Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWP272899(2)
Award Date: 9//-7 If ZoC) t CAG — d/ — / S7 Awarded To: 7�d o -k- spt< City of Renton Bidding Requirements, Forms, Contract Forms, Conditions of the Contract, Plans and Specifications ' City of Renton MAPLEWOOD GOLD, COURSE REGRADE PROJECT PROJECT NO. SWP-27-2899 City of Renton Q 1 1055 S Grady Way +�` y Renton, WA 98055 cm Surface Water Contact: Gary Schimek (425)430-7205 Mtorney r ® Punted on Recycled Paper Icy -39L -81e9 ' S.Kv& 97S- 430 - 10806 7"oM i 1 1 1 1 1 1 1 1 0 C�1RACr0 s 1 . D N 1 G) TRANSFER INC. Qv �CgTE SVe 1 1 September 11, 2001 1 Corporate Resolution 1 All persons whose signatures appear below have voted to PP accept the appointment as described. It is agreed and accepted by the Board of Directors of City Transfer, Inc. that the appointment of 1 Jeff G. Anderson as Secretary and Keith R. Benson as President is effective as of the date shown above. Keith R. Benson and Jeff G. Anderson have the authority to sign all bidding documents and corporate checks. Dat 1 Je on Se 1 1 ate 1 Keith R. Benson President 1 1 Dated this__LL:��day of 2001 at: 1 Subscribed and sworn before me this day and year first above written. By P�NSSIONM�����1 1 Notary Public for % ;p NOTA1,�, :U cn: PUBLIC ��I��• 7.19 131% \\\ WASN _— 2720 E. Valley Hwy. East • Sumner, WA 98390 \�'V'11- 1 P.O. Box 1048 • Kent, WA 98035 • Seattle (253) 850-1775 • Tacoma (253) 863-4556 • Fax (253) 850-1797 .1RACT O� O CIO 0 Sub and Supplier Information G) cc Submission Date: September 27, 2001 c arr TRANSFER INC. QV Cq TE SUQ ' Maplewood Golf Course Regrade Project Project #: SWP-27-2899 ' The following is the contact information for City Transfer and our subcontractors on this project. ' City Transfer, Inc Physical Address: Mailing Address: 2720 East Valley Hwy E. P.O. Box 1850 ' Sumner, WA 98390 Sumner, WA 98390 Fax: (253) 850-1797 ' Keith Benson—President (253) 850-1775 Stan McAllister—Project Superintendent (206) 396-8189 (Cell) (253) 926-2231 (Home/Emergency) ' Subcontractors Sod: J.B. Instant Lawn ' 14020 Northeast 124th St. Redmond, WA 98052 Contact: Joe Moorad ' (800) 599-2699 (425) 821-0444 Fax: (425) 821-0613 ' Surveying: Baseline Engineering, Inc. ' 1910 - 64th Ave. West Tacoma, WA 98466 Contact: Andy Somera ' Tacoma: (253) 565-4491 Seattle: (206) 824-1205 Fax: (253) 565-8563 ' Asphalt Concrete Pavement Mat. Northwest Asphalt, Inc. ' P.O. Box 1647 Renton, WA 98057-1647 Contact: Josh Gill (425) 254-1820 Fax (425) 254-1821 ' 2720 E. Valley Hwy. Ealt • Sumner, WA 98390 P.O. Box 1048 • Kent, WA 98035 • Seattle (253) 850-1775 • Tacoma (253) 863-4556 • Fax (253) 850-1797 Suppliers ' Stormwater pipe US Filter USF- Puyallup WA t Branch—302 602 Valley Ave NE Puyallup, WA 98372 (253) 840-5505 Fax (253) 840-1141 ' Bonding Agent USI Northwest 20415 - 72°d Ave. South, Suite 300 ' Kent, WA 98032 Contact: Holly Ulfers ' (206) 695-3106 1 ' 2 DEPARTMENT OF LABOR AND INDUSTRIES 1 ' I REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGIST. ## EXP. DATE CC01 CITYTK*324C6 06/04/2002 EFFECTIVE DATE 02/26/1968 CITY TRANSFER OF KENT INC PO BOX 1048 i KENT WA 98035 F625-052-000(8/97) 77 t t I?INTO N V 1 NA N Cf," ' �, V]o o I � Na It I,- J O i .v .......... SAR miff) aft ' I i i+ 1. Ja 5 1 3,6-9 ........... W I QUARTER ENDING JUN 30 , 2001 AUG 2001, CITY TRANSFER INC P () B OX -1-04-8- f5-O -Kzgw WA .4Q43.5 fpyyo AM) (.`OJWf-t/LjL, A k'J. '!!ION AS ................... ................ ............ .......... AO Pwsw' 2*720 E VALLEY HWY E -------- SUMNER WA 99390 206-850-1775 Within Ronton C,'ity Limits: 2. ft)j'qjjart(;r: .............. ......... ...... 3. fbte pe'r holn '29 .......... .................... ........... ........... RONALD G tENSON 2331.0 1-56TH SE 4. FT:J KENT WA 98042 5 Minimum charge: SY, ........... 1 1 5 0. Greater of Line's 4 al Idt..............1-1-................-.1-1-................. ........................ ' t t ra,ukt P4,mvuvt ,pholt q: 7. P(malty (Geo i'11M ANT)ERSON 206-804-0721., ....... ----------------- I)AVE DEBOLT 206-833-8064 8. V'rnvioi)�; ' ;�. "l'C's'i/�t. I'�'l_i "(Lirt59r;g _ tt): / �i �� �... 1.)(,Jejj)jjt',j(j Will-,Chic; . .............. ................ ........... r(poll. 111111()Will 1-)e '101 173005384 CITYTK*324C6 vonkspk+,"�rN-1 Oovoa, with CON of Renton ! icn , 'S (41"'xly wy . ......... + P! )T,P't" !(1.t! IU3s. :.I+ it 1+' U !.+.,�t+ 4r.; '%F'.I,a r.+atu.4 :t>•�>i6�+h?'i4�', tt. ' .,_..._.....,.__......K:ra::::n- s.. .._F. Penton WA 98OVi rpj!tjj.)q (425)430--C)8li'l Amount ............................................. ............ ............... ............ ............................ ........................ ..........11.1......................' _ ................. .................. D ate .......... ......... How. ........... ................. .......... ........ bj,wt octions mi 1 CITY OF RENTON ' RENTON, WASHINGTON 1 CONTRACT DOCUMENTS ' for the ' MAPLEWOOD GOLF COURSE REGRADE PROJECT ' PROJECT NO. SWP-27-2899 August 2001 ' BIDDING REQUIREMENTS CONTRACT FORMS CONDITIONS OF THE CONTRACT ' SPECIFICATIONS PLANS r -Z ; t CITY OF RENTON SURFACE WATER UTILITY ' 1055 S Grady Way Renton, WA 98055 ® Printed on Recycled Paper CITY OF RENTON ' Project Maplewood Golf Course Re grade Proj P g ' SWP-27-2899 CONTRACT DOCUMENT TABLE OF CONTENTS ' Summary of Fair Practices Policy Summary of Americans with Disability Act Policy ' Scope of Work Vicinity Map Instructions to Bidders ' Call for Bids *Combined Affidavit & Certificate Form: Non-Collusion ' Anti-Trust Claims Minimum Wage Form *Bid Bond Form ' *Proposal *Schedule of Prices vBond to the City of Renton ' vFair Practices Policy Affidavit of Compliance vContract Agreement (Contracts other than Federal - Aid FHWA) vCity of Renton Insurance Information Form ' vCity of Renton Standard Endorsement Form Prevailing Minimum Hourly Wage Rates (New job classifications) Statement of Intent to Pay Prevailing Wages ' Affidavit of Prevailing Wages Paid Certificate of Payment of Prevailing Wages Environmental Regulations Listing ' City of Renton Supplemental Specifications Special Provisions City Survey Control Information and Monuments ' Construction Plans Documents marked as follows must be submitted at the time noted and must be executed by the ' Contractor, President and Vice President or Secretary if corporation by-laws permit. All pages must be signed. In the event another person has been duly authorized to execute contracts, a copy of the corporation minutes establishing this authority must be attached to the bid document. * Submit with Bid v Submit after Notice of Award CITY OF RENTON ' Planning/Building/Public Works Department 1055 S. Grady Way Renton, Washington 98055 1 H: Div\UtR Docs\2001-468/DWC CITY OF RENTON ' SUMMARY OF FAIR PRACTICES POLICY ADOPTED BY RESOLUTION NO. 3 2 2 9 It is the policy of the City of Renton to promote and provide equal treatment and service to all citizens ' and to ensure equal employment opportunity to all persons without regard to race, color, national origin, ethnic background, gender, marital status, religion, age or disability, when the City of Renton can reasonably accommodate the disability, of employees and applicants for employment and fair, non- discriminatory treatment to all citizens. All departments of the City of Renton shall adhere to the following guidelines: (1) EMPLOYMENT PRACTICES - The City of Renton will ensure all employment related ' activities included recruitment, selection, promotion, demotion, training, retention and separation are conducted in a manner which is based on job-related criteria which does ' not discriminate against women, minorities and other protected classes. Human resources decisions will be in accordance with individual performance, staffing requirements, governing civil service rules, and labor contract agreements. ' (2) COOPERATION WITH HUMAN RIGHTS ORGANIZATIONS - The City of Renton will cooperate fully with all organizations and commissions organized to promote fair practices and equal opportunity in employment. ' (3) AFFIRMATIVE ACTION PLAN - The City of Renton Affirmative Action Plan and Equal Employment Program will be maintained and administered to facilitate equitable representation with the City work force and to assure equal employment opportunity to ' all. It shall be the responsibility of elected officials, the Mayor, the Affirmative Action Officer, department administrators, managers, supervisors, Contract Compliance Officers and all employees to carry out the policies, guidelines and corrective measures set forth ' in the Affirmative Action Plan and Equal Employment Program. (4) CONTRACTORS' OBLIGATIONS - Contractors, sub-contractors, consultants and ' suppliers conducting business with the City of Renton shall affirm and subscribe to the Fair Practices and Non-discrimination policies set forth by the law and in the City's Affirmative Action Plan and Equal Employment Program. ' Copies of this policy shall be distributed to all City employees, shall appear in all operational documentation of the City, including bid calls, and shall be prominently displayed in appropriate city facilities. ' CONCURRED IN by the City Council of the City of RENTON,Washington,this 7thday of October, 1996. ' CITY OF RENTON: RENTON CITY COUNCIL: ' ayor Council President Attest: 1 ` City Cl CITY OF RENTON ' SUMMARY OFAMERICANS WTIH DISAB=IESACT POLICY ADOPTED BY RESOLUTIONNO. 3007 ' The policy of the City of Renton is to promote and afford equal treatment and service to all-citizens and to assure employment opportunity to persons with disabilities, when the City of Renton can reasonably accommodate the disability. This policy shall be based on the. principles of equal employment opportunity, the Americans With ' Disabilities Act and other applicable guidelines as set forth in federal, state and local laws. All departments of the City of Renton shall adhere to the following guidelines: ' (1) EMPLOYMENT PRACTICES - All activities relating to employment such as recruitment, selection, promotion, termination and training shall be conducted in a non- discriminatory manner. Personnel decisions wi71 be based on individual perfon-nance, ' staffing requirements, and in accordance with the Americans With Disabilities Act and other applicable laws and regulations. (2) COOPERATION- WITH HUMAN RIGHTS ORGANIZATIONS - The City of ' Renton will cooperate fully with all organizations and commissions organized to promote fair practices and equal opportunity for persons with disabilities in ' employment and receipt.of City services,activities and programs. (3) AMERICANS WITH DISABILITIES ACT-POLICY-Tfie.City of Renton Americans ' With Disabilities Act Policy wi11-be maintained to facilitate equitable representation within the City work force and to assure equal employment opportunity and equal access to City services, activities and programs to all people with disabilities. It shall ' be the responsibility and the-duty of all City officials and employees to carry out the policies and guidelines as set forth in this policy (4) CONTRACTORS' OBLIGATION = Contractors, subcontractors, consultants and ' suppliers conducting business with the City of Renton shall abide by the requirements of the Americans With Disabilities Act and promote access to services, activities and programs for people with disabilities. ' Copies of this policy shall be distributed to all C'yemployees, shall appear in all operational documentation of the City, including bid calls, and shall be prominently displayed in appropriate City facilities. ' CONCURRED IN by the City Council o the City Renton Washington, I ry ol ton g ' this 4th day of October 1993. CITY RENTON RENTON CITY COUNCIL. Mayor Council President ' Attest: City Clerk UU 1 1 CITY OF RENTON SWP-27-2899 ' Maplewood Golf Course Regrade Project SCOPE OF WORK ' The work involved under the terms of this contract document shall be full and complete installation of the Maplewood Golf Course Regrade Project, as shown on the plans and as described in the construction ' specifications, to include but not be limited to the following: • Regrading of approximately 750 linear feet(30 yards wide) of rough and fairway area, ' • Placement of approximately 4,500 cubic yards of free-draining structural fill, • Placement of approximately 6,200 square yards of sod, ' • Placement of approximately 150 tons of aspha lt, 0 Placement of approximately 7501inear feet of silt fence, • and cleanup and restoration. The estimated project cost is $135,000 to $155,000. ' The contract will be executed upon contracting agency receiving all required local, state and federal permits. IA total of 25 working days is allowed for completion of the project. Any contractor connected with this project shall comply with all Federal, State, County, and City codes and ' regulations applicable to such work and perform the work in accordance with the plans and specifications of this contract document. t ------------ - -- .......... ........... ------------ �hJi Ir rn a� N}w4 J I i� v I• ` _______ ___ _ _ _ _ _ ----------------- ------------ ------------- S J 1 1 Q � r=nA •:�•J I� Kam, i { Y KMH. � ra•n 3 jot St MA `✓ t jj - N/ r ,.7 N sw H. K I � • Kary L _ _ 7 11 yew w �' o'ect Area - iyr» --.J pe N �9• / Y NOw A t} A III' IIRIY 8 'O S}!w St S 1• S�l� �`TO s n. S S �i68t St <' �1 VICINITY MAP City of Renton G 1'=3000' 3000 Surface Water Utility Maplewood Golf Course Regrade Project ' Pv FEET LEGEND: ———— City Limits ' INSTRUCTIONS TO BIDDERS Sealed bids for this proposal will be received by the City of Renton at the office of the Renton City Clerk, Renton City Hall, up to the time and date specified in the Call for Bids. ' At this time the bids will be publicly opened and read, after which the bids will be considered and the award made as early as practicable. ' No proposal may be changed or withdrawn after the time set for receiving bids. Proposals shall be submitted on the forms attached hereto. The contract will be executed upon contracting agency receiving all required local, state and federal permits. 3. The work to be done is shown in the plans and/or specifications. Quantities are understood to be only approximate. Final payment will be based on field measurement of actual quantities and at the unit price bid. The City reserves ' the right to add or to eliminate portions of that work as deemed necessary. 4. Plans may be examined and copies obtained at the Public Works Department Office. Bidders shall satisfy themselves as to the local conditions by inspection of the site. 5. The bid price for any item must include the performance of all work necessary for completion of that item as ' described in the specifications. 6. The bid price shall be stated in terms of the units indicated and as to a total amount. In the event of errors, the unit ' price bid will govern. Illegible figures will invalidate the bid. I. The right is reserved to reject any and/or all bids and to waive informalities if it is deemed advantageous to the City ' to do so. d. A certified check or satisfactory bid bond made payable without reservation to the Director of Finance of the City of ' Renton in an amount not less than 5% of the total amount of the bid shall accompany each bid proposal. Checks will be returned to unsuccessful bidders immediately following the decision as to award of contract. The check of the successful bidder will be returned provided they enter into a contract and furnishes a satisfactory performance bond covering the full amount of the work within ten days after receipt of notice of intention to award contract. Should ' they fail, or refuse to do so, the check shall be forfeited to the City of Renton as liquidated damage for such failure. 9. All bids must be self-explanatory. No opportunity will be offered for oral explanation except as the City may ' request further information on particular points. 10. The bidder shall, upon request, furnish information to the City as to his financial and practical ability to satisfactorily perform the work. 11. Payment for this work will be made in Cash Warrants. 112. The contractor shall obtain such construction insurance (e.g. fire and extended coverage, worker's compensation, public liability, and property damage as indicated on forms enclosed herein and/or as identified within Specification ' Section 1-07.18. t3. The contractor, prior to the start of construction, shall provide the City of Renton a detailed bar chart type construction schedule for the project. .4. Payment retainage shall be done in accordance with Section 1-09.0(2) Retainage and Section" 1-09.9(3) "Contracting Agency's Right to Withhold and Disburse Certain Amounts" located in City of Renton Supplemental Specifications. 1 ' L 5. The construction contract will be awarded by the City of Renton to the lowest, responsible, resp onsive ponsrve bidder. '6. Trench Excavation Safety Systems As required by RCW 39.04.180, on public works projects in which trench excavation will exceed a depth of four ' feet, any contract therefor shall require adequate safety systems for the trench excavation that meet the requirements of the Washington Industrial Safety and Health Act, Chapter 49.17 RCW. These requirements shall be included in the Bid Schedule as a separate item. The costs of trench safety systems shall not be considered as incidental to any ' other contract item and any attempt to include the trench safety systems as an incidental cost is prohibited. 17. Payment of Prevailing Wages In accordance with Revised Code of Washington Chapters 39.12 and 49.28 as amended or supplemented herein, there shall be paid to all laborers, workmen or mechanics employed on this contract the prevailing rate of wage for ' an hour's work in the same trade or occupation in the area of work regardless of any contractual relationship which may exist, or be alleged to exist, between the CONTRACTOR and any laborers, workmen, mechanics or subconsultants. ' The most recent issue of the prevailing wage rate are included within these specifications under section titled "Prevailing Minimum Hourly Wage Rates". The CONTRACTOR is responsible for obtaining updated issues of the prevailing wage rate forms as they become available during the duration of the contract. The wage rates shall be ' included as part of any subcontracts the CONTRACTOR may enter into for work on this project. 18. Employment of Resident Employees The CONTRACTOR and subcontractors shall employ Washington State residents in accordance with the requirements of RCW 39.16. ' 9. Pollution Control Requirements ' Work under this contract shall meet all local, state and federal requirements for the prevention of environmental pollution and the preservation of public natural resources. The CONTRACTOR shall conduct the work in accordance with all applicable pollution control laws. The CONTRACTOR shall comply with and be liable for all penalties, damages, and violations under Chapter 90.48 RCW, in performance of the work. The CONTRACTOR ' shall also comply with Article 4 in the Puget Sound Air Pollution Control Agency Regulation III regarding removal and encapsulation of asbestos materials. 0. Standard Specifications All work under this contract shall be performed in accordance with the following standard specifications except as ' may be exempted or modified by the City of Renton Transportation Supplemental Specifications, Special Provisions other sections of these contract documents. These standard specifications are hereby made a part of this contract and shall control and guide all activities within this project whether referred to directly, paragraph by paragraph, or not. ' 1. WSDOT/APWA "1996 Standard Specifications for Road, Bridge and Municipal Construction" and "Division I APWA Supplement" hereinafter referred to by the abbreviated title "Standard Specifications." ' A. Any reference to "State," "State of Washington," "Department of Transportation," "WSDOT," or any combination thereof in the WSDOT/APWA standards shall be modified to read "City of Renton," unless specifically referring to a standard specification or test method. B. All references to measurement and payment in the WSDOT/APWA standards shall be detected and the ' measurement and payment provisions of Section 1-09.14, Measurement and Payment(added herein) shall govern. ?1. A soils investigation has not been performed for this project by a consultant engineer. The Bidders shall familiarize themselves adequately with the project site and existing subsurface condition as needed to submit their bid. Upon ' approval of the City, the Bidder may make such subsurface explorations and investigations as they see fit. The Bidder shall be responsible for protection of all existing facilities, utilities and other buried or surface improvements and shall restore the site to the satisfaction of the Citv. 1 771 CITY OF RENTON ' Maplewood Golf Course Regrade Project ' SWP 27 2$99 CALL FOR BIDS ' Sealed bids will be received until 11:00 a.m. September 11, 2001 at the City Clerk's office and will be opened and publicly read in the 5th floor conference room 511, Renton City Hall, ' 1055 S. Grady Way. The work to be performed within 25 working days from the date of commencement under this contract shall include, but not be limited to: ' Regrading of approximately 750 linear.feet of rough and fairway on City Golf Course,placement of approximately 4,500 cubic yards of free-draining structural fill, ' 6,200 square yards of sod, 150 tons of asphalt, 750 linear feet of silt fence and cleanup and restoration. ' The estimated project cost is $125,000 to $155,000. No bids will be accepted after the time and date shown above. ' The City reserves the right to reject any and/or all bids and to waive any and/or all informalities. A certified check or bid bond in the amount of five percent (5%) of the total amount of each bid must accompany each bid. A 100% performance bond will be required of the successful bidders. ' Approved plans, specifications, and contract forms may be obtained from the City of Renton Y tY Planning/Building/Public Works Department at the sixth floor Customer Service Counter in the ' Renton City Hall, 1055 S. Grady Way, for a non-refundable fee of $30.46 ($28.00 plus $2.46 sales tax) each set. If ordered by mail add $5.00 to cover postage, also non-refundable. Questions regarding the call for bids or plan holders lists should be directed to the Public Works Customer Service Counter at City Hall, or (425) 430-7266. If a bidder has questions regarding the project please contact the Project Manager, Gary Scfiii�ek, at (425) 430-7205. Marilyn et rs,pri, City Clerk ' Published: Daily Journal of Commerce August 28, 2001 September 4, 2001 ' CITY OF RENTON Combined Affidavit and Certification form: ' Non-Collusion,Anti-Trust, and Minimum Wage (Non-Federal Aid) NON-COLLUSION AFFIDAVIT ' Being duly sworn, deposes and says, that he is the identical person who submitted the foregoing proposal or bid, and that such bid is genuine and not sham or collusive or made in the interest or on behalf of any person not therein named, and further, that the deponent has not directly induced or solicited any other Bidder on the foregoing work or equipment to put in a sham bid, or any other person or corporation to refrain from bidding, and that deponent has not in any manner sought by collusion to secure to himself or to any other person any advantage over other Bidder or Bidders. AND ' CERTIFICATION RE: ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER ' Vendor and purchaser recognize that in actual economic practice overcharges resulting from anti-trust violations are in fact usually borne by the purchaser. Therefor, vendor hereby assigns to purchaser any and all claims for such over-charges as to goods and materials purchased in connection with this order or contract, except as to overcharges resulting from anti- trust violations commencing after the date of the bid, quotation, or other event establishing the price under this order or ' contract. In addition, vendor warrants and represents that such of his suppliers and subcontractors shall assign any and all such claims to purchaser, subject to the aforementioned exception. AND ' MINIMUM WAGE AFFIDAVIT FORM I, the undersigned, having been duly sworn, deposed, say and certify that in connection with the performance of the work ' of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of such work; not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the principal contract: that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. ' FOR: NON COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM WAGE AFFIDAVIT Maplewood Golf Course Regrade Project ' Name of Project ' f Bidder's Firm ' Signatu of Authorized Representative of Bidder Subscribed and sworn to before me on this day of 200./ Xgs►oNF+A ����t, No ry Public in alo for the State of Washington ' :o N Rye � OTA Notary Print Cn PUBLIC ; My appointment expires: J / 9 -Cr 9- � �WASM* ' BID BOND FORM Herewith find deposit in the form of a certified check, cashier's check, cash, or bid bond in the amount of $ 5% of Total Bid Amountwhich amount is not less than five percent of the City Transfer of Kent, Inc. ' total bid. Sign here 1 Know All Men by These Presents: That we, City Transfer of Kent, Inc. as Principal, and ' Liberty Mutual Insurance Company as Surety, are held and firmly bound unto the City of Renton, as Obligee, in the penal sum of Five Percent (5%) of the Total Amount Bid--- Dollars, for the payment of which the Principal end the Surety bind themselves, their heirs, ' executors, administrators, successors and assigns, jointly and severally, by these presents. ' The conditi% f this d ci Il gpti ourrsesu hradet Pf the ec Obligee shall make any award to the Principal for pBidoNo. SWP 27-2899 g according to the terms of the proposal ' or bid made by the Principal therefor, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the ' Obligee-, or if the Principal shall, in case of failure to do so, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation shall be null and 1 void; otherwise it shall be and remain in full force and effect and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the amount of this bond. ' SIGNED, SEALED AND DATED THIS loth DAY OF September , 2091 Cit GT f nc. By: 2 Principal Liberty Mutual Insurance Company \J�, uzp—,�� ' S u rety Holly E. Ulfers , Attorney-in-Fact ' Received return of deposit in the sum of $ THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 786488 This Power of Attorney limits the act of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON, MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts mutual insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint, MARY A. DOBBS, STEVEN W. PALMER, GERALDINE C. STEWART, HOLLY E. ULFERS, DAVID J. FORSYTH, ALL OF THE CITY OF KENT, STATE OF WASHINGTON............................................................... ................................................................................... ......... ................................ ........................................................... , each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding ONE HUNDRED MI ION AND W1100 DOLLARS ($100,000,000.00 ) each, and the execution of such bonds or undertakings, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by t the secretary of the Company in their own proper persons. z t a That this power is made and executed pursuant to and by authority of the following By-law and Authorization: t It to t ARTICLE XVI-Execution of Contracts:Section 5.Surety Bonds and Undertakings. i Y Any officer or other official of the company authorized for that purpose in writing by the chairman or the president, and subject to such i C 4) limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety t obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the company by their signature and execution of any such instruments and to attach thereto the seal of the company. When so executed such — t tm instruments shall be as binding as if signed by the president and attested by the secretary. t U UU V w By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact: y u O— C y > Pursuant to Article XVI, Section 5 of the By-laws, Assistant Secretary Garnet W. Elliott is hereby authorized to appoint such attorneys-in-fact O` { ip as may be necessary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and c all undertakings, O bonds, recognizances and other surety obligations. Q c � w O� O That the By-law and the Authorization above set forth are true copies thereof and are now in full force and effect. 0 t IN WITNESS WHEREOF, this instrument has been subscribed by its authorized officer and the corporate seal of the said Liberty Mutual Lns rance 3 t O a0i Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 4th day of April 2001 O 1 c at L LIBERTY MUTUAL INSURANCE COMPANY C Ct v� / r ��� lJ 4- C7-aasa� Gv. 0 c � ` oc �O By < it Garnet W.Elliott,Assistant Secretary t O._ v�4; COMMONWEALTH OF PENNSYLVANIA ss t O M COUNTY OF MONTGOMERY >S d c On this 4th day of April A.D. 2001 , before me, a Notary Public, personally came the individual, known to o > y me to be the therein desc yidual and officer of Liberty Mutual Insurance Company who executed the preceding instrument, and he acknowled c v>` ged that he executed 2sarfie am the seal affixed to the said preceding instrument is the corporate seal of said company;and that said corporate C c seal and his signatulbef ,was duly affixed and subscribed to the said instrument by authority and direction of the said company. O IN TESTIMOO REOF I h$e t set my hand and affix my official seat at Plymou Meeting, P ,th'e/day and year first above written. C u OF � �4�d��/ Notary Public n SYL`I �, CERTIFtEATE I, the undersigned tait3 retary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full,true and c fYect copy, is in full force and effect on the date of this certificate;and I do further certify that the officer who executed the said power of attorney was one of the officers specially authorized by the chairman or the resident to a XVI,Section 5 of the By-laws of Liberty Mutual Insurance Company. p appoint any attorney-in-fact as provided in Article This certificate may be signed by facsimile under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company wherever appearing upon a certified copy of any power of attorney issued by the company, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereyP�oOgubscribed my name and affixed the corporate seal of the said company,this__I Ot h day of September stant Secretary --_N THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTION DATE AFTER April 4-- 20 03 ' CITY OF RENTON SWP-27-2899 ' Project Maplewood Golf Course Re grade Proj P g ' PROPOSAL TO THE CITY OF RENTON ' RENTON, WASHINGTON Ladies and/or Gentlemen: ' The undersigned hereby certify that the bidder has examined the site of the proposed work and have read and thoroughly understand the plans, specifications and contract governing the work embraced ' in this improvement, and the method by which payment will be made for said work, and hereby propose to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the money available, in accordance with the said plans, specifications and ' contract and the following schedule of rates and prices: (Note: Unit prices for all items, all extensions, and ' total amount of bid should be shown. Show unit prices both in writing and in figures.) Printed Name ' Signature ' —t- 6— Address: 191) L3 d ' Names of Members of Partnership: OR Name of President of CorporationL Name of Secretary of Corporation ��� XA " Sp� Corporation Organized under the laws of With Main Office in State of Washington at CITY OF RENTON — Maplewood Golf Course Regrade Project SWP-27-2899 SCHEDULE OF PRICES Note: Unit prices for all items, all extensions and total amount of bid must be shown. Show unit prices in both words and figures. Where conflict occurs the written or typed words shall prevail. See Special Provisions for Bid Item descriptions. ' ITEM APPROX. ITEM NAME WITH UNIT PRICE UNIT AMOUNT NO. QUANTITY (Unit Prices to be written in words) PRICE (figure) (figure) ' 1. 1 Mobilization, Cleanup & Demobilization Lump Sum $ 1cipcTF / -Ttfu�S,gN� ' 2. 1 Locate and Protect Existing Utilities Lump Sum $ tv[F -rF/ou-sAnyv $ ()0 06' $ /,%)L�n a0 ' 3. 1 Clearing and Grubbing Lump Sum $ rl Vl[ -7-ffo1 ff41Va $ 0 `'° $J, fee. 4. 1 Removal of Structure and Obstruction Lump Sum $ G/VE TftUccSRny,0 C/YF /qGt/✓O.etW $11, 5-0 0.cc $ /, S 00. ff ' 5. 1 Tree Removal and Replanting Lump Sum $ (,)NF" 7WO"5,4 yo rl►/ HL.IVLL 7� $i, SDO.�` $ 6 1 Temporary Water Pollution/Erosion Control ' Lump Sum $ h/ 7740u3�/}iV0 $f0,000.°` $%D OUO. `f 7. 1 Construction Survey, Staking and As-built Drawings ' Lump Sum $ JFyt7�/TlfOzt SAlV/1 �i V� ifKAfn�°&Zj $7, 66."O $ 7. SDD , co 8. 30 4 in. Diam. CPEP Storm Sewer Pipe ' Linear Feet $ $ $ /+ SOD. `'� 9. 4,500 Structural Fill for Cart Path Ton $ '5i X $ $,Z 7 UU ' 10. 150 Crushed Surfacing Top Course Ton $ 7-a FLYE— $ $ ' 11, 90 Asphalt Concrete Pavement Class "B" Ton $ &IyE /funlpe_&- ' $ ' 12. 1,100 Topsoil Type A Ton $ '0-�0CL1eTEn/ $ / `/ Qo $/ 7, ' 13. 6,200 Sod Installation Square Yard $ 'J-A�jee-F- A.Nn Icc, $ SO $�Z /i 706 . ae' ' 14. 1 Irrigation Revisions Lump Sum $ ZHI2k�-C_- 7-goa(_SANt) $ 3 D0,°D $3, Doc. `C' ' Subtotal: $ /Z / ��� el; 8.8% Sales Tax: $ 10 7 / 7, 40 Total: $ ' Bond #23-000-440 BOND TO THE CITY OF RENTON ' KNOW ALL MEN $,' THESE PRESENTS: That we, the undersigned City Transfer of Kent, Inc. ' as principal, and Liberty Mutual Insurance Company corporation organized and existing under the laws of the State of Massachusetts as a surety corporation, and qualified under the laws of the State of Washington to become surety upon bonds of contractors with municipal corporations, as surety are ' jointly and severally held and firmly bound to the City of Renton in the penal sum of One Hundred Thi rty Two Thousand-Five Hundred Eighteen Thousand and 40/100($132,518.40) for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or person representatives, ' as the case may be. This obligation is entered into in pursuance of the statutes of the State of Washington, the Ordinance of the ' City of Renton. Dated at Kent Washington, this day of �0 01 ' Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to Public Works Construction Contract CAGSWP27-2899 providing for ' construction of Maplewood Golf Course Regrade Project. (projcc[namc) ' the principal is required to furnish a bond for the faithful performance of the contract; and WHEREAS, the principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for Ln the manner and within the time set forth; ' NOW, THEREFORE, if the principal shall faithfully perforni all of the provisions the manner and within the time therein set forth, or within such extensions of time as may beg antedtract underlsaid ' contract, and shall pay all laborers, mechanics, subcontractors and mat eriatmen, and all persons who shall supply said principal or subcontractors with provisions and supplies for the carrying on of said work, and shall hold said City of Renton harmless from any loss or damage occasioned to any person or property by ' reason of any carelessness or negligence on the part of said principal, or any subcontractor in the performance of said work, and shall indemnify and hold the City of Renton harmless from any damage or expense by reason of failure of performance as specified in the contract or from defects appearing or ' developing in the material or workmanship provided or performed under the contract within a period of one year after its acceptance thereof by the City of Renton, then and in that event this obligation shall be void: but otherwise it shall be and remain in full force and effect. ' City Transfer of Kent, Inc. Liberty Mutual Insurance Company Principal Surety Signature Signature Holly E. U1 fers Attorney-in-Fact Title Title ' Approved by L—am, warm.. L1,rr ' THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 786489 This Power of Attorney limits the act of those named herein, and they have no authority to bind the Company except in the ' manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON, MASSACHUSETTS tPOWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts mutual insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, ' constitute and appoint, MARY A. DOBBS, STEVEN W. PALMER, GERALDINE C.STEWART,HOLLY E. ULFERS, DAVID J. FORSYTH, ALL OF THE CITY OF KENT, STATE OF WASHINGTON............................................................... 1 ............................................................................ .. ..... ......... . ............. ............ ................................... ...................................................... . . . each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and a****de*a*#*gs, bonds, recognizances and other surety obligations in the penal sum not exceeding ONE HUNDRED MILLION AND 00/100 DOLLARS ($100,000,000.00 ) each, and the execution of such bonds or undertakings, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by M the secretary of the Company in their own proper persons. That this power is made and executed pursuant to and by authority of the following By-law and Authorization: c ARTICLE XVI-Execution of Contracts: Section 5.Surety Bonds and Undertakings. y Y Any officer or other official of the company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the e company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety Oe obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the company by their signature and execution of any such instruments and to attach thereto the seal of the company. When so executed such p d IM instruments shall be as binding as if signed by the president and attested by the secretary. v N M By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact: W M O m > Pursuant to Article XVI, Section 5 of the By-laws, Assistant Secretary Garnet W. Elliott is hereby authorized to appoint such attorneys-in-fact E p E 0. ce as may be necessary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, O O bonds,recognizances and other surety obligations. Q M � W That the By-law and the Authorization above set forth are true copies thereof and are now in full force and effect. 00-a IN WITNESS WHEREOF, this instrument has been subscribed by its authorized officer and the corporate seal of the said Liberty Mutual( urance 3 0 Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 4th day of April Z001 O E aE .� LIBERTY MUTUAL INSURANCE COMPANY By 0 . l�� [N.. C Garnet W.Elliott,Assistant Secretary +>, d COMMONWEALTH OF PENNSYLVANIA ss R O O COUNTY OF MONTGOMERY >.0 04 U t 0' e On this 4th day of April A.D. 2001 before me, a Notary Public, personally came the individual, known to £000 a)> me to be the therein desc idual and officer of Liberty Mutual Insurance Company who executed the preceding instrument, and he acknowled E N 3 ged that he executed arfte and the seal affixed to the said preceding instrument is the corporate seal of said company; and that said corporate W seal and his signatu was duly affixed and subscribed to the said instrument by authority and direction of the said company. asap 00 IN TESTIMO REOF, I h set my hand and affix my official seat at Plymou Meeting,P ,the day and year first above written. O ce t OF f N{ AP SEA! .�1�1�.' - * ' n vF F 1 0r ( Nctay P�ihlh Y o � �4 n - C`wmy Notary Public -- �.'.Ft NSYL`1�' � __.._ E I, the undersign , tad retary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full,true and c c copy, is in full force and effect on the date of this certificate;and I do further certify that the officer who executed the ' said power of attorney was one of the officers specially authorized by the chairman or the president to appoint any attorney-in-fact as provided in Article XVI,Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate may be signed by facsimile under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. ' VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company wherever appearing upon a certified copy of any power of attorney issued by the company, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereurytp�ybscribed my name and affixed the corporate seal of the said company, this day of Nil 11 stant Secretary I, THIS POWER OF ATTORNEY MAY NOT BE USED TO EXECUTE ANY BCNO WITH AN INCEPTION DATE AFTER April 4 ZU 03 �1`t� Ors CITY OF RENTON FAIR PRACTICES POLICY AFFIDAVIT OF COMPLIANCE City Transfer, Inc. hereby confirms and declares that (Name of contractor/subcontractor/consultant/supplier) ' I. It is the policy of City Transfer, Inc. to offer equal ' (Name of contractor/subcontractor/consultant/supplier) opportunity to all qualified employees and applicants for employment without ' regard to the race, creed, color, sex, national origin, age, disability or veteran status. II. City Transfer, Inc. complies with all applicable ' (Name of contractor/subcontractor/consultant/supplier) federal, state and local laws governing non-discrimination in employment. ' II. When applicable, City Transfer, Inc. will seek out and (Name of contractor/subcontractor/consultant/supplier) ' negotiate with minority and women contractors for the award of subcontracts. Keith Benson Print Agent/Representative's Name President ' Print Agent/Representative's Title ' Agent/Representative's S4pafure Date Signed Instructions: This document MUST be completed by each contractor, subcontractor, consultant tand/or supplier. Include or attach this document(s)with the contract. lit By: BASELINE ENGINEERING; 2535658563; Sep-25-01 2:26PM; Page 2!2 09-12412001 13:35 CITY TRANSFER OF KENT INC 4 95658563 NO.170 W2 ' CITY OF RENTON • FAIR PRACTICES POLICY ' AFFIDAVIT OF COMPLIANCE BASELI E Enaineering, IO,c_ , hereby confirms and ' declares that (Name of contractor/subrontraciaricansuitUtiiupptier) 1. It is the policy of DASELINE Engineerinq, Inc, to ' offer equal t Name of cottt7"9Ctar/subeonuactoNconeult9nusuppGu) opparm*ry to all qualified employees and applicants for employment Without regard to the race, creed, color, sex, national origin, ago, disability or vetoraa ' status. II. BASELINE Engineering, Inc, compliea with all applicable ' (Name of conaaewdsubcontnctorlconsuitandiuppiier) federal, state and local laws governing non-discrimination in employment. H. When applicable, BASELINE Engineering, Inc. will seek out and ' (Narno otconusctar/subcantractvt/caneultatWsuppiier) negotiate with minority and women contracrora for the award of subcontracts. ' Andy Somera , err • Print Agontatpresentative's Name 1 ' Print Agent/Represeniativ-a's Title ' Agont/lt scntativo's Signature Date Siped Instructions: This document MUST be completed by each contractor, subcontractor, consultam ' and/or supplier. tncludo or attach this documents)with the contract. Contracts other than Federal-Aid FHWA t CONTRACTS OTHER THAN FEDERAL-AID FHWA ' THIS AGREEMENT, made and entered into this day of 20 by and between THE CITY OF RENTON, Washington, a municipal corporation of the State of ' Washington, hereinafter referred to as "CITY" and I'NS hereinafter referred to as "CONTRACTOR." ' WITNESSETH: 1) The Contractor shall within the time stipulated, (to-wit: within Twenty Five [25] working ' days from date of commencement hereof as required by the Contract, of which this agreement is a component part) perform all the work and services required to be performed, and provide and furnish all of the labor, materials, appliances, machines, tools, equipment, utility and transportation services necessary to perform the Contract, and shall complete the construction and installation work in a workmanlike manner, in connection with the City's Project identified as SWP-27-2899 for improvement by ' construction and installation of: Maplewood Golf Course Regrade Project. All the foregoing shall be timely performed, furnished, constructed, installed and ' completed in strict conformity with the plans and specifications, including any and all addenda issued by the City and all other documents hereinafter enumerated, and in full compliance with all applicable codes, ordinances and regulations of the City of Renton ' and any other governmental authority having jurisdiction thereover. It is further agreed and stipulated that all of said labor, materials, appliances, machines, tools, equipment and services shall be furnished and the construction installation performed and completed to the satisfaction and the approval of the City's Public Works Director as being in such ' conformity with the plans, specifications and all requirements of or arising under the Contract. ' 2) The aforesaid Contract, entered into by the acceptance of the Contractor's bid and signing of this agreement, consists of the following documents, all of which are component parts of said Contract and as fully a part thereof as if herein set out in full, and if not attached, ' as if hereto attached. a) This Agreement ' b) Instruction to Bidders c) Bid Proposal d) Specifications ' e) Maps and Plans f) Bid g) Advertisement for Bids ' h) Special Provisions, if any i) Technical Specifications, if any 1 Contracts other than Federal-Aid FHWA 3) If the Contractor refuses or fails to prosecute the work or any part thereof, with such ' diligence as will insure its completion within the time specified in this Contract, or any extension in writing thereof, or fails to complete said work with such time, or if the Contractor shall be adjudged a bankrupt, or if he should make a general assignment for ' the benefit of his creditors, or if a receiver shall be appointed on account of the Contractor's insolvency, or if he or any of his subcontractors should violate any of the provisions of this Contract, the City may then serve written notice upon him and his ' surety of its intention to terminate the Contract, and unless within ten (10) days after the serving of such notice, such violation or non-compliance of any provision of the Contract shall cease and satisfactory arrangement for the correction thereof be made, this Contract, ' shall, upon the expiration of said ten (10) day period, cease and terminate in every respect. In the event of any such termination, the City shall immediately serve written notice thereof upon the surety and the Contractor and the surety shall have the right to ' take over and perform the Contract, provided, however, that if the surety within fifteen 15 days after the serving upon it of such notice of termination does not perform the Contract or does not commence performance thereof within thirty (30) days from the date ' of serving such notice, the City itself may take over the work under the Contract and prosecute the same to completion by Contract or by any other method it may deem advisable, for the account and at the expense of the Contractor, and his surety shall be ' liable to the City for any excess cost or other damages occasioned the City thereby. In such event, the City, if it so elects, may, without liability for so doing, take possession of and utilize in completing said Contract such materials, machinery, appliances, equipment, ' plants and other properties belonging to the Contractor as may be on site of the project and useful therein. 4) The foregoing provisions are in addition to and not in limitation of any other rights or ' remedies available to the City. 5) Contractor agrees and covenants to hold and save the City, its officers, agents, representatives and employees harmless and to promptly indemnify same from and against any and all claims, actions, damages, liability of every type and nature including all costs and legal expenses incurred by reason of any work arising under or in connection with the ' Contract to be performed hereunder, including loss of life, personal injury and/or damage to property arising from or out of any occurrence, omission or activity upon, on or about the premises worked upon or in any way relating to this Contract. This hold harmless ' and indemnification provision shall likewise apply for or on account of any patented or unpatented invention, process, article or appliance manufactured for use in the performance of the Contract, including its use by the City, unless otherwise specifically ' provided for in this Contract. In the event the City shall, without fault on its part, be made a party to any litigation ' commenced by or against Contractor, then Contractor shall proceed and hold the City harmless and he shall pay all costs, expenses and reasonable attorney's fees incurred or paid by the City in connection with such litigation. Furthermore, Contractor agrees to ' pay all costs, expenses and reasonable attorney's fees that may be incurred or paid by City in the enforcement of any of the covenants, provisions and agreements hereunder. ' Nothing herein shall require the Contractor to indemnify the City against and hold harmless the City, from claims, demands or suits based solely upon the conduct of the City, its officers or employees and provided further that if claims or suits are caused by ' or result from the concurrent negligence of(a) the Contractor's agents or employees and (b) the City, its agents, officers and employees, and involves those actions covered by Contracts other than Federal-Aid FHWA RCW 4.24.115, this indemnity provision with respect to claims or suits based upon such ' concurrent negligence shall be valid and enforceable only to the extent of the Contractor's negligence or the negligence of the Contractor's agents or employees. ' 6) Any notice from one party to the other party under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by its duly authorized representative of such party. Any such notice as heretofore specified shall be given by ' personal delivery thereof or by depositing same in the United States mail, postage prepaid, certified or registered mail. 7) The Contractor shall commence performance of the Contract no later than 5 calendar ' days after Contract final execution, and shall complete the full performance of the Contract not later than Twenty Five [251 working days from the date of commencement. For each and every working day of delay after the established day of completion, it is ' hereby stipulated and agreed that the damages to the City occasioned by said delay will be the sum of per Section 1-08.9 of Standard Specifications as liquidated damages (and not as a penalty) for each such day, which shall be paid by the Contractor to the City. 8) Neither the final certificate of payment not any provision in the Contract nor partial or entire use of any installation provided for by this Contract shall relieve the Contractor of ' liability in respect to any warranties or responsibility for faulty materials or workmanship. The Contractor shall be under the duty to remedy any defects in the work and pay for any damage to other work resulting therefrom which shall appear within the period of one (1) ' year from the date of final acceptance of the work, unless a longer period is specified. The City will give notice of observed defects as heretofore specified with reasonable promptness after discovery thereof, and Contractor shall be obligated to take immediate ' steps to correct and remedy any such defect, fault or breach at the sole cost and expense of Contractor. ' 9) The Contractor and each subcontractor, if any, shall submit to the City such schedules of quantities and costs, progress schedules, payrolls, reports, estimates, records and miscellaneous data pertaining to the Contract as may be requested by the City from time ' to time. 10) The Contractor shall furnish a surety bond or bonds as security for the faithful performance of the Contract, including the payment of all persons and firms performing ' labor on the construction project under this Contract or furnishing materials in connection with this Contract; said bond to be in the full amount of the Contract price as specified in Paragraph 11. The surety or sureties on such bond or bonds must be duly licensed as a ' surety in the State of Washington. 1 Contracts other than Federal-Aid FHWA 11) The total amount of this contract is the sum of $ One h klldra M I,—l-V tiva o 1i v1! h und(rew '/&//60 which includes Washington State Sales Tax. Payments will be made to Contractor as ' specified in the "General Requirements" and this Contract Document. ' IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor and attested by its City Clerk and the Contractor has hereunto set his hand and seal the day and year first above-written. ' ONT R CITY OF RENTON ' President/Partner/Owner Mayor ATTEST S ele City Clerk �✓ 7 S L✓ Firm Name check one 0 Individual [3 Partnership 0 Corporation Incorporated in 9 ' Attention: If business is a CORPORATION, name of the corporation should be listed in full and both ' President and Secretary must sign the contract, OR if one signature is permitted by corporation by-laws, a copy of the by-laws shall be furnished to the City and made a part of the contract document. ' If business is a PARTNERSHIP, full name of each partner should be listed followed by d/b/a (doing business as) and firm or trade name; any one partner may sign the contract. If business is an INDIVIDUAL PROPRIETORSHIP, the name of the owner should appear followed by d/b/a and name of the company. 1 1 Uti� o City of Renton Human Resources & Risk Management Department Insurance Information Fonn ' FOR: �Ct�IvSRr of�C�J1t TrtiC.. PROTECT NUMBER.SwF-27-2899 STAFF CONTACT: Gate Scbimek - Certificaze of Insurance indicates the covarages/limits.specified in Yes No contract? Are the following coverages and/or conditions in effects Yes No The Commercial General Liability policy form is an ISO I993 (� Yes No Occurrence Form or)equivalent? r" (If no,attach a copy of the policy with requircd eov=ges elaarly identified) Cq 0043 Amendatory .t�dorsem tnt provided)* Yes (� No l�vcrW ,\nUvd eh-&NMXdp, CAL Trern►. W►r L_! General A,Iggregate provided on a"pper project basis(CG2503)?* � Yes � No Qe.r rave► Fer"N Co Da tl 08 96 Additional Insured wording provided?' C' Yes F1 No Cof%CoAM =1�bas�{6d non-contributing basis?' :K Yes No Waiver of Subro atioo Clause applies" Y®a No R rs AAftA� .c� y QAftkm 5everability of Interest Clause(Cross Liability)applies? Yes No Notice of Cancellation/Non-Renewal amended to 45 days?" Yes No _ *To be shown on cartfcara of insurance* AM REST'S RATING FOR CARRIER OL tX V 'Auto Rtx\/ Umb Z^ Professional This Questionnaire is Issued as a matter of information. This questionnaire is not an insurance policy.and does not amend, extend or alter the coverage afforded by the policies indicated on the attacbed C)RTIFICATE OF 124SURANCE, Tate CITY OF RENTON, at its option, SbAll obtain copice of the policies and/or speciflc declaration pages FROM awarded bidder prior to execution of contract, lA►)3W of Seattle Try _ ria Koss' AgenryBrokor Completed By(Type or Prim Name) o• -160 -SLI Address gbjay AOMPlete%(Signature) r1.Q IDSS o " Name of person to contact - MG- `7400 Telephone Number N07E: THIS QUESTIONNAIRE MUST BE COMPLETED FOR E4CH LINE OF COVERAGE AND ATTACHED TO CERTIFICATE OF INSURANCE 1 1 . i 1 ACORD CERTIFICATE OF LIABILITY INSURANCE page 1 of 3 09/21/2001 ' PRODUCER 677-559-6769 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE wi111e North Amorica, Inc. - Regional cort center HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 11201 N. Tacum Blvd. