HomeMy WebLinkAboutPRE-APP_Meeting SummaryDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 |www.rentonwa.gov PREAPPLICATION MEETING FOR 108th Ave SE Apartments 17023 108th Ave SE, Renton, WA 98055 PRE 24-000107 April 18, 2024 Contact Information: Planner: Jill Ding, 425-430-6598, jding@rentonwa.gov Public Works Plan Reviewer: Huy Huynh, 425-430-7384, hhuynh@rentonwa.gov Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org Building Department Reviewer: Rob Shuey, 206.550.8523, rshuey@rentonwa.gov Please retain this packet throughout the course of your project as a reference. Consider giving copies to engineers, architects, and contractors who will work on the project. You will need to submit an PDF copy of this packet when you apply for land use and/or environmental permits. When the project application is ready for submittal, you may email the project planner to start the prescreen process. Similarly, you may contact the assigned planner if there are any questions regarding submittal requirements. The pre-application meeting is informal and non-binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Development Engineering Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). M E M O R A N D U M DATE: April 2, 2024 TO: Jill Ding, Senior Planner FROM: Corey Thomas, Lead Plans Review Inspector SUBJECT: 108th Ave Apartments 1. The preliminary fire flow is 1,500 gpm. A minimum of two fire hydrants are required. One within 150-feet and one within 300-feet of each of the buildings. One hydrant is required within 50-feet of all fire department connections for the fire sprinkler systems. At least one new fire hydrant is required for this proposed project. Water is provided by Soos Creek Water District. A water availability certificate is required to be provided to us. 2. Fire impact fees are applicable at the rate of $579.41 per multifamily unit and there is no charge for parking garage spaces. This fee is paid at the time of building permit issuance. Credit is available if any existing structures are removed. 3. Approved fire sprinkler and fire alarm systems are required throughout all the buildings. Direct outside access is required to the fire sprinkler riser room. Fire alarm system is required to be fully addressable and full detection is required. Separate plans and permits required by the fire department for fire sprinklers and fire alarms. Please note that in Renton NFPA 13R fire sprinkler systems are only allowed up to a maximum of 12,000 square feet. 4. Fire department apparatus access roadways are required within 150- feet of all points on all buildings. Fire lane signage required for the on- site roadways. The required turning radius is 25-feet inside and 45-feet outside. Roadways shall be a minimum of 20 feet wide. Roadways shall support a minimum of a 30-ton vehicle and 75-psi point loading. The maximum grade allowed is 15 percent. An approved turnaround is required as the dead-end roadway is over 150 feet long. A hammerhead style turn around is acceptable. See attached diagram. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: April 16th, 2024 June 20, 2011 TO: Jill Ding, Planning FROM: Huy Huynh, Development Engineering SUBJECT: 108th Ave SE Apartments PRE24-000107 NOTE: The applicant is cautioned that information contained in this summary is preliminary and non- binding and may be subject to modification and/or concurrence by official city decision-makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above-referenced proposal located at parcel 0087100-0295. The following comments are based on the pre-application submittal made to the City of Renton by the applicant. WATER 1. The subject development is within the water service area of Soos Creek Water and Sewer District. A water availability certificate from Soos Creek Water and Sewer District is required as part of the Land use Application. 2. A copy of the water main improvements plans shall be submitted to the City of Renton as a part of the City’s Civil Construction permit. 3. The number and locations of fire hydrants shall be determined by the City of Renton Fire Department as part of the review of the project plans. SEWER 1. The subject development is within the water service area of Soos Creek Water and Sewer District. A sewer availability certificate from Soos Creek Water and Sewer District is required as a part of the Land use Application. 2. A copy of the sewer main improvement plans shall be submitted to the City of Renton as a part of the City’s Civil Construction permit. 414 Monroe Ave NE Mixed-Use, PRE 23-000303 Page 2 of 4 Oct 3, 2023 3. If the existing homes on the sites are served by private on-site septic systems, the septic systems shall be abandoned in accordance with King County Department of Health regulations and Renton Municipal Code. Surface Water 1. There is an existing 12in stormwater main located 108th Ave SE (see record drawing R-260308). 2. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water Design Manual will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton Surface Water Design Manual (RSWDM) to determine what type of drainage review is required for this site. The site falls within the City’s Flow Control Duration Standard Area matching Forested Conditions. The site falls within the Black River drainage basin and Panther Creek subbasin. The site does not fall within the City’s Aquifer Protection Area (APA). 3. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The current City of Renton Standard Details are available online in the City of Renton website https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRenton 4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will be required to provide enhanced basic water quality treatment. Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. Separate structural plans will be required to be submitted for review and approval under a separate building permit for the detention and/or water quality vault. 5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new runoff created by this development to the maximum extent feasible. On-site BMPs shall be evaluated as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan, including the application of on-site BMPs, shall be included with the land use application, as applicable to the project. The final drainage plan and drainage report must be submitted with the utility construction permit application. 6. Any new storm conveyance installed on or off-site shall be designed and sized in accordance with standards found in Chapter 4 of the 2022 RSWDM and shall account for the total upstream tributary area, assuming developed conditions for onsite tributary areas and existing conditions for any offsite tributary areas. 7. A geotechnical soils report for the site is required per the 2022 Renton Surface Water Design Manual Section C.1.3. Any removal of existing underground storage tanks and/or contaminated soils will be required to meet all local, State and Federal requirements. 8. Erosion control measures to meet the City requirements shall be provided. 9. The development is subject to a surface water system development charge (SDC) fees. Fees will be charged based on the rate at the time of construction permit issuance. • The current SDC fee is charged per square foot of new impervious surface at $0.92 per square foot, but not less than $2,300. • The full fee schedule can be found at: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10067864&dbid=1&repo=Cityof Renton TRANSPORTATION 1. Per City code 4-6-060 frontage improvements are required for new construction in excess of $175,000. The proposed project fronts 108th Ave SE to the East: 108th Ave SE Apartments PRE24-000107 April 18th, 2024 414 Monroe Ave NE Mixed-Use, PRE 23-000303 Page 3 of 4 Oct 3, 2023 a. 108th Ave SE is classified as Minor Arterial with an existing right of way (ROW) width ranging from of 60’ to 65’ as measured using the King County Assessor’s Map. Per RMC 4- 6-060, to meet the City’s complete street standards for Minor Arterial streets, a minimum ROW width of 91 feet is required. Per City code 4-6-060, half street improvements shall include a pavement width of 54 feet (27 feet from centerline including a new 5’ bike), a 0.5-foot curb, an 8-foot planting strip, an 8-foot sidewalk, 2-foot minimum clearance between sidewalk and property line, street trees and storm drainage improvements. Since the existing street wide are vary along the project frontage, the dedication of ROW fronting the site will be vary from 12.5’ to 15.5’ depending on final survey. b. To the West, Renton subdivision plat is installing part of a through road. This project will complete the remaining half by installing half street improvements including 10-foot pavement, 0.5-foot curb, 8-foot planter, and 5-foot sidewalk. An additional dedication of 23.5-feet from the North property line is required. 2. On and off-site ADA, curbing, sidewalk and parking lot/drive-aisle improvements will be reviewed in conjunction with the civil construction permit and will require a grading plan consisting of spot elevations and slopes showing that ADA and City specifications are being met. 3. Refer to City code 4-4-080 regarding driveway regulations. a. A minimum separation of 5 feet is required between driveway and the property line. b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall provide slotted drains. c. The width of any driveway shall not exceed thirty feet (30') exclusive of the radii of the returns or the taper section. 4. Undergrounding of all existing and proposed utilities is required on all frontages per RMC 4-6-090. 5. Street lighting is required for a project that consists of more than four (4) residential units. See RMC 4-6-060 for street lighting requirements. 6. Sites that generate 20 or more net new peak hour trips (either in the AM peak or PM peak) are required to do a traffic impact analysis. The trips should be calculated based on the guidelines of the current ITE Trip Generation Manual. Refer to the attached policy guidelines for traffic impact analysis for guidelines. If the site generates 20 or more new peak hour trips in either AM peak or PM peak, then applicant should contact the City to get information of the locations where traffic analysis is required. 