Loading...
HomeMy WebLinkAboutEX15_ConstructionMitigationMemo 146 N Canal Street, Suite 111 • Seattle, WA 98103 • www.confenv.com To: Andrew Van Gordon, City of Renton cc: Elias Wolde, Property Owner From: Kerrie McArthur Date: January 4, 2024 Re: 13701 SE May Valley Road Patio Construction Mitigation This memorandum describes the proposed construction mitigation to the extent known at this time. A contractor has not yet been selected. The contractor may wish to alter some of the construction mitigation details described below. PROPOSED CONSTRUCTION DATES (BEGIN AND END DATES) Proposed begin and end dates of construction will be determined by the homeowner in conjunction with the contractor and are not known at this time. However, demolition of the structures should occur in the dry season (i.e., summer 2024). Restoration of the stream buffer (removing invasive species and installing native plants) should occur in the fall of 2024. HOURS AND DAYS OF OPERATION Proposed hours and days of operation will be determined by the homeowner in conjunction with the contractor and are not known at this time. However, it is anticipated that work will occur Monday through Friday by the contractor. If any work is done by the homeowner, then work on Saturdays and Sundays may occur. It is anticipated that work will occur between 8 am and 5 pm. PROPOSED HAULING/TRANSPORTATION ROUTES Proposed hauling routes will be determined by the contractor and are not known at this time. Hauling routes will depend on what is done with the materials (e.g., flagstones); materials may be disposed of at the transfer station, resold or used by the contractor for another project. For materials going to the Renton Transfer Station, the haul route would likely be from SE May Valley Road to Coal Creek Parkway SE (road changes name) to the transfer station. EXHIBIT 15 RECEIVED PLANNING DIVISION 02/02/2024 AVanGordon DocuSign Envelope ID: 50BB1D99-33BB-4242-8BA2-C57981940AC7 Andrew Van Gordon January 4, 2024 www.confenv.com page 2 of 2 MEASURES TO BE IMPLEMENTED TO MINIMIZE DUST, TRAFFIC AND TRANSPORTATION IMPACTS, EROSION, MUD, NOISE, AND OTHER NOXIOUS CHARACTERISTICS Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics will be determined by the contractor. ANY SPECIAL HOURS PROPOSED FOR CONSTRUCTION OR HAULING (I.E., WEEKENDS, LATE NIGHTS) Special hours for construction or hauling will be determined by the homeowner and contractor. However, it is possible that work could occur on weekends. DocuSign Envelope ID: 50BB1D99-33BB-4242-8BA2-C57981940AC7