APPLICATION RATES THAT WILL NOT RESUL T IN LOSS OF CHEMICAL TO STORMWA TER RUNOFF. MANUFACTURERS' RECOMMENDATIONS SHALL BE FOLLOWED FOR APPLICATION RATES AND PROCEDURES. 9. THE CONTRACTOR SHALL DESIGNATE A PERSON AS THE RESPONSIBLE REPRESENTATIVE IN CHARGE OF EROSION CONTROL AND MAINTENANCE OF ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION FACILITIES. DUST CONTROL WHEN EXPOSED SO/L SURFACES ARE EXPOSED TO THE POINT THAT W/ND TRANSPORT /S POSSIBLE, THE EXPOSED SOILS SHALL BE SPRA YED UNTIL WET, BUT RUNOFF SHALL NOT BE GENERA TED BY SPRA Y/NG. 430 r ----1 430 6' BERM (TYP) 160' EL. = 424.46 1 MAX 3.• 1 MAX \ \ � EL. = 420.96 j� I\ 420 \ WRE-BACKED S/L T FEN E 420 \ STAKED HA YBALES WRA OPED \ WITH FIL TER FABRIC OR 2:1 MAX EQUIVALENT D114VER TESL AA HOR/Z. SCALE. 1 "=30' VERT. SCALE- 1" 5' 0+50 1+00 1+50 2+00 2+25 CREST OF EMERGENCY SPILL WA Y 6' BERM (TYP) 430 430 2.1 MAX - EL. = 424.46 1 ' 2:1 MAX 3.1 MAX ^ 3.1 MAX OUTLET PIPE EL. = 420.96 420 420 Tf -MPORARY CONTROL STRUCTURE. SEE DETAIL THIS SHEET SECURE TANDP/PE /N CONCRETE PAD OR TO METAL PLATE TO PREVEN T FL 0TA T/ON. TES BB HOR/Z. SC LE.• 1" 30' VERT. SCALE- 1" 5' 0+50 1+00 UNDERGROUND LOCATOR SERVICE CALL BEFORE YOU DIG. 811 DEWA TERING CONTROL ANY RUNOFF GENERATED BY DEWATER/NG SHALL BE TREATED BY DISCHARGE TO SEDIMENTATION FACILITY. IF DEWATER/NG OCCURS FROM AREAS WHERE THE WATER HAS COME INTO CONTACT WITH NEW CONCRETE, THE pH OF THE WATER MUST BE MONITORED AND MUST BE NEUTRALIZED PRIOR TO DISCHARGE. A DEWA TER/NG PLAN MUST BE SUBMITTED AND APPR01/ED BY THE CITY OF RENTON PRIOR TO DEWATERING ACT/Y/T/ES. GENERAL STOCKPILENOTES STOCKPILE AREAS TO BE COVERED WITH 1/ISQUEEN PLASTIC (MIN/MUM 6 MIL.), WHEN NOT IN USE. WSQUEEN /S TO BE HELD /N PLACE BY A MIN/MUM OF 10 LB. SAND BAGS PLACED EVERY 15 FEET ALONG THE EDGE AND ACROSS THE PILE. STOCKPILE HEIGHT NOT TO EXCEED 8 FEET. CONSTRUCTION SEQUENCE 10 SCHEDULE AND A TTEND A PRE -CONSTRUCTION CONFERENCE W/TH THE CITY OF RENTON. 20 FLAG THE LIMITS OF CLEARING, INSTALL F/L TER FABRIC FENCE WHERE SHOWN ON PLANS. INSTALL E/THER 42" ORANGE SAFETY FENCE OR F/L TER FABRIC FENCE ALONG ALL OTHER LIMITS OF CLEARING WHERE F/L TER FABRIC FENCE /S NOT DELINEATED. CONTRACTOR TO COORDINATE WITH CITY TO WALK CLEARING LIMITS (AND TREE PROTECT/ON) PR/OR TO CLEARING OF THE SITE TO ENSURE ADJUSTMENTS DO NOT NEED TO BE MADE TO PROTECT TREES AND Vf'GETAT/ON TO REMAIN. O3 CONSTRUCT THE TEMPORARY ROCK LINED CONSTRUCTION ENTRANCE. 