HomeMy WebLinkAboutSWP272938(4) DRAINAGE REPORT
Proposed Rousso Short Plat "A"
J
1500 Aberdeen Avenue N.E.
Renton, Washington
Prepared for:
Mark Rousso
64 Rainier Avenue South, Suite T"
Renton, WA 98055
March 13, 2001
Our Job No.7585
�RRY JAC0,0
coo
EXPIRES 107107��
GHA(j CIVIL ENGINEERING, LAND PLANNING,SURVEYING, ENVIRONMENTAL SERVICES
18215 72ND AVENUE SOUTH, KENT,WA 98032 • (425)251-6222 (425)251-8782 FAX
www.barghausen.com
sG y.
TABLE OF CONTENTS
1.0 INTRODUCTION/GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.0 TIR WORKSHEET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.0 VICINITY MAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
4.0 ANALYSIS OF THE FIVE CORE REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
J
5.0 ANALYSIS OF SPECIAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
6.0 SCS SOILS MAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
•
.p6t1
1.0 INTRODUCTION/GENERAL INFORMATION
1.0 INTRODUCTION/GENERAL INFORMATION
• The proposed project site, known as Rousso Short Plat "A," is located within the southeast quarter of
Section 5, Township 23 North, Range 5 East, Willamette Meridian, City of Renton, King County,
Washington. More particularly,the site is located at 1500 Aberdeen Avenue N.E.,Renton,Washington.
The site currently exists as an existing single-family residence located on a 0.39-acre lot, with an
associated pool in the backyard,concrete driveway, and several trees scattered through the backyard of
the lot. The proposal for this development is to construct a 3-lot short plat by adding two new lots to the
development behind the existing single-family residence located in the front portion of the lot. The
majority of the lot,from the approximate location of the existing house,slopes off toward the back of the
lot in an easterly direction at an approximate grade of 1 1/2 percent. The front yard of the lot slopes off
toward Aberdeen Avenue N.E. at a similar grade:,the existing trees on the lot are fir trees and, for the
most part, will be cut down for development of the short plat. The project site soils are classified as
Indianola,which is a Type"A"soil,meaning infiltration would be applicable if it was required from this
development.
•
• 7585.002[JPJ/bgl
•
j�
• 2.0 TIR WORKSHEET
King County Department of Development and Environmental Services
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
• Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION
Project Owner Mark Rousso Project Name
Address 64 Rainier Avenue South, Suite "F," Rousso Short Plat"A"
Renton, WA 98055 Location
Phone Township 23 North
Project Engineer Hal Grubb Range 5 East
Company Barghausen Consulting Engineers, S.E. 1/4 Section 5
Inc.
Address/Phone 18215-72nd Avenue South
Kent,Washington 98032/(425)251-6222
Part 3 TYPE OF PERMIT Part 4 OTHER REVIEWS AND PERMITS
APPLICATION
❑ Subdivision HPA ❑ DFW HPA ❑ Shoreline Management
❑ Short Subdivision ❑ COE 404 ❑ Rockery
❑ Grading ❑ DOE Dam Safety ❑ Structural Vaults
• ❑ Commercial ❑ FEMA Floodplain ❑ Other
❑ Other Short Plat ❑ COE Wetlands
Part 5 SITE COMMUNITY AND DRAINAGE BASIN
Community
City of Renton
Drainage Basin
Lake Washington
Part 6 SITE CHARACTERISTICS
❑ River ❑ Floodplain
❑ Stream ❑ Wetlands
❑ Critical Stream Reach ❑ Seeps/Springs
❑ Depressions/Swales ❑ High Groundwater Table
❑ Lake ❑ Groundwater Recharge
❑ Steep Slopes ❑ Other
•
7585.003 [JPJ/athj
Part 7 SOILS
Soil Type Slopes Erosion Potential Erosive Velocities
• Indianola 4 to 15 percent
D Additional Sheets Attached
Part 8 DEVELOPMENT LIMITATIONS
REFERENCE LIMITATION/SITE CONSTRAINT
D
❑Additional Sheets Attached
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
❑ Sedimentation Facilities ✓ Stabilize Exposed Surface
❑ Stabilized construction Entrance ✓ Remove and Restore Temporary ESC Facilities
• ✓ Perimeter Runoff control ✓ Clean and Remove all Silt and Debris
❑ Clearing and Grading Restrictions ❑ Ensure Operation of Permanent Facilities
✓ Cover Practices ❑ Flag Limits of SAO and open space preservation
✓ Construction Sequence areas
❑ Other ❑ Other
Part 10 SURFACE WATER SYSTEM
❑ Grass Lined ❑ Tank ❑ Infiltration Method of Analysis
Channel ❑ Vault ❑ Depression
Compensation/Mitigation
❑ Pipe System ❑ Energy Dissipater ✓ Flow Dispersal of Eliminated Site Storage
❑ Open Channel ❑ Wetland ❑ Waiver
❑ Dry Pond ❑ Stream ❑ Regional Detention
❑ Wet Pond
Brief Description of System-Operation
Facility Related Site Limitations
• Reference Facility Limitation
7585.003 IJPJ/athi
Part 11 STRUCTURAL ANALYSIS Part 12 EASEMENTS/TRACTS
❑ Cast in Place Vault ❑ Drainage Easement
• ❑ Retaining Wall ❑ Access Easement
❑ Rockery>4' High ❑ Native Growth Protection Easement
❑ Structural on Steep Slope ❑ Tract
❑ Other ❑ Other
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
1 or a civil engineer under by supervision have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attachments'./To the best of my knowledge the information
provided here is accurate.
