HomeMy WebLinkAboutRE_ Swanson Gardner Meyer Ph 2 - Splash BlockHi Sheri,
Installation of the perforated pipe connection under the parking lot sounds good to me. A revised TIR and Civil Construction plan are not needed at this moment, and these changes shall
be shown on the final as-builts. Also, please ensure your contractor is aware of the proposed changes below.
The area drain does not need to route to the sewer system if no dumpster is proposed, but you may need to update the grading plan to ensure no ponding water upon completion of the project.
Thanks,
Yong
YONG QI, PHD, P.E., Civil Engineer III
City of Renton | CED | Development Engineering Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home>
(425) 430-7439 | yqi@rentonwa.gov
From: Sheri H. Murata <SMurata@coredesigninc.com>
Sent: Monday, April 15, 2024 7:22 AM
To: Yong Qi <yqi@rentonwa.gov>
Cc: Nick Schafer <nick@maintcogc.com>; Polly Gardner <pollygard56@gmail.com>
Subject: RE: Swanson Gardner Meyer Ph 2 - Splash Block
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Hi Yong,
Sorry I didn’t respond the other week I was out from 4/5 and all last week. I can’t shift the perf pipe under the landscape area since it would within 5’ of the property line so I’ll
put it under the parking lot.
One other question. We no longer have a dumpster. Instead, we have the same plastic bins used in residential areas. Do we still need to connect an area drain to the sewer?
Thanks,
Sheri
Sheri Murata, P.E.
Core Design, Inc.
425-885-7877
From: Yong Qi <yqi@rentonwa.gov <mailto:yqi@rentonwa.gov> >
Sent: Thursday, April 4, 2024 3:44 PM
To: Sheri H. Murata <SMurata@coredesigninc.com <mailto:SMurata@coredesigninc.com> >
Cc: Nick Schafer <nick@maintcogc.com <mailto:nick@maintcogc.com> >; Polly Gardner <pollygard56@gmail.com <mailto:pollygard56@gmail.com> >
Subject: RE: Swanson Gardner Meyer Ph 2 - Splash Block
External Message
Hi Sheri,
Is it possible that you can shift the existing connection drain (highlighted) further to the north within the landscaping area? So that you can install the perforated pipe connection
within pervious area. Otherwise, you may consider install the perforated pipe connection under the pavement as a “last resort”.
Yong
YONG QI, PHD, P.E., Civil Engineer III
City of Renton | CED | Development Engineering Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C02%7Cyqi%40rentonwa.gov%7Ce4d
9d466c56b486cdb3d08dc5d577a7e%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638487877517700834%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&s
data=cA%2FmYBQHS01wBLUM4cSQeb6dVoh4v5L6oRiIPynr2hg%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%
23%2Fhome&data=05%7C02%7Cyqi%40rentonwa.gov%7Ce4d9d466c56b486cdb3d08dc5d577a7e%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638487877517712728%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2lu
MzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=l40L6qYFYCNlLfvGOD5U6hXPm%2Bly7eGX8QYqKzVoSzM%3D&reserved=0>
(425) 430-7439 | yqi@rentonwa.gov <mailto:yqi@rentonwa.gov>
From: Sheri H. Murata <SMurata@coredesigninc.com <mailto:SMurata@coredesigninc.com> >
Sent: Thursday, April 4, 2024 1:51 PM
To: Yong Qi <yqi@rentonwa.gov <mailto:yqi@rentonwa.gov> >
Cc: Nick Schafer <nick@maintcogc.com <mailto:nick@maintcogc.com> >; Polly Gardner <pollygard56@gmail.com <mailto:pollygard56@gmail.com> >
Subject: RE: Swanson Gardner Meyer Ph 2 - Splash Block
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Hi Yong,
Thanks for talking with me today. The existing pipe that we discussed turning into a perforated pipe connection is 5.9’ from the property line and would be under the parking lot. I’d
prefer not to provide the perforated pipe connection, however since we can’t do the splash block so would this be considered a “last resort” and acceptable to the City?
Thanks,
Sheri
Sheri Murata, P.E.
Core Design, Inc.
