HomeMy WebLinkAboutWWP273262(1) PROJECT REQUEST FORM
PLANNINGBUILDING/PUBLIC WORKS
CONTACT: 171 EXT. ,
FILE STATUS NEW OR ❑ EXISTING: FILE CODE(PRI-xx-xxxx):
LOCATION My Work Space: 0 File Bay Shelf#: 0 Other:
PROJECT NAME/FILE TITLE: /���s ��e /2 fS 'C N
(70 charac max)
DESCRIPTION OF PR JECT:
P
UTILITY PERMIT#_(�jQ�fJ/lS LUA# O q—/D CI WO#
ADDRESS/STREET NAME(S): 917-9N PL
DEV: • CNTR: ;OWN: &r ; CNSLT/ENG: %14MA
OTHER ALIASES:
Circle Size of Waterline: 10" 12" Circle One: Pewk Replace/Extension
Circle Size of Sewerline: " 10" 12" Circle One:. (NeV41 Replace/Extension
Circle Size of Stormline: 2' 18" 24" Circle One e /Replace/Extension
CHECK EACH DISCIPLINE INVOLVED IN PROJECT Ltr Drwg #of sheets
TED V `1l 10
(off site improvements) (include TESC)
TRO X )Q 3
(Signalization,Channelization,Lighting)
WWI,
(sanitary sewer main,include basin name)
50 WTR
(Mains,Valves,Hydrants) (inc.composite&HorizontalCtrl)
SWP ❑
(CIP onlyxinclude basin name)
PLR (For Developer Files Only) ❑ (letter only)
PLEASE CIRCLE THE DISCIPLINES WHICH NEED TO SIGN MYLARS
WATER WASTEWATER SURFACE WATER TRANSPORTATION FIRE
FOR FILE MAINTAINANCE USE ONLY
File Codes p File Alias Date Entered and Labels Made
` o— r� P--
;z—
C Q- .1?.
v
CITY OF RENTON
Pre-Construction Conference Agenda
Tuesday,August 22, 2006 - 10:00 A.M.
Christelle Ridge Lift Station Project
I. Introduction and Sign-in
City of Renton
1055 South Grady Way
Renton, WA 98055
City Contact: Mr. Dave Christensen
Phone: (425) 430-7212
Fax: (425) 430-7241
City Inspector: Mr. Tom Main
Phone: (206) 999-1833
Fax: (425) 430-7300
Omega Contractors, Inc.
P.O. Box 430
Duvall, WA 98019-0430 (/
Phone: (425) 881-1697
Fax: (425) 883-4718
RH2 Engineering, Inc.
300 Simon Street Suite 5
East WenAa�tchee, WA 98802
Contacjl�,�lVlark Miller
Phone: (425) 951-5372
Fax: (425) 951-5373
Field Inspector: Jeff Laycock
Phone: (425) 951-5420
Fax: (425) 951-5417
I. Discussion Items
A. Review construction schedule and critical task items
B. Submittals & Shop Drawings
• Submit(1) copy to Owner, Submit(2) copies plus number wished to be
returned to Contractor.
• Essential to submit prior to execution of work allowing for review time
• Engineer will process within 20 working days.
• Send to: Mark Miller
RH2 Engineering, Inc.
J:\data\RSN\106-015Whristelle Ridge LS\PreconAgenda.doc
• City of Renton Page 2
Christelle Ridge Lift Station Preconstruction Conference Agenda
300 Simon Street SE, Suite 5
East Wenatchee, WA 98802
C. Product Substitution
• Must be approved by engineer and owner prior to execution of work
D. Inspection Responsibilities
• General and Civil Inspection—Renton Public Works
• Structural—R112 Engineering and Renton Public Works
• Mechanical—RH2 Engineering
• Electrical—RH2 Engineering, Renton Building Dept.
E. Review Items listed on Review Letter
F. Renton Inspector Discussion Items
G. Telemetry
• City will provide panel for installation by Contractor.
