Loading...
HomeMy WebLinkAboutWWP273262(1) PROJECT REQUEST FORM PLANNINGBUILDING/PUBLIC WORKS CONTACT: 171 EXT. , FILE STATUS NEW OR ❑ EXISTING: FILE CODE(PRI-xx-xxxx): LOCATION My Work Space: 0 File Bay Shelf#: 0 Other: PROJECT NAME/FILE TITLE: /���s ��e /2 fS 'C N (70 charac max) DESCRIPTION OF PR JECT: P UTILITY PERMIT#_(�jQ�fJ/lS LUA# O q—/D CI WO# ADDRESS/STREET NAME(S): 917-9N PL DEV: • CNTR: ;OWN: &r ; CNSLT/ENG: %14MA OTHER ALIASES: Circle Size of Waterline: 10" 12" Circle One: Pewk Replace/Extension Circle Size of Sewerline: " 10" 12" Circle One:. (NeV41 Replace/Extension Circle Size of Stormline: 2' 18" 24" Circle One e /Replace/Extension CHECK EACH DISCIPLINE INVOLVED IN PROJECT Ltr Drwg #of sheets TED V `1l 10 (off site improvements) (include TESC) TRO X )Q 3 (Signalization,Channelization,Lighting) WWI, (sanitary sewer main,include basin name) 50 WTR (Mains,Valves,Hydrants) (inc.composite&HorizontalCtrl) SWP ❑ (CIP onlyxinclude basin name) PLR (For Developer Files Only) ❑ (letter only) PLEASE CIRCLE THE DISCIPLINES WHICH NEED TO SIGN MYLARS WATER WASTEWATER SURFACE WATER TRANSPORTATION FIRE FOR FILE MAINTAINANCE USE ONLY File Codes p File Alias Date Entered and Labels Made ` o— r� P-- ;z— C Q- .1?. v CITY OF RENTON Pre-Construction Conference Agenda Tuesday,August 22, 2006 - 10:00 A.M. Christelle Ridge Lift Station Project I. Introduction and Sign-in City of Renton 1055 South Grady Way Renton, WA 98055 City Contact: Mr. Dave Christensen Phone: (425) 430-7212 Fax: (425) 430-7241 City Inspector: Mr. Tom Main Phone: (206) 999-1833 Fax: (425) 430-7300 Omega Contractors, Inc. P.O. Box 430 Duvall, WA 98019-0430 (/ Phone: (425) 881-1697 Fax: (425) 883-4718 RH2 Engineering, Inc. 300 Simon Street Suite 5 East WenAa�tchee, WA 98802 Contacjl�,�lVlark Miller Phone: (425) 951-5372 Fax: (425) 951-5373 Field Inspector: Jeff Laycock Phone: (425) 951-5420 Fax: (425) 951-5417 I. Discussion Items A. Review construction schedule and critical task items B. Submittals & Shop Drawings • Submit(1) copy to Owner, Submit(2) copies plus number wished to be returned to Contractor. • Essential to submit prior to execution of work allowing for review time • Engineer will process within 20 working days. • Send to: Mark Miller RH2 Engineering, Inc. J:\data\RSN\106-015Whristelle Ridge LS\PreconAgenda.doc • City of Renton Page 2 Christelle Ridge Lift Station Preconstruction Conference Agenda 300 Simon Street SE, Suite 5 East Wenatchee, WA 98802 C. Product Substitution • Must be approved by engineer and owner prior to execution of work D. Inspection Responsibilities • General and Civil Inspection—Renton Public Works • Structural—R112 Engineering and Renton Public Works • Mechanical—RH2 Engineering • Electrical—RH2 Engineering, Renton Building Dept. E. Review Items listed on Review Letter F. Renton Inspector Discussion Items G. Telemetry • City will provide panel for installation by Contractor. • City will program. (Schedule should reflect time for programming) H. Testing and Start-up II. Contractor Questions and Open discussion J:\data\REN\106-015\Christe11e Ridge LS\PreconAgenda.doc OMEGA CONTRACTORS, INC. P.O. Box 430 Duvall, WA 98019 (425) 881-1697 Fax (425) 883-4718 June 22, 2006 RECEIVED RT2 Engineering Inc. JUN ? 3 2006 Attn: Mark Miller CITY OF RENTON UTILITY SYS7;--h18 RE: Christelle Ridge Lift Station Final Review Revision Enclosed the signed and stamped replacements (as emailed to you on June 22) for sheets 2 and 5, which should replace our earlier submittal. Sincerely, Gordon Wagster cc: Dave Christensen, City of Renton Page 1 of 1 David Christensen - Comments on Christelle Ridge LS redesign From: "Mark Miller" <mmiller@RH2.com> To: 'David Christensen" <Dchristen@ci.renton.wa.us> Date: 05/22/2006 9:53 AM Subject: Comments on Christelle Ridge LS redesign Hi Dave - I had a chance on Friday to review the resubmittal of CR LS. Below our my preliminary comments. Have you had a chance to review? Preliminary Comments: 1. 4"Forcemain constructed of PVC or HDPE pipe with a minimum C value of 130. 2. Grinder pump selection is acceptable. 3. The 15 HP, 263 mm would be my choice in the future because it has more room for error in TDH calculations. 4. We may want CDF around the Wet Well if Gordy has concerns. 5. Provide best antenna combination to provide good communications. 