7. Paving and trench restoration within the City of Renton right of way shall comply with the City ’s Trench Restoration and Street Overlay Requirements. 8. The development is subject to transportation impact fees. Fees will be charged based on the rate at the time of building permit issuance. a. The 2024 transportation impact fee for apartment is $7,550.02 b. Unless noted otherwise in the Fee Schedule, the 2024 transportation impact fee is $8,031.94 per net new PM peak Hour Vehicle Trip per PM Peak Hour Vehicle Trip. GENERAL COMMENTS 1. A frontage improvements are required, all existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along property frontage or within the site must be underground as outlined in RMC 4-6-090 – UTILITY LINES - UNDERGROUND INSTALLATION. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from the right- of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls. 3. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements. 33.5 20 108th Ave SE Apartments PRE24-000107 April 18th, 2024 414 Monroe Ave NE Mixed-Use, PRE 23-000303 Page 4 of 4 Oct 3, 2023 a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 4. All construction utility permits for utility and street improvements will require separate plan submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up- to-date plan submittal requirements: http://rentonwa.gov/business/default.aspx?id=42473 5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets. 6. Fees quoted in this document reflect the fees applicable in the year 2024 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. 108th Ave SE Apartments PRE24-000107 April 18th, 2024 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: April 18, 2024 TO: Pre-Application File No. PRE24-000107 FROM: Jill Ding, Senior Planner SUBJECT: 108th Ave SE Apartment – 17023 108th Ave SE, Renton, WA 98055 Parcel No. 0087000295 General: We have completed a preliminary review of the pre-application for the above- referenced development proposal. The following comments on development and permitting issues are based on the pre-application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision- makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public Works Administrator, Planning Director, Development Services Director, Development Engineering Director, and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available online at https://www.codepublishing.com/WA/Renton. Project Proposal: The applicant is proposing the construction of three (3) townhome buildings on a property located at 17023 108th Ave SE (APN 0087000295). The project site is vacant and totals approximately 42,180 square feet (0.97 acres) in size and is within the Residential-14 (R-14) zoning designation. The site is designated Residential High Density (RHD) in the Comprehensive Plan. The proposed townhomes would include a total of 13 new dwelling units. A total of 26 parking spaces are proposed for the townhome units. Vehicular access is proposed via a new dead end 20-foot wide driveway off of 108th Ave SE. According to COR Maps, no critical areas are mapped on the site. Current Use: The site is currently vacant. 1. Zoning /Land Use Designation, and Overlays: The property is located within the Residential High Density (RHD) land use designation and the Residential-14 (R-14) zoning designation. Attached dwellings - townhouses are a permitted use within the R-14 zone. 2. Density Requirements: There are no minimum net density requirements for townhouse development in the R-14 zone. The maximum net density is 14 dwelling units per acre (du/ac). The Residential High Density Land Use designation is intended to create new units where access, topography, and adjacent land uses create conditions appropriate for a variety of housing unit types, or where there is existing multifamily development. 108th Ave SE Apartment Page 2 of 7 April 18, 2024 The area of public and private streets (excluding alleys) and critical areas (excluding buffers) would be deducted from the gross site area to determine the “net” site area prior to calculating density. In order to calculate the proposed density of the project, any area of public road, private easement, and/or critical area dedication must be known. The gross site area is approximately 0.97 acres. Based on the 0.97 gross site area, the proposal for thirteen (13) dwelling units would result in a gross density of 13.4 du/ac (13 units / 0.97 acres = 13.4 du/ac). The proposed gross density of 13.4 du/ac would be within the density range permitted for the R-14 zone, however the applicant would be required to submit a density worksheet at the time of formal land use application demonstrating co mpliance with the net density requirements. 3. Development Standards: The project is subject to RMC 4-2-110A, “Development Standards for Residential Zoning Designations” effective at the time of complete application (noted as “R-14 standards” herein). Maximum Number of Dwellings – N/A for attached dwellings. Minimum Lot Size, Width and Depth – The minimum lot size in the R-14 zone is 3,000 square feet. The minimum lot depth is 60 feet. The minimum lot width is 30 feet for interior lots and 40 feet for corner lots. The existing lot appears to comply with the lot dimensional requirements for the R-14 zone. Setbacks – Setbacks are the minimum required distance between the building footprint and the property line and any private access easement. The required setbacks in the R-14 zone are 15 feet for the front yard (10 feet when access taken from an alley), 10 feet for the rear yard, 4 feet for interior side yards (none for attached dwelling units), and 15 feet for secondary front yards. The proposed townhomes appear to meet the setback requirements for the R-14 zone. Building Height – The maximum wall plate height is 24 feet with 3 stories. Roofs with a pitch equal to or greater than 4:12 may project an additional six (6) vertical feet from the maximum wall plate height; common rooftop features, such as chimneys, may project an additional four (4) vertical feet from the roof surface. Non-exempt vertical projections (e.g., decks, railings, etc.) shall not extend above the maximum wall plate height unless the projection is stepped back one-and-a-half (1.5) horizontal feet from each façade for each one (1) vertical foot above the maximum wall plate height. The pre-application materials did not indicate a proposal for building height expansion. An increase up to 32 ft. possible subject to administrative conditional use permit approval. Elevations were not provided with the preapplication materials; building height would be verified at the time of formal land use application. Building Coverage – The R-14 zone allows a maximum building coverage of 65% of the lot area. Building coverage requirements for the site would be verified at the time of formal land use application. Impervious Surface Coverage – The maximum impervious surface would be limited to 80%. Impervious surface requirements for the site would be verified at the time of formal land use application. Maximum Number of Units per Building – No more than six (6) units per building. 4. Residential Design and Open Space Standards: All new residential dwelling units in the R-14 zone would be subject to the Residential Design Standards outlined in RMC 4-2-115. 108th Ave SE Apartment Page 3 of 7 April 18, 2024 Residential Design Review occurs as part of the Building Permit Review. For example, site design requirements for townhomes in the R-14 zones would require 350 square feet of common open space for each unit in the development. Open space may not have a slope greater than 5%. Each ground-related dwelling shall have a private yard that is at least 250 square feet in size with no dimension less than eight feet (8') in width. An additional two hundred fifty (250) square feet of open space per unit shall be added to the required amount of common open space for each unit that is not ground related. An example of the residential design standard requirement includes building entry must take access from and face a street, park, common green, pocket park, pedestrian easement, or open space. Open space should be contiguous to the majority of the dwellings in the development, accessible to all dwellings, and shall be at least thirty feet (30') wide. All site design, open space and residential design standards applicable to the R-14 zone would be verified at the time of formal land use application. 5. Screening: Screening must be provided for all surface-mounted and roof top utility and mechanical equipment. The site plan application will need to include elevations and details for the proposed methods of screening (see RMC 4-4-095). 6. Refuse and Recycling Areas: A minimum of one and one-half (1-1/2) square feet per dwelling unit in multi-family residences shall be provided for recyclables deposit areas. A minimum of three (3) square feet per dwelling unit shall be provided for refuse deposit areas. A total minimum area of eighty (80) square feet shall be provided for refuse and recyclables deposit areas. Architectural design of any structure enclosing an outdoor refuse or recyclables deposit area or any building primarily used to contain a refuse or recyclables deposit area shall be consistent with the design of the primary structure(s) on the site as determined by the Administrator. Enclosures for outdoor refuse or recyclables deposit areas/collection points and separate buildings used primarily to contain a refuse or recyclables deposit area/collection point shall have gate openings at least twelve feet (12') wide for haulers. In addition, the gate opening for any separate building or other roofed structure used primarily as a refuse or recyclables deposit area/collection point shall have a vertical clearance of at least eleven feet (11'), but no more than fourteen feet (14'). Weather protection of refuse and recyclables shall be en-sured by using weather-proofed containers or by providing a roof over the storage area. See RMC 4-4-090 for additional information and standards. Compliance with the refuse and recyclable standards for multi-family use must be demonstrated at the time of formal land use application. 7. Fences/Walls: If the applicant intends to install any fences or retaining walls as part of this project, the location must be designated on the landscape plan or grading plan. A fence and/or wall detail should also be included on the plan. A fence taller than 6 feet shall require a building permit or an explicit exemption from the Building Official. A retaining wall that is 4 feet or taller, as measured by the vertical distance from the bottom of the footing to the finish grade at the top of the wall requires a building permit. A fence shall not be constructed on top of a retaining wall unless the total combined height of the retaining wall and the fence does not exceed the allowed height of a standalone fence. For more information about fences and retaining walls refer to RMC 4-4-040. 8. Landscaping: Except for critical areas, all portions of the development area not covered by structures, required parking, access, circulation or service areas, must be landscaped with native, drought-resistant vegetative cover. The minimum on-site landscape width required 108th Ave SE Apartment Page 4 of 7 April 18, 2024 along street frontages is 10 feet and shall contain trees, shrubs, and landscaping. Street trees in the ROW planter will also be required. A fifteen-foot (15') wide partially sight-obscuring landscaped visual barrier, or ten-foot (10') wide fully sight-obscuring landscaped visual barrier, is required along common property lines when a multi-family residential zone or use abuts a less intensive residential zone. Please refer to landscape regulations (RMC 4-4-070) for additional general and specific landscape requirements. A conceptual landscape plan demonstrating compliance with the landscape standards shall be submitted at the time of land use application. 9. Significant Tree Retention: When significant trees (greater than 6-inch caliper or 8-caliper inches for alders and cottonwoods) are proposed to be removed, a tree inventory and a tree retention plan along with an arborist report, tree retention plan and tree retention worksheet shall be provided with the formal land use application as defined in RMC 4-8-120. The tree retention plan must show preservation of at least 30% of significant trees. Please refer to RMC 4-4-130, Tree Retention and Land Clearing Regulations for further general and specific tree retention and land clearing requirements. In addition to retaining a minimum of 30% of existing significant trees, properties subject to an active land development permit shall comply with minimum tree credit retention requirements of a minimum of 30 credits per net acre. Tree credits encourage retention of existing significant trees with larger trees being worth more tree credits. TREE SIZE TREE CREDITS New small species tree 0.25 New medium species tree 1 New large species tree 2 Preserved tree 6 – 9 caliper inches 4 Preserved tree 10 – 12 caliper inches 5 Preserved tree 12 – 15 caliper inches 6 Preserved tree 16 – 18 caliper inches 7 Preserved tree 19 – 21 caliper inches 8 Preserved tree 22 – 24 caliper inches 9 Preserved tree 25 – 28 caliper inches 10 Preserved tree 29 – 32 caliper inches 11 Preserved tree 33 – 36 caliper inches 12 Preserved tree 37 caliper inches and greater 13 108th Ave SE Apartment Page 5 of 7 April 18, 2024 Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; significant trees over sixty feet (60') in height or greater than eighteen inches (18") caliper; and trees that shelter interior trees or trees on abutting properties from strong winds, which could otherwise allow such sheltered trees to be blown down if removed. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non-native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. The Administrator may require independent review of any land use application that involves tree removal and land clearing at the City's discretion. The Administrator may authorize the planting of replacement trees on the site if it can be demonstrated to the Administrator's satisfaction that replacement requirements in RMC 4-4- 130H1e can be met. Tree retention standards shall be applied to the developable area, as defined in RMC 4-11- 040, Definitions D, of a property. A formal tree retention/planting plan and tree retention and tree credit worksheet prepared by an arborist or landscape architect would be reviewed at the time of the land use application. 10. Parking: Townhouse development requires two (2) onsite parking stalls per dwelling unit. Parking spaces within the garages shall be a minimum of 9’x20’. Bicycle parking based on 0.5 spaces per one dwelling unit would be required for the project. The bicycle parking shall be provided for secure extended use and shall protect the entire bicycle and its components and accessories from theft and weather. Acceptable examples include bike lockers, bike check-in systems, in-building parking, and limited access fenced areas with weather protection. Designated bicycle parking spaces within individual garages can count toward the minimum requirement. 11. Access/Driveways: Access to the site is proposed via a 20-foot wide dead end driveway access off of 108th Ave SE. There is a public street under construction to the west of the project site as part of a new residential subdivision (LUA16-000981). As part of the development of the proposed townhome project, the applicant would be required to extend the dead end street abutting the project site to the west to 108th Ave SE to provide a through street connection. This would include the construction of half street improvements, including paving, curb and gutter, an 8-foot wide landscape strip, and sidewalk. The maximum driveway slopes cannot exceed 15%. If the grade exceeds 15%, a variance is required. Driveways exceeding 8% shall provide slotted drains at the lower end. 12. Critical Areas: No critical areas are mapped on the project site. 13. Environmental Review: The construction of nine (9) or more dwelling units on a project site would be subject to Environmental (SEPA) Review in accordance with WAC 197-11-800. 108th Ave SE Apartment Page 6 of 7 April 18, 2024 14. Site Plan Approval: Per RMC 4-9-200, site plan review is required for any development in the R-14 zone. The purpose of the site plan review process is to analyze the detailed arrangement of project elements to mitigate negative impacts where necessary to ensure project compatibility with the physical characteristics of a site and with the surrounding area. Site plan review ensures quality development consistent with City goals and policies. Site plan review analyzes elements including, but not limited to, site layout, building orientation and design, pedestrian and vehicular environment, landscaping, natural features of the site, screening and buffering, parking and loading facilities, and illumination to ensure compatibility with potential future development. Decisional criteria for site plan approval are itemized in RMC 4-9-200.E.3. 15. Permit Requirements: The proposed project would require an Administrative Site Plan Review and Environmental (SEPA) Review. All land use permits would be processed within an estimated time frame of 6-8 weeks. The 2024 application fees are as follows: Administrative Site Plan Review is $3,030 and Environmental (SEPA) review is $1,800. The fee for any Code Modifications are $290 each. A 5% technology fee would also be assessed at the time of land use application. All fees are subject to change. Detailed information regarding the land use application submittal can be found on the City’s Permit Center website (www.Rentonwa.gov). The City now requires electronic plan submittal for all applications. In addition to the required land use permits, separate construction and building permits may be required. 16. Public Information Sign: Public Information Signs are required for all Type II and Type III Land Use Permits as classified by RMC 4-8-080. Public Information Signs are intended to inform the public of potential land development, specific permits/actions being considered by the City, and to facilitate timely and effective public participation in the review process. The applicant must follow the specifications provided in the public information sign handout. The applicant is solely responsible for the construction, installation, maintenance, removal, and any costs associated with the sign. 17. Impact Fees: In addition to the applicable building and construction fees, impact fees would be required. Fees change periodically and the fees in effect at the time of building permit issuance would apply. For informational purposes, the 2023 impact fees are as follows: • A Fire Impact fee of $579.41 per new multi-family dwelling unit; • A Transportation Impact fee of $6,987.79 per new townhouse unit; • A Parks Impact fee of $2,222.84 per dwelling unit; and • A Renton School District Impact fee of $4,257 per dwelling unit (plus and additional 5% processing fee). The city’s 2023-2024 fee schedule is available for your review on the City’s website. 18. Next Steps: When the formal application materials are complete, the applicant shall have the materials pre-screened prior to submitting the complete application package. Please contact Jill Ding, Senior Planner, at 425-430-6598 or jding@rentonwa.gov to submit prescreen materials and subsequent land use application. 19. Expiration: Once the Site Plan approval has been granted. The Site Plan approval is valid for a period of two (2) years from the date of approval, unless an extension is granted by the 108th Ave SE Apartment Page 7 of 7 April 18, 2024 Administrator. A single two (2) year extension may be granted for good cause by the Administrator. It is the applicant’s responsibility to monitor the expiration dates. From: Robert Shuey Sent: Friday, March 29, 2024 9:23 AM To: Jill Ding Subject: RE24-000107 • Building Review - Pre App/Pre Sub • Pre-Application Meeting Submittal v1 My comment: This project shall comply with WAC 51-50-0429 – Electric Vehicle Charging Infrastructure. Required Infrastructure shall be shown on submitted plans. Thank you, Rob Shuey, Building Official, CBO Development Services Director City of Renton | CED | Building Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections D: (425) 430-7290 | M: (206) 550-8523 | rshuey@rentonwa.gov