• City will program. (Schedule should reflect time for programming)
H. Testing and Start-up
II. Contractor Questions and Open discussion
J:\data\REN\106-015\Christe11e Ridge LS\PreconAgenda.doc
OMEGA CONTRACTORS, INC.
P.O. Box 430
Duvall, WA 98019
(425) 881-1697
Fax (425) 883-4718
June 22, 2006
RECEIVED
RT2 Engineering Inc. JUN ? 3 2006
Attn: Mark Miller CITY OF RENTON
UTILITY SYS7;--h18
RE: Christelle Ridge Lift Station
Final Review Revision
Enclosed the signed and stamped replacements (as emailed to you on June 22) for
sheets 2 and 5, which should replace our earlier submittal.
Sincerely,
Gordon Wagster
cc: Dave Christensen, City of Renton
Page 1 of 1
David Christensen - Comments on Christelle Ridge LS redesign
From: "Mark Miller" <mmiller@RH2.com>
To: 'David Christensen" <Dchristen@ci.renton.wa.us>
Date: 05/22/2006 9:53 AM
Subject: Comments on Christelle Ridge LS redesign
Hi Dave - I had a chance on Friday to review the resubmittal of CR LS. Below our my preliminary
comments. Have you had a chance to review?
Preliminary Comments:
1. 4"Forcemain constructed of PVC or HDPE pipe with a minimum C value of 130.
2. Grinder pump selection is acceptable.
3. The 15 HP, 263 mm would be my choice in the future because it has more room for error in TDH
calculations.
4. We may want CDF around the Wet Well if Gordy has concerns.
5. Provide best antenna combination to provide good communications.
6. Needs to be a CB for the Gen Set. Provide at location that meets NEC requirements and City of
Renton Electrical department.
Everything else looks pretty good. If you have any questions please call.
Thanks, Mark
This message contains confidential information and is intended only for the individual named.If you are not the named addressee you should not
disseminate,distribute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-
mail from your system.E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted,corrupted,lost,
destroyed,arrive late or incomplete,or contain viruses.The sender therefore does not accept liability for any errors or omissions in the contents of this
message,which arise as a result of e-mail transmission.If verification is required please request a hard-copy version.Any views or opinions presented
in this email are solely those of the author and do not necessarily represent those of the company.
RH2 Engineering,Inc,www.rh2.com
file://C:\Documents%20and%20Settings\dchristensen\Local%20Settings\Temp\GW}0000... 05/22/2006
lez
7 -:7-- 71-7.77'
1
�I WIN
RECEIE®
I E N I 1 5 T 5 JUN 3 0 2006
CITY OF RENTON
UTILITY SYSTEMS
June 28, 2006
RH2 ENGINEERING,INC
http://www.rhZ.com
mailboxorh2.com Mr. Gordon Wagster,P.E.
Omega Contractors, Inc. COP17
1.800.720.8052 P.O.Box 430
Duvall,WA 98019
Sent Via: I;-Mail dam' U.S Mail
WESTERN WASHINGTON
12100 NE 195th St.,Suite 100 Subject: City of Renton— Christille Ridge Lift Station
Bothell,WA 98011 Final Design Plan Review
(tel)425.951.5400
(fax)425.398.2774 Dear Gordy:
454 west Horton(toad The City of Renton has completed its second review of the proposed Christille Ridge Lift
Bellingham,WA 98226 Station. The City's review comments are based on the revised lift station design plans
(tel)360.676.0836 dated May 15, 2006, and an updated site and mechanical plan dated June 21 and June 15,
(fax)360.676.0837 respectively. The final design plans will be approved for construction of the lift station
by the City with the understanding that the approval is contingent on construction being
completed by the design engineer only. Additional design details will be necessary before
One Pacific Building a construction company other than Omega Contractors can be approved for constructing
621 Pack Avenue,suite 104 the Christille Ridge Lift Station.
Tacoma,WA 98402
(tel)253.272.3059 Below is a list of items that need to be addressed on the final plan set that will be
provided to the City for signature.