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Q 300 Fhon Phclx, a2 e502e INSURERS AFFORDING COVERAGE INSURED City Trancfcr of xent, Inc. INv URERA Trnvelezo indemnity Company OL A:aerics (25666-001) P. 0. Box 1038 INSURERS-Travelers Indemnl ' KeT.t, WA 98035-1048 t. Com en of connecticu (25674-003) INSURERC.westcheater B'_re Inauranco Co. (21121-OCO) INSURER D: INSURERE' ' COVERAGES THE PC CIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWiTH STANDING ANY REQUIREMENT, TERM OR CONDITICN OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN.THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.EXCLUSIONS AND CONDITIONS OF SUCH POLICIES AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ' FINGRIPOLICY EFF E POLICY EXPIRATION TYPE OFINSURANCE POLICY NUM(iER D TE DATE'MMDD LIMITS ceNERAL-ABILITY DTC0348KO294TIA01 06/01/2003. 06/01/2002 EACHoccURRENCE $ 1 000 000 X COMMERCIAL GENERAL UA8I1.I7Y I FIFE DAMApE An onefm) $ CLA MS MADE OCCUR MED EXF ens person) E PERSONALS AOV INJURY E GENERALAGGREGATE $ GEN'LAGGREGATE LIMIT APPLIES PER• PRODUCTS•COMPIOP AGO $ -2,O O O 000 i POLICY;ram jpERLQr 7 LOC ' B AUTDMOGJLELABILITY DT88810348KO294TCT01 06/01/2001 06/01/2002 C064BINEOSINOLELIMIT g 1,000,000 ANY AUTO (Es SCddent) ALL OWNED AUTOS BODILY INJURY $ ' I Pei cron I SCHEDVLEOAUTOS - ( P ` ) HIREDAUTOS @OC'LY IN!URv I f }{ NON.OWNEOAUTOS (Pcr�q-.iAenU ' I-- PROPERTY OHMAGE $ (Per eccldenl) GARAGE LIABILITY AUTO ONLY•EA ACCIDENT $ 7 ANv 4VTp OTHER THAN EA ACC $ AUTO ONLY AGG $ C ExcESSLIAEILITv CUS225147 09/01/2001 06/01/2002 EACH OCCURRENCE g OCCUR CLAIMS AGGREGATE I$ OEDUCT;BLE i g X I RETENr!ON g yyyyCC r �UJ $ WORKERS COMPENSATION AND TOFI�IIA�IT$ OTH• EMPLOYERS'LIA BIUTY ' 17 3 2 Z— 00 ) E.L `.AC ACCIUENT g EL OISEAS"c•EA EMPLOYEE E E.L.DISEASE•POLICY OMIT ? I OTHER I DESCRIPTION OF OPERATIONSiLOCATIONSIVEHICLES!Exr-LUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS The Certificate Holder is added as Additional Insured as respects operations performed by or on behalf of the Named Insured but only insofar as coverage is provided therefore in the afored captioned policies and as required by written contract. RE: Maplewood Golf Course Regrade Proyect ProjectWP-27- R CERTIFICATE HOLDER I TADDITIONAL INSURED:INSURER LETTER CANCELLATION So c e Non Pa ant of 9x.mj= SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION ' DATE THEREOF,THE IebUWG INSURER WILL XXiXMAIL 45 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,gap XK)kYXYffijN6M3CX %�t111��0��♦��XXIX��'Q�(��Q1YXIK��K'�14x��.9.� city of Renton IY1tAi]4QX ' 1055 South Orady Way AUTHORIZED R6PRESENTATNE ---^� Renton, WA 98055C.� �..1) ACORD 25-S(7/97) Coll:215787 Tpl:14799 Cert:764410 (PACORD CORPORATION 1988 1 W1111S CERTIFICATE OF LIABILITY INSURANCE Page 2 of 3 09/2DATE 1/2001 PRODUCER 877-559-6769 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Willis North America, Inc. - Regional Cart Center HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 11201 N. Tatum Blvd. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Suite 300 Phoenix, Az 85028 INSURERS AFFORDING COVERAGE INSUREO City Transfer of Kant, Inc. INSURERA: Traveler* IndQmnity company of America (25666-001) P. O. Box 1048' Kent, WA 99035-1048 INSURERB: Travoloro Indemrit Co an of Cannocticu (25674-003) INSURERC Nostcheeter Biro Insurance Co. (21121-000) INSURER D INSURERS. ' DESCRIPTION OF OPEFATION&1OCATIONS.NEHICLESLEXCLUSIONS ADDED BY ENOOR$EMENT(SPECIAL PROVISIONS The following are included as additional insured: City of Renton, and its officers, officials, agents, employees, and volunteers. 1 t i C011:215787 Tpl:14799 Cert1764410 ' Page 3 of 3 ' IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). ' If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER ' The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does It ' affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ' ACORD 25-S(7/97) Co11:215787 Tp1:14799 Cert:764410 COMMERCIAL GENERAL LIABILITY r THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ' BLANKET ADDITIONAL INSURED ' (CONTRACTORS) This endorsement modifies insurance provided under the following: ' COMMERCIAL GENERAL LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY—CONTRACTORS COVERAGE PART 1. WHO IS AN INSURED— (Section II) Is amended tlon with the general supervision of "your to Include any person or organization you are re- work". quired to Include as an additional insured on this e) This insurance does not apply to "bodily in- policy by a written contract or written agreement jury" or "property damage" arising out of in effect during this policy period and executed .1 your work" included in the "products- prior to the occurrence of any loss. completed operations hazard" unless you are 2. The insurance provided to the additional insured required to provide such coverage by written is limited as follows: contract or written agreement and then only ' a) The person or organization is only an addi- for the period of time required by the contract tional insured with respect to liability arising and in no event beyond the expiration date of out of"your work"for that additional insured. the policy. b) In the event that the limits of liability stated in f) This Insurance does not apply to any person ' the policy exceed the limits of liability re- or organization for whom you have procured quired by the written contract or written separate liability Insurance white such insur- agreement, the Insurance provided by this ance Is In effect, regardless of whether the ' endorsement shall be limited to the limits of scope or limits of Insurance in this policy ex- liability required by the written contract. This ceed those of such other insurance or endorsement shall not increase the limits whether such other insurance is valid or col- stated in Section III — LIMITS OF lectable. ' INSURANCE, 3. Subpart (1)(a) of the Pollution exclusion under c) The insurance provided to the additional in- Paragraph 2., Exduslons of Bodily Injury and sured does not apply to "bodily injury", Property Damage Liability Coverage (Section I — ' "property damage", personal injury" or Coverages) does not apply to you If the "bodily "advertising injury arising out of an archi- injury" or "property damage" arises out of "your tect's, engineers or surveyors rendering of or work"performed on premises which are owned or failure to render any professional services rented by the additional insured at the time "your ' Including: work"is performed. 1. The preparing, approving or falling to 4. Any coverage provided by this endorsement to an prepare or approve maps, shop drawings, additional insured shall be excess over any other opinions, reports, surveys, field orders, valid and collectible insurance available to the ' change orders, or drawings and specifi- additional Insured whether primary, excess, con- cations; and tingent or on any other basis unless a written contract or agreement specifically requires that 11. Supervisory or Inspection activities per- this Insurance apply on a primary or contributory ' formed as part of any related architec- basis. tural or engineering activities. 8. As soon as practicable, each additional insured d) Except when required by written contract or must give us prompt notice of any "occurrence" ' written agreement, the coverage provided to which may result in a claim, forward all legal pa- the additional insured by this endorsement pers to us, cooperate in the defense of any ac- does not apply to "bodily injury" or "property tions, and otherwise comply with policy condi- damage" arising out of acts or omissions of tions. ' the additional Insured other than in connec- tCG D2 09 07 98 Copyright, The Travelers Indemnity Company, 1998 Page 1 of 1 t surer's share is based on the ratio of its appli- transfer those rights to us and help us enforce ' cable limit of insurance to the total applicable them. limits of insurance of all insurers. We will not enforce our right of recovery against 6. Premium Audit any person or organization with whom you have ' a. We will compute all premiums for this Cover- waived your rights of subrogation in writing before age Part in accordance with our rules and the time of loss. However, our waiver applies only rates. to the extent required of you by such written con- b. Premium shown in this Coverage Part as ad- tract, vance premium is a deposit premium only. At 9• Motor Vehicle Laws the close of each audit period we will compute a. When this Coverage Part is certified as proof the earned premium for that period. Audit pre- of financial responsibility for the future under ' miums are due and payable on notice to thn the provisions of any motor vehicle financial first Named Insured. If the sum of the advance responsibility law, the insurance provided by and audit premiums paid for the policy period the Coverage Part for "bodily injury" or"prop- is greater than the earned premium, we will erty damage" liability will comply with the pro- return the excess to the first Named Insured. visions of the law to the extent of the c. The first Named Insured must keep records of coverages and limits of insurance required by the information we will need for premium com- that law. ' putation, and send us copies at such times as b. With respect to "mobile equipment" to which we may request. this insurance applies, we will provide any li- b. Representations ability, uninsured motorists, underinsured mo- torists. no-fault or other coverages required by By accepting this policy, you agree: any motor vehicle insurance law. We will pro- a. The statements in the Declarations are accu- vide the required limits for those coverages. rate and complete; 10. When We Do Not Renew b. Those statements are based upon repre- sentations you made to us; If we decide not to renew this Coverage Part, we will mail or deliver to the, first Named Insured c. We have issued this policy in reliance upon shown in the Declarations written notice of the ' your representations: and nonrenewal not less than 30 days before the expi- d. You represent that you do not know of any ration date. losses, claims, or "suits" pending against you If notice is mailed, proof of mailing will be suffl- that have not already been reported to us. cient proof of notice. 7, Separation of Insureds SECTION V—DEFINITIONS Except with respect to the Limits of Insurance, 1. "Advertising injury" means injury arising out of one and any rights or duties specifically assigned in or more of the foalpwing offenses: this Coverage Part to the first Named Insured, this �= insurance applies: a• Oral or written publication of material that slanders or libels a person or organization or a. As if each Named Insured were the only disparages a person's or organization's ' Named Insured, and goods, products or services: b. Separately to each insured against whom b. Oral or written publication of material that vio- claim is made or"suit" is brought. lates a person's right of privacy: ' 8. Transfer of Rights of Recovery Against Others c. Misappropriation of advertising ideas or style To Us of doing business; or If the insured has rights to recover all or part of d. Infringement of copyright, title or slogan. any payment we have made under this Coverage Part, those rights are transferred to us. The in- 2. "Auto means a land motor vehicle, trailer or sured must do nothing after loss to impair them. semitrailer designed for travel on public roads, in- At our request, the insured will bring "suit" or cluding any attached machinery or equipment. But auto"does not include "mobile equipment". ' GN Co 01 01 98 Copyright, The Travelers Indemnity Company, 1998 Page 11 of 14 O�DZaB ' -. 6� Wtxnt- to Ctrt+�IC.a►�t In consideration of the premium charged, It Is hereby agreed and understood that Policy Number_ ' UTcoa4bKp�gy Igaissued by eA S Insurance Company, is amended to Include the following terms and conditions as respects Contract Number CAG issued by the City of Renton(OWNER). ' 1. ADDJT10NAL INSURED. The OWNER, their elected or appointed officers, officials, employees, 9ubcon3ultents, and volunteers are included es additionalty ineured with regard to damages and defense of claims arising from: (a)activities performed by cr on behalf of the NAMED INSURED; ' or (q) products and completed operations of the NAMED.INSURED; or (c) premises owned, leased or used by the NAMED INSURED. 2. CONTRIBUTION NOT REQUIRED. As respects; (a)work performed by the NAMED INSURED ' for or on behalf of the OWNER; or(b) products sold by the NAMED INSURED to the OWNER; or (c) premises leased by the NAMED INSURED from the OWNER, the Insurance afforded by this policy shell be primary insurance as respects the OWNER, or any other Insured, its elected or ' appointed offters, officials, employees, subconsultants or volunteers; or stand In an unbroken chain of coverage exce®s of the NAMED INSURED'S scheduled underlying primary coverage. In either event, any other Insurance maintained by the OWNER, or any other insured, Its elected Or eppointed officers, offlclals, employees, subconsultants or volunteers shall be in excess of this ' Insurance and shall not contribute with it 3. 8EVERABILITY OF INTEREST, The Inclusion of more than one Insured under this policy shall not affect the rights of any Insured as respects any claim, suit or judgment made or brought by or ' for any other Insured or by or for any employee of any other insured. This policy snail protect each Insured in the same manner as through a separate policy had been issued to each, except that nothing herein shall operate to Increase the company's liability beyond the amount or amounts for which the company would have been liable had only one Insured been named. t 4. CANCELLATION NOTICE. The insurance afforded by this Policy shall not be nded voided, canceled, reduced In coverage or In limits except sifter FORTY-FIVE 45 days' prior' written notice by certlfled mail return receipt requested has been given to the OWNER. Such ' notice shall be eddressed to(a) the OWNER and (b)the CONSULTANT, 6, CLAIM REPORTING. The OWNER has no obligation to report occurrences unless a claim has ' be9n Flad with the OWNER, 6, AGGREGATE LIMIT. The General Aggregate Limit under Llmits of insurance applies separately to the above named contract for the above named OWNER, 1 ' Date �or1 1 Authorized 'JCI .. _ Representative W ' Signature tPage 2 of 5 ' PREVAILING MINIMUM HOURLY WAGE RATES State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section-Telephone(360)902-5335 PO Box 44540,Olympia,WA 985044540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe ' benefits. On public works projects,workers'wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key. ' KING COUNTY Effective 08-31-01 (See Benefit Code Key) Over PREVAILING Time Holiday Note ' Classification WAGE Code Code Code ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL $29.67 1M 5D ' BOILERMAKERS JOURNEY LEVEL $35.96 1B 5N BRICK AND MARBLE MASONS JOURNEY LEVEL $35.37 1M 5A ' CABINET MAKERS(IN SHOP) JOURNEY LEVEL $11.71 1 CARPENTERS ' ACOUSTICAL WORKER $34.50 1M 5D BRIDGE, DOCK AND WARF CARPENTERS $34.34 1M 5D CARPENTER $34.34 1M 5D CREOSOTED MATERIAL $34.44 1M 5D DRYWALL APPLICATOR $34.94 1M 5D FLOOR FINISHER $34.47 1M 5D FLOOR LAYER $34.47 1M 5D ' FLOOR SANDER $34.47 1M 5D MILLWRIGHT AND MACHINE ERECTORS $35.34 1M 5D PILEDRIVERS, DRIVING,PULLING,PLACING COLLARS AND WELDING $34.54 1M 5D ' SAWFILER $34.47 1M 5D SHINGLER $34.47 1M 5D STATIONARY POWER SAW OPERATOR $34.47 1M 5D STATIONARY WOODWORKING TOOLS $34.47 1M 5D ' CEMENT MASONS JOURNEY LEVEL $35.33 1M 5D DIVERS 8 TENDERS ' DIVER $74.30 1M 5D 8A DIVER TENDER $37.01 1M 5D DREDGE WORKERS ' ASSISTANT ENGINEER $35.67 1B 5D 8L ASSISTANT MATE(DECKHAND) $35.23 16 5D 8L BOATMEN $35.67 16 5D 8L ENGINEER WELDER $35.72 113 5D 8L ' LEVERMAN, HYDRAULIC $37.11 1B 5D 8L MAINTENANCE $35.23 1B 5D 8L MATES $35.67 113 5D 8L ' OILER $35.33 1B 5D 8L DRYWALL TAPERS JOURNEY LEVEL $34.92 11 5B ' ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL $18.69 1 Page 1 KING COUNTY ' Effective 08-31-01 (See Benefit Code Key) ' Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ' ELECTRICIANS-INSIDE CABLE SPLICER $44.57 1D 6H CABLE SPLICER(TUNNEL) $61.22 1D 6H ' CERTIFIED WELDER $42.95 1D 6H CERTIFIED WELDER(TUNNEL) $58.85 1D 6H CONSTRUCTION STOCK PERSON $22.79 1 D 6H ' JOURNEY LEVEL $41.33 1 D 6H JOURNEY LEVEL(TUNNEL) $56.47 1D 6H ELECTRICIANS-MOTOR SHOP CRAFTSMAN $15.37 2A 6C ' JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS-POWERLINE CONSTRUCTION CABLE SPLICER $42.16 4A 5A ' CERTIFIED LINE WELDER $38.72 4A 5A GROUNDPERSON $28.38 4A 5A HEAD GROUNDPERSON $29.81 4A 5A HEAVY LINE EQUIPMENT OPERATOR $38.72 4A 5A ' JACKHAMMER OPERATOR $29.81 4A 5A JOURNEY LEVEL LINEPERSON $38.72 4A 5A LINE EQUIPMENT OPERATOR $32.95 4A 5A ' POLE SPRAYER $38.72 4A 5A POWDERPERSON $29.81 4A 5A ELECTRONIC&TELECOMMUNICATION TECHNICIANS ' JOURNEY LEVEL $12.07 1 ELEVATOR CONSTRUCTORS CONSTRUCTOR $31.29 4A 61 MECHANIC $42.25 4A 61 ' MECHANIC IN CHARGE $46.63 4A 61 PROBATIONARY CONSTRUCTOR $16.27 4A 61 FABRICATED PRECAST CONCRETE PRODUCTS ' ARCHITECTURAL AND PRESTRESSED CONCRETE-All Classifications $10.60 1 ALL OTHER CONCRETE PRODUCTS-Carpenter $18.77 1 B 6S ALL OTHER CONCRETE PRODUCTS-Clean-up $17.99 113 6S ALL OTHER CONCRETE PRODUCTS-Fabricator $18.24 113 6S , ALL OTHER CONCRETE PRODUCTS-Gunite $18.24 1 B 6S ALL OTHER CONCRETE PRODUCTS-Maintenance $18.77 1B 6S ALL OTHER CONCRETE PRODUCTS-Operator $18.24 1 B 6S , ALL OTHER CONCRETE PRODUCTS-Welder $18.24 1 B 6S ALL OTHER CONCRETE PRODUCTS-Wet Pour $17.99 1 B 6S ALL OTHER CONCRETE PRODUCTS-Yard Patch $17.99 1 B 6S ' FENCE ERECTORS FENCE ERECTOR $13.80 1 FENCE LABORER $11.60 1 , FLAGGERS JOURNEY LEVEL $24.99 1M 5D GLAZIERS JOURNEY LEVEL $35.21 2E 5G ' HEAT&FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $35.83 1F 5C HEATING EQUIPMENT MECHANICS ' MECHANIC $18.45 1.1 5A Page 2 ' ' KING COUNTY Effective 08-31-01 ' (See Benefit Code Key) Over PREVAILING Time Holiday Note ' Classification WAGE Code Code Code INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 1 ' INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.07 1 INLAND BOATMEN ASSISTANT ENGINEER $30.68 1K 5D ' CHIEF ENGINEER $31.55 1K 5D COOK $26.56 1K 5D DECK ENGINEER,ABLE SEAMAN,OILER $26.56 1K 5D ' DECKHAND $26.15 1K 5D FIRST MATE $30.78 1K 5D MASTER $33.72 1K 5D MATE,LAUNCH OPERATOR $28.81 1K 5D MESSMAN $21.94 1K 5D ORDINARY SEAMAN $23.26 1K 5D INSPECTION/CLEANING/SEALING OF SEWER&WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR $9.73 1 GROUT TRUCK OPERATOR $11.48 1 HEAD OPERATOR $12.78 1 TECHNICIAN $6.72 1 TV TRUCK OPERATOR $10.53 1 INSULATION APPLICATORS JOURNEY LEVEL $34.34 1M 5D IRONWORKERS JOURNEY LEVEL $37.07 1 B 5A ' LABORERS ASPHALT RAKER $30.15 1M 5D BALLAST REGULATOR MACHINE $29.67 1M 5D BATCH WEIGHMAN $24.99 1M 5D ' CARPENTER TENDER $29.67 1M 5D CASSION WORKER $30.51 1M 5D CEMENT DUMPER/PAVING $30.15 1M 5D ' CEMENT FINISHER TENDER $29.67 1M 5D CHIPPING GUN(OVER 30 LBS) $30.15 1M 5D CHIPPING GUN(UNDER 30 LBS) $29.67 1M 5D ' CHUCK TENDER $29.67 1M 5D CLEAN-UP LABORER $29.67 1 M 5D CONCRETE FORM STRIPPER $29.67 1M 5D CONCRETE SAW OPERATOR $30.15 1M 5D CRUSHER FEEDER $24.99 1M 5D CURING LABORER $29.67 1M 5D DEMOLITION,WRECKING&MOVING(INCLUDING CHARRED MATERIALS) $29.67 1M 5D ' DITCH DIGGER $29.67 1M 5D DIVER $30.51 1 M 5D DRILL OPERATOR(HYDRAULIC,DIAMOND) $30.15 1M 5D DRILL OPERATOR,AIRTRAC $30.51 1M 5D DUMPMAN $29.67 1M 5D FALLERIBUCKER,CHAIN SAW $30.15 1M 5D FINAL DETAIL CLEANUP(i.e.,dusting,vacuuming,window cleaning;NOT $22.67 1 M 5D ' construction debris cleanup) FINE GRADERS $29.67 1M 5D Page 3 KING COUNTY Effective 08-31-01 , (See Benefit Code Key) ' Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ' FIRE WATCH $29.67 1M 5D FORM SETTER $29.67 1M 5D GABION BASKET BUILDER $29.67 1M 5D , GENERAL LABORER $29.67 1M 5D GRADE CHECKER&TRANSIT PERSON $30.15 1M 5D GRINDERS $29.67 1M 5D GROUT MACHINE TENDER $29.67 1M 5D , HAZARDOUS WASTE WORKER LEVEL A $30.51 1M 5D HAZARDOUS WASTE WORKER LEVEL B $30.15 1M 5D HAZARDOUS WASTE WORKER LEVEL C $29.67 1M 5D , HIGH SCALER $30.51 1M 5D HOD CARRIER/MORTARMAN $30.15 1M 5D JACKHAMMER $30.15 1M 5D LASER BEAM OPERATOR $30.15 1 M 5D MINER $30.51 iM 5D NOZZLEMAN,CONCRETE PUMP,GREEN CUTTER WHEN USING HIGH $30.15 1M 5D PRESSURE AIR&WATER ON CONCRETE&ROCK,SANDBLAST,GUNITE, SHOTCRETE,WATER BLASTER PAVEMENT BREAKER $30.15 1 M 5D PILOT CAR $24.99 1M 5D PIPE RELINER(NOT INSERT TYPE) $30.15 1M 5D , PIPELAYER&CAULKER $30.15 1M 5D PIPELAYER&CAULKER(LEAD) $30.51 1M 5D PIPEWRAPPER $30.15 1M 5D POT TENDER $29.67 1M 5D POWDERMAN $30.51 1M 5D POWDERMAN HELPER $29.67 1M 5D ' POWERJACKS $30.15 1M 5D RAILROAD SPIKE PULLER(POWER) $30.15 1M 5D RE-TIMBERMAN $30.51 1M 5D RIPRAP MAN $29.67 1M 5D ' SIGNALMAN $29.67 1M 5D SLOPER SPRAYMAN $29.67 1M 5D SPREADER(CLARY POWER OR SIMILAR TYPES) $30.15 1M 5D , SPREADER(CONCRETE) $30.15 1M 5D STAKE HOPPER $29.67 1M 5D STOCKPILER $29.67 1M 5D , TAMPER&SIMILAR ELECTRIC,AIR&GAS $30.15 1 M 5D TAMPER(MULTIPLE&SELF PROPELLED) $30.15 1M 5D TOOLROOM MAN(AT JOB SITE) $29.67 1M 5D TOPPER-TAILER $29.67 1M 5D , TRACK LABORER $29.67 1M 5D TRACK LINER(POWER) $30.15 1M 5D TUGGER OPERATOR $30.15 1M 5D ' VIBRATING SCREED(AIR,GAS,OR ELECTRIC) $29.67 1M 5D VIBRATOR $30.15 1M 5D WELDER $29.67 1M 5D WELL-POINT LABORER $30.15 1M 5D ' LABORERS-UNDERGROUND SEWER&WATER GENERALLABORER $29.67 1M 5D PIPE LAYER $30.15 1 M 5D ' Page 4 KING COUNTY Effective 08-31-01 ' (See Benefit Code Key) Over PREVAILING Time Holiday Note ' Classification WAGE Code Code Code LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $11.07 1 ' LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $10.63 1 LANDSCAPING OR PLANTING LABORERS $8.42 1 LATHERS JOURNEY LEVEL $34.94 1M 5D ' MACHINISTS(HYDROELECTRIC SITE WORK) MACHINIST $16.84 1 METAL FABRICATION(IN SHOP) ' FITTER $15.86 1 LABORER $9.78 1 MACHINE OPERATOR $13.04 1 ' PAINTER $11.10 1 WELDER $15.48 1 MODULAR BUILDINGS CABINET ASSEMBLY $11.56 1 ELECTRICIAN $11.56 1 EQUIPMENT MAINTENANCE $11.56 1 PLUMBER $11.56 1 PRODUCTION WORKER $9.26 1 TOOL MAINTENANCE $11.56 1 UTILITY PERSON $11.56 1 WELDER $11.56 1 ' PAINTERS JOURNEY LEVEL $27.63 2B 5A PLASTERERS ' JOURNEY LEVEL $35.63 1 R 5A PLAYGROUND&PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $8.42 1 ' PLUMBERS&PIPEFITTERS JOURNEY LEVEL $43.71 1G 5A POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $33.59 1T 5D 8L ' BACKHOE,EXCAVATOR,SHOVEL (3 YD&UNDER) $36.05 1T 5D 8L BACKHOE,EXCAVATOR,SHOVEL (OVER 3 YD&UNDER 6 YD) $36.49 1T 5D 8L BACKHOE,EXCAVATOR,SHOVEL(6 YD AND OVER WITH ATTACHMENTS) $36.99 1T 5D 8L BACKHOES, (75 HP&UNDER) $35.69 1T 5D 8L BACKHOES, (OVER 75 HP) $36.05 1T 5D 8L BARRIER MACHINE(ZIPPER) $36.05 1T 5D 8L BATCH PLANT OPERATOR,CONCRETE $36.05 1T 5D 8L BELT LOADERS(ELEVATING TYPE) $35.69 1T 5D 8L BOBCAT $33.59 1T 5D 8L BROOMS $33.59 1T 5D 8L BUMP CUTTER $36.05 1T 5D 8L CABLEWAYS $36.49 1T 5D 8L CHIPPER $36.05 1T 5D 8L ' COMPRESSORS $33.59 1T 5D 8L CONCRETE FINISH MACHINE-LASER SCREED $33.59 1T 5D 8L CONCRETE PUMPS $35.69 1T 5D 8L CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $36.05 1T 5D 8L CONVEYORS $35.69 1T 5D 8L CRANES, THRU 19 TONS,WITH ATTACHMENTS $35.69 1T 5D 8L Page 5 KING COUNTY Effective 08-31-01 (See Benefit Code Key) ' Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CRANES, 20-44 TONS,WITH ATTACHMENTS $36.05 1T 5D 8L ' CRANES, 45 TONS-99 TONS, UNDER 150 FT OF BOOM(INCLUDING JIB $36.49 1T 5D 8L WITH ATACHMENTS) CRANES, 100 TONS-199 TONS,OR 150 FT OF BOOM(INCLUDING JIB $36.99 1T 5D 8L WITH ATTACHMENTS) CRANES,200 TONS TO 300 TONS,OR 250 FT OF BOOM(INCLUDING JIB $37.49 1T 5D 8L WITH ATTACHMENTS) CRANES,A-FRAME, 10 TON AND UNDER $33.59 1T 5D 8L , CRANES,A-FRAME,OVER 10 TON $35.69 1T 5D 81. CRANES, OVER 300 TONS,OR 300'OF BOOM INCLUDING JIB WITH $37.99 1T 5D 8L ATTACHMENTS ' CRANES,OVERHEAD,BRIDGE TYPE(20-44 TONS) $36.05 1T 5D 8L CRANES,OVERHEAD, BRIDGE TYPE(45-99 TONS) $36.49 1T 5D 8L CRANES,OVERHEAD,BRIDGE TYPE(100 TONS&OVER) $36.99 1T 5D 8L ' CRANES,TOWER CRANE UP TO 175'IN HEIGHT,BASE TO BOOM $36.99 1T 5D 8L CRANES,TOWER CRANE OVER 175'IN HEIGHT, BASE TO BOOM $37.49 1T 5D 8L CRUSHERS $36.05 1T 5D 8L DECK ENGINEER/DECK WINCHES(POWER) $36.05 1T 5D 8L DERRICK,BUILDING $36.49 1T 5D 8L DOZERS, D-9&UNDER $35.69 1T 5D 81. DRILL OILERS-AUGER TYPE,TRUCK OR CRANE MOUNT $35.69 1T 5D 8L ' DRILLING MACHINE $36.05 1T 5D 8L ELEVATOR AND MANLIFT, PERMANENT AND SHAFT-TYPE $33.59 1T 5D 8L EQUIPMENT SERVICE ENGINEER(OILER) $35.69 1T 5D 8L FINISHING MACHINEIBIDWELL GAMACO AND SIMILAR EQUIP $36.05 1T 5D 8L ' FORK LIFTS,(3000 LBS AND OVER) $35.69 1T 5D 8L FORK LIFTS,(UNDER 3000 LBS) $33.59 1T 5D 8L GRADE ENGINEER $35.69 1T 5D 8L , GRADECHECKER AND STAKEMAN $33.59 1T 5D 8L HOISTS,OUTSIDE(ELEVATORS AND MANLIFTS),AIR TUGGERS $35.69 1T 5D 8L HORIZONTAL/DIRECTIONAL DRILL LOCATOR $35.69 1T 5D 8L ' HORIZONTAL/DIRECTIONAL DRILL OPERATOR $36.05 1T 5D 8L HYDRALIFTS/BOOM TRUCKS(10 TON&UNDER) $33.59 1T 5D 81. HYDRALIFTS/BOOM TRUCKS(OVER 10 TON) $35.69 1T 5D 8L LOADERS,OVERHEAD(6 YD UP TO 8 YD) $36.49 1T 5D 8L LOADERS,OVERHEAD(8 YD&OVER) $36.99 1T 5D 8L, LOADERS,OVERHEAD(UNDER 6 YD),PLANT FEED $36.05 1T 5D 8L LOCOMOTIVES,ALL $36.05 1T 5D 8L , MECHANICS,ALL $36.05 1T 5D 8L MIXERS,ASPHALT PLANT $36.05 1T 5D 8L MOTOR PATROL GRADER(FINISHING) $36.05 1T 5D 8L MOTOR PATROL GRADER(NON-FINISHING) $35.69 1T 5D 8L MUCKING MACHINE, MOLE,TUNNEL DRILL AND/OR SHIELD $36.49 1T 5D 8L OIL DISTRIBUTORS,BLOWER DISTRIBUTION AND MULCH SEEDING $33.69 1T 5D 8L OPERATOR ' PAVEMENT BREAKER $33.59 1T 5D 8L PILEDRIVER(OTHER THAN CRANE MOUNT) $36.05 IT 5D 8L PLANT OILER(ASPHALT CRUSHER) $35.69 1T 5D 8L , POSTHOLE DIGGER,MECHANICAL $33.59 1T 5D 8L POWER PLANT $33.59 1T 5D 8L PUMPS,WATER $33.59 1T 5D 8L QUAD 9,D-10,AND HD-41 $36.49 1T 5D 8L , REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $36.49 1T 5D 8L EQUIP Page 6 KING COUNTY Effective 08-31-01 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RIGGER AND BELLMAN $33.59 1T 5D 8L ROLLAGON $36.49 1T 5D 8L ' ROLLER,OTHER THAN PLANT ROAD MIX $33.59 1T 5D 8L ROLLERS,PLANTMIX OR MULTILIFT MATERIALS $35.69 1T 5D 8L ROTO-MILL,ROTO-GRINDER $36.05 1T 5D 8L SAWS,CONCRETE $35.69 1T 5D 8L ' SCRAPERS-SELF PROPELLED,HARD TAIL END DUMP,ARTICULATING $36.05 1T 5D 8L OFF-ROAD EQUIPMENT(UNDER 45 YD) SCRAPERS-SELF PROPELLED,HARD TAIL END DUMP,ARTICULATING $36.49 1T 5D 8L OFF-ROAD EQUIPMENT(45 YD AND OVER) ' SCRAPERS,CONCRETE AND CARRY ALL $35.69 1T 5D 8L SCREED MAN $36.05 1T 5D 8L SHOTCRETE GUNITE $33.59 1T 5D 8L SLIPFORM PAVERS $36.49 1T 5D 8L SPREADER,TOPSIDE OPERATOR-BLAW KNOX $36.05 1T 5D 8L SUBGRADE TRIMMER $36.05 1T 5D 8L TRACTORS,(75 HP&UNDER) $35.69 1T 5D 8L TRACTORS,(OVER 75 HP) $36.05 1T 5D 8L TRANSFER MATERIAL SERVICE MACHINE $36.05 1T 5D 8L TRANSPORTERS,ALL TRACK OR TRUCK TYPE $36.49 1T 5D 8L TRENCHING MACHINES $35.69 1T 5D 8L TRUCK CRANE OILER/DRIVER(UNDER 100 TON) $35.69 1T 5D 8L TRUCK CRANE OILER/DRIVER(100 TON&OVER) $36.05 1T 5D 8L ' WHEEL TRACTORS,FARMALL TYPE $33.59 1T 5D 8L YO YO PAY DOZER $36.05 1T 5D 8L POWER EQUIPMENT OPERATORS-UNDERGROUND SEWER&WATER ' (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE $28.90 4A 5A SPRAY PERSON $27.34 4A 5A TREE EQUIPMENT OPERATOR $27.72 4A 5A TREE TRIMMER $25.64 4A 5A TREE TRIMMER GROUNDPERSON $18.70 4A 5A REFRIGERATION&AIR CONDITIONING MECHANICS MECHANIC $41.86 1G 5A RESIDENTIAL BRICK&MARBLE MASONS JOURNEY LEVEL $19.25 1 ' RESIDENTIAL CARPENTERS JOURNEY LEVEL $25.78 1 B 5D RESIDENTIAL CEMENT MASONS JOURNEY LEVEL $35.33 1M 5D RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL $22.18 1 RESIDENTIAL ELECTRICIANS JOURNEY LEVEL $26.24 1 RESIDENTIAL GLAZIERS JOURNEY LEVEL $24.34 2E 5G ' RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL $17.59 1 RESIDENTIAL LABORERS ' JOURNEY LEVEL $7.96 1 Page 7 KING COUNTY Effective 08-31-01 (See Benefit Code Key) ' Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RESIDENTIAL PAINTERS JOURNEY LEVEL $14.83 1 RESIDENTIAL PLUMBERS&PIPEFITTERS ' JOURNEY LEVEL $27.67 1G 5A RESIDENTIAL REFRIGERATION&AIR CONDITIONING MECHANICS JOURNEY LEVEL $41.86 1 G 5A RESIDENTIAL SHEET METAL WORKERS ' JOURNEY LEVEL(FIELD OR SHOP) $26.23 1.1 5A RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $30.60 1B 5A , RESIDENTIAL SPRINKLER FITTERS(FIRE PROTECTION) JOURNEY LEVEL $15.37 1 ROOFERS ' JOURNEY LEVEL $31.03 1 R 5A USING IRRITABLE BITUMINOUS MATERIALS $34.03 1R 5A SHEET METAL WORKERS JOURNEY LEVEL(FIELD OR SHOP) $39.68 1.1 6L ' SIGN MAKERS&INSTALLERS(ELECTRICAL) SIGN INSTALLER $23.36 1 SIGN MAKER $16.84 1 SIGN MAKERS&INSTALLERS(NON-ELECTRICAL) SIGN INSTALLER $17.31 1 SIGN MAKER $15.61 1 , SOFT FLOOR LAYERS JOURNEY LEVEL $30.60 1B 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $12.44 1 `S ' SPRINKLER FITTERS(FIRE PROTECTION) JOURNEY LEVEL $42.43 113 5C STAGE RIGGING MECHANICS(NON STRUCTURAL) JOURNEY LEVEL $13.23 1 SURVEYORS CHAIN PERSON $9.35 1 INSTRUMENT PERSON $11.40 1 PARTY CHIEF $13.40 1 TELEPHONE LINE CONSTRUCTION-OUTSIDE CABLE SPLICER $24.74 2B 5A , HOLE DIGGERIGROUND PERSON $13.18 2B 5A INSTALLER(REPAIRER) $23.66 2B 5A JOURNEY LEVEL TELEPHONE LINEPERSON $22.91 2B 5A ' SPECIAL APPARATUS INSTALLER 1 $24.74 2B 5A SPECIAL APPARATUS INSTALLER 11 $24.21 2B 5A TELEPHONE EQUIPMENT OPERATOR(HEAVY) $24.74 2B 5A TELEPHONE EQUIPMENT OPERATOR(LIGHT) $22.91 2B 5A , TELEVISION GROUND PERSON $12.42 2B 5A TELEVISION LINEPERSON/INSTALLER $17.02 2B 5A TELEVISION SYSTEM TECHNICIAN $20.54 2B 5A , TELEVISION TECHNICIAN $18.33 2B 5A TREE TRIMMER $22.91 2B 5A TERRAZZO WORKERS&TILE SETTERS , JOURNEY LEVEL $32.83 1 H 5A Page 8 ' KING COUNTY Effective 08-31-01 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code TILE,MARBLE&TERRAZZO FINISHERS FINISHER $26.66 1H 5A TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $27.67 1 K 5A TRUCK DRIVERS ASPHALT MIX(TO 16 YARDS) $33.48 IT 5D 8L ASPHALT MIX(OVER 16 YARDS) $34.06 1T 5D 8L DUMP TRUCK $33.48 1T 5D 8L DUMP TRUCK&TRAILER $34.06 1T 5D 8L 1 OTHER TRUCKS $34.06 1T 5D 8L TRANSIT MIXER $23.45 1 WELL DRILLERS&IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER $17.71 1 OILER $12.97 1 WELL DRILLER $17.68 1 1 r t Page 9 1 BUILDING SERVICE EMPLOYEES EFFECTIVE 08-31-01 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code Counties Covered: JEFFERSON, KITSAP, LEWIS, MASON AND PACIFIC JANITOR $8.47 t SHAMPOOER $8.97 WAXER $8.97 WINDOW CLEANER $13.22 Counties Covered: KING JANITOR $13.45 2F 5S TRAVELING WAXER/SHAMPOOER $13.95 2F 5S WINDOW CLEANER(NON-SCAFFOLD) $17.5.4 2F 5S ' WINDOW CLEANER(SCAFFOLD) $18.53 2F 5S Counties Covered: 1 KLICKITAT AND SKAGIT JANITOR $10.00 SHAMPOOER $6.72 WAXER $6.72 WINDOW CLEANER $6.72 Counties Covered: OKANOGAN JANITOR $7.24 SHAMPOOER $10.00 WAXER $8.14 WINDOW CLEANER $9.14 Counties Covered: PEND OREILLE JANITOR $6.72 SHAMPOOER $8.50 WAXER $6.72 WINDOW CLEANER $9.00 � Counties Covered: PIERCE JANITOR $9.37 SHAMPOOER $10.08 WAXER $10.08 WINDOW CLEANER $13.22 � Counties Covered: SNOHOMISH JANITOR $8.73 t SHAMPOOER $9.23 WAXER $9.23 WINDOW CLEANER $13.48 Page 3 BENEFIT CODE KEY-EFFECTIVE 08-31-01 tt#ttiittf;i;;iitiiitittffiiiiiittfftttttii;tt##;ffiitttii;fitii;##;ifit;fiff;;#fi#tftiiiittf#fiiiitttiiiiifffitiiftttii OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER ON PUBLIC WORKS PROJECTS,THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE HOURLY RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER. 1. ALL HOURS WORKED IN EXCESS OF EIGHT(8) HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. C. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. D. THE FIRST EIGHT (8) HOURS ON SATURDAYS OF A FIVE - EIGHT HOUR WORK WEEK AND THE FIRST EIGHT (8) HOURS WORKED ON A FIFTH CALENDAR DAY,EXCLUDING SUNDAY,IN A FOUR-TEN HOUR SCHEDULE,SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT(8) HOURS PER DAY ON SATURDAY; ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS IN A FIFTH CALENDAR WEEKDAY OF A FOUR - TEN HOUR SCHEDULE; ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH FRIDAY,AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. F. THE FIRST EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS(EXCEPT LABOR DAY)SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TAMES THE HOURLY RATE OF WAGE. G. THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. H. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN)SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. J. THE FIRST EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. L. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS(EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. M. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS)SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. N. ALL HOURS WORKED ON SATURDAYS(EXCEPT MAKEUP DAYS)SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE 1 HOURLY RATE OF WAGE. P. ALL HOURS WORKED ON SATURDAYS(EXCEPT MAKEUP DAYS)AND SUNDAYS SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. Q. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIIv1ES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TAMES THE HOURLY RATE OF WAGE. , BENEFIT CODE KEY-EFFECTIVE 08-31-01 ' -2- 1. S. ALL HOURS WORKED ON SUNDAYS BETWEEN THE HOURS OF 12:OOAM SUNDAY AND 6:OOAM MONDAY AND ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. T. ALL HOURS WORKED ON SATURDAYS,EXCEPT MAKE-UP DAYS,SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED AFTER 6:OOPM SATURDAY TO 6:OOAM MONDAY AND ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TAMES THE HOURLY RATE OF WAGE. W. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS(EXCEPT MAKE-UP DAYS)SHALL BE PAID AT ONE AND ONE- HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. A. THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF SIX(6)HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. B. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. C. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TALES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TAMES THE HOURLY RATE OF WAGE. D. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN� ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. E. ALL HOURS WORKED ON SATURDAYS OR HOLIDAYS(EXCEPT LABOR DAY)SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TAMES THE HOURLY RATE OF WAGE. F. THE FIRST EIGHT(8)HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN� ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. G. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TAMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TAMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY. J. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TAMES THE HOURLY RATE OF WAGE. ALL HOURS) WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TAMES THE HOURLY RATE OF WAGE, INCLUDING THE HOLIDAY PAY. ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TAMES THE HOURLY RATE OF WAGE. N SATURDAYS SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE M. ALL HOURS WORKED O , OF WAGE. 0. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TAMES THE HOURLY RATE OF WAGE. 4. A. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. HOLIDAY CODES 5. A. HOLIDAYS: NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7). B. HOLIDAYS: NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,FRIDA AFTER THANKSGIVING DAY,THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY(8). BENEFIT CODE KEY-EFFECTIVE 08-31-01 -3- 5. C. HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8). D. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8). G. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY(7). H. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY,AND CHRISTMAS(6). 1 I. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY(6). N. HOLIDAYS: NEW YEAR'S DAY, WASHNGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS'DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(9). 0. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,AND CHRISTMAS DAY(6). Q. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY(6). R. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY,ONE-HALF DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY.(7 1/2). S. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,AND CHRISTMAS DAY(7). T. PAID HOLIDAYS: SEVEN(7)PAID HOLIDAYS. U. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,CHRISTMAS DAY,AND A DAY OF THE EMPLOYEES CHOICE(7). V. PAID HOLIDAYS: SIX(6)PAID HOLIDAYS. W. PAID HOLIDAYS: NINE(9)PAID HOLIDAYS. X. HOLIDAYS: AFTER 520 HOURS-NEW YEAR'S DAY,THANKSGIVING DAY AND CHRISTMAS DAY. AFTER 2080 HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,CHRISTMAS DAY AND A FLOATING HOLIDAY(8). Y. HOLIDAYS: NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY,THE FRIDAY FOLLOWING THANKSGIVING DAY,AND CHRISTMAS DAY(8). Z. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8). 6. A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8). C. HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING DAY,THE LAST WORK DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY(9). D. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS DAY,THE DAY BEFORE OR THE DAY AFTER CHRISTMAS DAY(9). H. HOLIDAYS: NEW YEAR'S DAY,MARTIN LUTHER KING JR DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8). I. PAID HOLIDAYS: NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7). 6. L. HOLIDAYS: NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY, ' THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY.(8) r BENEFIT CODE KEY-EFFECTIVE 08-31-01 , -4- Q. PAID HOLIDAYS: NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. UNPAID HOLIDAY_ PRESIDENTS'DAY. S. PAID HOLIDAYS: NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,CmUSTMAS EVE DAY,AND CHRISTMAS DAY(8). T. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTONS BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY(9). U. HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, DAY BEFORE INDEPENDENCE DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER , THANKSGIVING DAY,THE DAY BEFORE CHRISTMAS DAY,CHRISTMAS DAY(10). V. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,DAY AFTER THANKSGIVING DAY,CHRISTMAS EVE DAY,CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE(10). W. PAID HOLIDAYS: NEW YEAR'S DAY,DAY BEFORE NEW YEAR'S DAY,PRESIDENTS DAY,MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY,DAY BEFORE CHRISTMAS DAY(10). X. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY,CHRISTMAS DAY,DAY BEFORE OR AFTER CHRISTMAS DAY,EMPLOYEE'S BIRTHDAY(I I). NOTE CODES 8. A. THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50,TO 100'-$1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 175'-$2.25 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 175'TO 250'-S5.50 PER FOOT FOR EACH FOOT OVER 175 FEET OVER 250'-DIVERS MAY NAME THEIR OWN PRICE,PROVIDED IT IS NO LESS THAN THE SCALE LISTED FOR 250 FEET C. THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50'TO 100'-S1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 150'-S1.50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150'TO 200'-$2.00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 200'-DIVERS MAY NAME THEIR OWN PRICE D. WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDITIONAL$1.00 PER HOUR L. WORKER S ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS-LEVEL A:$0.75, LEVEL B:$0.50, AND LEVEL C:$0.25. M. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS: LEVELS A&B: $1.00 LEVELS C&D:$0.50. N. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS-LEVEL A:$1.00,LEVEL B:S0.75,LEVEL C:$0.50, AND LEVEL D:S0.25. �3 ZtY st�� GJ ........ off ' ot N icrn o 9, $ + C; ^ . y ,-% p� $ ,� ,�, &{' a ��{' •#t �`s i ( N N R sn er y N ' ..N,.,; �tt•X{UN NINl.y. I���,.:1.;!y!!; !i��r�!' fy..•+y,:�"S+'• }�t•}y.�:'ttr•. ».(F�:'`::FF:.���v�:, i:7'C:'.•{;,<J.' t'}FF.}Y'.Fi}�+;. }F / . $�•`+i',k.: F �'i '}.}fi5"Ji }Xt:$t.• >.ti ii.}ljF�'r!''h+f}:3�vi ?.{•,: :t''r':3�� c t •fit S::• •{F:;kify;.n s+' k: : Y :4 ;. F3>{�6::x :Gi }`�Y 2,'S,+•�t�ft��' }.'£,r�• .;tF �,.:r.n• sf: �••;?` :xi�2 Jn y;'!{'G,:<s:s: :•t`,'S.<$::,•r'•:;. r 3;.F Lki.;.,y� �ssf tt'� •w••�:�Gµ•.$3att•`�,f;t'':+F'?'%{2t:•M1%�:;:;%'fs`',•`.^k,.:z� X"k,'•g. '..4.vcr,.,::: /� � .�.i .� :�•F:;.' �.'•}�''"`}', #}' :iy�::'.•.rk'fi't ?'i t,i4� :;��G:�''�•J?s� };�`.;h; •L Fr/ :3 i � � '�•� ` s+f; � 4 �s Yif;`'} F fJ•ft:Sn �\�y � Y 7 i.%X}J v'>.?. ShYSt•y M1 dk{'.:��.`J%!y1; t Y.�r it ♦ �Q1 vl � � _'•E i�: am•3i•3.<:.¢:?�•'�;.�.1• 'f `F f'y:#;:nw4�• {r:<.•;:•.•: a a `' kk :'{'}�•: 5 3:. ?;fiF.•:, t:'•£"'F:::s a 'eb tj4'},•S'�Y:,:F^:Sft:•\ hn �}. 4y'�F�\1.� W //�.y .��5} � J,��i�•k�+;,' Xn�Fa 3JJ 9:� •,h,�+µ i{r.• :"�;":l:kr,.F.':::�; k:•'• u'`) F�1 nS' i F?F''j' :r;.a•> �'�`r ;;•x3;�J'., }:.' '' b•'f••:yt;;kt;r{nYf '.t.{Yt:};: �r{.�NG:: }'�'ii,:'+tt Fes' A J•:{4yv rr}: .•p S{ ;: 'w� LL co ••• y}f ` ♦. .• r• r: :}.,} 4'..J.t,{��{;}}•....r.0�i'CW$: I� r'a•Y :;n.• J.' JJ.k. r>f,• J r:G:. .:f::.. •vr i iaNt'v,F:d r:f::%;is't•F ashif� �:a'r,.'• '�•: .:::�.;r.: '!•a:: •;'�;.<,`•+' •y, n' 6 .e '';4:r,vr.,;i.•.t::;.•}•�;.;��r• y T Fo'�.3�•��yy�,, ::0. 'F' ); .F�R3:• n,.;; r�'..,•+ h;F,J;Y .�5.i'••°�. /•. W \�t'i+ }'i:%'y:'^f }O}: yF; :,':.".4:'•y k.titi:tF;,✓,.Jv'r'a.:. N ►` .7 `i;St;F:ylRRi.r';F iS hY W: t.L'r%E k•,. �¢•Y• ny }�t; .y p f•9 3 fv}rNPLO �'4.:e•>x'�.t i• s;:;> 3.• Cti < V � � ;••tk''�.Ff:' �3•i,.E'Gffi''';��` 3 ^u^`''{•h:.F.:}:kt < j t ?'kS. i.r{{{ 7•ii'?7 rR>:�;t 4r.4:Fk;}:r:.r�i 54 tiC}.`. ;'%;;�i /.. h:r 4.4;'•: ;r}:, r:f:<:�}n:'� } }}:; !y� £^•.t:a � •F:`v p ........... i' Rfiiff i kiifif' •3i '• t`i'i r1 l'. $ F - /FG�y }'T+�,f(( � � ...». ^ 4ti�''yyi,�'#i��ius` yyFti i�:;•,`.yt{'�iE2 h, }�' Yti ii �:,�'.L%'s rc:} i�t�:a,k: My. W '4�F:�:i;$;Jlr�f+',`2},.!��;;.f..:5,�R6f }4 :. 'v'} i :r ..., ff i�t;yE;},•, M i Yf:'r•.�:}':}: :$'. y:t.. k:,a:"'y',.•F as }�',1'•$,f.k^{:i4 Y }F:r:'ti;'�"'�; �' ,•`.k}Y., yt'�} S{Y;:>'F$'Y•,++FY� tl � C �`�`"< n;sf#F� :Z'?•:�a t;fk"y: ,.*'+,�5{9?'fis^nt4'}` •8: k.�:r.•:;•r'4s'rx+'' U '� i,.�,'f+•» •:r(e•�''�''•' .'#f'.::�v s9ti.M:: ;,;.�.kix'',�:.:';9y;:";i,', �' k r ;Q � � � `.k':`:T:; rJ:•z,r � 'vn`ii?',i>`k• i.'F', i:.:t}:� ;•t;J.f n{ � 4 i/ U .}Ze�� •�s#�S.',e7t$ri:'<•;tZ x n;� ��;,' :�. :'.!r:,+�}., .�v',;•�.}�y.;. �pt 7 5 ,ter;'. E ;• ,.X'• ,f g}3'':,;a 'i:: ��" d � T a '4.i`3�;;��'4{,�7,sq��:•�trA�t+ ;�?{+� ��'���•,•,'' ,{: cS„3�A{''�R :$�: � }:? �•'Fr'•�'.,gg44{i:� 1•`':.:�:itif� ,df; ':�q:,:§?:, •,''C !Y.1...•}.,•�:,; �y {/) ';n.Ft• t. �R;fYk'f�•K'q� } .};' i) :Y� .�n•:3}'a f�`� �ii.� � �, ,p ^� �... •y?3 `#3�t a�?�kf�;F'ir;'4�"wy.,�Y�yahf.X{y.}'rp•�::•�.s�''S�.. r••. gyp} ,� yy iT . �iw''1M:Y4t '1iiN 1 ii'IIMN'{N'ti`Ii/NY�II'MIMh NSi 'P � �� � it • t ' O � � to ':::: .. .. 4 CERTIFICATION OF PAYMENT OF PREVAILING WAGES Date: Project CAG No. IThis is to certify that the prevailing wages have been paid to our employees and our subcontractors' employees for the period from through in accordance with the Intents to Pay Prevailing Wage filed with the Washington State Department of Labor & Industries. This form will be executed and submitted prior to or with the last pay request. Company Name By: Title: l 1 1 1 1 REQUIREMENTS FOR THE PREVENTION OF ENVIRONMENTAL POLLUTION AND ' PRESERVATION OF PUBLIC NATURAL RESOURCES In accordance with the provisions of Chapter 62, Laws of 1973, H. B. 621, the Contractor shall secure any permits or licenses required by, and comply fully with all provisions of the following laws, ordinances, and resolutions: King County Ordinance No. 1527 requires Building and Land Development Division and Hydraulics Division review of grading and filling permits and unclassified use permits in flood hazard areas. Resolution No. 36230 establishes storm drain design standards to be incorporated into project design standards to be incorporated into project design by Engineering Services. Review by Hydraulics Division. King County Ordinance No. 800, No. 900, No. 1006 and Resolution No. 8778, No. 24553, No. 24834, No. 6894 and No. 11242 contained in King County Code Titles 8 and 10 are provisions for disposition of refuse and litter in a licensed disposal site and provide penalties for failure to comply. Review by Division of Solid Waste. ' Puget Sound Air Pollution Control Agency Regulation I: A regulation to control the emission of air contaminants from all sources within the jurisdiction of the Puget Sound Air Pollution Control Agency ' (King, Pierce, Snohomish, and Kitsap Counties) in accordance with the Washington Clean Air Act, R.C.W. 70.94. ' WASHINGTON STATE DEPARTMENT OF ECOLOGY W.A.C. 18-02: Requires operators of stationary sources of air contaminants to maintain records of emissions, periodically report to the State information concerning these emissions from his operations, and ' to make such information available to the public. See Puget Sound Pollution Control Agency Regulation I. R.C.W. 90-48: Enacted to maintain the highest possible standards to ensure the purity of all water of the State consistent with public health and public enjoyment thereof, the propagation and protection of wildlife, birds, game, fish, and other aquatic life, and the industrial development of the state, and to that end require the use of all known available and reasonable methods by industries and others to prevent and control the pollution of the waters of the State of Washington. It is unlawful to throw, drain, run or otherwise discharge into any of the water of this State any organic or inorganic matter that shall cause or tend to cause pollution of such waters. The law also provides for civil penalties of $5,000/day for each violation. R.C.W. 70.95: Establishes uniform statewide program for handling solid wastes which will prevent land, air and water pollution. Makes it unlawful to dump or deposit solid wastes onto or under the surface of the ground or into the waters of this State except at a solid waste disposal site for which there is a valid ' permit. R.C.W. 76-04.370: Provide for abatement of additional fire hazard (lands upon which there is forest debris) and extreme fire hazard (areas of additional fire hazard near buildings, roads, campgrounds, and school grounds). The owner and/or person responsible is fully liable in the event a fire starts or spreads on property on which an extreme fire hazard exists. R.C.W. 76.04.010: Defines terms relating to the suppression or abatement of forest fires or forest fire conditions. tPage l of 5 R.C.W. 70.94.660: Provides for issuance of burning permits for abating or prevention of forest fire ' hazards, instruction or silvicultural operations. R.C.W. 76-.04.310: Stipulates that everyone clearing land or clearing right-of-way shall pile and burn or dispose of by other satisfactory means, all forest debris cut thereon, as rapidly as the clearing or cutting progresses, or at such other times as the department may specify, and in compliance with the law requiring burning permits. R. C. W. 78-44: Laws governing surface mining (including sand, gravel, stone, and earth from borrow pits) which provide for fees and permits, plan or operation, reclamation plan, bonding, and inspection of operations. W.A.C. 332-18: Delineates all requirements of R.C.W. 76-04 pertaining to land clearing and burning. tU.S. ARMY CORPS OF ENGINEERS Section 1 of the River and Harbor Act of June 13, 1902: Authorizes Secretary of Army and Corps of Engineers to issue permits to any persons or corporation desiring to improve any navigable river at their own expense and risk upon approval of the plans and specifications. Section 404 of the Federal Water Pollution Control Act (PL92-500 86 Stat. 816): Authorizes the Secretary of the Army, acting through the Corps of Engineers, to issue permits for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Permits may be denied if it is ' determined that such discharge will have adverse effects on municipal water supplies, shell fish beds and fishery areas and wildlife or recreational areas. MISCELLANEOUS FEDERAL LEGISLATION Section 13 of the River and Harbor Act approved March 3, 1899: Provides that discharge of refuse ' without a permit into navigable waters is prohibited. Violation is punishable by fine. Any citizen may file a complaint with the U. S. Attorney and share a portion of the fine. Page 2 of 5 REQUIREMENTS FOR THE PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION OF PUBLIC NATURAL RESOURCES PERMITS REQUIRED FOR THE PROJECT ARE AS FOLLOWS: KING COUNTY BUILDING AND LAND DEVELOPMENT DIVISION ' King County Resolution No. 25789 requires an unclassified use permit for filling, quarrying (including borrow pits and associated activities such as asphalt plants, rock crushers) and refuse disposal sites and provides for land reclamation subsequent to these activities. A copy is available at the Department of 1 Public Works or Building and Land Development Division. Shoreline Management Act 1971 requires a permit for construction on State shorelines. Permit acquired by Public Works and reviewed by Building and Land Development Division. King County Ordinance No. 1488 requires permit for grading, land fills, gravel pits, dumping, quarrying and mining operations except on County right-of-way. Review by Building and Land Development ' Division. WASHINGTON STATE DEPARTMENT OF FISHERIES AND GAME Chapter 112, Laws of 1949: Requires hydraulics permit on certain projects. (King County Department of Public Works will obtain.) WASHINGTON STATE DEPARTMENT OF ECOLOGY W.A.C. 173-220: Requires a National Pollutant Discharge Elimination System (NPDES) permit before discharge of pollutants from a point source into the navigable waters of the State of Washington. W.A.C. 372-24: Permit to discharge commercial or industrial waste waters into State surface or ground water (such as gravel washing, pit operations, or any operation which results in a discharge which contains turbidity). IW.A.C. 508-12-100: Requires permit to use surface water. W.A.C. 508-12-190: Requires that changes to permits for water use be reviewed by the Department of Ecology whenever it is desired to change the purpose of use, the place of use, the point of withdrawal and/or the diversion of water. W.A.C. 508-12-220: Requires permit to use ground water. W.A.C. 508-12-260: Requires permit to construct reservoir for water storage. W.A.C. 508-12-280: Requires permit to construct storage dam. ' W.A.C. 508-60: Requires permit to construct in State flood control zone. King County Public Works secures one for design. Contractor secures one for his operation (false work design, etc.) ' Page 3 of 5 REQUIREMENTS FOR THE PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION OF PUBLIC NATURAL RESOURCES WASB INGTON STATE DEPARTMENT OF NATURAL RESOURCES R.C.W. 76.04.150: Requires burning permit for all fires except for small outdoor fires for recreational purposes or yard debris disposal. Also the Department of Natural Resources reserves the right to restrict ' burning under the provisions of R.C.W. 76.04.150, 76.04.170, 76.04.180, and 70.94 due to extreme fire weather or to prevent restriction of visibility and excessive air pollution. R.C.W. 76.08.030: Cutting permit required before cutting merchantable timber. R.C.W. 76.08.275: Operating permit required before operating power equipment in dead or down ' timber. R.C.W. 78.44.080: Requires permit for any surface mining operation (including sand, gravel, stone, and earth from borrow pits). UNITED STATES ARMY CORPS OF ENGINEERS Section 10 of River and Harbor Act of March 3, 1899: Requires permit for construction (other than bridges, see U. S. Coast Guard administered permits) on navigable waters (King County Department of Public Works will obtain.) FIRE PROTECTION DISTRICT ' R.C.W. 52.28.010, 52.28.020, 52.28.030, 52.28.040, 52.28.050: Provides authority for, requirements of, and penalties for failure to secure a fire permit for building an open fire within a fire protection district. UNITED STATES COAST GUARD ' Section 9 of River and Harbor Act of March 3, 1899, General Bridge Act of March 23, 1906, and General Bridge Act of 1946 as amended August 2, 1956: Requires a permit for construction of bridge on navigable waters (King County Department of Public Works will obtain). King County Department of ' Public Works will comply with pertinent sections of the following laws while securing the aforementioned permit: Section 4(f) of Department of Transportation Act, National Environmental Policy Act of 1969, Water Quality Improvement Act of 1970. ' PUGET SOUND AIR POLLUTION CONTROL AGENCY Section 9.02(d) (2) (iii) of Regulation I: Request for verification of population density. Contractor should ' be sure his operations are in compliance with Regulation I, particularly Section 9.02 (outdoor fires), Section 9.04 (particulate matter -- dust), and Section 9.15 (preventing particulate matter from becoming airborne). Page 4 of 5 REQUIREMENTS FOR THE PREVENTION OF ENVIRONMENTAL POLLUTION AND PRESERVATION OF PUBLIC NATURAL RESOURCES ENVIRONMENTAL PROTECTION AGENCY Title 40, Chapter Ic, Part 61: Requires that the Environmental Protection Agency be notified five (5) days prior to the demolition of any structure containing asbestos material (excluding residential structures ' having fewer than five (5) dwelling units). The above requirements will be applicable only where called for on the various road projects. Copies of these permits, ordinances, laws, and resolutions are available for inspection at the Office of the Director of Public Works, 900 King County Administration Building, Seattle, WA. 98104. ' It shall be the responsibility of the Contractor to familiarize himself with all requirements therein. All costs resulting therefrom shall be included in the Bid Prices and no additional compensation shall be made. ' All permits will be available at construction site. r ' Page 5 of 5 ' CITY OF RENTON SUPPLEMENTAL SPECIFICATIONS 1 1 1 1 City of Renton 1 SUPPLEMENTAL 1 SPECIFICATIONS for the i 1997 Standard Specifications for Road, Bridge, 1 and Municipal Construction jr, 1 , f. O + 1 Adopted May 19, 1997 r Washington State Department of Transportation VAf 1 American Public Works Association Washington State Chapter CITY OF RENTON STANDARD SPECIFICATIONS ' The City of Renton Standard Specifications for Municipal Construction (hereafter referred to as The Renton Standards) shall apply to all work performed within the public right-of-way by, or for, the City of Renton; or work ' performed as an extension, betterment or addition to any of the City's utility, or transportation systems. The Renton Standards are comprised of the following documents: ' Standard Specifications The Standard Specifications are "The 1996 Standard Specifications for Road, Bridge, and Municipal Construction (English)" published by the Washington State Department of Transportation and the American Public ' Works Association, Washington Chapter. WSDOT Amendments ' WSDOT Amendments are changes to the Standard Specifications published on a quarterly basis by WSDOT. The included Index to Amendments lists all amendments received and acknowledged by the time of publication of this document. These Amendments shall be considered a part of the Standard Specifications. Standard Plans The Standard Plans are selected pages of "The Standard Plans for Road and Bridge Construction" as published by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, adopted by the City of Renton, and bound together with those standard plans created by the City of Renton. An appendix contains the original WSDOT/APWA index showing the disposition (Adopted, Replaced, or Deleted) of all original pages. ' Supplemental Specifications The City of Renton Supplemental Specifications is a compilation of the revisions made to the original ' WSDOT/APWA document, as modified by the adopted WSDOT Amendments, and is produced to be used together with the original document(s). Where changes are being made to the 1996 Standard Specifications sufficient amounts of the original (WSDOT/APWA) text is reproduced to provide clarity and context. All original text being deleted is shown with a line through the characters. his-is-dceted4 All replacement text or text being added is shown as underlined tie. Sections being deleted in their entirety are so stated and not shown. When a section is described as being revised, sufficient text from the original section is shown with cross-outs and boldface to show the revisions. When a section is supplemented, existing text that is not being changed is not shown unless needed to clarify the meaning of the added text. Each item in the Supplemental Specifications signifies the source that wrote the item in parentheses following the listing of the section number and title: (APWA) Signifies an item taken verbatim from the Division 1 APWA Supplement to the 1996 Standard Specifications. (SA) Signifies that the section has been modified from the original State text by an amendment produced by WSDOT. The text of the subject section is shown as modified by the amendment, otherwise WSDOT Amendments are not shown in this document except for their listing in the Index to Amendments. (RC) Signifies an item produced by the City of Renton or an APWA or State Amendment that has been rewritten by Renton. Those documents listed above shall govern all work, except as these standards may be modified or superseded by project-specific plans, special provisions or other documents officially approved by the City of Renton. All work within the public right-of-way performed by other agencies or private parties working under permit authority of the City of Renton shall follow these standards with the exception of those requirements which pertain to payment and financing. Copies of the Renton Standards are on file at the Customer Service desk of the Planning/Building/Public Works Department, Municipal Building, Renton, Washington 98055, where they may be examined and copied by any interested party. ' Page-RS-i Revision Date:May 19, 1997 Table of Contents CITY OF RENTON STANDARD SPECIFICATIONS.....................................................................................i ' Division 1 General Requirements........................................................................................................... 