HomeMy WebLinkAboutWWP272955(2) Penhallegon Associates Consulting Engineers,Inc. Engineering Planning Surveying May 29, 2001 RECEIVED John D. Hobson MAY 3 12001 Waste Water Utility CITY OF RENTO�j 1055 S. Grady Way UTILITY SYSTEMS Renton, WA 98055 Subject: East Kennydale Sewer Infill Project Survey Proposal No. 211.01 Dear John: We are familiar with the project area, having surveyed various sites within the section. For purposes of estimating, we will treat the project as 5,850 feet in length. Because each project is different in length and it is obvious that one could not apply the same price per foot for a project of 100 feet as one of 4000 feet, it is necessary to start with a basic price (mobilization price), together with a price per foot. We are using a mobilization price of$1000, plus $5.00 per foot for streets. This is average for a sanitary sewer project based on your desired scope of work. T - t including s -T—crk,- �i o7 ��T- �sr I S 4 �41Z,vo DESCRIPTION OF PROPOSED WORK Phase 1 Purpose: The preparation of a base map for future design Area of Coverage: See attached exhibit maps. Description: ► All surveying will be tied to City of Renton NAD 83/91 horizontal control points and NAVD 88 vertical points. All survey work shall be conducted in accordance with City of Renton requirements. ► An electronic design locate will be ordered. ► Establish right-of-way centerline and boundaries ► Install P.K. nails in centerline at intervals of 200 feet and paint marks at intervals of 50 feet for later construction staking and as-built survey. P:\P01\01000\Survey Proposals\P211.01 JFW E Kennydale Sewer.wpd Federal Way Kirkland Cie Elum 750 Sixth Street South•Kirkland,WA 98033 P.425.827.2014•F.425.827.5043 John D.Hobson Waste Water Utility May 29,2001 Page 2 ► Set additional bench marks at beginning and end of streets, if needed. Maximum distance between bench marks to be 1000 feet in distance or 100 feet in elevation. ► Show spot elevations on hard surfaces on a separate layer. ► Show all data and 10 feet beyond right-of-way lines. ► Show topopgraphy lines at 1 foot intervals. ► Show control points with elevations, point numbers, coordinates & description in a map table. ► Show all known utilities, note size, type, invert elevations and direction of flow. ► Show all prominent landmarks ► Show front edge of houses, house numbers,property lines and right-of-way lines. ► One print for each street for review purposes. City will prepare plan and profile sheets. ► Project shall be prepared in AutoCAD version 2000. ► Two sets of prints will be provided for review,pickups will be made and two sets provided for final review. ► Projects: Disk or CD. Task 1: Supervision, research and centerline control survey Objective: Establish centerline of the streets, elevate the stations, set bench marks and provide project coordination. Approach: Intersections Recover or set P.K.nails and aluminum washer or equal at street intersections Centerline Control Set P.K. nail or equal at each street and label with appropriate station. Set P.K. nails along the centerline of the streets at 200 foot interval stations. Run levels and elevate 200 foot stations and control points. Bench Marks Run a level loop through the horizontal control, and set at least one bench mark at each street intersection and/or as called for in description of the work. Task 2: Calculations Objective: Establish coordinates and elevations for control points and fix street intersections and right-of-way lines. Approach: Compute traverse closures and coordinates on recovered points. Task 3: Field Topographic Survey Objective: Acquire topographic features for final map compilation Approach: Radial topography Data collect surface utilities and all other topography within streets and adjoining properties. Conduct measure downs to inverts of existing utilities. PAP01\01000\Survey Proposals\P211.01 JFW E Kennydale Sewer.wpd Penhallegon Associates Consulting Engineers,Inc. Engineering•Planning•Surveying John D.Hobson Waste Water Utility May 29,2001 Page 3 Task 4: Mapping Objective: Preparation of Final Mapping Approach: AutoCAD drafting in Release 2000 