Loading...
HomeMy WebLinkAboutMFP24001957.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24001957 IVR Number: 24001957 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/15/2024Application Date:0823059129Parcel Number: 420 SUNSET BLVD N Permit Type:05/02/2024Issue Date:Franchise Permit Work Class:05/02/2025Expiration Date:Minor Utility Job Number: 587034499Franchise Type:Electric Description: Puget Sound Energy Electric AT 318159 166397 (WSDOT cabinet SUA 2021 connected to City of Renton XFMR) CREW TO DISCONNECT/RECONNECT SERVICE. WORK IS PART OF THE WSDOT RENTON TO BELLEVUE EXPRESS TOLL LANE PROJECT. NO HS CUTS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 587034499 420 SUNSET BLVD N JESSICA SCHULTZ 425-480-2925 Monday - Friday 8:00AM - 3:00PM MFP24001957 Scott Warlick CED 5/2/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG HOUSER WAY BYPASSSUNSET BLVD N 420V01 RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE SUNSET BLVD N ARRW-BRD RIGHT L A N E CLOSE D AHEA D W20-5RW4-2RROAD WORK AHEA D W20-1200'200'200'11 1111 11 11 11 INTERST A T E 405 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND VAULTVault CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/10/2022 511238186 0 420 SUNSET BLVD, RENTON, WA 98057. Jason Bisenius 425-424-7316 jason.bisenius@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP24001957 V01 318159 166397 EXIST 50kVA 240/480VHOUSER WAY BYPASS"SUA 2021" 318171 166408 "420"SUNSET BLVD NEX UG FEEDER & 3Ø PRI318156 166396 V02 EXIST 50kVA 120/240V CØ32630 P01 EXIST 587034499THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) N Vicinity Map N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP JESSICA SCHULTZ 425-480-2925 3/7/24 TAYLOR ITTNER 425-306-7044 3/7/24 N/A N/A N/A TAYLOR ITTNER 425-306-7044 3/7/24 N/A N/A I-405 MP 4.54 SUA 2021 DISCONNECT / RECONNECT 420 SUNSET BLVD N, Renton, WA 98057 N/A N/A N/A 587034499 AS NOTED 1/1 KING N/A N/A N/A SE 08-23-05 N/A N/A A2305E032 D2305E040 R2305E032 PCR-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Owner / Developer Contact Info officeATTN: N/A N/A N/A N/A N/A THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA SCHULTZ (425) 480-2925 jessica.schultz@pse.com ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. UNIVERSAL MAP (2350E032) SCALE: NONE SUA 2021 DISCONNECT/RECONNECT WSDOT I-405 R2B PROJECT SITE PLAN SCALE:1" = 20' ELECTRIC SYMBOLS LEGEND S EXISTING PSE PULL VAULT EXISTING PSE SWITCH VAULT NEW PSE VAULT P NEW PSE TRENCH / DUCT BANK INSTALLATION EXISTING PSE DUCT BANK LIMITS OF EXCAVATION DUCT INTERCEPT POINT CIRCUIT REMOVAL EXISTING 3Ø 750 MCM EXISTING 3Ø 1/0 NEW 750MCM FEEDER NEW 1/0 PRIMARY & 4" CONDUIT P PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"X X X X HP Svc/MSA HP Main Distribution ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A 587034499511238186 CABLE TV PHONE GAS Perm. Service Relocation Removal Temporary Job Order Superior C. 6' Separation between Power vaults & Fire Hydrants. A. 1' Separation crossing over City Utilities. 5. REQUIREMENTS AROUND CITY WATER, SEWER & STORM LINES. COVER WITH LANDSCAPING. 4. THE DEVELOPER SHALL NOT OBSTRUCT ACCESS TO PSE'S EQUIPMENT OR F. Backfill of trench shall be completed prior to energizing. that workers will enter. E. Ditch sloping or shoring per Washing State Law for excavations deeper than 4' D. Removal and disposal of material not suitable for backfill. C. Compaction, restoration and any backfill required within the property covered with 6" of washed sand. B. All PSE'S conduits or direct buried cables are required to be bedded in 3" AND A. A minimum of 36 inches of cover is required for PSE'S Electrical system. 