HomeMy WebLinkAboutRS_Traffic Impact Analysis FULL_New Life_240402_v1.pdfTraffic Impact Analysis
NEW LIFE CHURCH OFFICE
ADDITION
Prepared for:
New Life Church
August 2023
Prepared by:
12131 113th Avenue NE, Suite 203
Kirkland, WA 98034-7120
Phone: 425-821-3665
www.transpogroup.com
1.22134.00
© 2023 Transpo Group
Traffic Impact Analysis
New Life Church Office Addition August 2023
i
Table of Contents
Introduction .............................................................................................................................. 1
Project Description ................................................................................................................. 1
Study Scope ........................................................................................................................... 1
Existing and Future Without-Project Conditions .................................................................. 4
Roadway Network .................................................................................................................. 4
Non-Motorized Facilities ........................................................................................................ 4
Transit Service ....................................................................................................................... 4
Traffic Volumes ...................................................................................................................... 5
Traffic Operations .................................................................................................................. 9
Traffic Safety ........................................................................................................................ 10
Project Impacts ...................................................................................................................... 11
Trip Generation .................................................................................................................... 11
Trip Distribution & Assignment ............................................................................................ 11
Traffic Operations Impact .................................................................................................... 14
Event Conditions .................................................................................................................. 14
Mitigation ................................................................................................................................ 20
Findings and Recommendations ......................................................................................... 21
Appendix
Appendix A: Traffic Counts
Appendix B: LOS Definitions
Appendix C: LOS Worksheets
Appendix D: Traffic Control Plan
Appendix E: Detailed Trip Generation
Figures
Figure 1. Site Vicinity and Study Intersections ................................................................... 2
Figure 2. Site Plan .............................................................................................................. 3
Figure 3. Previous Year’s Attendance at New Life Church per Service ............................. 6
Figure 4. Existing Peak Hour Traffic Volumes .................................................................... 7
Figure 5. Future (2024) Without-Project Peak Hour Traffic Volumes ................................. 8
Figure 6. Project Trip Distribution and Assignment .......................................................... 12
Figure 7. Future (2024) With-Project Weekday AM and PM Peak Hour Traffic Volumes 13
Figure 8. Event Attendance Review ................................................................................. 15
Figure 9. Future (2024) Sunday Event Peak Hour Traffic Volumes ................................. 17
Figure 10. New Life Church Parking Capacity Analysis ..................................................... 19
Tables
Table 1. Existing and Future Without-Project AM, PM and Sunday Peak Hour LOS
Summary ............................................................................................................. 9
Table 2. Five-Year Collision Summary (2018-2022) ....................................................... 10
Table 3. Estimated Weekday Project Trip Generation .................................................... 11
Table 4. Future (2024) Without- and With-Project Weekday Peak Hour LOS Summary 14
Table 5. Sunday Observed and Event Trip Generation .................................................. 16
Table 6. Future (2024) Sunday Peak Hour LOS Summary ............................................. 18
Traffic Impact Analysis
New Life Church Office Addition August 2023
1
Introduction
This traffic impact analysis (TIA) identifies potential transportation-related impacts associated
with the construction of the proposed office addition for the existing New Life Church. As
necessary, mitigation measures are identified that would reduce or offset significant
transportation-related impacts that the project may have on the surrounding transportation
system.
Project Description
New Life Church is an existing church located in Renton at 15711 152nd Avenue SE, south of
the 154th Place SE/152nd Avenue SE/Maple Valley Highway (State Route [SR] 169)
intersection. The existing church is 129,000 square feet (sf), which includes the auditorium
totaling 36,000 sf and the private school serving students kindergarten through 8th grade
totaling 38,680 sf. The proposal would construct a new 6,400 sf building to provide formal office
space for the church staff. The building would be located on the northern-most portion of the
existing surface parking lot. The proposed project would eliminate approximately 40 parking
stalls from the existing surface lot. No change to the existing congregation or school building
spaces or programs are proposed with the addition. Access to the site would continue to be
provided via 152nd Avenue SE at SE 155th Place. A site plan is included in Figure 2. The
project is anticipated to be constructed and occupied by 2024.
