Loading...
HomeMy WebLinkAboutC23002174_Swanson Gardner Meyers Parking Expansion_After Preconstruction Meeting NotesHello, Thank you for attending the pre-con meeting today. Below is a summary of the meeting with items that had additional discussion listed, please let me know if you feel anything is in error or missing: * Yong read the pre-con notes. * Rob and Yong emphasized the construction hours and fire prevention during construction. * Yong emphasized early communication with the franchise utilities. * Discussed erosion control and additional requirement will be added for wet season. * Yong emphasized tree protection during construction. * Nick will send out the PDF version of revised plan and lighting plan. * Nick will send out the revised landscaping plan for Alex to review. * Yong will help coordinate with the EV charger application through City's Building Department. * Perforated Pipe Connection Detail per COR 263.40: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8472813&dbid=0&repo=CityofRenton <https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8472813 &dbid=0&repo=CityofRenton> * The Land Use Conditions (LUA23-000035) can be downloaded from City's website Here: https://edocs.rentonwa.gov/Documents/Browse.aspx?id=10137975&dbid=0&repo=CityofRenton <https://edocs.rentonwa.gov/ Documents/Browse.aspx?id=10137975&dbid=0&repo=CityofRenton> Thank you, Yong YONG QI, PHD, P.E., Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425) 430-7439 | yqi@rentonwa.gov