1 1-01 Definitions and Terms..................................................................................................... 1 1-02 Bid Procedures and Conditions............................................................. 2 1-03 Award and Execution of Contract.................................................... 2 1-04 Scope of the Work. ...................................3 1-05 Control of Work............................................................................................................3 1-06 Control of Material.........................................................................................................7 ' 1-07 Legal Relations and Responsibilities to the Public..................................................................7 1-08 Prosecution and Progress................................................................................................12 1-09 Measurement and Payment..............................................................................................14 1-10 Temporary Traffic Control..............................................................................................18 1-11 Renton Surveying Standards............................................................................................19 Division2 Earthwork.........................................................................................................................22 ' 2-02 Removal of Structures and Obstructions.............................................................................22 2-03 Roadway Excavation and Embankment..............................................................................22 2-04 Haul...........................................................................................................................23 2-06 Subgrade Preparation..........................................:.........................................................23 2-09 Structure Excavation......................................................................................................23 Division 3 Production From Quarry and Pit Sites and Stockpiling.................................................................25 3 No supplemental specifications were necessary .....................................25 Division4 Bases • .........................................................................25 4 No supplemental specifications were necessary.........................................................................25 Division5 Surface Treatments and Pavements..........................................................................................26 5-04 Asphalt Concrete Pavement.............................................................................................26 ' Division 6 Structures..........................................................................................................................29 6-12 Rockeries....................................................................................................................29 ' Division 7 Drainage Structures, Storm Sewers,Sanitary Sewers,Water Mains, and Conduits.............................30 7-01 Drains........................................................................................................................30 7-02 Culverts.....................................................................................................................30 7-03 Structural Plate Pipe,Pipe Arch,Arch,and Underpass.........................................................30 7-04 Storm Sewers..............................................................................................................30 7-05 Manholes, Inlets,and Catch Basins..................................................................................31 7-08 General Pipe Installation Requirements.............................................................................32 7-10 Trench Exc., Bedding, and Backfill for Water Mains............................................................34 7-11 Pipe Installation for Water Mains ....................................................................................34 7-12 Valves for Water Mains.................................................................................................37 7-14 Hydrants....................................................................................................................38 7-15 Service Connections......................................................................................................39 ' 7-17 Sanitary Sewers...........................................................................................................39 Division8 Miscellaneous Construction.....................................................................................................40 ' 8-09 Raised Pavement Markers...............................................................................................40 8-10 Guide Posts..................................................................................................................40 8-13 Monument Cases...........................................................................................................40 8-14 Cement Concrete Sidewalks.............................................................................................40 ' 8-17 Impact Attenuator Systems............................................................. ...41 8-20 Illumination,Traffic Signal Systems, and Electrical..............................................................41 8-22 Pavement Marking........................................................................................................47 8-23 Temporary Pavement Markings........................................................................................48 Page-RS-ii Revision Date:May 19, 1997 ' Division 9 Materials................. ..................................................49 ........................................................ 9-00 Definitions and Tests......................................................................................................49 ' 9-02 Bituminous Materials.....................................................................................................49 9-04 Joint and Crack Sealing Materials.....................................................................................50 9-05 Drainage Structures, Culverts,and Conduits.......................................................................50 9-06 Structural Steel and Related Materials..............................................................................51 ' 9-08 Paints.........................................................................................................................51 9-23 Concrete Curing Materials and Admixtures.........................................................................52 9-29 Illumination,Signals,Electrical........................................................................................52 ' 9-30 Water Distribution Materials...........................................................................................58 INDEX TO WSDOT AMENDMENTS ......................................................................................................60 WSDOTAMENDMENTS......................................................................................................60 t Page-RS4U Revision Date:May 19, 1997 ' 1-01 Definitions and Terms 1-01 Definitions and Terms Department shall also refer to the Department of PlanningBuilding/Public Works Administrator. Division 1 ' Special Provisions(RC) — General Requirements odifications to the standard specifications -Ad be -;AsiRda�;ntr to the stand21;d specifiC21 s and supplemental specifications that apply to an individual project. The special provisions may describe work the 1-01 Definitions and Terms specifications do not cover. Such work shall comply first with the special provisions and then with any specifications that apply. The SECTION 1-01.1ISREVISED BYADDING THE FOLLOWING: Contractor shall include all costs of doing this work within the bid 1-01.1 General(RC) State(RC) Whenever reference is made to the State, Commission, The state of Washington acting through its representatives. Department of Transportation, Secretary of Transportation, The State shall also refer to The City of Renton and its authorized ' Owner Contracting Agency or Engineer, such reference shall be representatives where applicable. deemed to mean the City of Renton acting through its City Council, Contract Documents(APWA) employees and duly authorized representatives for all contracts The component pans of the contract which may include, but ' administered by the City of Renton. are not limited to, the Proposal Form, the Contract Form, bonds, insurance certificates, various other certifications and affidavit, the SECTION 1-01.3 IS REVISED AND SUPPLEMENTED BY Contract Provisions, the Contract Plans, Working Drawings, the THE FOLLOWING: Standard Specifications, the Standard Plans, Addendum, and ' 1-01.3 Def nitions(RC, APWA) Change Orders.Dates(APWA) Act of god(RC) Bid Opening Date(APWA) "Act of God" means an earthquake, flood, cyclone, or other The date on which the Contracting Agency publicly opens and cataclysmic phenomenon of nature. A rain, windstorm, high water reads the bids. or other natural phenomenon of unusual intensity for the specific Award Date(APWA, RC) locality of the work,which might reasonably have been anticipated The date of the formal decision of the Contracting Agency to from historical records of the general locality of the work, shall not accept the lowest responsible and responsive Bidder for the work. be construed as an act of god. Contract Execution Date (APWA) Consulting Engineer(RC) The date the Contracting Agency officially binds the agency to The Contracting Agency's design consultant, who may or may the Contract. not administer the construction program for the Contracting Notice to Proceed Date(APWA) Agency. The date stated in the Notice to Proceed on which the Contract Day( Q time begins. Unless otherwise designated, day(s) as used in the Contract Contract Completion Date(APWA, RC) Documents, shall be understood to mean working days. The date by which the work is contractually required to be Or Equal (RC) completed. The Contract Completion Date will be stated in the Where the term "or equal" is used herein, the Contracting Notice to Proceed. Revisions of this date will be authorized in Agency, or the Contracting Agency on recommendation of the writing by the Engineer whenever there is an extension to the engineer, shall be the sole judge of the quality and suitability of the Contract time. proposed substitution. Final Acceptance Date(APWA, RC) The responsibility and cost of furnishing necessary evidence, The date on which the Contracting Agency accepts the work demonstrations, or other information required to obtain the as complete per contract requirements. ' approval of alternative materials or processes by the Owner shall Material(APWA) be entirely borne by the Contractor. Any substance specified for use in the construction of the Owner (RC) project and its appurtenances which enters into and forms a part of The City of Renton, or its authorized representative. Also the finished structure or improvement and is capable of being so referred to as Contracting Agency. used and is furnished for that purpose. Plans(RC) Materialman(APWA) The contract plans and/or standard plans which show location, A person or organization who furnishes a raw material, character, and dimensions of prescribed work including layouts, supply, commodity, equipment, or manufactured or fabricated ' profiles,cross-sections,and other details. product and does not perform labor at the Project Site;a supplier. Drawings may either be bound in the same book as the Notice of Award(APWA) balance of the Contract Documents or bound in separate sets, and The written notice from the Contracting Agency to the ' are a part of the Contract Documents, regardless of the method of successful Bidder signifying the Contracting Agency's acceptance binding. of the Bid. The terms "Standard Drawings' or 'Standard Details" Notice to Proceed(APWA) generally used in specifications refers to drawings bound either The written notice from the Contracting Agency or Engineer ' with the specification documents or included with the Plans or the to the Contractor authorizing and directing the Contractor to City of Renton Standard Plans. proceed with the Work and establishing the date on which the Secretary, Secretary of Transportation(RC) Contract Time begins. The chief executive officer of the Department and other ' authorized representatives. The chief executive officer to the Page-SP-1 ' Revision Date:May 19, 1997 1-02 Bid Procedures and Conditions 1-03 Award and Execution of Contract ' 1-02 Bid Procedures and Conditions within 5 (five) years from the date of submission. Failure to so label such materials or failure to timely respond after notice of SECTION I-02.1 IS DELETED AND REPLACED BY THE request for public disclosure has been given shall be deemed a waiver by the submitting vendor of any claim that such materials ' FOLLOWING: are, in fact,so exempt. 1-02.1 Qualifications of Bidder(APWA) SECTION 1-02.12 IS SUPPLEMENTED BY ADDING THE Bidders shall be qualified by experience, financing, FOLLOWING: ' equipment and organization to do the work called for in the 1-02.12 Public Opening of Proposals (APWA) Contract Documents. The Contracting Agency reserves the right to take whatever action it deems necessary to ascertain the ability of The Contracting Agency reserves the right to postpone the , the Bidder to perform the work satisfactorily. This action may date and time for bid opening. Notification to bidder will be by include a pre qualification procedure prior to the Bidder being addenda. furnished a proposal form on any contract or a preaward survey of SECTION I-02.13 PARAGRAPH I IS REVISED AS FOLLOWS. the Bidder's qualifications prior to award. ' SECTION 1-02.2 IS DELETED AND REPLACED BY THE 1-02.13 Irregular Proposals(RCS FOLLOWING: a. The bidder is not prequalified when so required; 1-02.2 Bid Documents(APWA) SECTION 1-02.14 IS REVISED IN ITEM 3 IN PARAGRAPH I , Information as-to where Bid Documents can be obtained or TO READ: reviewed will be found in the Call for Bids for the Work placed in 1-02.14 Disqualification of Bidders (APWA) ' the Contracting Agency's official newspaper. 3. A bidder is not }qualified for the work or to the full SECTION 1-02.4(2) IS SUPPLEMENTED BY REVISING extent of the bid; SENTENCE 1, PARAGRAPH 1 TO READ. 1-02.4(2) Subsurface Information(APWA) 1-03 Award and Execution of Contract If the Contracting Agency has made subsurface investigation of the site of the proposed work, the boring log data and soil SECTION 1-03.1 IS SUPPLEMENTED AS FOLLOWS: sample test data, and geotechnical reports accumulated by the 1-03.1 Consideration of Bids_(RC, APWA) Contracting Agency will be made available for inspection by the bidders. The total of extensions, corrected where necessary, and SECTION 1-02.5 IS SUPPLEMENTED BY ADDING THE including sales taxes where applicable, will be used by the ' FOLLOWING. Contracting Agency for award purposes and to fix the amount of the contract bond. 1-02.5 Proposal Form (APWA) All bids will be based on total sum of all schedules of prices. No partial bids will be accepted unless so Stated in the call for bids The Engineer reserves the right to arrange the Bid Forms with or special provisions. The City reserves the right however to Alternates Additives or Deductives, if such be to the advantage of award all or any schedule of a bid to the lowest bidder at its the Contracting Agency. The Bidder shall bid on all Additives, discretion. Deductives m or Alternates set forth in the Proposal Fors unless otherwise specified in the Special Provisions. SECTION I-03.2 IS SUPPLEMENTED BY ADDING THE SECTION 1-02.6 IS SUPPLEMENTED BY ADDING THE FOLLOWING: FOLLOWING: 1-03.2 Award of Contract(RC) , 1-02.6 Preparation of Proposal (RC) The contract bond form and all other forms requiring execution together with a list of all other forms or documents All prices shall be in legible figures and(Pot-words)written in mired to be submitted by the successful bidder, will be ink or typed.The proposal shall include: forwarded to the successful bidder within 10 days of the award. ' 1. A unit price for each item (omitting digits more than four The number of copies to be executed by the Contractor shall be places to the right of the decimal point), each unit price shall also determined by the Contracting Agency. be written in words; where a conflict arises the written words shall prevail. SECTION 1-03.3 IS REVISED AND SUPPLEMENTED AS , SECTION I-02.6(l) IS AN ADDED SUPPLEMENTAL FOLLOWS: SECTION. 1-03.3 Execution of Contract(APWA, RC) 1-02.6Q) Proprietary Information (RC) Within 20 10 calendar days after receipt from the City of the ' Vendors should in the bid proposal, identify clearly any forms and documents required to be completed by the material(s) which constitute '(valuable) formula, designs, Cnutracto A-&@• the successful bidder shall return the drawings and research data" so as to be exempt from public signed Contracting Agency-prepared contract, an insurance , disclosure RCW 42.17.310 or any materials otherwise claimed to certification as required by Section 1-07.18, and a satisfactory bond be exempt along with a Statement of the basis for such claim of as required by law and Section 1-03.4. If the bidder experiences exemption. The Department (or State) will give notice to the circumstances beyond their control that prevents return of the vendor of any request for disclosure of such information received contract documents within 20 10 calendar days after the award Page-SP-2 Revision Date:May 19, 1997 ' 1-04 Scope of the Work 1-05 Control of Work date, the Contracting Agency may grant up to a maximum of 20 10 SECTION 1-04.4 IS SUPPLEMENTED WITH THE additional calendar days for return of the documents, provided the FOLLOWING: Contracting Agency deems the circumstances warrant it. The Contracting Agency is prohibited by RCW 39.06.010 1-04.4 Changes (RC) from executing a contract with a Contractor who is not registered Renton does not have a formal policy or guidelines on cost or licensed as required by the laws of the state. In addition the reduction alternatives, but will evaluate such proposals by the Contracting Agency requires persons doing business with the Contractor on a case-by-case basis. Contracting Agency to possess a valid City of Renton business license prior to award. SECTION 1-04.11 IS SUPPLEMENTED AS FOLLOWS: When the Bid Form provides spaces for a business license 1-04.11 Final Cleanup (RC) number, a Washington State Contractors registration number, or both the Bidder shall insert such information in the spaces 3. All salvage material as noted on the plans and taken from provided. The Contracting Agency requires legible copies of the any of the discarded facilities shall, at the engineer's discretion be Contractor's Registration and business license be submitted to the carefully salvaged and delivered to the City shops. Any cost Engineer as part of the Contracting Agency's post-award incurred in salvaging and delivering such items shall be considered information and evaluation activities. incidental to the project and no compensation will be trade. SECTION 1-03.4 IS SUPPLEMENTED BY ADDING THE The contract price for "Finish and Cleanup, lump sum,' shall FOLLOWING TO THE FIRST PARAGRAPH: be full compensation for all work, equipment and materials required to perform final cleanup. If this pay item does not appear 1-03.4 Contract Bond (APWA) in the contract documents then final clean up shall be considered ' incidental to the contract and to other pay item and no further 5. Be accompanied by a power of attorney for the Surety's compensation shall be made. officer empowered to sign the bond. 7. Be signed by an officer of the Contractor empowered to 1-05 Control of Work sign official statements (sole proprietor or partner). If the Contractor is a corporation, the bond must be signed by the president or vice-president,unless accompanied by written proof of SECTION I-OS.3 IS REVISED AS FOLLOWS: the authority of the individual signing the bond to bind the 1-05.3 Plans and Working Drawings RT corporation(i.e., corporate resolution,power of attorney or a letter to such effect by the president or vice-president). The Contractor shall submit supplemental working drawings, as required for the performance of the work. The drawings shall be 1-04 Scope of the Work on sheets measuring '14 by 36 22 by 34 inches or on sheets with dimensions in multiples of 8-1r1 by I itches. SECTION 1-04.1 IS SUPPLEMENTED BY ADDING THE SECTION I-05.4 IS SUPPLEMENTED BY ADDING THE FOLLOWING: FOLLOWING: 1-04.1 Intent of the Contract C 1-05.4 Conformity with and Deviations from Plans The Contractor is encouraged to provide to the Engineer prior and Stakes (RC) to progress payments an estimate of lump sum work accomplished If the project calls for Contractor supplied surveying, the to date. The Engineer's calculations and decisions shall be final in Contractor shall provide all required survey work, including such regard to the actual percentage of any lump sum pay item work as mentioned in Sections 1-05.4, 1-05.5;1-11 and elsewhere accomplished and eligible for payment unless another specific in these specifications as being provided by the Engineer. ' method of calculating lump sum payments is provided elsewhere in SECT70N 1-05.5 THE VACANT SECTION IS REPLACED BY the specifications. THE FOLLOWING. SECTION 1-04.2 IS REVISED AS FOLLOWS. 1-05.5 Construction Stakes (RC) ' 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda If the project calls for Contractor supplied surveying, the Contractor shall provide all required survey work, including such (RC) work as mentioned in Sections 1-05.4, 1-05.5, 1-11 and elsewhere ' Any inconsistency in the parts of the contract shall be resolved in these specifications as being provided by the Engineer. All costs by following this order of precedence (e.g., 1 presiding over 2, 3, for this survey work shall be included in 'Contractor Supplied 4,5,6,and 7;2 presiding over 3,4,5, 6,and 7; and so forth): Surveying,"per lump sum. 1. Addenda 1-05.5(1) General (APWA, RCZ ' 2. Proposal Form 3. Special Provisions The Engineer or Contractor supplied surveyor will provide 4. Contract Plans construction stakes and marks establishing lines, slopes, and grades 5. Amendments to the Standard Specifications as stipulated in Sections 1-05.5(1) and 1-05.5(2) and will perform 6. Supplemental Specifications. such work per Section 1-11. The Contractor shall assume full 7. Standard Plans responsibility for detailed dimensions, elevations, and excavation 6.8. Standard Specifications slopes measured from the Engineer or Contractor supplied surveyor furnished stakes and marks. Page-SP-3 ' Revision Date:May 19, 1997 1-05 Control of Work 1-05 Control of Work ' The Contractor shall provide a work site which has been with major grade changes shall be slope staked to establish grade prepared to permit construction staking to proceed in a safe and before offset hubs are set. orderly manner. The Contractor shall keep the Engineer or 1-05.5 3 Bridge and Structure Surveys (APWA) Contractor supplied surveyor informed of staking requirements and � For all structural work such as bridges and retaining walls, the provide at least 48 hours notice to allow the Engineer or Contractor supplied surveyor adequate time for setting stakes. Contractor shall retain as a part of Contractor organization an Stakes marks and other reference points, including existing experienced team of surveyors under direct supervision of a ' monumentation set by Contracting Agency forces shall be licensed surveyor. The Contractor shall ensure that required field carefully preserved by the Contractor. The Contractor will be measurements and locations match and fulfill the intended plan charged for the costs of replacing stakes, markers and dimensions. The Contractor shall provide all surveys required to monumentation that were not to be disturbed but were destroyed or complete the structure except the following primary survey control damaged by the Contractor's operations. This charge will be which will be provided by the Engineer: deducted from monies due or to become due to the Contractor. 1. Centerline or offsets to centerline of the structure. Any claim by the Contractor for extra compensation by reason 2. Stations of abutments and pier centerlines. ' of alterations or reconstruction work allegedly due to error in the 3. A sufficient number of bench marks for levels to enable Engineer's line and grade will not be allowed unless the original the Contractor to set grades at reasonably short distances. control points set by the Engineer still exist, or unless other 4 Monuments and control points as shown on the satisfactory substantiating evidence to prove the error is furnished Drawings. the Engineer. Three consecutive points set on line or grade shall be The Contractor shall establish all secondary survey controls, the minimum points used to determine any variation from a straight both horizontal and vertical as necessary to assure proper line or grade. Any such variation shall, upon discovery, be placement of all project elements based on the primary control reported to the Engineer. In the absence of such report the points provided by the Engineer. Survey work shall be within the ' Contractor shall be liable for any error in alignment or grade. following tolerances: The Contractor shall provide all surveys required other than 1 Stationing +.Ol foot those to be performed by the Engineer. All survey work shall be 2 Alignment +.Ol foot(between successive points) done in accordance with Section 1-11 SURVEYING STANDARDS 3 Superstructure Elevations+.01 foot (from plan elevations) , of these specifications. 4 Substructure Elevations+.05 foot(from plan elevations) The Contractor shall keep updated survey field rotes in a During the progress of the Work the Contractor shall make standard field book and in a format set by the Engineer,per Section available to the Engineer all field books including survey 1-11 1(3) These field notes shall include all survey work information footing elevations cross sections and quantities. performed by the Contractor's surveyor in establishing line, grade The Contractor shall be fully responsible for the close and slopes for the construction work. Copies of these field notes coordination of field locations and measurements with appropriate shall be provided the Engineer upon request and upon completion dimensions of structural members being fabricated. of the contract work the field book or books shall be submitted to 1-05.5 Contractor Supplied Surveying(RC) the Engineer and become the property of the Contracting Agency. 4� When the contract provides for Contractor Supplied If the survey work provided by the Contractor does not mat the standards of the Engineer, then the Contractor shall, upon the Surveying the Contractor shall supply the survey work required Engineer's written request remove the individual or individuals for the project The Contractor shall retain as a part of the doing the survey work and the survey work will be completed by Contractor Organization an experienced team of surveyors under the Engineer at the Contractor's expense. Costs for completing the the direct supervision of a professional land surveyor licensed by survey work required by the Engineer will be deducted from the State of Washington All survey work shall be done in monies due or to become due the Contractor. accordance with Sections 1-05.4, 1-05.5 and 1-11. All costs for survey work required to be performed by the Tire Contractor and/or Surveyor shall inform the Engineer in Contractor shall be included in the prices bid for the various items writing of any errors discrepaceies and omissions to the plans that which comprise the improvement or be included in the bid item for prevent the Contractor and/or Surveyor from constructing the "Contractor Supplied Surveying' per lump sum if that item is project in a manner satisfactory to the Engineer. All errors, included in the contracts. discrepancies and omissions must be corrected to the satisfaction of the Engineer before the survey work may be continued. 1-05.5(2) Roadway and Utility Surveys(APWA) The Contractor shall coordinate his work with the Surveyor The Engineer shall furnish to the Contractor one time only,or and perform his operations in a manner to protect all survey stakes Contractor supplied surveyor will provide as needed, all principal from harm The Contractor shall inform the Surveyor of the Fines, grades and measurements the Engineer deems necessary for Contractor's intent to remove any survey stakes and/or points completion of the Work. These shall generally consist of one initial before physically removing them. set of: The surveyor shall be responsible for maintaining As-Built 1. Slope stakes for establishing grading, records for the project The Contractor shall coordinate his 2. Curb grade stakes, operations and assist the Surveyor in maintaining accurate As-Built 3 Centerline finish grade stakes for pavement sections records for the project. wider than 25 feet,and If the Contractor and Surveyor fail to provide, as directed by 4 Offset points to establish line and grade for underground the Engineer and/or these plans and specifications, accurate As- utilities such as water, sewers and storm drains (with offsets, 50' Built records and other work the Engineer deems necessary, the max interval). Engineer may elect to provide at Contractor expense a surveyor to On alley construction projects with minor grade changes, the provide all As-Built records and other work as directed by the Engineer or Contractor supplied surveyor shall provide offset hubs Engineer. The Engineer shall deduct expenses incurred by the on one side of the alley to establish the alignment and grade. Alleys Engineer-supplied surveying from moneys owed to the Contractor. Page-SP-4 Revision Date:May 19, 1997 ' 1-05 Control of Work 1-05 Control of Work Payment per Section 1-04.1 for all work and materials provided by this Section nor shall the exercise of this right diminish ' required for the full and complete survey work required to the Contracting Agency's right to pursue any other avenue for complete the project and as-built drawings shall be included in the additional remedy or damages with respect to the Contractor's lump sum price for 'Contractor Supplied Surveying." failure to perform the Work as required. 1-05.5(5) Contractor Provided As-Built Information SECTION I-05.10 IS SUPPLEMENTED BY ADDING THE 1 RQ FOLLOWING: It shall be the contractors responsibility to record the location 1-05.10 Guarantees(APWA, RQ prior to the backfilling of the trenches, by centerline station, offset, and depth below pavement, of all existing utilities uncovered or If within one year after the Acceptance Date of the Work by crossed during his work as covered under this project. the Contracting Agency, defective and unauthorized Work is It shall be the contractors responsibility to have his surveyor discovered, the Contractor shall promptly, upon written order by locate by centerline station, offset and elevation each major item of the Contracting Agency, return and in accordance with the work done under this contract per the survey standard of Section 1- Engineer's instructions, either correct such Work, or if such Work I L. Major items of work shall include but not be limited to: has been rejected by the Engineer, remove it from the Project Site Manholes, Catch basins and Inlets, Valves, vertical and and replace it with non defective and authorized Work, all without Horizontal Bends, Junction boxes, Cleanouts, Side Sewers, Street cost to the Contracting Agency. If the Contractor does not Lights & Standards, Hydrants, Major Changes in Design Grade, promptly comply with the written order to correct defective and Vaults, Culverts, Signal Poles, Electrical Cabinets. unauthorized Work, or if an emergency exists, the Contracting After the completion of the work covered by this contract, the Agency reserves the right to have defective and unauthorized Work contractors surveyor shall provide to the City the hard covered corrected or removed and replaced pursuant to Section 1-05.8 field book(s) containing the as-built notes and one set of white "Owner's Right to Correct Defective and Unauthorized Work." prints of the project drawings upon which he has plotted the notes The Contractor agrees the above one year limitation shall not of the contractor locating existing utilities, and one set of white exclude or diminish the Contracting Agency's rights under any law prints of the project drawings upon which he has plotted the as- to obtain damages and recover costs resulting from defective and built location of the new work as he recorded in the field book(s). unauthorized work discovered after one year but prior to the This drawing shall bear the surveyors seal and signature certifying expiration of the legal time period set forth in RCW 4.16.040 it's accuracy. limiting actions upon a contract in writing, or liability expressed or All costs for as-built work shall be included in the contract implied arising out of a written agreement. item "Contractor Supplied Surveying." The Contractor shall warrant good title to all raterials, supplies, and equipment purchased for, or incorporated in the THE VACANT SECTION I-05.8 IS REPLACED BY. Work. Nothing contained in this paragraph, however, shall defeat or impair the right of persons furnishing materials or labor, to 1-05.8 Contracting Agency's Right to Correct recover under any bond given by the Contractor for their Defective and Unauthorized Work (APWA) protection, or any rights under any law permitting such persons to If the Contractor fails to remedy defective or unauthorized look to funds due the Contractor in the hands of the Contracting work within the time specified in a written notice from the Agency. Engineer, or fails to perform any part of the Work required by the The provisions of this paragraph shall be inserted in all Contract Documents, the Engineer may correct and remedy such subcontracts and material contracts, and notice of its provisions work as may be identified in the written notice, by such means as shall be given to all persons furnishing materials for the Work the Engineer may deem necessary, including the use of Contracting when no formal contract is entered into for such materials. Agency forces. Section 1-05.11 is deleted and the first two sentences of the If the Contractor fails to comply with a written order to fourth paragraph of section 1-08.9 is deleted and replaced by the remedy what the Engineer determines to be an emergency following: situation, the Engineer may have the defective and unauthorized 1-05.11 Final Inspection (APWA) Work corrected immediately, have the rejected Work removed and replaced, or have Work the Contractor refuses to perform completed by using Contracting Agency or other forces. An 1-05.11(1) Substantial Completion Date (APWA) emergency situation is any situation which, in the opinion of the When the Contractor considers the work to be substantially Engineer, a delay in its remedy could be potentially unsafe, or complete, the Contractor shall so notify the Engineer and request might cause serious risk of loss or damage to the public. the Engineer establish the Substantial Completion Date. To be Direct or indirect costs incurred by the Contracting Agency considered substantially complete the following conditions must be attributable to correcting and remedying defective or unauthorized met: Work, or Work the Contractor failed or refused to perform, shall 1. The Contracting Agency must have full and unrestricted be paid by the Contractor. Payment will be deducted by the use and benefit of the facilities, both from the operational and Engineer from monies due, or to become due, the Contractor. Such safety standpoint. direct and indirect costs shall include in particular, but without 2. Only minor incidental work, replacement of temporary limitation, compensation for additional professional services substitute facilities, or correction or repair work remains to reach required, and costs for repair and replacement of work of others physical completion of the work. destroyed or damaged by correction, removal, or replacement of The Contractor's request shall list the specific items of work the Contractor's unauthorized work. in subparagraph two above that remains to be completed in order to No adjustment in contract time or compensation will be reach physical completion. The Engineer may also establish the allowed because of the delay in the performance of the Work Substantial Completion Date unilaterally. attributable to the exercise of the Contracting Agency's rights Page-SP-5 Revision Date:May 19, 1997 1-05 Control of Work 1-05 Control of Work , If after this inspection the Engineer concurs with the Completion Date cannot be established until testing and corrections Contractor that the Work is substantially complete and ready for its have been completed to the satisfaction of the Engineer. intended use the Engineer, by written notice-to the Contractor, The costs for power, gas, labor, material, supplies, and ' will set the Substantial Completion Date. If, after this inspection everything else needed to successfully complete operational testing, the Engineer does not consider the Work substantially complete and shall be included in the various contract prices related to the system ready for its intended use the Engineer will by written notice, so being tested, unless specifically set forth otherwise in the Bid notify the Contractor giving the reasons therefor. Form. Upon receipt of written notice concurring in or denying Operational and test periods, when required by the Engineer, substantial completion whichever is applicable, the Contractor shall not affect a manufacturer's guaranties or warranties furnished shall pursue vigorously, diligently and without unauthorized under the terms of the Contract. interruption, the Work necessary to reach Substantial and Physical SEC77ON 1-05.12 IS DELETED AND REPLACED WITH THE Completion. The Contractor shall provide the Engineer with a FOLLOWING: revised schedule indicating when the Contractor expects to reach_ substantial and physical completion of the work, 1-05.12 Final Acceptance (APWA) The above process shall be repeated until the Engineer The Contractor must perform all the obligations under the establishes the Substantial Completion Date and the Contractor Contract before the Completion Date can be established. A considers the work physically complete and ready for Final Certificate of Completion for the Work issued by the Contracting Inspection. Agency will establish the Completion Date and certify the Work as 11-05.11(2) Final Inspection Date(APWA) complete. The Final Contract Price may then be calculated. The When the Contractor considers the Work physically complete following must occur before the Completion Date can be and ready for Final Inspection the Contractor by Written Notice, established and the Final Contract Price calculated: shall request the Engineer to schedule a final inspection. The 1. The physical work on the project must be complete. Engineer will set a date for Final Inspection. The Engineer and the 2. The Contractor must furnish all documentation required Contractor will then make a Final Inspection and the Engineer will by the Contract and required by law, necessary to allow the notify the Contractor in writing of all particulars in which the Final Contracting Agency to certify the Contract as complete. Inspection reveals the Work incomplete or unacceptable. The A Certificate of Completion for the Work, signed by the Contractor shall immediately take such corrective measures as are Contracting Agency, will constitute acceptance of the Work. The necessary to remedy the listed deficiencies. Corrective work shall issuance of this Certificate of Completion will not constitute be pursued vigorously, diligently, and without interruption until acceptance of unauthorized or defective work or material. physical completion of the listed deficiencies. This process will Failure of the Contactor to perform all of the Contractor's continue until the Engineer is satisfied the listed deficiencies have obligations under the Contract shall not bar the Contracting Agency been corrected. horn unilaterally certifying the Contract complete so the En it If action to correct the listed deficiencies is not initiated within may calculate a Final Contract Price as provided in Section 1-09.9. 7 days after receipt of the Written Notice listing the deficiencies, SECTION 1-05.13 IS SUPPLEMENTED BY REVISING the Engineer may, upon Written Notice to the Contractor, take PARAGRAPH 7 TO READ: whatever steps are necessary to correct those deficiencies pursuant 1-05.13 Superintendents, Labor, and Equipment of to Section 1-05.8. Upon correction of all deficiencies, the Engineer will notify Contractor (APWA) the Contractor and the Contracting Agency, in writing, of the date Whenever the Contracting Agency evaluates the Contractor's upon which the Work was considered physically complete. That p;wpmlification pursuant to Section 1-02.1,the Contracting Agency date shall constitute the Physical completion date of the Contract, will take these performance but shall not imply all the obligations of the Contractor under the d owreports into account. Contract have been fulfilled. SECTION 145 IS SUPPLEMENTED BY ADDING THE 1-05.11 3 Operational Testing(APWA) FOLLOWING NEW SECTIONS: It is the intent of the Contracting Agency to have at the Completion Date a complete and operable system. Therefore when 1-05.16 Water and Power (APWA) the Work involves the installation of machinery or other The Contractor shall make necessary arrangements, and shall mechanical equipment; street lighting electrical distribution or bear the costs for power and water necessary for the performance signal systems;buildings; or other similar work it may be desirable of the Work. for the Engineer to have the Contractor operate and test the Work for a period of time after final inspection but prior to the Physical 1-05.17 Oral Agreements (AMA) Completion Date. Whenever items of work are listed in the No oral agreement or conversation with any officer, agent, or Contract Provisions for operational testing they shall be fully tested under operating conditions for the time period specified to ensure employee the Contracting Agency, either before or after their acceptability prior to the Physical Completion Date. During execution off t the contract shall affect or modify any of the terms.or and following the test period the Contractor shall correct any items obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shad be considered of workmanship materials or equipment which proves faulty, or as unofficial information and in no way binding upon the that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested Contracting Agency, unless subsequently put in writing. during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Page-SP-6 Revision Date:May 19, 1997 ' 1-06 Control of Material 1-07 Legal Relations and Responsibilities to the Public 1-06 Control of Material its payment if the Contractor bases a bid on a misunderstood tax 1 liability. SECTION 1-06.02(2) IS SUPPLEMENTED BY ADDING THE The Contractor shall include all Contractor-paid taxes in the FOLLOWING: unit bid prices or other contract amounts. In some cases, however, state retail sales tax will not be included. Section 1-07.2(3) 1 1-06.2(2) Statistical Evaluation of Materials for describes this exception. The Contracting Agency will pay the retained percentage only Acceptance if the Contractor has obtained from the Washington State UNLESS STATED OTHERWISE IN THE SPECIAL PROVISIONS STATISTICAL EVALUATION WILL NOT BE Department of Revenue a certificate showing that all contract- related taxes have been USED BY THE CITY OF RENTON. paid (RCW 60.28.050). The Contracting Agency may deduct from its payments to the Contractor any amount the Contractor may owe the Washington State Department 1-07 Legal Relations and Responsibilities to of Revenue, whether the amount owed relates to this contract or 1 the Public not. Any amount so deducted will be paid into the proper State fund. SECTION 1-07.1 IS SUPPLEMENTED BY ADDING THE 1-07.2(2) State Sales Tax-Rule 171(APWA) FOLLOWING: WAC 458-20-171, and its related rules, apply to building, 1-07.1 Laws to be Observed (APWA) repairing, or improving streets, roads, etc., which are owned by a municipal corporation, or political subdivision of the state, or by The Contractor shall indemnify, defend,and save harmless the the United States, and which are used primarily for foot or Contracting Agency (including any agents, officers, and vehicular traffic. This includes storm or combined sewer systems employees) against any claims that may arise because the within and included as a part of the street or road drainage system Contractor(or any employee of the Contractor or subcontractor or and power lines when such are part of the roadway lighting system. ' materialman)violated a legal requirement. For work performed in such cases, the Contractor shall include In cases of conflict between different safety regulations, the Washington State Retail Sales Taxes in the various unit Bid Item more stringent regulation shall apply. prices or other contract amounts, including those that the The Washington State Department of Labor and Industries Contractor pays on the purchase of the materials, equipment, or shall be the sole and paramount administrative agency responsible supplies used or consumed in doing the work. for the administration of the provisions of the Washington Industrial Safety and Health Act of 1973 (WISHA). 1-07.2(3) State Sales Tax-Rule 170(APWA) The Contractor shall maintain at the Project Site office, or _WAC 458-20-170 and its related rules, apply to the other well known place at the Project Site,all articles necessary for constructing and repairing of new or existing buildings, or other providing first aid to the injured. The Contractor shall establish, structures upon real property. This includes, but is not limited to, publish and make known to all employees, procedures for ensuring the construction of streets roads highways, etc., owned by the immediate removal to a hospital, or doctor's care, persons, State of Washington; water mains and their appurtenances;sanitary including employees who may have been injured on the Project sewers and sewage disposal systems unless such sewers and Site. Employees should not be permitted to work on the Project disposal systems are within and a part of,a street or road drainage Site before the Contractor has established and made known system; telephone telegraph electrical power distribution lines, or procedures for removal of injured persons to a hospital or a other conduits or lines in or above streets or roads, unless such doctor's care. power lines become a part of a street or road lighting system; and The Contractor shall have sole responsibility for the safety, installing or attaching of any article of tangible personal property in efficiency,.arid adequacy of the Contractor's plant, appliances,and or to real property, whether or not such personal property becomes methods and for any damage or injury resulting from their failure, a part of the realty by virtue of installation. or improper maintenance use or operation. The Contractor shall For work performed in such cases,the Contractor shall collect be solely and completely responsible for the conditions of the from the Contracting Agency, retail sales tax on the full contract Project Site including safety for all persons and property in the price. The Contracting Agency will automatically add this sales performance of the work. This requirement shall apply tax to each payment to the Contractor. For this reason, the continuously, and not be limited to normal working hours. The Contractor shall not include the retail sales tax in the unit Bid Item required or implied duty of the Engineer to conduct construction prices or in any other contract amount subject to Rule 170, with review of the Contractor's performance does not, and shall not, be the following exception. intended to include review and adequacy of the Contractor's safety Exception: The Contracting Agency will not add in sales tax measures in, on,or near the Project Site. for a payment the Contractor or a subcontractor makes on the SECTION 1-07.2 IS DELETED AND REPLACED BY THE purchase or rental of tools, machinery, equipment, or consumable FOLLOWING: supplies not integrated into the project. Such sales taxes shall be included in the unit Bid Item prices or in any other contract 1-07.2 State Sales Tax(APWA) amount. 1-07.2(_4) Services (APWA) 1-07.2(1) GENERAL(APWA) The Contractor shall not collect retail sales tax from the The Washington State Department of Revenue has issued Contracting Agency on any contract wholly for professional or special rules on the state sales tax. Sections 1-07.2(I) through 1- other services (as defined in State Department of Revenue Rules 07.2(4) are meant to clarify those rules. The Contractor should 138 and 224). contact the Washington State Department of Revenue for answers to questions in this area. The Contracting Agency will not adjust Page-SP-7 Revision Date:May 19, 1997 1-07 Legal Relations and Responsibilities to the Public 1-07 Legal Relations and Responsibilities to the Public SECTION I-07.5(2) IS SUPPLEMENTED BY REVISING THE turbidity shall not exceed 5 NTU over background turbidity when TIME AND SENTENCE 2, PARAGRAPH 2 TO READ. the background turbidity is 50 NTU or less, or have more than a 10 - — percent increase in turbidity when the background turbidity is more 1-07.5(2) State Department of Fish and Wildlifer-e> than 50 NTU; for other classes of waters, refer to WAC 173-201- (APWA, SA) 045. If the work in (1) through (3) above differs little from what The term turbidity means the optical property of sample the contract requires, the Contracting Agency will measure and pay demonstrating the scattering and absorption of light caused by for it at unit contract prices. But if contract items do not cover suspended material as expressed in Nephelometric Turbidity Units those areas, the Contracting Agency will pay pursuant to Section 1- and measured with a calibrated turbidimeter. 