Study Scope
As coordinated with City of Renton staff, the following intersections were selected for analysis:
1. 152nd Avenue SE/Maple Valley Highway (SR 169)/154th Place SE
2. 152nd Avenue SE/SE 155th Place
The scope of the analysis includes a review of existing and future without-project conditions in
the vicinity of the project site under the weekday AM and PM peak hour conditions as well as
the Sunday peak hour. This report includes a review of the surrounding street system, transit
service, non-motorized facilities, existing and future without-project weekday peak hour traffic
volumes, traffic operations, and traffic safety. Future (2024) with-project conditions were
estimated by adding site-generated traffic to future without-project volumes. The project’s
impacts on the surrounding transportation system were identified by comparing the future with -
project conditions to the future without-project conditions. A review of event conditions is
summarized as well.
Traffic Impact Analysis
New Life Church Office Addition August 2023
4
Existing and Future Without-Project Conditions
This section describes both existing and future (2024) without-project conditions within the
study area. Characteristics are provided for the roadway network, non-motorized facilities,
transit service, traffic volumes, traffic operations, and traffic safety.
Roadway Network
The following sections describe the existing street network within the vicinity of the proposed
project and anticipated changes resulting from planned improvements.
Existing
The primary roadways within the study area and their characteristics near study intersections
are described below.
Maple Valley Highway (SR 169) is a Highway of Statewide Significance (HSS) and
functionally classified as an urban-principal arterial. Maple Valley Highway (SR 169) has a
speed limit of 50 mph and a total of 6 lanes in the vicinity of its intersection with 152nd Avenue
SE and 154th Place SE. Maple Valley Highway (SR 169) provides connectivity to I-405 to the
west. Sidewalks are present on both sides of the roadway.
152nd Avenue SE (south of Maple Valley Highway (SR 169)) is a local street with a total of 3
lanes approaching its intersection with Maple Valley Highway (SR 169). The speed limit is 25
mph. Sidewalks on both sides of the roadway are present for pedestrian use. 152nd Avenue
SE is the eastern boundary of the project. It provides access to the site along with access to
residential and commercial uses.
154th Place SE (north of Maple Valley Highway (SR 169)) is classified as a minor arterial with
a total of 4 lanes approaching its intersection with Maple Valley Highway (SR 169). The speed
limit is 35 mph. A sidewalk is present for pedestrians on the east side of the roadway only.
Planned Improvements
Based on a review of the City of Renton’s 2023-2028 Six-Year Transportation Improvement
Plan (TIP) and Washington State Department of Transportation’s 2023-2026 Statewide
Transportation Improvement Plan (STIP), there are no planned improvements within study
area that would impact the street network.
Non-Motorized Facilities
Sidewalks are provided along all the nearby streets with a signalized crossing provided across
all legs of the Maple Valley Highway’s (SR 169) intersection with 152nd Avenue SE.
Additionally, the Cedar River Trail runs along the north side of Maple Valley Highway (SR 169)
through the study area, stretching 17.3 miles connecting Renton to Maple Valley for all non-
motorized users.
Transit Service
Transit service in the study area is provided by King County Metro. The nearest bus stops to
the project site are located at the intersection of Maple Valley Highway (SR 169) and 152nd
Avenue SE and is served by Route 907. Route 907 is a dial-a-ride transit (DART) route, which
has fixed routing and limited variable routing with hourly service from 8 a.m. and 5 p.m.
between Renton and Black Diamond. Additionally, the project site (New Life Church) serves
as a park and ride lot.
Traffic Impact Analysis
New Life Church Office Addition August 2023
5
Traffic Volumes
The following sections summarize existing and future (2024) without-project traffic volumes
within the study area.
