Loading...
HomeMy WebLinkAboutWWP272829(8) 035267 HORTON DENNIS & ASSOCIATES 0180094 04/06/00 ORIGINAL tifd,pr.Nf Vendor Name:: •• Pa Date..... u Chapter 116, Laws of 1965 CITY OF RENTON Purchase Order City of Renton Certification — I, the undersigned, do hereby certify under penalty of perjury, that the materials have been furnished, the services rendered, or the labor performed as described herein, and that the claim is a just, due and HORTON DENNIS & ASSOCIATES unpaid obligation against the City of Renton, and that I am authorized to 320 SECOND AVE S authenticat nd certify to said clai KIRKLAND, WA 98033-6687 Signed% PLNG/BLD /PUB WKS UTILITY SYS FERKINGSTAD, LINDA <><»::;: Qt. "nit: Descrl Lion iJf» ::E?ff� ESt.:A...ourit N/4J unc Amount Survey Services 5,840.00 E 421.000400.018.5960.0035.65.045295 45295/5400 5, 840.00 Topog mapping 80th Av U ' 2D64lJ)/ cj �(y7 y-3 0 0 58�0 00 South Sewer Project i i Authorized By 5, 840.00 S 5, 840.00 Accounts Payable Div.•200 Mill Ave. S. •Renton,WA 98055•Phone(206)235-2618•Fax(206)235-2513 " ` DP 3119 11/94 H_t)A JJ HORTON DENNIS & ASSOCIATES, INC. Consulting Engineers, Planners & Surveyors 320 SECOND AVENUE SOUTH KIRKLAND, WASHINGTON 98033-6687 (206) 822-2525 E APR - n 2000 Invoice number 9447 April 3, 2000 Page number 1 Project 9815.02 - S. 130th at 80th So. Attention: Mr. David Christensen City of Renton(69) 1055 South Grady Way CONCURRENCE Renton, WA. 98055 DOTE ��6V iL1 f E INITIAL/DATE Project Location: S. 130th at 80th So. Project Title: S. 130th at 80th So. Sewer Project Description: Design topo for sanitary sewers Progress Billing Period: March, 2000 Total fee 21, 970.00 Percent complete 100. 00 Total fee billed 21,970.00 Fee previously billed 16, 130.00 Current fee billing 5, 840.00 Total Due: $ 5, 840.00 To Insure Proper Credit, Please Reference Invoice No. Net: 30 days - 1 112% Service Charge Horton Dennis &Associates, Inc. HDA Consulting Engineers, Planners & Surveyors October 25, 1999 RECEIVED Mr. David M. Christensen OCT 26 1099 Renton City Hall 5th floor 1055 South Grad Wa CITY OF RENTON Y Y UTILITY SYSTEMS Renton, Washington 98055 Re: Sewer Design Topographic Mapping, 80th Avenue South Dear David: Enclosed, are the signed original contract documents for the above referenced survey project. I'm sorry I am so slow returning them. I was waiting for an insurance certificate that I found out, today, was mailed on the 1 lth of October to Bob MacOnie. If there are any problems, please feel free to call at any time. Sincere , Neil abbage PLS 320 Second Avenue South, Kirkland, Washington 98033, Phone (425) 822-2525, Fax (425) 822-8758 Kirkland•East Wenatchee•Leavenworth CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: April 3,2000 TO: Gregg Zimmerman FROM: Dave Christens SUBJECT: Addendum No. 2—Horton Dennis&Associates 80`h Avenue South Sewer Extension Gregg, please find attached for your signature, Addendum No. 2 for Horton Dennis and Associates survey work on the 80`" Avenue South Sewer Extension project. Horton Dennis has completed all of the work and has submitted it to the City. They encountered additional work items as they went along the survey and I gave them verbal approval for this addition upon completion of all work. The overall price for the survey is well within reason for the level of work performed. Please return the originals to me and I will process from there. Thanks, Dave C. Document2\d 4110 CITY OF RENTON 2MR1, Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator March 15, 2001 Michael G. Mickiewicz, P.L.S. Reid Middleton, Inc. 728 134"' Street SW, Suite 200 Everett, WA 98204 SUBJECT: 80TH AVENUE SOUTH SEWER PROJECT Dear Mike: Enclosed please find a signed original of the contract. This letter also serves as your notice to proceed. Thank you for your assistance with this project and I look forward to working with you. Please call me at 425-430-7279 if you have any questions. Sincerely, ./ John Hobson Wastewater Utility into H:\DIVISION.S\UTILITIE.S\DOCS\2001\2001-137.doc\JH\tb 1055 South Grady Way- Renton, Washington 98055 �e� 11 ®This paper contains 50%recycled material,20%post consumer CITY OF RENTON Planning/Building/Public Works Department 1 e Tanner,Mayor Gregg Zimmerman P.E.,Administrator March 8, 2001 Mike Mickiewicz Reid Middleton, Inc. 728 134`h St SW, Suite 200 Everett, WA 98204 SUBJECT: 80TH AVENUE SOUTH SEWER PROJECT Mike: The City of Renton's Wastewater Utility contracted with Horton Dennis&Associates, Inc.to prepare base maps for design of the above referenced project. My understanding is that your office is in possession of their survey information for this project. Since there is no monumentation that exists in the area,we would like to secure your firm to provide us with centerline stationing in the project area. I have included a copy of the construction plans. Please fax me a cost for this work(425-430-7241), and I will fax back a notice-to-proceed. In order to make billing easier, I would like to make one payment for the work. Please call me at 425-430-7279 if you have any questions. WSincerely, Wastewater Utility into 1055 South Grady Way- Renton,Washington 98055 p ti This naner contains 50%recvcled material.20%oost consumer en tend