6. Needs to be a CB for the Gen Set. Provide at location that meets NEC requirements and City of Renton Electrical department. Everything else looks pretty good. If you have any questions please call. Thanks, Mark This message contains confidential information and is intended only for the individual named.If you are not the named addressee you should not disseminate,distribute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e- mail from your system.E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted,corrupted,lost, destroyed,arrive late or incomplete,or contain viruses.The sender therefore does not accept liability for any errors or omissions in the contents of this message,which arise as a result of e-mail transmission.If verification is required please request a hard-copy version.Any views or opinions presented in this email are solely those of the author and do not necessarily represent those of the company. RH2 Engineering,Inc,www.rh2.com file://C:\Documents%20and%20Settings\dchristensen\Local%20Settings\Temp\GW}0000... 05/22/2006 lez 7 -:7-- 71-7.77' 1 �I WIN RECEIE® I E N I 1 5 T 5 JUN 3 0 2006 CITY OF RENTON UTILITY SYSTEMS June 28, 2006 RH2 ENGINEERING,INC http://www.rhZ.com mailboxorh2.com Mr. Gordon Wagster,P.E. Omega Contractors, Inc. COP17 1.800.720.8052 P.O.Box 430 Duvall,WA 98019 Sent Via: I;-Mail dam' U.S Mail WESTERN WASHINGTON 12100 NE 195th St.,Suite 100 Subject: City of Renton— Christille Ridge Lift Station Bothell,WA 98011 Final Design Plan Review (tel)425.951.5400 (fax)425.398.2774 Dear Gordy: 454 west Horton(toad The City of Renton has completed its second review of the proposed Christille Ridge Lift Bellingham,WA 98226 Station. The City's review comments are based on the revised lift station design plans (tel)360.676.0836 dated May 15, 2006, and an updated site and mechanical plan dated June 21 and June 15, (fax)360.676.0837 respectively. The final design plans will be approved for construction of the lift station by the City with the understanding that the approval is contingent on construction being completed by the design engineer only. Additional design details will be necessary before One Pacific Building a construction company other than Omega Contractors can be approved for constructing 621 Pack Avenue,suite 104 the Christille Ridge Lift Station. Tacoma,WA 98402 (tel)253.272.3059 Below is a list of items that need to be addressed on the final plan set that will be provided to the City for signature. 1. The proposed 3-inch forcemain is not required if a flushing port can be installed EASTERN WASHINGTON on the 4-inch forcemain at the lift station for maintenance of the line by City 300 Simon Street SE,Suite 5 crews. East Wenatchee,WA 98802 2. Locate the proposed Engine Generator Set (EG set) to the west by 1-foot to (tel)509.886.2900 allow more access on the east side. (fax)509.886.2313 3. Locate the PSE transformer as far to the north on the lift station property as possible,to maximize access to the proposed EG set. KITSAP PENINSULA 4. Retaining wall must be completely constructed within the road right-of-way. The 600 Kitsap Street,Suite 101 footings cannot be located within the City's easement. Apparently this has been Port Orchard,WA 98366 worked out with Touma Engineers and the lift station plans should reflect this (tell 360.876.7960 change. (fax)360.876.7988 5. Final selection of the telemetry antenna shall be completed during construction. Contractor shall work with RH2 Engineering in determining the best method available for establishing reliable communications. 06/28/06 8:51 AM J:\data\RFN\106-015\Christelle Ridge LS\Ltr-062706-GWagster-CR LS 2nd Review.doc . Mr. Gordon Wagster,P.E. June 28,2006 Page 2 If you accept the above mentioned comments without exception, a pre-construction conference can then be arranged for installation of the lift station. Please furnish five (5) sets of final plans to the City at least three days prior to the pre-construction conference for signature. If you do take exception to the comments please do not hesitate to contact the City to arrange for a review meeting to resolve the issues. All responses to the City from the developer should be done in writing. Sincerely, RH2 ENGINEERING, INC. eV w A Sy l C � 1 Mark Miller,P.E. Project Engineer 38613 4 SIGNED: ,r ('JSTER�v�14� MM/sp/kl ONAL��� EXPIRES 7/15/07 41 P .t J 22780 O R�GJSTE?