Loading...
HomeMy WebLinkAboutMFP24001702.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24001702 IVR Number: 24001702 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/01/2024Application Date:3119900161Parcel Number: 1835 NE 12TH ST Permit Type:04/15/2024Issue Date:Franchise Permit Work Class:04/15/2025Expiration Date:Minor Utility Job Number: 104357318Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AND CONNECT NEW SERVICE Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 104357318 1835 NE 12TH ST JESSICA SCHULTZ 425-480-2925 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1835 NE 12th St Renton WA 98056 USA V01 POLICEUPO ©©SU N S E T B L V D N E111111111111ARRW-BRD LEFT KEEP R4-8B RIGHT LANECLOSED AHEAD W20-5RW4-2LROADWORK AHEADW20-1350'350'35 0 'W20-7ABE PREPARE D TOSTOP W3-4X'X'W2 0 - 7 AROADWORKAHEADW2 0 - 1 BEPREPAREDTOSTOPW3- 4 350' 350' 350'W20-7ABEPR E P A R E D TO ST O P W3-4X'X'RIGHT LANE CLOSED AHEAD W20-5RW20-7AX'X'X'ROAD WORK AHEAD W20-11 MILE BEFORE WORK AREA PCMS 11 11 11 11111111 11 11 11 11 11 11 11 11 I-405 ON RAMPNORTHBOUNDPLACE PCMS BOARDS 1 MILE BEFORE WORK AREA. TWO-SECOND SEQUENCE 3-LINE, 8 CHARACTER MESSAGES WILL READ: 1) 2) 3) ROAD WORKAHEAD RIGHT LANE CLOSED BE PREPARED TO STOP THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA 1111111111 SRMP 5.4 SRMP 12.60'70'35' N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Jaber Tofan 206-406-8460 Jaber.tofan@pse.com 1 OF 21835 NE 12th St Renton WA 98056 0 514507662 12/27/2023 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRONARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP WORK PIT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: John Crofoot Card No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658 Additional approval from WSDOT will be required for traffic control signs in their ROW PCMS board may cause confusion on 405. TEMPORARY TRAFFIC CONTROL PLAN WSDOT NOTES & TABLES ”” – Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Jaber Tofan 206-406-8460 Jaber.tofan@pse.com 2 OF 21835 NE 12th St Renton WA 98056 0 514507662 12/27/2023 Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24 John.Crofoot@pse.com (425)424-6658 SUA 2024A "City of Renton" EX 1Ø UG PRI N E S U N S E T B L V D EXIST 104357318N Vicinity Map 47.5028, -122.1950 Owner / Developer Contact Info officeATTN: WSDOT JIM RHODES 425-213-9930 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No No No No Developer "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Service Meter Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. SCHULTZ 425-480-2925 10/6/23 K. LIM 206-475-5503 10/6/23 N/A N/A N/A K. LIM 206-475-5503 10/6/23 N/A CITY OF RENTON WSDOT SUA 2024A New Perm Service 1835 NE 12th St #LGHTS Renton WA, 98056 PUGET SOUND ENERGY N/A N/A N/A 104357318 AS NOTED 1/1 KING N/A N/A QCSOKE T23 R05E S17 N/A N/A 2305E029 2305E040 2305E029 HIG-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA SCHULTZ 425-480-2925 JESSICA.SCHULTZ@PSE.COM ... ... ... RHODESJ@CONSULTANT.WSDOT.WA.GOV JOB SITE LEGEND PROPOSED 42"X48" VAULT & PM XFMR PROPOSED NEW UG PRIMARY PROPOSED 4'-8" SQ VAULT & TUT EXIST. 115KV WIRE PROPOSED 5'X7'X5' JBOX WSDOT SUA 2024A SERVICE 3. 2. 1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PSE STANDARDS. ANY DEVIATIONS FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S ENGINEERING AND NOTED ON THE FORMAN'S COPY. TAG CUSTOMER OWNED SERVICE ON SECONDARY(S) AT THE METER BASE AND AT THE POINT OF DELIVERY (THE TRANSFORMER OF PSE SECONDARY HANDHOLE). EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 "TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL" AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POWER GENERAL NOTES PSE NOTES: C. B. 1.STAKING OF GRADES AND VAULT LOCATIONS TRANSFORMERS SHALL BE LOCATED A MINIMUM OF 3 FEET FROM NONCOMBUSTIBLE WALL OR A MINIMUM IF 10 FEET FROM ANY DOOR, WINDOW OPENING OR COMBUSTIBLE WALL. TRANSFORMERS SHALL BE A MINIMUM OF 6 FEET FROM ANY GAS METER AND/OR FIRE FIGHTING EQUIPMENT. TRANSFORMERS SHALL NOT BE LOCATED UNDER ANY BUILDING EVES. AN AREA 10 FOOT IN FRONT OF ALL TRANSFORMERS LOCATIONS SHALL BE REASONABLY LEVEL AND CLEAR FROM ALL OBSTRUCTIONS. WHEN TRANSFORMERS ARE EXPOSED TO VEHICULAR TRAFFIC THEY MUST MEET THE FOLLOWING MINIMUM CLEARANCES REQUIREMENTS: FROM THE BACK & SIDES - 5 FEET: FROM THE FRONT (MUST ALLOW 10' MIN WORKSPACE) - 10 FEET. CLEARANCE ARE MEASURED TO ANY SURFACE NORMALLY USED BY VEHICULAR TRAFFIC (PARKING LOTS, PARKING SPACES, ALLEYS, DRIVEWAYS OR ROADWAYS) (SEE 0700.1600) CUSTOMER SHALL SUPPLY GUARDPOSTS WHEN THE MINIMUM CLEARANCE REQUIREMENTS TO VEHICULAR TRAFFIC CANNOT BE MET (SEE 0700.1600). SITE PREPARATION WORK AREA SHALL BE AT OF FINAL GRADE, CLEAR OF SPOILS OR CONSTRUCTION MATERIAL WHICH WOULD RESTRICT CONSTRUCTION ACCESS BEFORE WORK BEGINS. TRENCHING AND RESTORATION. A MINIMUM OF 36 INCHES OF COVER IS REQUIRED FOR PSE'S ELECTRICAL SYSTEMS. ALL PSE'S CONDUITS OR DIRECT BURIED CABLES ARE REQUIRED TO BE BEDDED IN 3 INCH AND COVERED WITH 6 INCH OF WASHED SAND. COMPACTION, RESTORATION AND ANY BACKFILL REQUIRE WITHIN THE PROPERTY. REMOVAL AND DISPOSAL OF MATERIALS NOT SUITABLE FOR BACKFILL. DITCH SLOPING OR SHORING PER WASHINGTON STATE LAW FOR EXCAVATIONS DEEPER THAN 4 FEET THAT WORKERS WILL ENTER. BACKFILL OF TRENCH SHALL BE COMPLETED PRIOR TO ENERGIZING. THE DEVELOPER SHALL NOT OBSTRUCT ACCESS TO PSE'S EQUIPMENT OR COVER WITH LANDSCAPING. REQUIREMENTS AROUND CITY WATER, SEWER & STORMS LINES 1 FEET SEPARATION CROSSING OVER UTILITIES. 5 FEET SEPARATION PARALLELING CITY UTILITIES. 6 FEET SEPARATION BETWEEN POWER VAULTS & FIRE HYDRANTS. DEVELOPER NOTES: THE DEVELOPER IS RESPONSIBLE FOR, BUT NOT LIMITED TO THE FOLLOWING ON PRIVATE PROPERTY. A. D. E. 2. 