HomeMy WebLinkAboutWWP272988 Michael Benoit- DOWNTOWN OVERLAY Page 1 From: William Wressell To: Benoit, Michael Date: 02/06/2006 8:36:34 AM Subject: DOWNTOWN OVERLAY Mike, Attached please find my best crystal ball estimate for the overlay work on your Wells-Williams CIP Project. I took field measurements and came up with what I thought the prices will be this year on these quantities. Please remind Mr. Gafour that I have no control of how much the winning contractor bids on Mob or TC. The TC price will depend on whether the work is done at night or during the day, and if traffic has to be detoured around the street being paved, or if traffic can be reduced to one lane. My figures are for a 2" grind, curb to curb, and a 2" overlay. I anticipate the quantity for ACP will go higher because of all the unevenness of the two streets. The Overlay Program may pay for an additional inch of ACP(100 tons) because these are arterial streets and we overlay our arterials at 3" 1 counted all utility covers that I could find on the two streets. After the grind and overlay are complete, some of them may fit and won't need adjusting. I assume all the patching, sealing, and curb replacement will be completed before the overlay. I tried to make this estimate as accurate as possible, but remember, it is only my best guess-could be higher or lower. I hope this helps and let me know if you need more from me. CC: Stenhouse, Michael; Wilhoit, James I ESTIMATED OVERLAY COSTS FOR S WELLS AND S WILLIAMS WELLS WILLIAMS ITEM QUANT UNIT PRICE TOTAL ITEM QUANT UNIT PRICE TOTAL MOB 1 $ 10,000.00 $ 10,000.00 MOB 1 $10,000.00 $ 10,000.00 TC 1 $ 12,000.00 $ 12,000.00 TC 1 $12,000.00 $ 12,000.00 GRIND 2522 ;.,$ 10.00 $ 25,220.00 GRIND 2522 $ 10.00 $ 25,220.00 PAVE 290 $ 48.00 $ 13,920.00 PAVE 290 $ 48.00 $ 13,920.00 ADJ MH 3 $ 350.00 $ 1,050.00 ADJ MH 7 $ 350.00 $ 2,450.00 ADJ WV 4 $ 300.00 $ 1,200.00 ADJ WV 7 $ 300.00 $ 2,100.00 CW 380 $ 1.20 $ 456.00 CW 390 $ 1.20 $ 468.00 1 W 70 $ 1.50 $ 105.00 1 W 70 $ 1.50 $ 105.00 2e 10 $ 3.50 $ 35.00 2e 10 $ 3.50 $ 35.00 2b 2 $ 10.00 $ 20.00 2b 3 $ 10.00 $ 30.00 F&C 1 $ 1,000.00 $ 1,000.00 IF&C 1 1 $ 1,000.00 $ 1,000.00 TOTAL $ 65,006.00 TOTAL $ 67,328.00 TOTAL FOR BOTH STREETS $ 132,334.00 PLUS TAX ???? Ll v_ 3 S, 5 WELLS-WILL OL.As WEL.L.S-WILL OLAs CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: February 24,2005 TO: Mike Stenhouse,Maintenance Services Director FROM: Mike Benoit M6 SUBJECT: Wells Williams Utility Replacement Enclosed are two sets of plans for the above-mentioned project for maintenances review. Water has sent the plans to a consultant for the review of the cathodic protection. We expect them to respond by the end of next week. We would appreciate any comments that the Maintenance Division would have by the March P. PLEASE REVIEW THE ATTACHED Dan Scottie Zy Sled George Stahl John Thompson Bill Wressell Pat Zellner -I Document2\mab STATIONSTEST C..catnoluic virmecuoI1 &ACCESSOWS Test est Stations „� �xx w ,k• s k -. x . dam' Mii..�kf!�'a . w`WF+"+'ai..R#1 YR.a.YSY{?..�»,ek,K�w�2�c9 ah The Brooks 1-RT pre-cast concrete valve box is traffic rated.It's body is armored with a heavy cast iron ring which seats a deeply ribbed cast iron cover. The cover may be marked ANODE,C.P-TEST,or as specified. FI ATUI?ES: �. 4nnoared tap and cost iron lid. Ordering Information: �''�-�r,��. .- .�E)1•t)'pJ�tG'lll'C^t:.S •:;. - • 8-319"inside.r 12 deep 712* 9 creme van box b>dv 1•RT 07.2)000ctunplete: 661hs. Lid can /w Munk or marked 1-RT-Lid talk od,marked ANODE 07.23505 2t1NODE, C'.F TEST,or as rCn Va hC rid.mar ed 3'RT•Lid 07.20500 9.5r18»diameter Ca:TE5T;12 bs spec•tlied cP-TssT • Optional terminal hoard t-R;-Lid Cast iron v4frrc rid:wunarked available Blank 07.20a"t0 9-5,'6'd ameter or speciry,12 bs t•RT-6 07•'a0517 6'extemion 6`x 8-In'Ezens,on.70.114 las 12•x8.In'Exiensw% 4•RTA2 07.WS16 12'exfension 20.1)2 los The Brooks 3-RT pre-cast concrete valve box is traffic rated.It's body is armored with a heavy cast iron ring which seats a deeply ribbed cast iron cover. The cover may be marked ANODE,C.P.TEST,or as specified. Ordering Information: r•EATURES. - • Armoured tap tu)d Cast n-on lid. 10-t1i'ID X pre-cast:onctete traffic box 3-RT 07-2000t s2 jeop trsdx55ths jor nrrj�ir 01'e ac • 1��-1 i'� ill.�ttle-X.i 2 dL'L'? 341%id Cast,rrenira€tk ud.marked MODE 07-20505 9.5t8'diameter AMIDE.t2 bs • I°Feight complete:66 lbs, IRT-Lid Cast iaor'traf6c lid,marked * Lid can he blank of ma)•ked CP-TEST 07-20500 9-Sr8»diameter cF-'rES't;12 bs ` ANODE. C'.I'TEST,or as a•RT•ud cast iron traffic lid.onmarked or � 07,20510 9-W diameter spediy.'2 bs specified • Optional terminal board tPPTT, 07.20519 12'eAension 1T x6-W"Extension,24b$ available st o7;20043 cast iron rise,ring.16 lbs The Christy G-5 box is specifically designed to meet modern day requirements. The carefully engineered iron lid and ring set furnishes a complete unit reducing the danger of lid"pop-out"in heavy traffic areas. Vandal resistance is optional at extra cost by the addition of hold down screws. FEATURES. Ordering Information: • Large irzsirle diameter g r<. Unique locking grade rings assure permanence and quality Cr, 10 x precast coraete traffic box body q t11 face r ades when sweets 0'21033 Ure � s 12'deep ".6 t fis rh'�havt!1 G•5C 07,22064 1"dia Cast'sran traffic Ikl,SO Itss Optional terminal hoard 12'teia�edcorIcrete G•SX12 07-21037 t2'c as c on extension.29 ib5 available w • Lid can be Munk o)-marked G•SGRtO 07-21200 1'h,h cent rrc»grade drk�•10 tb5 AIVOI)E,CYTEST ora»s Cr5GA15 07•21201 1-1re Ngh Coot irCn grade dr'g.14 bs ,spec iea` G-SGR24 07.21202 2`hqh Cast iron grade ring 17 ibs • f-1�p 7ia,jJic•rntea t lm—m nmmm'�+tz r� 's '�`.Woo: &ArS:.'i�w.!��aar-.i.�e;.�:a.aw+s3.. . .kP rz A FARWEST Toll Free: (888) 5-FARWEST (888) 532-7937 � R CORROSION m CONTROL Internet: www.farwestcorrosion.co r COMPANY E-mail: sales@farwestcorrosion.com Michael Benoit- Re: Schedule?- Fwd: Re: Wells and Williams Avenues Page 11 From: Terrence Flatley To: Mbenoit@ci.renton.wa.us Date: 02/16/2005 7:38:37 PM Subject: Re: Schedule ? - Fwd: Re: Wells and Williams Avenues What is the extent of the work? What is to happen to the street trees? Are they going to be removed? Replaced? Replaced in grates? As part of, or concurrently with, this project Parks Maintenance would like to remove the larger existing trees and replace them with new trees in tree grates. These trees are high maintenance as we have to round them over(hedge) twice a year. When we first explored this we ran into PW crews and discovered the extent of this project. Can you update me on these street projects. Thanks. Terry Flatley Parks Maintenance Manager 5th Floor City of Renton Parks Division 1055 S. Grady Way Renton, WA 98055 425-430-6601 >>> Michael Benoit 02/16/05 2:20 PM >>> Approximate Schedule: Bid early March, start construction very late March or early April, finish around August >>> Daniel Carey 02/16/2005 8:53:08 AM >>> Hi Terry, Mike B. will be putting the project out for bids so he should be able to give you an approximate schedule. Thanks, Daniel >>> Terrence Flatley 02/16/2005 8:14:51 AM >>> Hi Dan, Can you answer my question below? >>> Michael Stenhouse 2/14/2005 9:00:30 AM >>> Terry, You will need to talk to Dan Carey or Mike Benoint. This project is one of theirs. Hope this helps. >>>Terrence Flatley 02/10/2005 5:11:56 PM >>> Hi Mike, Can you provide timelines for construction work on Wells and Williams Avenues between 2nd and 3rd Streets for this year? CC: Ibetalch@ci.renton. wa.us,jslaney@ci.renton.wa.us CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: February 24, 2005 TO: Mike Stenhouse, Maintenance Services Director FROM: Mike Benoit VNlb SUBJECT: Wells Williams Utility Replacement Enclosed are two sets of plans for the above-mentioned project for maintenances review. Water has sent the plans to a consultant for the review of the cathodic protection. We expect them to respond by the end of next week. We would appreciate any comments that the Maintenance Division would have by the March Yd. DocumenQ\mab a R CITY OF RENTON Planning/Building/PublicWorks Department ,my Keolker-wheeler, Mayor Gregg Zimmerman P.E.,Administrator February 10,2005 Gerald 1343peng,P.E. CH2MHill P.O.Box 91500 Bellevue, WA 98009-2050 SUBJECT: Cathodic Protection on New City Water Lines near Cedar River Pipelines Dear Gerry: Please review the enclosed preliminary design plans for the cathodic protection system for two proposed 12-inch City's water lines that will cross over Seattle's 66-inch Cedar River Pipeline No. 3 located in South 2°d Street between Wells Avenue South and Williams Avenue South. Please invoice us for this work using the existing contract CAG-04-141 for Watermain Electric Continuity Testing. If you have any questions,please call me at 425-430-7210 or e-mail a ag four@ci.renton.wa.us. Sincerely, Abdoul Gafour Water Utility Supervisor Enclosure cc: Mike Benoit,Wastewater Utility Engineer H:\File Sys\WTR-Drinking Water Utility\WTR-27-Water Project Files\WTR-27-298&Wells Ave S Utility Re ement\ch2mhill- design-review dec\A�atp � E N T O N 1055 South Grady Way-Renton,Washington 98055 ®This paper contains 50%recycled material,30%post consumer AHEAD OF THE CURVE i\ J r• •s NR fN.' tiWl IP !'a NI Iv M • S I a see 0/'99��3'`S Ror+• = 9as 1 3.MI 19t7 I os - e4 9p•^r � 1 '-r � ' • 7 '0976 +'• � J Iss a t" •*+3w+KI .5111 J 1 6fop r / C pML+ /��s ~,� 0� y w J� ao� y'•+ j r +l v� 71#,1• L rr . f/' a N Raa 11•+ It .e•S� d �� � Qom` 'v,y CO 701 IT O .!•T / �i A. 3 '-YB LX • Y m a£I c,s �P .• o e.A;• .. S TOBIN STD /9'IQ:N a/.•.a s • ;. 01 lee D� ss 2'Sr DE/ 2' 12'e 4 6 04 sa5Ss5 e a R 3 � • 1 a r V+•S[M' +lv I.'s `rdr 09 � `9 •a / s .s• :� a s r.z.a BgIDGr- wn., r, Ib �b j• 1 n 'r7 MS ^• c ••r.s 9'w �B K� S+ O o� N AA 132 Q � l:♦ 711+ ,s7S b '4' 137'S THIS DRA G IS NOT TO BE U OR Q ;; DETERMINI HE ACTUAL LOCAT N 3 fie' 3oo's N:, OF ANY OF OUR u, !=/AC!LIT!ES IF YO Ql ! � T! N;rB..3., � w � I 9Q0 973 N HAVE ANY cS vet In u y:e a o. ; - I HIS[1r?A1,N!f,ii ._v7: EXT.249. Q' Dr`° M7 V 1.5 I V1 r .Ievb lic' xis ss,,'N REFOZE YOU S i/;pzl'.,,W;r C ', i i iJ V T �..N • 3905 m� lTl I LOti� h<G C1.11 ♦ 1-' �;.r� _ - 960 SURE YOU HAVE PIE P-A I CURRENT 3 ''' 'e'" o INFCRM3TION. / 19 b9 N •,I H } ^ I I7 W r►e .+ 'sco's >• ,N ti^WASH 'uTON NF. U Y' ^� ^I '. O�IPANY - 1977 ha v., uUIic I v@ r,t t 'h $ o N R d v ! r7S • r f93',r •3te: 1973 I./g 31'. e _ st••3'S6N A a 'g Ilwl1 1'' � \`.•` ` - Me I'A'3,Z N Yr'3�Q'N '961• IY. I.�o `Oy �\ '7 6 ,J `1 >t"r 19Gt! ~ I%a•y],•N rA � ; = 19Bt�PEIN bl Z•Z CASING- in h S/gyl6 I r. N _ 9e] U 1IQgB to, H _ Pl TwIVA ` ^ 1973 F.A > _ U' 1M•ISe'N • 1479 Z Q e J191.7 N ILA r'- N Sp IIoN 90Z T9(Z•I�`,) JJ W 1't.'