40 CLEAR THE AREA SHOWN ON SHEET C2.01 FOR THE INSTALLATION OF TEMPORARY SEDIMENT POND. CONSTRUCT TEMPORARY SEDIMENT POND. TEMPORARY SED/MENT POND CAN BE REMOV0 ONCE DETENTION VAUL T /S FULL Y CONSTRUCTED. O5 CONSTRUCT THE DETENT/ON VAUL IS, CONTROL STRUCTURE, AND OUTLET P/PE. SEE SHEETS C4.31 & C4.32 FOR DETA/LS. INSTALL FILTER FABRIC PROTECT/ON ON NEWLY CONSTRUCTED CATCH BASINS AND EXISTING CATCH BASINS AS DESIGNATED ON SHEETS C2. 01-C2. 02. O6 BEGIN CLEARING AND GRADING WHILE EXTENDING TEMPORARY INTERCEPTOR SWALES. BRING THE SITE TO SUBGRADE, INSTALL UT/L/TIES. HYDROSEED AS SOON AS PRACTICAL. 70 STAB/L/ZE ALL AREAS ONCE FINAL GRADES ARE ESTABLISHED BY SUITABLE APPL/CAT/ON OF BMPS BY HYDROSEED, SOD, OR SIMILAR METHOD. 80 REMOVE EROSION CONTROL FACILITIES EXCEPT INLET F/L TERS. (ONL Y WHEN APPROVED BY CITY INSPECTOR) 90 PA VE ROADWA YS. 10 REMOVE INLET F/L TERS WHEN THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 11 CLEAN STORM SYSTEM PR/OR TO USE. DO NOT FLUSH CLEAN/NG WATER DOWNSTREAM. 12 TEMPORARY BMP'S CAN BE REMOVE-D ONL Y AFTER PROJECT /S COMPLETE AND RISK OF S/L T LADEN WATER LEA V/NG THE SITE HAS PASSED. WET WEA THER CONSTRUCTION NOTE. - ALL PROJECTS WORKING UNDER A DRY SEASON TESC MANAGEMENT PLAN SHALL BE SUBSTANTIALL Y COMPLETE BY SEPTEMBER 30TH TO A VOID IMPLEMENTA TION OF RA/NY SEASON CONSTRUCTION REQUIREMENTS. PROJECTS THA T W/LL NOT BE SUBSTANT/ALL Y COMPLETED BY SEPTEMBER 30TH SHALL SUBMIT A SEASONAL SUSPENSION PLAN AND/OR WET WEA THER PLAN PREPARED /N ACCORDANCE WITH THE GENERAL STANDARDS FOR RA/NY SEASON CLEARING / GRADING, FOR APPROVAL BY THE CITY OF RENTON. AN APPROVED PLAN MUST BE AVAILABLE BY SEPTEMBER 1ST. ALLOW 7 WORKING DAYS FOR EACH REVIEW PER/OD. THE APPR01/ED PLAN MUST BE IMPLEMENTED BY SEPTEMBER 15TH. IF NO PLAN HAS BEEN APPROVED BY SEPTEMBER 1ST, THEN STOP WORK AND SECURE THE SITE AGAINST EROSION, NO FURTHER WORK W/LL BE PERM/TTED UNTIL MAY 1ST WHEN THE DRY SEASON RETURNS. Docu51gn Envelope ID; 6EECF5B6-642A-4E4A-8436-A317AA538878 SANDEA0 0"P.1 10' lrlA% Ili TOE IN SHEETING IN I i�'•"'' .� I - . 4' ■ 4- MkN TRENCH �11 PROVIDE ENERGY DISSIPATION AT TOE. IF EROSION 18 LDLELY 10'MAX NOTES: 1. C0 0910%5 OF USE 1.1 PLAST2 COVERING MAY BE USED ON DISTURBED AREAS THAT F1EOL11RE COVER ►IEA$UREB FOR LESS THAN 30 DAYS 1.2. PLASTIC IS PARTWULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES. 1-2- CLEAR PLASTIC SHE ETR-1G MAY BE USED OVER NEWLY-WEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH. CLEAR PLASTID SHOULD NOT BE USED FOR THIS PURP05E DURING THE SUMMER MOKTHS. 