HomeMy WebLinkAboutWWP272829(12) C`�Zr�,2�v -2Zd7 •'•R CITY OF RENTON Planning/Building/PublicWorks Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator January 14, 2002 Wally Clayton Pivetta Brothers Construction,Inc. P.O. Box 370 Sumner, WA 98390 SUBJECT: 80TH AVENUE SOUTH SEWER: PUNCH LIST Dear Wally: The City performed a walk-through of the project on the.morning of January 14th. The City's maintenance personnel were very impressed with the job that your crews did and,therefore,have approved the work. As far as the City is concerned there are only a few items, all of which you are aware of,that need to be finished. 1. Turn in as-built plans. 2. Pavement Re-striping Thermo-plastic: Crosswalk on S. 130t"at 801h Ave. S. Stop bar on S. 130"'at S. Langston Rd. Stop bar on S. 130th at Renton Ave S. Paint: Double yellow centerline stripe on patches on S. Langston Rd. Crosswalk on 80th Ave S. at S. 132nd St. Traffic Island touch-up at intersection of S. 132rid St. and S. Langston Rd. Stop bar at S. Langston Rd. at S. 132nd St. 3. Repair of leaking joint. Pressure grout leaking joint between MH#7&MH#8 and re-TV line. I have a walk-through scheduled with King County's inspector on Wednesday. I will let you know of any concerns he may have after the inspection. If you have any questions,please call me. SRnHobson ly, J Wastewater Utility H:\DIVISION.S\UTILITIE.S\DOCS\2002\2002-015.doc\JDMtb O 1055 South Grady Way-Renton,Washington 98055 ®This paper contains 50%recycled material;30%post consumer AHEAD OF THE CURVE CENTERLINE ELEVATIONS FOR SOUTH 130TH STREET STATION ELEVATION 93+00 314.17 93+50 311.47 94+00 309.89 94+50 308.72 95+00 307.61 95+50 306.57 96+00 305.73 96+50 305.15 97+00 304.57 97+50 303.99 98+00 303.10 98+50 302.21 99+00 301.71 99+50 301.31 100+00 300.92 100+50 301.75 101+00 302.91 101+50 304.30 102+00 305.90 102+50 308.11 103+00 309.88 103+50 310.56 104+00 311.16 104+50 311.76 105+00 312.31 105+50 311.88 ;y ,T CITY OF RENTON Planning/Building/Public Works Department J e Tanner,Mayor Gregg Zimmerman P.E.,Administrator December 10, 2001 Jeffrey Corliss Utility Inspection Unit, Road Maintenance Section Road Services Division Department of Transportation 155 Monroe Ave NE Renton, WA 98056-4199 SUBJECT: CITY OF RENTON 80TH AVENUE SOUTH SEWER EXTENSION PROJECT SOUTH 130TH ST PAVING Dear Jeff.- Enclosed is a copy of the Pivetta Brothers Construction Co., Inc., submittal for full road replacement for S. 130th Street. I have also enclosed a copy of the letter from King County that allowed a similar restoration method for another project that involved Pivetta Brothers Construction Co. Please let me know at your earliest convenience if this method will be acceptable so we may begin preparations for the roadway restoration. I can be reached at 425-430-7279 and my fax number is 425-430-7241. Siyrcerely, PohnHobson Wastewater Utility LAigento H ADI V ISION.S\UT1L1T1E.S\DOCS\2001\2001-772.doc\JDH\tb 1055 South Grady Way-Renton,Washington 99055 ®This paper contains 50%recycled material,30%post consumer �`it te'a I I I I i f i i I i I ! C H� 2 � a4ar� i I I I r E ' i ( i i i 1 I i C I i I �01t-01 •�w�7 f 1 H.�-C �r i i NOTICE SEWER INSTALLATIONS FOR 80TH AVENUE S, S. 130TH ST. and S. LANGSTON RD. The City of Renton is in the process of installing sanitary sewer mainS in 80' Avenue South, South 130t' St. and South Langston Rd. As part of the construction, we will be installing side sewer stubs from the sewer main to your property line. The City has designed side sewer stub locations for each property. However, the City is offering property owners the opportunity to choose where they would prefer their side sewer to be located. Therefore, the City is supplying each property owner with this stake to indicate where they want the stub to be located. Please place this stake in your yard to help us install your side sewer in the location you would prefer. Try to place your stake in a location that will keep your side sewer at least 10 feet from your water meter (see drawing below). We will endeavor to place the side sewer stub close to your stake. However, other buried utilities may not allow this. We will attempt to place the sewer stub as close to your stake as possible. Please remember, we are only installing the side sewer to your property line so place the stake in a location that will be convenient for you if you decide to connect your house at a later date. After your sewer stub has been installed you can remove the stake. The City will record the location of the stub and keep them on file at City Hall. If you have any questions, please contact John Hobson of the City of Renton's Wastewater Utility at 425-430-7279. A�� 1 nor Cjl%�1r(il7tft E Yo�,� Srqwx: Cvrsirc of tiere7L `7he =FAWD At.-d IF CEUT'�JZ o� �TTi�7' - SIDS W R.DOC\ — CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: November 2, 1999 TO: Paulie Sulky FROM: David Christens SUBJECT: Insurance Review—Survey Services—Horton Dennis Please find attached for insurance review is a consultant contract for survey services for Horton Dennis and Associates(HDA). HDA is currently on the City's annual roster for survey services and has performed work in the City Previously. Please contact me a x-7212 if you have any questions. cc: [Click here and type name] DocumenOd CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: November 8, 1999 TO: Gregg Zimmerman FROM: Lys Hornsby STAFF CONTACT Dave Christensen SUBJECT: Survey Services Contract with Horton Dennis&Associates 80'h Avenue South Sewer Main Please find attached two original contracts for your signature. The total contract amount is $9,650 and is within our line item for this work. Also attached is a copy of the CityAttorney's and Risk Manager's approval memos,and the original Insurance Certificate. Please return the documents to Dave and he will forward them to the consultant and up to the City Clerk. cc: [Click here and type name] Document2\d C 1'F`yc' O f REN TOICI Planning/Building/Public Works Department Gregg Zimmerman P.E.,Administrator Jesse Tanner Mayor October 12, 1999 Neil Cabbage, P.L.S. Horton Dennis & Associates 320 Second Avenue South Kirkland, WA 98033 SUBJECT: SEWER DESIGN TOPOGRAHIC MAPPING,80TH AVENUE SOUTH Dear Neil: Please find attached two original contracts for execution by HDA. Please return these documents to the City for our execution. Once completed, the City will submit one original to you for your records. In addition, the City needs an Insurance Certificate completed as indicated on the attached sheet. I look forward to working with you on this project. Once the contract has been executed I will send you notice to proc you have any questions, please contact me at(425)430-7212. Since , Id . C irist sen astewater to Supervisor enclosures 1 i:\DIVISION.S\[J"IILITIC.S\DOCS\I999\CURRHNT\99-695.DOC\DMC\tb 1055 South Grady Way-Renton, Washington 98055 ®This paper contains 50%recycled material,20%post consumer CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: November 8, 1999 TO: Marilyn Petersen A FROM: Dave Christensen : ' v, .w SUBJECT: Survey Services Contract—Horton Dennis&Associates 801h Avenue South Sewer Improvements Please find attached two original contracts for processing by your staff. As this contract was under $10,000, it was executed by Gregg Zimmerman. Also included are all the supporting paperwork needed including reviews and original Insurance Certificate. Please return one original to me for distribution to our consultant. Thanks, if you have any questions, please contact me at x-7212. Dave C. cc: [Click here and type name] DocumenOd