425-885-7877
From: Yong Qi <yqi@rentonwa.gov <mailto:yqi@rentonwa.gov> >
Sent: Wednesday, April 3, 2024 8:08 AM
To: Sheri H. Murata <SMurata@coredesigninc.com <mailto:SMurata@coredesigninc.com> >
Cc: Nick Schafer <nick@maintcogc.com <mailto:nick@maintcogc.com> >; Polly Gardner <pollygard56@gmail.com <mailto:pollygard56@gmail.com> >
Subject: RE: Swanson Gardner Meyer Ph 2 - Splash Block
External Message
Hi Sheri,
Your proposal below to remove the splash block due to the grading challenge and potential erosion of adjacent landscaping area is reasonable. However, per Section 1.2.9.2.2 of 2017 Renton
Surface Design Manual, the feasibility of on-site BMPs shall be evaluated, if the splash block on-site BMP discussed below is not feasible, the roof downspout connecting to the drainage
system must be via a perforated pipe connection per COR std Plan 263.40 <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fedocs.rentonwa.gov%2FDocuments%2FDocView.aspx%3Fid%3D847281
3%26dbid%3D0%26repo%3DCityofRenton&data=05%7C02%7Cyqi%40rentonwa.gov%7Ce4d9d466c56b486cdb3d08dc5d577a7e%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638487877517721292%7CUnknown%7CTWFpbGZsb3d8eyJWIjo
iMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=AFaQTKrNn0xYxeaJt%2BNHziyIzczoa8WP%2Fi0AYsiclEw%3D&reserved=0> . Please let me know if this is feasible
and send me the revised civil construction plan for us to review.
By the way, no site construction activity shall be conducted until the preconstruction meeting is occurred.
Thank you,
Yong
YONG QI, PHD, P.E., Civil Engineer III
City of Renton | CED | Development Engineering Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Frentonwa.gov%2Fcms%2FOne.aspx%3FportalId%3D7922741%26pageId%3D17625638&data=05%7C02%7Cyqi%40rentonwa.gov%7Ce4d
9d466c56b486cdb3d08dc5d577a7e%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638487877517728396%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&s
data=ZEtDIQjHWZrTaelQkJRF%2FbEk9n7EGbrrjpyrC0UgyzI%3D&reserved=0> | Online Applications and Inspections <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fpermitting.rentonwa.gov%2F%
23%2Fhome&data=05%7C02%7Cyqi%40rentonwa.gov%7Ce4d9d466c56b486cdb3d08dc5d577a7e%7C71014141061148858e98cc96a05e1675%7C1%7C0%7C638487877517734153%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2lu
MzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=%2FTllg%2F7g93blh%2ByDqkDG04Q9C2LoubgkJShBObXw7b4%3D&reserved=0>
(425) 430-7439 | yqi@rentonwa.gov <mailto:yqi@rentonwa.gov>
From: Sheri H. Murata <SMurata@coredesigninc.com <mailto:SMurata@coredesigninc.com> >
Sent: Monday, April 1, 2024 1:30 PM
To: Yong Qi <yqi@rentonwa.gov <mailto:yqi@rentonwa.gov> >
Cc: Nick Schafer <nick@maintcogc.com <mailto:nick@maintcogc.com> >; Polly Gardner <pollygard56@gmail.com <mailto:pollygard56@gmail.com> >
Subject: Swanson Gardner Meyer Ph 2 - Splash Block
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Hi Yong,
We have run into a problem with constructing the vegetated flow path on the north side of the driveway shown in yellow in the snip below. The grade really falls off at the north property
line and we don’t want to discharge water onto the property to the north. We would not be able to raise the grade without a wall which would remove trees and doesn’t leave much room
for a flow path. (See the photos attached.) I’d like to remove the splash block and keep the downspout connected to the storm system that discharges to Talbot.
I don’t see any other feasible BMPs that can replace the splash block. This splash block was proposed to replace the splash block that was installed with Ph 1 on the south west corner
of the new addition. A covenant was recorded for the Ph 1 splash block. Can we have the recorded covenant removed?
Another question I have is if ROW Use permit would be needed to replace the extruded curb in the ROW (highlighted in orange below) with curb and gutter.
Thanks,
Sheri
Sheri Murata, P.E.