09.4. Discharges to a State waterway caused by aggregate washing, drainage from aggregate pit sites, and stockpiles or dewatering of pits and excavations shall not increase the existing turbidity of the receiving waters. SEC77ON 1-07) IS SUPPLEMENTED BY ADDING THE Turbid water from the Project Site shall be treated before FOLLOWING NEW SECTION: being discharged into stream or other State waters. Turbidity may 1-07.11(11) City of Renton Affidavit of Compliance be removed by the use of lagoons or holding ponds, settling basins, overflow weir, polymer water treatment, discharging to ground (RQ surface, by percolation, evaporation or by passing through gravel, Each Contractor, Subcontractor, Consultant, and or Supplier sand or fiber filters. shall complete and submit a copy of the "City of Renton Fair 2. Erosion Control: Temporary erosion control shall be Practices Policy Affidavit of Compliance". A copy of this exercised by minimizing exposed areas and slopes until permanent document will be bound in the bid documents. measures are effective. The minimum exposed area and slopes will be defined in the Special Provisions. Plastic sheet covering shall be placed over exposed ground areas to protect from rain erosion. SECTION I-07.I3(I)IS SUPPLEMENTED AS FOLLOWS: Other alternative methods for erosion control under certain 1-07.13(1) General (RC) situations may include netting,mulching with binder, and seeding. Should rutting and erosion occur the Contractor shall be During unfavorable weather and other conditions, the responsible for restoring damaged areas and for clean-up of eroded contractor shall pursue only such portions of the work as shall not material including that in ditches, catch basins, manholes, and , be damaged thereby. culverts and other pipes. No portion of the work whose satisfactory quality or 3. Chlorine Residual: Water containing chlorine residual efficiency will be affected by unfavorable conditions shall be shall not be discharged directly into storm drains, streams, or State constructed while these conditions exist, unless by special means or waters. Chlorine water may be discharged into sanitary sewers or precautions acceptable to the engineer, the contractor shall be able disposed on land for perculation. Chlorine residual may be reduced to overcome them. chemically with a reducing agent such as sodium thiosulphate. Water shall be periodically tested for chlorine residual. SECTION 1-07.14 (APWA) IS SUPPLEMENTED BY 4. Vehicle and Equipment Washing: Water used for REVISING ALL REFERENCES TO "STATE, COMMISSION, washing vehicles and equipment shall not be allowed to enter storm SECRETARY" OR "STATE" TO READ "CONTRACTING drains streams or other State waters unless separation of petroleum AGENCY." products fresh concrete products or other deleterious material is accomplished prior to discharge. Detergent solution may be SECTION I-07.15 IS REVISED AND SUPPLEMENTED AS discharged into sanitary sewers or allowed to be held on the ground FOLLOWS: for percolation. A recirculation system for detergent washing is recommended. Steam cleaning units shall provide a device for oil 1-07.15 Temporary Water Pollution Erosion Control separation. (APWA , RC) 5. Oil and Chemical Storage and Handling: Handling and storage of oil and chemicals shall not take place adjacent to If done according to the approved plan or the Engineer's waterways. The storage shall be made in dike tanks and barrels orders, temporary water pollution/erosion control work will be with drip pans provided under the dispensing area. Shut-off and measured and paid for pursuant to Section 1-09.41-04.1 through lock valves shall be provided on tanks. Shut-off nozzles shall be the lump sum item for "Temporary Water Pollution/Erosion provided on hoses. Oil and chemicals shall be dispensed only Control.: during daylight hours unless the dispensing area is properly lighted. If no pay item appears in the contract for "Temporary Water Disposal of waste shall not be allowed on oil and chemical spills. Pollution/Erosion Control" then all labor, materials, tools and Fencing shall be provided around oil storage. Locks shall be equipment used to complete the work shall be considered incidental provided on valves,pumps,and tanks. to other pay items in the Contract and no further compensation 6. Sewage: If a sanitary sewer line is encountered and repair shall be made. or relocation work is required, the Contractor shall provide In addition to other requirements in the Contract Documents blocking and sealing of the sanitary sewer line. Sanitary sewer flow this temporary work shall include, but is not limited to, the shall be pumped out, collected, and hauled by tank truck or following water quality considerations: pumped directly to a sanitary system manhole for discharge. The 1. Turbid Water Treatment Before Discharge: existing sewers shall be maintained by the Contractor without Determination of turbidity in surface waters shall be at the interruption of service by the use of temporary sewer bypasses. In discretion of the Engineer; for Lake Class Receiving Waters, addition, the excavated materials adjacent to and around a rupture turbidity shall not exceed 5 NTU (Nephelometric Turbidity Units) of a sanitary sewer line shall be removed from the Project Site and over background conditions; for Class AA and Class A Waters, Page-SP-8 Revision Date:May 19, 1997 1-07 Legal Relations and Responsibilities to the Public 1-07 Legal Relations and Responsibilities to the Public deposited into refuse trucks for haul to a sanitary fill site. other temporary obstacles shall be removed by the contractor and Equipment and tools in contact with the above materials shall be immediately replace, after the trench is backfilled, in their original washed by pressure water lines and the attendant wash water position. The contractor shall notify the Contracting Agency and discharged into a sanitary sewer line for transmission to a sewage property Owner at least 24 hours in advance of any work done on treatment plant. easements or rights-of-way. Damage to existing structures outside of easement areas 1-07.16 Protection and Restoration of Property that may result from dewatering and/or other construction activity SECTION 1-07.16(I) IS SUPPLEMENTED BY ADDING THE under this contract shall be restored to their original condition or FOLLOWING: better. The original condition shall be established by photographs taken and/or inspection made prior to construction. All such work 1-07.16(1) Private/Public Property (RC) shall be done to the satisfaction of the property Owners and the The Contracting Agency will obtain all easements and Contracting Agency at the expense of the contractor. franchises required for the project. The contractor shall limit his D. Streets. The contractor will assume all responsibility of operation to the areas obtained and shall not trespass on private restoration of the surface of all streets(traveled ways)used by him property- if damaged. The Contracting Agency may provide certain lands, as In the event the contractor does not have labor or material indicated in connection with the work under the contract together immediately available to make necessary repairs, the contractor with the right of access to such lands. The contractor shall not shall so inform the Contracting Agency. The Contracting Agency unreasonably encumber the premises with his equipment or will make the necessary repairs and the cost of such repairs shall be materials. paid by the contractor. The contractor shall provide, with no liability to the The contractor is responsible for identifying and Contracting Agency, any additional land and access thereto not documenting any damage that is pre-existing or caused by shown or described that may be required for temporary others.Restoration of excavation in City streets shall be done in construction facilities or storage of materials. He shall construct accordance with the City of Renton Trench Restoration all access roads detour roads,or other temporary work as required Requirements which is available at the Public Works Department by his operations. The contractor shall confine his equipment, Customer Services counter on the 4th floor, Renton Municipal storage of material and operation of his workers to those areas Building,200 Mill Avenue South. shown and described and such additional areas as be may provide. SECTION 1-07.17IS SUPPLEMENTED BY ADDING: A. General. All construction wont under this contract on easements,right-of-way,over private property or franchise,shall be 1-07.17 Utilities and Similar Facilities (APWA,RQ confined to the limits of such easements, right-of-way or franchise. All work shall be accomplished so as to cause the least amount of In addition to the other requirements pursuant to RCW disturbance and a minimum amount of damage. The contractor 19.122 an act relating to underground utilities and prescribing shall schedule his work so that trenches across easements shall not penalties, the Contractor shall: be left open during weekends or holidays and trenches shall not be 1. call the utilities underground location center for field open for more than 48 hours. location of the utilities; B. Structures. The contractor shall remove such existing Call Before You Dig structures as may be necessary for the performance of the work and, if required shall rebuild the structures thus removed in as good a The 48 Hour Locators condition as found. He shall also repair all existing structures which may be damaged as a result of the work under this contract 1-800-424-5555 C. Easements. Cultivated areas and other surface improvements. All cultivated areas,either agricultural or lawns,and and other surface improvements which are damaged by actions of the 2. not begin excavation until all known underground contractor shall be restored as nearly as possible to their original facilities in the vicinity of the proposed excavation have been condition. located and marked. Prior to excavation on an easement or private right-of- Location and dimensions shown on the Plans for existing ' way, the contractor shall strip top soil from the trench or facilities are in accordance with available information without construction area and stockpile it in such a manner that it may be uncovering measuring or other verification. If a utility is known replaced by him, upon completion of construction. Ornamental or suspected of having underground facilities within the area of the trees and shrubbery shall be carefully removed with the earth proposed excavation and that utility is not a subscriber to the ' surrounding their roots wrapped in burlap and replanted in their utilities underground location center then the Contractor shall give original positions within 48 hours. individual notice to that utility. All shrubbery or trees destroyed or damaged, shall be If, in the prosecution of the work it becomes necessary to replaced by the contractor with material of equal quality at no interrupt existing surface drainage sewers underdrains, conduit, additional cost to the Contracting Agency. In the event that it is utilities similar underground structures or parts thereof, the necessary to trench through any lawn area, the sod shall be contractor shall be responsible for and shall take all necessary carefully cut and rolled and replaced after the trenches have been precautions to protect and provide temporary services for same. backfilled. The lawn area shall be cleaned by sweeping or other The contractor shall at his own expense, repair all damage to means,of all earth and debris. such facilities or structures due to this construction operation to the The contractor shall use rubber wheel equipment similar satisfaction of the City; except for City owned facilities which will to the small tractor-type backhoes used by side sewer contractors for be repaired by the utility department at contractor's expense,or by all work including excavation and backfill, on easements or rights- the contractor as directed by the City. of-way which have lawn areas. All fences, markers,mail boxes,or Page-SP-9 Revision Date.May 19, 1997 1-07 Legal Relations and Responsibilities to the Public 1-07 Legal Relations and Responsibilities to the Public SECTION 1-07.18 IS DELETED AND REPLACED BY THE and shall be cause for immediate termination of the contract at the FOLLOWING: option of the City. The Contractor shall obtain and maintain the minimum 1-07.18 Public Liability and Property Damage insurance coverage set forth below. By requiring such minimum Insurance (RC) insurance the City of Renton shall not be deemed or construed to State Amendment to 1-07.18 is not used. Renton uses the have assessed the risks that may be applicable to the Contractor. following: The Contractor shall assess its own risks and if it deems appropriate and/or prudent, maintain higher limits and/or broader SECTION 1-07.18(1)IS REPLACED WITH THE FOLLOWING: coverage. Coverage shall include: 1-07.18(1) General (RC) (1) Commercial General Liability - ISO 1993 Form or The contractor shall obtain and maintain in full force and equivalent. Coverage will be witten on an occurrence basis effect from the Contract Execution Date to the Completion Date, and include: public liability and property damage insurance with an insurance • Premises and Operations (including CG2503: General company(ies) or through sources approved by the State Insurance Aggregate to apply per project,if applicable). Commissioner pursuant to RCW 48. • Explosion Collapse and Underground Hazards _The Contractor shall not begin work under the Contract until • Products/Completed Operations the required insurance has been obtained and approved by the • Contractual Liability (including Amendatory Contracting Agency. Insurance shall provide coverage to the Endorsement CG 0043 or equivalent which includes _Contractor, all subcontractors Contracting Agency and the defense coverage assumed under contract) Contracting Agency's consultant. The coverage shall protect • Broad Form Property Damage against claims for bodily injuries personal injuries, including; • Independent Contractors accidental death, as well as claims for property damages which Personal/Advertising Injury may arise from any act or omission of the Contractor or the :Stop Gap Liability subcontractor, or by anyone directly or indirectly employed by (2) Automobile Liability including all either of them. • Owned Vehicles If warranted work is required the Contractor shall provide the • Non-Owned Vehicles City proof that insurance coverage and limits established under the • Hired Vehicles term of the Contract for work are in full force and effect during the (3) Workers' Compensation period of warranty work. • Statutory Benefits (Coverage A) - Show Washington The Contracting Agency may request a copy of the actual Labor&Industries Number declaration pages(s) for each insurance policy effecting coverage(§) (4) Umbrella Liability(when necessary) required on the contract prior to the date work commences.Failure • Excess of Commercial General Liability and of the Contractor to fully comply during the term of the Contract Automobile Liability. Coverage should be as broad as with the requirements described herin will be considered a material primary• breach of contract and shall be caused for immediate termination of (5) Professional Liability - (whenever the work under this the Contract at the option of the Contracting Agency. Contract includes Professional Liability, (i.e.architectural, ' SECTION 1-07.18(2)IS REPLACED WITH THE FOLLOWING: engineering advertising or computer programming) the CONTRACTOR shall maintain professional liability 1-07.18(2) Coverages (RC) coveting wrongful acts errors and/or omissions of the As part of the response to this proposal the Contractor shall CONTRACTOR for damage sustained by reason of or in submit a completed City of Renton Insurance Information form the course of operations under this Contract. which details specific coverage and limits for this contract. (6) The Contracting Agency reserves the right to request and/or All coverage provided by the Contractor shall be in a form require additional coverages as may be appropriate based on and underwritten by a company acceptable to the Contracting work performed(i.e.pollution liability). , Agency. The City requires that all insurers: 1) Be licensed to do business within the State of Washington. CONTRACTOR shall Name CITY OF RENTON, and its officers 2) Coverage to be on an "occurrence' basis (Professional officials agents employees and volunteers as Additional Liability and Pollution coverage artre acceptable when Insured (ISO Form CG 2010 or equivalent). The CONTRACTOR written on a claims-made basis). The also require shall provide CITY OF RENTON Certificates of Insurance,prior proof of professional liability coverage be provided for up to commencement of work. The City reserves the right to request copies of insurance policies if at their sole discretion it is deemed to two(2)years after the completion of the project. 3) The City may request a copy of the actual declaration appropriate Further, all policies of insurance descnbed above ' page(s) for each insurance policy affecting coverage(s) shall: required by the Contract prior to the date work commences. 1) Be on a primary basis not contributory with any other 4) Possess a minimum A.M. Best rating of AVE (A rating of insurance coverage and/or self-insurance carried by CITY A XII or better is preferred.) If any insurance carver OF RENTON. possesses a rating of less than AVII the City may make an 2) Include a Waiver of Subrogation Clause. exception. 3) Severability of Interest Clause(Cross Liability) The City reserves the right to approve the security of the 4) Policy may not be non-renewed canceled or materially insurance coverage provided by the insurance company(ies), terms, changed or altered unless forty-five (45) days prior written conditions, and the Certificate of Insurance. Failure of the notice is provided to CTTY OF RENTON. Notification Contractor to fully comply during the term of the contract with shall be provided to CITY OF RENTON by certified mail. these requirements will be considered a material breach of contract Page-SP-10 Revision Date:May 19, 1997 1-07 Legal Relations and Responsibilities to the Public 1-07 Legal Relations and Responsibilities to the Public REPLACE SUPPLEMENTAL SPECIFICATION SECTION I- no obligation or liability of any kind upon the 07.18(3) 'LIMITS'WITH THE FOLLOWING: company, its agents or representatives". ' 1-07.18(3) Limits (RC) c. Amend the cancellation clause to state: 'Policy may LIMITS REQUIRED not be non-renewed, canceled or materially changed or Providing coverage in these stated amounts shall not be altered unless 45 days prior written notice is provided construed to relieve the contractor from liability in excess of to the City". Notification shall be provided to the City such limits. The CONTRACTOR shall carry the following by certified mail. limits of liability as required below: For Professional Liability coverage only, instead of the Commercial General Liability — cancellation language specified above, the City will accept a General Aggregate* S2,000,000** written agreement that the consultant's broker will provide the Products/Completed Operations $2,000,000** required notification. Aggregate Each Occurrence Limit $1,000,000 SECTION.1-07.20 IS REVISED AS FOLLOWS: Personal/Advertising Injury $1,000,000 Fire Damage(Any One Fire) $50,000 1-07.20 Patented Devices, Materials, and Processes Medical Payments(Any One Person) $5,000 (APWA) Stop Gap Liability $1,000,000 • General Aggregate to apply per project The Contractor shall assume all costs arising from the use of (ISO Form CG2503 or equivalent) patented devices;materials, or processes used on or incorporated in **Amount may vary based on project risk the work, and agrees to indemnify, defend, and save harmless Automobile Liability The Contracting Agency, and their Bodily Injury/Property Damage $1,000,000 duly authorized agents and employees from all actions of any (Each Accident) nature for, or on account of the use of any patented devices, Workers'Compensation materials,or processes. ' Statutory Benefits-Coverage A Variable (Show Washington Labor and Industries Numbe SECTION 1-07.22IS SUPPLEMENTED BY THE FOLLOWING: r) Umbrella Liability 1-07.22 Use of Explosives (APWA) Each Occurrence Limit $1,000,000 General Aggregate Limit $1,000,000 Explosives shall not be used without specific authority of the Products/Completed Operations $1,000,000 Engineer, and then only under such restrictions as may be required Aggregate by the proper authorities. Explosives shall be handled and used in Professional Liability(If required) sect compliance with WAC 296-52 and such local laws, rules and Each Occurrence/Incident/Claim $1,000,000 regulations that may apply. The individual in charge of the blasting Aggregate $2,000,000 shall have a current Washington State Blaster Users License. The City may require the CONTRACTOR to keep The Contractor shall obtain, comply with, and pay for such professional liability coverage in effect for up to two(2)years after permits and costs as are necessary in conjunction with blasting completion of the project. operations. The Contractor shall promptly advise the CITY OF RENTON When the use of explosives is necessary for the prosecution of in writing in the event any general aggregate or other aggregate the Work, the Contractor's insurance shall contain a special clause limits are reduced. At their own expense, the CONTRACTOR permitting the blasting. will reinstate the aggregate to comply with the minimum limits and 1-07.23 Public Convenience and Safety requirements as stated in Section 1-07.18(3) and shall furnish the CITY OF RENTON a new Certificate of Insurance showing such SECTION I-07.23(1) IS SUPPLEMENTED BY ADDING THE coverage is in force. FOLLOWING PARAGRAPH SECTION 1-07.18(4)IS REPLACED WITH THE FOLLOWING 1-07.23(1) - Construction Under Traffic SUPPLEMENTAL SPECIFICATION 'EVIDENCE OF The contractor shall be responsible for controlling dust and INSURANCE': mud within the proiect limits and on any street which is Within 20 days of award of the contract the CONTRACTOR utilized by his equipment for the duration of the project. shall provide evidence of insurance by submitting to the The contractor shall be prepared to use watering trucks, CONTRACTING AGENCY the following: power sweepers, and other pieces of equipment as deemed 1) City of Renton Insurance Information Form (attached necessary by the engineer,to avoid creating a nuisance. herein) without modification. Dust and mud control shall be considered as incidental to 2) Certificate of Insurance (Accord Form 25s or equivalent) the project, and no compensation will be made for this conforming to items as specified in Sections 1-07.18(l), 1- section. 07.18(2), and 1-07.18(3). as revised above. Other requirements are as follows: Complaints of dust, mud or unsafe practices and/or property damage to private Ownership will be transmitted a. Strike the following or similar wording: "This to the contractor and prompt action in correcting them will Certificate is issued as a matter of information only be required by the contractor. and confers no rights upon the Certificate Holder"; b. Strike the wording regarding cancellation notification to the City: "Failure to mail such notice shall impose Page-SP-II Revision Date:May 19, 1997 1-08 Prosecution and Progress 1-08 Prosecution and Progress SECTION I-07.24 IS DELETED AND REPLACED BY THE SECTION I-07.26 (APWA) IS REVISED BY CHANGING ALL FOLLOWING: REFERENCES TO acOMMISSION, THE SECRETARY" OR 1-07.24 Rights of Way (APWA) "STATE"TO READ "CONTRACTING AGENCY." , SECTION 1-07.27 (APWA) IS REVISED BY CHANGING Street right of way lines limits of easements, and limits of ALL REFERENCES TO "STATE" OR "SECRETARY" TO construction permits are indicated on the Drawings. The READ "CONTRACTING AGENCY." Contractor's construction activities shall be confined within these limits unless arrangements for use of private property are made. Generally, the Contracting Agency will have obtained, prior 1"U8 Prosecution and Progress to Bid opening all rights of way and easements, both permanent , and temporary, necessary for carrying out the completion of the SECTION I-08.I IS DELETED AND REPLACED BY THE Work. Exceptions to this are noted in the Contract Documents or FOLLOWING: brought to the Contractor's attention by a duly issued Addendum. 1-08.1 Preliminary Matters (APWA) Whenever any of the Work is accomplished on or through property other than public right of way, the Contractor shall meet and fulfill all covenants and stipulations of any easement agreement 1-08.1(1) Preconstruction Conference (APWA) obtained by the Contracting Agency from the owner of the private The Engineer will furnish the Contractor with up to 10 copies property. Copies of the easement agreements are included in the of the Contract Documents. Additional documents may be Contract Provisions or made available to the Contractor as soon as fumished upon request at the cost of reproduction. Prior to practical after they have been obtained by the Engineer. undertaking each part of the Work the Contractor shall carefully Whenever easements or rights of entry have not been acquired study and compare the Contract Documents and check and verify , prior to advertising these areas are so noted on the Drawings. The pertinent figures shown therein and all applicable field Contractor shall not proceed with any portion of the Work in areas measurements. The Contractor shall promptly report in writing to where right of way, easements or rights of entry have not been the Engineer any conflict error or discrepancy which the acquired until the Engineer certifies to the Contractor that the right Contractor may discover. , of way or easement is available or that the right of entry has been After the Contract has been executed, but prior to the received. If the Contractor is delayed due to acts of omission on the Contractor beginning the Work a preconstruction conference will part of the Contracting Agency in obtaining easements, rights of be held between the Contractor, the Engineer and such other entry or right of way, the Contractor will be entitled to an interested parties as may be invited. The purpose of the extension of time. The Contractor agrees that such delay shall not preconstruction conference will be: be a breach of contract. 1. To review the initial progress schedule; Each property owner shall be given 48 hours notice prior to 2 To establish a working understanding among the various entry by the Contractor. This includes entry onto easements and parties associated or affected by the Work; private property where private improvements must be adjusted.. 3 To establish and review procedures for progress payment, The Contractor shall be responsible for providing, without notifications,approvals, submittals,etc.; expense or liability to the Contracting Agency, any additional land 4. To establish normal working hours for the Work; and access thereto that the Contractor may desire for temporary S. To review safety standards and traffic control; and construction facilities storage of materials, or other Contractor 6. To discuss such other related items as may be pertinent to needs. However, before using any private property, whether the Work. adjoining the Work or not the Contractor shall file with the The Contractor shall prepare and submit at the preconstruction Engineer a written permission of the private property owner, and, meeting the following: upon vacating the premises a written release from the property 1. A breakdown of all lump sum items; owner of each property disturbed or otherwise interfered with by 2 A preliminary schedule of working drawing submittals;and reasons of construction pursued under this contract. The statement 3. A list of material sources for approval if applicable. shall be signed by the private property owner, or proper authority 4. A Proiect Schedule. acting for the owner of the private property affected, stating that permission has been granted to use the property and all necessary 1-08.1(2) Subcontracting (APWA) permits have been obtained or, in the case of a release, that the Work done by the Contractor's own organization shall account ' restoration of the property has been satisfactorily accomplished. for at least 30 percent of the Awarded Contract Price. Before The statement shall include the parcel number, address,and date of computing this percentage however, The Contractor may subtract signature Written releases must be filed with the Engineer before (from the Awarded Contract Price) the costs of any subcontracted the Completion Date will be established. work on items the contract provisions specifically designates may be first excluded from the Awarded Contract Price. The Contractor shall not subcontract work regardless of tier unless the Engineer approves in writing. Each request to subcontract shall be on the form the Engineer provides. If the Engineer requests, the Contractor shall provide proof that the subcontractor has the experience ability, and equipment the work requires Each subcontract shall contain a provision which requires the subcontractor to comply with Section 1-07.9 and to furnish all certificates submittals and statements required by the Contract Documents. Along with the request to sublet, the Contractor shall submit the names of any contracting firms the subcontractor proposes to Page-SP-I2 Revision Date:May 19, 1997 1-08 Prosecution and Progress 1-08 Prosecution and Progress use as lower tier subcontractors. Collectively, these lower tier Permission to work between the hours of 10:00 p.m. and 7:00 subcontractors shall not do work that exceeds 25 percent of the a.m. during weekdays and between the hours of 10:00 p.m. and total amount subcontracted to a subcontractor. When a 9:00 a.m. on weekends or holidays may also be subject to noise subcontractor is responsible for construction of a specific structure control requirements. Approval to continue work during these or structures, the following work may be performed by lower tier hours may be revoked at any time the Contractor exceeds the 1 subcontractors without being subject to the 25 percent limitation: Contracting Agency's noise control regulations or complaints are I. Furnishing and driving of piling, or received from the public or adjoining property owners regarding 2. Furnishing and installing concrete reinforcing and post- the noise from the Contractor's operations. The Contractor shall tensioning steel. Except for the 25 percent limit, lower tier have no claim for damages or delays should such permission be subcontractors shall meet the same requirements as revoked for these reasons. subcontractors. Permission to work Saturdays, Sundays, holidays or other The Engineer will approve the request only if satisfied with than the agreed upon normal straight time working hours Monday the proposed subcontractor's prior record, equipment, experience, through Friday may be given subject to certain other conditions set and ability to perform the work.Approval to subcontract shall not: forth by the Contracting Agency or Engineer. These conditions 1. Relieve the Contractor of any responsibility to carry out the may include but are not limited to: requiting the Engineer or such contract, assistants as the Engineer may deem necessary to be present during 2. Relieve the Contractor of any obligations or liability under the Work; requiring the Contractor to reimburse the Contracting ' the contract and the Contractor's bond, Agency for the cost of engineering salaries paid Contracting 3. Create any contract between the Contracting Agency and Agency employees who worked during such times; considering the the subcontractor, or Work performed on Saturdays and holidays as working days with 4. Convey to the subcontractor any rights against the regards to the Contract Time; and considering multiple work shifts Contracting Agency. as multiple working days with respect to Contract Time even The Contracting Agency will not consider as subcontracting: though the multiple shifts occur in a single 24-hour period. (1) purchase of sand, gravel, crushed stone, crushed slag, batched Assistants may include, but are not limited to, survey crews; ' concrete aggregates, ready mix concrete, off-site fabricated personnel from the Contracting Agency's material testing lab; structural steel, other off-site fabricated items, and any other inspectors; and other Contracting Agency employees when in the materials supplied by established and recognized commercial opinion of the Engineer,such work necessitates their presence. plants;or(2)delivery of these materials to the work site in vehicles owned or operated by such plants or by recognized independent or 1-08.1 4 Reimbursement for Overtime Work of commercial hauling companies. I Contracting Agency Employees (APWA) However, the State L&I may determine that RCW 39.12 Where the Contractor elects to work on a Saturday, Sunday, applies to the employees of such firms identified in (1) and (2) or other holiday, or longer than an 8-hour work shift on a regular above in accordance with WAC 296-127. If this should occur, the working day, as defined in the Standard Specifications, such work provisions of Section 1-07.9, as modified or supplemented, shall shall be considered as overtime work. On all such overtime work apply, an inspector will be present, and a survey crew may be required at The Contractor shall certify to the actual amounts paid to any the discretion of the Engineer. The Contractor shall reimburse the Disadvantaged, Minority, or Women's Business Enterprises futns Contracting Agency for the full amount of the straight time plus that were subcontractors, manufacturers, regular dealers, or overtime costs for employees of the Contracting Agency required service providers on the contract. This certification shall be to work overtime hours. supplied with the Final Application for Payment on the form The Contractor by these Specifications does hereby authorize provided by the Engineer. the Engineer to deduct such costs from the amount due or to If dissatisfied with any part of the subcontracted work, the become due the Contractor. Engineer may request in writing that the subcontractor be removed.1 SEC770N I-08.4 IS DELETED AND REPLACED BY THE The Contractor shall comply with this request at once and shall not employ the subcontractor for any further work under the contract. FOLLOWING. 1-08.1(3) Hours of Work(APWA) 1-08.4 Notice to Proceed and Prosecution of the Work Except in the case of emergency or unless otherwise approved APWA by the Contracting Agency, the normal straight time working hours Notice to Proceed will be given after the contract has been for the contract shall be any consecutive 8-hour period between executed and the contract bond and evidence of insurances have 7:00 a.m. and 6:00 p.m. of a working day with a maximum 1-hour been approved and filed by the Owner. The Contractor shall not lunch break and a 5-day work week. The normal straight time 8- commence the Work until the Notice to Proceed has been given by hour working period for the contract shall be established at the the Engineer. The Contractor shall continence construction preconstruction conference or prior to the Contractor commencing activities on the Project Site within ten days of the Notice to the Work. Proceed Date. The Work thereafter shall be prosecuted diligently, If a Contractor desires to perform work on holidays, vigorously, and without unauthorized interruption until physical Saturdays, Sundays, or before 7:00 a.m. or after 6:00 p.m. on any completion of the work. There shall be no voluntary shutdowns or day, the Contractor shall apply in writing to the Engineer for slowing of operations by the Contractor without prior approval of permission to work such times. Permission to work longer than an the Engineer. Such approval shall not relieve the Contractor from 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. the Contractual obligation to complete the work within the Such requests shall be submitted to the Engineer no later than noon prescribed Contract Time. on the working day prior to the day for which the Contractor is ' requesting permission to work. Page-SP-l3 Revision Date_May 19, 1997 1-09 Measurement and Payment 1-09 Measurement and Payment ' SECTION 1-08.5 IS DELETED AND REPLACED WITH THE SECTION 1-08.9 IS REVISED PER SECTION 1-05.11. FOLLOWING. 1-08.10 Termination of Contract (APWA) 1-08.5 Time For Completion (Contract Time) (APWA, SECTION I-08.10(l)IS SUPPLEMENTED BY REVISING ALL REFERENCES TO "STATE TREASURER, DEPARTMENT OF The Work shall be physically completed in its entirety within TRANSPORTATION" IN THE LAST SENTENCE, ' the time specified in the Contract Documents or as extended by the PARAGRAPH S TO READ aCONTRACTING AGENCY." Engineer. The Contract Time will be stated in "working days", shall begin on the Notice To Proceed Date, and shall end on the SECTION I-08.11 IS A NEW SECTION.- Contract Completion Date. 1-08.11 Contractor's Plant and Equipment (RC) A nonworking day is defined as a Saturday, a Sunday, a day on which the contract specifically suspends work, or one of these The contractor alone shall at all times be responsible for the holidays: January 1, adequacy,efficiency, and sufficiency of his and his subcontractor's Ma;jAfty of emorial Day, July 4, Labor Day, plant and equipment. The Owner shall have the right to make use November 11, Thanksgiving Day, the day after Thanksgiving, and of the contractor's plant and equipment in the performance of any Christmas Day. When The day before Christmas shall be a work on the site of the work. holiday when Christmas Day-occurs on a Tuesday or Friday. The The use by the Owner of such plant and equipment shall be day after Christmas shall be a holiday when Christmas Day occurs considered as extra work and paid for accordingly. ' on a Monday Wednesday, or Thursday. When Christmas Day Neither the Owner nor the engineer assume any responsibility, occurs on a Saturday, the two preceding working days shall be at any time for the security of the site from the time contractor's observed as holidays.- When"Christmas day occurs on a Sunday, operations have commenced until final acceptance of the work by the two working days following shall be observed as holidays. the engineer and the Owner. The contractor shall employ such When holidays other than Christmas fall on a Saturday, the measures as additional fencing barricades, and watchmen service, preceding Friday will be counted as a non-working day and when as he deems necessary for the public safety and for the protection they fall on a Sunday the following Monday will be counted as a of the site and his plant and equipment. The Owner will be ' non-working day. The Contract Time has been established to allow provided keys for all fenced, secured areas. for periods of normal inclement weather which, from historical records is to be expected during the Contract Time, and during 1-08.12 Attention to Work (RC) which periods work is anticipated to be performed. Each The contractor shall give his personal attention to and shall successive working day, beginning with the Notice to Proceed Date supervise the work to the end that it shall be prosecuted faithfully, and ending with the Physical Completion Date, shall be charged to and when he is not personally present on the work site, he shall at the Contract Time as it occurs except a day or part of a day which all times be represented by a competent superintendent who shall is designated a nonworking day or an Engineer determined have full authority to execute the same and to supply materials, unworkable day. tools and labor without delay, and who shall be the legal The Engineer will furnish the Contractor a weekly report representative of the contractor. The contractor shall be liable for showing (1) the number of working days charged against the the faithful observance of any instructions delivered to him or to Contract Time for the preceding week; (2) the Contract Time in his authorized representative. ' working days; (3) the number of working days remaining in the Contract Time; (4) the number of nonworking days; and (5) any partial or whole days the Engineer declared unworkable the 1-09 Measurement and Payment previous week. This weekly report will be correlated with the Contractor's current approved progress schedule. If the Contractor SECTION 1-09.1 IS SUPPLEMENTED BY ADDING THE elects to work 10 hours a day and 4 days a week (a 4-10 schedule) FOLLOWING: and the fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as a working day then the fifth day of that 1-09.1 Measurement of Quantities (RC) week will be charged as a working day whether or not the When items are specified to be paid for by ton, it will be the Contractor works on that day. Contractor's responsibility to see that a certified weight ticket is The-Contractor will be allowed 10 calendar days from the date gn,en to the Inspector on the project at the time of delivery of ' of each report in which to file a written protest of an alleged materials for each truckload delivered. Pay quantities will be discrepancy in the Contract Time as reported. Otherwise, the prepared on the basis of said tally tickets delivered to the Inspector report will be deemed to have been accepted by the Contractor as at the time of delivery of materials. Tickets not receipt by the correct. Inspector will not be honored for payment. The requirements for scheduling the Final Inspection and Where items are specified to be paid by the ton, the following establishing the Substantial Completion, Physical Completion, and system will be used. Completion Dates are specified in Sections 1-05.11 and 1-05.12. Each truck shall be clearly numbered to the satisfaction of the Engineer and there shall be no duplication of numbers. _Duplicate tickets shall be prepared to accompany each truckload of material delivered to the project. The tickets shall bear at least the following information: ' I. Truck Number. 2. Truck tare weight(stamped at source). 3. Gross truck load weight in tons(stamped at source). 4. Net load weight (stamped at source). ' 5. Driver's name and date. Page-SP-14 Revision Date:May 19, 1997 1-09 Measurement and Payment 1-09 Measurement and Payment 6. Location for delivery_ LABORATORY" TO READ "CONTRACTING AGENCY'S 7. Pay item number. MATERIAL LABORATORY." 8. Contract number and/or name. SECTION 1-09.9 IS DELETED AND REPLACED BY THE The Contractor shall submit a breakdown of costs for each FOLLOWING: lump sum Bid Item. The breakdown shall list the items included in ' the lump sum together with a unit price of labor, materials and 1-09.9 Payments (APWA) equipment for each item. The summation of the detailed unit prices for each item shall add up to the lump sum Bid. The unit price values maybe used as a guideline for determining progress 1-09.9(1) Progress Payments (APWA) 1 payments or deductions or additions in payment for ordered work Progress payments for completed work and material on hand changes. The detailed cost breakdown of each lump sum item shall will be based upon progress estimates prepared by the Engineer. A be submitted to the Engineer prior to the Preconstruction progress estimate cutoff date will be established at the Conference. preconstruction meeting. 1 Within 3 days after the progress estimate cutoff date (but not SECTION 1-09.2 (APWA)IS SUPPLEMENTED BY REVISING more often than once a month) the Contractor shall submit to the ALL REFERENCES TO "MATERIAL RECEIVER" TO READ Engineer for review an Application for Payment filled out and "ENGINEER." signed by the Contractor, covering the work completed prior to the SECTION 1-09.3 IS SUPPLEMENTED BY ADDING THE progress estimate cutoff date. The Application for Payment shall be FOLLOWING: accompanied by documentation supporting the Contractor's Application for Payment. 1-09.3 Scope of Payment (APWA, RC) If payment is requested for materials and equipment not Unless modified otherwise in the Contract Provisions the Bi incorporated in the work, but delivered and stored at approved sites d Items listed or referenced in the "Payment" clause of each Section pursuant to the Contract Documents, the Application for Paymentshall be accompanied by a bill of sale invoice or other of the Standard Specifications, will be the only items for which documentation warranting that the Contractor has received the ' compensation will be made for the Work described in or specified materials and equipment and evidence that the materials and in that particular Section when the Contractor performs the specifiedequipment are covered by appropriate insurance or other Work. Should a Bid Item be listed in a "Payment" clause arrangements to protect the Engineer's interests therein. but not in the Proposal Form, and Work for that item is performed' '� initial progress estimate will be made not later than 30 in the Contractor and the work is not stated as included in days to a pay item in the contras and is not work that woulldd after the Contractor commences the Work and successiveprogress estimates will be made every month thereafter until the be required to complete the intent of the Contract per Section I- Completion Date. Progress estimates made during progress of the 04.1, then payment for that Work will be made as for Extra Work Work are tentative, and made only for the purpose of determining pursuant to a Change Order. progress payment. The progress estimates are subject to change at The words"Bid Item," "Contract Item," and "Pay Item," and any time prior to the calculation of the Final Payment per similar terms used throughout the Contras Documents are Section 1-09.9(4). synonymous. The value of the progress estimate will be the sum of the If the "payment" clause in the Specifications relating to any following: unit Bid Item price in the Proposal Form requires that said unit Bid 1. Unit Price Items in the Bid Form — the approximate Item price cover and be considered compensation for certain work quantity of acceptable units of Work completed multiplied by the ' or material essential to the item, then the work or material will not Unit Price. be measured or paid for under any other Unit Bid Item which may 2. Lump Sum Items in the Bid Form — the estimated appear elsewhere in the Proposal Form or Specifications. percentage complete multiplied by the Bid Forms amount for each Pluralized unit Bid Items appearing in these Specifications are Lump Sum Item. changed to singular form. 3. Materials on Hand — 90 percent of invoiced cost of Payment for Bid Items listed or referenced in the "Payment" material delivered to Job site or other storage area approved by the clause of any particular Section of the Specifications shall be Engineer. considered as including all of the Work required specified or 4. Change Orders — entitlement for approved extra cost or described in that particular Section. Payment items will generally completed extra work as determined by the Engineer. be listed generically in the Specifications and specifically in the Progress payments will be made in accordance with the bid form. When items are to be "furnished" under one payment progress estimate less: item and "installed" under another payment item such items shall 1. Five(5)percent for retained percentage. be furnished FOB project site, or, if specified in the Special 2. The amount of Progress Payments previously made. Provisions, delivered to a designated site. Materials to be 3. Funds withheld by the Contracting Agency for "furnished," or "furnished and installed" under these conditions disbursement in accordance with the Contras Documents. shall be the responsibility of the Contractor with regard to storage Progress payments for work performed shall not be evidence until such items are incorporated into the Work or, if such items of acceptable performance or an admission by the Contracting are not to be incorporated into the work, delivered to the applicable Agency that any work has been satisfactorily completed. Contracting Agency storage site when provided for in the Payments will be made by warrants, issued by the Contracting Specifications. Payment for material "furnished," but not yet Agency's fiscal officer, against the appropriate fund source for the incorporated into the Work, may be made on monthly estimates to project Payments received on account of work performed by a the extent allowed. subcontractor are subject to the provisions of RCW 39.04.250. SECTION 1-09.8 (APWA)IS SUPPLEMENTED BY REVISING ALL REFERENCES TO -HEADQUARTERS' MATERIAL Page-SP-1 S Revision Date:May 19, 1997 1-09 Measurement and Payment 1-09 Measurement and Payment 1-09.9(2) Retainage (APWA,RCZ 1-09.9(3) Contracting Agency's Right to Withhold Pursuant to RCW 60.28 there will be retained from monies and Disburse Certain Amounts (APWA) earned by the Contractor on progress estimates a sum not to exceed In addition to monies retained pursuant to RCW 60.28 and ' 5 percent of the monies earned by the Contractor. Such retainage subject to RCW 39.04.250, RCW 39.12, and RCW 39.76, the shall be used as a trust fund for the protection and payment (1)to Contractor authorizes the Engineer to withhold progress payments the State with respect to taxes imposed pursuant to Title 82, RCW due or deduct an amount from any payment or payments due the , which may be due from such Contractor, and (2)the claims of any Contractor which, in the Engineer's opinion, may be necessary to person arising under the Contract. cover the Contracting Agency's costs for or to remedy the Monies reserved under provisions of RCW 60.28 shall, at the following situations: option of the Contractor, be: 1. Damage to another contractor when there is evidence 1. Retained in a fund by the Contracting Agency. thereof and a claim has been filed. 2. Deposited by the Contracting Agency in an interest- 2. Where the Contractor has not paid fees or charges to bearing account in a bank, mutual savings bank, or savings and public authorities or municipalities which the Contractor is loan association(interest on monies so retained may be paid to the obligated to pay. Contractor). 3. Utilizing material, tested and inspected by the Engineer, 3. Placed in escrow with a bank or trust company by the for purposes not connected with the Work(Section 1-05.6) Contracting Agency. When the monies reserved are to be placed in 4. Landscape damage assessments per Section 1-07.16. escrow the Contracting Agency will issue a check representing the 5. For overtime work performed by City personnel per sum of the monies reserved payab)e to the bank or trust company Section 1-08.1(4). and the Contractor jointly. Such check shall be converted into 6. Anticipated or actual failure of the Contractor to bonds and securities chosen by the Contractor and approved by the complete the Work on time: Contracting Agency and the bonds and securities held in escrow. a. Per Section 1-08.9 Liquidated Damage;or Interest on the bonds and securities may be paid to the Contractor b. Lack of construction progress based upon the Engineer's as the interest accrues. review of the Contractor's approved progress schedule which The Contractor shall designate the option desired as--" indicates the Work will not be completed within the Contract Time. ' When calculating an anticipated time overrun, the Engineer will at make allowances for weather delays, approved unavoidable delays, least 10 working days prior to the first progress payment for the and suspensions of the Work. The amount withheld under this contract. The Contractor in choosing option (2) or (3) agrees to subparagraph will be based upon the liquidated damages amount assume full responsibility to pay all costs which may accrue from per day set forth in Contract Documents multiplied by the number escrow services, brokerage charges or both, and further agrees to of days the Contractor's approved progress schedule, in the opinion assume all risks in connection with the investment of the retained of the Engineer, indicates the Contract may exceed the Contract percentages in securities. The Contracting Agency may also, at its Time. option accept a bond for all or a portion of the contractor's 7. Failure of the Contractor to perform any of the retainage. Contractor's other obligations under the contract, including but not Release of retained percentage will be made 60 days following limited to: the Completion Date (pursuant to RCW 39.12, RCW 39.76, and a. Failure of the Contractor to provide the Engineer with a RCW 60.28)provided the following conditions are met: field office when required by the Contract Provisions. 1. On contracts totaling more than$20,000.00, a release has b. Failure of the Contractor to protect survey stakes, been obtained from the Washington State Department of Revenue markers etc., or to provide adequate survey work as required by , (RCW 60.28.051). Section 1-05.5. 2. No claims, as provided by law, have been filed against c. Failure of the Contractor to correct defective or the retained percentage. unauthorized work(Section 1-05.8) 3. Affidavit of Wages Paid is on file with the Contracting d. Failure of the Contractor to furnish a Manufacture's Agency for the Contractor and all Subcontractors regardless of tier Certificate of Compliance in lieu of material testing and inspection (RCW 39.12.040). as required by Section 1-06.3. In the event claims are filed the Contractor will be paid such e. Failure to submit weekly payrolls, Intent to Pay retained percentage less an amount sufficient to pay any such Prevailing Wage forms or correct underpayment to employees of ' claims together with a sum determined by the Contracting Agency the Contractor or subcontractor of any tier as required by Section sufficient to pay the cost of foreclosing on claims and to cover 1-07.9. attorney's fees, f. Failure of the Contractor to pay worker's benefits (Title Retainage will not be reduced for any reason below the 50 and Title 51 RCW)as required by Section 1-07.10, minimum limit provided by law. g. Failure of the Contractor to submit and obtain approval Pursuant to Section 1-07.10, the Contractor is responsible for of a progress schedule per Section 1-08.3. submitting to the State L&I a "Request for Release" form in order The Contractor authorizes the Engineer to act as agent for the for the Contracting Agency to obtain a release from that Contractor disbursing such funds as have been withheld pursuant to department with respect to the payments of industrial insurance this section to a patty or parties who are entitled to payment. medical aid premiums. The Contracting Agency will ensure the Disbursement of such funds, if the Engineer elects to do so,will be Washington State Employment Security Department and any made only after giving the Contractor 15 calendar days prior applicable Contracting Agency department or organization are written notice of the Contracting Agency's intent to do so, and if , notified of Contract completion in order to obtain releases from prior to the expiration of the 15-calendar day period, those departments or agency organizations. 1. no legal action has commenced to resolve the validity of the claims,and 2. the Contractor has not protested such disbursement. Page-SP-16 Revision Date:May 19, 1997 ' 1-09 Measurement and Payment • 1-09 Measurement and Payment A proper accounting of all funds disbursed on behalf of the of the responsibility to comply with all laws ordinances and ' Contractor in accordance with this section will be made. A regulations — Federal, State, or local — that affect the contract payment made pursuant to this section shall be considered as The date the Contracting Agency unilaterally signs the Final payment made under the terms and conditions of the Contract. The Progress Estimate constitutes the final acceptance date (Section 1- Contracting Agency shall not be liable to the Contractor for such 05.12). ' payment made in good faith. If legal action is instituted to determine the validity of the 1-09.11 Disputes and Claims claims prior to expiration of the 15-day period mentioned above, the Engineer will hold the funds until determination of the action or SECTION I-09.11(2)IS REVISED AS FOLLOWS. ' written settlement agreement of the parties. 