Check all data for correctness,plot located and calculated data on base map. Products: Provide disk only. ESTIMATE OF HOURS AND COST (Phase I) Task 1: Position $/Hour Hours Cost Principal Surveyor $96.00 12 $ 1,152.00 Project Surveyor $75.00 24 1,800.00 Senior Party Chief $68.00 32 2,176.00 Instrument Person $48.00 32 1,536.00 Senior Office Tech $48.00 2 96.00 Sub Total $ 6,760.00 Task 2: Position $/Hour Hours Cost Project Surveyor $75.00 24 $ 1,800.00 Principal Surveyor $96.00 4 384.00 Sub Total $ 2,184.00 Task 3: Position $/Hour Hours Cost Project Surveyor $75.00 8 $ 600.00 Senior Party Chief $68.00 96 6,528.00 Instrument Person $48.00 96 4,608.00 Sub Total $ 11,736.00 Task 4: Position $/Hour Hours Cost Senior Computer Tech $75.00 50 $ 3,750.00 Senior CAD Drafter $68.00 80 5,440.00 Principal Surveyor $96.00 4 384.00 Sub Total $ 9,574.00 SUMMARY OF FEE FOR PHASE I Direct Salary Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 30 254.00 Direct Non-Salary Costs: Utility Locate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 840.00 Reproduction Expense . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85.00 Other Mapping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150.00 Sub Total $ 1,075.00 TOTAL PHASE I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 31,329.00 PAPO1\01000\Survey Proposals\P211.01 JFW E Kennydale Sewer.wpd Penhallegon Associates Consulting Engineers,Inc. Engineering•Planning•Surveying John D.Hobson Waste Water Utility May 29,2001 Page 4 Phase II Purpose: Re-establish elevations on existing control monuments;Benchmarks#71 and #250. Description: ► We will re-establish elevations on newly re-set monuments #71 and #250. ► All work performed will conform to Federal Geodetic control Committee requirements for third order vertical control work. ► Prepare City of Renton monument cards referencing the new elevations. Task 1: Field Survey Objective: Run vertical control loop from existing City benchmarks through re-set monuments #71 &#250. Approach: Run double level loop using digital bar code level. Task 2: Calculations Objective: Establish elevations on re-set monuments #71 and#250. Approach: Compute level loop closures using Star Net program. Task 3: City of Renton Monument Reference Cards Objective: Provide client with standard Monument Cards. Approach: Complete the Monument Cards provided. ESTIMATE OF HOURS AND COST (Phase II) Task 1: Position $/Hour Hours Cost Senior Party Chief $68.00 4 $ 272.00 Instrument Person $48.00 4 192.00 Sub Total $ 464.00 Task 2: Position $/Hour Hours Cost Senior Computer Tech $75.00 4 $ 300.00 Sub Total $ 300.00 P:\P01\01000\Survey Proposals\P21 1.01 1FW E Kennydale Sewer.wpd Penhallegon Associates Consulting Engineers,Inc. Engineering•Planning•Surveying John D.Hobson Waste Water Utility May 29,2001 Page 5 Task 3: Position $/Hour Hours Cost Project Surveyor $75.00 1 $ 75.00 Survey Tech I $61.00 4 244.00 Sub Total $ 319.00 SUMMARY OF FEE FOR PHASE II Direct Salary Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,083.00 TOTAL PHASE II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,083.00 TOTAL FEES, PHASE I & PHASE II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 32,412.00 SCHEDULE FOR COMPLETION OF AUTHORIZED WORK We will complete the tasks outlined in eight weeks of notice to proceed unless unforeseen problems are encountered. Thank you for the opportunity to present this proposal. Please sign below and return one copy to our office. Receipt of a signed copy will be our notice to proceed. The supervisor of the project will be Fred Williamson and the field surveyor will be Fred Warner. Sincerely, PENHALLEGON ASSOCIATES CONSULTING ENGINEERS, INC. �b. fz.4� Gordon S. Rector, P.L.S. Director of Surveying Proposal Accepted By: Name Title Date PAP01\01000\Survey Proposals\P211.01 JFW E Kennydale Sewer.wpd Penhallegon Associates Consulting Engineers,Inc. Engineering•Planning•Surveying EAST KENNYDALE SURVEY AREAS (Streets to be survey are shaded) SCALE 1"=400' -T NE 74rh It. z 7 �F a� I" d r i 0 h NE 20th z N a 4 CITY OF RENTON 9 MLLPlanning/Building/Public Works Department R J e Tanner,Mayor Gregg Zimmerman