Mr. David Ditmar, P.E.
King County Wastewater Treatment Division
201 South Jackson Street, M/S KSC-NR-0507
Seattle, WA 98104-3855
SUBJECT: REIMBURSEMENT OF ENGINEERING COSTS-EASTSIDE
INTERCEPTOR SECTION 1 CAPACITY RESTORATION PROJECT
Dear Mr. Ditmar:
Enclosed is a check in the amount of$32,365.00 for reimbursement of engineering costs for the
design of the water line and storm sewer line for the above project, per the Memorandum of
Agreement dated July 9, 2001.
If you have any questions, please call me at(425)430-7247.
Sincerely,
Allen Quy n
Surface W to tility Project Manager
Enclosure
cc: Abdoul Gafour,Water Utility Engr.Supervisor
Ron Straka,Surface Water Utility Engr.Supervisor
� tia
0 out a d y ay-Renton,Washington 98055
This paper contains 50%recycled material,30%post consumer
0++
CITY OF RENTON PAGE 1
1055 S. GRADY WAY
ilI
RENTON, WA 98055 10/23/O1 1180214
/ENDOR: 042364 SHIP TO:
K C TREASURER
'X. '
V'
FOB Point: Req. No.:
Terms: Dept.: PLNG/BLDG/PUB WKS UTILITY SYS
ieq. Del. Date: Contact: F.
E RK I NGSTAD. L I NDA
Speciallnst: Confirming? N
:......::.::::.:::::::...,.......:..:;:.::..:.::.::.::...:. ,p
Quanta...:.. Una Descrp ;;»:.»;>: . ::: ^ .
. ..:.. ..... .. .
:> f
.::...-.::::.......—..::::::::::::: .::...—.,_> .:..:::::1P..::.....�.::::::::::::::::::::..::::::..::.:::::.::::::.:::::::::.....--:-::.:.................................................. ................................ .............................. ....
...................................
per MOA with King Co.
:.
.Ai :.,..
r....C.s .--- .. ...... . :::::. :...:::.::...................... .............................................. :.....::::::::::::::::::::.: .:::::::::::::::::.:::::
::.;:.;:.:::.:::.::::::::::::::.:::.:::::.:: :::::::::::::: :::::::: :::::::::...................................................... .... ....... .......................................... ....
ESI , per MOA with King Co.
sUBTOTAL 32,365. 0
31LL TO:Ci ty of Renton TAX . 0
1055 S GRADY WAY FREIGHT . O
RENTON. WA 98055-3232 TOTAL 32,365. 0
..
::'.>::>:::>:.Acouirt 11Cnmber Work Qrdes Fwiction:Asiiiber Amourrt
''
''
''
..
..
..
..
..
.1
421.000500.018.5960.0034.65.055170 55170/5160 17.190.0
421 .000600.018.5960. 0038.65.065380 65380/5160 15.175. 0
/-'� ),--' )// I I
/ 11r Z& I
L������
ORIGINAL/FILE COPY /
U of ed Signature PINK WHITE 4Aor na Sigtur
PD r ► �� a r L4
King County
Wastewater Treatment Division g p ice,
Department of Natural Resources RE _IV
P F
King Street Center �+
201 South Jackson Street
Seattle,WA 98104-3855 OCT 2 3 2001
October 22, 2001 CITY OF RENTON
UTILITY SYSTEMS
�Jt
Mr. Allen Quynn, Civil Engineer II L �
City of Renton 0
Surface Water Utility
Renton City Hall
1055 South Grady Way
Renton, WA 98055
Eastside Interceptor Section 1 Capacity Restoration Project
Memorandum of Agreement
Storm Sewer and Water Line Reimbursement
Dear Mr. Quynn:
Per the Memorandum of Agreement dated July 9, 2001 between the City of Renton and King
County,the engineering cost for the design of the water line and storm sewer is the following:
Water Line: $17,190
Storm Sewer: $15,175 merit :
Total $32,365
Attached is the backup, detailing the costs. Please send the reimbursement check to me,payable
to King County, to the following address:
King County Wastewater Treatment Division
201 South Jackson Street, Mailstop KSC-NR-0507
Seattle, WA 98104-3855
If you have any questions, please call me at (206) 684-1813
CONCLlRd�l=i��t
ery t ly your i DATE 2 3
NAIVE INITIAUDAT, :mA
David Dittmar, P.E.
Senior Project Manager ,
DD%lm
Attachments _ 4t - y)-r- 3 2p
15, t75p0 1N_0- - &53'60
421 /S5Imo UK�tP Pank c0 e 1�,190 �-- \d-U. u 551'0
CLEAN WATER -A SOUND INVESTMENT
Eastside Interceptor Section 1 Capacity Restoration Project
Renton Utility Costs
As of October 15,2001
Other
Task Firm Labor Cost Direct Costs Prof. Fee* Totals Budgets
220-Water Line Design
Herrera Env.Consultants $ 13,665 $ 49 $ 1,123 $ 14,837 $ 13,255
Tetra Tech/KCM,Inc. $ 2,985 $ - $ 365 $ 3,350 $ 3,935
Subtotal-Water Line Design $ 18,187 $ 17,190
221 -Storm Sewer Design
Herrera Env.Consultants $ 10,939 $ 96 $ 958 $ 11,993 $ 9,859
Tetra Tech/KCM, Inc.** $ 2,859 $ - $ 365 $ 3,224 $ 3,935
Budget adjustment for added catch basins*** $ 1,381
Subtotal- Storm Sewer Design $ 15,217 $ 15,175
Total Cost $ 33,404 $ 32,365
* Fixed fees per King Co. approved changes and Renton catch basin additions (see below)
** Includes one hour of Cranston's time in current billing period
*** Breakdown of budget adjustment for added catch basins agreed to with Allen Quynn
of Renton Storm Water Utility:
Sr.Engineer Engineer CAD
Hours 1 8 16
Labor Cost $ 126 $ 73 $ 34
Subtotals $ 126 $ 583 $ 547
Total Labor Cost $ 1,255
Professional Fee Q 10% $ 126
Total Budget Adjustment $ 1,381
Eastside Interceptor Section 1 Capacity Restoration Project
E83010E
Water and Storm Sewer Design and Construction Services
Summary of Estimated Costs
Tetra Tech/KCM, Inc.
Other Direct
Task Task Budget Fee Hours Costs
220 Water Line Design $3,934.81 $364.64 35 $531.50
221 Storm Sewer Design $3,934.81 $364.64 35 $531.50
220 Water Line Construction Assistance $1,771.54 $162.84 15 $251.75
321 Storm Sewer Construction Assistance $1,771.54 $162.84 15 $251.75
Firm Totals $11,412.70 $1,054.96 100 $1,566.50
Herrera Environmental Consultants
Other Direct
Task Task Budget Fee Hours Costs
220 Water Line Design $13,255.24 $1,123.40 166 $897.88
221 Storm Sewer Design $9,859.39 $832.14 122 $705.88
220 Water Line Construction Assistance $4,056.22 $350.48 46 $200.88
321 Storm Sewer Construction Assistance $4,056.22 $350.48 46 $200.88
Firm Totals $31,227.05 $2,656.50 380 $2,005.50
Totals $42,639.75 $3,711.46 480 $3,572.00