1-09.11(2) Claims (APWA) 1-09.9(4) Final Payment(APWA) Failure to submit with the Final Application for Payment Pinal Upon Acceptance of the Work by the Contracting Agency the such information and details as 1 final amount to be paid the Contractor will be calculated based described in this section for any claim shall operate as a waiver of upon a Final Progress Estimate trade by the Engineer. Acceptance the claims by the Contractor as provided in Section 1-09.9. by the Contractor of the Final Payment shall be and shall operate as SECTION I-09.I1(3) IS DELETED AND REPLACED BY THE 1 a release: FOLLOWING:1. to the Contracting Agency of all claims and all liabilities of the Contractor, other than claims in stated amounts as may be 1-09.11(3) Time Limitations and Jurisdiction _specifically excepted in writing by the Contractor; (APWA) 2. for all things done or furnished in connection with the This contract shall be construed and interpreted in accordance Work; with the laws of the State of Washington. The venue of any claims 3. for every act and neglect by the Contracting Agency; and or causes of actions arising from this contract shall be in the 4. for all other claims and liability relating to or arising out Superior Court of the county where the work is performed. of the Work. For convenience of the parties to this contract, it is mutually A payment (monthly, final, retainage, or otherwise) shall not agreed that any claims or causes of action which the contractor has release the Contractor or the Contractor's Surety from any against the Contracting Agency arising from this contract shall be obligation required under the terms of the Contract Documents or brought within 180 days from the date of Final Acceptance of the the Contract Bond; nor shall such payment constitute a waiver of contract by the Contracting Agency. The parties understand and the Contracting Agency's ability to investigate and act upon agree that the Cont-actor's failure to bring suit within the time findings of non-compliance with the WMBE requirements of the period provided shall be a complete bar to any such claims or Contract; nor shall such payment preclude the Contracting Agency causes of action. from recovering damages, setting penalties, or obtaining such other It is further mutually agreed by the parties that when any remedies as may be permitted by law. claims or causes of action which a Contractor asserts against the Before the Work will be accepted by the Contracting Agency Contracting Agency arising from this contract are filed with the the Contractor shall submit an affidavit, on the form provided by Contracting Agency or initiated in court, the Contractor shall the Engineer, of amounts paid to certified disadvantaged (DB) permit the Contracting Agency to have timely access to any records minority (MBE) or women business enterprises (WBE) deemed necessary by the Contracting Agency to assist in evaluating participating in the Work. Such affidavit shall certify the amounts the claims or actions. paid to the DB, MBE, or WBE subcontractors regardless of tier. On Federally-funded projects the Contractor may also be 1-09.13 Arbitration required to execute and fumish the Contracting Agency an affidavit certifying that the Contractor has not extended any loans, gratuity SECTION I-09.13(2) (RC) IS SUPPLEMENTED BY or gift and money pursuant to Section 1-07.19 of these REPLACING ALL REFERENCES TO "THURSTON COUNTY" Specifications. WITH THE WORDS "KING COUNTY." If the Contractor fails refuses, or is unable to sign and return the Final Progress Estimate or any other documents required for SECTION 1-09.13(3)IS SUPPLEMENTED BY ADDING: the final acceptance of the contract, the Contracting Agency reserves the right to establish a completion date and unilaterally 1-09.13(3) Procedures to Pursue Arbitration (RC) accept the contract. Unilateral acceptance will occur only after the The findings and decision of the board of arbitrators shall be Contractor has been provided the opportunity, by written request final and binding on the parties, unless the aggrieved party, within ' from the Engineer, to voluntarily submit such documents. If 10 days, challenges the findings and decision by serving and filing voluntary compliance is not achieved, formal notification of the a petition for review by the superior court of King County, impending unilateral acceptance will be provided by certified letter Washington. The grounds for the petition for review are limited to from the Engineer to the Contractor which will provide 30 calendar showing that the findings and decision: days for the Contractor to submit the necessary documents. The 1. Are not responsive to the questions submitted; 30-calendar day deadline shall begin on the date of the postmark of 2• is contrary to the terms of the contract or any component the certified letter from the Engineer requesting the necessary thereof; documents. This reservation by the Contracting Agency to 3. Is arbitrary and/or is not based upon the applicable facts unilaterally accept the contract will apply to contracts that are and the law controlling the issues submitted to arbitration. The completed in accordance with Section 1-08.5 or for contracts that board of arbitrators shall support its decision by setting forth in are terminated in accordance with Section 1-08.10. Unilateral writing their findings and conclusions based on the evidence acceptance of the contract by the Contracting Agency does not in adduced at any such hearing. any way relieve the Contractor of the provisions under contract or Page-SP-17 Revision Date:May 19, 1997 1-10 Temporary Traffic Control 1-10 Temporary Traffic Control The arbitration shall be conducted in accordance with the If the Engineer requires the Contractor to furnish additional statutes of the State of Washington and court decisions governing channelizing devices, pieces of equipment, or services which could such procedure. not be usually anticipated by a prudent contractor for the , The costs of such arbitration shall be borne equally by the City maintenance and protection of traffic, then a new item or items and the contractor unless it is the board's majority opinion that the may be established to pay for such items. Further limitations for contractor's filing of the protest or action is capricious or without consideration of payment for these items are that they are not reasonable foundation. In the latter case, all costs shall be borne covered by other pay items in the bid proposal, they are not by the contractor. specified in the Special Provisions as incidental, and the accumulative cost for the use of each individual channelizing 1-10 Temporary Traffic Control device, piece of equipment, or service must exceed $200 in total cost for the duration of their need. In the event of disputes, the Engineer will determine what is usually anticipated by a prudent SECTION 1-ID.1 IS SUPPLEMENTED BY ADDING THE contractor. The cost for these items will be by agreed price, price FOLLOWING: established by the Engineer, or by force account. Additional items 1-10.1 Generals required as a result of the Contractor's modification to the traffic , When the bid proposal includes an item for 'Traffic Control," control plans)appearing in the contract shall not be covered by the the work required for this item shall be all items described in provisions in this paragraph. Section 1-10, including, but not limited to: If the total cost of all the work under the contract increases or , 1. Furnishing and maintaining barricades, flashers, decreases by more than 25 percent, an equitable adjustment will be construction signing and other channelization devices, considered for the item 'Traffic Control"to address the increase or unless a pay item is in the bid proposal for any specific decrease. device and the Special Provisions specify furnishing, SECTION 1-10.2(l) TRAFFIC CONTROL SUPERVISOR IS maintaining and payment in a different manner for that REVISED AS FOLLOWS device• 2. Furnishing traffic control labor, equipment, and supervisory 1-10.20) Traffic Control Supervisor C (SA) personnel for all traffic control labor, , 3. Furnishing any necessary vehicle(s) to set up and remove —Tthe Contractor shall designate an individual or the Class B construction signs and other traffic control individuals to perform the Traffic Control Supervisor's(TCS)duties devices; for the project. The TCS shall be certified inat:-a worksite traffic control 4. Furnishing labor and vehicles for patrolling and maintaining in position all of the construction signs and the traffic . The TCS shall assure that pcmatslly control devices unless a pay item is in the bid proposal to all the duties of the TCS are performed during the duration specifically pay for this work;and of the contract. 5. Furnishing labor, material, and equipment necessary for 7. Ensuring that corrections are made if traffic control cleaning up removing and replacing of the construction devices are not functioning as required. The TCS may , signs and the traffic control devices destroyed or damaged make minor revisions to the traffic control plan to during the life of the project. accommodate site conditions as long as the original intent of the traffic control plan is maintained and the revision 6. Removing existing signs as specified or a directed by the is in conformance ' engineer and delivering to the City Shops or storing and re- with established standards. installing as directed by the Engineer. 7. Preparing a traffic control plan for the project and designating the person responsible for traffic control at the work site. The traffic control plan shall include descriptions of the traffic control methods and devices to be twof rhoa ;ioU of .Possession of a current flagging card used by the prime contractor, and subcontractors, shall be by the TCS is mandatory. , submitted at or before the preconstruction conference, and SECTION 1-I0.2(2)IS SUPPLEMENTED AS FOLLOWS.- shall be subject to review and approval of the Engineer. 8 Contacting police fire 911 and ambulance services to 1-10.2(2) Traffic Control Plans(RC) notify them in advance of any work that will affect and The Contractor shall be responsible for assuring that traffic ' traveled portion of a roadway. control is installed and maintained in conformance to established standards The Contractor shall continuously evaluate the 9 Assuring that all traveled portions of roadways are open to operation of the traffic control plan and take prompt action to traffic during peak traffic periods 6:30 a.m. to 8:30 a.m. correct any problems that become evident during operation. and 3.00 p.m. to 6:00 p.m. or as specified in the special SECTION 1-10.3(3)HAS BEEN REVISED AS FOLLOWS. provisions or as directed by the Engineer. 10 Promptly removing or covering all nonapplicable signs 1-10.3(3) Construction Sigm during periods when they are not needed. All signs required by the approved traffic control plan(s) as well as any other appropriate signs prescribed by the Engineer, or If no bid item "Traffic Control' appears in the proposal then required to conform with established standards, will be furnished all work required by these sections will considered incidental and by � gaaGy_Contractor. their cost shall be included in the other items of work. Page-SP-18 Revision Date:May 19, 1997 1-11 Renton Surveying Standards 1-11 Renton Surveying Standards No separate pay item will be provided in the bid proposal for The item "Traffic Control- will be considered for an equitable Class A or Class B construction signs. Payment fQr. C12sr H adjustment per Section 1-04.6 only when the total contract price increases or decreases by more than 25 percent. All olhcr--costs for the work to "PC;hour. provide Class A or Class B construction signs shall be included in The Lump Sum wait contract price pes44eu;:-shall be full the unit contract price for the various other items of the work in the pay for all costs involved in furnishing the pilot car(s),pilot car bid proposal. driver(s), and the appropriate pilot car sign(s)for any ese pilot car operation. Any necessary flaggers will be paid under the SECTTON 1-10.3(6)IS REVISED AS FOLLOWS: item for traffic control 12W . 1-10.3(6) One-Way Piloted Traffic Control Through The Lump Sum wait contract price peF-)}eus shall be full Construction Zone pay for all costs for the labor provided for performing those construction operations described in Section 1-10.3(1) and as authorized by the Engineer. icgnu:ol -;c--Ad will fumish n pilo;ca;md driuc;to 1-2d the uaffiG "GoA&w_,Q;ion Sign;Class A,-pe;squam too$panel ama The Lump Sum wait contract price pc; 6qusse--foot-" pmal "ca-shall be full pay for all costs for performing the 1 work described in Section 1-10.3(3) and Section 1-10.3(4). This payment will include all labor, equipment, and vehicles necessary for the initial acquisition, the initial installation of Contractor-Furnished One-Way Piloted Traffic Control. The Class A signs, and ultimate return of all Contracting Agency- fumished signs. Contractor shall furnish the pilot car(s)and driver(s)for the pilot car Pa�zmm;will not be made fo;signs dclwcmd control area Any necessary flaggers shall be furnished by the 4Q, JEABince; Contractor The Lump Sum wait contract price pes-day-shall be full pay for all costs involved in furnishing the person(s)assigned as the "Traffic Control Supervisor" DELETE SEC77ON 1-10.4 AND REPLACE WITH: .All costs for the vehicle(s)required for the Traffic Control Supervisor shall be included in the Lump 1-10.4 Measurement (RC) (SA) Sum wait contract price for"Traffic Control SupcRtsiec." ' No specific unit of measurement will apply to the lump sum item of"Traffic Control". SECTION 1-10.5 IS REVISED AND SUPPLEMENTED AS FOLLOWS: 1-10.5 Payment (RC) scs lip, be , ' Payment for all labor, materials, and equipment described in Section 1-10 will be made in accordance with Section 1-04.1, for the following bid items when thcys;included in the proposal: "Traffic Control," lump sum. The lump sum contract price shall be full pay for all costs not " Pe covered by other specific pay items in the bid proposal for The Lump Sum wait-contract price per daffy shall be full furnishing installing, maintaining, and removing traffic control pay for all costs involved in furnishing the vehicle or vehicles ' devices required by the contract and as directed by the Engineer in for the work described in Section 1-10.3( conformance with accepted standards and in such a manner as to maximize safety, and minimize disruption and inconvenience to the -boc� public.. ' Progress payment for the lump sum item "Traffic Control" 1-11 Renton Surveying Standards will be made as follows: a. When the initial warning signs for the beginning of the project and the end of construction signs are installed 1-11.1(1) Responsibility for surveys (RC) and approved by the Engineer, 30 percent of the All surveys and survey reports shall be prepared under the amount bid for the item will be paid. direct supervision of a person registered to practice land surveying b. Payment for the remaining 70 percent of the amount under the provisions of Chapter 18.43 RCW. bid for the item will be paid on a prorated basis in All surveys and survey reports shall be prepared in accordance accordance with the total job progress as determined with the requirements established by the Board of Registration for by progress payments. Professional Engineers and Land Surveyors under the provisions of Chapter 18.43 RCW. t Page-SP-l9 Revision Date:May 19, 1997 1-11 Renton Surveying Standards 1-11 Renton Surveying Standards ' 1-11.1(2) Survey Datum and Precision(RC) In those cases where an electronic data collector is used, a hard The horizontal component of all surveys shall have as its copy print out in ASCII text format will accompany the field notes. coordinate base: The North American Datum of 1983/91. , 11.1(5) Corners and Monuments(RC) All horizontal control for protects must be referenced to or in 1- conjunction with a minimum of two of the City of Renton's Survey Corner A point on a land boundary, at the juncture of two or more boundary lines. A monument is usually set at such points to Control Network monuments. The source of the coordinate values used will be shown on the survey drawing per RCW 58.09.070. physically reference a corner's location on the ground. The horizontal component of all surveys shall meet or exceed Monument Any physical object or structure of record which the closure requirements of WAC 332-130-060. The control base marks or accurately references: lines for all surveys shall meet or exceed the requirements for a Class A survey revealed in Table 2 of the Minimum Standard A corner or other survey point established by or under the Detail Requirements for ALTAIACSM Land Title Surveys jointly supervision of an individual per section 1-11.1(1) and any established and adopted by ALTA and ACSM in 1992 or comer or monument established by the General Land Office comparable classification in future editions of said document. The and its successor the Bureau of Land Management including angular and linear closure and precision ratio of traverses used for section subdivision comers down to and including one- survey control shall be revealed on the face of the survey drawing, sixteenth corners;and as shall the method of adjustment. . Any permanently monumented boundary, right of way The horizontal component of the control system for surveys , using global positioning system methodology shall exhibit at least 1 alignment, or horizontal and vertical control points established part in 50 000 precision in line length dependent error analysis at a by any governmental agency or private surveyor including street intersections but excluding dependent interior lot 95 percent confidence level and performed pursuant to Federal Geodetic Control Subcommittee Standards for GPS control surveys corners. as defined in Geometric Geodetic Accuracy Standards & Specifications for Using GPS Relative Positioning Techniques dated 1-11.1(6) Control or Base Line Survey (RC) August 1 1989 or comparable classification in future editions of Control or Base Line Surveys shall be established for all , said document.. construction projects that will create permanent structures such as The vertical component of all surveys shall be based on roads, sidewalks, bridges, utility lines or appurtenances, signal or NAVD 1988 the North American Vertical Datum of 1988, and light poles or any non-single family building. Control or Base tied to at least one of the City of Renton Survey Control Network Line Surveys shall consist of such number of permanent benchmarks. If there are two such benchmarks within 3000 feet of monuments as are required such that every structure may be the project site a tie to both shall be made. The benchmark(s)used observed for staking or 'as-builting' while occupying one such will be shown on the drawing. If a City of Renton benchmark does monument and sighting another such monument. A minimum of not exist within 3000 feet of a project one must be set on or near two of these permanent monuments shall be existing monuments, the project in a permanent manner that will remain intact recognized and on record with the City of Renton. The Control or throughout the duration of the project. Source of elevations Base Line Survey shall occupy each monument in turn, and shall (benchmark) will be shown on the drawing as well as a description satisfy all applicable requirements of Section 1-11.1 herein. of any bench marks established. The drawing depicting the survey shall be neat, legible, and ' drawn to an appropriate scale. North orientation should be clearly 1-11.1(3) Subdivision Information (RC) presented and the scale shown graphically as well as noted. The Those surveys dependent on section subdivision shall reveal drawing must be of such quality that a reduction thereof to one-half the controlling monuments used and the subdivision of the original scale remains legible. ' applicable quarter section. If recording of the survey with the King County Recorder is Those surveys dependent on retracement of a plat or short plat required it will be prepared on 18 inch by 24 inch molar and will shall reveal the controlling monuments measurements, and comply with all provisions of Chapter 38.09 RCW. A methodology used in that retracement. photographic mytar of the drawing will be submitted to the City of Renton and upon their review and acceptance per the specific 1-11.1(4) Feld Notes (RC) requirements of the project the original will be recorded with the Field notes shall be kept in conventional format in a standard King County Recorder. , bound field book with waterproof pages. In cases where an If recording is not required the survey drawing shall be electronic data collector is used field notes must also be kept with a prepared on 22 inch by 34 inch molar, and the original or a sketch and a record of control and base line traverses describing photographic molar thereof will be submitted to the City of Renton. station occupations and what measurements were made at each The survey drawings shall meet or exceed the requirements of ' oP mt. WAC 332-130-050 and shall conform to the Cityof Renton's Every point located or set shall be identified by a number and Drafting Standards American Public Works Association symbols a description Point numbers shall be unique within a complete shall be used whenever possible and a legend shall identify all job The preferred method of point numbering is field notebook, symbols used if each point marked by a symbol is not described at page and point set on that page. Example: The first point set or each use. found on page 16 of field book 348 would be identified as Point An electronic listing of all principal points shown on the No 348 16.01 the second point would be 348.16.02,etc. drawing shall be submitted with each drawing. The listing should Upon completion of a City of Renton project either the field include the point number designation (corresponding with that it notebook(s) provided by the City or the original field notebook(s) the field notes) a brief description of the point and northing, used by the surveyor will be given to the City. For all other work, easting and elevation (if applicable) values all in ASCII format, surveyors will provide a copy of the notes to the City upon request. on IBM PC compatible media. Page-SP-20 Revision Date:May 19, 1997 e1-11 Renton Surveying Standards 1-11 Renton Surveying Standards 1-11.1(7) Precision Levels (RC) 1-11.1(12) Monument Setting and Referencing (RC) ' Vertical Surveys for the establishment of bench marks shall All property or lot corners, as defined in 1-11.1(5) satisfy all applicable requirements of section 1-05 and 1-11.1. established or reestablished on a plat or other recorded survey shall Vertical surveys for the establishment of bench marks shall be referenced by a permanent marker at the corner point per 1- meet or exceed the standards, specifications and procedures of third 11.2(1). In situations where such markers are impractical or in order elevation accuracy established by the Federal Geodetic danger of being destroyed, e.g., the front corners of lots a witness Control Committee. marker shall be set. In most cases, this will be the extension of the Bench marks must possess both permanence and vertical lot line to a tack in lead in the curb. The relationship between the stability. Descriptions of bench marks must be complete to insure witness monuments and their respective corners shall be shown or both recoverablilty and positive identification on recovery. described on the face of the plat or survey of record, e.g., "Tacks in lead on the extension of the lot side lines have been set in the 1-11.1(8) Radial and Station—Offset Topography curbs on the extension of said line with the curb." In all other (RC) cases the corner shall meet the requirements of section 1-11.2(I) ' Topographic surveys shall satisfy all applicable requirements herein. of section 1-11.1 herein. All non corner monuments, as defined in 1-11.1(5) shall meet All points occupied or back sighted in developing radial the requirements of section 1-11.2(2) herein. If the monument topography or establishing baselines for station—offset topography falls with in a paved portion of a right of way or other area the shall meet the requirements of section IA1.1 herein. monument shall be set below the ground surface and contained The drawing and electronic listing requirements set forth in within a lidded case kept separate from the monument and flush section 1-11.1 herein shall be observed for all topographic surveys. with the pavement surface, per section 1-11.2(3). ' In the case of right of way centerline monuments all points of 1-11.1(9) Radial Topography (RC) curvature (PC), points of tangency (PT), street intersections center Elevations for the points occupied or back sighted in a radial points of cul de sacs shall be set. If the point of intersection PI topographic survey shall be determined either by 1) spirit leveling for the tangents of a curve fall within the paved portion of the right e with misclosure not to exceed 0.1 feet or Federal Geodetic Control of way, a monument can be set at the PI instead of the PC and PT Committee third order elevation accuracy specifications, OR 2) of the curve. trigonometric leveling with elevation differences determined in at For all non corner monuments set while under contract to the least two directions for each point and with misclosure of the _City of Renton or as part of a City of Renton approved subdivision ' circuit not to exceed 0.1 feet. of property, a City of Renton Monument Card (furnished by the city) identifying the monument; point of intersection (PI), point of 1-11.1(10) Station—Offset Topography (RC) tangency (PT), point of curvature (PC), one-sixteenth corner, Plat Elevations of the baseline and topographic points shall be monument, street intersection, etc., complete with a description of ' determined by spirit leveling and shall satisfy Federal Geodetic the monument, a minimum of two reference points and NAD 83/91 Control Committee specifications as to the turn points and shall not coordinates and NAVD 88 elevation shall be filled out and filed exceed 0.1 foot's error as to side shots. with the city. 1-11.101) As-Built Survey(RC) 1-11.2 Materials All improvements required to be "as-built" (post construction survey) per City of Renton Codes, TITLE 4 Building Regulations 1-11.2(1) PropertyaM Corners (RC) and TITLE 9 Public Ways and Property, must be located both Comers per 1-11.1(5)shall be marked in a permanent manner horizontally and vertically by a Radial survey or by a Station offset such as 12 inch diameter rebar 24 inches in length, durable metal survey. The "as-built" survey must be based on the same base line plugs or caps, tack in lead, etc. and permanently marked or tagged or control survey used for the construction staking survey for the with the surveyor's identification number. The specific nature of 1 improvements being "as-built". The "as-built" survey for all the marker used can be determined by the surveyor at the time of subsurface improvements should occur prior to backfilling. Close installation. cooperation between the installing contractor and the "as-builting" surveyor is therefore required. 1-11.2(2) Monuments (RC) All "as-built" surveys shall satisfy the requirements of section Monuments per 1-11.1(5) shall meet the requirements as set 1-11.1(1) herein and shall be based upon control or base line forth in City of Renton Standard Plans page H031 and permanently surveys made in conformance with these Specifications. marked or tagged with the surveyor's identification number. The field notes for "as-built" shall meet the requirements of section 1-11.1(4) herein and submitted with stamped and signed 1-11.2(3) Monument Case and Cover (RC) "as-built" drawings which includes a statement certifying the Materials shall meet the requirements of section 9-22 and City accuracy of the "as built". of Renton Standard Plans page H031. The drawing and electronic listing requirements set forth in section 1-11.1(6) herein shall be observed for all 'as-built" surveys. Page-SP-21 Revision Date:May 19, 1997 2-02 Removal of Structures and Obstructions 2-03 Roadway Excavation and Embankment Division 2 Earthwork quantities and changes will be computed, either manually or by means of electronic data processing equipment, by Earthwork use of the average end area method. Any changes to the proposed , work as directed by the Engineer that would alter these quantities shall be calculated by the Engineer and submitted to the Contractor for his review and verification. 2-02 Removal of Structures and Any excavation or embankment beyond the limits indicated in Obstructions the Plans, unless ordered by the Engineer, shall not be paid for. All work and material required to return these areas to their original conditions, as directed by the Engineer, shall be provided SECTION 2-02.3(3) IS REVISED AND SUPPLEMENTED AS by the Contractor at his sole expense. FOLLOWS. All areas shall be excavated, filled, and/or backfilled as 2-02.3(3) Removal of Pavement, Sidewalks, and necessary to comply with the grades shown on the Plans. In filled and backfilled areas, fine grading shall begin during the placement , Curbs (RC) and the compaction of the final layer. In cut sections, fine grading In removing pavement, sidewalks, and curbs, the Contractor shall begin within the final six (6) inches of cut. Final grading shall: shall produce a surface which is smooth and even, without abrupt 1. Haul broken-up pieces ' changes in grade. to some off-project site. Excavation for curbs and gutters shall be accomplished by cutting accurately to the cross sections, grades and elevations - shown. Care shall be taken not to excavate below the speed S. When an area where pavement has been removed is to be grades. The contractor shall maintain all excavations free from , Wined to traffic before pavement patching has been completed, detrimental quantities of leaves, brush, sticks, trash and other temporary mix asphalt concrete patch shall be required. debris until final acceptance of the Work. Temporary patching shall be placed to a minimum depth of_2 Following removal of topsoil or excavation to grade and inches immediately after backfilling and compaction are complete, before placement of fills or base course, the subgrade under the , and before the road is opened to traffic. MC cold mix or MC hot roadway shall be proofrolled to identify any soft or loose areas mix shall be used at the discretion of the Engineer. which may warrant additional compaction or excavation and If pavements, sidewalks, or curbs lie within an excavation replacement. ' area and are not mentioned as separate pay items, their removal The Contractor shall provide temporary drainage or protection will be paid for as part of the quantity removed in excavation. If to keep the subgmde free from standing water. they f" Acceptable excavated native soils shall be used for fill in the mentioned as a separate item in the proposal, they will be measured area requiring fills. Care shall be taken to place excavated material ' and paid for as provided under Section 2-02.5, and will not be at the optimum moisture content to achieve the specified included in the quantity calculated for excavation. compaction. Any native material used for fill shall be free of SECTION 2-02.5 IS SUPPLEMENTED BY ADDING. organics and debris and have a maximum particle size of 6 inches. It shall be the responsibility of the Contractor to prevent the 2-02.5 Payment (RC) native materials from becoming saturated with water. The 2. "Saw Cutting", per Lineal Foot. treasures may include sloping to drain, compacting the native 3. "Remove Sidewalk",per Square Yard. materials and diverting runoff away from the materials. If the ' 4. "Remove Curb and Gutter`, per Lineal Foot_. Contractor fails to take such preventative measures, any costs or . "Cold Mix',per Ton delay related to drying the materials shall be at his own expense. S If the native materials become saturated, it shall be the . "Remove Asphalt Concrete Pavement,'per square Yard. 7. "Remove Cement Concrete pavement,"per square Yazd. responsibility of the Contractor to dry the materials to the , optimum moisture content. If sufficient acceptable native soils are 8. "Remove existing per not available to complete construction of the roadway embanlmient, All costs related4o the removal and disposal of stiwttues and Gravel Borrow shall be used. obstructions including saw cutting excavation, backfilling and If subgrade trimmer is not required on the protect,all portions temporary asphalt shall be considered incidental to and included in of Section 2-03 shall apply as though a subgrade trimmer were other items unless designated as specific bid items in the proposal. specified. If sufficient acceptable native soils as determined by the 2-03 Roadway Excavation and Engineer,are not available to complete construction of the roadway Embankment embankment Gravel Borrow meeting the requirements of Section 9-03.14 of the Standard Specifications shall be used. SECTION 2-03.3 IS SUPPLEMENTED BY ADDING THE SEC77ON 2-03.4 IS SUPPLEMENTED BY ADDING THE FOLLOWING: FOLLOWING: 2-03.3 Construction Requirements (RC) 2-03.4 Measurement(RC) Roadway excavation shall include the removal of all materials The Contracting Agency will use the following methods to excavated from within the limits shown on the plans. Suitable measure work performed unless specific exceptions in other excavated material shall be used for embankments, while surplus sections provide otherwise: excavated material or unsuitable material shall be disposed of by 1. At the discretion of the engineer, roadway excavation, , the Contractor. borrow excavation and unsuitable foundation excavation - by the Page-SP-22 Revision Date:May 19, 1997 ' 2-04 Haul 2-09 Structure Excavation cubic yard (adjusted for swell) may be measured by truck in the 2-06 Subgrade Preparation hauling vehicle at the point of loading. The contractor shall provide truck tickets for each load removed. Each ticket shall have the truck number, time and date, and be approved by the engineer. SECTION 2-06.5 IS SUPPLEMENTED BY ADDING THE FOLLOWING: SECTION 2-03.5 IS REVISED AS FOLLOWS: 2-06.5 Payment (RC) 2-03.5 Payment (RC) Subgrade preparation and maintenance including watering Payment will be made for the following bid items when they shall be considered as incidental to the construction and all costs are included in the proposal: thereof shall be included in the appropriate unit or lump sum 1. "Roadway Excavation" or"Roadway Excavation—Area contract bid prices. A (B, C,etc.)", per cubic yard. When the Engineer orders excavation 2 feet or less below 2-09 Structure Excavation ' subgrade, unit contract prices for roadway excavation and haul shall apply. If he orders excavation more than 2 feet below subgrade, that pan below the 2-foot depth shall be paid for as SECTION 2-09.1 IS SUPPLEMENTED BY ADDING THE provided in Ssciaea-1 04,4 Item 3 of this payment section. In this FOLLOWING: case, all items of work other than roadway excavation shall be paid 2-09.1 Description (RC) at unit contract prices. This work also includes the excavation, haul, and disposal of The unit contract price per cubic yard shall be full pay for all unsuitable materials such as peat, muck, swampy or unsuitable excavating, loading, placing, or otherwise disposing of the ' material. materials including buried logs and stumps. 2-09.3 Construction Requirements tThe unit contract price per cubic yard shall include haul. SECTION 2-09.3(I)D IS REVISED AS FOLLOWS: 3. "Unsuitable Foundation Excavation",per cubic yard. 2-09.3(1)D Disposal of Excavated Material(RC) The unit contract price per cubic yard for "Unsuitable Foundation Excavation" shall be full pay for excavating, loading, All costs for disposing of excavated material within the project and disposing of the material. limits shall be included in the unit contract price for structure excavation, Class A or B. The unit contract price per cubic yard shall include haul. 7 disposal If the contract includes structure excavation, Class A or B, including haul, the unit contract price shall include all costs for loading and hauling the material the full required distance= otherwise all such disposal costs shall be considered incidental to Payment for the work. embankment compaction will not be made as a separate item. All SECTION 2-09.4 IS REVISED AND SUPPLEMENTED AS ' costs for embankment compaction shall be included in other bid FOLLOWS: items involved. 2-09.4 Measurement (RC) ' 2-04 Haul Gravel backfill. All gravel backfill will be measured by the cubic yard in place determined by the neat lines required by the SECTION 2-04.5 IS REVISED AND SUPPLEMENTED AS Plans or by the ton as measured in conformance with section 1-09.2. FOLLOWS: Gravel backfill used for pipe bedding shall be incidental to the installation of the pipe or paid for as other gravel backfill unless a specific separate pay item is included in the contract for gravel 2-04.5 Payment (RC) backfill for pipe bedding. 1 "Q@ " • SECTION 2-09.5 IS REVISED AND SUPPLEMENTED AS FOLLOWS: All costs for the hauling of material to, from, or on the job site shall be considered incidental to and included in the unit price 2-09.5 Payment of other units of work. Payment will be made for the following bid items when they are included in the proposal: "Structure Excavation Class A",per cubic yard. "Structure Excavation Class B",per cubic yard. "Structure Excavation Class A Incl. Haul",per cubic yard. "Structure Excavation Class B Incl. Haul", per cubic yard. The unit contract price per cubic yard for the bid items listed as 1 through 4 above shall be full pay for all labor, materials, ' tools, equipment, and pumping, or shall be included in the unit bid price of other items of work if 'Structure Excavation" or Page-SP--23 Revision Date:May 19, 1997 2-09 Structure Excavation 2-09 Structure Excavation "Structure Excavation Incl Haul' are not listed as pay items in the contract. "Shoring or Extra Excavation Class B", per square foot. The unit contract price per square foot shall be full pay for all excavation, backfill, compaction, and other work required when extra excavation is used in lieu of constructing shoring. If select backfill material is required for backfilling within the limits of the structure excavation, it shall also be required as backfill material for the extra excavation at the Contractor's expense. Any excavation or backfill material being paid by unit price shall be calculated by the Engineer only for the neat line measurement of the excavation and shall not include the extra excavation beyond the neat line. If there is no bid item for shoring or extra excavation Class B , on a square foot basis and the nature of the excavation is such that shoring or extra excavation is required, then shoring or extra excavation shall be considered incidental to the work involved and no further compensation shall be trade. "Gravel Backfill (Kind) for (Type of Excavation), per Cubic Yard or per Ton". When gravel backfill is paid by the ton,the Contractor shall take care to assure to the satisfaction of the Engineer that such per ton backfill is only being used for the specified purpose and not for purposes where backfill is incidental or being paid by cubic yard. Evidence that per ton gravel backfill is not being used for its ' designated purpose shall be grounds for the Engineer to deny payment for such load tickets. Unless included in the contract as a separate pay item, gravel backfill used for pipe bedding shall be considered incidental to the installation of the pipe or shall be ' included in the gravel ball used to backfill the trench, if a separate pay item is included for trench backfill. Page-SP--24 Revision Date:May I9, 1997 ' 3 No supplemental specifications were necessary 4 No supplemental specifications were necessary Division 3 ' Production From Quarry and Pit Sites Division 4 and Stockpiling Bases 3 No supplemental specifications were 4 No supplemental specifications were necessary ' No supplemental specifications were necessary for Division 3. necessary No supplemental specifications were necessary for Division 4. t Page-SP-25 ' Revision Date:May 19, 1997 5-04 Asphalt Concrete Pavement 5-W Asphalt Concrete Pavement ' Division 5 (2) Surface Treatments and Pavements sites !oWhen a sample from uncompacted mix is needed, the Contractor shall ensure that the samples can -be obtained 5-04 Asphalt Concrete Pavement in accordance with WSDOT Test Method 712. SECTION 5-04.3(8)A IS REVISED AND SUPPLEMENTED AS kiauliAg6h;Gl. FOLLOWS: B. Definition of Sampling Lot and Sublot. For the purpose 5-04.3(8)A Acceptance Sampling and Testing(RC) of acceptance sampling and testing, a lot-is is-sl3all-ba defined as 1. General. Acceptance of asphalt cement concrete shall be the total quantity of material or work produced for each job mix ' as--provided under--rtzt Wcal--es a nonstatistical acceptance. formula QMF). Only one lot per JMF is expected to occur.. fo- Determination of-statiWv—los nonstatistical acceptance shall be based on proposal quantities and shall consider the total of all bid items involving mix of a specific class. Dense graded mixes(asphalt concrete pavement Classes A. B, E, F, and G) shall be evaluated for quality of gradation on a auillthe A0 The JMF dailylet basis by the Contractor. This gradation analysis shall be Mix based on WSDOT Test Method 104 and the results delivered to the is def in Section Contracting Agency by noon of the following working day. This 03.8(�A (Basis of Acceptance). The Contractor may not make information shall be used by the Engineer to evaluate conformance n changes to the JMF without prior written approval of the En with Section 9-03.8(6)A.2.-aad Aasphalt content shall be tested at Engineer. , the Eengineer's discretion if the Compaction Pay Factor(Section 5- 04.3(10)B)falls below 1.00. The Contracting Agency may take their own independent , gradation samples at the stockpile to confirm the gradation testing done by the contractor. If the independent sample gradation varies from the Contractor's data by more than t3% for sieve sizes greater than 1/4" and t25o for sieves smaller than the No. 10, thenrftmple per. ze be ' the costs of the sampling and testing shall be borne by the Contractor. If the tTest results vary from the Contractor's data ar*-within the ranges listed abov.p. 4om the then Sampling and testing for nonstatistical acceptance shall be the cost of sampling and testing will be borne by the Contracting performed on a random basis at a minimum frequency of one A en sample for each sublot of 400 tons or each day's production, @f gmeluioA only, Terain" whichever is least. When proposal quantities exceed 1,200 tons for a class of mix under nonstatistical acceptance, sublot size shall be determined to the nearest 100 tons to provide not less than three , uniform sized sublots, based on proposal quantities, with a maximum sublot size of 800 tons. C. Test Results. The Engineer will furnish the Contractor ' with a copy of the results as they become available.-of as administaced under. the pFoktisioar, of Sectign 5 04 5(1) "60 next M'OFMay after. Sampling, or.fa; lmigwime 4*94 within D. Test Methods. When sample testing of asphalt content is , necessary, Aacceptance te"ing for compliance o€asplaftit GO "& will use the Nuclear Asphalt Gauge Procedure; WSDOT Test 2. Aggregates. _Aggregates will be accepted for sand Method 722-T. When sample testing of gradation is necessary, equivalent and fracture based on their conformance to the Aacceptance testing for compliance of gradation will use the Quick ' requirements of Section 9 03.8(2)_ Determination of Aggregate Gradation using Alternate Solvent 64-11a4ieR. Procedure;WSDOT Test Method 723-T. 3 Asphalt Cement. Asphalt Cement will be accepted f" E. Reject Mixture last&-based on dw4p-conformance to the requirements of Section 9- (1) Rejection by Contractor. The Contractor may, prior to 02.1(43). Testing of asphalt properties to assure certification shall sampling, elect to remove any defective material and replace it be the responsibility of the contractor. If the vendor or grade of with new material at no expense to the Contracting Agency. Any the asphalt cement changes a new job mix formula (JMF) shall be such new material will be sampled, tested, and evaluated for ' evaluated and approved. acceptance. 43. Asphalt Concrete Mixture (2) Rejection -by Engineer Without TestingI;41; t-Testing. A. Sampling The Engineer may, without sampling, reject any batch, load, or (1) A sample will not be obtained from either the first or last section of roadway , 25 tons of mix produced in each production shift. Page-SP-26 Revision Date:May 19, 1997 ' e5-04 Asphalt Concrete Pavement 5-04 Asphalt Concrete Pavement ;Aato;aal that appears defective in gradation or asphalt cewetat SECTION 5-04.03(10)A IS SUPPLEMENTED BY ADDING ' content. Material rejected before placement shall not be THE FOLLOWING: incorporated into a!a" pavement. Any rejected section of compacted;oadwa}pavement shall be removed. 5-04.3(10)A General (RC) No payment will be made for the rejected materials or the The Contractor shall not use vibration when compacting on a removal of the materials unless the Contractor requests that the street where A.C. Line (Transite) is in place (refer to City of rejected material be tested. If the Ccontractor elects to have the Renton Comprehensive Water System Plan to identify locations of rejected material tested, a minimum of three representative samples A.C.lines.) will be obtained and tested. Representative samples to be removed SECTION 5-04.3(10)B IS REVISED AS FOLLOWS. ' for testing from compacted pavement shall be removed by coring. 5-04.3(10)B Control (SA) Asphalt concrete pavement Classes A. B, E, and F used in traffic lanes, including lanes for ramps, truck climbing, weaving, ' —M-wini, _ and speed change, and having a specified compacted course thickness greater than 0.10 foot, shall be compacted to a specified level of relative density. The testing shall occur on a sublot basis using the defmition of a sublot described in Section 5-04.3(8). The ' specified level of relative density shall be a Composite Pay Pam; than 0:75, G@mpaAwrigi; fQ; ;he rejogtod mix will be �p (C32P) 4 not !err &hmi 11 00 whop ip—luateA ;;I �cgor.—nge 924-.0 percent of the Acceptance of the initially reference maximum density ' rejected2'eiRio"d, ected material will use the acceptance sampling and Mashed-SAS. _The reference maximum density shall be determined testing s.n If the material does not fall within the job mix as that developed in the job mix formula formula tolerances of Section 9-03.8(6)A, the mix will be rejected of the mors mr.&R, five dowmin—oar to; the log of asp e and all costs associated with sampling, testing and removal shall be Goncmte being pinc.9d. If the Contractor chooses, a moving borne by the Contractor. The rejected material must be removed average of the three most recent tests of maximum density may be and replaced with new material at no expense to the Contracting determined through the use of WSDOT Test Method 705 by the Agency. If the material falls within the job mix formula Contractor at the Contractor's expense. The specified level of ' tolerances, the mix will be accepted for quality of mix but will density attained will be determined by the average statistical remain subject to the compaction adjustment of Section 5-04.3(10) rvahwion-of three €" nuclear density gauge tests taken in and all costs associated with sampling and testing will be borne by accordance with WSDOT Test Method 715 on the day the mix is the Contracting Agency. placed (after completion of the finish rolling) at locations determined by ndom_saw within each density lot Uom - Aopmnl sublot ftA5' —04-1 that k suWOG89-1 of being Uo 91inatity;6p;9soater,by enrh dear'43,104 will bo no ffmate;Ah-q ' lsss.The Engineer will furni a copy of the results of all acceptance testing performed in the field as soon as the results are availabl ' shift.- Pavement compaction below 89 percent of the reference maximum density shall not be accepted. Relative densities falling between 89 percent and 92 percent shall be subject to the price adjustments of Section 5- 04.5(1)B. d060ANi:te44. For compaction lots falling below a CPF of 1.00 pay facto; and thus subject to price reduction or rejection, cores may be used as an alternatives to the nuclear density gauge tests. AQwP-;eras ' g—When the Contracting Agency requests cores and the psegssss: level of relative density within a sublot is less than 92.0 percent, tThe cost for ilte-coring ' and testing shall be borne by the Contractor. When the Contracting Agency requests cores and the level of relative density within a sublot is greater than 92.0 percent, the cost for coring and testing shall be borne by the Contracting Agency. expeases as the ;-to of Shall be )5 pe;ceuG. At the start of paving, if requested by the Contractor, a ' compaction test section shall be constructed, as directed by the Engineer, to determine the compactibility of the mix design. ' Page-SP-27 Revision Date:May 19, 1997 5-04 Asphalt Concrete Pavement 5-04 Asphalt Concrete Pavement ' Compactibility shall be evaluated as the ability of the mix to attain SECTION 5-04.5(1) QUALITY ASSURANCE PRICE a ig yen quality level corresponding to a pay factor of 1.00 or ADJUSTMENTS IS DELETED. greater referenced to the specified minimum density (9U percent SECTION 5-04.5(1)1 IS DELETED AND REPLACED WITH ' of the reference maximum density THE FOLLOWING: h4etlted-�95). If a compaction test section is requested, a Compaction pay factor of 1.00 shall apply until compatibility is 5-04,5(1)A Price Adjustments for Quality of AC Mix proven. Following determination of compactibility, the Contractor (RC) ' is responsible for the control of the compaction effort. If the Nonstatistical Acceptance-Each lot of asphalt concrete Contractor does not request a test section, the mix will be pavement produced and having all constituents falling within considered compactible. the limits of the job mix formula shall be accepted at the unit , Asphalt Concrete Classes A, B, E, F, and G constructed contract price. If the constituents of the mix fall outside the under conditions other than listed above shall be compacted on the omits of the Job mix formula,the mix shall not be accepted(see basis of a test point evaluation of the compaction train. The test Section 5-04.3(8)Rejection of Mixture). point evaluation shall be performed in accordance with instructions ' from the Engineer. The number of passes with an approved SECTION 5-04.5(1)B IS REVISED AND SUPPLEMENTED AS compaction train, required to attain the maximum test point FOLLOWS. density, shall be used on all subsequent paving. 5-04.5(1)B Price Adjustments for Quality AC Asphalt Concrete Class D and preleveling mix shall be I compacted to the satisfaction of the Engineer. Compaction C In addition to the randomly selected locations for tests of the For each sublot a Compaction P_ya density, the Engineer may also isolate from a normal lot any area Factor will be that is suspected of.being defective in relative density. Such determined based on the relative density of the tests. The , isolated material will-not include an original sample location. A following table lists the Compaction Pay Factors and their minimum of three S randomly located density tests will be taken. associated relative density. The CMAN The isolated area will then be evaluated for price adjustment in accordance with this 'on, consideringaggion , it as a separate-mblotlet. quantity of asphals rowas@ 'a the compa SECTION 5-04.S IS REVISED AS FOLLOWS: 5-04.5 Payment (RC) Relative Density Compaction Pay Factor (average of three tests) "Misc and/or Driveway Asphalt Conc. Apps+eactt Cl. _ �92.0 1.00 per ton. This item, when included in the contract, includes asphalt 91.5 0.9 paving for areas such as driveways and traffic islands that are not 91.0 0.95 part of other paving work. 90.5 0.91 "lob w-��, rrompl;nage Rice A r6. r,.e..r ^ by calo..t 90.0 0.85 89.5 0•80 , 89.0 0.75 Page-SP-28 Revision Date:May 19,1997 , 6-12 Rockeries 6-12 Rockeries Division 6 and have a stable appearance. The rocks shall be carefully placed by mechanical equipment and in a manner such that the longitudinal Structures axis if the rock shall be at right angles or perpendicular to the rockery face. The rocks shall have all inclining faces sloping to the back of the rockery. Each row of rocks will be seated as SECTION 6-12 IS A NEW SEC77ON tightly and evenly as possible on the rock below in such a manner ' that there will be no movement between the two. After setting a 6-12 Rockeries course of rock, all voids between the rocks shall be chinked on the back with quarry rock to eliminate any void sufficient to pass a 2 ' 6-12.1 Description (RC) inch square probe. The work described in this section, regardless of the type of 6-12.3.1 Rockery Baekfill (RC) materials encountered, includes the excavation and shaping of the The wall backfill shall consist of 1-1/2 inch mimes crushed cut or fill slopes and furnishing and constructing rockeries/rock rock or gravel conforming to section 9-03.9(3). This material will ' retaining wall where shown on the plans or where directed by the be placed to an 8 inch minimum thickness between the entire wall engineer. and the cut or fill material. The backfill material will be plated in lifts to an elevation approximately 6 inches below the course of 6-12.2 Materials (RC) rocks placed. The backfill will be placed after each course of ' Rock walls shall be formed of larger pieces of quarried basalt, rocks. Any backfill material on the bearing surface of the rock andesite or other igneous rock. Individual pieces of rock shall be course will be removed before setting the next course. sound and resistant to weathering. When broken into pieces 6-12.3.2 Drain Pipe (RC) weighing 50 to 150 grams and tested for soundness with sodium A 4 inch diameter perforated pvc pipe shall be placed as a sulphate in accordance with aashto t104, the loss through a one footing drain behind the rockeries as shown in the standard plans, inch sieve after 6 cycles shall not exceed 35% by weight. and connected to the storm drainage system where shown. The rock material shall be as nearly rectangular as possible so as to afford the minimum amount of void space between the blocks. 6-12.3.3 Rejection Of Material(RC) No stone shall be used which does not extend through the wall. 