Loading...
HomeMy WebLinkAboutSWP272899(18) CITY OF RENTON Mayor Jesse Tanner CEDAR RIVER FLOODPLAIN MAPPING PROJECT UPDATE -- NEIGHBORHOOD MEETING SUMMARY Dear Resident: The City of Renton held a public meeting on December 13,2000,to present preliminary results related to the Cedar River Floodplain Mapping Project. Meeting notices were sent to residents on November 29, 2000. In case you were not able to attend the meeting,a summary of the main points is listed below. • The City installed a 600-ft long temporary flood control structure on December 7 and 8, 2000, at the Maplewood Golf Course along the Cedar River. The temporary structure is intended to decrease the possibility of flooding within the Maplewood Neighborhood if Cedar River flows increase above 9,000 cubic feet per second. • If a resident is interested in purchasing flood insurance,the National Flood Insurance Program(NFIP) suggests that you first call your insurance agent. If your agent does not write flood insurance or you don't have an agent,the NFIP suggests that you call 1-888- CALL FLOOD,ext.445 to obtain the names of agents in your area who provide flood insurance. There may be a 30-day waiting period before the policy is activated. • The City developed an Emergency Response Plan that will be implemented in case of a flooding emergency on the Cedar River. The plan is summarized on the back side of this page. • The City is planning to develop preliminary engineering and architectural designs for a permanent solution(i.e. construction of an earthen levee or concrete floodwall along the river)to the recently identified flooding hazard. At this time,construction of a permanent structure is anticipated to occur in late 2001. The exact date of construction will depend on the timing of project permit approvals. If you have any questions related to this project,please call Gary Schimek, Surface Water Utility Project Manager, at 425-430-7205,or Ron Straka, Surface Water Utility Supervisor, at 425-430-7248. Si ely, esse Tanner Mayor 00-138/GZ:mp Cc: Jay Covington,Chief Administrative Officer Gregg Zimmerman,Planning/Building/Public Works Administrator Chief Lee Wheeler,Fire Department Mike Webby,Human Resources&Risk Management Administrator Lys Hornsby,Utility systems Director 1055 South Grady Way - Renton, Washington 98055 - (425)430-6500 / FAX(425)430-6523 9 This paper contains 50%recycled material,20%post consumer EMERGENGY RESPONSE PLAN AND INFORMATION FOR CEDAR RIVER FLOODING IN MAPLEWOOD NEIGHBORHOOD EMERGENCY RESPONSE PLAN ' City of Renton Emergency Operation Center(EOC) is activated when a Phase 4 Flood Warning is issued by the King County Flood Warning Center for the Cedar River. Surface Water Utility monitors Cedar River flow conditions prior to and after EOC is activated. ' Renton Police Department will broadcast an evacuation warning within the Maplewood Neighborhood after the EOC is activated, if Cedar River flow conditions warrant. ' Renton Police Department will broadcast an evacuation notice within the Maplewood Neighborhood,if Cedar River flows are expected to increase above 9,000 cfs. EMERGENCY FLOOD INFORMATION Renton Emergency Operation Center 430-7111 (when activated) ----------------------------------------------------------------------------------------------------------------- King County Recorded Flood Information 1-800-945-9263 ------------------------------------------------------------------------------------------------------------------ King County Flood Warning Center 1-800-768-7932 ----------------------------------------------------------------------------------------------------------------- Renton Surface Water Utility Staff 430-7248 (Ron Straka, Surface Water Utility Supervisor) 430-7205 (Gary Schimek, Surface Water Utility Project Manager) ----------------------------------------------------------------------------------------------------------------- USGS Web Site http://wa.water.usgs.gov/rt-egi/gen_tbl_pg CITY OF RENTON Maplewood Golf Course Regrade Project SWP-27-2899 CALL FOR BIDS Sealed bids will be received until 11:00 a.m. September 11, 2001 at the City Clerk's office and will be opened and publicly read in the 5th floor conference room 511, Renton City Hall, 1055 S. Grady Way. The work to be performed within 25 working days from the date of commencement under this contract shall include, but not be limited to: Regrading of approximately 750 linear feet of rough and fairway on City Golf Course,placement of approximately 4,500 cubic yards of free-draining structural fill, 6,200 square yards of sod, 150 tons of asphalt, 750 linear feet of silt fence and cleanup and restoration. The estimated project cost is $125,000 to $155,000. No bids will be accepted after the time and date shown above. The City reserves the right to reject any and/or all bids and to waive any and/or all informalities. A certified check or bid bond in the amount of five percent (5%) of the total amount of each bid must accompany each bid. A 100% performance bond will be required of the successful bidders. Approved plans, specifications, and contract forms may be obtained from the City of Renton Planning/Building/Public Works Department at the sixth floor Customer Service Counter in the Renton City Hall, 1055 S. Grady Way, for a non-refundable fee of $30.46 ($28.00 plus $2.46 sales tax) each set. If ordered by mail add $5.00 to cover postage, also non-refundable. Questions regarding the call for bids or plan holders lists should be directed to the Public Works Customer Service Counter at City Hall, or (425) 430-7266. If a bidder has questions regarding the project please contact the Project Manager, Gary BSc i ek, at (425) 430-7205. Marilyn et rs , City Clerk Published: Daily Journal of Commerce August 28, 2001 September 4, 2001 Bid opening � Maplewood � Golf Course Regrade Tuesday, September I I th 11 : 00 — 12 : 00 5th Floor Conference Room 511