Senior Project Manager/Engineer
Office: 425.885.7877
www.coredesigninc.com <https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.coredesigninc.com%2F&data=05%7C02%7Cyqi%40rentonwa.gov%7Ce4d9d466c56b486cdb3d08dc5d577a7e%7C710141410611488
58e98cc96a05e1675%7C1%7C0%7C638487877517739674%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=TPNzfuyNEbFrm7IkFw9IFGrGNboxB7iEAOZISniOr5
w%3D&reserved=0>
猏ꢐ咿䷥딁⚾螆㲣䆹✌ܰ链ꛇ萶ꓵ䴆棒算歨필䬝独됩ꭝ兔䯳覽ʖ︶闝Ӭ獏쿌꼨ၭ쏃驑駜丘鬚�㰭쇍뻘쏌⣤虯蘠鐋鏗␚齉猹䧦䂂哋뇽⻄䊗뗛ᕊ뼵蘦ࣧ聳枿毄쐛烐䦨ㄶ㒜퉡迊厨�䄌ᔌ歐ハ츤篙ﮖ땈ꍗ低褧ꏺ嶉蔮殶⊕湪�」障쁹ⲝ鹎屸ᘦ蜏梚쌓卉벘ⲕ忹ঔ옔넅肸퍚ꡥ놝⻄䊗鵹횪䔪�ᢚ钖˧憎ಭ伥⸼ഖ骇፨䧃伓즜ꆄ觤엇ʢ䵪噇ឫᔉ궢쓑霮뱂畆镫樚䵞鮛ꞛ酨令㷘ﶖ쌲Ꮙ쓆鍐扭椸췢됐骷㳽짃옓폄樂읍盶倜髭丘碖헟喭
ꡪ㊵就쎑✴챪貣歧쯷춓⿎䯸멇㞔၃짃痁倩鸵竲ꆎ趍羍䈖涵㡢쩙껻굪ɒ쩷噟ի䍝╋埻靤㦪翁羸隓ࢤ磩ퟘ䘈㴓ᘓ뗣⒴�핧�䵿ꓻ�듰碖茭蝰⽼ﯖ㺲�䋝皨్謧篚┌媋ጧ跃㦨ㄱᒜ왽鯟뎸ౘଧ맮儯戛棷鉚쮢쓚䣞�垂ࣵ鿊꣮蘽䒒醭眉⟾楩쵄覉擡ﺸ喟ޞ욆�ၙ䧃㚣覄擡ව棡笩薩⟞�엋潰魔蘦ᢻ䚵蘦ꅛ쓦烄�鎃Ꭲ㎪쌓ꍉ萶偤揫硢ᚅ퉊飘ᄟꖢꨗጽ짃ᡲ巶ༀ㸒횯됻䊴觍偤慳硢へ鿑ᵕ湮幮䭇ꢲ愍㡢퐙飺鸘祃薡焿�藌騗筕蘦
肻쌓�浻㓶⼵娦䂒藍偱騝丘붖旗儯퇜懬♚혏㈻饨祃薡㒓䴞諿㝨ⴗ冝饭丘딖ᣯ얬ㆵ쇡翝ꖤ樓䱞伌谞力䧸왚畁扪椸蛔礼뫔亘㪝繐洤皈ẃ䭇䐧뤻丘钖峷媌ጛ鷃�騻鮍ۤ쵂覅뷀߀읔娦䖒衭坜罥隗ꍉ쓖냄籠䆡웆矆뚈텳軕兤蹻撡�볜굇�뿟묢쵈覍즖廬꽸ྚⴓꋣ㘺㶝뒱줤䫞哶↵둌陌䟭體仠绵ສ䠴㚒�点鞽틓픚覎擡煉閿扢㞸湪暎ꑯ鉥릨㸼娠䖒︓竅ⴹ䒓薭告栝⒰衭珶�픚覆擡ﭑꆍ쀤밚벯☦ᇜꖟ㞥㸩쉰ꌃ㔽☟
