HomeMy WebLinkAbout5719.05 E 2024 0415BEarth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
FIELD REPORT
Project No. 5719.05 Page 1 of 3 Report ID 5719.05 E 2024 0415B
Date Mon 4/15/2024 Weather 50°F Cloudy
Arrival/Departure Time(s) 10:30AM; 11:15AM, 1:30PM; 4:15PM Travel Time (hr)1.75
Project Name Solera – Building B
Location 2950 NE 11th St, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact Heartland Construction, LLC | Craig Vierling, Benham Hansen
Reviewed By LAC
Initials/Date
RAC
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was onsite to observe and test compaction of HMA paving on Harrington Pl NE.
HMA Paving
As requested by the client, ESNW rep was onsite to observe and test compaction of HMA paving on
Harrington Pl NE. ESNW rep observed the paving contractor placing approximately 4 inches of HMA,
compacting with a vibrating drum roller. Today a base lift of HMA was placed on top of a previously
installed sewer trench to bring the road up to a constant grade. ESNW rep took compaction tests and
observed adequate compaction of at least 92% of the RICE number. Please see map and table below.
Test
Number Test Location Elevation Rice Value
(pcf)
Test Density
(pcf)
% of
Rice Value
1154 Harrington Pl NE -2"158.6 147.3 93
1155 Harrington Pl NE -2"158.6 150.1 95
1156 Harrington Pl NE -2"158.6 149.1 94
1157 Harrington Pl NE -2"158.6 150.2 95
1158 Harrington Pl NE -2"158.6 150.7 95
1159 Harrington Pl NE -2"158.6 153.4 97
1160 Harrington Pl NE -2"158.6 148.7 94
Report ID 5719.05 E 2024 0415B Page 2 of 3
Earth Solutions NW, LLC
HMA Paving
1154
1155
1156
1157
1158
1159
1160
Report ID 5719.05 E 2024 0415B Page 3 of 3
Earth Solutions NW, LLC