'The inspector will have the authority to reject any defective The rock material shall be hard, sound, durable and free from material and to suspend any work that is being improperly done, weathered portions, seams, cracks and other defects, subject to the final decision of the engineer. All rejected material The rock density shall be a minimum of 160 pounds per cubic will be removed from the construction site and any rejected work foot. The source of supply and representative samples of the shall be repaired or replaced at no additional cost to the Owner. material shall be approved by the engineer before delivery to the site. 6-12.4 Measurement (RC) The rock walls shall be constructed of one-man rocks, (85 to 300 pounds) each 10" in its least dimension; two-man rocks, (300 Measurement of the finished rock wall for payment will be to 600 pounds) each 13' in its least dimension; three-man rocks made from the footing grade to the top of the wall and rounded to ' (800 to 1,200 pounds) each 16" in its least dimension; four-man the nearest square yard. rocks(1,500 to 2,200 pounds)each 18' in its least dimension. The 6-12.5 Payment (RC) rocks shall range uniformly in size for each classification specifies. The four-man rocks shall only be used for the first course of Payment will be made under the item "rock retaining wall', rock in walls over 6 feet in height. per square yard. The unit price per square yard shall be full compensation for 6-12.3 Construction Requirements(RC) the rockery/rock retaining wall in place and shall include all work, The rock unloading at the site will be done in such a manner materials, and equipment required to complete the installation, ' as to segregate the rock by the size ranges indicated in the including drainage pipe and all other items. preceding paragraph. The walls shall be started by excavating a trench, not less than 6 inches or more than one foot in depth below subgrade in excavation sections, or not less than 6 inches or more than one foot in depth below the existing ground level in embankment sections. Areas on which the rockery is to be placed shall be trimmed and ' dressed to conform to the elevation or slope indicated. The rock wall construction shall start as soon as possible upon_the completion of the cut or fill section. Rock selection and placement shall be such that there will be ' no open voids in the exposed face of the wall over 6 inches across in any direction. The rocks shall be placed and keyed together with a minimum of voids. Particular attention shall be given to ' the placing and keying together of the final course of all rockeries. The final course shall have a continuous appearance and be placed to minimize erosion of the backfill material. The larger rocks shall be placed at the base of the rockery so that the wall will be stable Page-SP-29 ' Revision Date.May 19, 1997 7-01 Drains 7-04 Storm Sewers ' Division 7 Corrugated Polyethylene Culvert Pipe 9-05.19 Where steel or aluminum are referred to in this Section in Drainage Structures, Storm Sewers, regard to a kind of culvert pipe, pipe arch, or end sections, it shall Sanitary Sewers, Water Mains, and be understood that steel is zinc coated with Asphalt Treatment I (galvanized) or aluminum coated (aluminized) corrugated iron or Conduits steel, and aluminum is corrugated aluminum alloy as specified in Sections 9-05.4 and 9-05.5. ' Where plain or reinforced concrete, steel, or aluminum are referred to in Section 7-02 it shall be understood that reference is 7-01 Drains also made to PVC. SECTION 7-01.2 IS REVISED AS FOLLOWS: , 7-03 Structural Plate Pipe, Pipe Arch, Arch, 7-01.2 Materials RAC and Underpass Drain pipes may be concrete,zinc coated (galvanized)Asphalt ' Treatment I or aluminum coated (aluminized) corrugated iron or SECTION 7-03.2 IS REVISED AS FOLLOWS: steel with Asphalt Treatment I, corrugated aluminum alloy, polyvinyl chloride (PVC), or corrugated polyethylene (PE) at the 7-03.2 Materials (RC) , option of the Contractor unless the Plans specify the type to be Materials shall meet the requirements of the following used. sections: SECTION 7-01.3 IS REVISED AS FOLLOWS: Concrete Class 3000 6-02 Corrugated Steel Asphalt Treatment 1 9-05.6(8) ( , 7-01.3 Constriction RequirementsSRC� Corrugated Aluminum 9-05.6(8) PVC drain pipe shall be jointed with a bell and spigot joint Reinforcing Steel 9-07 using a flexible elastomeric seal as described in Section 9-04.8. The bell shall be laid upstream. PE or ABS drain pipe shall be SECTION 7-03.5 IS REVISED AS FOLLOWS: jointed with snap-on, screw-on, or wraparound coupling bands as recommended by the manufacturer of the tubing. 7-03.5 Payment RQ PVC underdrain pipe shall be jointed using either the flexible Payment will be made in accordance with Section 1-04.1, for , elastomeric seal as described in Section 9-04.8 or solvent cement as each of the following bid items that are included in the proposal: described in Section 9-04.9, at the option of the Contractor unless "St. Str. Plate Pipe _ Gage _ In. Diam.", per linear otherwise specified in the Plans. The bell shall be laid upstream. I foot with Asphalt Treatment I. PE or ABS drainage tubing underdrain pipe shall be jointed with snap-on, screw-on. or wraparound coupling bands, as "St. Plate Pipe Arch Gage_Ft. foot with Asphalt Treatment I. In. Span", recommended by the manufacturer of the tubing. "St. linear foot "St. Str. Plate Arch_ Gage_Ft. _In. Span", per SECTION 7-01.4 IS SUPPLEMENTED ADDING THE linear foot with Asphalt Treatment I. ( , FOLLOWING: "Structure Excavation Class B", per cubic yard. "Structure Excavation Class B Incl.Haul",per cubic yard. 7-01.4 Measurement (RC) If no bid item for Structure Excavation Class A or Structure When the contract does not include "structure excavation Excavation Class B including haul, is included in the schedule of ' Class B" or "Structure excavation Class B including haul"as a pay prices then the work will be considered incidental and its cost item all costs associated with these items shall be included in other should be included in the cost of the pipe. "Shoring or Extra contract pay items. Excavation Class B". If it is not in the contract, then it shall be , incidental. 7-02 Culverts 7-04 Storm Sewers SECTION 7-02.2 IS REVISED AND SUPPLEMENTED AS FOLLOWS: SECTION 7-04.2 IS REVISED AS FOLLOWS: 7-02.2 Materials 7-04.2 Materials (RC) I Materials shall meet the requirements of the following Where steel or aluminum are referred to in this Section in ' sections. regard to a kind of storm sewer pipe, it shall be understood that Plain Concrete Culvert Pipe 9-05.3(1) steel is zinc coated (galvanized), Asphalt Treatment I Coated Q* Reinforced Concrete Culvert Pipe 9-05.3(2) corrugated iron or steel and ' Beveled Concrete End Sections 9-05.3(3) aluminum is corrugated aluminum alloy as specified in Sections Steel Culver Pipe and Pipe Arch,Asphalt Treatment I 9-05.4 9-05.4 and 9-05.5. Steel Nestable Pipe and Pipe Arch, Asphalt Treatment I 9-05.4(8) Steel End Sections, Asphalt Treatment I 9-05.4(9) Aluminum Culvert Pipe 9-05.5 Aluminum End Sections 9-05.5(6) Solid Wall PVC Culver Pipe 9-05.12(1) Profile Wall PVC Culvert Pipe 9-05.12(2) Page-SP-30 Revision Date:May 19, 1997 ' 7-05 Manholes,Inlets,and Catch Basins 7-05 Manholes,Inlets,and Catch Basins 7-04.3 Construction Requirements 7-05 Manholes, Inlets, and Catch Basins SECTION 7-04.3(1)B IS SUPPLEMENTED BY ADDING THE SECTION 7-05.3 IS SUPPLEMENTED BY ADDING THE FOLLOWING: FOLLOWING: 7-04.3(1)B Pipe Bedding(RC) 7-05.3 Construction Requirements (RC) Pipe bedding for PVC sewer pipe shall consist of clean, granular pea gravel consistent with section 9-03.12(3). It shall be All manholes shall have eccentric cones and shall have placed to a depth of 6" over and 6' under the exterior walls of the ladders. ' pipe. SECTION 7-05.3(1) IS REVISED AND SUPPLEMENTED AS 7-04.3(2) Laying Storm Sewer Pipe FOLLOWS: SECTION 7-04.3(2)A IS REVISED AS FOLLOWS: 7-05.30) Adjusting Manholes and Catch Basins to ' Grade (RC) 7-04.3(2)A Survey Line and Grade (RC) The existing cast iron ring and cover on manholes and the Survey line and grade will be provided by the Engineer or catch basin frame and grate shall first be removed and thoroughly contractor in a manner consistent with accepted practices and these cleaned for reinstalling at the new elevation. From that point, the specifications. existing structure shall be raised or lowered to the required SECTION 7-04.3(2)G IS SUPPLEMENTED BY ADDING THE elevation. ' FOLLOWING: 7-04.3(2)G Storm Sewer Line Connections (RC) All connections not occurring at a manhole or catch basin shall In unpaved streets: Manholes, catch basins and similar be done utilizing pre-manufactured tee connectors or pipe sections structures in areas to be surfaced with crushed rock or gravel shall approved by the Engineer. Any other method or materials be constructed to a point approximately eight inches below the proposed for use in making connections shall be subject to approval subgrade and covered with a temporary wood cover. Existing by the Engineer. manholes shall be cut off and covered in a similar manner. The contractor shall carefully reference each manhole so that they may SECTION 7-04.4 IS REVISED AS FOLLOWS: be easily found upon completion of the street work. After placing 7-04.4 Measurement R� the gravel or crushed stone surfacing the manholes and manhole` castings shall be constructed to the finished grade of the roadway The length of storm sewer pipe will be the number of linear surface. Excavation necessary for bringing manholes to grade ' feet of completed installation measured along the invert and will shall center about the manhole and be held to the minimum area include the length through elbows, tees, and fittings. The number necessary. At the completion of the manhole adjustment, the void of linear feet will be measured from the center of manhole to around the manhole shall be backfilled with materials which result ' center of manhole or from the center of catch basin to center of in the section required on the typical road way section, and be catch basins and similar type structures. thoroughly compacted. SECTION 7-04.5 IS SUPPLEMENTED AND REVISED AS In cement concrete pavement: Manholes catch basins and ' FOLLOWS: similar structures shall be constructed and adjusted in the same manner as outlined above except that the final adjustment shall be 7-04.5 Payment(RC) made and cast iron frame be set after forms have been placed and checked. In placing the concrete pavement, extreme care shall be The unit contract price per linear foot for storm sewer pipe of taken not to alter the position of the casting in any way. ' the kind and size specified shall be full pay for all worst to In asphalt concrete pavement: Manholes shall not be adjusted complete the installation including adjustment of inverts to until the pavement is completed at which time the center of each manholes. When no bid item "gravel backfill for pipe bedding" is manhole shall be carefully relocated from references previously included in the Schedule of Prices pipe bedding, as shown in the established by the contractor. The pavement shall be cut in a ' standard plans shall be considered incidental to the pipe and no restricted area and base material be removed to permit removal of additional payment shall be made. the cover. The manhole shall then be brought to proper grade utilizing the same methods of construction as for the manhole Testing of storm sewer pipe if required by the Engineer, shall itself. The cast iron frame shall be placed on the concrete blocks be considered incidental to and included in the unit contract prices and wedged up to the desired grade. The asphalt concrete pavement for other items. shall be cut and removed to a neat circle, the diameter of which shall be equal to the outside diameter of the cast iron frame plus two feet. The base materials and crushed rock shall be removed and Class 3000 or Commercial Portland Cement Concrete shall be placed so that the entire volume of the excavation is replaced up to within but not to exceed 2 inches of the finished pavement surface. On the day following placement of the concrete, the edge of the asphalt concrete pavement and the outer edge of the casting shall be painted with hot asphalt cement. Asphalt Class G concrete shall then be placed and compacted with hand tampers and a patching ' roller. The complete patch shall match the existing paved surface for texture density, and uniformity of grade. The joint between the Page-SP-31 ' Revision Date:May 19, 1997 7-08 General Pipe Installation Requirements 7-08 General Pipe Installation Requirements , patch and the existing pavement shall then be carefully painted with SECTION 7-05.4 IS REVISED AS FOLLOWS. hot asphalt cement or asphalt emulsion and shall be immediately 7-05.4 Measurement_ covered with dry paving sand before the asphalt cement solidifies. , The inside throat of the manhole shall be thoroughly mortared and Manholes will be measured per each. Measurement of plastered. manhole heights for payment purposes will be the distance from Adjustment of inlets: The final alignment and grade of cast finished rim elevation to the invert of the lowest outlet pipe. iron frames for new and old inlets to be adjusted to grade will be Adjustments of new structures and miscellaneous items such ' established from the forms or adjacent pavement surfaces. The as valve boxes shall be considered incidental to the unit contract final adjustment of the top of the inlet will be performed in similar price of the new item and no furthur compensation shall be made. manner to the above for manholes. On asphalt concrete paving Adjustment of existing structures and miscelaneous items such projects using curb and gutter section, that portion of the cast iron as valve boxes shall be measured by "Adjust Existing ' per ' frame not embedded in the gutter section shall be solidly embedded each which shall be full pay for all labor and materials including all in concrete also. The concrete shall extend a minimum of six concrete for the completed adjustment in accordance with Section inches beyond the edge of the casting and shall be left 2 inches 7-05.3(1)and the City of Renton Standard Details. ' below the top of the frame so that the wearing course of asphalt Connection to existing pipes and structures shall be measured concrete pavement will butt the cast iron frame. The existing per each. concrete pavement and edge of the casting shall be painted with hot SECTION 7-05.5 IS REVISED AND SUPPLEMENTED AS asphalt cement. Adjustments in the inlet structure shall be FOLLOWS. , constructed in the same manner and of the same material as that required for new inlets. The inside of the inlets shall be mortared 7-05.5 Payment (RC) and plastered. "Adjust4daW ela Existing ,° per each. Monuments and-cast iron frame and cover: Monuments and The unit contract price per each for 'Adjust ' monument castings shall be adjusted to grade in the same manner Existing " shall be full pay as for manholes. for all costs necessary to make the adjustment including restoration Valve box castings:Adjustments of valve box castings shall be made in the same manner as for manholes. of adjacent areas in a manner acceptable to the Engineer. ' "Structure Excavation Class B",per cubic yard. SEC77ON 7-05.3(2)IS REVISED AS FOLLOWS: "Structure Excavation Class B Incl.Haul",per cubic yard. Structure excavation for concrete inlets and area inlets is 7-05.3(2) Abandon Existing Manholes (RC) considered incidental to the cost of the inlets and shall be included , Where it is required that an existing manhole be abandoned, in the unit contract price for the concrete inlet and the area inlet. If the structure shall be-broken down to a depth of at least 4 feet no bid item for Structure Excavation Class A or Structure below the revised surface elevation, all connections plugged, the Excavation Class B is included in the schedule of prices then the manhole base shall be fractured to prevent standing water, and the work will be considered incidental and its cost should be included ' manhole filled with sand and compacted to 90 percent density as in the cost of the pipe. specified in Section 2-03.3(14)C. Debris resulting from breaking "Connect to Existing Catch Basin,'per each. the upper part of the manhole may be mixed with the sand subject 'Connect Structure to existing pipe,' per each. ' to the approval of the Engineer. The ring and cover shall be salvaged and all other surplus material disposed of. 7-08 General Pipe Installation Requirements SECTION 7-05.3(3) IS SUPPLEMENTED BY ADDING THE SECTION 7-08.3(1)C SUPPLEMENTED AS FOLLOWS: FOLLOWING. 7-08.3(1)C Pipe Zone Bedding (RC) (SA) ' 7-05.3(3) Connections to Existing Manholes Hand compaction of the bedding materials under the pipe Where shown on the plans, new drain pipes shall be connected haunches will be required. Hand compaction shall be accomplished to existing line, catch basin, curb inlets and/or manholes. The by using a suitable tamping tool to firmly tamp bedding material ' contractor shall be required to core drill into the structure, shape under the haunches of the pipe. Care shall be taken to avoid the new pipe to fit and regrout the opening in a workmanlike displacement of the pipe during the compaction effort. manner. .Where directed by the engineer or where shown on the Pipe bedding shall be considered incidental to the pipe and 22 ' plans, additional structure channeling will be required. further compensation shall be made. A "Connection to existing" item will be allowed at any SECTION 7-08.3(2)E IS SUPPLEMENTED AS FOLLOWS: connection of a new line to an existing structure, or the connection of a new structure to a existing line. No 'connection to existing" 7-08.3(2)E Rubber Gasketed JointsTC ' will be accepted at the location of new installation, relocation and In laying pipe with rubber gaskets, the pipe shall be handled adjustment of line manholes,catch basins or curb inlets. carefully to avoid knocking the gasket out of position or Any damage to existing pipe or structure that is to remain in contaminating it with foreign material. Any gasket so disturbed place resulting from the Contractor's operations shall be repaired shall be removed, cleaned, relubricated if required, and replaced , or replaced at his own expense. before joining the sections. The unit bid price per each shall be full compensation for all The pipe shall be properly aligned before joints are forced labor, materials and equipment required. home. Sufficient pressure shall be applied in making the joint to ensure that the joint is home, as defined in the standard installation ' instructions provided by the pipe manufacturer. The Contractor may use any method acceptable to the Engineer for pulling the pipe together, except that driving or ramming by hand or machinery will , not be permitted. Any pipe damaged during joining and joint Page-SP-32 Revision Date:May 19, 1997 ' ' 7-08 General Pipe Installation Requirements 7-08 General Pipe Installation Requirements tightening shall be removed and replaced at no expense to the Pipe shall be kept clean during and after laying. All openings in ' Contracting Agency. the pipe line shall be closed with water tight expandable type sewer Care shall be taken by the CONTRACTOR to avoid over plugs at the end of each day's operation or whenever the pipe pushing the pipe and damaging the pipe or joint system. Any openings are left unattended. The use of burlap, wood, or other damaged pipe shall be replaced by the Contractor at his expense. similar temporary plugs will not be permitted. ' Care shall be taken to properly align the pipe before joints are Where necessary to raise or lower the pipe due to unforeseen entirely forced home. During insertion of the tongue or spigot, the obstructions or other causes, the ENGINEER may change the pipe shall be partially supported by hand, sling or crane to alignment and/or the grades. Except for short nuns which may be minimize unequal lateral pressure on the gasket and to maintain permitted by the ENGINEER, pipes shall be laid uphill on grades ' concentricity until the gasket is properly positioned. Since most exceeding 10 percent. Pipe which is laid on a downhill grade shall gasketed joints tend to creep apart when the end of the pipe is be blocked and held in place until sufficient support is furnished by deflected and straightened, such movement shall be held to a the following pipe to prevent movement. minimum once the joint is home. Unless otherwise required, all pipe shall be laid straight ' between the changes in alignment and at uniform grade between SECTION 7-08.3(2)J IS AN ADDED NEW SECTION: changes in grade. For concrete pipes with elliptical reinforcement, 7-08.3(2)J Placing PVC Pipe Q the pipe shall be placed with the minor axis of the reinforcement in In the trench prepared as specified in Section 7-02.3(1) PVC a vertical position. ' pipe shall be laid beginning at the lower end, with the bell end Immediately after the pipe joints has been made, proper gasket upgrade. Pea gravel will be used as the bedding material and placement shall be checked with a feeler gage as approved by the extend from 6" below the bottom of the pipe to 6" above the top of pipe manufacturer to verify proper gasket placement. ' the pipe. When it is necessary to connect to a structure with a SECTION 7-08.3(2)G IS SUPPLEMENTED BY ADDING THE mudded joint a rubber gasketed concrete adapter-collar will be used FOLLOWING. at the point of connection. 7-08.3(2)G Sewer Line Connections (RC) 7-08.3(2)A Survey Line and Grade Unless otherwise approved by the Engineer, all connections of Survey line and grade control shall be provided in accordance lateral sewers to existing mains shall be trade through a cast iron with Sections 1-05.4, 1-05.5 and 1-11 saddle secured to the sewer main with stainless steel bands. When min a manner consistent with accepted practices. the existing main is constructed of vitrified clay, plain or 1 The Contractor shall transfer line and grade into the trench reinforced concrete cast or ductile iron pipe, the existing main where they shall be carried by means of a laser beam using 50 foot shall be core drilled. minimum intervals for grade staking. Any other procedure shall Connections (unless booted connections have been provided have the written approval of the Engineer. for) to existing concrete manholes shall be core-drilled, and shall ' have an "O" ring rubber gasket meeting ASTM C-478 in a 'ngep—lr of;1ot mo;@ than 30 fee, Not'err than thme baUsF-boaf& manhole coupling equal to the Johns-Manville Asbestos-Cement collar, or use a conical type flexible seal equal to kore-N-Seal. ' PVC pipe connection shall consist of tee, nipple and couplers as approved by the Engineer. WfQthe applpgvnl of the Q10i SECTION 7-08.4 IS REVISED AND SUPPLEMENTED AS FOLLOWS. SECTION 7-08.3(2)B IS SUPPLEMENTED BY ADDING THE FOLLOWING: 7-08.4 Measurement (SA) 7-08.3(2)B Pipe Laying ('RC) Gravel backfill for foundations, or gravel backfrll for pipe ' Checking of the invert elevation of the pipe may be made by zone bedding when used for foundations, shall be measured by the calculations from measurements on the top of the pipe, or by cubic yard,including haul,as specified in 2-09., or by the TON. looking for ponding of 1/2" or less which indicates a satisfactory Concrete for plugging existing pipes will be measured by the condition. At manholes when the downstream pipe(s) is of a cubic yard for the volume which would be required to completely ' larger size pipe(s) shall be laid by matching the(eight-tenths)flow fill the pipe for a distance of two diameters. Computation for elevation unless otherwise approved by the Engineer. corrugated metal pipes will be based on the nominal diameter. All pipe fittings etc. shall be carefully handled and protected Excavation of the trench will be measured as structure against damage impact shocks and free fall. All pipe handling excavation Class B or structure excavation Class B including haul, e q ipment shall be acceptable to the ENGINEER. Pipe shall not by the cubic yard as specified in Section 2-09. When excavation be placed directly on rough ground but shall be supported in a below grade is necessary, excavation will be measured to the limits manner which will protect the pipe against injury whenever stored ordered by the Engineer. at the trench site or elsewhere. No pipe shall be installed where Embankment construction before culvert placement under the ' the lining or coating show defects that may be harmful as applicable provisions of Section 7-08.3(1)A will be measured in determined by the ENGINEER. Such damaged lining or coating accordance with Section 2-03. shall be repaired or a new undamaged pipe shall be furnished and Shoring or extra excavation class B will be measured as installed. specified in Section 2-09.4. The CONTRACTOR shall inspect each pipe and fitting prior to installation to insure that there are not damaged portions of the pipe Any defective damaged or unsound pipe shall be repaired or replaced All foreign matter or dirt shall be removed from the interior of the pipe before lowering into position in the trench. Page-SP-33 Revision Date:May I9, I997 7-10 Trench Exc.,Bedding,and Backfill for Water Mains 7-11 Pipe Installation for Water Mains , SECTION 7-08.5 IS REVISED AND SUPPLEMENTED AS 7-11 Pipe Installation for Water Mains FOLLOWS: 7-08.5 Payment I (SA) 7-11.3 Construction Details (RC) ' Payment will be made in accordance with Section 1-04.1 for each of the following bid items that are included in the proposal: 7-11.3(4) Laying of Pipe on Curves "Gravel Backfill for Foundations", per cubic yardior Ton. SECTION 7-11.3(4)A HAS BEEN REVISED AS FOLLOWS. ' "Gravel Backfill for Pipe Zone Bedding", per cubic yard, or Ton. 7-11.3(4)A Ductile Iron Pipe RQ "Commercial Concrete",per cubic yard. Long radius (500feet or more) curves, either horizontal or , "Structure Excavation Class B", per cubic yard. vertical, may be laid with standard pipe by deflecting the joints. If "Structure Excavation Class B Incl.Haul",per cubic yard. the pipe is shown curved in the Plans and no special fittings are Unless specifically identified and provided as separate items, shown, the Contractor can assume that the curves can be made by structure excavation dewatering and backfilling shall be incidental deflecting the joints with standard lengths of pipe. If shorter , to pipe installation and no further compensation shall be made. lengths are required, the Plans will indicate maximum lengths that "Shoring or Extra Excavation Class B",per square foot. can be used. The amount of deflection at each pipe joint when pipe If this pay item is not in the contract, then it shall be is laid on a horizontal or vertical curve shall not exceed one half of incidental. the manufacturer's printed recommended deflections. , 7-10 Trench Exc., Bedding, and Backfill for SECTION 7-11.3(4)B IS SUPPLEMENTED AS FOLLOWS- Water Mains 7-11.3(4)B Polyvinyl Chloride(PVC) Pipe (4 inches ' and Over) C SECTION 7-10.41S REVISED AS FOLLOWS. Polyvinyl Chloride (PVC) Pipe shall not be used for water mains and appurtenances. 7-10.4 Measurement C THE TITLE AND TEXT OF SECTION 7-11.3(6) HAS BEEN Measurement of bank run gravel for trench backfill will be by REVISED AS FOLLOWS: the cubic yard measured by the calculation,of neat lines based on maximum trench width per Section 2-0 .4 or by the ton, in 7-11.3(t7 Laying Ductile Iron Pipe and Fittings with accordance with Section 1-09. Polyethylene Encasement_R Q Whom* sho-um ia she . case Contractor shall lay ductile 7-10.5 IS REVISED AND SUPPLEMENTED AS FOLLOWS: iron pipe with a polyethylene encasement. Pipe and polyethylene 7-10.5 Payments encasement shall be installed in accordance with AWWA C105. ' The polyethylene encasement shall also be installed on all appurtenances such as pipe laterals, couplings, fittings, and mod. valves with 8 mil. polyethylene plastic in accordance with Section 4-5 of ANSI 21.5 or AWWA C105. ' The polyethylene wrap shall be tube type and black color. Any damage that occurs to the wrap shall be repaired in accordance Payment for "removal with ANSI/AWWA C105/A21.5-93. and replacement of unsuitable material" will be considered Installation of the polyethylene encasement shall be considered incidental to or calculated under other bid items and no further incidental to the installation of the pipe and no additional payment compensation will be made. shall be allowed. 4. "Bank Run Gravel for Trench Backfill", per cubic yard 711.3(7)A AND 7-11.3(7)B HAVE BEEN DELETED AND ' or ton. REPLACED BY THE FOLLOWING The unit contract price per cubic yard or ton for "Bank Run Gravel for Trench Backfill" shall be full pay for all work to 7-11.3(7) Laying Steel Pipe (RC) furnish,+place, and compact the material in the trench. Also Steel pipe shall not be used. , included in the unit contract price is the disposal of excess and unusable material excavated from the trench. SECTION 7-I1.3(9)A IS REVISED AND SUPPLEMENTED AS 6. "Foundation Material" , per ton or cubic yard. FOLLOWS: Payment at the unit contract price for "foundation material" 7-113(9)A Connections to Existing Mains(RC) ' shall be full compensation for excavating and disposing of the The Contractor may be required to perform the connection unsuitable material and replacing with the appropriate foundation during times other than normal working hours. The Contractor material per Section 9-30.7B(1). shall not sp operate any valves on the existing system wiitnetitt- ocitic of the . Water system personnel will operate ' 111 valves on the existing system for the contractor when required. No work shall be performed on the connections unless a representative of the water department is present to inspect the ' work. When not stated otherwise in the special provisions or on the plans all connections to existing water mains will be done by City forces as provided below: ' City Installed connections: Page-SP-34 Revision Date:May 19, 1997 ' 7-11 Pipe Installation for Water Mains 7-11 Pipe Installation for Water Mains Connections to existing piping and tie-ins are indicated on the registering 1 gallon per revolution. The meter shall be approved by drawings. The contractor must verify all existing piping, the Engineer. dimensions, and elevations to assure proper fit. Acceptability of the test will be determined as follows: Connections to the existing water main shall not be made Acceptability of the test will be determined by two factors, as without first making the necessary arrangements with the Engineer follows: ' in advance. 1. The quantity of water lost from the main shall not exceed A two-week advance notice shall be required for each the number of gallons per hour as listed in the following connection which requires a cutting of the existing water mains or a table. shut-down of the existing water mains. The City reserves the right 2. The loss in pressure shall not exceed 5 psi during the 2 hour ' to re-schedule the connection if the work area is not ready at the test period. scheduled time for the connection. All water used to perform hydrostatic pressure shall be Work shall not be started until all the materials, equipment charged a usage fee. and labor necessary to properly complete the work are assembled ' on site. Allowable leakage per 1000 ft. of pipeline*-in GPH The Contractor shall provide all saw-cutting, removal and disposal of existing surface improvements, excavation, haul and Nominal Pipe Diameter in inches ' disposal of unsuitable materials, shoring, de-watering, foundation PSI 6' 8' 10' 12" 16' 20' 24' material, at the connection areas before the scheduled time for the 450 0_95 1.27 1.59 1.91 2.55 3.18 3_82 connection by the City. The Contractor shall provide all materials 400 0_90 1.20 1_50 1.80 2.40 3_00 3360 necessary to install all connections as indicated on the construction 350 0_84 1.12 1.40 1.69 2_25 2.81 3.37 plans, including but not limited to the required' fittings, couplings, 275 0.75 1_00 1.24 1.49 1_99 2.49 2_99 pipe spools, shackle materials to complete the connections. The 250 0.71 0_95 1.19 1.42 9090 2.37 2_85 Contractor shall provide and install concrete blocking, polywrap 225 0_68 0_90 1.13 1.35 1.80 2_25 2.70 the piping at the connections, backfill and surface restoration at the 200 0.64 0.85 1.06 1.28 1.70 2.12 2.55 ' locations shown on the plans for the connections to the existing *If the pipeline under test contains sections of various water mains. diameters, the allowable leakage will be the sum of the computed The City will cut the existing main and assemble all materials. leakage for each size. For those diameters or pressures not listed, the formula below shall be used: SECTION 7-11.3(ll)IS SUPPLEMENTED AND REVISED AS _ The quantity of water lost from the main shall not exceed the FOLLOWS. number of gallons per hour as determined by the formula 7-11.3(11) Hydrostatic Pressure Test (RC) L=NDFP A hydrant meter and a back flow prevention device will be 7400 ' used when drawing water from the City system. These may be in which obtained from the City by completing the required forms and L = Allowable leakage,gallons/hour making required security deposits. There will be a charge for the N = No.of joints in the length of pipeline tested water used. Before applying the specified test pressure, air shall D = Nominal diameter of the pipe in inches be expelled completely from the pipe, valves and hydrants. If P = Average test pressure during the leakage test, psi permanent air vents are not located at all high points, the contractor shall install corporation cocks at such points so that the air can be ' expelled as the line is filled with water. After all the air has been SECTION 7-11.3(12)A SHALL BE REVISED AND expelled, the corporation cocks shall be closed and the test SUPPLEMENTED AS FOLLOWS. pressure applied. At the conclusion of the pressure test, the corporation cocks shall be removed and plugged. 7-11.3(12)A Flushing and "Poly-pigging"(RQ The mains shall be filled with water and allowed to stand Sections of pipe to be disinfected shall first be 4"hod2gly-- under pressure for a minimum of 24 hours to allow the escape of pigged to remove any solids or contaminated material that may air and allow the lining of the pipe to absorb water. The State will have become lodged in the pipe.If ' furnish the water necessary to fill the pipelines for testing purposes of the mainthe main cannot be "poly-pigged", then a tap shall be at a time of day when sufficient quantities of water are available for provided large enough to develop a velocity of at least 2.5 fps in normal system operation. the main. The test shall be accomplished by pumping the main up to the The 'Poly-pig" shall be equal to Girard Industries Aqua- ' required pressure, stopping the pump for a minimum of two hours, Swab-AS, 21b/cu-ft density foam with 90A durometer urethane and then pumping the main up to the test pressure again. During rubber coating on the rear of the "Poly-pig" only. The 'Poly-pig' the test, the Section being tested shall be observed to detect any shall be cylinder shaped with bullet nose or squared end. visible leakage. A clean container shall be used for holding water ' for pumping up pressure on the main being tested. This makeup Pipe, flia6hing GhWl be"gas after.dirmfe(a.0t76 water shall be sterilized by the addition of chlorine to a Dechlorination of all water used for disinfection shall be concentration of 50 mg/I. accomplished in accordance with the City's standard detail. Water The quantity of water required to restore the pressure shall be containing chlorine residual in excess of that carried in the existing ' accurately determined by either 1)pumping from an open container water system, shall not be disposed into the storm drainage system of suitable size such that accurate volume measurements can be or any water way. made by the Owner or, 2) by pumping through a positive displacement water meter with a sweep unit pumping through a ' positive displacement water meter with a sweep unit band Page-SP-35 Revision Date:May 19, 1997 7-11 Pipe Installation for Water Mains 7-11 Pipe Installation for Water Mains ' SECTION 7-11.3(12)D HAS BEEN DELETED AND Joint restrainer system components: REPLACED WITH: Tiebolt: ASTM A242, type 2, zinc plated or hot-dip , galvanized. SST 7:5/8" for 2' and 3' mechanical joints, 3/4" for 7-11.3(12)D Dry Calchun Hypochlorite (RC) 4' to 12" mechanical joints, ASTM A325, type 313, except tensile Dry calcium hypochlorite shall not be placed in the pipe as strength of full-body threaded section shall be increased to 40,000 laid. lbs. minimum for 5/8" and 60,000 lbs. minimum for 3/4" by heat SECTION 7-11.3(12)K HAS BEEN REVISED AS FOLLOWS: treating (quenching and tempering) to manufactures reheat and ' hardness specifications. SST 753: 3/4" for 14' to 24" mechanical 7-11.3(12)K Retention Period (RC) joints. same ASTM specification as SST 7. SST 77: 3/4" same as Treated water shall be retained in the pipe at least 24 hours SST 7, except I" eye for 7/8" rod. same ASTM specification as ' but no long than 48 hours. After this period, the chlorine residual SST 7. at pipe extremities and at other representative points shall be at Tienut-. heavy hex nut for each tiebolt: SS8: 5/8" and 3/4% least 25 mg/l. ASTM A563, grade C3, or zinc plated. S8: 5/8" and 3/4',ASTM SECTION 7-11.3(12)N HAS BEEN REVISED AS FOLLOWS: A563, grade A,zinc plated or hot-dip galvanized ' 7-11.3(12)N Final Flushing and Testing(RC) Tiecoupling: used to extend continuous threaded rods and are Before placing the lines into service,a satisfactory report shall provided with a center stop to aid installation, zinc plated or hot- dip galvanized. SS10: for 5/8' and 3/4" tierods, ASTM A563, , be received from the local or State health department or an rov grade C3. SIO: for 5/8" and 3/4' tierods,ASTM A563, grade A. app ed testing lab on samples collected from representative points in the new system. Samples will be collected and Tierod: continuous threaded rod for cutting to desired lengths, bacteriological tests obtained by the Engineer. zinc plated or hot-dip galvanized. SS12: 5/8" and 3/4" diameter, ASTM A242, type 2; ANSI B1.1. S12: 5/8" and 3/4" diameter, , SECTION 7-11.3(13) HAS BEEN SUPPLEMENTED BY ASTM A36,A307. ADDING THE FOLLOWING: Tiewasher: round flat washers, zinc plated or bot-dip 7-11.3(13) Concrete Thrust Blocking and Dead-Man galvanized. SS17:ASTM A242,F436. 517:ANSI B18.22.1. ' Installation:Block (RC) Install the joint restraint system in accordance with the Provide concrete blocking at all hydrants, fittings and manufactures instructions so all joints are mechanically locked horizontal or vertical angle points. Conform to The City of Renton together to prevent joint separation. Tiebolts shall be installed to standard details for general blocking, and vertical blocks herein. pull against the mechanical joint body and not the MJ follower. All fittings to be blocked shall be wrapped with 8-mil polyethylene Torque nuts at 75-90 foot pounds for 3/4"nuts. htstall tiecouplings plastic. Concrete blocking shall be properly formed with plywood with both rods threaded equal distance into tiecouplings. Arrange or other acceptable forming materials and shall not be poured tierods symmetrically around the pipe. , around joints. The forms shall be stripped prior to backfilling. Joint restraint(shackle rods), where required, shall be installed in accordance with section 7-11.3(15). Provide concrete dead-man blocks at locations shown on the Pipe Diameter Number of 3/4" plans. The dead-man block shall include reinforcing steels, shackle Tie Rods Required ' rods,installation and removal of formwork. Blocking shall be commercial concrete (hand mixed concrete 4' .....................................2 is not allowed)and poured in place. 6 ...........................................2 ' 8'...........................................3 SECTION 7-11.3(15)IS A NEW ADDITIONAL SECTION. 10'...........................................4 12............................................6 7-11.3 1 Joint Restraint Systems (RC) 14'...........................................8 ' General: 16............................................8 Where shown on the-plans or in the specifications or required by 18'...........................................8 the engineer, joint restraint system (shackle rods)shall be used. all 20'...........................................10 joint restraint materials used shall be those manufactured by star 24............................................14 ' national products, 1323 holly avenue PO box 258, Columbus Ohio 30"...........................................(16-7/8"rods) 43216, unless an equal alternate is approved in writing by the 36............................................(24-7/8-rods) engineer. Materials: Steel types used shall be: High strength low-alloy steel(cor-ten), ASTM A242, heat- Where a manufactures mechanical joint valve or fining is treated,superstar "SST" series. supplied with slots for 'T' bolts instead of holes, a flanged valve , High strength low alloy steel(cor-ten), ASTM A242, superstar with a flange by mechanical joint adapter shall be used instead, so "SS"series. as to provide adequate space for locating the ti Items to be galvanized are to meet the following requirements: Where a continuous run of pipe is requiredred t. to be restrained, ' ASTM A153 for galvanizing iron and steel hardware. no run of restrained pipe shall be greater than 60 feet in length ASTM A123 for galvanizing rolled, pressed and forged steel between fittings. Insert long body solid sleeves as required on shapes. longer runs to keep tierod lengths to the 60 foot maximum. Pipe used in continuously restrained runs shall be mechanical joint pipe , and tiebolts shall be installed as rod guides at each joint. Page-SP-36 Revision Date:May 19, 1997 ' ' 7-12 Valves for Water Mains 7-12 Valves for Water Mains Where poly wrapping is required all tiebolts, tienuts, 7-12 Valves for Water Mains ' tiecouplings, tierods, and tiewashers, shall be galvanized. All disturbed sections will be painted, to the inspectors satisfaction, SECTION 7-12.02 HAS BEEN REVISED AS FOLLOWS. with koppers bitomastic no. 300-m, or approved equal. Where poly wrapping is not required all tiebolts, tienuts, SECTION 7-12.3(I)HAS BEEN REVISED AS FOLLOWS. tiecouplings, tierods and tiewashers may be galvanized as specified in the preceding paragraph or plain and painted in the entirety with 7-12.3(1) Installation of Valve Marker Post koppers bitumastic no. 800-m, or approved equal. Where required, a valve marker post shall be furnished and Tiebolts, tienuts, tiecouplings, tierods, and tiewashers shall be installed with each valve. Valve marker posts shall be placed at the ' considered incidental to installation of the pipe and no additional edge of the right-of-way opposite the valve and be set with payment shall be made. 18 inches of the post exposed above grade. SECTION 7-11.4 HAS BEEN SUPPLEMENTED AS FOLLOWS: ' 7-11.4 Measurement (RC) Measurement for payment of concrete thrust blocking and dead-man blocks will be per cubic-yard when these items are SECTION 7-I2.3(2)IS A NEW SECTION. included as separate pay items. If not included as separate pay items in the contract, then thrust blocking and dead-man blocks 7-12.3(2) Adjust Existing Valve Box to Grade_RQ shall be considered incidental to the installation of the water main Valve boxes shall be adjusted to grade in the same [Wanner as and no further compensation shall be made, for manholes, as detailed in Section 7-05.3(1) of the Renton ' Measurement for payment for connections to existing water Standards. Valve box adjustments shall include, but not be limited mains will be per each for each connection to existing water to, the locations shown on the Plans. main(s)as shown on the plans. Existing roadway valve boxes shall be adjusted to conform to ' SECTION 7-II.S HAS BEEN REVISED AS FOLLOWS: final finished grades. The final installation shall be made in accordance with the applicable portions of Section 7-12. 7-11.5 Payment (RC) In the event that the existing valve box is plugged or blocked with debris, the Contractor shall use whatever means necessary to Pipe for Water Main and Fittings In. Diam.", per remove such debris, leaving the valve installation in a fully lineal foot. operable condition. The unit contract price per linear foot for each size and kind The valve box shall be set to an elevation tolerance of one- of '_Pipe for Water Main _In. Diam.' shall be full pay for fourth inch(1/4')to one-half inch (1/2')below finished grade. ' all work to complete the installation of the water main including but not limited to trench excavating, bedding, laying and jointing SECTION 7-12.4 IS SUPPLEMENTED BY ADDING THE pipe and fittings, backfulling, concrete thrust blocking, installation FOLLOWING. of polyethylene wrap, cleaning by poly-pigs, vertical crosses for 7-12.4 Measurement insertion and removal of poly-pigs, temporary thrust blocks and blow-off assemblies, testing, flushing, disinfecting the pipeline, Adjustment of existing valve boxes to grade shall be measured shackle rods, abandoning and capping existing water mains, per each if included as a separate pay item in the Contract; if not a removing miscellaneous pipes, removing and salvaging existing separate pay item but required to complete the work, then value hydrant assemblies, and other appurtenances to be abandoned as box adjustment shall be considered incidental. shown on the plans,and cleanup. Hydrant auxiliary gate valve will be included in the 'Concrete Thrust Blocking and Dead-Man Blocks% per cubic measurement for hydrant assembly and will not be included in this yard- measurement item. The unit contract price bid for 'Concrete Thrust Blocking and Dead-Man Block" Shall be for the complete cost of labor, SECTION 7-12.5 IS DELETED AND REPLACED WITH THE materials, equipment for the installation of the concrete thrust FOLLOWING: blocks and dead- man blocks, including but not limited to 'Gate Valve from 4 inch to 10 inch in diameter and Valve ' excavation, dewatering, haul and disposal of unsuitable materials, Box,' per each. concrete, reinforcing steel, shackle rods and formwork. If this The trait contract price per each for the valve of the specified item is not included in the contract schedule of prices, then thrust size shall be full pay for all labor, equipment and material to blocking and dead-man blocks shall be considered incidental to the furnish and install the valve complete in place on the water main, ' installation of the pipe and no further compensation shall be made. including trenching, jointing, blocking of valve, painting, 'Connection to Existing Water Mains% per each. disinfecting, hydrostatic testing, cast-iron valve box and extensions The unit contract price per each connection to existing water as required,valve nut extensions, adjustment to final grade. ' mains shall be for complete compensation for all equipment,labor, "12 inch Gate Valve and Concrete Vault,'per each. materials required for the connections to the existing water mains. The unit contract price per each for the 12' gate valve assembly, shall be full pay for all labor, equipment and material to furnish and install the valve complete in place on the water main, including trenching, jointing, blocking of valve, by-pass assembly, cast-iron casting and cover, ladder rung, concrete risers as required, adjustment to final grade. "16 inch and larger Butterfly Valve and Concrete Vault,' per ' each. Page-SP-37 Revision Date:May 19, 1997 7-14 Hydrants 7-14 Hydrants , The unit contract price per each for the 16' and larger cast iron valve box and cover, 3/4' shackle rods and accessories, butterfly valve assembly, shall be full pay for all labor, equipment concrete blocks and two concrete guard posts (only if hydrants are and material to furnish and install the valve complete in place on outside right-of-way). ' the water main, including trenching, jointing, blocking of valve, Joint restraint(Shackle Rods) shall be installed in accordance painting, disinfecting, hydrostatic testing, concrete vault, cast-iron with Section 7-11.3(15). casting and cover, ladder, concrete risers as required, adjustment SECTION 7-14.3(3) IS SUPPLEMENTED BY ADDING THE to final grade. FOLLOWING: ' "Blow-off assembly,"per each. The unit contract price per each for each blow-off assembly 7-14.3(3) Resetting Existing Hydrants Q shall be for all, labor, equipment and material to complete the This work shall conform to Section 7-14.3(1). All hydrants ' installation of the assembly per the City of Renton Water Standard shall be rebuilt to the approval of the City(or replaced with a new Detail, latest revision. hydrant). All rubber gaskets shall be replaced with new gaskets of "Air-Release/Air-Vacuum Valve Assembly,' per each. the type required for a new installation of the same type. The unit contract price per for air-release/air-vacuum valve ' assembly shall be for all, labor, equipment and material to SECTION 7-14.3(4) IS SUPPLEMENTED BY ADDING THE complete the installation of the assembly including but not limited FOLLOWING: to, excavating, tapping ft main, laying and jointing the pipe and fittings and appurtenances, backM ling, testing, flushing, and 7-14.3(4) Moving Existing Hydrants RC ' disinfection, meter box and cover, at location shown on the plans, All hydrants shall be rebuilt to the approval of the City(or and per City of Renton Standard Detail, latest revision. replaced with a new hydrant). All rubber gaskets shall be replaced "Adjust Existing Valve Box to Grade (RC),' per each. with new gaskets of the type required for a new installation of the The contract bid price for "Adjust Existing Valve Box to same type. ' Grade" above shall be full compensation for all labor, material, SEMON 7-14.5 IS REVISED AS FOLLOWS. tools and equipment necessary to satisfactorily complete the work as defined in the Contract Documents, including all incidental 7-14.5 Payment( C) work. If not included as a separate pay item in the Contract, but , required to complete other work in the Contract,then adjustment of Payment will be made in accordance with Section 1-04.1, for valve boxes shall be considered incidental to other items of work each of the following bid items that are included in the proposal: and no futher compensation shall be made. "Hydrant Assembly",per each. The unit contract price per each for "Hydrant Assembly" shall be full pay for all work to furnish and install fire hydrant assemblies, including all costs for auxiliary gate valve, shackles, tie rods, concrete blocks, gravel, and painting and guard posts ' required for the complete installation of the hydrant assembly as sack@;pestr specified. The pipe connecting the hydrant to the main shall be considered incidental and no additional payment shall be made., 7-14 Hydrantsexrotibe then Sewall;1 ' 7-14.3 Construction Details "Resetting Existing Hydrants",per each. I RQ The unit contract price per each for "Resetting Existing Hydrant" shall be full pay for all work to reset the existing ' SECTION 7-14.3(1) IS REVISED AND SUPPLEMENTED AS hydrant, including rebuilding(or replacetent with a new hydrant), FOLLOWS. shackling, blocking, painting, and guard posts and reconnecting to the main. The new pipe connecting the hydrant to the main shall be 7-14.3(1) Setting Hydrants C considered incidental and no additional payment shall be made. After all installation and testing is complete, the exposed portion of the hydrant shall be painted with erwtwo field coats. The . Guard posts, shown on the plans shall type and color of paint will be designated by the Engineer. be incidental to the contract. Any hydrant not in service shall be identified by covering with "Moving Existing Hydrants",per each. , a burlap or plastic bag approved by the Engineer. The unit contract price per each for "Moving Existing Hydrants shall be installed in accordance with AWWA Hydrant" shall be full pay for all work to move the existing specifications C600-93, Sections 3.7 and 3.8.1 and the City of hydrant, including new tee, rebuilding (or replacement with a new ' Renton standard details. Hydrant and guard posts shall be painted hydrant), shackling, blocking, painting, and guard posts and in accordance with the water standard detail. Upon completion of reconnecting to the main. The new pipe connecting the hydrant to the project, all fire hydrants shall be painted to The City of Renton the main shall be considered incidental and no additional payment specifications and guard posts painted with two coats of shall be made , preservative paint NO. 43-655 safety yellow or approved equal. Guard posts, shown on the plans shall Fire hydrants shall be of such length as to be suitable for be incidental to the contract. installation with connections to 6% 8' AND 10' piping in trenches 3 - 1/2 feet deep unless otherwise specified. The hydrant shall be ' designed for a 4-1/2 foot burial where 12' and larger pipe is shown unless otherwise noted on the plan. Fire hydrant assembly shall include: cast-iron or ductile iron tee (MJ x FL), 6" gate valve(FL x MJ), 6' DI spool (PE x PE),5- ' 1/4' MVO fire hydrant (MJ connection), 4" x 5" Stortz adapter, Page-SP-38 Revision Date:May 19, 1997 7-15 Service Connections 7-17 Sanitary Sewers 7-15 Service Connections SECTION 7-17.3(2)H IS SUPPLEMENTED BY ADDING THE ' FOLLOWING: SECTION 7-15.3 IS SUPPLEMENTED AS FOLLOWS: 7-17.3(2)H Television Inspection (RC) Once the television inspection has been completed the 7-15.3 Construction Details (RC) contractor shall submit To the Engineer the written reports of the Pipe materials used to extend or replace existing water service inspection plus the video tapes. Said video tapes are to be in color lines shall be copper. and compatible with the City's viewing and recording systems. The Where instalation is in existing paved streets, the service lines City system accepts 1/2' wide high density VHS Tapes. The tapes shall be installed by a trenchless percussion and impact method will be run at standard speed SP(1 5/16 I.P.S.). (hoe-hogging). If the trenchless percussion and impact method SECTION 7-17.4 IS REVISED AND SUPPLEMENTED AS fails regular open trench methods may be used. FOLLOWS. SECTION 7.15.5 IS SUPPLEMENTED AS FOLLOWS: 7-17.4 Measurement(RC) ' The length of sewer pipe will be the number of linear feet of 7-15.5 Payment (RC) completed installation measured along the invert and will include Payment will be made in accordance with Section 1-04.1, for the length through elbows, tees and fittings. The number of linear the following bid item when it is included in the proposal: feet will be measured from the center of manhole to center of "Service Connection In. Diam.",per each. manhole or to the inside face of catch basins and similar type The unit contract price per each for "Service Connection structures. In. Diam" shall be full pay for all work to install the service The length of testing sewer pipe in conformance with ' connection, including but not limited to, excavating or oe- Section 7-17.3(2) will be the number of linear feet of completed hogging), tapping the main,laying and jointing the pipe and fittings installation actually tested. and appurtenances, backfilling, testing, flushing, and disinfection Measurement of `Bank Run Gravel for Trench Backfill of the service connection. Sewer" will be determined by the cubic yard in place, measured by ' the neat line dimensions shown in the Plans, or by the Ton on truck I 7-17 Sanitary Sewers tickets. SECTION 7-17.5 IS REVISED AND SUPPLEMENTED AS SECTION 7-17.2 HAS BEEN REVISED AS FOLLO WS. FOLLOWS. 7-17.5 Payment CZ 7-17.2 Materials C (SA) Payment will be made in accordance with Section 1-04.1, for Pipe used for sanitary sewers may be: each of the following bid items that are included in the proposal: ' Rigid Flexible "Plain Conc. or— Sewer Pipe _ In. Diam.", per linear Concrete ABS Composite foot. IritFified-Clay PVC(Polyvinyl Chloride) "Cl. a Reinf. Conc. Sewer Pipe _ In. Diam.", per linear ' Ductile Iron foot. Materials shall meet the requirements of the following "PVC Sanitary Sewer Pipe_In. Diam.", per linear foot. sections. "Ductile Iron Sewer Pipe_In. Diam.",per linear foot. Plain Concrete Storm Sewer Pipe 9-05.7(1) " _in piam "I PS&URem togs ' Reinforced Concrete Storm$ewer Pipe 9-05.7(2) The unit contract price per linear foot for sewer pipe of the alit-iF.,,,a_a Cay-S"uCar pipe 9.059 kind and size specified shall be full pay for furnishing, hauling, and PVC Sanitary Sewer Pipe 9-05.12(1) assembling in place the completed installation including all wyes, Ductile Iron Sewer Pipe 9-05.13 tees, special fittings, joint materials, bedding material, and ADS r-,,.....,,..:.o co,.,e-Aps 90.90." adjustment of inverts to manholes for the completion of the installation to the required lines and grades. All pipe shall be clearly marked with type, class, and "Testing Sewer Pipe",per linear foot. thickness. Lettering shall be legible and permanent under normal The unit contract price per linear foot for "Testing Sewer ' conditions of handling and storage. Pipe" shall be full pay for all labor, material and equipment SECTION 7-17.3(I) IS SUPPLEMENTED BY ADDING THE required to conduct the leakage tests required in Section 7-17.3(2). If no unit price for "Testing Sewer Pipe" is included it shall be FOLLOWING: considered incidental to the pipe items. 