Loading...
HomeMy WebLinkAboutJ_Street Mod Request 1_New Life_240402_v1.pdf 10317 8th Ave NE Seattle, WA 98125 509.336.9200 kplusarchitects.net MODIFICATION REQUEST@ 152nd Avenue: NEW LIFE CHURCH - RENTON March 4, 2024 PROJECT NAME, SIZE, AND LOCATION OF SITE • Project Name: New Life Church Office Addition • Gross Site Area: Approx. 56 acres • Location: 15711 – 152nd Avenue SE ZONING DESIGNATION OF THE SITE AND ADJACENT PROPERTIES • Site: R-14 • Adjacent properties: R-14, RMH, R-4 (King County) PROPOSED USE OF THE PROPERTY AND SCOPE OF THE PROPOSED DEVELOPMENT The proposed project is to add approximately 6,400 square feet of new Church Office Space, The Church building will be located at the North portion of the existing parking lot. The new building will only be used as Church Office Space and affairs. The Church office will remove 39 existing parking spaces. ESTIMATED CONSTRUCTION COST AND ESTIMATED FAIR MARKET VALUE OF THE PROPOSED PROJECT The estimated construction costs for the proposed building addition project at fair market value are estimated to be roughly $2,400,000 for Building + Onsite earthwork & Utilities $550,000 = Total $2,950,000. ROM attached. REQUIRED OFF-SITE IMPROVEMENTS (i.e., INSTALLATION OF SIDEWALKS, UNDERGROUND UTLILITES, ETC.) Per the City of Renton Municipal Code (RMC) section 4.6.06, this project triggers the threshold for frontage improvements for additions exceeding $150,000. The City has required the Church to change the curb cut, sidewalk and landscaping along 152nd Ave to meet current landuse codes. REQUEST That the modification to not update the 152nd street to follow the current design standards. The standards along 152nd were originally met 12 years ago in a previous project. Currently the infrastructure in place meets the safety requirements, is functional, has the same local appearance as the properties in the vicinity, meets environmental protection and is maintainable. Keeping the infrastructure in place will not create adverse impacts to neighboring properties and will not be injurious to other properties in the near vicinity. The powerlines and road improvements along 152nd at one time conformed to the intent and purpose of the code and should be grandfathered in. New Life Church has appreciated being part of a community that supports each other and strives to provide a healthy, safe, interactive environment for families to live and conduct business. The growth and reputation of New Life Church signifies our effort to be a part of that process. We strongly believe that the financial burden to convert the overhead utility infrastructure to underground is an impractical requirement and is not consistent with the philosophy of Renton’s City Council. We strongly request your consideration to approve this modification for this proposed project.