�1,,& ?�-1 '12 c
Signed/Date
•
•
7585.003 PPJ/ath]
• 3.0 VICINITY MAP
3S ' Sf 1 t; ;2y1€ .MS` n a� •- vf:
390p � E 1 WK
AY
t yt�t
a .Fi t t
>< N1[ M L
ts
t �i wkr ��t r M +t2 S � �C,�A'b •k
12A � q
di � G Y C t •�. .t*�P i � ti .,y
H19ITr
��,p 'r �. tq`r.,d •r. H 1 Vt, J 'l,p a'
t f_
a,
n
[ N � fir•,
�$u
t;
Ste
r i.�. iQ` / 711 ♦ h r ..
•
4.0 ANALYSIS OF THE FIVE CORE REQUIREMENTS
4.0 ANALYSIS OF THE FIVE CORE REQUIREMENTS
• Core Requirement No. I-Discharge at the Natural Location: The discharge from the proposed project
site must occur at the natural location.
Response: This project site proposes no change in the discharge location of any on-site runoff generated
and released from the project site.
Core Requirement No. 2- Off-Site Analysis: All proposed projects must identify the upstream tributary
drainage area and perform a downstream analysis. Levels of analysis required depend upon the
problems identified orpredicted. At a minimum,a Level I Analysis must submitted with the initial permit
application. 1'
Response: The City of Renton has indicated that a Level 1 Downstream Analysis is not required for this
project.
Core Requirement No. 3 - Runoff Control: Proposed projects must provide runoff control to limit the
developed condition's peak rates of runoff to the pre-development peak rates for specific design storm
events based on the runoff from defined existing site conditions and install biofiltration measures.
7
Response: This project proposes to construct less en 5,�omet.
e feet of new impervious surface.
Therefore, the requirements for peak rate runoff contro In addition, the requirement for
providing stormwater quality treatment: If there is a 5,000 square feet of new impervious surface subject
to vehicular use or storage of chemicals will dictate whether a project is required to provide treatment
for water quality. Since this project is proposing much less than 5,000 square feet of new impervious
surface subject to vehicular traffic or storage of chemicals,water quality improvements are not required
for this development.
Core Requirement No. 4- Conveyance System: All conveyance systems for proposed projects must be
analyzed, designed, and constructed for existing tributary off-site runoff and developed on-site runoff
from the proposed project.
Response: As mentioned previously,the soil type is Indianola, as classified by the SCS Classification
System,which is highly permeable type soil. According to the 1998 King County, Washington Surface
Water Design Manual,for individual single-family residential lots that have not previously been covered
under an approved drainage plan with a lot area that is under 22,000 square feet, splash blocks may be
used in place of other downspout systems, provided that certain requirements are met. This project
proposes splash blocks as a means of downspout conveyance. It is likely that runoff from the downspouts
will infiltrate into the ground very readily.
Core Requirement No. 5- Temporary Erosion and Sedimentation Control. All projects that require
engineered drainage plans shall provide temporary erosion and sedimentation control measures that
minimize the transport of sediment to drainage facilities, water resources, and adjacent properties.
Response: A Temporary Erosion and Sedimentation Control Plan shall be provided with the final
construction drawings prepared for this project, meeting all the requirements of the 1998 King County,
Washington Surface Water Design Manual.
• 7585.002[JPJ/bg]
• 5.0 ANALYSIS OF SPECIAL REQUIREMENTS
5.0 ANALYSIS OF SPECIAL REQUIREMENTS
• Many of the special requirements delineated in the 1998 King County, Washington Surface Water Design
Manual are applicable to this project site, therefore,no analysis of these requirements are being made
at this time. This project site does not meet the threshold of any of those requirements.