P.E.,Administrator May 23,2001 Gordon Rector Penhallegon Associates Consulting Engineers, Inc. 750 Sixth Street South, Ste. 200 Kirkland, WA 98033 SUBJECT: REQUEST FOR SURVEY SERVICES FOR THE EAST KENNYDALE SEWER INFILL Dear Gordon: I am writing to request a proposal to perform survey work for use in designing new sanitary sewer systems and watermain replacement within the East Kennydale area. The scope of work should match that of a previous survey project that your firm performed for us(copy enclosed). I have made a couple of edits to the enclosed proposal. In addition to the utility base map survey, we need elevations reset on a couple of benchmarks that were disturbed. Benchmarks#71 and#250 were disturbed during a recent utility project on Aberdeen Avenue NE. The monuments were reset after construction although elevations were no reestablished. I have included monument cards to be filled out and returned for the City's files. I have enclosed the following information for your use: • King County Assessor Maps • Plat Maps • All available utility design and as-built drawings for the associated areas • City of Renton survey bench marks and monument information If you have any questions, please call me at 425-430-7279. SinWely, John Hobson Wastewater Utility Into H:\DIVISION.S\UTILITIE.S\DOCS\2001\2001-287.doc\JDH\tb , , 1055 South Grady Way-Renton,Washington 98055 0 ti ®This paper contains 50%recycled material,30%post consumer en`en�1 EAST KEN NYDALE SURVEY AREAS VICINITY MAP Not to Scale NE 31st St H o May t Creek t t NE t. 0UXE co m z p O � LEL i �• > d 0 ? v, o H NI G� o L i u CO c w aq,cc5 w v� � t rT a� FtIE t St. 9�11 CL) a� ' I Jun 13 01 01 : 59p Penhallegon Associates 425-827-5043 p. l IT • tf ,1 FAX Transmittal Pages including cover sheet: Date: 1,� r To: Y `� b 4 . i _ t ` �1 J t Fax No: ��.� ` ` i 1��� Job No.: From: Subject: Comments: Ia ;r it is a 3 Originals to be mailed: Yes No i� Copy to: { ,a CONFIDENTIALITY NOTICE. The material contained in this fax transmission is private and confidential, and is intended only for use by the individuals named on this sheet. Use,disclosure,copying,distribution or reliance upon the information contained in this fax by anyone other than the individuals named is prohibited. if you have received this fax in error,please call(425)027-2014 to i arrange for the return of this material. I N I'� g IVY 9 i � �•-- From the offices of... ; _ Y Penhallegan Associates Consulting Engineers, Inc. i 750 Sixth Street South, Kirkland,WA 98033 Phone: (425) 827-2014 Fax: (425) 827-5043 Jun 13 01 01 : 59p Penhallegon Associates 425-827-5043 p. 2 q� Penhailegon Associates Consulting Engineers,Inc. F I«; rig ' Engineering t Planning i 11 Surveying June 13, 2001 1 ; 4 F. John D. Hobson Waste Water Utility 1055 S. Grady Way Renton, WA 98055 } Subject: East Kennydale Sewer Infill Project Survey Proposal No.211.01 i i Dear John: +� it{ We are familiar with the project area,having surveyed various sites within the section. For purposes of estimating, we will treat the project as 7,250 feet in length. i Because each project is different in length and it is obvious that one could not apply the same price per foot for a project of 100 feet as one of 4000 feet, it is necessary to start with a basic price h (mobilization price),together with a price per foot. We are using a mobilization price of$1000, plus $5.00 per foot for streets. This is average for a sanitary sewer project based on your desired scope of work. Total project cost is$39,162.00. it DESCRIPTION OF PROPOSED WORK i 11 ' Phase 1 �k Pu--rpose: The preparation of a base map for future design al i Area of Coverage: See attached exhibit maps. i Description: r# ► All surveying will be tied to City of Kenton NAD 83/91 horizontal control points and NAVD 88 vertical points. All survey work shall be conducted in accordance with City of Renton requirements. • An electronic design locate will be ordered. ► Establish right-of-way centerline and boundaries r ► Install P.K. nails in centerline at intervals of200 feet and paint marks at intervals of 50 feet I� for later construction staking and as-built survey. i