1,4- THIS METHOD SHALL NOT BE U$!Eb UPSLOPE OF AREAS THAT MIGHT BE AOVER5rt-Y IMPACTED BY KtUNOFF- SUCH AREAS INCLUDE STEEP AND UNSTABLE SLOPES. L DESIGN AND INSTALLATK)N SPECIFICATIONS 2-1 PLASTIC SHEETING 5HCULD HAVE A MINIMUM THICKNESS OF D.06 MILLUETER5 2.2- IF EROSION AT THE TOE OF A SLOPE IS Li KELY. A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SMALL BE IN87ALLEDAT THE TOE OF THE SLOPE IN DRDER TO REDUCE THE VELOCITY OF RUNOFF. 2.3. TIRES. SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC Z4, SEAFAS BETWEEN SHEETS MUST OVEW APA MINIMUM Of 12 INCHES AND BE WEIGHTED OR TAPED L IIIIAdNTENANCE STANDARDS 31 TORT! SHEETS MUST BE REPLACED AND OP EN SEAMS REPAIRED. 3.2- IF THE PLASTFC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATIDN. 1T MUST BE COMPLETELY REMOVED AND REPLACED 3.3- W HEN THE PLASTIC i5 NO LONGER NEEDED, FT SHALL HE COMPLETELY REMOVED - UN LESS OT-101%g5E NOTFP, DRAVOUn I5 7JOT TO W-At£ INF51 STD, PLAN • 213.30 'R PUBLIC PLASTIC COVERING aK 9/26/2019 1 DEPAARTMENTMENT GAZ 4 5 AM TEMPORARY COVER 1. FROM MAY 1 TO SEPTEMBER 30 ANY DISTURBED AREA /N WHICH NO ADDITIONAL WORK W/LL BE PERFORMED WITHIN 7 DAYS SHALL BE PROTECTED BY STRAW MULCH, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING, CRUSHED ROCK, OR OTHER APPROVED METHODS. 2. PREFERRED MULCH, HAY, OR STRAW A. DEPTH OF THE APPLICATION A MIN/MUM OF 2 INCHES. B, APPL/CA TION RA TE 75 TO 100 POUNDS (TWO TO THREE BALES) PER 1, 000 50. FT. 1. 5 TO 2.5 TONS (90 TO 120 BALES) PER ACRES 3. IN AREAS 2:1 OR STEEPER, ALL WINDBLOWN AREA MULCH MAY NEED TO BE ANCHORED DOWN WITH THE NETTING, KEPT MOIST, OR BE AN EQUIVALENT APPROVED METHOD. PERMANENT COVER O O N 0 N v I CONSTRUCTION ACCEPTANCE W/LL BE SUBJECT TO A WELL ESTABLISHED GROUND COVER THAT WILL FULFILL THE REQUIREMENT OF THE APPROVED CONSTRUCTION PLAN. 2. ALL DISTURBED AREAS, SUCH AS RETENTION FACILITIES, ROADWAY BACKSLOPES, ETC., SHALL BE SEEDED WITH A O PERMANENT GROUND COVER OR AS DIRECTED BY CITY INSPECTOR TO M/N/M/ZE EROSION. GRASS WILL BE DONE USING AN APPROI/ED HYDROSEEDER OR OTHERWISE APPROVED BY ENGINEER. THE FOLLOWING BMPS SHALL APPL Y TO ALL GRADING AND CLEARING ACTIVITY PERFORMED BETWEEN OCTOBER 1 AND MARCH 31: O I GRADING AND CONSTRUCTION SHALL BE TIMED AND CONDUCTED /N STAGES TO MINIMIZE SOIL EXPOSURE. O 2. EXPOSED SOILS SHALL BE COVERED W/TH/N 2 DAYS USING DAM MULCH, SOD, HOG FUEL, PLASTIC OR OTHER APPROVED nN ` PROTECTED COVER. V 3 INSPECT AND MAINTAIN SED/MENT CONTROL MEASURES DAIL Y. A. REPLACE ANY DAMAGED BMPS AND UPGRADE BASED ON WEATHER CONDITIONS. V B. REMOVE SED/MENT ACCUMULATION ONCE DEPTH EXCEEDS 6 INCHES. 4. INSTALL CO/R LOG, ROCK OR STRAW BALE CHECK DAMS EVERY 100 FEET ON CENTER ALONG ALL DRAINAGE INTERCEPTOR DITCHES. 5. EROS/ON CONTROL MATERIALS ARE TO BE STOCKPILED ON SITE PR/OR TO ANY SITE ACTIVITY. 6. AT STORM EVENT, NO ACTIVITY WILL OCCUR ON SITE, EXCEPT WORK ON EROS/ON CONTROL. MAINTENANCE o 1. MAINTENANCE AND REPAIR OF EACH TEMPORARY AND PERMANENT EROSION AND SED/MENT CONTROL BMP SHALL BE O CONDUCTED AS NEEDED TO ENSURE DES/RED FUNCTION. 0 2. VISUAL MONITORING OF ALL BMPS INSTALLED W/LL BE CONDUCTED AT LEAST ONCE EVERY CALENDAR WEEK AND WITHIN 24 CV HOURS OF ANY STORMW,4 TER OR NON-STORMWA TER DISCHARGE FROM THE S17F IF THE SITE BECOMES /NACT VE AND /S N TEMPORARY STABILIZED, THE INSPECT/ON FREQUENCY MAY BE REDUCED TO ONCE EVERY CALENDAR MONTH. 3. PERMANENT BMPS INSTALLED FOR THE CONTINUED USE OF STORMWA TER CONTROL SHALL BE EXAMINED AND RESTORED TO FULL OPERATING COND/T/ON. IF SEDIMENT ENTERS THESE BMPS, THE SED/MENT SHALL BE REMOVED. BERM EL= 426.46 - - �- EMERGENCY OVERFLOW SPILL WA Y EL= 425.46 1 REVISED PER CITY COMMENTS MJS 7/26/23 HHH SUIRVEYED: BY OTHERS 2 REVISED PER CITY COMMENTS KEL 9/12/23 HHH DESIGNED: ROLL/ HEAVR/N 3 REVISED PER CITY COMMENTS KEL 10/11/22 HHH DRAWN: MARY MOORE CHECKED: ROLL/ HEA VR/N NO. REVISION BY DATE APPR ROLL/ HE l/R/N SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY BERM OVERFLOW RISER 0Vf-RFL0W RISER EL= 424.46 _ TO OUTFALL JJ' 426 AL TERNA P PEL Y, METAL STAKES AND W/RE MAY BE USED TO PRE I/ENT FLOTAT/ON RISER PIPE (PRINCIPLE SPILLWAY) OPEN AT TOP WITH TRASH RACK PRO VVE ADEQUATE STRAPPING POL YETHYLENE CAP 15" -_____- PERFORATED POL YETHYLENE CORRUGATED --___-- DRAINAGE TUBING, DIAMETER METAL RISER ------- MIN. 2" LARGER THAN ----- DEWA TERING ORIFICE. ----- TUBING SHALL COMPL Y WITH L`) ------- ASTM F667 AND AASHTO M294. WATERTIGHT ------- COUPLING ------- ----- DEWA TERING ORIFICE, TACK .;'' SCHEDULE 40 STEEL STUB WELD ` ' DIAMETER= 3-5/8" EL= 420.96 6" M/N `-------------- {- WIRE -BACKED S/Z T FENCE, STAKED HA YBALES WRAPPED CONCRETE BASE WITH FIL TER FABRIC OR EQUIVALENT DIWDER. 20" MIN TEMPORARYSEDIMENT POND RISER 10/11 /23 CIVIL ENGINEERING VERTICAL• NAVD 1988 HORIZONTAL- NAD 1983/1991 DATU M NO SCALE CITY OF RENTON Planning/Building/Public Works Dept. LANDSCAPE ARCHITECTURE C;L)fm PLANNING �zw� DESIGN SURVEYING 12100 NE 195th St, Suite 300 Bothell, Washington 98011 425.885.7877 R-425510 IN COMPLIANCE WITH CITY OF RENTON STANDARDS Fi• DEVELOPMENT ENGINEERING yqi 12/06/2023 TOWNS ON 12TH 3916 & 3926 NE 12TH ST, RENTON, WA 98056 TEMPORARY EROSION & SEDIMENTA TION CONTROL NOTES N DATE: F,0/111202J ELOBo PAGE DRAWING NO: C2.31 SHEET: OF: 10 93