• 7585,002[JPJ/bq]
•
f
• 6.0 SCS SOILS MAP
• f�S
{ G m 1v" - �G•tG Q �• f 'j( «A N ti
�two
LO
•
C .f W U-LU
a
/Z�i\:A,� ✓ .. ' I pUr E -r" { ` s 7" • 1ai' ~ �•� �1
s ^' EvC} -" S �--r .. ' •H19/l 4 — Q — , � ., r, r ,•
x: ca� ht . a, .• •::. n •
• ;
r. ,s ek`S! -. a '.� c.. •',�` V - ,t. .Q ,` �� • 4rf w . O
m .,, „, $ � ,:.; � ,. Sao ,�„o ac• �.: a , m ��� r,
,• a;,y+
F
IE-2 LANE '� --•� d•
r 7M1`'rI ♦ .� y
LANE-� 4 ,; ,,kty ,{4 • AY '11 ••• ^ N C
m • •V• • I rN� ,. r
A.
rcd a LN `� :, ,i}�#''•r r3*`A.r. �s'- e.. f c• .
caJAs.. ; ,( 9r �'.�+'Ar t���.,• wJ "�`, '�;r52' A M'r•�f'� ..
- s•o�ySr'` m
49
%�• m.• ^ $ 4 y 4 1} V ,fib .�h, `n,• to .... k 4
. KpY• r4 ' f '� ` ty,,1 '�, Y t Yi t
Lu
IS �
�. � (�rppy._ a tip.�'�� r.-•: � �a 3y � �'��_,� ��--�` S�y 4+�a'�t�... w f � O
fa hf� w i s tl^i '�(t i , eyy t MS.Y r G O 00
•i r
_
t r
yy 1, M•• Y
IFJ9 • * c , �� T.i ''%I :. Y -•._'. .. ,%rw¢.T.� "v E.�i'.ct .'!. 'Ce ~. i. 4'...z::
GUIDE TO MAPPING UNITS
For a full description of a mapping unit, read both the description of the mapping unit and that of the soil
series to which the mapping unit belongs. See table 6, page 70, for descriptions of woodland groups. Other
• information is given in .tables as follows:
Acreage and extent, table 1, page 9. Town and country planning, table 4, page 57.
Engineering uses of the soils, tables 2 and 3, Recreational uses, table 5, page 64.
pages 36 through 55. Estimated yields, table 7, page 79.
Woodland
Described Capability unit group
Map on
symbol Mapping unit page Symbol Page Symbol
AgB Alderwood gravelly sandy loam, 0 to 6 percent slopes---------- 10 IVe-2 76 3d2
AgC Alderwood gravelly sandy loam, 6 to 15 percent slopes--------- 8 IVe-2 76 3dl
AgD Alderwood gravelly sandy loam, 15 to 30 percent slopes.-------- 10 VIe-2 78 3dl
AkF Alderwood and Kitsap soils, very steep-------- t'------------- 10 VIIe-1 78 2d1
AmB Arents, Alderwood material, 0 to 6 percent slopes 1/---------- 10 IVe-2 76 3d2
AmC Arents, Alderwood material, 6 to 15 percent slopes 1/--------- 10 IVe-2 76 3d2
An Arents, Everett material 1/---------------------------------- 11 IVs-1 77 3f3
BeC Beausite gravelly sandy loam, 6 to 15 percent slopes---------- 11 IVe-2 76 3d2
BeD Beausite gravelly sandy loam, 15 to 30 percent slopes--------- 12 VIe-2 78 3dl
BeF Beausite gravelly sandy loam, 40 to 75 percent slopes--------- 12 VIIe-1 78 3dl
Bh Bellingham silt loam------------------------------------------ 12 IIIw-2 76 3w2
Br Briscot silt loam--------------------------------------------- 13 IIw-2 75 3wl
Bu Buckley silt loan--------------------------------------------- 13 IIIw-2 76 Owl
Cb Coastal beaches----------------------------------------------- 14 VIIIw-I 78 ---
Ea . Earlmont silt loam-------------------------------------------- 14 IIw-2 75 3w2
Ed Edgewick fine sandy loam-------------------------------------- 15 IIIw-1 75 2ol
EvB Everett gravelly sandy loam, 0 to 5 percent slopes------------ 15 IVs-I 77 3f3
EvC Everett gravelly sandy loam, 5 to 15 percent slopes----------- 16 VIs-1 78 3f3
EvD Everett gravelly sandy loam, 15 to 30 percent slopes---------- 16 VIe-1 77 3f2
EwC 'Everett-Alderwood gravelly sandy loams, 6 to 15 percent
slopes------------------------------------------------------ 16 VIs-1 78 3f3
• InA Indianola loamy fine sand, 0 to 4 percent slopes-------------- 17 IVs-2 77 4s3
_ InC Indianola loamy fine sand, 4 to 15 percent slopes---- ------ 16 IVs-2 77 4s3
InD Indianola Loamy fine sand, 15 to 30 percent slopes------------ 17 VIe-1 76 4s2
KpB Kitsap silt loam, 2 to 8 percent slopes----------------------- 17 IIIe-1 75 2d2
KpC Kitsap silt loam, 8 to 15 percent slopes---------------------- 18 IVe-1 76 �d2
KpD Kitsap silt loam, 15 to 30 percent slopes--------------------- 18 VIe-2 78 2d1
KsC Klaus gravelly loamy sand, 6 to 15 percent slopes------------- 18 VIs-1 78 3fl