P:\P01\01000\Survey Proposals\P211.01 JFW G Kennydale 5ewermpd Federal Way Kirkland Cle Elum 750 Sixth Street South-Kirkland,WA 98033 i P.425.827.2014•F.425.827.SC43 j ii 11 Jun 13 01 01 : 59P Penhallegon Associates 425-827-5043 P. 3ho l 1 a ,1 . John D. Hobson Waste Water Utility June 4,2001 ii Page 2 u ib ► Set additional bench marks at beginning and end of streets, if needed. Maximum distance between bench marks to be 1000 feet in distance or 100 feet in elevation. s ► Show spot elevations on hard surfaces on a separate layer. r ► Show all data and 10 feet beyond right-of-way lines. • Show topopgraphy lines at 1 foot intervals. ► Show control points with elevations, point numbers, coordinates & description in a map table. ► Show all known utilities,note size, type, invert elevations and direction of flow. ► Show all prominent landmarks ► Show front edge of houses, house numbers, property lines and right-of--way lines. 'i ► One print for each street for review purposes. City will prepare plan and profile sheets. a ► Project shall be prepared in AutoCAD version 2000. Two sets of prints will be provided for review,pickups will be made.and two sets provided for final review. 1 i ► Projects: Disk or CD. 9 Task 1: Supervision, research and centerline control survey I?l Objective: Establish centerline of the streets, elevate the stations, set bench marks and provide project coordination. 1 Approach: Intersections Recover or set P.K.nails and aluminum washer or equal at street intersections Centerline Control t Set P.K. nail or equal at each street and label with appropriate station. Set P.K. nails along the centerline of the streets at 200 foot interval stations. r Run levels and elevate 200 foot stations and control points. , y Bench Marks j et at least one bench Run a level loop through the horizontal control, and s mark at each street intersection and/or as called for in description of the work. i Task 2: Calculations ;1. Objective: Establish coordinates and elevations for control points and fix street intersections and right-of-way lines. a Approach: Compute traverse closures and coordinates on recovered points. Task 3: Field Topographic Survey w is Objective: Acquire topographic features for final map compilation Approach: Radial topography Data collect surface utilities and all other topography within streets and i. P:\P01\ol000\S11rvey Proposnls\P211.01 JtW E Kennydalc Sewer.wpd F Penhallegon Associates Consulting Engineers,Inc. Engineering•Planning-Surveying i Jun 13 01 01 : 59p Penhallegon Associates 425-827-5043 p. 4 r �I 'I 3 John D.Hobson 1 Waste Water Utility M' June 13,2001 Page 3 I. Task 4: Mapping Iw t+ � f Objective: Preparation of Final Mapping Approach: AutoCAD drafting in Release 2000 Check all data for correctness,plot located and calculated data on base map. Products: Provide disk only. I i ESTIMATE OF HOURS AND COST (Phase 1) 1 � Task 1: Position $/Hour Hours Cost , Principal Surveyor $96.00 14.5 $ 1,392.00 Project Surveyor $75.00 29 2,175.00 Senior Party Chief $68.00 38 2,584.00 Instrument Person $48.00 38 1,824.00 Senior Office Tech $48.00 3 144.00 Sub Total $ 8,119.00 Task 2: Position $/Hour Hours Cost Project Surveyor $75.00 30 $ 2,250.00 Principal Surveyor $96.00 5 480.00 ,; t Sub Total $ 2,730.00 �9 $/Hour . Hours Cost j Task 3: Position ' Project Surveyor $75.00 10 $ 750.00 a $68.00 116 7,888.00 1 Senior Party Chief 5,568.00t Instrument Person $48.00 116 Sub Total $ 14,206.00 I $!Hour Hours Cost �a Task 4: Position $ 420000 Senior Computer Tech , . $75.00 56 t Senior CAD Drafter $68.00 96 6,528.00 l Principal Surveyor $96.00 5 480.00 Sub Total $ 11,208.00 i SUMMARY OF FEE FOR PHASE I Direct Salary Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 36,263.00 Direct Non-Salary Costs: , . $ 1,500.00 Utility Locate . . . . � - ' 116.00 Reproduction Expense 200.00 Other Mapping . . . . • . . . . . . ' . . . , . . ; PP g . . . . . . . . . . . . . . S.ub. Total $ 1,816.00 , $ 38,079.00 i TOTAL PHASE I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . „ € PAP011010msurvey Proposals\P211.01 JFW E Kennydale Se\ver.wpd 1 Penhallegon Associates Consulting