- �4 F� 'ONAL EXPIRES 3/19/08 06/29/06 8:43 AM J:\data\REN\106-015\Christe11e Ridge LS\Ltr-062706-GWagster-CR LS 2nd Review.doc E N G I N E E R S S C I E N T I S T S Y`\♦ % �'' RI-1 FIRS2 ENGINEERING,INC MAILED FROM 98802 300 Simon Street SE 1 0 01 Suite 5 01 T04 10201 East Wenatchee WA 98802 Mr. Dave Christcrisen City of Renton 1055 South Gradv Way, 5th Floor Renton, W k 98055 _:__a = If,l1lilllliil,I,f111,11111,1111i,lfllflflrllllflil,f,l,1,1111 1 RECEIVED t MAY 0 4 2006 CITY OF RENTON E N G I N E R s UTILITY SYSTEMS P L N N E R -- -- S I E N T 1 S T S qqw— COPY May 1,2006 Mr. Gordon Wagster,P.E. RH2 ENGINEERING, INC Omega Contractors, Inc. P.O. Box 430 http://www.rh2.com Duvall,WA 98019 mailbox@rh2.com Sent Via: E Mail&US Mail 1.800.720.8052 Subject: City of Renton—Christille Ridge Lift Station Design and Plan Review WESTERN WASHINGTON Dear Gordy: 12100 NE 1951h St,Ste 100 We have concluded our review of the lift station design for the Christille Ridge development. This review is limited to the lift station and does not include review of the gravity or force Bothell,WA 98011 tTnam design. (tell425.951.5400 As submitted, a full review was not able to be completed. The City will need time to fully assess the station plans once they are in a more complete stage and incorporate all items (fax)425.398.2774 included in this letter. We will be happy to meet with you prior to that time if you feel the need to address specific issues. EASTERN WASHINGTON Below is a list of our preliminary comments. 300 Simon Street SE,Suite 5 General East Wenatchee,WA 98802 1. The station needs to be sized to serve all potential areas in the basin that could gravity flow to this lift station location. A cursory review indicates that. an (tell 509.886.2900 additional 80 to 100 ERUs could be sewered by this proposed lift station. (fax)509.886.2313 2. The design allows for one-hour emergency storage. Given the isolation of this site, the City would like to review the cost to increase the emergency storage capacity from one hour to two hour using the higher flows proposed above. KITSAP PENINSULA 3. Odor potential at both the lift station wet well and the discharge manhole is a 600 Kitsap Street,Suite 101 concern. Provide alternative lift station configuration that may be better suited for the head and flow conditions expected at the early stages of the development and Port Orchard,WA 98366 at full build out. (tel)360.876.7960 4. The detention time of the wastewater in a six-inch forcemain could create a foul (fax)360.876.7988 odor at the discharge manhole. Please consider alternatives to keep the average detention time of the effluent to under one hour. 05/01/06 8:37 AM Ji\data\REN\W40U.tr-042806-GWagster-Christille Ridge Review.doc Mr. Gordy Wagster,P.E. May 1,2006 Page 2 Site Plan 1. Provide design information on how the lift station site will be accessed from the roadway. Need design details on driveway configuration, construction materials, drainage, slope, and relationship to road. Site shall be designed to slope all stormwater away from access hatches. The proposed driveway curb cut shall be a minimum of 30 feet wide and meet the City Standard. 2. Provide landscaping plan to meet City of Renton land development standards. 3. Provide positive drainage for all electrical hand holes to prevent water from collecting in them as per our discussions on previous projects. Structural Plan 1. The access hatches to wet well and valve vault shall be manufactured by LW Hatch or Bilco. Odor gasket shall be provided on wet well hatch. 2. Current plan sheet shows conflict with lower ladder and influent pipe. 3. Current plan sheet shows conflict with upper ladder and platform railing. A larger manhole may correct this issue. 4. Please indicated on the Plans the type of material to be used for compaction around the valve vault and wet well. 5. Please provide a metal roof with wood truss. Color to be selected by the City. Mechanical Plan 1. Provide Kor-n-Seal boot at all pipe penetrations into the wet well and valve vault to provide a watertight seal. 2. Provide a stainless steel lifting chain on each pump. Electrical Plan 1. Engine generator shall meet the City's noise ordinance for quite operation during testing and emergency operation. 2. Engine generator is located close to the proposed property line. Relocate to provide adequate room for maintenance if the site is fenced as part of this project or in the future. 3. The close proximity of the proposed floats to the pumps could cause the floats to get stuck in the open or closed position. More room is required to avoid this potential problem. 05/01/06 8:37 AM J:\data\REN\W40\Ltr-042806-GWagster-Christille Ridge Review.doc Mr. Gordy Wagster,P.E. May 1,2006 Page 3 Please feel free to contact tne should you have any questions. Sincerely, RH2 ENGINEERING, INC. Mark Miller,P.E. Project Engineer MM/kd/kj cc: Dave Christensen, City of Renton L. �'j P� j U AS WAS/ `v WAS/./,, O� � 38613 SIGNED: 22780 ? J ,�OFlS CI TERb S:S`v `,j Zvr�1 Q �G'IST1:'tk �Yt S/ ,L�cCs / / fc� 70NALE?'G EXPIRES 7/15/07 EXPIRES 3/19/08 05/01/06 11:57 AM J:\dataUtEN\W40\Ltr-042806-GWagster-Christille Ridge Review.dce