1. The proposed 3-inch forcemain is not required if a flushing port can be installed
EASTERN WASHINGTON on the 4-inch forcemain at the lift station for maintenance of the line by City
300 Simon Street SE,Suite 5 crews.
East Wenatchee,WA 98802 2. Locate the proposed Engine Generator Set (EG set) to the west by 1-foot to
(tel)509.886.2900 allow more access on the east side.
(fax)509.886.2313
3. Locate the PSE transformer as far to the north on the lift station property as
possible,to maximize access to the proposed EG set.
KITSAP PENINSULA 4. Retaining wall must be completely constructed within the road right-of-way. The
600 Kitsap Street,Suite 101 footings cannot be located within the City's easement. Apparently this has been
Port Orchard,WA 98366 worked out with Touma Engineers and the lift station plans should reflect this
(tell 360.876.7960 change.
(fax)360.876.7988 5. Final selection of the telemetry antenna shall be completed during construction.
Contractor shall work with RH2 Engineering in determining the best method
available for establishing reliable communications.
06/28/06 8:51 AM J:\data\RFN\106-015\Christelle Ridge LS\Ltr-062706-GWagster-CR LS 2nd Review.doc
. Mr. Gordon Wagster,P.E.
June 28,2006
Page 2
If you accept the above mentioned comments without exception, a pre-construction conference can
then be arranged for installation of the lift station. Please furnish five (5) sets of final plans to the City
at least three days prior to the pre-construction conference for signature. If you do take exception to
the comments please do not hesitate to contact the City to arrange for a review meeting to resolve the
issues. All responses to the City from the developer should be done in writing.
Sincerely,
RH2 ENGINEERING, INC. eV w A Sy l
C �
1
Mark Miller,P.E.
Project Engineer 38613 4 SIGNED:
,r ('JSTER�v�14�
MM/sp/kl ONAL���
EXPIRES 7/15/07
41
P
.t J
22780
O R�GJSTE?- �4
F� 'ONAL
EXPIRES 3/19/08
06/29/06 8:43 AM J:\data\REN\106-015\Christe11e Ridge LS\Ltr-062706-GWagster-CR LS 2nd Review.doc
E N G I N E E R S
S C I E N T I S T S Y`\♦ % �''
RI-1 FIRS2 ENGINEERING,INC MAILED FROM 98802
300 Simon Street SE
1 0 01
Suite 5 01 T04 10201
East Wenatchee
WA 98802
Mr. Dave Christcrisen
City of Renton
1055 South Gradv Way, 5th Floor
Renton, W k 98055
_:__a = If,l1lilllliil,I,f111,11111,1111i,lfllflflrllllflil,f,l,1,1111
1
RECEIVED
t MAY 0 4 2006
CITY OF RENTON
E N G I N E R s UTILITY SYSTEMS
P L N N E R -- --
S I E N T 1 S T S
qqw— COPY
May 1,2006
Mr. Gordon Wagster,P.E.
RH2 ENGINEERING, INC Omega Contractors, Inc.
P.O. Box 430
http://www.rh2.com Duvall,WA 98019
mailbox@rh2.com Sent Via: E Mail&US Mail
1.800.720.8052 Subject: City of Renton—Christille Ridge Lift Station
Design and Plan Review
WESTERN WASHINGTON Dear Gordy:
12100 NE 1951h St,Ste 100 We have concluded our review of the lift station design for the Christille Ridge development.
This review is limited to the lift station and does not include review of the gravity or force
Bothell,WA 98011 tTnam design.
(tell425.951.5400 As submitted, a full review was not able to be completed. The City will need time to fully
assess the station plans once they are in a more complete stage and incorporate all items
(fax)425.398.2774
included in this letter. We will be happy to meet with you prior to that time if you feel the
need to address specific issues.