Existing
Existing weekday AM peak period (7-9 a.m.), PM peak period (4-6 p.m.), and Sunday peak
period (10 a.m. - 1 p.m.) traffic volumes were collected in July/August 20231. Detailed traffic
counts are provided in Appendix A. Given the data collection took place during the summer,
additional review of the volumes was conducted to identify any needed calibration to reflect
typical conditions for the weekday and Sunday peak hours. The considerations for each peak
period are summarized below.
• Weekday - City staff provided previous non-summer traffic counts that were
conducted in May 2022 during the weekday AM and PM peak periods. The review
showed that generally movements along Maple Valley Highway (SR 169) as well as
to/from 154th Place SE were similar or greater in the recent counts; however, trips
to/from the 152nd Place SE were lower for the 2023 summer counts. This difference in
trips is associated with school not being in session during the summer. The difference
in weekday AM and PM peak hour trips to/from 152nd Place SE were added into the
2023 existing weekday peak hour volumes. The traffic added was 684 trips (352
in/332 out) in the AM peak hour and 193 trips (68 in/95 out) in the PM peak hour. The
difference in traffic counts was consistent with vehicular activity to/from the school as
coordinated with New Life Church staff.
• Sunday – The attendance of the observed July 2023 Sunday was compared to the
average attendance over the past year to ensure the counts reflected typical
conditions. The observed attendance had a peak service of 900 attendees at 11 a.m.
Figure 3 illustrates the past year’s service attendance2. The figure shows the service
with the highest attendance is 11 a.m. and the average attendance at the service is
approximately 870 attendees. Given the observed attendance exceeded the average
attendance, no adjustment was made to the Sunday counts.3
1 Sunday July 30, 2023 and Tuesday August 1, 2023.
2 New Life Church provided the past year’s Sunday attendance including a total daily attendance for all Sunday non-
holiday services and an attendance per service for holidays . For non-holiday services, the observed split of
attendance per service in July 2023 was applied to the total attendance numbers from the past year to estimate
attendance per service.
3 Considerations for adjustments on Sunday was limited to attendance of the church as the school is closed on
weekends regardless of the season.
Traffic Impact Analysis
New Life Church Office Addition August 2023
6
Figure 3. Previous Year’s Attendance at New Life Church per Service
The resulting existing weekday and Sunday peak hour traffic volumes at the study
intersections are shown on Figure 4. The Sunday peak hour reflects the overlap between
services (outbound from the 1st service and inbound from the 2nd service). Volumes are
rounded to the nearest 5 vehicles to account for the daily fluctuations in traffic volumes.
Future Without-Project Traffic Volumes
Future (2024) without-project traffic volumes were forecasted by applying an annual growth
rate to existing traffic volumes and adding traffic from “pipeline” development projects that
would also contribute traffic to study intersections. An annual growth rate of 2.0 percent was
applied to existing study intersection traffic volumes to estimate 2024 horizon year background
traffic growth, as coordinated with City of Renton staff. Two pipeline projects were identified
through coordination with City staff to be completed by 2024 and are included in the analysis.
These include:
• Cedar River Apartments: This project consists of 481 apartment units and a medical
office building to be constructed on approximately 12.5 acres at 1915 Maple Valley
Highway (SR 169) in the City of Renton.
• Lakeside Industries Asphalt Plant: This project involves the relocation of Lakeside
Industries’ current Asphalt Plant in Covington to 18825 Maple Valley Highway (SR
169). The plant will sit on a 25-acre parcel and produce asphalt used in a variety of
construction projects.
The forecast future 2024 without-project weekday and Sunday peak hour traffic volumes are
shown in Figure 5.