7-17.3(1) Protection of Existing Sewerage Facilities "Removal and Replacement of Unsuitable Material", per (RC) cubic yard. When extending an existing sewer, the downstream system The unit contract price per cubic yard for "Removal and shall be protected from construction debris by placing a screen or Replacement of Unsuitable Material" shall be full pay for all work trap in the first existing manhole downstream of the connection. It to remove unsuitable material and replace and compact suitable material as specified in Section 7-08.3(1)A. shall be the contractor's responsibility to maintain this screen or trap until the new system is placed in service and then to remove it. "Bank Run Gravel for Trench Backfill Sewer", per cubic ' yard or Ton. Any construction debris which enter the existing downstream , system shall be removed by the contractor at his expense, and to The unit contract price per cubic yard, or Ton for "Bank Run the satisfaction of the Engineer. When the first manhole is set, it's Gravel for Trench Backfill Sewer"shall be full pay for all work to outlet shall be plugged until acceptance by the Engineer. famish, Place, and compact material in the trench. ' "Television Inspection",per Lump Sum. Page-SP-39 Revision Date:May 19, 1997 8-09 Raised Pavement Markers 8-14 Cement Concrete Sidewalks ' Division 8 SECTION 8-13.5 IS SUPPLEMENTED BY ADDING THE FOLLOWING: Miscellaneous Construction ' 8-13.5 Payment 'Reset Existing Monument"per each. 8-09 Raised Pavement Markers Resetting an existing monument impacted by construction shall be incidental unless included as a pay item in the Schedule of ' SECTION 8-09.S HAS BEEN REVISED AS FOLLOWS: Prices_ 8-09.5 Payment (RC) (SA) 8-14 Cement Concrete Sidewalks Payment will be made for each of the following bid items that are included in the proposal: SECTION 8-14.3(4) IS SUPPLEMENTED BY ADDING THE "Raised Pavement Marker Type 1",per eachhaadmd. FOLLOWING: "Raised Pavement Marker Type 2", per eachlnuadmd. 8-14.3(4) Curing,(RC) , "Raised Pavement Marker Type 3- In.", per eact>}wadcQd The Contractor shall have readily available sufficient "Recessed Pavement Marker",per eachlwadmd. Protective covering, such as waterproof paper or plastic membrane, The unit contract price per eacktla+adrad for"Raised Pavement to cover the pour of an entire day in the event of rain or other , Marker Type I", "Raised Pavement Marker Type 2", and"Raised unsuitable weather. Pavement Marker Type 3- In." and "Recessed Pavement The Contractor shall be responsible for barripding, patrolling, or otherwise protecting newly placed concretes Marker"shall be full pay for all labor, materials, and equipment ' necessary for furnishing and installing the markers in accordance Damaged, vandalized, or unsightly concrete shall be removed and with these Specifications including all cost involved with traffic replaced at the expense of the Contractor. control unless traffic SECTION 8-I4.4 IS SUPPLEMENTED BY ADDING THE control is listed in the FOLLOWING. contract as a separate pay item. 8-14.4 Measurement (RQ 8-10 Guide Posts When the contract contains a pay item for "Curb Ramp, Cement Concrete," the per each measurement shall include all costs for the complete installation per the plans and standard detaila 8-13 Monument Cases including expansion joint material, curb and gutter and ramped sidewalk section. Sawcuttjng, removal and disposal of excavated ' SECTION 8-13.1 IS REVISED AND SUPPLEMENTED AS materials including existing pavement and sidewalk, crushed FOLLOWS: surfacing base materials and all other work, materials and equipment required per Section 8-14 shall be included in the per 8-13.1 Description (RC) each price for "Curb Ramp, Cement Concrete' unless any of these t This work shall consist of furnishing and placing monument other items are listed and specified to be paid as separate pay cases and covers, in accordance with the Standard Plans and these items. Specifications, in conformity with the lines and locations shown in If the contract does not provide a pay item for "Curb Ramp, the Plans or as staked by the Engineer or by the Contractor Cement Concrete,' but the plans call for such installation, then ' supplied surveyor. quantities shall be measured with and paid for under the bid items for Curb and Gutter and for Cement Concrete Sidewalk. When SECTION 8-13.3 IS REVISED AND SUPPLEMENTED AS curb ramps are to be constructed of asphalt concrete, the payment FOLLOWS. shall be included in the pay item for *Miscellaneous and/or ' 8-13.3 Construction Requirements Driveway Asphalt Concrete." SECTION 8-14.5 IS SUPPLEMENTED BY ADDING THE The monument will be furnished and set by the Engineer or by FOLLOWING: , the Contractor supplied surveyor. When existing monuments will be impacted by a project, the 8-14.5 Payment(RC) Contractor shall be responsible for assuring that a registered surveyor references the existing monuments prior to construction. 'Curb Ramp,Cement Concrete,"per each. Payment for excavation of material not related to the After construction is complete the monuments shall be re- established by the surveyor in accordance with RCW58.09.130. construction of the sidewalk but necessary before the sidewalk can be placed, when and if shown in the Plans, will be made in SECTION 8-13.4 IS SUPPLEMENTED BY ADDING THE accordance with the provisions of Section 2-03. Otherwise, the FOLLOWING: Contractor shall make all excavations including haul and disposal, regardless of the depth required for constructing the sidewalk to the 8-13.4 Measurement lines and grades shown, and shall include all costs thereof in the All costs for surveying and resetting existing monuments unit contract price per square yard for "Cement Conc. Sidewalk ' impacted by contraction shall be considered incidental to the and the per each contract price for Curb Ramp,Cement Concrete." contract unless specifically called out to be paid as a bid item. Page-SP-40 Revision Date:May 19, 1997 8-17 Impact Attenuator Systems 8-20 Illumination,Traffic Signal Systems,and Electrical 8-17 Impact Attenuator Systems City reserves the right to make additions or deletions to the trench which prove necessary for the completion of the project. THE STATE AMENDMENT TO SECTION 8-17 IS The minimum width for the trench will be at the option of the SUPPLEMENTED BY THE FOLLOWING: contractor. Trench width will, however, be of sufficient size so that all of the necessary conduit can be installed within the depths 8-17.5_Payment (RC) specified while maintaining the minimum cover. Trench backfill material in roadway and sidewalk areas shall If no pay item is included for temporarey impact attenuators be compacted to 95`Yo of the material's maximum density per then all costs to provide and install shall be considered a part of the Section 2-03.3(14)D. pay item for 'Traffic Control.' SECTION 8-20.3(4)HAS BEEN REVISED AS FOLLOWS. 8-20 Illumination, Traffic Signal Systems, 8-20.3(4) Foundations (RC) and Electrical 8-20.2 Materials )C- Where obstructions prevent construction of planned SECTION 8-20.2(l)HAS BEEN SUPPLEMENTED WITH THE foundations, the Contractor shall construct an effective foundation FOLLOWING. satisfactory to the Engineer. 8-20.2(1) Equipment List and Drawings(RC) phis tho ft;wha;bolt&U.-ya height shall not----A A -bove 9b- The Contractor shall submit for approval six sets of shop ; drawings for each of the following types of standards called for on The contractor shall provide all material for and constrtct the this project: foundations for and to the dimensions specified in table I below. 1. Light standards with or without pre-approved plans. The anchor bolts shall match that of the device to be installed 1 2. Signal standards with or without pre-approved plans. thereon. 3. Combination Signal and lighting standards. All excess materials are to be removed from the foundation 4. Metal Strain Poles. construction site and disposed of at the contractor's expense. Concrete shall be placed against undisturbed earth if possible. Disturbed earth or backfill material shall be compacted to 95 percent of the material's maximum density. Before placing the The Contractor also shall submit either on the signal standard concrete the contractor shall block-out around any other ' shy drawings or attached to the signal standard shop drawings all underground utilities that lie in the excavated base so that the dimensions to clearly show the specific mast arm mounting height concrete will not adhere to the utility line. Concrete foundations and signal tenon locations for each signal pole to be installed. shall be troweled, brushed, edged and finished in a workmanship- like manner. Concrete shall be promptly cleaned from the exposed SECTION 8-20.3(2) HAS BEEN SUPPLEMENTED BY portion of the anchor bolts and conduit after placement. ADDING THE FOLLOWING: Foundation shall all be Class 3000 concrete. After the specified curing period, the contractor may install the applicable device 8-20.3(2) Excavating and Baclt3illing (RC) thereon The contractor shall supply trench within the unit widths and to the specified depths at the locations indicated on the contract Table I plans or as directed by the engineer. The contractor shall have approved compaction equipment on Type of device Dimensions site before beginning any excavation; compaction shall be Street Light Pole 4'Deep x 3' Sq or Dia. performed at the time of the initial backfilling of the trench unless Signal Pole up to 40'mast arm 7'Deep x 3' Sq or Dia. directed otherwise by the engineer. Signal Controller See Detail Sheet Trenching for conduit runs shall be done in a neat manner Street Light Control Cabinet See Detail Sheet with the trench bottom graded to provide a uniform grade. No Special Base See Detail Sheet work shall be covered until it has been examined by the engineer. backfill material used for fill around and over this conduit system shall be free of rocks greater than two inches in diameter to a depth All concrete foundations shall be constructed in the manner of six inches above the conduit. specified below: Trench within the roadway area shall use select trench backfill 1. Where sidewalk or raised islands are to be constructed as a which shall consist of 5/8th inch minus crushed surfacing to part of this project, the top of the foundation shall be made p' flush with the top of the sidewalk or island. (See detail course or other material as indicated in the special provisions or schedule of prices and directed for use by the engineer. The source sheet and quality of the material shall be subject to approval by the 2. Where no sidewalks are to be installed,the grade for the top engineer. Trench backfill within the sidewalk area shall be made of the foundation shall be as specified by the engineer.(See with acceptable materials from the excavation subject to the detail sheet Engineer's approval of the material and shall be considered a All concrete foundations shall be located as per stationing on necessary part and incidental to the excavation in accordance with the plans or as located by the engineer in the field. the standard specifications. Unsuitable material shall be removed ' and backfill shall be select material approved by the Engineer. The Page-SP-4l Revision Date:May 19, 1997 8-20 Illumination,Traffic Signal Systems,and Electrical 8-20 Illumination,Traffic Signal Systems,and Electrical ' SECTION 8-20.3(5) IS REVISED AND SUPPLEMENTED AS Pull Wires Shall be installed. FOLLOWS: All conduit shall be rigid non-metallic unless noted otherwise in the Plans or Special Provisions. ' 8-20.3(5) Conduit (RQ All conduit openings shall be fitted with approved bellends or Bushings. Wall thickness of conduit shall be consistent within lecstierns: continuous conduit runs with no mixing of different schedule types II r between terminations. The contractor shall provide and install all conduit and necessary fittings at the locations noted on the plans. Conduit size bQ'-- shall be as indicated on the wiring and conduit schedule shown on ice— Conduit to be provided and installed shall be of the type indicated below: 1. Schedule 40 heavy wall p.v.c. Conforming to ASTM "Pi(aur-66 am exempted standards shall be used whenever the conduit is to be plated other than within the roadway area. 2. Schedule 80 extra heavy wall p.v.c. Conforming to ASTM standards shall be used when the conduit is to be placid within the roadway area. All joints shall be made with strict compliance to the manufacturer's recommendations regarding cement used and environmental conditions. SECTION 8-20.3(6)IS SUPPLEMENTED BY ADDING TAE FOLLOWING: 8-20.3(6) Junction Boxes4. ' The contractor shall provide and install junction boxes of the type and size at the locations specified in the plans and as per detail sheets The inscription on the covers of all junction boxes shall be as indicated below: 1. Street lighting only: "Lighting" 2. Signal only: "Signals" ' 3. Traffic signal and street lighting: 'TS-LT' 4. Telemetry only: 'Telemetry" GgAdwit subject to the fQ11ou"Age Inscriptions on junction boxes performing the same function, i.e. street lighting, traffic signal, or both, shall be consistent throughout the project. All iunction boxes shall be installed in 4064 conformance with provisions contained in the standard plans and detail sheets. The unit contract price per each for 'Type I" or "Type II" junction box shall be full compensation for furnishing same and for A;r&-;b6A ;A—how;he�i�pgvftl 09 the liag-Age;and then Only all costs of labor, material, tools, and equipment necessary to provide and install the junction boxes including excavation, backfilling and compaction all in accordance with plans, If allowed in the-,Plans or if obstructions are encountered in specifications and detail sheets. jacking or drilling operations, the Contractor will be allowed to All junction boxes shall have galvanized steel lids and frames. install conduits by open trenching. Open trench construction shall All junction boxes and associated concrete pads shall be conform to the following: insWIed on compacted sub grade which shall include six inches of 1. The pavement shall be sawcut a minimum of 3 inches 5/8th-inch minus crushed surfacing top course material installed deep. The cuts shall be parallel to each other and extend 2.Us& ne under and around the base of the junction box. Concrete shall be I foot beyond the edge of the trench. promptly cleaned from the junction box frame and lid. 2. Pavement shall be removed in an approved manner. The unit contract price per junction box shall include 3. Trench depth shall provide 24 inches minimum cover installation of 5/8th-inch minus crushed surfacing top course and a over conduits below the roadbed, and 18 inches below finished 4' thick Class "B' cement concrete pad enclosing the junction box ' grade in all other areas.. as per the plans, specifications and detail sheets. Installation of the crushed surfacing and the concrete pad shall be incidental to the unit price per junction box and no further compensation will be 5. Trenches located within paved roadway areas shall be made unless the contract includes separate pay items for "crushed restored per the Renton Standard Detail. surfacing"and/or for"concrete pad." vtr-fellewed ' Page-SP-42 Revision Date:May 19, 1997 8-20 Illumination,Traffic Signal Systems,and Electrical 8-20 Illumination,Traffic Signal Systems,and Electrical SECTION 8-20.3(9) IS REVISED AND SUPPLEMENTED AS Upon request of the Contractor, the Engineer will make the FOLLOWS. necessary arrangements with the serving utility to complete the service connections. Electrical energy used prior to completion of 8-20.3(9) Bonding, Grounding (RQ the contract will be charged to the Contractor, except that the cost All metallic appllacaniwes Ggwaiaing of energy used for public benefit, when such operation is ordered by the Engineer,will be borne by the Ssasa City. Three types of power service are used as indicated below: 1. Type I system shall be single phase 120 volt, 2 wire, 60 cycle A.C.(traffic signal service only) 2. Type II,system shall be single phase 240 volt,2 wire,60 cycle A.C. (street lighting non contactor, individual controlled photo-cell with no neutral wire) 3. Type III system shall be single phase 120240 volt, 3 wire 60 cycle A_C_ (street lighting contactor/traffic signal, grounded neutral service) The power service point shall be as noted on the plans and shall be verified by the electrical servicing utility. Identification of the equipment grounding conductor shall The service cabinet shall be marked with the service conform to all Code requirements. agreement letters and numbers. The markings shall be installed on Grounding of conduit and neutral at the service point shall be the outside cabinet door [tear the top of the cabinet. The markings accomplished as required under the Code. Grounding of the neutral shall be series C using stencils and black enamel alkyd gloss paint shall be accomplished only at the service. conforming to Federal Specification TT-E489. SECTION 8-20.3(11)IS REVISED AND SUPPLEMENTED AS FOLLOWS: be IoG 8-20.3(11) Field Test (RQ .1.,vo S 1 All street light standards, signal poles and other standards on No change to stop and go operation will be allowed after 2 p.m. on which electrical equipment is mounted shall be grounded to a any day nor will the change be allowed on Friday, weekends, copper clad metallic ground rod 5/8" in diameter x 8'0" in length holidays,or the day preceding a holiday. complete with a#8 AWG bare copper bonding strap located in the of the consFoller.Supplier.shall be pmseat fa;the Ghange nearest junction box. All signal controller cabinets and 1. Requests for traffic signal turn on will not be considered until a signal/lighting service cabinets shall be grounded to a 5/8' in pre-turn on inspection of signal system has taken place. diameter x 8'0" in length copper clad metallic ground rod located 2. All discrepancies and deficiencies must be corrected by the in the nearest junction box with a bare copper bonding strap sized contractor and re-inspected prior to requesting signal turn on in accordance with the plans, specifications and applicable codes. date. Ground rods are considered miscellaneous items and all costs 3. Requests for signal turn on-shall not be considered until are to be included with the system or conductors. Ground straps electrical service to the intersection has been provided and has are also miscellaneous items unless a separate pay item is provided been energized by the electric utility. ' in the "Schedule of prices." 4. A minimum of three (3) working days notice will be required for signal turn on. SECTION 8-20.3(10)IS REVISED AND SUPPLEMENTED AS 5. Channelization at the intersection must be complete per plan FOLLOWS. before requesting signal turn on date. Any deletions of channelization prior to turn on must be approved by the 8-20.3(10) Service(RC) engineer. Power sources shown in the Plans are approximate only;exact 6. City forces shall provide, post and maintain proper signing location will be determined in the field. warning of new signal ahead. 8-20.3(13) Illumination Systems SEC77ON 8-20.3(13)A IS REVISED AND SUPPLEMENTED AS FOLLOWS. 8-20.3(13)A Light Standards (RC) (SA) �Gsambly Page-SP-43 Revision Date:May 19, 1997 8-20 Illumination,Traffic Signal Systems,and Electrical 8-20 Illumination,Traffic Signal Systems,and Electrical All poles and davit arms shall be designed to support a of the top of the bottom W;P pl�ts luminaire weight of 50 lbs. or more and to withstand pressures I All rh211 ►e A e NT-0 M 164 (e eT- 4 n caused by wind loads of 85 m.p.h. with Rust factor of 1.3. All poles shall maintain a minimum safety factor of 4.38 p.s.i. slop Plus and the kesper.PWO on yield strength of weight load and 2.33 p.s.i. for basic wind 3. Anchor bolts shall extend through the top heavy hex nut two pressure. full threads. Davit Arms: The davit style arm shall incorporate a 5'9" radius bend as measured from the centerline of the shaft. The outer portion of the arm shall be nearly horizontal to +2' above horizontal and shall be furnished with a 2" diameter shipfitter with a maximum length of 8 inches to fit the luminaire specified. The pole end of the davit arm tube shall be fastened securely to the top of the shaft producing a flush joint with an even profile. and to pmvan; sjagkoaipg of boll flaUsaing of Anchor Base: A one piece anchor base of adequate strength, shape and 6. Anchor bolts damaged after the foundation concrete is placed size shall be secured to the lower end of the shaft so that the base shall not be repaired by bending or welding. The Contractor's shall be capable of resisting at its yield point the bending motnent repair procedure is to be submitted to the Engineer for of the shaft at its yield point. The base shall be provided with four approval prior-to making any repairs. The procedure is to slotted or round holes to receive the anchor bolts. Nut covers shall include removing the damaged portion of the anchor bolt, be provided with each pole. cutting threads on the undamaged portion to remain, the Anchor Bolts: installation of an approved threaded sleeve nut and stud, and Four steel anchor bolts, each fitted with two hexmits and repairing the foundation with epoxy concrete repair. two washers, shall be furnished with the pole. Anchor bolts shall 7. The grout pad shall not extend above the elevation of the meet the requirements of Section 9-06.5(3) and 9-06.5(4). The ' bottom of the slip base. anchor bolt yield point shall be capable of resisting the bending installed plumb, t 1 degree. moment of the pole shaft at its yield point The contractor shall assure that all anchor bolts conform to the SaAdard-RI-as. recommended ASTM specifications of the pole manufacturer and shall secure and submit to the City for approval all manufacturer data on pole bending moment, anchor bolt fabrication data, test results and any other data that may be required to confirm that the anchor bolts meet these specifications. Miscellaneous Hardware: All hardware (bolts, nuts, screws, washers, etc.) needed to complete the installation shall be stainless steel. I.D. (Identification for poles): asm"Od with tgp of bolt The contractor shall supply and install a combination of feuadatiea. 4-digits and one letter on each pole, whether individual hmrinaire or signal pole with luminair. The letter and numbers combination shall be mounted at the 15 foot level on the pole facing approaching traffic. Legends shall be sealed with transparent film, resistant to dust,weather and ultraviolet exposure. The decal markers shall be 3 inch square with gothic gold white reflectorized 2 inch legend on StaadaM-RJsas. a black background. The I.D. number will be assigned to each pole at the end of the contract or project by the City traffic engineering office. shall bestamped 9A;he mg; Cost for the decals shall be considered incidental to the ' contract bid. Light standards shall be spun aluminum davit style and shall meet the pole detail requirements indicated below and the detail All new light standards shall be numbered for identification in sheets at the end of these specifications. accordance with the Plans using painted 3-inch series C numbers The pole shaft shall be provided with a 4" x 6" flush hand installed three feet above the base facing the travelled way. Paint hole near the base and a matching metal cover secured with shall be black enamel alkyd gloss conforming to Federal stainless steel screws or bolts. Specification TT-E-489. The pole shall be adjusted for plumb after all needed In setting timber poles, the Contractor shall provide a equipment has-been installed thereon. After pole is installed and minimum burial of 10 percent of the total pole length plus 2 feet plumbed nuts shall be tightened on anchor bolts using proper sized and shall plumb or rake the poles as directed by the Engineer. sockets open end,or box wrenches. Use of pliers, pipe wrenches, The hand hole shall be located at 90 degrees to the davit arm or other tools that can damage galvanizing will not be permitted. on the side away from traffic. A grounding lug or nut shall be Tools shall be of sufficient size to achieve adequate torquing of the provided in the hand hole frame or inside the hand hole frame or nuts. the space between the concrete foundation and the bottom of inside the pole shaft to attach a ground bonding strap. the pole base plate shall be filled with a dry pack mortar grout and Page-SP-44 Revision Date:May 19, 1997 9-20 Illumination,Traffic Signal Systems,and Electrical 8-20 Illumination,Traffic Signal Systems,and Electrical trowled to a smooth finish conforming to the contour of the pole SECTION 8-20.3(14)F IS AN ADDED NEW SECTION: base plate. 8-20.3(14)F Opticorn Priority Control Systems (RC) Dry pack mortar grout shall consist of a 1:3 mixture of All new Opticom Priority System components shall be 500 portland cement and fine sand with just enough water so that the Series, or approved equal. The Contractor shall supply one copy mixture will stick together on being molded into a ball by hand, of the manufacturer's software on original disks. Controller and will not exude moisture when so pressed. A one half inch cabinets shall have the 562 harness wired into the cabinet by the drain hole shall be left in the bottom of the grout pad as shown on supplier the standard detail. SECTION 8-20.3(15) IS SUPPLEMENTED BY ADDING THE SECTION 8-20.3(14) IS SUPPLEMENTED BE ADDING THE FOLLOWING: FOLLOWING: 8-20.3(15) Grout (RC) 8-20.304) Signal Systems (RC) After the pole is plumbed the space between the concrete All signal conductors shall be stranded copper and shall have foundation and the bottom of the pole base plate shall be filled with 600 volt insulation and be of the sizes noted on the plans. All a dry pack mortar grout trowled to a smooth finish conforming to multi-conductors used for the signal system shall conform to the contour of the pole base plate. Dry pack mortar grout shall division 9-29.3 and shall be of the sizes noted on the signal wiring consist of a 1:3 mixture of portland cement and fine sand with just schedule and wiring diagram. All stranded wires terminated at a enough water so that the mixture will stick together on being terminal block shall have an open end, crimp style soderless molded into a ball by hand and will not exude moisture when so terminal connector, and all solid wires terminated at a terminal pressed. A one half inch drain hole shall be left in the bottom of block shall have an open end soldered terminal connector. All the grout pad as shown on the standard detail. terminals shall be installed with a tool designed for the installation SECTION 8-20.4 IS REVISED AND SUPPLEMENTED AS of the correct type of connector and crimping with pliers, wire FOLLOWS. cutters, etc., will not be allowed. All wiring inside the controller cabinet shall be trimmed and cabled together to make a neat, clean 8-20.4 Measurement (RC) appearing installation. No splicing of any traffic signal conductor When shown as lump sum in the Plans or in the proposal as shall be permitted unless otherwise indicated on the plans. All illumination system _, traffic signal stem conductor runs shall be attached to appropriate signal terminalgnal no specific unit of measurement boards with pressure type binding posts. The only exceptions shall will apply, but measurement will be for the sum total of all items be the splices for detector loops at the nearest junction box to the for a complete system to be furnished and installed. loops. Conduit of the kind and diameter specified in the Schedule of SECTION 8-20.3(14)4 IS SUPPLEMENTED BY ADDING THE Prices will be measured by the linear foot for the actual teat line FOLLOWING(RC) length in place, unless the conduit is included in an illumination system, signal system, or other type of electrical system lump sum 8-20.3(14)C Induction Loop Vehicle Detectors RC bid item. 11. Splices to loop return cables shall be made with soldered Measurement for unit price items shall be as described in compression type connectors. Section 8-20.5 or as described in the contract schedule of prices SECTION 8-20.3(14)D IS SUPPLEMENTED BY ADDING THE and/or special provisions. FOLLOWING: SECTION 8-20.5 IS SUPPLEMENTED AND REVISED AS 8-20.3(14)D Test forInduction Loops and Lead-in FOLLOWS: Cable C 8-20.5 Payment (RC) The Contractor shall keep records of field testing and shall furnish the engineer with a copy of the results. Payment will made for each of the following bid items that p are included in the proposal: SECTION 8-20.3(I4)E IS REVISED AND SUPPLEMENTED "Illumination System_', lump sum. AS FOLLOWS. "Traffic Signal ystem ", lump 8-20.3(14)E Signal Standards_RC� SUM." 3. Disconnect connectors complete with pole and bracket The lump sum contract price for "Illumination System _ cable shall be installed in any signal standard supporting a and "Traffic Signal ystem _", sad luminaire. =Faffir. _" 11 be full pay for furnishing all labor, materials, tools, and equipment necessary for the Art- construction of the complete electrical system, modifying existing systems, or both, as shown in the Plans and herein specified 14. The signal standard and its fabrication shall conform with including excavation, backfrlling, concrete foundations, conduit, all current Washington State Department of Transportation Signal wiring, restoring facilities destroyed or damaged during Standard Specifications and current pre-approved plans by construction, salvaging existing materials, and for making all WSDOT, required tests. All additional materials and labor, not shown in the 15. Installation of all nuts and bolts shall be performed with plans or called for herein and which are required to complete the proper sized sockets open end or box wrenches. Use of pipe electrical system,shall be included in the lump sum contract price. wrenches or other tools which can damage the galvanization of the nuts and bolts will not be permitted. Tools shall be of a sufficient size and strength to achieve Pay fQF ng all — adequate torquing of the nut(s). Page-SP-45 Revision Date:May 19, 1997 8-20 Illumination,Traffic Signal Systems,and Electrical 8-20 Illumination,Traffic Signal Systems,and Electrical The unit per each price for (14)"Service cabinet" shall be full compensation for furnishing and installing the fully equipped cabinet and for risers, standoffs and any other materials, labor or costs associated with providing electrical service as required by the electrical utility, the contract plans, details and specifications and not included as separate pay items in the contract schedule of rip ces systam rhosvu- "........Signal head......,"per each. All costs for installing conduit containing both signal and '.......Signal head mounting hardware,"per lump sum. illumination wiring shall be included in the contract prices for the The lump sum price for (16)"....Signal head mounting signal system. hardware" shall be full compensation for supplying and installing All costs for installing junction boxes containing both all traffic or pedestrian signal head mounting hardware in illumination and signal wiring shall be included in the contract conformance with the plans,specifications and detail sheets. prices for the signal system. "Pole mounted terminal box,..."x..."x...", and mounting The unit prices for the items listed below shall be full hardware," per each. compensation for furnishing and 'installing each item and for all "2/c shld loop return cable," per linear foot. labor, materials tools equipment and testing necessary and/or "3/C shld pre-emption cable,"per linear foot. incidental for the full and complete installation as per the contract ...-pair shld interconnect cable," per linear foot. plans,detail sheets and these specifications. "Traffic signal controller and cabinet,' per each. "Trench and Backfill......... wide by........." deep, " per The unit contract price for "Traffic Signal Controller and linear foot. Cabinet" shall be full compensation for furnishing and installing a The unit contract price for (3) "Trench and Backfill" per fully equipped wired and operational controller and cabinet. linear foot shall be full compensation for excavating, loading, "Traffic signal wire,'per lump sum. hauling and otherwise disposing of the waste materials, for "Signal standard Type...,with ...-foot mast arm,"per each. backfilling and compacting backfill material to specified density "Induction loop vehicle detector." per linear foot. and for the restoration of the trench to its pre-existing condition or The unit linear foot contract price for (24)"Induction loop as shown on the plans or as directed by the Engineer all in vehicle detector' shall be measured by the linear feet of full depth accordance with the plans, specifications and detail sheets. sawcut required for installation. The unit price shall be full "Select Trench Backfill," per ton. (4)"Select Trench Backfill" compensation for full and complete installation including wire, shall consist of 5/8" minus crushed surfacing top course and the sealant and all other labor, materials, tools and equipment required unit per ton price shall include all costs associated with furnishing to complete the installation in accordance with the plans, and installing the material and loading, hauling and disposing of specifications and detail sheets. The unit price shall also include waste materials. providing and installing conduit stub-outs and soldered splices, "........Foundation, ......... per each.' splices to loop return cables unless separate pay items are included "Type ....Junction box," per each. ; in the contract schedule of prices for these other items. Sawcutting *The unit per each price for(5)"Foundation" and (6)"Junction shall be considered incidental to the loop installation whether or not Box" shall be full compensation for full and complete installation there is a separate pay item in the contract for sawcutting. per the plans specifications and detail sheets including enclosing Measurement for a standard 6' x 6' induction loop shall be 28 each item in a finished concrete pad which shall be incidental linear feet. Sawcutting for loop"Home trans" shall be done such as unless a separate pay item is included in the Schedule of Prices for to minimize the total linear feet of sawcutting required by meaTM of "Concrete Pad." proper locating of loop return "Stub-out", by direct routing of "Concrete Pad," per square yard. "home tuns" and by combining up to 4 pairs of loop wires in a Measurement for (7)"Concrete Pad" shall be by the square single "home run" sawcut. Loop and "Home Run" layout shall be yard of surface area enclosed inclusive of and not subtracting for approved by the Engineer before sawcutting takes place. the area of the junction box or foundation enclosed and shall be full .......Splice kit,"per each. compensation for full and complete installation as per the plans, "Emergency Vehicle pre-emption detector," per each. specifications and detail sheets. "Opticom discriminator card," per each. '...t.." Schedule 40 Conduit, P.V.C.' per linear foot.* "Detector amplifier," per each. ." Schedule 80 conduit, P.V.C., " per linear foot.' "Street light fuse kit,' per each. s The unit contract price for conduit shall include all conduit, "Pedestrian push button with sign, "per each. couplings adapters elbows bends reducers, bell ends, bushings, 'Pedestrian push button post," per each. and any other material labor or equipment necessary to complete "Pedestrian signal pole,Type I, 10-feet," per each. the installation of the conduit. Measurement shall be by linear foot "Relocate existing.......pole,*per each. from end of conduit to end of conduit as measured from the top of The unit per each price for "relocate existing ....pole" shall be grade along the middle of the trench line and adding a vertical full compensation for removing the pole from its existing measurement at the end of each conduit run equal to the design foundation removing and salvaging or re-installing existing depth of the trench. No payment shall be made for additional equipment plugging holes as required and installing the pole on its conduit used by the contractor due to horizontal or vertical weaving new foundation and shall include all labor, tools, materials, of the conduit within the trench line. equipment and any other costs necessary and/or incidental to 'Street Light Standard ......... per each. complete the installation and make the electrical equipment ........watt...Luminaire and lamp,' per each. operational all in accordance with the plans, specifications and .......watt...Luminaire and lamp with photocell," per each. detail sheets. .......AWG....copper wire," per linear foot. "Remove existing.......Foundation," per each. "Service cabinet, " per each. Page-SP-46 Revision Date:May 19, 1997 8-22 Pavement Marking 8-22 Pavement Marking The unit per each price for 'Remove existing foundation" Traffic LwAe 1S1,end shall be full compensation for full and complete removal and A WHITE marking confi;;ming to;he PWWA publication hauling and disposal of the foundation. and 1204,0U1009 A!"Xk!Affg to; pFe{�eFtie;using alphabetical letters.. 8-22 Pavement Marking SECTION 8-22.1 IS REVISED AS FOLLOWS. high.See contract plans and detail sheets. 8-22.1 Description(RQ SECTION 8-22.3(5)IS REVISED AS FOLLOWS: Skip Center Stripe 8-22.3(5) Tolerances for Line Stripes (RC) A BROKEN YELLOW line 4 inches wide. The broken Length of Stripe: The longitudinal accumulative error or "skip" pattern shall be based on a-40-feet 24-foot unit consisting Within afoot 24-foot length of skip stripe shall not exceed plus ' of a_W-feet 9-foot line and a-30 feet 15-foot gap. Skip center or minus 1 inch. stripe is used as center line delineation on two lane or three lane, SECTION 8-22.3(6)IS REVISED AS FOLLOWS. two way highways. Double Yellow Center Stripe 8-22.3(6) Installation Instructions (RC' Two SOLID YELLOW lines, each 4 inches wide, Installation instructions for plastic markings shall be provided separated by a 4-inch-er-l47-iPch space. Double yellow center stripe for both the Contractor and the Engineer. All materials shall be is used as center line delineation on multilane, two way highways installed according to the manufacturer's recommendations-wW-a and for channelization. Gore-suipaApproach Stripe A SOLID WHITE line, 8 inches wide, used as "93A , SECTION 8-22.3(7)IS A NEW SECTION.to delineate turn lanes ' from through lanes, for traffic islands, and for hash marks. Hash 8-22 3('n Removal of Traffic Markers(RC) mark stripes shall be placed on 45 degree angle and 10 =feet apart. � The work to remove all old or conflicting stripes, Iines, Lane Stripe buttons, or markers as required to complete the channelization of A BROKEN WHITE line, 4 inches wide, used to the project as shown on the plans or detail sheets shall be considered incidental to other contract pay items and no further delineate adjacent lanes travelling in the same direction. The broken or "skip" pattern shall be based on a-40-feet24-foot unit p videdfi r shall be made unless a separate pay item or items are consisting of a 4444Q4 9-foot line and a-30 feet 15-foot gap. provided for such removal. ' Drop Lane Stripe(Skip Approach Line) SECTION 8-22.4 IS REVISED AND SUPPLEMENTED AS A BROKEN WHITE line, 8 inches wide, used to FOLLOWS. delineate a lane that ends-at-aw-etl maip. The broken or "skip" pattern shall be based on a 2445-foot unit consisting of a 93-foot 8-22.4 Measurement(RC) (SA) line and a I542-foot gap. The measurement will be based on the travel distaaca-roquiFe3 Ale Rass-Swipe of a marking system capable... Go"Approach stripe, barrier stripe, crosswalk stripe, and 40;n he -As botinded by ;he Whom passing-46 stop bar will be measured by the linear foot of each marking type. Traffic arrows will be measured by the unit with each arrow ZZiAGh space head defined as a unit. Traffic 4U"&1egends, handicapped parking stall symbols, preferential lane symbols, railroad crossing symbols, drainage markings, and cycle detector symbols will be measured by the unit. gaf),_ Measurement for paint/plastic stripe line removed shall be by Two Way Left Turn Stripe the linear foot of "...." wide line or shall be included in the lump A SOLID YELLOW line, 4 inches wide, with a sum price for 'remove existing traffic markings' unless specified BROKEN YELLOW line, 4 inches wide, separated by a 4-inch to be paid as a separate pay item. If not specified as a separate pay space. The broken or "skip" pattern shall be based on a-404"24- item then removal of existing traffic markings shall be considered I foot unit consisting of a-104ee4 9-foot line and a-30-feet 15-foot incidental to the payment for other items of work and no further_ space. The solid line shall be installed to the right of the broken compensation shall be made. line in the direction of travel. SECTION 8-22.5 IS REVISED AND SUPPLEMENTED AS Crosswalk Stripe FOLLOWS: A SOLID WHITE line,-1Z 8 inches wide and 10-feet long, installed parallel to another crosswalk stripe,-with--6 feet 8-22.5 Payment (RC' and parallel to the direction of traffic flow and centered in pairs on lane "Painted GeFeApproach Stripe", per linear foot. lines and the center of lanes. See detail sheet.. "Painted Traffic LetteFLegend",per each. Stop Bar A SOLID WHITE line,—I-S 12, 18 or 24 inches wide "Plastic Traffic Line ...... wide," per each. .ales as noted eiheFaviss-ice on the Contract plans. "Remove Paint Line ....." wide,' per linear foot.' Page-SP-47 Revision Date:May 19, 1997 8-23 Temporary Pavement Markings 9-23 Temporary Pavement Marking! , 'Remove Plastic Line....... Wide,' per linear foot.* 8-23 Temporary Pavement Markings 'Remove existing traffic markings, "per lump sum.' ' The linear foot contract price for "Remove Paint Line' and SECTION 8-23.5 IS SUPPLEMENTED WITH THE ' "Remove Plastic Line' and the lump sum contract price for FOLLOWING: "Remove existing traffic markings" shall be full compensation for removal of existing traffic markings as per the plans, specifications 8-23.5 Payment (RC) and detail sheets If these pay items do not appear in the contract schedule of prices then the removal of old or conflicting traffic If no pay item is included in the contract for installation or for removal of temporary pavement markings then all costs associated markings required to complete the channelization of the project as shown on the plans or detail sheets shall be considered incidental to �'�'�� these items are considered incidental to other items in the other items in the contract and no further compensation shall be contract or included under "Traffic Control,' if that item is included as a bid item. made. The unit contract prices for the above listed bid items shall be full pay for furnishing all labor, tools material, and equipment - necessary for the completion of the work as specified. , r Page-SP-48 Revision Date:May 19, 1997 ' 9-00 Definitions and Tests 9-02 Bituminous Materials Division 9 material for payment may be produced for use on a project until the job mix formula has been approved by the engineer. The mixture Materials shall be designed to meet the test criteria listed in Section 9-03.8(2) and remain within the limits set forth in 9-03.8(6). The determination of the job mix formula shall be the responsibility of the Contractor. 9-00 Definitions and Tests The intermingling of asphalt concrete mixtures produced from more than one JMF is prohibited. Each strip of asphalt concrete SECTION 9-00 IS SUPPLEMENTED BY ADDING THE pavement placed during a working shift shall conform to a single FOLLOWING: job mix formula established for the class of asphalt concrete 9-00(A) Recycled Materials (RC) specified unless there is a need to make an adjustment toss the JMF The City encourages the use of recycled materials whenever The JMF shall be submitted in writing by the Contractor to practicable, provided that those materials meet or exceed all the Engineer at least 10 days prior to the start of paving operations applicable requirements described elsewhere in the contract and shall include as a minimum: specifications. Should recycled materials be utilized, the City a. Percent passing each sieve size. requires that a Recycled Product Reporting Form be completed by b. Percent of asphalt cement. the Contractor. c. Asphalt grade. d. Mixing temperature. 9-02 Bituminous Materials e. Compaction temperature. f. Anti-strip agent content. 9-02.1 Asphalt Material, General The Contractor may not make any changes to the JMF without SECTION 9-02.1(IO)IS A NEW SECTION: prior written approval of the Engineer. Should a change in sources of materials be made, a new JMF must be approved by the Engineer before the new material is used. 9-02.1(10) Loop Sealant (RQ Unless specified otherwise in the contract or permitted by the Engineer upon request from the contractor, loop sealant shall be hot-melt, rubberized asphalt sealant (Crafco Loop Detector Sealant or approved equal), shall meet the penetration, flow and resilience Goomwe Mix subm;U9.4 by !be CGIR&F-arse; in tho Mix A; specifications of ASTM D3407 and shall be installed with an approved applicator in conformance with manufacturer's Design shall be the A= Any changs o; recommendations. The contractor shall request and obtain approval from the aaw3;0. Engineer for the type of loop sealant to be used before installing 23. Job Mix Formula Tolerances-aa3-Adjusuaaaw. detector loops and shall submit manufacturer cutsheets or other a. After the JMF is data if requested by the Engineer in order to enable the Engineer to determined, the several constituents of the mixture at the time of determine the acceptability of the sealant. All loop sealant shall acceptance shall conform to the following tolerances: only be installed in thoroughly clean and dry pavement and shall be Constituent of Mixture Tolerance Limits applied in conformance with the methods required as to The tolerance limit for each temperature and means of application such as to completely fill the mix constituent shall not sawcut area, encapsulate the loop wires and adhere to the exceed the broad band pavement. specification limits specified in Section 9-03.8(6). 9-03 Aggregates Aggregate passing 1", Broad band specification 314 5/8 , /2", and limits Section 9-03.8(6). SECTION 9-03.8(6)A IS REVISED AS FOLLOWS: 3/8" sieves 9-03.8(6)A Basis of Acceptance(RO Aggregate passing 1/4• sieve f 6% Aggregate passing No. 10 sieve t 5% 1. Asphalt Concrete will be accepted based on its Aggregate passing No. 40 sieve t 4% conformance to the project job mix formula MAF). F*P—tlw Aggregate passing No. 200 sieve f2% Notel Asphalt cement t0.5%Note2 For open graded mix: Tolerance limits shall be for aggregate gradation only and shall be as specified in Section 9-03.8(6). Note 1 — 2.0% if less than 50% RAP (Recycled Asphalt Pavement), 2.5% for 50% RAP or more. Note 2 — 0.5% if less than 20% RAP, 0.7% for over 20% RAP, but less than 50% RAP, 1.0%for 50% RAP or greater. These tolerance limits constitute the allowable limits used in Section 5-04.3(8)A to determine acceptance. 4-116'1 .1), as—blirbed rhWl be Ghaagor' only 11pon or-do; of the Engines;, No Page-SP-49 Revision Date:May 19, 1997 9-04 Joint and Crack Sealing Materials 9-05 Drainage Structures,Culverts,and Conduits ' SECTION 9-05.7(3) IS DELETED AND REPLACED BY THE FOLLOWING: 9-05.7(3) Concrete Storm Sewer Pipe Joints (RC) Joint assembly design shall be reinforced concrete bell and Q A4jusssam" spigot type incorporating a fully retained single rubber gasket in accordance with ASTM C361 or AWWA C302. Rubber gasket material shall be neoprene. SECTION 9-05.7(4) IS SUPPLEMENTED BY THE FOLLOWING: 9-05.7(4) Testing Concrete Storm Sewer Pipe Joints RCS Hydrostatic testing of rubber gasket joints shall be performed ' in accordance with ASTM C361 or AWWA C302 except test pressure shall be 5 psi. SECTION 9-05.9 IS REVISED AND SUPPLEMENTED AS SPOGi€iaatiGns. FOLLOWS: 9-05.9 Steel Spiral Rib Storm Sewer Pipe (RC) Maximum of Q 3 p@Fr.*At Uon; the approved IMP No Steel Spiral ;;b pe shall meet the raquirameaf& ikw-5pacitacaiieas. The manufacturer of spiral rib storm sewer pipe shall furnish 9-04 Joint and Crack Sealing Materials the Engineer a Manufacturer's Certificate of Compliance stating that the materials furnished comply in all respects with these SECTION 9-04.11 IS A NEW SECTION Specifications.The Engineer may require additional information or tests to be performed by the Contractor at no expense to the State. 9-04.11 Butyl Rubber (SA) Unless otherwise specified, spiral nib storm sewer pipe shall be furnished with pipe ends cut perpendicular to the longitudinal Butyl rubber shall conform to ASTM D2000,M1 BG 610. axis of the pipe. Pipe ends shall be cut evenly. Spiral rib pipe shall be fabricated either by using a continuous helical lock seam or ' 9-05 Drainage Structures, Culverts, and a continuous helical welded seam paralleling the rib. Conduits SECTION 9-05.4 IS REVISED AS FOLLOWS: 9-05.4 Steel Culvert Pipe and Pipe Arch (RC) Steel culvert pipe and pipe arch shall meet the requirements of r AASHTO M 36, Type I and Type 11. Welded seam aluminum coated (aluminized)_corrugated steel pipe and pipe arch with metallized coating applied inside and out following welding is jg;at&A with coupling bands, acceptable and shall be asphalt treatment coated. SECTION 9-05.7(2) IS DELETED AND REPLACED BY THE FOLLOWING: Steel spiral rib storm sewer pipe shall be manufactured of ' metallic coated (alum(aluminized or galvanized) corrugated steel and 9-05.7(2) Reinforced Concrete Storm Sewer Pipe inspected in conformance with Section 9-05.4. The size, coating, (RC) and metal shall be as shown in the Plans or in the Specifications. Reinforced Concrete Storm Sewer pipe shall conform to the For spiral rib storm sewer pipe, helical ribs shall project requirements of ASTM C-76 and shall be Class IV. Cement used outwardly from the smooth pipe wall and shall be fabricated from a in the manufacture of reinforced concrete pipe shall be Type 11 in single thickness of material. The ribs shall be essentially conformance with ASTM C150. No admixture shall be used unless rectangular and shall be 314 inch plus two times the wall thickness otherwise specified. (2t) plus or minus 1/8 inch (measured outside to outside) and a SECTION 9-05.7(2)A IS SUPPLEMENTED BY THE minimum of 0.95 inch high (measured as the minimum vertical FOLLOWING. distance from the outside of pipe wall immediately adjacent to the lockseam or stiffener to the top surface of rib). The maximum 9-05.7(2)A Basis for Acceptance (RC) spacing of the ribs shall be 11.75 inches center to center(measured All pipe shall be subject to (1) a three-edge-bearing strength normal to the direction of the ribs). The radius of bend of the (D-load) test in accordance with ASTM C76; and (2) a hydrostatic metal at the corners of the ribs shall be a minimum of 0.10 inch test of rubber gasket joints in accordance with ASTM C361 or and a maximum of 0.17 inch. If the sheet between adjacent ribs , AWWA C302 except test pressure shall be 5 psi. does not contain a lockseam, a stiffener shall be included midway Page-SP-50 Revision Date:May 19, 1997 9-06 Structural Steel and Related Materials 9-08 Paints between ribs having a nominal radius of 0.25 inch and a minimum 1/8 inch wide (measured outside to outside) and a minimum height of 0.20 inch toward the outside of the pipe. Pipe shall be spacing of ribs shall be 4.80 inches center to center (measured fabricated with ends that can be effectively jointed with coupling normal to the direction of the ribs). The radius of bend of the bands. metal at the corners of the ribs shall be 0.0625 inch with an When required spiral rib or narrow pitch spiral rib pipe shall allowable tolerance of+ 10 percent. be bituminous treated or paved The bituminous treatment for For wide pitch spiral rib storm sewer pipe, helical nibs shall ' spiral rib pipe shall conform to the requirements of Sections 9- project outwardly from the smooth pipe wall and shall be fabricated 05.4(3)and 9-05.4(4) from a single thickness of material. The ribs shall be 3/4 inch + For narrow pitch spiral rib sewer pipe the helical ribs shall 1/8 inch wide(measured outside to outside)and a minimum of 0.95 project outwardly from the smooth pipe wall and shall be fabricated inch high (measured as the minimum vertical distance from the from a single thickness of material. The ribs shall be .375 inch— outside of pipe wall to top surface of the rib). The maximum 1/8 inch wide (measured outside to outside) and a minimum of spacing of ribs shall be 11.75 inches center to center (measured 4375 inch high (measured as the minimum vertical distance of fibs normal to the direction of the ribs). The radius of bend of the shall be 4.90 inches center to center (measured normal to the metal at the corners of the ribs shall be 0.0625 inch with an direction of the ribs). The radius of bend of the metal at the allowable tolerance of+ 10 percent. corners of the ribs shall be 0.0625 inch with an allowable tolerance of-10 percent. 9-06 Structural Steel and Related Materials i SECTION 9-05.12(3)IS A NEW ADDITIONAL SECTION. 