•n'N ) 19,73 A70 b J 7tN L'C�sING +•"� y9e2,�� t 71G J 19aL MI.I � 7iw 9• LI 2 ND ••• ST IT Dano•r Yw v9a Is orwl T D61'•LT IIr VMI 1'♦ saa oRw. � N� `£?+ STIOS IIG I tit I 1 I _ a I I I11 = l00, s� soo I TRACING ¢?_ I UP TO DATE i o 0 rpN ♦0 01 U 11 6 1960 ` Z3 I I r 1470 _mot 111 lk 0- d n4N JT 197o I I m 27E z" S7 so 7-113 CY.B 1♦ 5 Rol 45S O/-C4-74Drr/F" z� 33'S -1 R �r y 11- 27- 74 �Jc_ 19Yo N o N ; N 196 Z Q 2- 17. L, !d3 N ynd S-.Z-77 BF, W 10 2B 77 WS 1035 11 '4 "77 A A 12 7''77 1r5S sI IODS IQ-24-79 S'. 2 Cls:'S cl � Lu � b'IS 6% �_ su O = 1969 lJ e 8-13'6 L cr 1c. c�� '9's o•S Nr ;'i 1625 A 5-Zw-fl) ^ •o��T 3} "s W v 19b0 it I d 7 3 4,s D`^] i g-zz.c'- Jf, QI N " /z�v o�b Z L1 ae� p -- 197o 1 n;'a-s91 N 1 I Q� Isoc 591k �s EN 4065 I I I 1974 DE TAIL-0~ „S•5 1969 „5 .o s G J /2 ,o Y 114'�4��i N 486S 5 Y�4xN d ,i 1970 (g 1�14-n�re'N In ♦11'N 1 THIS DRAWING IS NnT 70 PF USED FOR I /ir l�tJ 1960 OF i•,t / ( �:l A Ilia - y kNI;VV N '/2 J41'N R1 21,7c EX .249. 3 co �t r i96VR '7 QI ; \ 1SON 6'= -Y!_ c i,PT M,Y(;`..•`,- RUC,TION s a H- LLJ C 'L'.. .`i ,)SI • N ANCE IN U C 1/2 2DSIN Z L( �, I.IT;t.S TU IN —s 'n't 6170 a Cr CURRENT co W 2 Y-� u Y U 31( 4 coi IITI a4PY\4E � rlt;���I /9P5" e A S7 — .. 4'w/ I► f:N i �r' �. o.F.c. 'N .•r\as 1 A 9 J:" I,R4 yl � •,Id 6• I`I�S � � t� r I�-� ce4,No I 1 d I t n Set or.wl.�• � < .. o•..Iv• � � I - � 1 1 WASTEWATER WORK SCHEDULE FOR--08/26/04 12 :47 pm DATE : Request No: W005256 Mgmt Unit : WW1 Request Date : 08/12/04 Time : 2 28 Name : MIKE BENOIT Phone : H (425) - Address : W (425) - Source : 7 -------------------------------------------------------------------------------- Problem/Need: TEST HOLES IN WELLS AV S BETWEEN 3&2nd AV S Status : S APROX 1/3 & 2/3rd OF WAY IN CENTER OF WELLS LOCKING FOR MATERIAL OF ROAD BED IE BRICK OR? Comments : NEED TO KNOW ALSO DEPTH OF MATERIAL Problem Addr: ON S WELLS ,,.,/�, �. AVE S 2nd & S3rd Prob. Loctn: NOTES : Prg : 25 Activity: 40019 (Correct if different) AMT : �, UNIT: �� f" ACCT NO. : E M P L O Y E E E Q U I P M A T E R I A L S IEMPL # NAME HOURS KOT UNIT # HOURS CLASS QTY EA COST 'z 2 5 . A 3 COMMENTS : Cj Z 3 1 U 7 w 15 ttfAr CLOSEOUT YES / NO APPROVAL �c44 Z 2�17 1 ` CA Vjl r 4 �9 i 3 ovTS �i a ._. A.PPRUX. 250T LF, I N TG VALVE CLUSTER , B I z EXIST 48" CULVERT BE REMOVED 3 IL a p ,q 1 REPLACE 60 LF W/NEW BENCHMARK l Z 8" 0 WATERMAIN:_TO RIM OF MANHOLE I N O1 EL 200.96' 3 V 1 1 t NEW DEPTHS,-SEE 2 K,' E }wU 1 1� ' C9 NEW 18"0 CASING : REMOVE'EXISTINGS 22.1/2' VERT BEND j REMOVE EXISTING V) O' Q w � (WAIJ) CONE BLOCKING 8" 22 1 2• VERT BEND AND'CONNECT'NEW 8"'DI (MJxMJ CONC BLOCKING -X=TINE ?" 1 'a' BOND WITH 8 SLEEVE AND CONNECT NEW 8" DI -` - _- s� WITH 2 - 8" 22 1/2' BENDS - I -- - o ---------- LLJF�-1 / - -- - -_ -- ---- - ---- - - 1 -8_8 S ---- h S VERT -O ~ FL{ ' - - 8 - ---- - --� -__�_8"S \ EXISTING 1 i \ 8 5 - w t ; -EXISTING 8 111 1/4- VERT BEND EXISTING 8" DI 6i Iry 8 ,- .. _ _ _ _ --_--�- - -- - _ ~ { - ----- 6 1/4' VERTICAL `EXIST NG 8 11 1/4' VERT BEND 1 -- 8 11 1 END (RJ x MJ) E I 7STING NEW DEAD MAN OR WITH SHACK - • �I - VER-PAL 1 8"x8"x8" TEE < zhPF:Y cE 8 22 1/2 S. 3 6" GV S AND q GV BEND_(RJ x MJ) 11 N a. O.p c E. �, 1 8 457-VERTICAL BEND'(RJ x MJ) \ EXISTING 8'0 PIPE < _ F_z Ilu Of N A - WATERLINE- RELOCATION PIJN :V!`EW` t IaD gel ^', •� a C>G' go - _ - k s 0 4 - 3/4" SHACKLE RODS NOTE: SHACKLE BETWEEN ALL FITTINGS NOTES: AND DEAD MAN ANCHORS - -_-_- 0 PLACE CONCRETE AGAINST UNDISTURBED EARTH, BOTH FACES 16' 10' w - CLASS 5 1/2 SACK CONCRETE 3000 PSI MIN ----------- FINISHED CHANNEL .L 2 - 8" 22 1/2-BENDS (RJ) N EL 196.6' ._.__ -_ _ PLAN `VIEW . �` ? 202.1 ° NTS w #4 REBAR 12" D.C. EACH 0 F 8- 22 1/2'BEND 8" SLEEVE WAY, CENTER IN CONCRETE 8" SLEEVE - T� 3" COVER TYP. _ 0�18"0 CASIN - ♦ 1" 1 OVER 10" SS---------------------------� 8" 11 1/4' BEND ��. °� T I•. r-------- -------------- - �r fY! - -- --- I I EXIST 8"0 PIPE 1 3 8" 45'BEND (RJ) 6` BENCHMARK: RIM MANHOLE EL 200.96', SEE PLAN VIEW ' F�. „`,�5=" 5— 0 ' 9TYPICAL CONCRETE DEAD-MAN ANCHOR SECTION 2 NTS NOTE: SCALE: 1" = 5'-D" - CONSTRUCTION SEQUENCING NOTES IM RECORD HASSIZIN�ARED ALL NEW 8'0 DI EXPOSED TO (LOOKING UPSTREAM) M4D ON ItFgsIA710111 CM941M 'EARTH' TAD-BE.VAWIIPED (ENCASED) CONSTRUCTION SEQUENCE AND STREAM FLOW DIVERSIONS PER STREAM RESTORATION NOTES ON SHEET G3. FROM ME OInRACIOR AM 07E1t5 IN POLYETHYLENE PER CITY STANDARDS. BY COORDINATE ALL CONSTRUCTION, CONNECTIONS AND TESTING WITH THE CITY OF RENTON. ALL VALVE - OPERATIONS AND WATER SHUT DOWNS TO BE PERFORMED BY THE CITY ONLY. DATE HAMMO D.OOLLM t 7WIDE- PROVIDE CONSTRUCTION FENCING AROUND ALL EXCAVATIONS. L1V�iCB1D1E t ASi0CIA7E5 INC_ C9119ULAIC ENOEf7tS 4010 STM VAkY-NORM Z INSTALL DEAD-MAN ANCHOR BLOCKS ON EXISTING 8" WATERLINE AND SHACKLE ROD STUB OUTS. ALLOW 3-DAY SFATRZ WA V O701 M03 0 n CURING TIME FOR CONCRETE. �Ll W,3 REMOVE EXISTING BENDS AND INSTALL 2-8" (MJ) END CAPS AND SHACKLE TO DEAD-MAN ANCHOR BLOCKS. REMOVE SECTION OF EXISTING WATERMAIN. / INSTALL NEW 8" DI PIPE IN STEEL CASING, VERTICAL BENDS, FITTINGS, SHACKLE RODS, TEMPORARY CAPS, S BLOWOFFS, AND BLOCKING. R PRESSURE TEST NEW PIPE, FLUSH, DISINFECT, AND OBTAIN PURITY TESTS. �n~ma g wwp-s�JAA% REMOVE TEMPORARY END CAPS AND CONNECT EXISTING WATERLINE. W— 6 C ROLL 179 FK I� . PROVIDE t UK >I nr- rwlu t t 1 V ... � REPRESENTATIVE ON SITE WHEN CONSTRUCTING WITHIN 20 FEET OF SEA TTLE WATER MAIN k I E S * WELLS AVE S. WIWAMS AVE S. S 2ND ST. f MAY HAVE 6 TO 8 INCH THICK CONC. PAVEMENT _ Z " UNDER THE ASPHALT " C4 '00 SO 0 .r13 REPLACE ANY DECORATIVE SIDEWALK BRICK REMOVED FOR W t ' ED �STR NEW BRICK OR CONCRETE. AS DIRECTED BY CITY. - RIM=41.12 R. 3'PVC E/W=40.3 BLDG.# c f 2 STORY CONC, BLOCK �► _ -a FIN FLOOR=40.9 c) 41 RIM=41.25 CB RIM=41.21 NO BASEMENT rn " 4p1 N/5=35.4 BLDG_ # 225 !E 3"PVC E=41.4 3 STORY CONC BLDG. ` y FIN FLOOR 41.3 m c CB RIM=40.06 z � NO BASEMENT BUT SOME ASPHALT ASPHALT IE 6-CONC E=38.4 " f c II CABLE VAULTS CAUTION ce RIM=41.08 3ESSURE UGT AND FIBER OPTIC CONDUITS. IE 3'PVC E/S=a0.3 B"CONC TO SDMH POSSIBLY ENCASED. C8 RIM=40.83 ALONG ENTIRE BLOCK IE 3-PVC E/S=40.0 i N v .C. UGP P �-136 6"DEC. 6"DEC. 6"DEC. L�Gp ® CONC. WALK /T 1/ 1 E -t GP T T \UGFO \UGFO ' \UGF CB-12B \UGFO \UGFO -10B GFO 1 1 1 REMOVE EX CO k REMOVE EX S SD ANDTEW ® ® 4' DEACTIVE G 0 G G G G G In t + N in N01-27'34"E78* SGia� *xc>+us uotS _ G ar G G G 12" STW HP G 1. ASPHALT ROADWAY o 6" AP J G CB-13. REMO EX CB Ex; t2'w{ E1<I%Aaa ;�I" T x SO . C8-12 CB-11 CB- - " o SO SD SO ❑ W CB-13A CURB do GUT R W W W W W W W W 6.OEC. 6"DEC. 6"DEC. CB-1P En F 4' . 2A 8"DEC. r � UG UGT UG UGT: UGT 12"DEC UG - UGP? T 6"DEC. CON WAL B'DEC. / 4' CHN LNK F C ? f REMO EX 6"� ASPHALT CB-1;OA APMM UMION �►t REMOVE EX CB 0 2ND ST POTHOLE mw a� Y t �`'' 6' WM CONC. ; t*. AND LATERAL z Am RM MAIN UNK UTILITY LINE RU T6-8E ABANDONDED !y t I PIPE ENDS TOP OF EX 8" SRM ASPHALT I BNB- i Irk 1 1 ,-� \\ CB RIM=39.98 0 BLDG. # 214 Ic€ v IE 6'N=37.8 J 1 STORY CONC STA 14+50t coNc, ISTAII NEW SIDE SEMAE>RRa s _1s 1 yt r ;`'- IF 6'W=37.8 v m m FIN FLOOR=41.3 IE 4"PVC E=39.o e RIM=40.98 CB RIM=40.69 I t M EAST OR PREVIOUS BLDG. >� x o W/ NO APPARENT I CO RIM=41.12 E 3'PVC E/W=40.2 IE 4"W=39.7 ' RECONNECT NEW SIDE SEME3t DEMOLISHED o c c' BASEMENT IE 3'PVC E/W=40.3 IWTAUM FOR BANK Z cZi vi o ' SDMH RIM=41.10 SDMH RIM=40.65 ��*1 IE 8" N=38.1 REOM61RUCTM IE 15'W=36.5 Z D A IE 4-CLAY E=38.8 IE 15'E=36.6 N x IE 8" 5=38.2 I I IE 8' S=36.9 00 n IE 8-CONC W=38.5 I I D a 0 0 > O N N _ 1 , W m tip 30' 30' � s- ry � d A y 44 Y �k .�r 12 . 16 . 2004 . .v } + I . 12 . 16 . 2004 Contractor shall carefuiiy excavate to the Z. V J manhole specified by the on—site Qwest representative from the end of the conduit shown. Contractor shall core bore or knock out (if available) the entrance into the mahole � -- t 1_,a the location specified by the Qwest on site z i -,representative. I C �R f 44 R r yp,� be�,{ 1 y". faNtl tiC ' may 1 � w /l. S DE_ ALK `� + + :' ,o — SIDEWALK "}' ``t Vy - 1 1 EDP a ll ... `—STds: 5r : 3 �—.To EOP J _o o EOP Ems';?': 3 2 a} '� o fF.>" . ? 5 E t L!Giit _S,A: T-f a ST1: H+ts BELT �.STE;vi tAANi,G.E I irrSE,- 2 TREE 3 .SE R __.._. .a_-- _,� i y H 3 STRE_. LIGHT SAN / Snit 1—___ 1 _____. —Y .._ . _ .--: '---•-- _. ......._.�_.._._ _.. _._..._._._ . _ SAN , i SA SAN SAN ___SAN SAN SAN i 1 SAN SAN SAN SAN --- ^- - SOUTH SECOND STREET W —'-- 66" WATER w -- Ww w __ < W y 66" WATER _ W W 5 .✓'\, S W T W W 66" WATER i S 5 S S S W S S S W ' / i i S S S S w w w w EOP w w w EOP W__ w W W 0. EDP EP O R/w En 3 R/w w z R/W z N w a H F- w z x 2 z I ,r w M• N REV DESCRR'T(ON BY APVD DATE ;.E r.eacr3433 S. 120TH PLACE PERMIT ISSUE SEE C� LK 9 24 99 G DMs /Ts/oz PCODE TUKWLA, WA 98168 RENTON POI#1CONTACT: Kim Kennedy 206.988.8602 M F N'" 3 D .rworm vnar.�mut ono_o,�rt 4 (i;J:x:T•p1, C4i�1�. s ti rJ q P N t ( e,"IAI :S iA�t ST EST (R Pt'".1 IN ND 'mil 51A. 7+ Ss:= 7, t} AL RE T 'v .^,FFSET: D R ST� ET IL j� 7 ! =TA• K+$W •5,py ,''}„ i ALiGt.!M "ST P. �`• ' -- I r'. �� A1.lGNlsc•er ^,is::?tGE O FSO "f 7 �t n w� OFFS C h' "`VVV 't ENO 1SP4A - RcF'T ?1 !® „.:-. i� �; SIDEW .,� b_C!t Cu NCaETE 'iDZ'•dAL.K `( DRIVEWAY I` EDP C r=w) (RCzLAAC=> fN kwoj f SIDEWALK '' DRIVEWAY _.,__.... _ _-... s - £E TYPICAL SIDEWALK 5. 7+N 4 :E ,#p#;ttATiari DET.�{L .-EDP ETs 2 a S O._._._.. ._ STA: `•T6 o i ' TR T'r,C 1V .