0
200
400
600
800
1,000
1,200
Attendance per service9:30 AM Service 11 AM Service 12:30 PM Service Average Attendance (11 AM Service Non-Event)
* 12/24/2022 Service Times: 3 PM, 5 PM, 8 PM
*
*
*Christmas EveEasterObservations
KIDS OFFICE(10'X8'2")
CARE(9'9"X9')
YOUTHPASTER(10'X9')
WORSHIPPASTER(8'X10')
I.T./STOR.JAN
SM CONF(13'6"X9')
DIRECTOR(10'X9')
FINANCESUITE
HR/PAY(10'X9'')
KIDS OFFICE(10'X8'2")
KIDS OFFICE(10'X8'2")
KIDS
BREAKAREAGROUPPASTER(8'X10')
YOUTH
WORSHIP
Existing Peak Hour Traffic Volumes
New Life Church Office Addition
FIGURE
4
Aug 17, 2023 - 9:58am lilyh M:\22\1.22134.00 - New Life Church - Addition\Graphics\DWG\New Life Church TIA Graphics.dwg Layout: Existing Vols
1
152ND AVE SE154TH PL SESE 155T
H
P
L
2
MAPL
E
V
A
L
L
E
Y
H
W
Y
LEGEND
Study Intersection
X Weekday PM Peak
Hour Traffic Volumes
X
(X) Weekday AM Peak
Hour Traffic Volumes
152nd Ave SE
SR 169/Maple Valley Hwy
(495) 405
(275) 1,105
(325) 150
(270) 150
65
(260)
(60) 60
(85) 25
(625) 440
(390) 145
(90) 565
(110)
95
(280) 600
152nd Ave SE
SE 155th Pl
(5) 5
(0) 5
170
(390)
(5) 5
(70) 40
(10) 85
(35)
10
(410) 110
1 2
(20)
Weekday AM and PM Peak Hour Traffic Volumes
152nd Ave SE
Maple Valley Hwy (SR 169)
264
417
249
257
86
63
62
593
121
127
87
279
152nd Ave SE
SE 155th Pl
126
1
1
174
2
2
54
40
2
317
1 2
4
Sunday Mid-Day Peak Hour Traffic Volumes
Site AccessX
LEGEND
X
Sunday Mid Day
Peak Hour Traffic
Volumes
LEGEND
KIDS OFFICE(10'X8'2")
CARE(9'9"X9')
YOUTHPASTER(10'X9')
WORSHIPPASTER(8'X10')
I.T./STOR.JAN
SM CONF(13'6"X9')
DIRECTOR(10'X9')
FINANCESUITE
HR/PAY(10'X9'')
KIDS OFFICE(10'X8'2")
KIDS OFFICE(10'X8'2")
KIDS
BREAKAREAGROUPPASTER(8'X10')
YOUTH
WORSHIP
Future (2024) Without-Project Peak Hour Traffic Volumes
New Life Church Office Addition
FIGURE
5
Aug 17, 2023 - 9:58am lilyh M:\22\1.22134.00 - New Life Church - Addition\Graphics\DWG\New Life Church TIA Graphics.dwg Layout: Without Proj Vols
1
152ND AVE SE154TH PL SESE 155T
H
P
L
2
MAPL
E
V
A
L
L
E
Y
H
W
Y
LEGEND
Study Intersection
X Weekday PM Peak
Hour Traffic Volumes
X
(X) Weekday AM Peak
Hour Traffic Volumes
152nd Ave SE
SR 169/Maple Valley Hwy
(510) 425
(300) 1,135
(330) 155
(275) 155
65
(265)
(60) 60
(85) 25
(645) 465
(400) 150
(90) 575
(110)
95
(295) 620
152nd Ave SE
SE 155th Pl
(5) 5
(0) 5
175
(400)
(5) 5
(70) 40
(10) 85
(35)
10
(420) 110
1 2
(20)
Weekday AM and PM Peak Hour Traffic Volumes
152nd Ave SE
Maple Valley Hwy (SR 169)
269
425
254
262
88
64
63
605
123
130
89
285
152nd Ave SE
SE 155th Pl
126
1
1
174
2
2
55
41
2
317
1 2
4
Sunday Mid-Day Peak Hour Traffic Volumes
Site AccessX
LEGEND
X
Sunday Mid Day
Peak Hour Traffic
Volumes
LEGEND
Traffic Impact Analysis
New Life Church Office Addition August 2023
9
Traffic Operations
The operational characteristics of an intersection are determined by calculating the
intersection level of service (LOS). At signalized intersections, LOS is measured in average
control delay per vehicle and is reported using the intersection delay. At unsignalized side -
street, stop-controlled intersections, LOS is measured by the average delay on the worst -
movement of the intersection. Traffic operations and average vehicle delay can be described
qualitatively with a range of levels of service (LOS A through LOS F), with LOS A indicating
free-flowing traffic and LOS F indicating extreme congestion and long vehicle delays.
