Loading...
HomeMy WebLinkAboutRE23_002R02April 26, 2024 File No. 262023.003/00202 Mr. Rob Shuey, Building Official Development Services Division Department of Community and Economic Development City of Renton 1055 South Grady Way Renton, WA 98055 Subject: Building Permit Plan Review – Final Submittal King County Metro Rapid I-Line (C21001128) Dear Mr. Shuey: We reviewed the proposed project for compliance with the structural provisions of the 2018 International Building Code (IBC) as amended and adopted by the state of Washington and the City of Renton. The permit applicant has responded successfully to our comments. Drawing Revisions New structural drawing sets were submitted in response to our plan review. These sets should replace any previous sets submitted with the original permit submittal. The new drawing sets are dated April 12, 2024. Special Inspections, Submittals, Tests, and Structural Observation Structural special inspections: Special inspections by qualified special inspectors should be provided. Please reference the special inspections indicated drawing 1R0.00. Structural tests: Tests by qualified special inspectors should be conducted. See the material sections on Sheets 1R0.00 of the structural general notes for specific requirements. Structural submittals: Reports, certificates, and other documents related to structural special inspections and tests should be submitted to the City of Renton. See the material sections on Sheets 1R0.00 of the structural general notes for specific requirements. Mr. Rob Shuey, Building Official City of Renton, Development Services Division, Department of Community and Economic Development April 26, 202X File No. 262023.003/00202 Page 2 Structural Observation: Structural observation during construction is required for this project per IBC Section 1704.6. The section of the structural general notes on Structural Observation, Sheet 1R0.00, specifies structural observation by the structural engineer. Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This review is for general compliance with the International Building Code as it relates to the project. If you have any questions or need additional clarification, please contact us. Sincerely, Reid Middleton, Inc. Paul N. Crocker, P.E., S.E. Noman Shafi Principal Engineer Senior Designer cc: Rob Shuey, City of Renton (by e-mail) Michael Sippo, City of Renton (by e-mail) tvf\O:\Plan Review\Renton\23\RE23_002R02.docx\ns