- aA y{ STAR B+ 2 ._ W w - W -- - - _— _t _oIiT TOLE --�.. CSFSEi: 7R T°-� T T— T T i T T T T- -SAN SAN SAN i-- SA� ' -SAN S N SAN SAN SAN SAN SAN SAN l -- _— SOU H SECOND STREET — W W 66" WATER I W W w w r I i/ + W 66" WATER W W w W 66 T-ER s ' r — S S S S .. f.,S S-- S g W M S S S;. S W j ENW W W W W W • I E W W DP W W EDP W q T T T T R/W ! —T T T— R/W R/W rw. o 3 O in I W z W 4 d ; I w3 R " � MFN •-- •REV DESCRIPTION BY APVD DATE .oaTmw 3433 S. 120TH PLACE PUNK ISSUE SEi CCLS LK 9 24 99 PCODE D UNI DMA /l�/oz TUKWLA, WA 98168 = ^w RENTON POI #1 SCALE t" = 20' CONTACT: -- Kim Kennedy 206.988.8602 M F N' �°��°� � DRAWN 2 m LOT DA IE a[uuo.Quin,acrwa,c[o ort M.rt�"��APPV OASri05(n M+ARL t)1 M>A.t� TM(�.HII-�Hp SHEET OF uwwo nur.aw[ onoy.rt T�A 3/4" N 4 4 — WATER STR ET SIDE 20)1 1/4" (1)4" (3)2" PVC LJ _ 4" STA 27+05 6" SEWER X-ING 7 ELECTRIC 30'- 40 8" SEPARATION STA 27+12 C/L PFL MANHOLE #1B 28' O/S END/BEGIN (4 i 1/4" PVC SWEEP sEwER STREET SIDE ()20)1 1/4" (1)4" (3)2" PVC 4' STA 27+44 (2)4 ELECTRIC UNDER X-ING 20" 8" SEPARATION z w — STA 27+47 C/L PFL MANHOLE #2A 28' O/S rri 0 m o E%BEGIN (4 1 1/4" PVC SWEEP 5 ' STREEET SIDE ()20)1 1/4" (1)4" (3)2" PVC oN �_ STA 27+50 BEGIN R/L CHANGE 27' O/S (2)4" — STA 27+80 3/4" WATER 3" ELECTRIC UNDER 00 o ELECTRI X-ING 20" 13" SEPARATION 90 STA 27+89 (1)1" (1)2" TELEPHONE UNDER co R. X-ING 12" 22" SEPARATION CD STA 27+92 (1)3" (3)4" ELECTRIC UNDER X-ING 24" 5" SEPARATION A N ❑ STA 28+00 C/L PFL MANHOLE #2B 28' O/S Z — EcTe END/BEGIN (4 1 1/4" PVC SWEEP r STIR ET SIDE ()20)1 1/4" (1)4" (3)2" PVC " m - ELEPH E— STA 28+15 4 SEWER UNDER X-ING -- — ELECT c— 28" 4" SEPARATION STA 28+31 3/4" WATER UNDER X-ING ------ 11" SEPARATION o < 4" SEW R --- /—� p n L i y 16' z - -- 3 R -- STA 28+67 END R/L CHANGE 25' O/S WA!p 01— STA 28+07 END CONCRETE ENCASEMENT 0 2 , 3 ` a y -P STA 28+78 3/4" WATER UNDER X-ING ` a x 5 '�' t 0 24" 11 SEPARATION A O w " — �-., STA 28+86 (2) 1/2" ELECTRIC UNDER X-ING 14" 18" SEPARATION _ ELL TRIC j,� o n ELE�TRIc STA 28+87 (1)3 ELECTRIC UNDER X-ING o W N 12" 18 SEPARATION m AT G� W STA 29+41 C L NEXTLINK MANHOLE 29' O/S m m m END/BEGIN (1)4" PVC SWEEP _ --10 STREET SIDE ()24)1 1/4" (3)2" PVC z I D1m 1 m STA 29+70 1" WATER UNDER X-ING w A 14" 21" SEPARATION p W ER STA 29+87 C/L LEVEL 3 MANHOLE 29' 0/S END/BEGIN (8 1 1/4" PVC SWEEP „ STREET SIDE ()16)1 1/4" (1)4 (3)2 PVC STA 30+01 6" SEWER UNDER X-ING SEPARATION Z SE ER P z� m cl Nv = 1r D c C W r o D s, ELEP 4 C L TRAFFIC A `; a � Z r1 TT - �+ 3" FIBER 2 OPTIC — c -- m 4" GAS 6"WATER -- m — FIBER OPTIC --- FIBER OPTIC — `` N o _�2NIZ�TRE.E _ 8"EWER— 2" GAS S 2ND STREET Z frl•• 6 RIV. ST. WATE \f c - 0 45 -- �; O 2&� -1"EWE i z = F—_ -- STORM --- o N oa _ RA "TELEPHONE ° --T — -6" STORM O o f9 L J iAm — — ddd y a N 0.250 I N A> ti N u � r I n-1 I r L" STA 29+41 C/L NEXTLINK MANHOLE 29' O/S STA 28+78 WATER METER 22' 0 S I �m tND/BEGIN (1 4" PVC SWEEP STA 28+79 BEGIN SIDEWALK I I� STREET SIDE ()24)1 1/4" (3)2" PVC STA 28+83 END SIDEWALK STA 28+87 BEGIN POWER VAULTE�266' 0j�S� BEGIN ASPHALT PARKING LOT STA 29+70 1" WATER UNDER X-ING STA 28+93 END POWER VAULT 4x6 -- � � Z`I-��ti 14" 21° SEPARATION STA 29+04 BEGIN DRIVEWAY `'' Abt STA 29+27 END DRIVEWAY WA R —j 10 �� STA 29+87 C/L LEVEL 3 MANHOLE 29' 0/S STREET LIGHT VAULT 22' 0/S ND/BEGIN (8 1 1/4' PVC SWEEP l o STA 29+30 STREET LIGHT POLE 290H STREET SIDE O16)1 1/4" (1)4" (3)2" PVC 22' O/S STA 30+01 6" SEWER UNDER X-ING ` 0� STA 29+47 BEGIN DRIVEWAY 4"� 2" SEPARATION STA 29+74 END DRIVEWAY s 6' R —I C� i O SEWER MANHOLE 2' 0/S, BEGIN BRICK le —70 1 & CONCRETE DECORATIVE SIDEWALK — _� STA 29+89 TREE 22' 0/S STA 29+95 SIGN 22 0/S n 4� STA 30+22 TREE 22' 0/S STA 30+26 LIGHT POLE 31' O/S /� �1 n Z� 7 Ln S "� ' N STA 30+39 SIGN 22' O/S �- I STA 30+52 MAIL BOX 22' O/S {' STA 30+56 TREE 22' 0/S STA 30+74 UNKNOWN VAULT 2x5 26' O/S -- TELEPHONE , z• * O� STA 30+77 END PARKING LOT TRAFFIC STA 30+86 TRAFFIC SIGNAL POLE #385F 28' O/S r 3' FIBER - -_r_...:�s W �_,. �— _.. . - ._� 3' FIBER _�__e_ _____z , — s-I. ` STA 30+89 SIGNAL V OPTIC OPTICAULT 28' O/S ,[�� GAS TELEVISION VAULT 38' 0/S z" GAs f 6' WATER TER C STA 30+92 BEGIN TRENCH 2 10" STEEL FIBER OPTIC — CASING 17" I FIBER OPTIC PTIC ' DER— 2' GAS ' As STA 30+94 EDGE OF PAVEMENT � � S 2ND STREET STA 30+96 GAS VALVE 24' 0 $ / 66 RIV. 57. WATE 66" RIV. ST. WATER I C It P 66=WA{E" (C.R.P.L. 13) 6" WATER STA 31+00 WATER VALVE 22' O/S 16" SEWER �a STA 31+12 SEWER MANHOLE 5' O/S //� STORM " WAR" 16 Ste" 2" TRAFFIC EEI " TELEPHONE. " TELEPHONE L 6" STORM — 6" STORM - " S WFR=- } i CALL BEFORE I I r I I I YOU DIG UNDERGROUND SERVICE ALERT L. I 48 HOURS NOTICE REOUIRED. MFN EN ER 1-800-424-5555 REV DATE DESCRIPTION BY CKD APP'D TITLE: 3433 S. 120TH PLACE z 4/15/02 REROUTE DMw MFN PROJECT CODE: RENTON PIO #2 TUKWLA, WA 98168 CONTACT: KIM KENNEDY 206.988.8602 FIBER OPTIC CABLE NETWORK PROJECT NUMBER: DWG NO: 2 REV: DRAWN: DRAWN ENGINEERED: ENGINEERED APPROVED: APPROVED LOOP:__, SEGMENT: , M F N 2 SHEET ND OF Of r: I0o 2 m I ➢ Nw Z - m LM _ I H ➢ i N R Z Z ( as 1 { o.. A With a representative of 360 Networks present, z V7 ' contractor shall identify the conduit containing MFN cable at the nearest manhole to the north and locate same conduit at the excavation point below F-� the western sidewalk on Wells Ave South adjacent to the location selected for the placement of the new MFN � m m z % manhole. At this point contractor shall identify the most likely duct containing MFN fiber cable and cut a small window in said duct to prove and verify it is the _ j k correct conduit. Once identified the conduit shall be split and removed over a minimum distance of 8' to r ` accomodate proper bend radius- Contractor shall pull 0 w 0 Q =r�"b� approx. Reposition 66' of FOC from MFN manhole south C v, I _3 u * ��.� ✓ s `� of proposed new manhole. L-4 ? Contractor shall use standard street use manhole 5: M 1 _ �< manufactured for the purposes of intercepting and y �„ conatining existing cable. (2 piece vault box) See r specifictions. AIVM301S AVM3AIdatn / 4S f.. N Z..M - - -• ._-._-..._ -- — M M - T _ T T T — --- T T T - sa —SAN NVS NVS NVS NVS --- NVS NVS NVS -..-- - M M w ��L1Q�S 111V OOL7 J T 1 iO J Z �T 6" WATER 2i31VM „99 M M 831VM 99 MFN REV DESCRIPTION 1 BY APVD DATE 3433 S. 120TH PLACE PERMIT ISSUE SET COLS Ix y zf 99 PCODE � •r DNM /t,t o2 TUKWLA, WA 98168 lzl — RENTON POI #I SCALE 1" = 20' CONTACT: Kim Kennedy 206.988.8602 _ W __-- M F N T=. �, , ,DRAWN �� 1 Oi DAtE psaosio�,�ou° f:..r�' AP ..�rtu case.rt a r.. SHEET OF arnwm aimr ewe onoart • a ` / 13-782 500 SHEETS,FILLER 5GOUARE 42-381 105(0)SHEETS EYE-EASE 5 SQUARE Nations!OS,,d 42-382 HEETS EYE-EASF-5 UARE 42-389 2()0 SHEETS EYE EASE*5 SQUARE 423 2 !00 RECYCLED WHITE 5 SQUARE 42�39 q9 20ORECYCI.ED WHITC. 5S0UARE Mtl�c in 11 S A Lmufie� Ov U"x 1 kit tl',3lE-(TkV1 C* S cu A\m lab. 4 (#\,t* 11'4 ic L 8" 6 mf: VAL U6 C,ft v m I ) 1 joy 8 t-j:S , "57) 12" r-A'ZA*Lve t mix tiEMnr [V- A4* ��,Q L WO A 11% D L6%16-AYlS -to Q-4 ck C it u XTO 0 C— (CAJ I-Wt d1l Dcl a i L S sk a s PH M t_ rr •,...n � a `�, .i .x . .. ,� � SAC "� �#''''` _ Y-Y• _ r x s • ar• � � r ,�, � t t ''r 4 w • T, x,. a r` Y� • qq "ate P x f» .a { IPEOPLES SANK 1 I w >- I C--! In "� i + I I N ! v m + + I Nf NI I C 1 123 - 121-J, + !15 I i 105 I , 1 N , � jl L � 1:1 4 I I 11 I � 1I I 1 1 II ll I �j 11 , I 11 I I I ! II 11 11 !I II �� 1 1 I I II j 1 it 1; I II f• I I I I II I I II I I !! W 1 1 ! ! II !1- ! �� _ EX. CURB,GUTTER 8 SIDEWALK W m .q wM W M1 W -�- O O IIt41 10F04. O o 44*46- 0 12+51.25 73�MH 7 ! EX.MH -I �_s 4'r• MH- O1 q'G 4"G a' EX.MH(REMOVE) Z s . EX,8"S.S. 13 =1 -- 77 12 _ 5 1 _ - - 394 IOf00 �PLJG� EX.B�S.S 1FE TEOX.OS.S. INS,TA LL L.F.-g PPE { fL-- IRE WEST 0)F OF Sj(P1 a REMOVE EXIS ING 8 PI a"SD e"SD a"SD B SD 9•W ,1 6"W ew _6'W I - 9 SS / 4 0 _ _ A , / �_ __ WM N'M [`JWM O WM M TY WM - p . WM + -_ / _ E. i -- I I d 1 I 1 1 mn A I ca- i i :! WELLS AVENUE. SOUTH M II Q I I W IA 1 I 4 N + c + 1 1 3 ' 1 1 N N M M K� I-_L I I 26 r_= O I + C m - lit -112 114 N III `m I F ne l04 i oa z I7 ,j ; I ... , ,,, - ��;:.��j , , - p PLAN VIEV U) SCALE: 1"=2Q' . ,...,< a 10 11 12 13 14 ._.._.- --. .._._._ _ ..,.... ....-_._._._ - .. ._.--'-f5---"----- '---'--- ------- ._. ____.-._.._..__...._....._..__......--`---.._.__._.�_._....__..._......,__.._---.-_.__..._-------'--.. ...---..-...._.--'___._...__...._..._ _._..___-____:-.._.----._.•_._._-_._......._..._....__..,...-..-_-.--..............__,..__...---'- '--------..:__..:_ -....... ... ....... ....... ...... ....... ....... ...... '--'--'- --`---_.�.-._.-...-___._........_-.._-- --- '-.1� ..... . .... .. ....... ._.__....___.._.-_.___._......._� -,--- , _T__....._..__ .1 .. ....... .. .. .... .. .... .......-1........ ...... ...... ...... ...... ....... ....... .... .. ..... ....... ...... ...... ....... ..... 1. I. ....... ... � I� ........l ! ...... ..... ....... ::::':....... . ..... i:. .... 1' r �....... .. ... ..... ....... .....:I:.. .... ..... ...... .!. ...... ..... .. ... .. ....... ....... ..... ....... .... .. ..... ..... i .. ..... .... ..... .. 't' ...... ....... ..... .. ....... ....... ...... .... .. ... .•1 i' ...... .... ....... ..... . '� 'i' ....... .... ....... ....... i .... . ....:I: ..... ....... .. ... ....... .. ..... .. .... ...... :, i:...... ..... ...... I .. ... .... .. ... ....... .... I' .. .. ::::: :: :... .... ...... ....... ....... ....... .. .. ..... ....... ... ... ... ... .. ....... ....... W .. .. 'I' ... ...... .. .. ...:�:. .. ..... ... ....... .... .. ....... ....... ... .. .... ....... ... .. .. ..... ..... ... ....... ..... .. .. .. i .. .... �' .. .. ...... ....... ..... .. ..... ....... ....... ....... ... t ....... ... ....... .... ...... ..... ...... ... W __._..-_..... ...... ! I .. n .... !. .. .!. _....._._..._ .__.. .__.._.. -.- S_._-.._ - - -- .. ... ... ..... ! 1.� x ..... ....... .... .. .. -_ -_-_....._._..__.___....__-..-._._-......-.__._. , q - _"-___. - - ...... ....... ....... ..... .....—.--'' r. a .. . .. .... ... ..... --__ _ ... ... .. ....... ...4.... .. ..... - .. .. ....... .. ............ �.. !... .! ...! .O. .... .. .. _ ...... .. J ....... ....... .... ± q f _ .. ..... .......!......... ...... , ! : '' ..... .... .. ..... .� : . , I ! ..!.........:...... . ....... W ..... ...... . ..... ....... :::::: .. .... ......._! ..... .... ... W ... ....... .. .... ..:: ... ....... ....... .... ...... .............. ....... .... . ... .. x .. .. ... ..... ..i ....... ... .. W ....... ....... W ..... ...... ..... !O' ....... ... ... ..... .... 2 I .... .. ....:J. ....... ....... ... ') .. ... ... .... ...... .. . ...... ..... i a +n:.... ... .... i ... o .......:i. ..... ....... ....�,.!. ... .. ... ..... ........ !a .. ..is .. 1 ...... ....... ... .. .... .... .....b ....... ... ....... ... .:S: ....... ....... ... ....... ....... ... ...... i ....... .... ..... ..... ....... ... ..... O .. ..1 ... .... . .. ....... .. ... .... .. ....... ...... ,_ - ....... ._..... ..... .. .. .. .. .. .... .... .. .... ..... .m __ .--- -- .-.. ._._. 1: ..................... ......... a ---...- -- .._ .. - - - --... ....... ......40 ± 1. _ - - ... - --- - -- - - --.--.. z...... - --------+-.... :,' °-�- =� -of --- !n .. ..... ...... ....... ....... ....... 1n- ...... ...... .... ... ... .. .I �! .... .. ....... ....... -W .... .... _ X .. .. ....... ... ... .... ... .. ..... .... .. ... N .. ....... .... .... ....... ... 2..... .. .. ... ....... .... ....... ....... ..... .... X±: ....... ... .. W ....... ... .. _ .. ....... .. .. ....... 'M ..... ..... .. ... .. ....... ...... .. .. ...... .. W!... ...... ... .... ...... ....... ..... ..... .. - .. X:' ..... .... ....... .... ..... ..... Q X .... ::::::. ...... .. ...... ....... ....... ....... ....... .. .... ..... ....... ..... .... .. ... W!..... ... .. ��T- ....... ...... ....... .. ... ... y...... .... ... .. .... ...... ...... ... .. .. .... ..... ... ....... .. ....... .. ....... .... .. .... .. ....... ..... .. F-....