Appendix B contains a detailed explanation of LOS criteria and definitions.
Signal timing was provided by the City of Renton. Analysis parameters such as lane
channelization and signal timing were maintained for future (2024) without-project conditions
from existing conditions.
Weekday AM, PM and Sunday peak hour traffic operations for existing and future (2024)
without-project conditions were evaluated based on the procedures identified in the Highway
Capacity Manual (HCM 6) using Synchro 11 at the signalized study intersection. Synchro 11 is
a software program that uses HCM methodology to evaluate intersection LOS and average
vehicle delay. SimTraffic 11 was used to analyze the stop-controlled SE 155th Place/152nd
Avenue SE intersection due to its non-traditional 3-way stop configuration. Results for the
existing and future without-project operations analyses are summarized in Table 1. Detailed
LOS worksheets for each intersection analysis are included in Appendix C.
Table 1. Existing and Future Without-Project AM, PM and Sunday Peak Hour LOS Summary
Existing (2024) Without-Project
Intersection Traffic Control LOS1 Delay2 WM3 LOS Delay WM
AM Peak Hour
1. 152nd Ave SE/MVH (SR 169) Signalized D 54 - E 57 -
2. 152nd Ave SE/SE 155th Pl Stop-Controlled B 12 WB B 12 WB
PM Peak Hour
1. 152nd Ave SE/MVH (SR 169) Signalized E 61 - E 66 -
2. 152nd Ave SE/SE 155th Pl Stop-Controlled A 7 WB A 7 WB
Sunday Peak Hour
1. 152nd Ave SE/MVH (SR 169) Signalized C 27 - C 28 -
2. 152nd Ave SE/SE 155th Pl Stop-Controlled A 8 NB A 7 NB
Note: MVH = Maple Valley Highway.
1. Level of Service (A – F) as defined by the Highway Capacity Manual (TRB, 6th Edition).
2. Average delay per vehicle in seconds
3. Worst movement reported for unsignalized intersections. WB = westbound, NB = northbound
Based on the City of Renton Comprehensive Plan (2018), the City has adopted a standard of
LOS D for arterial and collector roadways and a LOS E for State Routes.
As shown in Table 1, the 152nd Avenue SE/Maple Valley Highway (SR 169) intersection
operates at LOS E or better during the weekday AM and PM peak hours as well as during the
Sunday peak hour under both existing and future (2024) without project conditions, meeting
the LOS standard for State Routes. The 152nd Avenue SE/SE 155th Place intersection is
forecast to also operate acceptably at LOS B or better.
The existing operations reflect the mitigation measures New Life Church has implemented to
minimize off-site impacts, particularly during the weekday AM peak hour when school volumes
are greatest. These measures were identified through collaboration with the surrounding
community and City of Renton staff. The measures include:
Traffic Impact Analysis
New Life Church Office Addition August 2023
11
Project Impacts
The following sections summarize the proposed project’s impacts on the surrounding street
system. First, traffic volumes generated by the proposed project are estimated and then
distributed and assigned to adjacent roadways within the study area. Next, project trips are
added to future without-project traffic volumes and the potential impact to traffic operations are
identified. Review of non-typical event conditions associated with the church are also
summarized below.
