Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWP272960(3)
BID SUBMITTAL REVIEW Eastside Interceptor Section 1 Capacity Restoration Project Contract No.C03070C Bids Opened Aug.21,2001 Bidder(s): Engineer's Estimate rank Coluccio Const. lames W.Fowler Co. Stanley Contracting,Inc. Tri-State Const..,Inc. Robison Const.,Inc. Co. 1. Eastside Interceptor Bypass $ 4,540,710.0 $ 3,982,200.0 $ 4,830,980.0 $ 4,600,000.0 $ 5,580,377.0 $ 8,045,000.0 72-inch Trunk,Manholes and 2. Trench xcavatlon ety $ 30,000.00 $ 10,000.0 $ 450,000.0 $ 903,297.0 $ 600,000.0 $ 25,000.0 System 3. Renton Water Line $ 163,773.0, $ 308,000.0 $ 205,500.0 $ 345,526.0 $ 225,000.0 $ 280,000.0 Construction 4. Renton Storm Water Sewer $ 165,814.0 $ 140,800.0 $ 107,700.0 $ 244,935.0 $ 115,000.0 $ 200,000.0 Construction 5. Construct Renton Water Line $ 24,389.0 $ 440.00 $ 21,500.0 $ 32,623.0 $ 25,000.0 $ 17,000.0 Crossing Beneath Railroad 6. ALLOWANCE for Relocation $ 8,000.0 $ 8,000.0 $ 8,000.0 $ 8,000.0 $ 8,000.0 $ 8,000.0 of PSE Gas Line TOTAL BID PRICE ', $ 4,932,686.00 $ 4,449,440.00 $ 5,623,680.00 $ 6,134,381.00 $ 6,553,377.00 $ 8,575,000.00 Subcontractors List-Electrical Colvico,Inc. James W.Fowler Co. Udelhoven General,Inc. D.W.Close Ashford Electric (Section 0 10 14,1.11) Acknowledged No.Addendum ' Yes Yes Yes Yes Yes Issued (4 issued) WA Contractor's License/Federal Id No./WA Workers Comp No. Yes Yes Yes Yes Yes orm of Bid(Se c tonor Yes Yes Yes Yes Yes rm o i (Section 00300) Yes Yes Yes Yes Yes completed Bid Guaranty Bonding Company Safeco Insurance Co.of Fidelity and Deposit Co.of United States Fidelity and The American Insurance Lumbermen Mutual America M land Guaranty Co. Co. Casualty Co. Bid Guaranty @ 5% Yes Yes Yes Yes Yes Bid Guaranty signed/sealed/dated Yes Yes Yes Yes Yes Power of Attorney dated/covers Yes Yes Yes Yes Yes Bid Guaranty Bonding company on WA Commissioner ListingYes Yes Yes Yes Yes BID RESPONSIVE YES YES YES YES YES Crystal Graham,Contracts Specialist Aug.21,2001 Page I of I BID SUBMITTAL REVIEW Eastside Interceptor Section 1 Capacity Restoration Project Contract No.C03070C Bids Opened Aug.21,2001 Bidder(s): Engineer's Estimate Frank Coluccio Const. James W.Fowler Co. Stanley Contracting,Inc. Tri-State Const..,Inc. Robison Const.,Inc. 1. Eastside Interceptor Bypass $ 4,540,710.0 $ 3,982,200.0 $ 4,830,980.0 $ 4,600,000.0 $ 5,580,377.0 $ 8,045,000.0 72-inch Trunk,Manholes and Trench2. Excavation Safety $ 30,000.0 $ 10,000.0( $ 450,000.0 $ 903,297.0 $ 600,000.0 $ 25,000.0 System 3. Renton Water Line $ 163,773.0 $ 308,000.0 $ 205,500.0 $ 345,526.0 $ 225,000.0 $ 280,000.0 Construction 4. Renton Storm Water Sewer Construction $ 165,814.0 $ 140,800.0 $ 107,700.0 $ 244,935.0 $ 115,000.0 $ 200,000.0 5.C _ Construct Renton Water Line Crossing Beneath Railroad $ 24,389.0 $ 440.0 $ 21,500.0 $ 32,623.0 $ 25,000.0 $ 17,000.0 C 6. ALLOWANCE for Relocation $ g 000.0 $ 8,000.0 $ 8,000.0 $ 8,000.0 $ 8,000.0 $ 8,000.0 of PSE Gas Line TOTAL BID PRICE $ 4,932,686.00 $ 4,449,440.00 $ 5,623,680.00 $ 6,134,381.00 $ 6,553,377.00 S 8,575,000.00 Subcontractors List-Electrical (Section 0 10 14, 1.11) Colvico,Inc. James W.Fowler Co. Udelhoven General,Inc. D.W.Close Ashford Electric Acknowledged No.Addendum Yes Yes Yes Yes Yes Issued (4 issued) WA Contractor's License/Federal Id No./WA Workers Comprm o No. Yes Yes Yes Yes Yes o i ec ion Yes Yes Yes Yes Yes rm o (section 003003completed - -----— Yes Yes Yes Yes Yes Bid Guaranty Bonding Company Safeco Insurance Co.of Fidelity and Deposit Co.of United States Fidelity and The American Insurance Lumbermen Mutual America Maryland Guaranty Co. Co. Casualty Co. Bid Guaranty @ 5% '- Yes Yes Yes Yes Yes Bid Guaranty signed/sealed/dated Yes Yes Yes Yes Yes Power of Attorney dated/covers Yes Yes Yes Yes Yes Bid Guaranty Bonding company on WA Commissioner ListingYes Yes Yes Yes Yes BID RESPONSIVE YES YES YES YES YES Crystal Graham,Contracts Specialist Aug.21,2001