-. ....... ...... .... ....... ....... .... .. ... ....... ..—_ .... ... .. ....... ... ... ....... .. ... ...... .... ....... ...... ... .... .. R...... ... .... .. i ...... .. ....... ....... .. .... ... ...... ....... .. .... .... I ...... ....... ....... ..... ... -- ..... ...... .. ....... ..... ... .... ..... ...... ..... .. ... .. -.. ... ....... ..... ....... .. m ... .. I . ...... .....................! .... _.__-__- _---___._ --- -- - __ _-_____ .. ... . .....!.. i .i I ......... .. ! ..! ... -----......_-.- ._..-- - -'----__.._..-- --_- ___-- - ..... ....... .. ... .. .. ... .. , ! ....i. : .. ...... _.•___.!--.-..---. ....... ....... .. ---- 6T !---_._. _..__. ....... .... .... ...... ......... I .±. .......!. .. .. .... .. I v'.. .. ....... .. ..... ..... .... ..... .... .... ...... .. .... .. ....... .. .. ... '6: .... ....... ...... . ... 'I. .... .... .... ....... ....... .. ... ....... ..... ..... ... ... .... f ... �� ..... ... . :i: ..... . +...... .... ...... ....... .... .. ...... ... :j. .. .... .. .... ....... ..... . .. ...... ....... .... .. .. .... ..... ... ....... .... .... ....... .. ....... ... ....... ... ....... .. .... .. ... ....... h...... ....... ....... 1• II' .... .. .. .... .. :� .... ....... .. 'I' .. ....... :� ...... ... ... . �: .. 1' ..... .. ...... .... .. ...... .... ....- ... . .. .... ....... ....... ...... .. ....... ....... .- .:1..... .. .... .. ... ... ....... ....... i ..... ..... .. ... 4'�S SEX :I: M�E "I r. ... RE OV ............ a: r -- - - I: `_ _ ... .. .......: --- - - - .s sE_ - - _ _ -- -- --- - _..... I .._ .-. - RE MOYf_ - - - - ......I ....... ! _ ... .=..._ T-- ..REMOVE.'.EJ>:.$..$S - - _� - -- - , , -yam, ....-:..._.-_ _ - - --- -_- -- .. -._.. i.__--_S2'_. --'--------I--- - -•'--_.._._-;fX�' -.... Y -- - - - - }-.` .. .. ... . ::..i ... ..11... .. .--- - - -- /'r �. -. ::':... .........�......... .. ... .... .I. .. :l'� ';' ... ... ...... .. .. ....... .... .±. ....... .U...P.L.UG EX..B 5.5.1......... ......... .. ..... .. .::PLi11G EXIST. _.i........ 3078� ::: ::::a: ±� .. . ......... ......... ....... .I aI MN ...!.. .B eS.S:PI PE I' .. .. ...... ... .:INS PALL .3B6F L.F-B��PIP AT� ....... .... .. ' !.........i.:...... ......i ....... .. .. ... ! .... ....... ... ..... ... .. ... .. .. .. ..............1......... .........!..... .. ....... ... :' ..... ::: ... ...... . ... ...i......... .... ! ... .... ..... ........ ... .i 31:l9-.. :.:. ... E 0.4 b-/ ... 1Nv. UT �:.. 354:.. . .........±.... Q .. .. ... ! ......... .........i....... ! ... ..... .. .... ..... .. .... ........�.. .. :.:::.: ....... .. ..... ...... ....... ..... ....... ..... ..1........ ....... .. :::: ...... ....... ....:.. .. .... :.:..- ...... .....!. .........1......... ..... .. .... .... ...... .. ... ....... ....... ... .... ....... ..... .......:{:....... ... ... :I' _ __ .........__...... ............._.._.. __ _... __._.__ ..._...._...... _._.__...._..._ ...... .I.. !.. ......!.........'........ .... 3 .. .. ....... .. ... .... .... ... .. .. ... ..... .. .. ! .. ... ...... I .. ...1. .. .. ... ..... I ....... ... . .. .. . ... .... .....:i. ... ... :::: 1 .. ... ...... .... !'.... .. ... .. ..'i.. ....:!: .....'I' .I... ... .... .. .. ...... .... .... .. ...... .. .. ..... .. .. .j�... ...... .... .. ...... .. .. I ..... ... . .. ....... ...... ...... ....... ..... ....... ...... ..... ....... .. ... ..... . .. ....... ....... ....... ..... i ....... ....... .. 'I: .... .......'I:...... .... ....... ....... ....... ... 'I' .. ..... .. .... .. .... .. ... ...... ..... ....... .. .. .. ... .. .. ..... ....... t' ....... ...... ..... .. ..... ... .. .... ... .... ..:: :1. ..... ..... .. .. .. .. ....... ... .. :::: .... :1:....... ...... .. . 1� ... .... .. .. .... .. I: .. .. .... :I ... .... ... .. .. .. .. .. .. ....... .. .. ....... .... �.... .. .. :I ....... ..... .... ... I ......!.. ... !. i ' ...I............ I I ... .... ' .!.. ..... , , I .. ... ... .. .... .. _......... I..--........ -- _ __ ...._. .__ ..._.._. ! i ! .. ....I.. :.: :::: .. ... ...:j: .. .. ... .. ... ........... :�. ... .. ... .:... .. .. ... .. .. ....... ... ... I..... .. .. .. ... ..... .........1:. i .. .... ....... ....... .. .. .. .. :::::: :i .. .. ....... ..... .. .... .. .. . .. ... .. ..... ... .. ... ..... .... - : ..... ..... .I:...... ..... ... .. .. ... .. j ...... .... .. ....... .. .... .... . .. ... ..:1� .. .... .. ... :� .1 .. .... ... ..... .... .. ...:i: .. ... .. ... .. .. .... .. .. ... ..... ..... .. ... ... ... .. .. I'..... ... ....... ..... ....... ....... ... .. .. .:i .... ... .'i ...... ...... .... .. .. .. .. .... .. ..._ .. .. .. .. .. .. ....... .. .. .... ...... .... .. .. .. ... .. ..... ... .. .. .. .. ....... .. - .. . !' ..... ... ....... i .. ... .. ... .... ... . .. .... ... ... .. :l ... .. .. ... .I. :�: .. ... i ! .. .. .. . .. .... .. :. !. ... .. .. ....... ... ... . .... .. ..... ... .. .:1. _ ._. _. _. ::'i:.. ... :PROFIL! SCALE _ ._._ ----- ---. _. . __,.. .....,. __...__. .. . - - - - -...__...- ---- -- --- --- .._... - ate^ _ .±......... .........- .. .. _.. .n A...... .. .- .. ... .. ... ..... e ,aA.r: ± . .... ...... .. .. .. i ....... .. .. ..... ..-. , VF,. I VERT �1..40 'i: SCHE4E1I E .B ... ..... i ... 1 .... .... aca� Cyr; ° .. .... .... .. .... ....... ... ::. ... .. .. .. ..... .... ... .... E. RENT ON I .. ...... .... .. .. 1 C I T Y O F R E .. .. ...... ....... .. .. .. ... k .... . , :... ... .. .! _ --- _. _ _... ----- - - -- .........!.................. .. ___.� __. __ _ .-_ ._ __. ____._-._ .. ... __ ._.______ .__.._ ..____ _._.___.__ __ _ _ _ - .. .. -__ ... --3-� T �y ... DEPARTMENT OF PUBLIC WORKS _-:-......._._.._.__-.._.._-.._._._.-._ -t ...... ... .... .. ....... .. .. ... ... ... .. ..... .. ....... i_ _--_--____-.-..__-.__ .... ... ::::j: ... .. .. .. .. .. :. ...: anai;n' 1983 SANITARY SEWER REHABILITATION .........,I. .. 1. ..... .,. ...... .:..... :: .. .... -,..k ►YELLS AVENUE SOUTH :::': :: .. .... A S D UI�T NORTH OF SOUTH 2ND STREET . ...: ... - -- - - -- ;. I. :. !. is .. ..:.. ""' _4___ _ ___ .___ __ _... _ ._._... _. .. .... ___— ___.._ __ ... .. -- DESIGNED R 2-83 ___ ......_._-._... --'-- - _..---__'-'.-.___...-._____ __ .. .... .. - .._.. _ .. DA1'c FILE NO. . :.- ... :.�. -- . ... ...! ... .. .. .. _ .. . .. a ..... ..... .. _... : .. .. .. .. .. .. ....:..... .... .... ... I.. ... .... .. .. .. .. ... DRAW.. _.... :.........! ... .. _ ...... .. o .. ... _ Bcon Aa .I. !. _.... ....... i ... ... ... ... _ .. .. ... .. .... ..! .. .. ... .... .... ..... ... ..... ... ...... .. .. .. - ...- .. .. .. .. - .... ... ... wwICIDN ev APPR [IATE PPROVED SHEET S1 of 4�6 ..... ....... - : ... .. .. t- . .. .... _ ..: ........ un ANE GKED RB scALF AS SHOWN i I CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: October 1,2004 TO: Mike Benoit FROM: Abdoul Gafour SUBJECT: Utilities Replacement in Wells and Williams Ave. S. Mike: I really appreciate your excellent work in preparing the water plans for this project. I have made the final red-lined revisions on the attached plans. I can ask Laszlo to make the edits on the Cad files if you don't have time. We will provide you with an alternate connection detail to the water mains for the intersection of S.2nd with Wells and with Williams Ave S. due to potential existing fiber optics and telephone duct banks near the connection areas. I will review and update the technical provisions, and check the quantities and should have the final package to you by the end of next week,October 8,2004. cc: Dave Christensen cc: [Click here and type name] I:\ABDOUL\DO WNTO WN\memo-to-mike-100104.doc L11 Zc f 1 p I STREET SIDE (�24)1 1/4" (3)2" PVC m r, �? ���� STA 29+70 1" WATER UNDER X-ING 14" 21" SEPARATION w A A w ER � �'' '� ' LY r STA 29+87 C L LEVEL 3 ' o MANHOLE 29 0/S END/BEGIN (8 1 1/4 PVC SWEEP STREET SIDE ()16)1 1/4" (1)4" (3)2" PVC STA 30+01 6" SEWER UNDER X-ING � o 34" 2" SEPARATION Z SE ER A m n N r � N CD O v e EIEP Lv r 2• O L TRAFFIC A t . A IN o Z r 3' FIBER OPTIC — c � _ ��_ 4 GAS _ 6" WATER — FIBER OPTIC -- FIBER OPTIC 11 B=SEWER— 2" GAS _ n. N _� 21�IBE.E — S 2ND STREET m 6 RIV. ST. WATE - Z 1 — --_— N - Z ^_ �—-- STORM _ WATER- f c — �RZM- ' TELEPHONE r o O o o^ L= 6" STORM I ny C — 0. < N II Onn I G m U ti N u r � L � r v ' --- m 002/002 AX 425 821 3481 TRIAD ASSOCIATES Q Q E41R1 too �+`1 RLID 01-W Gfl U / 8/ t3_ 4 /J p �fSifu� g C1 Wati� C1rT• 1 h C M 3,,c F L) �j', K.,S S. V 'roe oowNw� hU l'1 SAV\N61 �k►c1L of �oftDt9 - �� �o• �' S}tom✓�- �C4 ouct00 a I , gl"CK lkuce� cep Hqa 12"GAQ, 11�W�l r LjD>'/ j-3j f� 4. 3/q. Rye (�v1c*L) T�kAG\t f1cuJ lnc� �pVe- MICA 6u,rie�. �rncC� �S mAdl" noV be 0CCeSs;6l- -VD reed add 12. 1�eh pYc �A�Jc br1 �.ch S� �d UIt �( 1,11 �µ (6nnetkU'(11 iso lahon� -3 1Gr lye•,,f -4:�9 clC k25� .43a- alb ter//J� wo - �vua� b� Cov m oil 13l Mid A � ' t �tinn y6a Pl6n1 ! �--- -- Vyl. �►3k 6 .r .0 ±leIla ` �2 ��� (�L�►Jb�� i�(d�t�lCtl GOvl�l) MT XP. A-�4-rWL I Iz� �pooL CAL, L&&bW rF'-r) v . r� �� P"�� sue: RECOMMENDED FOUR APPROVAL IZ xE MY—ge-(f Lx H ) V ATj:R ITI.ITYc ialct ertltV� cif it �9-PT Cft 7 b�� An/D 9d ° ��1.� To C/ZVSS VAII . 13 782 501)SHEETS,FILLLR 5SQUI�I.F. 12�381 SO SHEETS EYE-EASE•5 SQk).Rl2382 !\r/ WAM Notional""Brand n200 � I2W SHEE TS EYE EAST^5 SQUAW, 42-372 IW RECYCLED WHITF JSQUARL 42-399 2W RECYCLEC WHITE 5 SQUARE Maarr u u 5 n c 1t � � t4 00 L—-- � I I 1�' I i i I f i s CITY OF RENTON PRECONSTRUCTION MEETING Williams Ave South Water Main Replacement 6/09/2004 W-3165 PROJECT PERSONNEL AND NUMBERS Mike Dotson, Plan Review 425-430- 7304 Steve Pinkham, City Inspector 206-999- 1832 Corey Thomas, Fire Department 425-430- 7024 Wade Archer, Contractor 253-872- 7222 GENERAL: 1. CALL 425-430-7203 FOR INSPECTION (24 HR NOTICE) BEFORE YOU START WORK. NOTIFY FIRE, POLICE AND METRO OF CONSTRUCTION SCHEDULE. CALL 911 FROM A LOCAL LAND LINE ONLY. FIRE DISPATCH FROM CELL PHONE: 253-852-2121 2. Contractors shall use only sets of drawings stamped and signed by the City of Renton for constructing utility and transportation improvements. The approved plans do not constitute a fill and grade permit or grant any rights to fill and/or grade outside of the right-of-way. Keep a set of approved drawings on-site at all times. 3. Work hours for hauling in right-of-way are weekdays, 8:30 AM to 3:30 PM. Saturday by prior approval, and no work on Sundays. 4. CONSTRUCTION HOURS: 7:00 AM to 8:00 PM Monday thru Friday and 9:00 AM to 8:00 PM on Saturdays. No work allowed Sundays. 5. Contractor must call for City inspection before 3:00 p.m. on the previous day. Overtime takes special authorization and scheduling in advance. Pay schedule is $50 per hour for overtime. 