Trip Generation
As described above, no change to the existing congregation or school building spaces are
proposed with the addition. The proposed office addition is to provide a space for staff that
already exist on-site today. However, in order to provide a conservative estimate of the trip
generation for the proposed office addition, trips associated with the addition were estimated
based on Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition,
2021) assuming Office (Land Use #710).
Given the office land use and as the staff would already be present on Sundays within the
primary existing building (not the proposed office space), no additional trip generation is
anticipated on Sunday as a result of the proposed project.
The estimated trip generation with the proposed development is summarized in Table 3. The
detailed trip generation estimate is included in Appendix E.
Table 3. Estimated Weekday Project Trip Generation
Daily Trips
AM Peak Hour Trips PM Peak Hour Trips
Land Use1 Size In Out Total In Out Total
Office (LU #710) 6,400 sf 70 9 1 10 2 7 9
Note: sf = square feet
1. Trip generation estimates based on the number of units and the trip rates from ITE Trip Generation Manual, 11th Edition (2021).
As shown in the table, the proposed office is anticipated to generate a total of 70 new
weekday daily trips with 10 occurring during the AM peak hour and 9 occurring during the PM
peak hour. This is a conservative estimate for the new project trips as the addition is
anticipated to accommodate existing staff such that trips are already occurring on-site today
and the proposed addition simply provides an improved working environment.
Trip Distribution & Assignment
Trip distribution patterns for the proposed uses to and from the site were based on existing
travel patterns. The trip distribution for the proposed project is shown on Figure 6. The net new
peak hour project trips were assigned within the study area based on distribution for the
proposed project and are shown on Figure 6.
Site generated weekday peak hour traffic volumes were added to future without-project
volumes at study intersections. The resulting future (2024) with-project weekday peak hour
traffic volumes are illustrated on Figure 7.
KIDS OFFICE(10'X8'2")
CARE(9'9"X9')
YOUTHPASTER(10'X9')
WORSHIPPASTER(8'X10')
I.T./STOR.JAN
SM CONF(13'6"X9')
DIRECTOR(10'X9')
FINANCESUITE
HR/PAY(10'X9'')
KIDS OFFICE(10'X8'2")
KIDS OFFICE(10'X8'2")
KIDS
BREAKAREAGROUPPASTER(8'X10')
YOUTH
WORSHIP
Project Trip Distribution and Assignment
New Life Church Office Addition
FIGURE
Aug 17, 2023 - 10:04am lilyh M:\22\1.22134.00 - New Life Church - Addition\Graphics\DWG\New Life Church TIA Graphics.dwg Layout: Dist&Assignment152ND AVE SE154TH PL SESE 155TH
P
L
MAPL
E
V
A
L
L
E
Y
H
W
Y
Study Intersection
Site Access
Trip Distribution
LEGEND
X
X
XX%
10%
55%
35%
1
2
(0) 2
(3) 1
(1) 4
(5) 1
(1) 0
(0) 1
(X) Weekday AM Peak
Hour Project Trips
X Weekday PM Peak
Hour Project Trips
KIDS OFFICE(10'X8'2")
CARE(9'9"X9')
YOUTHPASTER(10'X9')
WORSHIPPASTER(8'X10')
I.T./STOR.JAN
SM CONF(13'6"X9')
DIRECTOR(10'X9')
FINANCESUITE
HR/PAY(10'X9'')
KIDS OFFICE(10'X8'2")
KIDS OFFICE(10'X8'2")
KIDS
BREAKAREAGROUPPASTER(8'X10')
YOUTH
WORSHIP
Peak Hour Traffic Volumes
New Life Church Office Addition
FIGURE
Aug 17, 2023 - 10:05am lilyh M:\22\1.22134.00 - New Life Church - Addition\Graphics\DWG\New Life Church TIA Graphics.dwg Layout: With Proj Vols
1
152ND AVE SE154TH PL SESE 155T
H
P
L
2
MAPL
E
V
A
L
L
E
Y
H
W
Y
LEGEND
Study Intersection
X Weekday PM Peak
Hour Traffic Volumes
X
(X) Weekday AM Peak
Hour Traffic Volumes