Ma Mixed alluvial land------------------------------------------- 18 VIw-2 78 2ol
NeC Neilton very gravelly loamy sand, 2 to 15 percent slopes------ 19 VIs-1 78 3f3
Ng Newberg silt loam--------------------------------------------- 19 IIw-1 74 2ol
Nk Nooksack. silt loam--------------=----------------------------- 20 _ IIw-1 74 2ol
No Norma sandy loam---------------------------------------------- 20 IIIw-3 76 3w2
Or Orcas peat---------------------------------------------------- 21 VIIIw-1 78 ---
Os Oridia silt loam---------------------------------------------- 21 IIw-2 75 awl
OvC Ovall gravelly loam, 0 to 15 percent slopes------------------- 22 IVe-2 76 3d1
OvD Ovall gravelly loam, 15 to 25 percent slopes------------------ 23 VIe-2 78 3d1
OvF Ovall gravelly loam, 40 to 75 percent slopes------------------ 23 VIIe-I 78 3d1
Pc Pilchuck loamy fine sand-------------------------------------- 23 VIw-1 78 2sl
Pk Pilchuck fine sandy loam--------------------------------------. 23 IVw-1 76 2sl
Pu Puget silty clay loam----------------------------------------- 24 IIIw-2 76 3w2
Py Puyallup fine sandy loan------=------------------------------- 24 IIw-1 74 2ol
RaC Ragnar fine sandy, loam, 6 to 15 percent slopes---------------- 25 IVe-3 77 4sl
RaD Ragnar fine sandy loam, 15 to 25 percent slopes-------------=- 26 VIe-2 78- 4sl
RdC Ragnar-Indianola association sloping: 1 -------- 26 -------- --
Ragnar soil---------------------------------------------- -- IVe-3 77 4sl
Indianola soil------------------------------------------- -- IVs-2 77 4s3
RdE Ragnar-Indianola association, moderately steep: 1/------------ 26 -------- --
Ragnar soil--------------------------------------------- -- VIe-2 78 4sl
Indianola soil------------------------------------------- -- VIe-1 77 4s2
•
U.S. GOVERNMENT PRINTING OFFICE:1973 o-468-266
GUIDE To MAPPING UNITS--Continued
Woodland
Described Capability unit group
ap on
mbol
mbol Mapping unit page Symbol Page Sy
-------------------=- 26 IIIw-1 75 3wl
Re Renton silt loam----------------------- -----
27 VIIIw-1 78
-------
Rh Riverwash--------------------------------------- ------- 27 IIw-1 74 201
Sa Salal silt loam--------------------------------------
Sh Sammamish silt loam----------------------------------------- 27 IIw-2 75 3w1
28 IIw-3 75 ---
Sk Seattle muck------------------------------------------------ 29 IIw-3 75
Sm Shalcar muck------------------------------------------------
Sn Si silt loam------------------------------------------------ 29 IIw-1 74 3 w2
IIw-2 75 3 3w2
So Snohomish silt loam-----------------------------------------
Sr Snohomish silt loam, thick surface variant------------------ 31 IIw-2 75 3w2
Su Sultan silt loam---------------------- -------------- 31 IIw-1 74 3w1
---
Tu Tukwila muck-------------------------------------------------- 32 IIw-3 75
UrUiban land-------------------=----------------------/ ------ 33 -------- -- ---
Wo Woodinville silt loam-------------------------- ---------- 33 IIw-2 75 3w2
1/
The composition of these units is more variable than that of the others in the Area, but it has been
controlled well enough to interpret for the expected use of the soils.
• 4.0 RETENTION/DETENTION POND ANALYSIS AND DESIGN
4.0 RETENTION/DETENTION POND ANALYSIS AND DESIGN
• There are no detention or water quality facilities required for this project. Please see Section 3.1 of this
report for further details.
•
• 7585.005[DED/bq/kn]
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
• 5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
There are no conveyance systems required for this project. Therefore, this section does not apply.
•
• 7585.005[DED/bq/knl
6.0 SPECIAL REPORTS AND STUDIES
• 6.0 SPECIAL REPORTS AND STUDIES
No special reports or studies have been required for this project.
i
• 7585.005[DED/bq/knl
7.0 BASIN AND COMMUNITY PLAN AREAS