6. Streets shall be kept clean at all times. Truck washing and other measures as approved are required for the duration of the project. Provide whatever measures necessary for cleanup and dust control during job and at night. 7. Provide traffic control plan in accordance with the Manual on Uniform Traffic Control Devices. Haul legal loads and observe all traffic laws. All truck maneuvering and materials storage to be on-site only. The right of way should remain unobstructed whenever possible. No stockpiles are allowed in the right of way. 8. All Utilities are required to be inspected prior to backfill. 9. The contractor, as well as the engineer, shall keep as-built drawings. All changes shall be shown on as-built drawings. All bends on waterlines shall be surveyed prior to backfill with horizontal and vertical control for all bends established. Sewer lines may be surveyed after backfill at manhole access. As-built drawings must have a P.E. or P.L.S. stamp. Final plat recording or Final occupancy will not be issued until receipt and approval by the City of project utility and transportation improvement as-built drawings. 10. Field changes: If minor, submit a shop drawing or schematic through the inspector or by FAX 425- 430-7300. If major, the project engineer should submit drawings and complete justification, 1 information and calculations as applicable to the Plan Review project manager. The City will answer by memo or schedule a meeting within two days. The field inspector cannot give approval in the field for major construction changes. 11. Street Restoration is required to conform to the City of Renton Trench Restoration and Street Overlay Standards. A copy has been provided. All street repairs shall be complete and in place within 14 days, or as directed by the Public Works Inspector. FIRE PREVENTION: 1. Maintain access to site at all times. Access must be able to support emergency equipment in all types of weather. Hydrants are required to be in place prior to any combustible installation above the foundations. 2. All new hydrants shall be Cory type hydrants to be painted Safety Yellow. Iowa and Renselear are manufacturers of Cory type. An alternate fire hydrant, Clow Medallion or Mueller Super Centurion has been approved for use. Any hydrant installed shall be equipped with 5-inch diameter Storz "quick connect" style fittings. 3. New hydrants are to be covered with burlap, or heavy plastic and wrapped until operational. 4. The Public Works inspector must inspect all concrete blocking prior to backfill. 5. Water main leads that exceed 50 feet in length shall be minimum 8-inch diameter pipes. 6. Call 911 from a local land-line phone if the water main needs to be shut off (emergency only). All other water mains or for valves shut down, call the Renton Water Department at 425-430-7400." 7. Fuel: any temporary on-site fuel supplies shall have a separate permit from Fire Prevention. 8. A permit from the Fire Department is required for all underground mains serving fire sprinkler systems. All systems must be installed by a Washington State certified fire sprinkler contractor. 9. Notify central dispatch 24 hours prior to work in the existing right-of-way. (Local Land Line: 911) or Fire Dispatch (cell phone - 253-852-2121) 10. Any Hazardous Materials permit (including removal of underground fuel tanks) or Hot Works Certification may be applied for through Fire Prevention, sixth floor of Renton City Hall. CITY UTILITIES WATER: 1. Pipe materials, valves and fittings shall be as indicated on the approved plans and standard notes. In the case of construction in proposed new roadways, the proposed road prism shall be constructed to sub-grade prior to any utility installation. 2. The City of Renton shall install all connections to existing mains. The contractor shall construct the new water main to a point approximately ten feet short of the existing main. All necessary excavation, shoring, and materials are supplied by the contractor and shall be on-site prior to scheduling. Allowing at least seven working days advance notice, schedule the connection through the construction inspector. 2 3. Temporary and permanent thrust blocks shall be formed. Concrete for thrust blocks shall be delivered to the job. No on-site mixes are allowed. Standard mix design shall be 3,000 psi. All blocking must be inspected before backfilling. 4. Procedure for cleaning and construction testing of new water lines: 1. Pipe cleaning shall be by poly pigging through vertical crosses installed at the ends of the water lines to serve as pig launches and sediment traps. Water main shall be poly-wrapped. 2. All water lines shall be pressure tested to minimum of 200 psi or 150 over operating pressure (static) for 2 hours. Services may be tested separately by visual inspection of the Corp stop under static pressure. 3. Chlorinate for 24 hours, using liquid chlorine and chlorine pump assembly. The inspector shall schedule chlorination. Seven working days advance notice is required. 4. Water used for flushing water lines shall be drained into sanitary sewer only. 5. The construction inspector will collect purity tests at blow-offs. Water purity tests are taken to the testing laboratory by the city inspector. Test results are available in 5-7 days. 5. Crushed rock 5/8 minus backfill to grade is required in City right-of-way. Recycled 11/4" concrete may be used in lieu of crushed rock backfill. Pit run type material may be considered for use in backfill by the construction inspector. Compaction testing may be required. 6. Where conflict exists, the water main shall go under other utilities, however, it is preferred that no water mains shall have more than 6 feet of cover. All water mains up to 10-inch and under shall have a minimum of three feet of cover. Water mains 12-inch and larger shall have a minimum of four feet of cover. 7. Final acceptance shall be after final walk through inspection, adjustment of all structures, and approval of as-built, bill of sale, cost data inventory and if applicable, easements. CONDITIONS TO ISSUANCE OF A CONSTRUCTION PERMIT: 1. Provide Cost estimate and Permit Bond in the amount of 100% of total improvements to be constructed in the City ROW. 2. Provide copy of utility contractor's license number. 3. Provide copy of utility contractor's business license number with the City of Renton. 4. Payments of remaining permit fees. 5. Execute the Authorization of Special Billing. Revised 6/09/04 3 CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS MEMORANDUM DATE: August 18, 2004 TO: Abdoul Gafour Ron Straka Mike Stenhouse Kayren Kittrick FROM: Mike Benoit /ll'd SUBJECT: CBD Utility Replacement Enclosed for review is a copy of the plans and specs for the proposed project on Wells and Williams. The shaded areas in the specs, for the most part, are items that need last minute checking because sections tend to move. One shaded area for Abdoul to review is Section 8-30. This section is info you gave me. Is the un-shaded portion of this section sufficient or is there some portion of the `Boeing' portion that needs to be edited and included? Items remaining are: • Tie down quantities for each utility. • Determine Working days (Wastewater is figuring 25 working days for the installation of sewer main and side sewers). • Ron Shaffer is potholing the middle of Wells this week to determine if there is concrete of brick under the roadway. Please provide me with your comments by September 1, 2004. H:\File Sys\WWP-WasteWater\WWP-27-2988 Wells Ave S Utility Replacement\MEMO Ol.doc\MABtp ME ME 1 11' dw� R L_.._ T ----- ----- -- --- ---- - -- - ---- -- -- -�i_L - - - i - - -- - - -- -- - --- -- LL -- ----------------- L _ 1 LI LLI - -- -- - ---- --- - ------ > , + It - --- --------- 1 I ' i i i I _ I ■ t A A I 5 u c . c i,c)P .33 ��n Z•J� i I � C��4L 5"'C�i�'� 5 4 V 5 'r.o/0, bca i 0 2 CITY OF RENTON WASTEWATER DIVISION PUBLIC WORKS LOG REPORT WORK ORDER: 5389 DATE : 9-05-02 OPERATOR : ROCKY TAPE # : 1 TAPE START: CAM START : 8 . 0 HEADING :SOUTH LOCATION : 222 S.WILLIAMS PIPE INFORMATION UPSTREAM MH# : 5317-C/0815 DOWNSTREAM MH#: 5317-170 PIPE TYPE : CLAY PIPE SIZE LENGTH DEPTH : 5 ' 11 " FLOW RATE : LOW-MOD WEATHER:SUNNY SEWER INSP FOR POSSIBLE REHAB WORK. LOOKING FOR S/S LOCATIONS & CONDITION OF MAIN & MANHOLES FOOTAGE: FAULT OR COMMENTS: 'Q 'igM Ft #PF03 S/S LEFT# 9 . 3 Ft #PF03 S/S LEFT# 34 . 5 Ft #PF03 S/S LEFT#CAPPED OFF? 46 . 9 Ft #PFO2 S/S RIGHT# 53. 0 Ft #PF03 S/S LEFT MATERIAL IN S/S PROBABLY NOT IN USE# 78 . 1 Ft #PF02 S/S RIGHT MATERIAL IN S/S# 111 . 2 Ft #PF03 S/S LEFT# 144 . 2 Ft #PF02 S/S RIGHT# 160. 4 Ft #PF03 S/S LEFT# 167 . 1 Ft F " #PF02 S/S RIGHT# 182. 1 Ft A V,6' #PF03 S/S LEFT# 192. 5 Ft #PF02 S/S RIGHT MATERIAL IN S/S# 198 . 9 Ft #PFO3 S/S LEFT MATERIAL IN S/S# 205 . 0 Ft #PF03 S/S LEFT MATERIAL IN S/S# 211 . 0 Ft #PF02 S/S RIGHT# 266 . 4 Ft #266FT TO C/O 5317-815 CIO IS BURIED.MAINLINE IS IN NEED OF REHAB. ALOT OF OFFSET JOINTS. END OF INSP# mw W'M v ya4ltl.:.- tv^ 'lY?. �i i i }i j 17.C3- - �i 17,F3-1 Fjq" 7 �!j -. 1 .C3-14 I 7 _ ..IQ _._ _17.6 7 17 F 7,F - - _ 7 17 Q i 7,23-8 i 17,F3-1 17 -7 ` D d IJ1 Z i - - - - -- - ` *� r 17.E3 7,E3-4 7,F - - --. ji - - 1 21� 7,83 f C - - - - - n� .E3 3l. 7,F3 0 / -� i 7 - - r 1 -3" t 17 3-40 17, 9 _ _ _ - i __ '�17,E3-2.. 7,F3 TF17,F 17,C3- .C3-3 Y ,D3-1 - - 17,F3-12 17 9' - '` 7,C3- - - - -- 17,F3- 317 17.B3-3 , _._. ---- 7.D3-13 ------ ,a 17,E3-12 , - - , \`� �\�, •; h� '� _ � - _ r--� _-�� `� 17,D4- 1` � 17,E3 17,F 1f14 17 - -- I 17,E3- J' - - ---- 17,B4 �� 7 7,B4 17,C4- ii 4" IT 4 i r 17,F4-1 7 -19 �.._it 7,D4-17 ° A17JR ` i 17,E4- 17,F4-1 S 27,C4-1 17 C4�16 17,�C4- 17,D4T 7 -11 D4-9 �4D4-s 17,D4- 9 - I ,i r/h 17,E4�1 F 17,F4'- 4-20` I 7,C4-1 1 ,C4-1 .D4-1 . ,D4- - t 17,F4 _._ 17 4 i - _ \� 7,B4�5 17,E4`9 r� 1 17,F4-237,F4-21 r 1- - - - - - x,<' C4- t1 .C4-3 -- // i7E 17,E. 30� �17,F4-8 4 s7 4- j 17.C4-2 + -- lx 13 17,E4-;7,i4-31� 7,F4 ! , y3 7 \V- I 17,C4 0 7,C4-1 -- .D4-2 17,E4-6 - 7,�4 3 i TT 1 ,B 2 .;�4 �'17,C4-6 17,D4-22 1 -s 17,E 17 '17,E 7.E4- .E4- ` 4- 1 _ 17,D4-23 1 4� j 17.F4-6 7,C4-9 , - 17,E =27 4 7,D4 1 17 D4 t- � -34 _ 7'E� 7,E4-33 7 7,F4 4\ 7 1 .7,E 1 4 .70 3`6 E 7 E -3 - • 17 _- 17,C4-19�\. \� \ 7.D4-2 1 -pA 17� 17,F4 17.FM�9 � . a i i 17,B4-1 17s 4� i 17,C5-12 J 1 \`� 17,E5 r f f' 17,E5- 1 '24 17,Cs17 C�. T _ � t 7.B5-4 17.FS- - - 1 ' a W ,C5-7 .5-2 -14 i - r } -- 17 7�5- y 17,Es-2 E5-30 y 17 17= \�� - 17,Cs-1 17,D5- 17 �9 y 5-29 51 y� 52728 +. S� 17 .3 1 ,I 23 17,C5-17,C5-dD ` -17 - a \ 17,D5- , /' 17,C5-9 jl7jC5-117,Ds-5 x 5-a7 -21 �. sa1 ,1E 7,E5- 17.C5_5-8 �', 17 8 { 00 ; M (" 7.85- 17.C5-3 7,C5-4 17,C5-517 \ �f i th O _ ~� 7,B - = 7.B6 17,C6-2 i 1 D6-12 7;D6-7 P �7,B6-6 17,C6-27 s7� b' -24 D6 •� . 