152nd Ave SE
SR 169/Maple Valley Hwy
(510) 425
(300) 1,135
(335) 156
(276) 159
67
(265)
(60) 61
(86) 25
(645) 465
(400) 150
(90) 575
(113)
96
(295) 620
152nd Ave SE
SE 155th Pl
(5) 5
5
182
(401)
(5) 5
(70) 40
(10) 85
(35)
10
(429) 112
1 2
(20)
Weekday AM and PM Peak Hour Traffic Volumes
Site AccessX
LEGEND
Future (2024) With-Project Weekday AM and PM
Traffic Impact Analysis
New Life Church Office Addition August 2023
14
Traffic Operations Impact
A future (2024) with-project level of service analysis was conducted for the peak hour to
analyze traffic impacts of the proposed project. The same methodologies were applied as
described for existing and future without-project conditions. All intersection parameters such
as channelization, intersection control, and signal timing were consistent with those used in
the evaluation of future without-project conditions. A comparison of future (2024) without-
project and with-project weekday peak hour traffic operations is summarized in Table 4 for the
weekday AM and PM peak hours. Detailed LOS worksheets are provided in Appendix C.
Note that as no new trips are anticipated as a result of the proposed project on Sunday, the
future (2024) without-project Sunday peak hour operations summarized in Table 1 previously
are the same as the future (2024) with-project Sunday conditions (i.e., there is no change in
traffic operations). Table 1 showed the study intersections are forecast to operate at LOS C or
better under the future (2024) Sunday peak hour.
Table 4. Future (2024) Without- and With-Project Weekday Peak Hour LOS Summary
Traffic Control 2024 Without-Project 2024 With-Project
Intersection LOS1 Delay2 WM3 LOS Delay WM
Weekday AM Peak Hour
1. 152nd Ave SE/MVH (SR 169) Signalized E 57 - E 58 -
2. 152nd Ave SE/SE 155th Pl Stop-Controlled B 12 WB B 16 WB
Weekday PM Peak Hour
1. 152nd Ave SE/MVH (SR 169) Signalized E 66 - E 66 -
2. 152nd Ave SE/SE 155th Pl Stop-Controlled A 7 WB A 7 WB
Note: MVH = Maple Valley Highway.
1. Level of Service (A – F) as defined by the Highway Capacity Manual (TRB, 6th Edition)
2. Average delay per vehicle in seconds.
3. Worst movement (WM) reported for unsignalized intersections only. WB = westbound.
As shown in Table 4, with the addition of project traffic, the study intersections are forecast to
operate at the same LOS under future (2024) without-project conditions, with a change in
vehicle delay of 4 seconds or less. Consistent with without-project conditions, all study
intersections are anticipated to meet the City of Renton’s LOS standards.
Event Conditions
The above operational analysis reflects typical conditions; however, there are a limited number
of events that occur annually which have higher than typical attendance. As described
previously, New Life Church has proactively worked with the City and surrounding community
to minimize impacts. This proactive event management includes advanced communication of
events to the surrounding community, added traffic control with a police officer flagging traffic,
and coordinating off-site parking and providing shuttle service to support higher parking
demands. Additionally, New Life Church has reviewed, monitored, and adjusted on-site
circulation to provide for more efficient traffic operations both on and off-site.
The proposed project is not anticipated to contribute to higher demands for event activities or
change event types and conditions. City staff requested a review of trip generation, traffic
volumes, operations, and parking associated with event activities relative to non -event
conditions.