EASTERN WASHINGTON Below is a list of our preliminary comments.
300 Simon Street SE,Suite 5 General
East Wenatchee,WA 98802 1. The station needs to be sized to serve all potential areas in the basin that could
gravity flow to this lift station location. A cursory review indicates that. an
(tell 509.886.2900 additional 80 to 100 ERUs could be sewered by this proposed lift station.
(fax)509.886.2313
2. The design allows for one-hour emergency storage. Given the isolation of this
site, the City would like to review the cost to increase the emergency storage
capacity from one hour to two hour using the higher flows proposed above.
KITSAP PENINSULA
3. Odor potential at both the lift station wet well and the discharge manhole is a
600 Kitsap Street,Suite 101 concern. Provide alternative lift station configuration that may be better suited for
the head and flow conditions expected at the early stages of the development and
Port Orchard,WA 98366 at full build out.
(tel)360.876.7960
4. The detention time of the wastewater in a six-inch forcemain could create a foul
(fax)360.876.7988 odor at the discharge manhole. Please consider alternatives to keep the average
detention time of the effluent to under one hour.
05/01/06 8:37 AM Ji\data\REN\W40U.tr-042806-GWagster-Christille Ridge Review.doc
Mr. Gordy Wagster,P.E.
May 1,2006
Page 2
Site Plan
1. Provide design information on how the lift station site will be accessed from the roadway. Need
design details on driveway configuration, construction materials, drainage, slope, and relationship to
road. Site shall be designed to slope all stormwater away from access hatches. The proposed
driveway curb cut shall be a minimum of 30 feet wide and meet the City Standard.
2. Provide landscaping plan to meet City of Renton land development standards.
3. Provide positive drainage for all electrical hand holes to prevent water from collecting in them as per
our discussions on previous projects.
Structural Plan
1. The access hatches to wet well and valve vault shall be manufactured by LW Hatch or Bilco. Odor
gasket shall be provided on wet well hatch.
2. Current plan sheet shows conflict with lower ladder and influent pipe.
3. Current plan sheet shows conflict with upper ladder and platform railing. A larger manhole may
correct this issue.
4. Please indicated on the Plans the type of material to be used for compaction around the valve vault
and wet well.
5. Please provide a metal roof with wood truss. Color to be selected by the City.
Mechanical Plan
1. Provide Kor-n-Seal boot at all pipe penetrations into the wet well and valve vault to provide a
watertight seal.
2. Provide a stainless steel lifting chain on each pump.
Electrical Plan
1. Engine generator shall meet the City's noise ordinance for quite operation during testing and
emergency operation.
2. Engine generator is located close to the proposed property line. Relocate to provide adequate room
for maintenance if the site is fenced as part of this project or in the future.
3. The close proximity of the proposed floats to the pumps could cause the floats to get stuck in the
open or closed position. More room is required to avoid this potential problem.
05/01/06 8:37 AM J:\data\REN\W40\Ltr-042806-GWagster-Christille Ridge Review.doc
Mr. Gordy Wagster,P.E.
May 1,2006
Page 3
Please feel free to contact tne should you have any questions.
Sincerely,
RH2 ENGINEERING, INC.
Mark Miller,P.E.
Project Engineer
MM/kd/kj
cc: Dave Christensen, City of Renton
L. �'j P� j U AS WAS/ `v WAS/./,,
O� �
38613 SIGNED: 22780
? J
,�OFlS CI TERb S:S`v `,j Zvr�1 Q �G'IST1:'tk �Yt
S/ ,L�cCs / / fc� 70NALE?'G
EXPIRES 7/15/07 EXPIRES 3/19/08
05/01/06 11:57 AM J:\dataUtEN\W40\Ltr-042806-GWagster-Christille Ridge Review.dce