6�.."...€ s..1 .1 ` _ 17 6-11 ,C6' ` _ I � _ _ _ 17,B6- 1 7,B6-10,17.86-9 l �1 Cfj 19 +e, . i l 9, Q �� t 1. .. •- p 17.D6 9 17.D 3~ +� �\`1 \ �t D 1R -2 7.C6-8 7 17, ly.C6-9 i 17 �6414 2Y� _ 1 7,n6 --- ---� ��l- .B6-1E` b. m , , v o d� � �n � �� 1. f Williams Ave - East Side CB Locations x Williams Ave - East Side Williams Ave - East Side appx sta.14+30 appx sta.14+30, Looking S (across street) k _ r , n � � a r r Williams Ave - East Sided Williams Ave - East Side appx sta.11+50, Looking S bus�gl° ■r appx sta.11+50, Looking E - Nw ti Iy-r30 r Williams Ave -West Side CB Locations - nil IN .no _� ■ loss ®, ONE ..:= WAY s MIN k�{ a: Williams Ave -West Side appx sta.14+30 Williams Ave -West Side appx sta.11+50 Williams Ave / S 2nd St r ' Williams-NW Corner-Looking NE Williams-NW Corner-Looking N r. B Y 1 ,r t ... t x p Williams-NE Corner-Looking E Williams-NE Corner-Looking W Williams-NE Corner-Looking S '_ G►-.ss wa (k t Wi I I iams Ave. / S 2nd St Williams-SE Corner-Looking W Williams-SE Corner-Looking N t s + Williams-SW Corner-Looking E Williams-SW Corner-Looking N r i n k' E^a, Printed:08-26-2003 Mike Benoit _.:-� ••r.y — s tTs r�� ., }>,{J�'y r F r. �0a — �ak04 ".City_ of`Renton` Department'of Streets and 'Sewers l TO THE CITY ENGINEER Date.i L�fX�-__'7....f hereby make application for a permit to��conn(nlect' the premises at Sol TU 09 ci_ r�X Street or Avenue No... located on Lot.._ . Blk......7r- Addition, W with the sanitary sewer system, agree to construct the same as prescribed `. by Ordinance No, 243. Signed..... ........................ INBPECTOW8 RRPORT r size of Pipe...../7 rr .........__ Kind of Pipe.....1//............................ O(� Sewer laid by ... c'c.:�4Ll,. _•............................................................ Work done in a satisfactory manner?...........................................••-.--------•---.._--••---•-••--- Inspected by•............ ......................... L Date.....`7............................ s Vr ���• rT :���f�,a �a,� � �T�..-.. � S 4aFi� '�r�.n� 1'far �r�r�(:a,rj1)�r ..rA i.� r � ve— So. 0 1 00006716 Printed:08-26-2003 Mike Benoit CITY OF RENTON IF14e APPLICATION FOR SEWER SERVICE Date.... ................. 19 ....... 6 he ... . ..........................Qp.her �*...r'n... ap7p�i-�"f .......................................................... No. ........ ...... .. ................ on Lot No,11 Block No..C ........ Additior...... . . .. ..2� . . . ........,_..... or property description:............ .....................749. ................. ... - --- - ------ The Sewer is to be used f0r-.67 .. ..... . .........purposes, and..........................agree to pay the rates n ea .for such service and'comply with All the rules and regulations as set forth in Ordinance to be adopted regarding the use of such service and the care of plumbing fixtures. Signed............................................................................................ Sizeof Pipe.......................................<21 .......Kind ... ........... ...... .............. Sewer laid by.... Date ............................... .2?.............. Sewer turned irL.. "V '4-e-e-&7-y V/ -S 'e -. On ez, ILI 0 / c (A 00006466 Printed:08-26-2003 Mike Benoit CITY OF RENTON APPLICATION FOR SEWER SERVICE ,,�,, QQQ� C i Date._...� _/'�.�.—_. ._...._�—._—_.___.___._._ 19._..L a__. ] i hereby make a plication for Sewer Service for the premises located at ! L on Lot No._.._I_..._. ... Block No__ __. . Addition ___ C(L�t __ -•.K �l -_._. X i or property description: The Sewer is to sed for_— _ _�.�_ __( �YC�?-- _ purposes, I and _�..,.�..—...._........._�—agree to pay the rates now or hereafter in effect for such service +'� and comply with all the rules and regulations as set forth in Ordinance to be adopted regarding the use of such service and the care of plumbing fixtures. Signed Size of Pipe_. '. -—' 4 Kind Sewer laid by 0 Data T _2~� � _ Sewer turned in ^� _..__.__.___..___...._.._.... I . ._ Of/Zi{r AT-Fe 5ZA7T4E WA7-A 'A,' 6K6 wyE ear � I � I N FIRST F6p. SAJ, D I 201 WELLS AVE. 50, I 5b� 2 6X'P wya JI b -%Cons. t! 00006465 Printed:08-26-2003 Mike Benoit STORM N � CITY OF RENTON ° APPLICATION FOR SEWER SERVICE ' ___.-----____ 19_"4L { hereby make application for Sewer Service for the premises located at { No. ___._ 2G/ WELLS AV „ G• . _� _ ___ ----_— ___.__.__._...._._ p ! on Lot No..._.__ __. Block No._—....—.— Addition t or property description: �,��7�1 ( 1 The Sewer is to be used for_— _. (_�._..___.. _._ ___ _ __. _.._ purposes, E and__ agree to pay the rates now or hereafter in effect for such service { and comply with all the rules and regulations as set forth in Ordinance to be adopted regarding �` { the use of sunk service and the care of plumbing fixtures. { Signed— Size of Pipe_ 6 Sewer laid b ✓ ✓- ✓�C/C SGN _ .__.—�_ i Y { Date —�—� Sewer turned in__�_�7 l E 577 -- — _ — — — S' 0_r. wgrc R r1RiN 1� Calve. 57—ORI`9 i y 6X6 wyF_4-t(3END i FIR5Y FED. SAV, z� m �y 201 -wc-u-S Avr:, 50. r r crl ¢i 3y4"C.I. 1(1 ai I 6 x 6 VV YE r- 6 X 4 R6 00006464 CREW WORK REPORT SERVICE REQUEST NO. # WORK ORDER NO. # MGMT UNIT Ww ( DATE _IX, -0 3 PROGRAM � ACTIVITY QUAD NO . # l ADDRESS 5. WORK AMOUNT_q,_�WORK UNITM � EXTRA EXPENSE ACCOUNT N0. # LABOR EQUIPMENT EMPLOYEE # NAME HOURS KOT UNIT # HOURS MATERIALS WATER METER CLASS QUANTITY COST U/M OLD NEW NUMBER MAKE SIZE READING *COMMENTS : * S* 5 c— S SResf Li Sio l4k"14e6Lej FURTHER ACTION REQUIRED: ( 7►ve. IN O `^ IQ* o ERVICE ACTION COMPLETED: YES NO DATE ,, 6-03 TIME APPROVED BY : DATE : 5 r _. -- - - -{ I. I I. . �I;..:I_ :.:.! I, j:l.l. I L11.L.L. I . I,.II _. ..:- �: I 1'1 II ii ,: - -A . c f l'I i j•L I 1.1 (i it I I I:i! I! --,f - 1i I! II11 I�I II 11 II jI II'I 1 �j { III I tl l I..1.t. .1� I I I I-�" .. ..ICI I ' ' ....L- I--(1•" .. II ;I.1.... III � �., �t..11 ! I I ! III 1 I�It --it �_:�� -1 -f_. ,,1. . 1. t.; � ::_ :_ I ( I „ 1 I I! III I �, I :! 'I r �L ! : �II Ii1 ► I11 I, !I li, I it II11li I!� II;f I I,IA- ! I: I 1 ; :1 i I ! I r11 111:111 IIII IIII III I. } �. _ .: I li i lil Il,llil i l ll !! , I I Iil I I II I 1, , I. .. ... _. .. .... _. _ !I_:.• .: .-.... �. ..L... .;..�.I_ -.. ;..:Ti. ,.! .Ll.I,I..,I IL�),.1.. ...,1..!.,. I 11,1.'.I .I ....! ..L ..L.I I. .' I,I.ILLII. lil IIII ,!;-II I I� c. .. .. -. ---.. _ ... _.. ._ .I.. I 1 1� 1I I I� :III .rI ! ' �' 1.1. I ii!LI'4 ,I III Ili !II illil C III I II I lil llll 'IIjl j! I. .. . I !.' III jl ,I �,,I� llllll !i'I .I I1.1.,I ,I. 111 II Il, I I I : I i I i I II! I III i I - a .. .: _:- �-.: i _-. -.:_ � I II I I ,i :j.11ll ,i- Iji it IIiIII! Iilillil , '!' 11 , _ �, I I I III 'i 'III I!' II I' '1 I,.I l I i :I II -� L,� !i } I _ .. .. f L'_ }. { I . - i t1_ a _ f:.j .: .. .. .:I i I.!... . _ L-.L I, j I'rt� ,1I ( E.III I ! .I-1..i. I, 1 I' ii i' I, :iil:i Ii L I I 1 ,;I I:I 11 1l+ I I I! i III! f II II II I I ! I - ilI-:.L..:i1 1 ..:.'11 ..,! .I ,, ; 1 ;: � 1 I ! I-I I I I ,I ,:� II,III I; I, i Ij !� I .I 1- LIII -� 1.: I. 1 ..I. � i1 ! ; I ! 11. I I .I I II II ,I I Ij1, i 11 ! I I _�.I .. Itt '1 ! 'I II 1 I , Its - II I II t) liI.1. I. i I'' C 1...i l-1 1- +I_..; .; .,:.I:ILI .. !. !i i i.!, "I .':1.,.. yl�, I I 1 1 .I I I l i, I I FI I 'III 'Ii :I, I " -i _ .._ ; I. LI'I Ii I'I '.I Iit.411 .I ,I ji. Ij�! 11 , !1�. i I I I .. 1 1 I;1 ,, IIII -1:11 II.I�! :.�IIL-Itllt 1.. _I; }� .L. , ! II' If I. I. I! ii 1.1111 ii! I:II I it ! II I I ! . .. I . hI`:{-�' �i-li i.I ..!I ! 1}- I --'! I is i� !�.,Ilili I !11 Il .; LII 'I, i' i' 'I li I I ' ! :. i I1. ll I II I- I' !_;.j. . L -�--I ., !���- -I ' -�'-t- + - .,J-L I. ,U.r I i I tia i_ I!- i_{-•j_L. I' -li.l t_L 1...',.�. .I. !' !:. .. .-.,-i..,. :i T a L{T 4 I I I .,.I ! Ij ii- ..I I {I I' -i11 li- i 1 l II i,; l IIII I:I! it !I 11 II i � ( :!I 111;' IIII ill I II -N I I c 1 1 i.l, l 1I 'i I !II I , 11 I,i t� 'III 1 i !I'ir -I ; I J il�� it I II I ii II I I . �:. :I L,I + -r-:-l- j i I I'III j...-: r.. I i.. i i 1 I. I ., I 7 • , 1 1 , tl }I� f i ail 11 ?.,�Irll ,(} rj: + Ii �I;, I ,.I•. . H 1 I ,Ill I +I}I I LI, i, ; .III 1 11_il ;I! �:I '1l Ii,1 1, �, 1;:1 l ,.11:Ij .1i 11'I -t-1 ill' I! Il:.j 'tee-';y-�-.I it III' ! 'IIII I I,1 i�Ill �I it I,I!�. ,' i':ili 1' II .. I� .. t:!:�:...{1 I .il �I.I ' -IIII I IfI';1'II I 1 411 ,.1 j! 'i , I I11 ' I ! i { :I L, .I. ! I I ;� I:II I I I I I I. I i I I II i ! .. ! I ! ! - - - I. t 1 I !I ! 1 1 I I' + I ,,{�!1 itl, I ;-I- I -. ..t..l.l ,j.} a.- 1.;. C I �.:�t!.1a I !i t I j .... I : :.1-.. ( .. i i,. I1i.11 ., :j.: 'I(, ,Ii�_i 1I11; ;I'!!.!' ,-.-1•I-,�.;� II1: I I !II II , I I ` 1 II' 4 'I �;I. I... I iI ; ' I• I _. .. 1 l.-i.!1!I IIII. [II 11-11' .Li al y1 �}!!I I 11,1 ,•1 .! .! 1 I i. I 1'{-`-�' _f I Yyl , ' 1 1 I I -1 1 ' i I I 1 111 1''II ��' ' oS a. ; h. T... i, 1 ., III: �Il f' 1 , I It - I I. ;�iI A I; �1! , , .: I , , .,, ,., j I.111 4 I t,,I TCT�,I , 11 1 I!11'. II 11 1 , 1iL I�I_ Illl I I !t� 111 I ;! ! I 1 i1 , 1!1�r �I I 1 LI1 1i II ll , ,,III I 1 I1:1 1 I ; !I I I }I t JJI1i ) Iil.IIPi, II Ilil!i ! t' II ' li it it I it ' I ! 7 II I I , LI I ,Ii 't 'I. . 1 : I. { ' rl!}i ' �.•a �J1 1!.i_II II L I, .1.,1,1 ;II, I 1,-,�I II 'I :! . _ Ii_ I I II t' lllllill IIII I I :I II I IT I " ; I' ( I , j. II I1 .LI I II' IIII IIII 11: Mill !' I' ! I III .:-I X, I i 1'111 IIII I i1 ,111 I; I. !.. I . i.11. , I I. I I' I I i ,III- IIII! III 1111,� I I III I' I (I' '' IIII I 1111!j. I 1 1 I , I - , . I I I! .i..1 _ ' I- 1: ..- ; .. . 1 { 1.1.!1 I.iI ;1:j !1 !.! I-II I _ I. '�I. Ii II I 1I I i ,:... 1 I 1' 1! �•�! LIII I !! I 11.1'1.i:1'II {r. III I' i- �) i1'Il i I'I, 1,; 11 '{II°,I I !' 1 ! i1 ' 1 ! . I L.. !i I I i IIII!I I I�,_!",;'i.i. IIII I! !! I!i 1 I i (1 I ! I I! 'I - I�I .II. !i ' l I II IIIIIIIit ' �li;l �Iljl,: I ';I!lii .j!lil I iil,� l I,«}II llllll ! 1'I 11 !' ._ ,! II II Il1Il 111 I,lil 11 ! !i i1111: :I �,..::.:: it II'I; I'll'!I!1 . . .. r .I. ri. L f+'._,.� I,.1..I. .I (i -1,1,I! :I_, I, I.i 1 1 ,. . , ,,. I ! ! I I,• I it 11, III 1 II 'I I !I'1 I 1 i 1 I 111 I' i I 111111 11 II I,' i!Il; I! I Ili I i' � I 1 . 1 I i Ili :I I ''I , ,1 II 11 I Illi 1 IIII 11 i It IIII Iii!1 111111 ! I !: . �t� �, ., - 1_S� I !I I: II! I'tl! I' I LI 1111 Illl I Ii Ili , 11 ii II, �I III I II I ..,� '_ . ,�. ! I.il.;' ;�,. l,tl �.. �L '1 ,! 'I ;i IILI I II LI ;I 1, I. I �1`1 I I . II, ! IIV.1 ;li! I'll ,II,III! ,;III ;; 1 1 1 1, :I ;I I 1 i.1 , 1 I III„! '! I'r,.y „ Ill I I IIII Ii1: 11 I ' I II 11 I ' , j.. T. ;. ! i :1 11 I.I I I ! i.t�' !1 I 1 I I l 1 !III I I I I I 1 I I I i 1 I i I, ,, ' I I 111.. I .t l. . !I !,I , �.,ILI :II LI...L.