HomeMy WebLinkAboutWWP272829(8) 035267 HORTON DENNIS & ASSOCIATES 0180094 04/06/00 ORIGINAL
tifd,pr.Nf Vendor Name:: •• Pa Date.....
u Chapter 116, Laws of 1965
CITY OF RENTON Purchase Order City of Renton Certification
—
I, the undersigned, do hereby certify under penalty of perjury, that the
materials have been furnished, the services rendered, or the labor
performed as described herein, and that the claim is a just, due and
HORTON DENNIS & ASSOCIATES unpaid obligation against the City of Renton, and that I am authorized to
320 SECOND AVE S authenticat nd certify to said clai
KIRKLAND, WA 98033-6687
Signed%
PLNG/BLD /PUB WKS UTILITY SYS
FERKINGSTAD, LINDA
<><»::;:
Qt. "nit: Descrl Lion iJf» ::E?ff� ESt.:A...ourit N/4J unc Amount
Survey Services 5,840.00 E 421.000400.018.5960.0035.65.045295 45295/5400 5, 840.00
Topog mapping 80th Av U ' 2D64lJ)/ cj �(y7 y-3 0 0 58�0 00
South Sewer Project
i
i
Authorized By 5, 840.00 S 5, 840.00
Accounts Payable Div.•200 Mill Ave. S. •Renton,WA 98055•Phone(206)235-2618•Fax(206)235-2513 "
` DP 3119 11/94
H_t)A JJ
HORTON DENNIS & ASSOCIATES, INC.
Consulting Engineers, Planners & Surveyors
320 SECOND AVENUE SOUTH
KIRKLAND, WASHINGTON 98033-6687
(206) 822-2525
E
APR - n 2000
Invoice number 9447
April 3, 2000
Page number 1
Project 9815.02 - S. 130th at 80th So.
Attention: Mr. David Christensen
City of Renton(69)
1055 South Grady Way CONCURRENCE
Renton, WA. 98055
DOTE ��6V
iL1 f E INITIAL/DATE
Project Location: S. 130th at 80th So.
Project Title: S. 130th at 80th So. Sewer
Project Description: Design topo for sanitary sewers
Progress Billing
Period: March, 2000
Total fee 21, 970.00
Percent complete 100. 00
Total fee billed 21,970.00
Fee previously billed 16, 130.00
Current fee billing 5, 840.00
Total Due: $ 5, 840.00
To Insure Proper Credit, Please Reference Invoice No.
Net: 30 days - 1 112% Service Charge
Horton Dennis &Associates, Inc.
HDA
Consulting Engineers, Planners & Surveyors
October 25, 1999 RECEIVED
Mr. David M. Christensen OCT 26 1099
Renton City Hall 5th floor
1055 South Grad Wa CITY OF RENTON
Y Y UTILITY SYSTEMS
Renton, Washington 98055
Re: Sewer Design Topographic Mapping, 80th Avenue South
Dear David:
Enclosed, are the signed original contract documents for the above referenced survey project.
I'm sorry I am so slow returning them. I was waiting for an insurance certificate that I found
out, today, was mailed on the 1 lth of October to Bob MacOnie. If there are any problems,
please feel free to call at any time.
Sincere ,
Neil abbage PLS
320 Second Avenue South, Kirkland, Washington 98033, Phone (425) 822-2525, Fax (425) 822-8758
Kirkland•East Wenatchee•Leavenworth
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: April 3,2000
TO: Gregg Zimmerman
FROM: Dave Christens
SUBJECT: Addendum No. 2—Horton Dennis&Associates
80`h Avenue South Sewer Extension
Gregg, please find attached for your signature, Addendum No. 2 for Horton Dennis and
Associates survey work on the 80`" Avenue South Sewer Extension project. Horton Dennis has
completed all of the work and has submitted it to the City. They encountered additional work
items as they went along the survey and I gave them verbal approval for this addition upon
completion of all work. The overall price for the survey is well within reason for the level of
work performed.
Please return the originals to me and I will process from there. Thanks, Dave C.
Document2\d
4110 CITY OF RENTON
2MR1, Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
March 15, 2001
Michael G. Mickiewicz, P.L.S.
Reid Middleton, Inc.
728 134"' Street SW, Suite 200
Everett, WA 98204
SUBJECT: 80TH AVENUE SOUTH SEWER PROJECT
Dear Mike:
Enclosed please find a signed original of the contract. This letter also serves as your notice to proceed.
Thank you for your assistance with this project and I look forward to working with you.
Please call me at 425-430-7279 if you have any questions.
Sincerely,
./
John Hobson
Wastewater Utility
into
H:\DIVISION.S\UTILITIE.S\DOCS\2001\2001-137.doc\JH\tb
1055 South Grady Way- Renton, Washington 98055 �e� 11
®This paper contains 50%recycled material,20%post consumer
CITY OF RENTON
Planning/Building/Public Works Department
1 e Tanner,Mayor Gregg Zimmerman P.E.,Administrator
March 8, 2001
Mike Mickiewicz
Reid Middleton, Inc.
728 134`h St SW, Suite 200
Everett, WA 98204
SUBJECT: 80TH AVENUE SOUTH SEWER PROJECT
Mike:
The City of Renton's Wastewater Utility contracted with Horton Dennis&Associates, Inc.to
prepare base maps for design of the above referenced project. My understanding is that your
office is in possession of their survey information for this project. Since there is no
monumentation that exists in the area,we would like to secure your firm to provide us with
centerline stationing in the project area. I have included a copy of the construction plans.
Please fax me a cost for this work(425-430-7241), and I will fax back a notice-to-proceed. In
order to make billing easier, I would like to make one payment for the work.
Please call me at 425-430-7279 if you have any questions.
WSincerely,
Wastewater Utility
into
1055 South Grady Way- Renton,Washington 98055 p ti
This naner contains 50%recvcled material.20%oost consumer en tend