陚몃ጀ됽줤闾矙ඩꉡ牥疨ꈈእݕ䩚욒빦隃ꡖ䰶✌䩋䵻횡쓄싰令ꈉ㉥盜淛ꢗス닑逼⮌㮿隘兤↛隈냉뎳륳͚ⴓꢵ큺䦠ლ롢ꨕ覾擡慉喟㲁䙰ভ胮伿㦨亭槫㔏䄗Ⲵ甗䄡䲴殂릮氼ﻅ땂䰡ﲣﬔꠂꞹﵚ貲枨婚욒ﲍ娑儚䷵✌�౧ṍẵ蘦䌇퇍坌ᝤ监ꢠࡹ斢ꃹ䯳់謓ζ䤅뛠휾㜢딃뫷꯬㭩쩐ᷳ隋呆桝⓰衭牾�ꪈ扫夸Ổ档樛倽蟾骊₧๚㔌䄏彗듅ఝ럸⇦慵둁ࠝ뚸譳譜둁룱ꋊᖥ㺪䨴⺒䞯渐ﻔ�浟歐扡ᑸ峔瓍癅洉䕋䇍둽Ⱍ畢뇹ꇑ흐扡㖸㍲崄嶑�兒
ૣ≂嗼嫚�䚀퉉ᜫ뗃窨蘦䖓ⷭ⚆꿙떫᷀⟮ᥨﶅ뭍�棛텢ശה싆쨽槇ᔝ鹬啇䇿躸䟿⭫囶澲魗校棷䆶㋫䂸⦍툣픘㐎鉚陼⠼쯺䭅ꨥ覎擡ﭑꆊꋉ쇖暮꠷謹恨鼟䖏듫ᝐ홚�ᏚὩ鶔鶝啫敿�担ᆵ텢ᨺ쁈原解歅吧퀻䥨ლ딂빟ᢘ陎�譏㦀柿㗥�〝ꌭ䒃굽랚菭㽡겠廆䓓끝췒�늬栐繋껒氬쾠䪲逯侨趫ଐ�̇柳橅攼�픙㐖鉪嫆⯜쳺譅籠్謧䯚䴌딒☆鞆퍆륿롁�⫅솽뻸㲶╞嘽㚙蓫ﶁ噃规ᜓ픥镎ퟖ鿗넋뫷㋬㫊銷ﻵ芾였仸ᘵ
薡類䚙퉍휳㎙鹧쭄쨜絏奬�糜⼵でỔ桢썁ㄫ樏㸍쭇凒埳␥�땦끆翖豏劳鮘짿榪讀뫾궖퓕埢ﭓ鏟蝹ፎ詬哟꣣青뜻吪킻䧨ᬚ忺纋텳蜲⻲塛㞣狰䌆ᯭ⚆骇ጓ߃骆뛃寚黍曃푲髸檄ﻩ뜠퀚搲뢏ॹꂣ묖촋䳙몎⛾ꣂꆶ鏑↴췺�䞞ŋ工캶ⓧ㮍맖ꈋ䃥ᾱ嚎�奊硖騇ꌚ푤덷ᔬ쀵琱퓪ꖩ큾⹄᭸䳽ᓶ鄶욣ꅒ냗䭍퉉왈ᐯꖢ嬭珧嚒懳硢총圮�붤旗曏㤓걪䡁翎�ϡ殃靼གﰭ푋낋엙텪뒛ⱷ밫䗓⮌㛒ꈨ팟鉒↴컺撅沓럊鵬䦯眚⾨떱ⴀ䒓淍䪭孏
잔ﲋ盵캆뀏뿀鹔뚄랲뇜즙ր豾㔺ꈼ彞⦅虦ņ旃嵡鞾ꗡ꺠쓁姥炶ﴣ幆惎綨탁⡤쯯蘠켧櫾瓶켵r㔡Ờ頥莥퀍⟫Ꚗ爳鐓쫵৬螜㶨탁䁤甆䩛✌�덫燐ꍰ឴길黊双㳧蔧踸�䧢燚朜磂皒윜゙꒞윝♱➌읩鱱�♱䶵鮦엾㟍ﳟ걍桲孛᭛뷼⧇蔱贤瘽ၧ㪋䐳踛㤳ꆰ蟥騄놴�뉄놄湬繮謷䯎邦趤Ằ孛ཛꢱ렵綳ꡳ읿眝玎萠붍⺀卤ᇉ穉䥚쓚횢刬燗䴦췗뺽ﺾ뢔抏牢轞穉䤚裚ᗷ⏁�ఏ좳紏ᑮ㥆㉬ⓤ铆㒒蘯蔽濣煥搾Ḝ�诠矖