-i lj! {{I I IIII 11 ;i I 11 11 r� 1, }i i lii I.,'I,�,� ,Itllll I I II I Iilil, !: tj1. -I I. ,I ( I I .ill 1 LIII I ! III, i! ;I 11 :;1. 1 I , �h r. I lij II I' / 1 11 , IIII IIf ,III I I ! i I.; I I ,j I i . - [' i• I I'I I I I 1 it II II '' i ! II: '! - 11! II ..I. I F1J1 L! I li I,rlliill Iliillil 111 I1! ii1' 1 ; I , I i i1 i... :.11 p._I- I - I'1.' - - 1-!' I 1 !-1 I I ,1 'I DiL �, + II. I "I I Y" I 'I'I� liilllI III!' 111 ;Illjll ,1 ,1 II ! II 11 ir'! 1 •' 'I 1 I, 11 I IL. .I I j' jli_ II!ii 11!llllll II!!I111 1'!'1 11 !1'I 1 I illlft I.:, i I. I I 'I ,1 , III J I I I'1�1 I ill' iiii III III I!lillt !' 'dill- I II IIII I i II I' I; . - I _i!l - --I1.�.1_, lT:IY� ,-I.. }1 11.L{ ,�• -�i1. l: {I11 I :I. ILL. !I ,.I I. ( ,i1 I " . I 11 I j1! .) h I II. ! I I; I I' i }4.. _ .I I l I:I-, ,LIII. !Il I IIII ,I ' I1 I 'il'I! ' 1 I. ,IL1l 11-!Ilj. 11 �, ! _l1 'li 11.1 11• II ; it .''I 11' ;I:. ! I' - i1i �f I+ r1 _ _I: I III,!-'I - i 11 I �1!I I !1!lilli II 1' I' I I , ! ' 1 II _ �. ,. ..'Ii ,II '1I ,III ' i I 111-I fl �a.! 111. �Li{ L1.,1 'I t Il..._. ... ... ...I-.. �1._.� .. I 11' I ,I i 111 ii: '' 1 -1-1 hl�"{ � !! .11:' .I_I l L. I ! i a l ''� 1 ,t' •I �.t..11:1 .. II iilI'Ii 1 m. ,, , }�'�� :_ II it III II 1 i1'II Hill-, i 1111i I ;I 1 I „I. �I 'I � I Ilt' IIt U. .. . # 11_I. { ...,I it .�iII rr II, IIIi111;I ll;,1 I ILI II;.l i ,t {{ r I: , i I� I I I I I 14 II 1 I1 I i... + .i.j :I - }•i llli.lliill ,I 11,1..1 „I ,,,,., I I11 !_�L.L. I I .1,1 .i, ..j. .. { - �1�:11 } ... .. ; .. 'I. i .j I1 ,ILj I "! ... I, ,1I 1. ,1 - I . I . ' I' I II,I,I I t III 1I1 I ; .1 ' I I Ili k {I1 I, ! ,; Ilr l I'I IjI'li I II!Iai,l' j1' I Il�l.l:i III lllllllll I I� i ..LI � -i IIII :I� ! i II. .► , 111 i-jl� ,l,, I ! , ....I.. .. I' r►'° .. II - 1 - 1.41.1 . !1 I' tI7 �, lI ItI., ,I. I4 II I '1 ii' I IIII tii !yll'tl1 ! 'i11 11 ! I k_ .. 1:I'I1. 1111 1..1 {.L.i.II CI _L.I,II,1-IL.II 'I1i11 11 :lii t ll'I II II; ! .III 111j1 I jlli,i li !: ! �' I . T.'.: } �. .I_-'I.t:!I+.I i I:_L.1. I I I 1 1 I I I I I I i t f i I i_1 I ", ,1 1 ' 11 1, i. .!III j i,i i 1 i. ' I - a.. (. ( .I r: 1 I .l.!-. I I 11.! H 11 I 'i `� 1 I l , 'It li T I {... ,I t ,F;. -i ... . . rr 1117t Ili I ! ! ;fell I I I ; i , . t.,rl' t I-II-- }I 'I.I C�1 -I�IIIII}1t ' ,, -t l ,;,II ' 'III t 1 Itll. ,. •IIII i11 I{I , ,I ;i l I I, , „ a r ��4 �II I {.I '.IL�. tll Ili II,_,., t !1i/ (III1:II , ,l 11 ' till ( ,I 1 'I '! . 1" i, , 1 1 t i I ill-I LI _a t i I { �, ' ' ;' Irii 1j, , �- {. '� . ,1 I ,{i...IIII; -,. �.II. i. 1 .. k I t" �.L.I .I1r1_ I• II! i L, 'I', I; I I 1 il, �i 1 I , I' !,1 ,1 1 -±. - I ,. .. .. �. 1. {t I I i I.ii I I f- 1{(1111 ' I of 1 11 1 -i I I I 1 ., I 1! ..' , 1 ' 1 - i .. _, 1 I �1I ' ' I +t r' ` 1 :LIII 1 1 ' ' 'I I t t' _I -,ft- : 1{1 . -I , t 1"I I;I! , Ii I 1 1 i 1 t I I, I I , I 1 i IN I.li _ '.��1111 .I. .I� �I4 �, �Il I �• _' 1 fl i �". II I' '!"t�',�'i - I � ' .{ .t.. I , I ...,.. 1. .11 I r ,i'. i�I ;.;.1 III . .. t 1 1-I I. 1 .1 1 7 l :I, I i ' :I; , 1:. I'.I. ,! - .1- I II. I .I ' li li 1:II I I F I. , I 1 I ,, j !alm f' 1L. IIII 1' !I I611.,[, t:1' 1I �'il `Il 1{11liil 't 1,.1,.. I ,'. { 'Ili i! 11' I ! I (11 ` I , I } I i I `- .. } t,F tl `.j' r1 I r �rl IICI Mil 1 +I- i-! y ,- I _ tl, ' ;-..' , Ir ' I 111 ,; I .1..11 .,.,. .#.• I.. }1 , 1 -1-1 _�il�l :.,, If - I , 1 .I I. I I il'11 I1 I I , 'I. I f III Il1i II (IIII 1; (I1 II. It Ili li: I I 'I .,.`I !'III. I i 1 I I 1 II.. I . 11.!:Lj i' .1i l IIII 1 ! i,,. { m. ' 111 I 1 1 I 6- '. 111 ' I I t -. I -. ill II -1I- Ili i 1} l .1 L 11-i ! III I i li iIi �. i1".I I. ,.... i .�I...I: .1_1tI .I.i I ,I,.I ,! 1! -Ilti I IIII II:I 11 ,: 'I, II II II!1:.1 1 ';i I, I .! - ! �} --.,I r �111L .., Il i 11 'il 'lil II I:I. ! ..I.I ; ti, Il: !ji1'11 III I1 i ,ii �I ... ! -. I ;�. I .. I.J"I i 41 !,II r,ll.,i 11' Ill I ; 11! II IIII ,� !II. III II { :, i -At �i t l Iali ! i!i p t �,.•1!.I�.�_r II.Ir. !.. :� I, {i1 , .,1. .. . ., -,- . I I,- ;1 1 ...... t a, { 11 I it IIII I Ijl !" I. Il:ill; I 1 I _ ) I II I . a 1 l II 11 III �I 1 - - it•I -I 1 ! .I '1'! 1� r -!� I, .I. IIIj I 11 ! 1il I .. cl I, I�I ii, I' ]'I. '- I 111 L�.�' �! 'li, I - II _..... i ..;..,, I 1 I. '' .l.. r., .' 1 .. - H, ryI71..,}..1•Y� IT."!', ,., ,[_ -I 1 i I , _11.. . I.I. i 1111 11{l i1I •I II III! 11' i''~i L: 1' '1 1+ ,i ' -i. 11,1 r iII .:I:I:.{. .�. L. IN I-IIII 'I ;I II� LII.L.I .I 'I .! ,.I,., 1,1 .. II ;I - 1 I ! I, II I I ! II I : 1 It' ! lj1 i I I 11 t r j I I I I 1. I 1 I 1 , I, l I 11 II -Ii 11 , JI IIII I . r - - �•I�11 I 1 .�.�;; t�,, 1�-� I-� al,. ;.h .ail,i,� I :;. .I: .i `I , I._ II iI i I 1 I ;!11 ,i1;11 1�� I li 1'I 'I .1. t . t I1j(:(. .I r I Iil 11 I I i, I„ , II' ' .I-. _�.I .I. _.1.. �1:. ! II I 1 I I ! !i 1 ^I I i t !'1' i- I:i, I • -, , !:, I-f : .I I� 't �111! I 1! II , I:!; I' I I I !{'IIII II i II I 1.. :1 `' a t:. LI r.: TII l L I.... f Al- 1'1 .:I I1 . 1;; i 4 :I I I "1 I I _ - I. �,._ I II t(: _ _ I I_ii III '• I I•;} ! I !IIj 1. lY .L. !1 'ii 1 , ! ' Ii I �f 11 1 1 .1!' 11 !Ill �'ll I I IIII I I' 1 i• I^. I t. I I.I. ii 11- 1 'i+ i .-L1 .{ Ili .!' !il 'IIII 'I il1'if .. I•' .` ! - � II I t rlll I. I,. II I,; ,. ,, . , I, IIII 1 i .i_il l I I{ {I I 'I ?' ..m... ,! ., . . j . - - 11'I-, 111� .r ll 1 ..I_ T ,ir;l•I_ :;,,I •:, :i. _ . �,�•1� I 1 1 I. I ;rl 1 II I it i ;i,i II I ! I; ,, II G I .... T I 7t ; C'L,:I. Ilit I I! I I_. '1.1'i' I:. I!II !Ii I" :ll !i1 !!Y .i. ,I _ --. _ .. .t III ( .11.i.III 1:� '.,-t. I .L..`_,:�- ; .,I ,IIIII (: .I.I I :I I h!1'i1, .. .. •I' 1 .+' t 17 ,:. !--I- i.l.. .I. 1.1! -I! fl1 'Ia.Il 1:!1111 •I i I II. :I: .,: C ._{l ,:.. . , 1 ::.. '. � {:.1 i-1 , Itt. ll 'l,,lll`1 11 -1.,1 III •1. I! II I I' 1, ... IIII'- -' F I i • I i .- _f•-1 I I 1 Vi '�I i-' I 'f i l I- .i. , } .. I �. I, t' -i' + ,.. ,i -I I- II ll it 1 I _1` _� 1 :. I 1 ..-I,�- ,..I !Tl..._... tt'.I ,I.1 I. l+ II I I 1. I.1..1 If�l ;.I I I -{-I- IF{I , - .t1 11I - �111 I!.i.. 1..; .. ''..:. IIII. :._11-#:!I ,1 i 1 11. ,. -1 ,. .,. ;1 1:, I.i- 1 ,t ` I. !r r 1:(.I I 1 1 ' ... ''. '' .. .'! •I a.!;1. it[I -: .!-I;: .,.. t.:j �II1' -( L.1._ '1,11- ,I�:j:1- 1 i'I Il.�il it I, i..l {II ':j '1 I - I! .. :1' 'I� _ '1 ._.:I i _I_. I;,ir-_ Ir.,. :1. ,, 1 I ..I-1 ' I1 T.. 1 I. i.l:l I I llllil 'Ill i.il lI! !' I 1 IIII II-. 1 .1 ,.1- I t ''I 1I 't I'I 1(I I. I j-1. It i .III- I ''I I I! .1! {IIII.; ...I 1 i,1:i I I i. 1 I 1 _,:. -__!'?J, ' i l I I '-1: �_,_, t '' 1 IIII ,I , 1 ' �'i' l j l-'11 t ... 1 1. i..l �.{I .[ .T. Li. `.7_ .,-F -,. , 1 :, I I I I., I , , ! i t ::.;I :. _ _ .I. _1 _..r ._.. 1 } L_ I . 'I 1 '_ I,r t l !, . E II 1 LI I'1 t�i ill. 111 t Lli Fii11 I i t JI I `I Ii i6. ' ;I' ilI I111 I�I 1I. .,I 4! ,: !�;II !` 1 t IY_. �1 { .It�i I ) II I 11F- II !I i�'1 i ! t + _.I.. f4 I ! I,I ..I 1 i.Y 1 I ' ' I.Ii ! I "I LTt-! �i' I .t.}I_I r.'.l la:.!,� -1: ,.,.Illl ttt fI _ -LI 1' '�.11;:It ' _.. .. .. : ` •1 t _ ;:I' ! ,I I r^� i rli j l LI I-r w -- ---- 1 i - } i I { . :,i FF -IILj , 1�1 :.I It, ri-�I II 1�I�i, 1 II:-;i1 .! I' I,1 lI::. !III .. i t.. .. I, - t• .I '� . I IiII1 I' Illl. „t141i { Il,:l� ;i11' 11 ' Iljl:l 1 t i. is - 1. ... '4 _.if IJ I+T I_I: - V'1 .:,. LI I_I III i%i I ! :ii II i .! 11 - _ ,t - .- r - 1- ii_ '.I.I J""I { -I- .1 -.i. i I'1II IIII, 1 F ! 1i I 1 . I ..'1: 1. ... i .-., I .. .. .. �$ r- TMH I !! li''I I'yl l I ,r ; '1 i i i li :.I I f 1"_.. l: _._•M1 1 ._ ..,.. I, - , I.. , , , e Y II.I.1 �Iid 1i1. 11 ,1.,-i ,:Il i1.! !Ili .1,'I. Ilill.11l IjI�III' ,. I, I'I III!!! �.:I- .-.'...6) '-�-. 1 Y o City of Renton + & + PLANNING/BUILDING/ PUBLIC WORKS DEPARTMENT INV Utility Systems - Fifth Floor 1055 South Grady Way Date: March 30, 2005 Renton, WA 98055 TO: Les Nelson FROM: Abdoul Gafour Seattle Public Utilities Water Utility Engineering Phone: 206-684-5919 Phone: (425) 430-7210 Fax Phone: 206-684-8535 Fax Phone: (425) 430-7241 SUBJECT: CRPL crossing at Williams Number of pages including cover Ave S. & S. 2"d St. sheet REMARKS: ❑ Original to ❑ Urgent ❑ Reply ❑ Please ❑ For your be mailed ASAP Comment review Les: Attached are copies of the proposed 12-inch City water lines at S.2"d&Williams Ave S. and S.2"d&Wells Ave. S. Both lines will be crossing over SPU's CRPL#3 at S. 2"d St. Anodes and test stations will be installed on both ends of the crossing and a joint test station will be installed along the curb line, that will include a cad weld connection to SPU's pipeline. Gerry Duppong of CH2M Hill has reviewed the plans and provided us with the design and location of the anodes and test stations. The City will also be installing sewer lines in Wells and Williams, the City's project manager is Mike Benoit, 425-430-7206 and his e-mail is mbenoit(Liici.renton.wa.us Mike has been in contact with Jim Wilke during the design of this project and has incorporated Jim's comments in the final plans. This project is being advertised for bidding. Please contact Mike if you need copies of the design plans and specs or if you have any questions on the City's water and sewer projects in Wells and Williams. There is also a private development project(Merrills Garden Apartments)that is currently under construction. Their contractor,Nelson Construction, is installing the 12-inch water line crossing at S. 2"d St and Williams Ave S. They will be using Norton Corrosion to install the anodes,test stations and cad welds according to the City's design plans. I have advised Nelson Const. to contact SPU before any excavation near CRPL and that SPU will perform all cad welding on the CRPL. If you need additional information, please call me at 425-430-7210. Thank you for your assistance. Abdoul Gafour (425-430-7210) agafour(a,c i.renton.wa.us I:\AB DOUL\FAX\fax-spu.03 3005 doc.doc Michael Benoit-2988 W-6 Test Station FI Page 1 From: <Jerry.Duppong@CH2M.com> To: <agafour@ci.renton.wa.us> Date: 03/03/2005 10:22:16 AM Subject: 2988 W-6 Test Station FI O PII'LIJNI 1'-6" SQUARE FINISH GRADE CONCRETE SLAB 6" THICK III®II , .� III®III ANODE WIRI _ °° y EXISTING OR GALVANIC ANODE —� NEW OR PROTECTED UNPROTECTED PIPELINE TERMINALS PLAN PIPELINE TERMINALS 1 -#8 AND 1-#12 AWG COPPER PIPELINE WIRES WITH GREEN 1-#8 AND 1-#1 INSULATION AWG COPPER WIRES WITH BLUE INSULATION p� 4M4 EXISTING OR ofj8rkc[ 14CULA'no'T UNPROTECTED PIPELINE ANODE WIRE NEW OR WIRE CONNECTION, (;Al VANIC AIJODI PROTECTED TYP, SEE DETAIL PIPELINE THIS SHEET ELEVAT INSULATING JOINT, NOTES: SEE DETAIL THIS 1. ALTERNATE ANODE PLACE► R- --GA�a[14nf"LSHEET OPPOSITE SIDES OF PIPE ANODES 2' TYPE A 2 LOCATE O HER UNPROTECTEDI P FI 49mo1L/,4,,rAu, ALL Wig /9 (" PSG codwrT 2;- /414, &AIA`tea 3. ISTALL ONE ANODE ON EA !2,. 