Engineers,Inc. Engineering•Planning•Surveying t s r Jun 13 01 02: 00p Penhallegon Associates 425-827-5043 p. 5 M John D.Hobson Waste Water Utility June 13,2001 is Page 4 Phase 11 t Pumose: Re-establish elevations on existing control monuments;Benchmarks 471 and #250. i Description: ► We will re-establish elevations on newly re-set monuments #71 and#250. ► All work performed will conform to Federal Geodetic control Committee requirements for third order vertical control work. { • Prepare City of Renton monument cards referencing the new elevations. Tasli 1: Field Survey Objective: Run vertical control loop from existing City benchmarks through re-set monuments 471 &#250. y Approach: Run double level loop using digital bar code level. �t9 Task 2: Calculations it Objective: Establish elevations on re-set monuments 971 and 4250. I' I Approach: Compute level loop closures using Star Net program. Task 3: City of Renton Monument Reference Cards Objective: Provide client with standard Monument Cards. Apl)roach: Complete the Monument Cards provided. ESTIMATE OF HOURS AND COST (Phase 11) Task 1: Position $/Hour Hours Cost Senior Party Chief $68-00 4 $ 272.00 Instrument Person $48.00 4 192.00 Sub Total $ 464.00 $/Hour Hours Cost Task 2: Position i g $ 300.00 Senior Computer Tech $75.00 4 i Sub Total $ 300.00 1" r1 i i i P:\PoIxoI000lSurvcy Proposals1P211.01 JFW E Kennydale Sever-�\pd Penhallegon Associates Consulting Engineers,Inc. $ Engineering s planning,Surveying Jun 13 01 02; 00p Penhallegon Associates 425-827-5043 P. 6 i' John D. Hobson Waste Water Utility June 13,2001 Page 5 Task 3: Position $(1 lour Hours Cost 75.00 Project Surveyor $75,00 1 $ l Survey Tech I $61.00 4 244.00 Sub Total $ 319.00 SUMMARY OF FEE FOR PHASE II p Direct Salary Cost . . . . . . . . . . . . . . . . . . . . . $ 1,083.00 TOTAL PHASE II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,083.00 TOTAL FEES, PHASE I & PHASE II . . . . . . . . . . . . . . $ 39,162.00 # • • • t� a i VI SCHEDULE FOR COMPLETION OF AUTHORIZED IVOI K i We will complete the tasks outlined in eight weeks of notice to proceed unless unforeseen problems ' are encountered. Thank:you for the opportunity to present this proposal. Please sign below and return one copy to our lit office. Receipt of a signed copy will be our notice to proceed. The supervisor of the project will be Fred Williamson and the field surveyor will be Fred Warner. 1 i Sincerely, f PENHALLEGON ASSOCIATES CONSULTING ENGINEERS,INC. Gordon S. Rector, P.L.S. ' Director of Surveying t �I Proposal Accepted By: i Name Title Date !k i 1 i i P:\I'OI\OIO=Survey ProposalsT211.01 JFW E Kennydale Sewer.Npd Penhallegon Associates Consulting Engineers,Inc. !� Engineering-Planning•Surveying CITY OF RENTON � NTo� HUMAN RESOURCES & RISK MANAGEMENT DEPARTMENT MEMORANDUM RECEIVE® DATE: June 28, 2001 JUN 2 9 2001 TO: John Hobson, Utility Systems CITY OF RENTON UTILITY SYSTEMS FROM: 4�. Webby, HR&RM Administrator SUBJECT: Ins. Review/Penhallegon Associates Consulting Engineers, Inc. I have reviewed the Certificate of Insurance for the above referenced contract. The insurance coverage, provided for this project, meets the City's risk management requirements. CITY OF RENTON MEMORANDUM DATE: June 26,2001 TO: Mike Webby FROM: John Hobson SUBJECT: Revised Insurance submittal for Penhallegon Associates Consulting Engineers,Inc. Please review the attached revised insurance form for workers compensation requirements as required by your June 18, 2001 memo(copy attached). Document2\jdh oo o� CITY OF RENTON �NTo� HUMAN RESOURCES & RISK MANAGEMENT DEPARTMENT MEMORANDUM DATE: June 18, 2001 RECEIVED TO: Jo4nobson, Utility Systems JUN ' ZoO1 FROM: MR. Webby, BR &RM Administrator CITY OF RENTON UTILITY SYSTEMS SUBJECT: Ins. Review/Penhallegon Associates Consulting Engineers, Inc. I have reviewed the Certificate of Insurance renewal for the above referenced contract. The insurance coverage,provided for this project, will meet the City's risk management requirements when the following items have been provided for: • Please provide proof of workers comp coverage Please provide the revised certificate to HR when received