3. TRENCHING AND RESTORATION material which would restrict construction access before work begins. Work area shall be at of near final grade, clear of spoils or construction 2. SITE PREPERATION be met. (see 0700.1600) when the minimum clearance requirements to vehicular traffic cannot driveways or roadways) (see 0700.1600) Customers shall supply guardposts surface normally used by vehicular traffic (parking lots, parking spaces, alleys front (must allow 10' min workspace) - 10feet. Clearance are measured to any minimum clearances requirements: From the back & sides - 5 feet: From the E. When Transformers are exposed to vehicular traffic they must meet the following clear of all obstructions D. An area 10 foot in front of all transformer locations shall be reasonably level and C. Transformers shall not be located under any building eves. equipment. B. Transformers shall be a minimum of 6 feet from any gas meter and/or fire fighting a minimum of 10 feet from any door, window opening or combustible wall. A. Transformers shall be located a minimum of 3 feet from a noncombustible wall or 1. STAKING OF GRADES AND VAULT LOCATION. THE FOLLOWING ON PRIVATE PROPERTY. THE DEVELOPER IS RESPONSIBLE FOR, BUT NOT LIMITED TO DEVELOPER NOTES: jurisdiction requirements. "Techniques for Temporary Erosion and Sediment Control" and any additional local 3. Erosion and sediment control shall be per PSE Standard Practice 0150.3200 delivery (The Transformer of PSE Secondary Handhole). 2. Tag customer owned service on secondary(s) at the meter base and at the point of work sketch must be authorized by PSE'S Engineering and noted on the Foreman's Copy. 1. All materials to be installed in accordance with PSE Standards. Any deviation from this PSE NOTES: POWER GENERAL NOTES B. 5' Separation paralleling City Utilities. GENERAL UNDERGROUND NOTES: CONSTRUCTION OF ELECTRICAL SYSTEM MUST COMPLY TO PUGET SOUND ENERGY STANDARDS. OWNER/DEVELOPER RESPONSIBILITIES: PROVIDE ALL TRENCHING, BACKFILL (SELECT BACKFILL AND COMPACTION TO 95% OF ORIGINAL DENSITY IN CROSSINGS) AND RESTORATION WITHIN THIS PROJECT. LOCATE: THE ONE CALL CENTER (1-800-424-5555) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION SO ALL UTILITIES CAN BE LOCATED PRIOR TO ANY DIGGING. INSTALLED BY PSE MUST BE 18 INCHES MINIMUM IN WIDTH & SHALL HAVE A MINIMUM OF 36 INCHES COVER OVER THE TOP OF THE CONDUCTOR OR FROM THE TOP OF THE CONDUIT TO THE POINT OF FINAL GRADE. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. THE REMAINING BACKFILL MAY CONSIST OF NATIVE MATERIALS IF SUITABLE (I.E.; FREE FROM ROCKS, SHARP OBJECTS OR CORROSIVE MATERIALS THAT MAY DAMAGE CABLES OR CONDUITS). IF NATIVE MATERIALS ARE UNSUITABLE, AS DETERMINED BY PSE OR ITS INSPECTOR, SELECT BACKFILL SHALL BE SUPPLIED BY THE CUSTOMER. BACKFILL THE EXCAVATION TO FINISHED GRADE AT 2 INCHES BELOW THE VAULT TOP AS SOON AS PRACTICAL AFTER FACILITIES ARE PLACED AND INSPECTED.THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH.THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN POWER CONDUITS OR CABLE & ADJACENT UTILITY SERVICES. TRENCHING-SERVICE: THE CUSTOMER'S SERVICE TRENCH MUST MEET STATE & LOCAL REGULATORY REQUIREMENTS. SECONDARY TRENCHES SHALL HAVE A MINIMUM OF 24 INCHES COVER. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. A 48 SQUARE INCH WORK PIT MUST BE PROVIDED AT THE METER BASE. THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN CONDUITS OR CABLE & ADGACENT UTILITY SERVICES. THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH. VAULT EXCAVATION: SIX INCHES (6") OF CRUSHED ROCK IS TO BE USED AS THE VAULT BASE. BACKFILL AROUND VAULTS SHOULD CONSIST OF GOOD COMPACTIBLE MATERIAL SUCH AS CLEAN EARTH FILL, CRUSHED ROCK, OR SAND. NO VOIDS SHOULD REMAIN BETWEEN THE VAULT WALLS & THE SIDES OF THE EXCAVATION. STAKING: PRIOR TO CONSTRUCTION, LOT LINE AND GRADE STAKES WILL BE PROVIDED BY THE CUSTOMER/DEVELOPER. SITE PREPARATION: PRIOR TO CONSTRUCTION, THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE AND CLEAR OF ANY SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION ACCESS. TRENCHING-PRIMARY: TRENCHES SUPPLIED FOR PRIMARY SYSTEMS OWNED & EQUIPMENT ACCESS: ADEQUATE SPACE IS TO BE MAINTAINED AROUND PSE'S FACILITIES, UNIMPEDED BY FENCES, ROCKERIES, WALLS, STRUCTURES, ETC. JOB SITE SITE NOTES: V01 -CONNECT SUA 2021 TO V01 (318159-166397) -INSTALL NEW METER Katie Costley 3/4/24 VTrofimenko 3/11/24 MFP24001957