04SIMIA (.AWAr4L MJoOE ►`-a" �Etew P,PF �""6 --r c��AT�� OF PIPE AND ON EACH F FLUSH MOUNTED TEST STATION GALVANIC ANODE 1� NTS NTS THERMITE WELD CAP, TYP ONE PIPE DIA MINIMUM, #2 AWG INSULATED 2'-0" MAXIMUM STRANDED COPPER WIRE THERMITE 'NF LD THERMITE WELD CAP, SEE NOTE a, WIRE CONNECTION, TYP NOTE: TYP, SEE DETAIL THIS SHEEI 1. TWO BOND WIRE ASSEMBLES REQUIRED AT EACH 16" PIPE JOINT FILE OR GRIND AND ONE ASSEMBLY ON SMALLER PIPE JOINTS. WELD AREA TO 2. PUSH—ON JOINT SHOWN. BOND SIMILAR FOR FLANGED JOINT. BRIGHT METAL PUSH-ON AND FLANGED JOINT BOND NTS NSULATE STRAN ED2 AWGNSULATED CO PER STRAND D 12 AWG1 COPPER D WIRE 24" LONG WIRE, TYP OF 2 NOTES: FLEXIBLE OR 1. COPPER SLEEVE REQUIRED FOR EXPANSION #10 AWG AND SMALLER WIRE. COUPLING 2. USE COPPER SLEEVE ON #2 AW S. WELDER AND CARTRIDGE SIZE VI WIRE SIZE AND PIPE MATERIAL, MANUFACTURER FOR RECOMMENI 4. COAT WELD AREA AND FILL REC THERMITE WELD CAP WITH COLD APPLIED COAL THERMITE WELD CAP, CAP TO WELD. -0 TYP EACH WELD, WIRE CONNECTION, TYP, SEE DETAIL IRE CONNECT1O1 TYPnTUCDCEA Hint cun%nrni -� W 4 F: f PIPELINE:: 1 '-6" SQUARE FINISH GRADE CONCRETE SLAB -- 6" THICK . • �) ANODE WIRE ° GALVANIC ANODE EXISTING OR NEW OR PROTECTED UNPROTECTED PIPELINE TERMINALS PIPELINE -TERMINALS PLAN ___#8 AND 1 -# 12 AWG COPPER PIPELINE WIRES WITH GRELN 1 -#8 AND 1 -#1 ' INSULATION AWG COPPER WIRES WITH BLUE INSULATION i.r2- Aw4 " LXISIING O of/gL kci- I�S��1� 0+-1 UNPROTECI ED PIPELINE ANODE WIRE NEW OR GAI VANIC; ANODI PROTECTED VV11:L c�)NNLc�IlO€�,, PIPELINE TYP, SEE DETAIL THIS SHEET ELEVAT INSULATING JOINT, NOTES: SEE DETAIL THIS 1 . ALTERNATE ANODL PLACEI` SHEET OPPOSITE SIDES OF PIPE TYPE F l ?_. LOCATE I ER UNPROTECTED I PIF /J10T*S.,vAsp4L.t_.. &L vlla5 M� Pfc c041>13rt' 1' 5. ISTALL ONE ANODE ON EF I. !14S?1AUL G�AL_VAT►IL A/J CE 11,0. ' "'�t�+� 'p,pe WV�T v�'��'a OF' PIPE AND ON EACH I FLUSH MOUNTED TEST STATION _GALVANIC ANODE I � NTS NTS THERMITE WELD CAP, TYP ONE PIPE. 2 AWG INSULATED IA MINIMUM, # 2 2''-0" MAXIMUM --- STRANDED COPPER WIRE THERMITE ',11[ LD THERMITE WELD CAP, SEE NOTE -1 , WIRE CONNECTION, TYP NOTE: TYP, SEE DETAIL THIS SHEF 1 1 . TWO BOND WIRE ASSEMBLES REQUIRED Al EACH 16" PIPE JOINT FILE OR CRIND \ AND ONE ASSEMBLY ON SMALLER PIPE JOINTS. WELD AREA TO 2. PUSH-ON JOINT SHOWN. BOND SIMILAR FOR FLANGED JOINT. BRIGHT METAL PUSH - ON AND FLANGED JOINT BOND NTS #2 AWG INSULATED #12 AWG INSULATED STRANDED COPPER STRANDED COPPER WIRE 24" LONG WIRE, EYP OF 2 NOTES: FLEXIBLE OR 1 . COPPER SLEEVE REQUIRED FOR EXPANSION # 10 AWC AND SMALLER WIRE. COUPLING 2. USE COPPER SLEEVE ON #2 AA 5. WEI. DER AND CAR FRIDGL SIZE V/ WIRE SIZE AND PIPE MATERIAL, MAN U FACT URE'r� FOR RECOMMENI 4. COAT WELD AREA AND FILL REC CAP WITH COLD APPLIED COAl THERMII E WELD CAP TO WELD. THERMITE WELD CAP, CONNECTION, EACH WELD, WIRE CONNECTIO, E � ,�, }} nTiicr�c MnT QWn+nini TYP SE,Er DETAIL WIRE CONNECTiVI 'ADE INSULATING FLANGE INSTALLATION SHOWN ED OR SUBMERGED INSULATING FLANGE INSTALLATION, DO NOT ASULATING WASHER ON PROTECTED OR NEW SIDE OF FLANGE. 'IED OR SUBMERGED INSULATED FLANGES WITH COLD APPLIED MASTIC AFTER ASSEMBLING JOINT AND WRAP WITH A BUTYL ADHESIVE, POLYETHYLENE BACKED TAPE. _ATING FLANGE 1 '-6" SQUARE CONCRETE SLAB , . 6" THICK FINISH GRADE TERMINAL BLOCK 'ER WIRE 1 #8 AND 1 #12 AWG COPPER WIRE WITH WHITE TW INSULATION /11 6�.,d�c� t�s u c_q.2i a ONE PIPE DIAMETER MIN. (TYPICAL) NEW RENTON'S D.I. WATER LINE A EXISTING c- C .t bu i ' C.R.P.L. (TYPICAL) uJIRES r^J � " STEEL PIPELINES lrc<l �li�✓. BJR� - �� ' E FF - CATHODIC PROTECapE ' i S H MOUNTED TEST STATION oG � +� l A9 P_ e-V4 of ?A9 Ary I VDED WIRE CONNECTION, TYP. WITH SEE DETAIL THIS SHEET \TION I i WELLS AVE S & S rl co to � � N t_��- r � S � �.� � �;h QO .p w Via ` In �V 3,6' C r 4.2' C 4.C. C w 8.0 C • I lDJ , i R ..E ANDiSlt4+a JGT ki1c . . i wT, t L4t :.{ E(1 A SCit) Gta WD F F-1 01 STA f5+61t, 15' R INSTALL DEADMAN THRUST BLOCKS NG AND ANODES � a �� �' � CONNECT TO EXISTING LOCATION APPROXIMATE AS SHOWN W 121" WATER 12" FLANGE[) GATE VALVE EXACT LOCATION TO BE APPROVED BY T W-5 .1 I r :.; e °a STA 15+741 15 RT EXTEND 12" WATER W/ INSERT CLEANING "POLY PIG- ENGINEER /N FIELD 12 45 BEND FL x MJ (NORTH) SEE DETAIL 8 SHT W5 " ( ) 12" TEMP PLUG (,Wj) ALL FITTINGS SHALL BE RESTRAINED WITH 12" 45' BEND (MJ x MJ) 12" TEMP PLUG (Aw 4 —1" SHACKLE RODS ttt3 (eft ALL FITTINGS TO BE W/ 2" TAP & BLOWOFF ASSSLY RESTRAINED WITH BLOCK AS REQUIRED 4 — I" SHACKLE RODS FLUSH MAIN AFTER SATISFACTORY RESULT OF BACT SAMPLE REMOVE TEMP PLUGS CONNECT 12" MAIN WITH 12" SOLID SLEEVE (MI) 12" SPOOLS AS REQUIRED TO COMPLETE' FINAL CONNECTION COMPLETE 4 — 1" SHACKLE RODS ACCROSS NEW PIPING ? AVE S� FOR R APPROVAL ti °F w,asy�'s�� WELLS AVE. S. & S ! qp tom.+R Qpm N cY ca "!v I v, w 4 3.&' C -a 4.2' C 4.0' C S_B' C 6 . 8.0 C F ANDS1tci ED WD F-1 Ol STA 15+6ft, 15' RT INSTALL DEADMAN THRUST BLOCKS VG AND ANODES f ! t CONNECT TO EXISTING LOCATION APPROXIMATE AS SHOWN EXACT LOCATION TO BE APPROVED BY W 12" WATER 12" FLANGED GATE VALVE STA 15+74t 15' RT T W-5 `i �' '''c ' ' EXTEND 12" WATER W ENGINEER IN FIELD ,++� INSERT CLE,4N/NG "POLY P!G" (NORTH}12 45- BEND (FL x MJ) 12" TEMP PLUG (M�/) SEE DETAIL 8 SNT W5ALL FITTINGS SHALL BE RESTRAINED WITH 12 d5` BEND (MJ x MJ) 12" TEMP PLUG (MJ) 4 -f" SHACKLE RODS Ct ..q, ALL FITTINGS TO BE W/ 2" TAP & SLOWOFF ASSRLY RESTRAINED WITH BLOCK AS REQUIRED 4 - 1" SHACKLE RODS FLUSH MAIN AFTER SATISFACTORY RESULT OF BACT SAMPLE REMOY£ TEMP PLUCS CONNECT 12" MAIN WITH 12" SOUD SLEEVE (MJ) 12" SPOOLS AS REQUIRED TO COMPLETE FINAL CONNECTION COMPLETE 4 — 1" SHACKLE RODS ACCROSS NEW PIPING WILUAMS AYE S & S, Mph R APPROVAL n Win: L� '�.. BIZ v� JIZ ?� Fv � � y N I 3�W •� s a �!m ao( l<Im is ^ V i OIv ��Q Q Ql �o + a h ��i VIG s c� c y W �Im kIJ C 4.2 c 4.0' c ® -- TESTING CONFIGURATION 6,6 5 T(n - 6 R D �j�IOAL DEFLECT 12" DIP WATER DOWN 9" PER 20" TO INSTALL 2 DEADMAN THRUST BLOCKS ---/ CLEAR FIBER OPTICS LOCATION APPROXIMATE AS SHOWN EXACT LOCATION TO BE APPROVED BY ENGINEER IN FIELD "� u;titu tcu►�6in SEE DETAIL 5 SHT W3 ALL FITTINGS SHALL BE RESTRAINED WITH 4 -1"' SHACKLE RODS OF FINAL CONNECTION CONFIGURATION TIN I- fi 4�it-nt,rrl.. a WELLS AVE. S. o. S. 2ND ST. WATER CROSSING c INS LL 1 � IN LATE ABLE OU NG D BLDG.# 201 I� T ST TION - F- 2 STORY CONC, BLOCK 0 S A 1 36t TO 16 01 FIN FLOOR=40.9 I I ST JOl T BON NG D ODE NO BASEMENT STIN AND EW 1 WA N S CB RIM=40.06 0 SSMFI RIM=40.85 t c, c CL CHAN=33.7 CB =41A ASPf ALT IE 6"GONG E=38.4 v IE B" N=34.1 n i IE B" S-34.0 IE 3"PVC E/S= z CB RI -40.83 IE 3"P E/S=40.0 � N s"DEc. 10"a c. UGP/I CB- \UGFO `UGFO CB-1 OB 1 — REMOVE EX CB GFO ` GF W AND — RAE G G 4` DEA IVE G � w — —— STa G `' a a ,n s tAs"14 ■ _Lo tot DE(1DMAN 7 oG G g 12" STW HP LOCK J ��i g V Gb���'�� U ASPHALT ROADWAY 6x,S11 �6`TAP /G J G -mr^ / TO Ex SD •.. CB-20 �.QC$T6 C 1 ti W — _ AV coo W 8"DEC. _ -UGT UG7 12^DEC. CB 8"DE . _— — _— n T. _. GP/T -- - UGP/T- 4' CHN LNK FNC CB-10A o ' REM r REMOVE EX CB o EX D v CONC. AND LATERAL z E7 I o --Az m E.X. CB RIM=39.98 14+50t IE 6"N=37.8 ONC. t� X TALL NEW SIDE SEWER IE 6"W=37.8 o C CURB LINE OR PREVIOUS BLDG. IE 4"PVC E=39.0 I 0 W �, m ,ONNECT NEW SIDE SEWER DEMOLISHED p � sr ( o k` TALLED FOR BANK SDMH RIM=40.65 r*1 = z ,ONSTRUCTION IE 15"W=36.5 n Q A m m IE 15"E=36.6 N X I z IE 8` S=36.9 p z o STA 15+61t RT 15' INSTALL r CONNECT TO EXISTING GROUND LEVEL TEST STATION Do �' A 12' FLANGE GATE VALVE TYPE FF ON BOTH SPU AND 0 EXTEND APPROXIMATELY Tn N x i y 4 0 LF 12- WATER PER ETAILS - SHT - � AfL-�T SH -4 LzeATE 'TI'ST �x D , o tt 4 1Tl1�14 T Cu 1 I IT AND c EXIST 6" W-•— I ue� BOX R VANE 3 30' WST Sr'AtQA- -rge6 F-j I I I sa oG-rA Ins -U46W Vrf s L.ocAr a TVSr 6*-'c S 16+01 RT 15' Awc w r S NECT TO EXISTING 6' WATER I z E DETAIL 7 SHT W-4 I co I AND DETAIL 8 SHT W-5 Ui co 12 X 6 TEE (MJ X FL) 0 1" 6- GV (FL X MJ) I NJ I h CUT AND CAP EXIST 6" W OD 15+00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .M . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . . . . . . L i PROVIDE 65t OF PIPE JOINT + BONDING do CATHODIC < PROTECTION 5 GALVONIC ANODES CB WEST V)l PER DETAILS — SHT W-5 N RIM=40.06 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IE-6"-E=38:4• . . . . INSTALL ' CB EAST o o :� GROUND LEVEL TEST STATION HIM=39.98 z z o TYPE FF ON BOTH SPU AND STA 15+36, 15' RT lE 6" W=37.8 � � .N RENTON WATERLINES 12' INSULATED FLEXIBLE IE 6" N=37.8 (r wo�.= SEE DETAILS — T W-5 w IJW IJ U uj COUPLING o$o ' *12 . . . . . . . . . . . . . . TEST STATION "' TYPE'f'-1 w lE. 4". E=3,9,0„ : . Z o�$: . . . . . N SEE DETAILS — SHEET W-5 .^ z ' Q in W _ �� 00 Q Q w O a,W - z w r r Z 'a �w F to CN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ,. < __ so. C900 PVC 0 a4x -t?"17Awi ►Ja' i2' 9 i 2� Ili t�!►rt v 4S LC- VQ �Y = <0 "`'' SSMH RIM=40.85 z� : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o93. . . . . .w�L . . . . . . . . . . . . CL• CHAN=33:7. . . . . . . . . . . . . . IE 8" N=34.1' IE 8" S=34.0- w1E �! C,I Ty nF 1/12/05 )(ISLE I c> l TYPE F-1 ( , HEEL W-5 A `" SSMH RIM=42.03 ASPHALT CL CHAN 12" E/W= 4.2 ASPHALT CB RIM=41.40 c IE 8" CONC SE=35. n IE 6" CONC E=38.9 z IE 6" CONC W=39.2 o IE 6" CONC. SW=38.9 n CONC. WALL —F.O. F.O. CONC. WALK --UGT GT •— CURB do GUTTER SD W G ( 6 DEACTIVATED) CA c G 94 L 13 P c L J� ll�Shc�4i�� 6' CI CURB do GUTTER----IF t llr�' CONC. WALK D- '� __ LaC,IHL�'tf,SY *-r Lim P.A. (2) 8- DE 206 )R=42.3 ASPHALT A CB RIM=41.37 S6 (1V RT) IE 6' CONC W=39.8 0 c TEE (MJ x FL) c v N RANVALTS (FL ASSEMBLY)(24' RT) SDMH RIM=42.10 N IE CL CHAN f 2` S/W=37.6 m z I (GONG. W IN N� W N N 3o, iq N 3 C' CUT do C INSTALL EXIST 6' GROUND LEVEL TEST STATION TYPE FF ON BOTH SPU AND I Z RENTON WATER LILIES ET D6� IE�T 1 �, aT 25+00 . . . . . . . . . . . . . . . . . . . . . + . . . . . . . N PROVIDE.98t OF PIPE JOINT N BONDING & CATHODIC PROTECTION 5 GALVONIC ANODES : F cn PER DETAILS — SHT W-5 RIM=42.10 _. . . . . . . . . . . . . . . . . . . IE 12" S/W=37.6 INSTALL SSMH RIM=42.03 GROUND LEVEL TEST STATION CL CHAN 12.1 E/W=34.2 TYPE FF ON BOTH SPU AND RENTON WATER LINES IE 8" CONC SE=35.3 STA 25+:15, 15' RT SEE DETAILS — SHT W-5 06 .? z aF o 120 INSULATED FLEXIBLE COUPLING . �,• -�.„ . W a TEST STATION — TYPE F-1 o 0 Z ;a z m a. SEE DETAILS — SHEET W-5 ? TS Z) m m ski O a r - W U z 2 Ul Z O -a =Ia . . . . . . . . . . . . . . . . CO R Din . . . . . . . . . . . . . . .. . . . . . . . . . . .. . . . : . . . . . . . . . : . . . . .cB wEs� - : . .0 a . . . . . . . RIM=41.40 W IE 6" CONC E=38.9 Zw IE 6" CONC W=39.2 IE 6" CONC. SW=38.9 . . . . . .-CEL EAST. . . . . .... . . . . . . . . . . RIM-41.37 IE 6" CONC W=39.8; CONNECT TO EXIST W z CONNECT TO EXIST '6' q W SEE: DETAIL 6 SHT W-4 8' Cl WATER Z AND DETAIL 8 SHT •W--5 SEE DETAIL 6 SHT W-4 r a WTI 1/12/05 OF WATER MAIN REPLACEMENT nELDRO - I Tn N i . . ._. . PAGE: