Loading...
HomeMy WebLinkAbout04249 Renton WA.Rpt.0006.2024-04-12.Reinforcing Steel Observations.GREENREINFORCING STEEL OBSERVATIONS REPORT Report Number:M7241122.0006 Service Date:04/12/24 20225 Cedar Valley Rd Ste 110 Report Date:04/12/24 Lynnwood, WA 98036-6365 Task:Reinforced Concrete 425-742-9360 Client Project Chick-fil-A Inc Chick-fil-A #04249 Renton, WA (T) Attn: Kari Teresa 375 Rainier Ave S 5200 Buffington Road Renton, WA 98055 Atlanta, GA 30097-3508 Project Number: M7241122 Services: Special Inspections / Materials Testing Terracon Rep.: Craig Williams Reported To:Jim Hibbard with ESI Contractor:ESI Report Distribution: See attached distribution list. Reviewed By:____________________________________ Myndi Kraft Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM022, 04-29-22 Rev.7 Page 1 of 1 Permit No: C23000412 General Information Jim Hibbard with ESI requested Terracon to be on site for reinforcing steel observation of the following elements: isolated footing. These elements are being constructed by EM Precision. The results of observation(s) for today were reported to Jim Hibbard with ESI. The construction documents referenced for this observation include: Approved Plans and Documents. Reinforcing Steel Terracon observed reinforcing steel detailed below for the following items (as applicable): grade, configuration, size, lap length, quantity, spacing, tying, clearances, steel condition and embedded items. Element Location Referenced Documents Status Comments (2) Refuse Enclosure Foundations West Chick-fil-A & North O’Reilly’s Auto Parts D2/S-602 & Note on S- 602 Complies Compliance Statement Based on our observations, reinforcing steel at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications. Photo Log Report Number:M7241122.0006 Service Date:04/12/24 20225 Cedar Valley Rd Ste 110 Report Date:04/12/24 Lynnwood, WA 98036-6365 Task:Reinforced Concrete 425-742-9360 Chick-fil-A IncAttn: Kari Teresa CT0001, 10-16-13, Rev.10 Page 1 of 1 West, Chick-fil-A Refuse Enclosure Foundation North, O’Reilly’s Auto Parts Refuse Enclosure Foundation Report Date: Service Date: Report Number: Task: M7241122.0006 04/12/24 04/12/24 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360Reinforced Concrete Distribution List Distribution Page (1) Chick-fil-A Inc, Kari Teresa (1) Barghausen Consulting Engineers, Inc., Alex Bell (1) City of Renton WA, Development Engineering (1) City of Renton WA, Patrick Decaro (1) City of Renton WA, Yong Qi (1) ESI Construction Inc, Eric Quevedo (1) ESI Construction Inc, Jim Hibbard (1) Jones Lang Lasalle, Agustin Solaberrieta (1) Jones Lang Lasalle, Maggie Nuckols (1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Myndi Kraft