鸎┩ꍩ黋鱵ᤤ鍢턏玆䱰䤰⸿췍㿍ᬜᬛᛟ滏忡爉䦜㘒覹鵅ශ翩㚅ﺺ꿀Ἵ潮�佥ィꢉ�ះ䓏鳽�뽁ᄭ㻐ホሯ軟딶洤慻堞䜴히ᑹ띘ୟ烵坼忟뉑躽볫樧⛫㗻虯ȗ럻ϰ攀ᾬ䈿탟䷵皿⓯둊ைポ뚻ﬓ낕嬁彽ꪷଛꈷ텏䜺ﯤᘺቕꕹ诂冏Ῑᗦ恋⽜Ḉ䧄寖ⵯ郞ㅌᭉ㑙ꫀ봤賯叛ﭪ䄀ⷕ횋灊濽�趸챲㯎⨯쩻Ể燻鷚䃃뢼�끶㺁笘涩䷨룘婿꼪귬ꬓ蠔闢爫�辳粍습付鎭呴嚧蹇ᤜᎎ퉎⧿鶌㍅㥂쳶ᘹቕ熼객ﶃ널맭鷂츣⯿춫�抇呯俧륔
ᷭ鵖甃䤊輚鿊휗掍�粉㥓핞쨷뎏鎚닂ឨ⑸쏹㏀ퟻ캰뎷跁盩�撁䋲ﳝ캞픑䲯釒ệ쫍紾掳픟䤪繇鵹놸黍ꣾⳲ哊뒓욡쪮袪ᮽᬛ뀷蹸쟘䤢켋洅⫚ᵒ듹쥅椣㮊툉틛仔埔挜3嵹ⅻꒆࣷ㪋�撀躒귢⛦䏶䦍࠺㵣냆芇䖗㊃⓱楽럭ﻟ陸편ﮟ쨝찘꯵姳䥜髰푘킛핎猧ⓣꤝ퇶㲝퉹䥿糩�䌠챮始ꌴ㽏筑鋿㍅뚺ࢥ䁭䦵㜚困ן䎗ꠝ鉕跆䏵플ﰒᴼ⦔椧鸣墯圌礒{瑐뛛袛雺镭㒓䗶㗣뗖᳧슍�的暋ᢄ�낷醨읐ꋄꄙ鬜载鵅�䮟룒ႅ內ꈫ嬶椥㜖ﰒ㬻
霻梱꒞碍䳎��థቕ㲼䕭莨墳ᙉ⋵厴翕䤹뢳�쎿ꁼ䛫⎩莴圄畸鬙篪蒁篶ꏬ㣀螾鷅릡ᴤ㫅獝꽔䤱뫣쇟䛢ᵂ輤뀷と䡒飒슫쪋긬︄�捺䝑㭓뺸鉙黆残�ﺄ謆쎝뱎⳰䷪㭕ﬨ衂ᗵ⪛㎯諔⒁ᙩ⊵㧔鍟톴�瞂넑䪩隰ꙿ闪筅㢁덉ᖨ뭱ᮦ롮皹焧ע內뀯�핚�彇ꦱ鐹쓗⵰�뒓넹ʩ뷶쫪❛ⵖ㟐ᭉ�ᢱ䌛爭㭝녵袡裻냅鉹쐾驉쒃퇺嶸斬폥넔䖏ᘅ퉉뢁卜鵉衄頗뵅殨ᬇ≼䚋紃㲽难㺺輣椧퉏ꂵ뒻∝݉Ʞ衮䶢䉧넌皰巯ۗ쬒譥퇶尕櫓돨�
㸨꒗⍱潺�ꈪ㴶ཉ靌썹�엗䓟ꭨ筭﹍錡t��夗ꓬ塎뻔ꖛ槼ᘻᇏ�଼떽ன몺૫栱䤮ℛ쒎╺檋扁奸ꛔ漺뿁뺾㳾됦뛕⛿�䧗䖐픖邾润뛽ꆾ먳�洤兢넭㴤崰ⷧ미꧔䮢塛�陿﹕銱勤ﭾܺ塈껐誋㙍�⦶摼躷쿘䚢运냼㘊鿣냱␒�ꃗꢲ瑀唽穉釶፤▋캸䟙⦷퉏팃�훖뻖퐦�ੇ톬㳝ᆜ槚Ὺ꿱붊﹕䤾甚╡﵍ऺ旒녑齹딣盺�㹷溛Ꞗ㐱輻웺㯠ﱾ鬻齏﴾ႌ姛䜼飰员訠Ⓥ円㎸罂雿Სᱛ穉褐富컹얓砒呏냹꽮ㄈ擸⿂鍽�飡ˡꍨ鉓잎衭㬻⼻Ḍ
먓兡ꣻ덪懖䚟浔觕捕�혴혤⎙哲椦ꏼ寈꒞ꘇ볏頙盧鹵扵˕蟊ﳵ屬�콸闤⁋⧞ꍉ�ᔏᆴ㦫Ƈ삵䉍嶢䟸啧斻⍡ㇿይꝕ�缪⊭헲輪婎轢漳광�㺱呋墝ප꒞ꄃ鵎畨憜曀⥽ꗴ솰獬퐳鎚伧긷䟙퇏柆娙瀚梲ꓲ꒒ʇ瑷镗�᧻൪ᳪẇ蛽缾切ﬢ쏟ﭾ౯踹䝓䛣筭䭼軒鳣₧켹�內砒皒₼栤퉏ጸ丣毐歫摏ቱ鉸ᱶ大떻Ꮙ丧쑜א�쿛鐦엝㉸鉸ᱶ大䧊亸큈怯꒵⓰㣭几쒫멬髦ᩫሿ政䤼踻䳣优軒㣣옓뒓㣣蓎⓱㣭㎎㱡㭉ᡌ퉏ጸ鏆
츸踸愳䤼踻䳣优軒㣣ꘓꂜ坷펲㤌ܸ⅍ὁ뻍拂燇朜찊홪蟹ᶅ燇醜䤉Ꞛ츸踸㣣踸㣣踸㣣踸㣣椸斓㪎鶰ිⶋ