The most prominent of the annual events include Easter and Christmas Eve. Easter occurs on
a Sunday in the Spring with added services on the Saturday night prior and Christmas Eve is
December 24 where the day-of-week varies each year. The past year’s attendance including
these events was shown above on Figure 3. The attendance at these two events relative to
Traffic Impact Analysis
New Life Church Office Addition August 2023
15
the observed (typical Sunday) evaluated above is summarized below and is illustrated on
Figure 8.
• Observed (Typical Sunday) – Overall attendance was 2,155 with attendance per
service being 840, 900, and 415.
• Easter - 3,569 attendees total with each service with attendance per service being
1,032, 1,201, and 912.
• Christmas Eve – 2,750 attendees total with each service with attendance per service
being 950, 1,100, and 700.
Figure 8. Event Attendance Review4
As shown on Figure 8, for the events, the three Easter services each exceeded the average
typical (non-holiday) peak attendance and two services exceeded the average typical peak
attendance on Christmas Eve. Under all three reviewed conditions (event and non-event), the
first two services have the highest attendance. As Easter had the highest attendance, this was
assumed for purposes of estimating event conditions (a Sunday condition) which is discussed
in the following section.
Trip Generation and Traffic Volumes
The event trip generation was estimated programmatically based the Sunday July 2023
observations with known attendance and associated vehicles , which allows for the calculation
of average vehicle occupancy (AVO). During the peak hour observations, which occurred
between 10:15-11:15 a.m., there were 626 vehicles with 304 outbound and 322 inbound. The
outbound vehicles were assumed to correspond with the first service (9:30 a.m.) and the
inbound vehicles were assumed to correspond with the second service (11 a.m.). The vehicles
associated with the attendance equates to an AVO of approximately 2.80 attendees/vehicle.
Applying this AVO to the Easter event attendance, this equates to a total peak hour trip
generation of 803 vehicles. It is noted that this estimate could be conservative as with
increased attendance during the holiday period the number of families attending services
increases leading to additional persons per vehicle. Table 5 summarizes the peak hour trip
generation for the observed Sunday and estimated event Sunday.
4 The attendance numbers are all actual. The vehicles are actual for the observed Sunday only. The event vehicles
illustrated are projections, programmatically estimated relative to the observed vehicles per attendance.
0
200
400
600
800
1,000
1,200
Attendance Vehicles Attendance Vehicles Attendance Vehicles
Observed (Sun, 7/30/2023)Easter (Sun, 4/9/2023)Christmas Eve (Sat,
12/24/2022)ATTENDANCE PER SERVICEFirst Service Second Service
Third Service Average Peak Service Attendance
Traffic Impact Analysis
New Life Church Office Addition August 2023
16
Table 5. Sunday Observed and Event Trip Generation
Typical (Observed Sunday)1 Event (Easter)2
Intersection
Attendance Vehicles Peak Hour Trips Attendance Vehicles Peak Hour Trips
In Out Total In Out Total
Service 1 (9:30 a.m.) 840 304 1,032 373
Service 2 (11 a.m.) 900 322 1,201 430
Peak Hour Trips 322 304 626 430 373 803
1. Observations conducted on Sunday, July 30, 2023. Peak Hour (10:15-11:15 a.m.). Attendance values provided.
2. Attendance as observed in the 2023 Easter services. Vehicles estimated assuming the estimated AVO rate of 2.8
attendees/vehicle per the observed Sunday.
The event peak hour trip generation is estimated to be 177 vehicle trips greater than the
observed typical Sunday condition (or an increase of 28 percent). As described above, the
observed Sunday was shown to correspond with the typical (or average) Sunday. The
additional trips associated with the event condition were added to future without-project
Sunday peak hour volumes at the study intersections. The resulting future (2024) Sunday
without event and with-event peak hour traffic volumes are illustrated on Figure 9.