3. A. B. C. D. E. F. 4. 5. A. B. C. CONSTRUCTION OF ELECTRICAL SYSTEM MUST COMPLY TO PUGET SOUND ENERGY STANDARDS OWNER/DEVELOPER RESPONSIBILITIES: PROVIDE ALL TRANCHING, BACKFILL (SELECT BACKFILL AND COMPACTION TO 95% OF ORIGINAL DENSITY IN CROSSINGS) AND RESTORATION WITHIN THIS PROJECT. LOCATE: THE ONE CALL CENTER (1-800-424-5555) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION SO ALL UTILITIES CAN BE LOCATED PRIOR TO ANY DIGGING TRENCHING-PRIMARY: TRENCHES SUPPLIED FOR PRIMARY SYSTEMS OWNED & INSTALLED BY PSE MUST BE 18 INCHES MINIMUM IN WIDTH & SHALL HAVE A MINIMUM OF 36 INCHES COVER OVER THE TOP OF THE CONDUCTOR OR FROM THE TOP OF THE CONDUIT TO THE POINT OF FINAL GRADE, PROVIDE 3 INCHES OF SAND BEDDING BELOW AND 6 INCHES OF SAND BACKFILL. THE REMAINNG BACKFILL MAY CONSIST OF NATIVE MATERIAL IF SUITABLE (I.E.; FREE FROM ROCKS SHARP OBJECTS OR CORROSIVE MATERIALS THAT MAY DAMAGE CABLES OR CONDUIT). IF NATIVE MATERIALS ARE UNSUITABLE AS DETERMINED BY PSE OR ITS INSPECTOR, SELECT BACKFILL SHALL BE SUPPLIED BY THE CUSTOMER. BACKFILL THE EXCAVATION TO FINISHED GRADE AT 2 INCHES BELOW THE VAULT TOP AS SOON AS PRACTICAL AFTER FACILITIES ARE PLACED AND INSPECTED. THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH. THE TRENCH SHALL PROVIDED ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN POWER CONDUITS OR CABLE & ADJACENT UTILITY SERVICES. TRENCHING SERVICES: THE CUSTOMER'S SERVICE TRENCH MUST MEET SATE & LOCAL REGULATORY REQUIREMENTS. SECONDARY TRENCHES SHALL HAVE A MINIMUM OF 24 INCHES COVER. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. A 48 SQUARE INCH PIT MUST BE PROVIDED AT THE METER BASE. THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN CONDUITS OR CABLE & ADJACENT UTILITIES SERVICES.THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH. VAULT AND EXCAVATION: SIX INCHES (6") OF CRUSHED ROCK TO BE USED AT THE VAULT BASE. BACKFILL AROUND VAULTS SHOULD CONSIST OF GOOD COMPACTABLE MATERIAL SUCH AS CLEAN EARTH FILL, CRUSHED ROCK, OR SAND. NO VOIDS SHOULD REMAIN BETWEEN THE VAULT WALLS & SIDES OF THE EXCAVATION. STAKING: PRIOR TO CONSTRUCTION, LOT LINE AND GARDE SKATES WILL BE PROVIDED BY THE CUSTOMER/DEVELOPER. SITE PREPARATION: PRIOR TO CONSTRUCTION, THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE AND CLEAR OF ANY SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION ACCESS. EQUIPMENT ACCESS: ADEQUATE SPACE IS TO BE MAINTAINED AROUND PSE'S FACILITIES, UNIMPEDED BY FENCES, ROCKERIES, WALLS, STRUCTURES, ETC. GENERAL UNDERGROUND NOTES NOT TO SCALE UNIVERAL MAP (2305E029) NEW CUST. OWNED & INSTALLED WIRE JOB SITE EXISTING POLE PROPOSED 1Ø FUSED RISER CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date 1" = 20' SITE PLAN EXIST. 3Ø OH/UG PRIMARY 3002418557 104357318514507662 N/A VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 318631- 166372 EXISTING Keang Lim 3/20/24