9-06.5 Bolts 9-05.12 3) CPEP Sewer Pipe (RC) CPEP - Smooth interior pipe and fittings shall be SEC7ION9-06.5(4)HAS BEENSUPPLEMENTEDBYADDING: manufactured from high density polyethylene resin which shall meet or exceed the requirements of Type 111 Category 4 or 5 9-06.5(4)' Anchor Bolts(RC) Grade P33 or P34 Class C per ASTM D1248. In addition, the All anchor bolts nuts washers and anchor plates for signal pipe shall comply with all material and stiffness requirements of poles street light poles strain poles or other types of poles shall AASHTO M294. meet the recommended specifications of the pole manufacturer. The Contractor shall be responsible for providing to the Engineer SECTION 9-05.14IS DELETED: any and all data concerning fabrication strength test results, mill ' SECTION 9-05.17 IS REVISED AND SUPPLEMENTED AS certification and other data required to confirm that the anchor FOLLOWS: bolts meet those specifications. The following standard specifications shall apply to anchor 9-05.17 Ahuainum Spiral Rib Storm Sewer Pipe bolts for street light signal and strain poles provided that the (RQ Contractor can submit documentation from the manufacturer Unless otherwise specified, spiral rib storm sewer pipe shall affirming that anchor bolts meeting these specifications are be furnished with pipe ends cut perpendicular to the longitudinal recommended for the pole to be installed thereon: axis of the pipe. Pipe ends shall be cut evenly. Spiral rib pipe shall 1 The standard anchor bolt for aluminum street light poles be fabricated by using a continuous helical lock seam with a seam shall be 42 inches in length and shall meet the requirements of gasket ASTM A 36 or ASTM A 307. The shaft of the anchor bolt shall be a full one inch in diameter with a hot forged four inch "L" bend on the bottom end and a minimum of six inches of die-cut threads on the top end. 2 The anchor bolts for signal poles and strain poles shall meet the specifications as designated on the approved manufacturer's pole plans and/or supplemental plans or specifications provided by the manufacturer. All anchor bolts nuts and washers shall meet the pole manufacturer's specifications and shall be hot dipped galvanized unless such galvanization is not permitted for the type of steel as T per Section 9-06.5(4). joinse"with Goilpling bands 9-08 Paints SECTION 9-08.8 IS A NEW SECTION: 9-08 8 Manhole Coating System Products (RC) For spiral rib storm sewer-pipe helical ribs shall project outwardly from the smooth pipe wall and shall be fabricated from a single thickness of material. The ribs shall be 3/4 inch wide by 3/4 9-08 8(1) Coating System Specification (RC) inch deep with a nominal spacing of 7-1/2 inches center to center. The following coating system specifications shall be used for Pipe shall be fabricated with ends that can be effectively jointed coating_(sealing) interior concrete (including the channel) surfaces with coupling bands. of sanitary sewer manholes when required. For narrow pitch spiral rib storm sewer pipe, helical ribs shall project outwardly from the smooth pipe wall and shall be fabricated from a single thickness of material. The ribs shall be 0.375 inch + Page-SP-51 Revision Date:May 19, 1997 9-23 Concrete Curing Materials and Admixtures 9-29 Illumination,Signals,Electrical , Coating System Specification SECTION 9-29.3 IS REVISED AND SUPPLEMENTED AS FOLLOWS: A. General 1. Buried Manhole 9-29.3 Conductors, Cable (RC) Surface Color Paint System Each wire shall be numbered at each terminal end with a wrap-around type numbering strip bearing the circuit number a. Buried, and White C-1 shown on the plans. exposed No splicing of any traffic signal conductor shall be permitted concrete unless otherwise indicated on the plans. All conductor runs shall surfaces. be pulled to the appropriate signal terminal compartment board 9-08.8(2) Coating Systems with pressure type binding posts. The only exceptions shall be the A. High Solids Urethane splices for detector loops at the nearest junction box to the loops. The contractor shall provide and install all the necessary Coating System: C1 wiring fuses and fittings so as to complete the installation of the ' signal and lighting equipment as shown on the plans. All materials Coating Material: High Solids Urethane and installation methods, except as noted otherwise herein, shall Surfaces: Concrete comply with applicable sections of the National Electrical Code. Surface Preparation: In accordance with SSPC SP-7 8. Detector loop wire shall be No. 1244 AWG stranded , (Sweep or brush off blast) copper wire, Class B, with chemically cross linked polyethylene Application: betweeShop[Fn c The drying time type RHH-RHW insulation of code thickness. between coats shall not exceed (11) Siac-ps"• gommunications cable(bRtC}-shall meet REA 24hours in any case specification PE-39 and shall have six-Fair-No. 19 AWG wires System Thickness: 6.0 mils dry film with 0.008 inch FPA/MPR coated aluminum shielding. The cable Coatings: Primer: One coat of Wasser shall have a petroleum compound completely filling the inside of MC-Conseal high solids the cable. urethane(2.0 DF1)Finish: The shielded communications/signal interconnect cable shall Two or more coats of Wasser meet the following- MC-Corneal (min.4.0 DFT) 1. Conductors: Solid, soft drawn, annealed copper, size 19 awg. 9-23 Concrete Curing Materials and 2. Insulation: solid, virgin high density polyethylene or Admixtures polypropylene, with telephone industry color coding. 3. Cable core assembly: insulated conductors are twisted SECTION 9-23.9 IS REVISED AS FOLLOWS. into pairs with varying lays (twist lengths) to minimize cross talk ' and meet strict capacitance limits. 9-23.9 Fly Ash(RC) 4. Shielding: A corrosion/oxidation resistant tinted ethylene Fly ash shall not be used around water lines. copolymer coated (both sides) .008' thick corrugated aluminum tape shield is applied longitudinally with shielding coverage. A 9-29 Illumination, Signals, Electrical .005 corrugated tape applied in the same manner is acceptable. 5. Outer jacket: A black, low density high molecular weight SECTION 9-29.1 IS SUPPLEMENTED BY ADDING 7HE virgin polyethylene (compounded to withstand sunlight, FOLLOWING. temperature variations and other environmental conditions plus abase during installation) is extruded overall to provide a 9-29.1 Conduit.(RC) continuous covering. The conduit P.V.C. - non-metallic shall be of the two types 6. Footage markings: footage markings must be printed indicated below: sequentially a minimum of 2' along the outer jacket. 1. Schedule 80 Extra heavy wall P.V.C. conforming to 7. Filling: the entire cable within the outer jacket is floodec ASTM Standards to be used in all installations under roadways. with petroleum-polyethylene gel filling compound including the 2. Schedule 40 heavy wall P.V.C. conforming to ASTM area between the outer jacket and the shield. Standards. SECT70N 9-29.9 IS SUPPLEMENTED BY ADDING THE SECTION 9-29.2 IS SUPPLEMENTED BY ADDING THE FOLLOWING: FOLLOWING. 9-29.9 Ballast, Transror mers (RC) 9-29.2 Junction Boxes(RC) The Ballast shall be pre-wired to the lamp socket and termina Junction boxes shall be reinforced concrete with galvanized board. steel from anchored in place and galvanized steel cover plate SECTION 9-29.10 IS SUPPLEMENTED BY ADDING THI (Diamond pattern)as indicated on detail sheets. FOLLOWING. The inscriptions on the covers of the junction boxes shall be as 9-29.10 Luminaires(RC) follows: 1. Signal only: "Signals' The filter shall be charcoal with elast-omer gasket. 2. Street Lighting only: "lighting' Luminaires shall have a cast aluminum housing of the cobr. 3. Traffic Signal and Street lighting Facilities: "TS-LT" head style with a glass ovate refractor. The above inscriptions shall not be higher than the top surface of the cover plates. Page-SP-52 Revision Date:May 19, 1997 9-29 Illumination,Signals,Electrical 9-29 Illumination,Signals,Electrical The manufacturer's name or symbol shall be clearly marked re-energize without change. on each luminaire. 9-29.11 Control Equipment @,1- 5. Conflict Monitor. Upon sensing conflicting signals or SECTION 9-29.11(2)IS DELETED AND REPLACED WITH unsatisfactory operation voltages, the conflict monitor shall immediately cause the signal to revert to flash; however, the 9-29.11(2) Photoelectric Controls (RC) controller shall stop time at the point of conflict. After the conflict Photoelectric controls shall be a plug-in device, rated to monitor has been reset, the controller shall immediately take operate on 120 volts, 60 Hz. The unit shall consist of a light command of the signal displays at the beginning of artery sensitive element connected to necessary control relays. The unit g ely low shall be so designed that a failure of any electronic component will 6. Flash unit shall be a two circuit type, capable of energize the lighting circuit. switching loads up to 1000 watts per circuit alternately at a rate of The photo cell shall be a solid state device with stable turn-on 60 flashes per minute per circuit, plus or minus two flashes per values in the temperature range of-55 degrees C to +70 degrees minute. C. The photo cell shall be mounted externally on top of the luminaire. In a contactor controlled system, the photo cell to SECTION 9-29.13(3) IS REVISED AND SUPPLEMENTED AS control the system shall be mounted on the luminaire nearest to the FOLLOWS: service/contactor cabinet. The photo cell shall be capable of switching "ON" 1,000 watts of incandescent load as a minimum. 9-29.13(3) Emergency Pre-emption (RC) Immediately after a valid call has been received, the SEC77ON 9-29.13 IS SUPPLEMENTED BY ADDING THE pre-emption controls shall cause the signals to display the required FOLLOWING: clearance intervals and subsequent pre-emption intervals. 9-29.13 Traffic Signal Controllers (RC) Pre-emption shall sequence as noted in the contract. Pre-emption equipment shall be installed so that internal wiring of the The unit shall operate on 120 volt, 60 cycle, single phase controller, as normally furnished by the manufacturer, is not alternating current and shall use the power line frequency as a time altered. base. The traffic signal controller shall meet the requirements of the National Electrical Manufacturers Association (NEMA) Standard Publications. phase. Components such as resistors, capacitors, diodes and Emergency vehicle pre-emption shall be furnished as modules transistors shall be individually replaceable utilizing approved that plug directly into a rack wired to accept 3-M discriminator ' standard soldering techniques. Intergrated circuits shall be type units. The pre-emption system operation shall be compatible mounted in sockets and shall be easily replaceable without with the 500 Series 3M company "opticom" system which the City soldering. All components shall be standard"Off the shelf' items. of Renton is currently using and shall be capable of being activated The traffic signal controller shall be capable of interfacing by the same transmitters. with the Multisonic real time, master computer. The controller The optical signal discriminator system shall enable an shall be capable of both on-line operation(control by the multisonic authorized vehicle to remotely control traffic control signals from a master computer) and standby operation. The controller shall distance of up to 1800 feet(0.54 kilometers)along an unobstructed establish the sequence of signal phases, including overlaps, in "line of sight" path. The system shall cause the traffic signals conformance with the signal phasing diagram on the plans. When controller to move into an appropriate fire pre-emption program. operating either in a fixed time mode or in a fully-actuated mode this optical discriminator shall interface to the 562 software, for with volume density on each phase as required. All clearance field programmability. It shall consist of the following timing and pedestrian timing shall be accomplished at the local components: intersection. a. Optical energy detectors which shall be mounted on the SECTION 9-29.13(2)IS REVISED AND SUPPLEMENTED AS traffic signal mast arms and shall receive the optical energy FOLLOWS, emitter's signal. b. Discriminators which shall cause the signal controller to 9-29.13(2) Flashing Operations (RC) go into internal pre-emption which will give the authorized vehicle 2. Police Panel Switch. When the flasb-automatic switch the right of way in the manner shown on the phase sequence located behind the police panel door is turned to the flash' position, diagram.the signals shall immediately revert to flash; however, the c. Pre-emption Indicator Lights. controller shall "STOP TIME." When the switch is placed on Optical Detector a. Shall be automatic, the signals shall continue to flash for an additional b. Fittings s solid state construction. shall meet the specifications of the system 8 second flash period. At the completion of the continued 8 second manufacturer to facilitate ease of installation. flash period, unless otherwise specified, the controller shall c. Shall operate over an ambient temperature range of-40PF immediately resume normal cyclic operations at the beginning of to +IWF(-40'C to +850C). artery grsea Show. d. Shall have internal circuitry encapsulated in a semi- 4. Power Interruption. On "NEMA" controllers any power interruption longer than 475 plus or minus 25 milliseconds, signals flexible compound and shall be impervious to moisture. shall re-energize consistent with No.2 above to ensure an 8 second e. Shall respond to the optical energy impulses generated by flash period prior to the start of artery green. A power interruption a pulsed Xenon source with a pulse energy density of 0.8 micro of less than 475 plus or minus 25 milliseconds shall not cause Joule per square meter at the detector, a rise time less than one resequencing of the controller and the signal displays shall microsecond and half power point pulse width on not less than thirty microseconds. Page-SP-53 Revision Date:May 19, 1997 9-29 Illumination,Signals,Electrical 9-29 Illumination,Signals,Electrical Discriminator Each module shall do the following: a. Shall provide for a minimum of two channels of optical Method of 04w;'aps detector input. b. Shall provide for a minimum of two discrete channels of optically isolated output. When a pre-emption detector detects an emergency vehicle, the phase selector shall hold the controller in the required phase or advance directly to that phase after observing all vehicle r;Mu'A0Q4'rj)'with gthe;timing data clearances. The phase selector shall hold the controller in the phase selected until the detector no longer detects the emergency vehicle. When the phase selector is responding to one detector, it shall All timing functions and input and output features for fully- not respond to any other detector until calls from the first detector actuated, volume-density operation shall be provided in accordance are satisfied. Indicator lights shall indicate power on, signal being with NEMA standards. received, channel called. Switches shall control system power and The controller shall provide for setting each timing interval by simulate detector calls for each phase. means of positively calibrated settings. The timing functions shall be on the front of the controller unit or shall have keyboard entry SECTION 9-29.13(2) IS SUPPLEMENTED BY ADDING THE and liquid crystal display. For the standby operation, the traffic FOLLOWING: signal controller shall include all circuitry required to provide all -' timing and all functions for signal operation in a fully-actuated 9-29.13(4) Wiring Diagrams(RC) mode. Standby operation shall automatically occur upon opening The controller cabinet shall have a waterproof envelope with a of interconnect lines, failure of central master computer, or when side access attached to the inside of the cabinet door. At the time specified by the master. The standby operation shall follow and be of delivery the envelope shall have four complete sets of schematics coincidental in phase to that phase being displayed at the start of and manuals for all assemblies and sub-assemblies. standby operation. Transfer from computer supervision shall not SECTION 9-29.13(6) IS SUPPLEMENTED BY ADDING THE cell up a starting yellow. FOLLOWING. SECTION 9.29.13(7)A IS SUPPLEMENTED BY ADDING THE FOLLOWING. 9-29.13(6) Radio Interference Suppressors 9-29.13(7)A Environmental, Performance and Test A Cornell-Dubiler radio interference filter NF 10801-1 30 amps or equivalent shall be used to filter the A.C. power. Standards for Solid-State Traffic Additionally, all power supplies shall have noise immunity from Controllers (RC) , other devices within the cabinet. The traffic signal controller assemblies, including the traffic signal controller, auxiliary control equipment and cabinet shall be SECTION 9-29.13(7)IS REVISED AND SUPPLEMENTED AS shop tested to the satisfaction of the Engineer. Testing and check- FOLLOWS: out of all timing circuits, phasing and signal operation shall be at 9-29.13(7) Traffic-Actuated Controllers(RC) the City of Renton Signal Shop, Renton, Washington. The Signal Shop will make space available to the contractor for the required Traffic-actuated controllers shall be electronic devices which, test demonstrations. The contractor shall assemble the cabinet and when connected to traffic detectors or other means of actuation, or related signal control equipment ready for testing. A complete both, shall operate the electrical traffic signal system at one or demonstration by the contractor of all integrated components more intersections. satisfactorily functioning shall start the test period. Any All solid-state electronic traffic-actuated controllers and their malfunction shall stop the test period until all parts are supplemental devices shall employ digital timing methods. satisfactorily operating. The test shall be extended until a The traffic signal control equipment, unless otherwise minimum of 72 hours continuous satisfactory performance of the permitted in the contract, must specifically conform to current entire integrated system has been demonstrated. The NEMA specifications. demonstration by the contractor to the Engineer of all components functioning properly shall not relieve the contractor of any Actuated traffic signal controllers shall be 8-phase control control relative to the proper functioning of all afor estated_ control gear when field installed. units. Volume-density timing features shall be provided on all controllers. SEC77ON 9-29.13(7)B IS REVISED AND SUPPLEMENTED ' "zed r ra;'613' Pin of ag plug shall be us AS FOLLOWS: 9-29.13(7)B Auxiliary Equipment for Traffic Actuated Controllers (RC) ,y babe=at� — I Page-SP-54 Revision Date:May 19, 1997 9-29 Illumination,Signals,Electrical 9-29 Illumination,Signals,Electrical Power Switches Computer Interface Unit ' There shall be a main power switch inside the cabinet that Interface communication devices shall be designed as separate shall render all control equipment electrically dead when turned units or as modules that plug directly into the controller case. The off. There shall be a controller power switch that shall render the communication devices shall be used for on-line computer control controller and load switching devices electrically dead while of the intersection and shall be capable of transmitting all detector maintaining flashing operation for purposes of changing controllers and signal status information and receiving and decoding command or load switching devices. information from the computer all in conformance and within the capability of the multisonic master computer unit and the Stop Time Bypass Switch interconnect cables. There shall be a switch in the cabinet identified as the stop SECTION 9-29.13(7)D IS REVISED AND SUPPLEMENTED AS FOLLOWS: time bypass switch. if the intersection is placed on flashing gyration either by the flash switch or the fail safe monitor, the 9-29.13(7)D Controller Cabinets(RC,§A) controller shall immediately stop time. The stop time bypass 1. Construction shall be of 0.073-inch minimum thickness switch shall remove stop time from the controller and permit Type 304 stainless steel, 0.125-inch minimum thickness ciaas normal cycling operation while the intersection remains in flashing aaediaed-.sheet aluminum, or cast aluminum. Cabinets shall be operation. finished inside with an approved finish coat of exterior white enamel and outside with an approved enamel finish, light gray or DETECTOR test switch aluminum in color. As an alternate to painting, the outside and inside of the aluminum cabinets may be clear anodized aluminum. Each vehicle and pedestrian phase shall have a momentary 5. The cabinet door shall be provided with: (spring return) detector test switch. When depressed, the switch a. A spring loaded construction core lock capable of shall place a call on its respective signal phase. accepting a Best CX series core installed by others. Cast cabinets shall have an approved one point positive latch. Formed cabinets The convenience outlet and lamp socket shall have a three point latch. b. A police panel door with a stainless steel hinge pin and A convenience outlet protected with a ground fault interrupter a lock. Two police keys with shafts a minimum of 1 3/4 inch long and an incandescent lamp socket shall be furnished in the main shall be provided with each cabinet. cabinet. A door switch for the lamp shall be provided. THIS Inside the police panel there shall be a signal on-off circuit shall be protected by a circuit breaker rated at 20 amps. switch which shall prohibit any signal display in the field but will allow the control equipment to operate when placed in the "off" Fail Safe Unit position. A second switch shall be the auto-flash switch. When placed in the "flash" position,controller power shall remain on and Fail safe unit shall meet the NEMA-PLUS specifications and controller shall stop time dependent on switch setting on the shall monitor both the positive and negative portions of the A.C. auxiliary panel described later. sine wave for all green, amber and pedestrian walk indications. c. The duration of a display of conflicting indications shall not be long Cabinet doors shall be gasketed enough to be visible to motorists or pedestrians before the monitor with one piece, close cell neoprene. They shall be equipped with initiates flashing operation. There shall be a visual indication that some type of stops so the door may be held open in either of two- the monitor has preempted normal operation. positions at approxirnately 90 degrees and 180 degrees and be of The fail safe monitor shall be Model SSM-121E as suitable design to withstand a 40 mph wind.. manufactured by Eberle Design Inc., or approved equal. d. A two position door stop assembly. e. The Controller cabinet shall have a load bay parcel with at Surge Protector(Lighting Arrester) least the following items mounted on the face of the panel: transfer relays; load switches; and, terminal blocks for termination of all The controller shall have an input voltage surge protector that wires contained on a separate panel (the terminal block shall shall protect the controller input from any voltage surges that could conform to Washington Standard Specifications). damage the controller or any of its components. This load bay panel shall be mounted so that when the screws are removed, it will be possible to obtain full access to the Field Wiring Terminal terminations on the back of the load bay panel. There shall be a terminal strip for field wiring in the controller cabinet. The terminals shall be numbered in accordance th the schematic wiring diagram on the plans. If a different SECTION 9-29.16 IS SUPPLEMENTED BY ADDING THE numbering system is used for the cabinet wiring, then both FOLLOWING. mbers shall label each terminal and the cabinet wiring schematic 9-29.16 Vehicular Signal Heads (RC) drawing shall include the field wiring numbers where the terminal strip is illustrated. A common bus bar with a minimum of 15 Vehicular signal heads shall have 12 inch lens sizes unless terminals and a ground bar with a minimum of 6 terminals shall be shown otherwise on the signal plans. Vehicular signal head provided. housings shall consist of separate sections and be expandable type for vertical mounting. Lens shall be glass and meet I.T.E. Specifications for light output. Reflectors shall be alzac. Each signal head shall have a 1/4 inch drain hole in its base. Page-SP-55 Revision Date:May 19,1997 9-29 Illumination,Signals,Electrical 9-29 Illumination,Signals,Electrical Vehicle signal heads shall be cast aluminum. 9-29.16(2)E Painting Signal Heads (RC) All signal heads shall include a back plate 5 inch square cut Traffic signal heads, including outside of visors and back of border. Signal heads, including outside of visors and back of back back plates, shall be finished with two coats of factory applied ' plates shall be finished with two coats of factory-applied traffic traffic signal gmsa-- ely low baked enamel. The inside of visors, signal yellow baked enamel. The inside of the visors and front of front of back plates, and louvers shall be finished with two coats of back plates shall be finished with two coats of factory-applied flat flat black enamel. black enamel. Mounting hardware will provide for a rigid connection SECTION 9-29.16(3)(RC)IS DELETED. between the signal head and mast arm. All mounting hardware (RQ will be of the top-mount plumbizer type as shown on the standard plans, unless specified otherwise on the plans. SECTION 9-29.16(3)A (RC)IS DELETED. Position of the signal heads shall be located as close as 9 '79 26(3)A 4_inch Roll,...,,-r..Gate, a ffi,,, Signal He.,a� possible to the center of the lanes. Signal heads shall be mounted on the mast arm such that the red indicators lie in the same plane lRC) and such that the bottom of the housing of a signal head shall not SECTION 9-29.16(3)B(RC)IS DELETED. r be less than 16 feet 6 inches nor more than 18 feet 6 inches above the grade at the center of the roadway. All bolts and other miscellaneous mounting hardware shall be stainless steel. Heads (RC) ' SECTION 9-29.16(2)A HAS BEEN REVISED AS FOLLOWS: SECTION 9-29.17 HAS BEEN REVISED AS FOLLOWS. 9-29.16(2)A Optical Units (RC) 9-29.17 Signal Head Mounting Brackets and Fittings Eight inch conventional signals shall employ a 67 to 69 watt (RC) ' traffic signal lamp rated for 130420 volt operation, 595 minimum Piaings for. T"^e Nd an,' u mounts shn" be ""-rrea initial lumen, 665 rated initial lumen, 8,000-hour minimum, unpaimed—All adw&-hardware for ate-mounts shall be painted 2 7/16-inch light center length, A-21 bulb, medium base, clear with two coats of factory applied traffic signal Federal yellow traffic signal lamp. Twelve inch traffic signal heads require gmen baked enamel. 4=130:volt, 165 watt, 1,750 minimum initial lumen, 1950 rated initial lumen clear traffic signal lamps with a 3-inch light center SECTION 9-29.18(1)IS SUPPLEMENTED AND REVISED AS length, 8,000 hour minimum rated life, P-25 bulb and medium FOLLOWS. , base. Bulbs shall be installed with the opening between the filament ends up. 9-29.18(1) Induction Loop Detectors (RC7 Detector amplifiers shall be Detector Systems model 910A or SECTION 9-29.16(2)B HAS BEEN REVISED AS FOLLOWS: egual. I Induction loop amplifiers installed with NEMA controls shall 9-29.16(2)B Signal Housing (RC) fien Each lens shall be protected with a removable visor of conform to current 11EIv1A specifications. aluminum of the tunnel type, unless specified 46. otherwise in the contract. Visors shall have attaching ears for installation to the housing doors. Conventional signal heads shall SECTION 9-29.20 HAS BEEN REVISED AS FOLLOWS: have square doors. 9-29.20 Pedestrian Signal (RC) SECTION 9-29.16(2)C HAS BEEN REVISED AS FOLLOWS: Pedestrian signals shall be either ineandascons- fiber optic or neon-grid type, or other types as specified in the contract. 9-29.16(2)C Louvered Visors RQ Pedestrian signals shall conform to rM Standards (Standard for Where noted in the Contract, louvered tunnel visors shall be Adjustable Face Pedestrian Signal Heads, 1975). furnished and installed. Directional louvers shall be constructed to have a snug fit in the signal visor. The outside cylinder shall be constructed of alumin , and the louvers shall be constructed of anodized aluminum painted flat black. cents;191vii, A"I bulb- Dimensions and arrangement of louvers shall be as shown in the contract. a-rr —ei 4--I Q inch: Irigb. Symbol messages, when specified, shall be a minimum of 12 inches high and 7 inches in , SECTION 9-29.16(2)D HAS BEEN DELETED AND width. REPLACED WITH. Housings shall be die-cast aluminum and shall be painted with two coats of factory applied traffic signal ySllow enamel. 9-29.16(2)D Back Plates (RC) Back plates shall be famished and attached to the signal VACANT SECTION 9-29.20(l) IS REPLACED BY ADDING heads. Back plates shall be constructed of anodized, 3-S THE FOLLOWING NEW SECTTON: half-hard aluminum sheet, 0.058-inch minimum thickness, with 9-29.20(1) Fiber Optic Type(RC) 5-inch square cut border and painted black in front and yellow in The fiber optics shall be drawn from optical glass of high back. purity. The fibers shall be temperature resistant. The fibers shall be resistant to the UV light emitted by the halogen lamp and shall maintain their high transmission properties throughout the lifetime Page-SP-56 Revision Date:May 19, 1997 9-29 Illumination,Signals,Electrical 9-29 Illumination,Signals,Electrical of the sign. The light guides shall contain fibers with a diameter of SECTION 9-29.24(1) IS DELETED AND REPLACED WITH ' 53 microns. Each single arm in the harness shall contain THE FOLLOWING: approximately 300 fibers. The optical sheathing shall have a wall thickness of at least 1.5 microns. The common end of each bundle 9-29.2 finish Painting (RC) Thea fin shall have a hexagonal bundle format. The common bundle end ish coat shall be a factory baked on enamel light grey and each arm end shall be epoxied and optically polished. in color. The galvanized surface shall be etched before the baked on enamel is applied. The interior shall be given a finish coat of The light source shall be a halogen incandescent lamp with dichroic reflector. The lamp shall use built-in, lead-in wires instead exterior grade of white metal enamel. of pins. The reflector shall be covered with a hard coating capable Painting shall be done in conformance with the provisions of to withstand a temperature of 400 degrees Centigrade, rapid Section 8-20.3(12). temperature changes aggressive chemical attacks. The coating SECTION 9-29.24(2) IS DELETED AND REPLACED WITH shall be tested by soaking in Oxalic Acid 0.71N for a period of 2 THE FOLLOWING: hours. The coating shall not dissolve during this period. The lamp shall be 50 watt and rated for 6000 hours at 10 volts. The lamp 9-29.24(2) Electrical Circuit Breakers and Contactors together with the fiber shall produce a light intensity as high as (RC) 3800CD. The 115-volt primary, 10-volt secondary transformers, The electrical circuit breakers and contactors shall be as light guides and all wiring shall be enclosed in a sheet aluminum indicated on the contract plans and detail sheets. The following housing. The matrix plate shall be constructed of 0.125 thick equipment shall be featured within the cabinet. aluminum sheet protected by a 0.125 polycarbonate sheet. The 1. Main circuit breaker signal housing shall be weather tight. Each common end of a 2. Branch circuit breakers bundle shall have a clip-on type color filter, one of Portland 3. Utility plug(120 volt-20 Amp rated)G.F.I.Type Orange and one of Lunar White.The viewing end of the fiber optic 4. Light control test switch(120 volt-15 Amp) display shall not require a cone for magnification, and shall provide 5. Contactor relay for each circuit a wide viewing angle. Each message shall have a minimum of 82 6. Double pole branch breaker(s) for lighting circuits (24(I light points. All components shall be fastened to the flat black volt matrix plate. When the sign is not illuminated, it shall blank out 7. One 120 volt, 20 Amp single pole branch breaker (for with no message legible. The low power consumption lamps shall utility plugs) be serviceable without any tools. S. Tyne 3-single phase 1201240 volt grounded neutral SECTION 9.29.20(2) IS REVISED AND SUPPLEMENTED AS service FOLLOWS. 9. One 120 volt 40 Amp single pole branch breaker (signal service ' 9-29.20(2) Neon Grid Type (RC) 10. Complete provisions for 16 breaker poles All neon grid heads shall be equipped with Z crate visors 11. Name plates phenolic black with white engraving except made of polycarbonate plastic designed to eliminate sun phantom. the main breaker which shall be red with white lettering. All name Neon tubing shall be enclosed and shockmounted inside plates shall be attached by S.S. screws. ' a rugged plastic module. 12. Meter base sections are unnecessary SECTION 9-29.25 IS DELETED AND SUPPLEMENTED BY F&GO660- GOWN THE FOLLOWING: The pedestrian signal shall have a solid state message module, 9-29.25 Terminal and Interconnect Cabinets (RC) electronic ballast no external transformer,and operate at 30 watts. The pole mounted terminal box shall be made of molded The heads shall display two symbol messages, "hand" (for the do not walk mode) in Portland orange and 'Man' (for the walk fiberglass be grey in color, be approximately 16" high x 13-7/8' wide x 5-7/8' deep and have a minimum of 16 terminals on the mode) in lunar white. The message module shall consist of two terminal blocks. The box shall be weather tight, have a single door neon gas tubes enclosed in a housing made of polycarbonate p with continuous hinge on one side and screw hold downs on the plastic. The lens material shall be polycarbonate plastic. The visors shall be flat black in color. door locking side. All hardware will be stainless steel. All mounting hardware shall be stainless steel and shall be incidental to SECTION 9-29.24 IS DELETED AND REPLACED BY THE the unit price of terminal box. FOLLOWING: Terminal blocks shall be 600V heavy duty, barrier type. Each terminal shall be separated by a marker strip. The marker strip 9-29.24 Service Cabinets (RC) shall be permanently marked with the circuit number indicated in The signal/street lighting service cabinet shall be as indicated the Plans. Each connector shall be a screw type with No. 10 post on the contract plans and detail sheets. All electrical conductors, capable of accepting no less than 3 #12 AWG wires fitted with ' buss bars and conductor terminals shall be copper or brass. The spade tips. cabinet shall be fabricated from galvanized cold rolled sheet steel, Cabinet doors shall be gasketed with a one-piece closed cell with 12 gauge used for exterior surfaces and 14 gauge for interior neoprene gasket and shall have a stainless steel piano hinge. panels Door hinges shall be the continuous concealed piano type One spare 12 position terminal block shall be installed in each and no screws rivets or bolts shall be visible outside the enclosure. terminal cabinet and amplifier cabinet. The cabinet door shall be fitted for a Best internal type lock. The Mounting shall be as noted in the contract. cabinet shall have ventilation louvers on the lower and upper sides Interconnect splice tower cabinets shall be Type F, with complete with screens filters and have rain tight gaskets. The nominal dimensions of 22" high x 13' wide x II" deep and ' cabinet door shall have a one piece weather proof neoprene gasket. constructed of cast aluminum and fitted with a Best internal lock. Page-SP-57 Revision Date:May 19, 1997 9-30 Water Distribution Materials 79-30 Water Distribution Materials 9-30 Water Distribution Materials SECTION 9-30.3(3) IS SUPPLEMENTED BY ADDING THE ' FOLLOWING: 9-30.1 Pipe 9-30.3(3) Butterfly Valves (RC) Butterfly valves shall be Dresser 450 or Pratt Groundhog. SECTION 9-30.1(1)IS REVISED AS FOLLOWS: SECTION 9-30.3(5) HAS BEEN DELETED AND REPLACED 9-30.1(1)Ductile Iron Pipe (RC) WITH THE FOLLOWING: 1. Ductile iron pipe shall be centrifugally cast and meet the requirements of AWWA C151. Ductile iron pipe shall have a 9-30.3(5) Valve Marker Posts (RC) cement-mortar lining meeting the requirements of AWWA C104.Dtir The valve markers shall be fabricated and installed in conformance with the Standard Drawings. . All other ductile iron pipe shall be Valve markers shall be carsonite composite utility marker Standard Thickness Class 5250 or the thickness class as shown in .375"x 6'-0"or approved equal with blue label "water. the Plans. SECTION 9-30.3(7) HAS BEEN SUPPLEMENTED AS 9-30.3 Valves FOLLOWS: 9-30.3(7) Combination Air Release/Air Vacuum 9-30.3(I)HAS BEEN REVISED AS FOLLOW. Valves (RC) 9-30.3(1) Gate Valves(RC) Air and vacuum release valves shall be APCO- Valve and Valves shall be designed for a minimum water operating Primer Corp, 'Heavy-Duty,' combination air release valve, or pressure of 200 PSI. Gate valves shall be Iowa List 14, Mueller mil• , Company No.A2380, Kennedy,or M&H. Installation shall be per the City of Renton Standard Detail, Approval of valves other than models specified shall be latest revision. obtained prior to bid opening. Piping and fitting shall be copper or brass. Location of the air All gate valves less than 12" in diameter shall include an 8' x release valve as show on the plans is approximate. The installation 24' cast iron gate valve box and extensions, as required. All 12" shall be set at the high point of the line. diameter and larger gate valves shall be installed in a vault. See SECTION 9-30.3(8)IS REVISED AS FOLLOWS: Water Standard Detail for 12" gate valve assembly vault and 1' bypass installation. 9-30.3(8) Tappit:g Sleeve and Valve Assembly(RC) Gate valves shall conform to AWWA C500 and shall be iron Tapping sleeves shall be cast iron, ductile iron staiAlo sr,-stall, body, bronze-mounted, double disc with bronze wedging device epoxy-coated steel,or other approved material. and O-ring stuffing box. RESILIENT SEATED GATE VALVES SECTION 9-30.3(9)IS A NEW SECTION: Resilient seated gate valves shall be manufactured to meet or 9-30.3(9) Blow-Off Assembly (RC) exceed the requirements of AWWA Standard C509 latest revisions. Permanent blow-off assembly shall be#78 Kupferle Foundff All external and internal ferrous metal surfaces of the gate Co. or approved equal. Installation of blow-off permanent blow- valve shall be coated for corrosion protection with fusion bonded off assembly shall be per City of Renton Water Standard Detail, epoxy. The epoxy coating shall be factory applied to all valve latest revision. Pipe and fittings shall be galvanized. Blow-off parts prior to valve assembly and shall meet or exceed the assembly shall be installed at location(s) shown on the plans. requirements of AWWA Standard C-550 latest revision. Valves Temporary blow-off assembly on nea dead-end water main shall shall be provided with two (2) internal 0-ring stems seals. The be installed at location shown on the plans. valves shall be equipped with one (1) anti-friction washer. The resilient gate valve shall have rubber sealing surfaces to permit bi- Temporary blow-off assemblies for testing and flushing of the directional flow. The stem shall be independent of the stem nut or new water mains will not be included under this item and shall be integrally cast. considered incidental to the contract and no additional payment Manufacturers of Resilient Seated gate Valves shall provide shall be made' the City on request that the valve materials meet the City SECTION 9-30.5 IS SUPPLEMENTED BY ADDING THE specifications. FOLLOWING: Valves shall be designed for a minimum water operating p 9-30.5 Hydrants (RC) pressure of 200 psi. End connections shall be mechanical ioints, flanged ioints or Fire hydrants shall be Iowa, Corey "hype (opening with the mechanical by flanged joints as shown on the project plans. pressure) or approved equal conforming to AWWA C-502-85. Resilient Seated Gate Valves shall be U.S. Metroseal 250, Approval must be obtained prior to bid opening._ Clow M&H Style 3067,Mueller Series 2370,Kennedy. Compression type fire hydrants (opening against pressure) Approval of valves other than model specified shall be shall be Clow Medallion, M&H 929, Mueller Super Centurion ' obtained prior to bid opening. All gate valves less than 12 inches 200,conforming to AWWA C-502-85. in diameter shall include an 8"x24" cast iron gate valve box and extensions, as required. SECTION 9-30.5(1) IS SUPPLEMENTED BY ADDING THE All 12 inch diameter and larger resilient seated gate valves FOLLOWING. shall have a 1 inch by-pass assembly and shall be installed in a concrete vault per City of Renton Standard Details, latest revision. 9-30.50) End Connections (RC) Hydrants shall be constructed with mechanical joint connection unless otherwise specified in bid proposal description. Page-SP-58 Revision Date:May 19, 1997 9-30 Water Distribution Materials 9-30 Water Distribution Materials SECTION 9-30.5(2) IS DELETED AND REPLACED WITH synthetic molded rubber gasket, and shall be attached to hydrant THE FOLLOWING: adapter with 1/8" coated stainless steel aircraft cable. Fire hydrants shall be installed per City of Renton Standard 9-30.5(2) Hydrant Dimensions (RC) Detail for fire hydrants latest revisions. Fire hydrants shall be Corey type (opening with the pressure) or compression type (opening against pressure) conforming to SECTIONS OF 9-30.6(3) HAVE BEEN MODIFIED AS AWWA C-502-85 with a 6 inch mechanical joint inlet and a main FOLLOWS: valve opening (M.V.O.) of 5 1/4 inches two 2 12 inch hose 9-30.6(3) Service Pipe nozzles with National Standard Threads 7 1/2 threads per inch and ' one 4 inch pumper nozzles with the new Seattle Pattern 6 threads 9-30.6(3)B Polyethylene Pipe(RC) per inch 60 degrees V. Threads, outside diameter of male tread Polyethylene pipe shall not be used. 4.875 and root diameter 4.6263. Hydrants shall have a 1-1/4" pentagon operating nut opened by turning counter clockwise(left). 9-30.6(3)C Polybutalene Pipe (RC) The two 2-1/2" hose nozzles shall be fitted with cast iron Polybutalene pipe shall not be used. threaded caps with operating nut of the same design and SECTION 9-30.6(4)HAS BEEN REVISED AS FOLLOWS: proportions as the hydrant stem nut. Caps shall be fitted with Fittings used for copper tubing shall be compression type with suitable neoprene gaskets for positive water tightness under test gripper ring. pressures. The 4" pumper nozzle shall be fitted with a Stortz adapter, 4" SECTION 9-30.6(5) HAS BEEN SUPPLEMENTED AS Seattle Thread z 5" Storm Stortz adapter shall be forged and/or FOLLOWS: extruded 6061-T6 aluminum alloy, hardcoat anodized. Threaded end portion shall have no lugs and 2 set screws 180 degrees apart. 9-30.6(5) Meter Setters (RC) Stortz face to be metal, no gasket to weather. Stortz cap to have Meter setters shall be installed per the City of Renton Standard Details for water meters, latest revision. r i i 1 Page-SP-59 Revision Date:May 19, 1997 WSDOT AMENDMENTS WSDOT AMENDMENTS INDEX TO WSDOT AMENDMENTS WSDOT AMENDMENTS ' The following WSDOT Amendments shall be used in conjunction with the WSDOTIAPWA 1996 Standard Specifications for Road, Bridge and Municipal Construction, and with any project specific Special Provisions contained within the contract document. The following "Index - Amendments," as issued by WSDOT, has been edited to signify (with the letters SAX followed by the subsection number) specific subsection amendments that have been issued by WSDOT but are not used by the City of Renton. Those SAX subsections have been deleted from this document. The following Amendments to the Standard Specifications are made a part of this contract and supersede any conflicting provisions of the Standard Specifications. In case of conflict, the order of precedence of the various contract documents shall be as specified in Section 1-04.2 as modified by the Renton Transportation Supplemental Specifications. For informational purposes,the date following each Amendment title indicates the implementation date of the Amendment or the last date of revision by WSDOT. SECTION 1 SECTION 2 02.AP1 SECTION 1-02, BID PROCEDURES AND 03.AP2 SECTION 2-03,ROADWAY EXCAVATION CONDITIONS AND EMBANKMENT (March 3, 1997) (March 3, 1997) "Irregular Proposals" revised. A new Amendment. Sub-section 2-03.3(2) Rock 04.AP1 SECTION 1-04, SCOPE OF THE WORK Cuts is revised. Sub-section 2-03.3(14)K Select of (March 3, 1997) Common Borrow is added. "Increased or Decreased Quantities" revised. "Embankments at Bridge and Trestle Ends" formula revised. 07.API SECTION 1-07, LEGAL RELATIONS AND 09.AP2 SECTION 2-09, STRUCTURE EXCAVATION RESPONSIBILITIES TO THE PUBLIC t (March 3, 1997) (March 3, 19977 A new Amendment. Sub-section 2-09.3(4) A new Amendment. Sub-section 1-07.9(5) Construction Requirements, Structure Excavation, Required Documents is revised. Sub-section Class B, Sub-section 2-09.4 Measurement, and 1-07.13(4) Repair of Damage is added. Sub-section 2-09.5 Payment are revised. Sub- "Required Records and Retention" revised. section 2-09.3(1)E Backfilling, Controlled Density 09.AP1 SECTION 1-09, MEASUREMENT AND Fill is added. ' PAYMENT "Measurement" drywells added. (March 3, 1997) "Payment for Material on Hand" revised. SECTION 3 ' 10.AP1 SECTION 1-10, TEMPORARY TRAFFIC 02.AP3 SECTION 3-02, STOCKPILING CONTROL (March 3, 1997) AGGREGATES A new Amendment. Sub-section 1-10.3(5) (March 3, 19977 Temporary Traffic Control Devices is revised. "Asphalt Concrete Aggregates" revised. Sub-section 1-10.5 Payment is added. "Conformance to Established Standards", "Traffic SECTION 5 ' Control Labor" and "Payment" have been revised. 04.AP5 SECTION 5-04, ASPHALT CONCRETE PAV174E NT (September 30, 1996) A new Amendment. Sub-section 5-04.3(10)B Control is revised. Page-SP-60 Revision Date:May 19, 1997 WSDOT AMENDMENTS WSDOT AMENDMENTS SECTION 6 SECTION 8 02.AP6 SECTION 6-02, CONCRETE STRUCTURES 09.AP8 SECTION 8-09, RAISED PAVEMENT (March 3, 1997) MARKERS A new Amendment. Sub-section 6-02.3(2)C (March 3, 1997) Contracting Agency-Provided Mix Design, Sub- A new Amendment. Sub-section 8-09.1 , section 6-02.3.(6)A Weather and Temperature Description is revised. A new section, Sub- Limits to Protect Concrete, and Sub-section 6- section 8-09.3(5) Recessed Pavement Markers is 02.3(24)C Placing and Fastening are revised. added. Sub-section 8-09.5 Payment is Subsection 6-02.3(6)A Temperature and Time for supplemented and revised. Placement is added. Sub-section 6-02.3(11) Section revised St. Item from plural to singular. Curing Concrete is added. "Face Lumber, studs, Wales, and Metal Forms", l0.AP8 SECTION 8-, 1996) GUIDE POSTS ' and "Field Bending" are revised: (September 30 A new Amendment. Sub-section 8-10.2 Materials 10.AP6 SECTION 6-10, CONCRETE BARRIER is revised. Sub-section 8-10.3 Construction (March 3, 1997) Requirements is revised. A new Amendment. Sub-section 6-10.5 Payment ILAP8 SECTION 8-11, GUARDRAIL is supplemented with an additional item. Sub- (March 3, 1997) section 6-10.3(1) Precast Concrete Barrier is Anchor Installation revised. ' added. "Precase Conc. Barrier" curing revised. 15.AP8 SECTION 8-15, RIPRAP (March 3, 1997) SECTION 7 "Materials", and "Measurement" are revised. 05.AP7 SECTION 7-05, MANHOLES, INLETS, AND 17.AP8 SECTION 8-17, IMPACT AT17ENUATORSYSTEMS CATCH BASINS (March 3, 1997) (March 3, 19979 Revised to include drywells. New standard item Construction Requirements revised. 1062 "precast conc. drywell". 20.AP8 SECTION 8-20, ILLUMINATION, TPJLFFIC Revised standard item 7345 `Abandon Existing SIGNAL SYSTEMS, AND ELECTRICAL Manhole". (March 3, 1997) 06.AP7 SECTION 7-06, CONCRETE PIPE A new Amendment. Sub-section 8-20.3(4) ' Foundations is revised. Sub-section 8-20.3(13)A ANCHORS Light standards is added. This section is deleted in its entirety. (March 1997) "Equipment List and Drawings" revised. ,08.AP7 SECTION 7-08, GENERAL PIPE 21.AP8 SECTION 8-21, PERMANENT SIGNING INSTALLATION REQUIREMENTS (March 3, 1997) (March 3, 1997) A new Amendment. Sub-section 8-21.3(6) Sign Refacing is revised. Sub-section 8-21.2 Materials , A new Amendment Sub-section 7-08.3(1)C Pipe is added. Sub-section 8-21.3(9)F Bases is added. Zone Bedding is renamed to Bedding the Pipe. Sub-section 8-21.3 Construction Requirements is Sub-section 7-08.3(2)D Pipe Laying—Steel or added Aluminum, Sub-section 7-08.4 Measurement, and "Construction Requirements", and "Materials" Sub-section 7-08.5 Payment are revised, are revised "Materials", "Trenches", "Jointing of Dissimilar Pipe", and "Payment" are revised. 22.AP8 SECTION 8-22, PAVEMENT MARKING ' "Standard plan for pipe collars pending. (March 3, 1997) A new Amendment. Sub-section 8-22.4 17.AP7 SECTION 7-17, SANITARY SEWERS Measurement is revised. (March 3, 1997) "Materials" revised. A new Amendment. Sub-section 7-17.3(2)C Infiltration Test is revised. Sub-section 7-17.2 Materials is added. , "Infiltration Test" revised. 18.AP7 SECTION 7-18, SIDE SEWERS (October 28, 1996) , Page-SP-6l Revision Date:May 19,1997 , WSDOT AMENDMENTS WSDOT AMENDMENTS SECTION 9 IO.AP9 SECTION 9-10, PILING (September 30, 1996) O1.AP9 SECTION 9-01, PORTLAND CEMENT A new Amendment. Sub-section 9-10.1 Timber (September 30, 1996) Piling is revised. Sub-section 9-10.5 Steel Piling A new Amendment. Sub-section 9-01.3 Tests and is revised. Acceptance is revised to reference "Mill Test Use message revised. Report Number". ILAP9 SECTION 9-11, WATERPROOFING 02.AP9 SECTION 9-02, BITUMINOUS MATERIALS (March 3, 1997) ' (March 3, 1997) Asphalt waterproofing revised. "Anti-Stripping Additive" revised. 12.AP9 SECTION 9-12, MASONRY UNITS 03.AP9 SECTION 9-03, AGGREGATES (March 3, 1997) (March 3, 1997) Revised. A new Amendment. Sub-section 9-03.15 Bedding 13.AP9 SECTION 9-13, RIPRAP, QUARRY SPALLS, Material for Rigid Pipe is revised. Sub-section 9- SLOPE PROTECTION, AND ROCK WALLS 1 03.14(2) Select Borrow is revised. (March 2) "Gravel Backfill", revised to include drywells. "Concr t Slab Riprap" section deleted. 04.AP9 SECTION 9-04, JOINT AND CRACK' 16.AP9 SECTION 9-16, FENCE AND GUARDRAIL SEALING MATERIALS (March 3, 1997) (March 3, 1997) "Joint Mortar" revised. "Posts and Blocks", revised. 05.AP9 SECTION 9-05, DRAINAGE STRUCTURES, 17.AP9 SECTION 9-17, FLEXIBLE GUIDE POSTS CULVERTS, AND CONDUITS (September 30, 1996) (March 3, 1997) A new Amendment. Sub-section 9-17.1 General A new Amendment. Sub-section 9-05.6(4) is revised. Structural Plate Pipe Arch, Sub-section 9- 21.AP9 SECTION 9-21, RAISED PAVEMENT 05.6(8)A Corrugated Steel Plates, and Sub-section MARKERS (RPM) 9-05.12(2)Profile Wall PVC Culvert Pipe and (September 30, 1996) Profile Wall PVC Storm Sewer Pipe are revised. Anew Amendment. Sub-section 9-21.1(1) Sub-sections revised and added concerning piping. Physical and Chemical Properties and Sub-section "Coupling Bands" revised. 9-21.2(2) Optical Requirements are revised. Sub- 06.AP9 SECTION 9-06, STRUCTURAL STEEL AND section 9-29.6(5) Foundation Hardware is revised. RELATED MATERIALS 29.AP9 SECTION 9-29, ILLUMINATION, SIGNALS, (March 3, 1997) ELECTRICAL A new Amendment. Sub-section 9-06.5(3)High (September 30, 1996) Strength Bolts is revised. A new Amendment. Sub-section 9-29.4 "High Strength Bolts" and "Anchor Bolts" are Messenger Cable, Fittings is revised. revised. Correction to "Bolt, Nut, and Washer 33.AP9 SECTION 9-33, CONSTRUCTION Specifications. GEOTEXTILE 09.AP9 SECTION 9-09, TIMBER AND LUMBER (September 30, 1996) (March 3, 1997) A new Amendment. Sub-section 9-33.2 A new Amendment. Sub-section 9-09.3(1)B Geoteztile Properties is revised. Placing in Treating Cylinders is revised.. Page-SP-62 Revision Date:May 19, 1997 i 1 1 1 1 SPECIAL PROVISIONS 1 1 Pz r .�rIE wn_S_yr w a o �. % C" r �p ? 35188 CW .C> FCI 35 q STOL % �SS10NAL EXPIRES: 3-16-2003 r 1 r r r r r .--� U W a � � � � � � � � i � � � � r � � � � � ' SPECIAL PROVISIONS The following Special Provisions are made a part of this contract and supersede any conflicting provisions of the 1996 Standard Specifications for Road, Bridge and Municipal Construction (English) including the American Public Works Association (APWA) Supplement to the Division 1, and the foregoing amendments to the Standard Specifications. DESCRIPTION OF WORK This project includes the regrade of approximately 300 lineal yards (30 yards wide) of rough and fairway area on the Maplewood Golf Course. All work, materials, tools, labor and guarantees thereof required for this project shall be furnished and supplied in accordance with the attached Contract Plans, these Contract Provisions, and the Standard ' Specifications. 1-01 DEFINITIONS AND TERMS ' 1-01.2 Abbreviations 1-01.2(2) Items of Work and Units of Measurement Supplement this section with the following: ACP Asphalt Concrete Pavement Conn. Connection E East ' Ex, Exist Existing ID Inside Diameter Inv. Invert CPEP Lined Corrugated Polyethylene Pipe MON Monument MUTCD Manual On Uniform Traffic Control Devices N North ' No. Number OD Outside Diameter PC Point of Curve ' PT Point of Tangency PI Point of Intersection PCC Portland Cement Concrete PVC Polyvinyl Chloride Pipe ' R/W Right-of-Way S South SS Sanitary Sewer or Side Sewer ' W West 1-02 BID PROCEDURES AND CONDITIONS 1-02.2 Plans and Specifications See "Instructions to Bidders" and "Bidders Checklist" contained in the Contract ' Documents herein for pre-bid information. 1-1 ' SPECIAL PROVISIONS - Continued ' 1-02.4 Examination of Plans, Specifications, and Site Work 1-02.4(1) General Add the following to the end of Section 1-02.4(1): ' Locations of existing utilities shown on the Drawings are approximate and some existing utilities may have been omitted. It is the Contractor's responsibility to verify the locations and elevations of existing pipelines, structures, grades, and utilities prior to ' construction. The Owner assumes no responsibility for any conclusions or interpretations made by the ' Contractor on the basis of the information made available. Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests, and studies and obtain any ' additional information and data which pertain to the physical conditions (surface, subsurface, and underground utilities) at or contiguous to the site or otherwise which may affect cost, progress, or performance of the work and which the Bidder deems necessary ' to determine its Bid for performing the work in accordance with the time, price, and other terms and conditions of the Contract Documents. The Bidder shall be responsible for all costs associated with these additional examinations including all restoration work and damages that may result of such investigation. 1-02.5 Proposal Forms Delete the first sentence of this section and replace with the following: The Proposal and associated forms are included in these Contract Documents under ' Documents Submitted in Sealed Bid Package. These forms shall not be altered by the bidder. Reference herein to the Proposal Form(s) shall mean the "Proposal" and "Schedule of Prices." ' 1-03 AWARD AND EXECUTION OF CONTRACT 1-03.1 Consideration of Bids (Addition) ' The Contract will be awarded to the lowest responsive, responsible bidder. 1-03.2 Award of Contract(Revised Supplemental Section) The contract, bond form, and all other forms requiring execution, together with a list of all other forms or documents required to be submitted by the successful bidder, will be forwarded to the successful bidder within 5 days of the award. The number of copies to be executed by the Contractor shall be determined by the Contracting Agency. The Contract award or bid rejection will occur within 30 calendar days after bid opening. 1-03.3 Execution of Contract (Revised Supplemental Section) ' Replace first paragraph of supplemental section with the following: 1-2 SPECIAL PROVISIONS - Continued ' Within 5 calendar days after receipt form the City of the forms and documents required to be completed by the Contractor, the successful bidder shall return the signed Contracting Agency-prepared contract, an insurance certification as required by Section 1-07.18, and ' a satisfactory bond as required by law and Section 1-03.4. If the bidder experiences circumstances beyond their control that prevents return of the contract documents within 5 calendar days after the award date, the Contracting Agency may grant up to a maximum of 5 additional calendar days for return of the documents, provided the Contracting Agency deems the circumstances warrant it. ' 1-04 SCOPE OF WORK 1-04.3 Project Coordination (New Section) ' It shall be the responsibility of the Contractor to coordinate all work to be performed under this contract, including the ordering and acquisition of all equipment and materials. This coordination shall encompass all work to be performed by the Contractor, their ' subcontractor, the City and any public utilities that may be involved. 1-04.12 Photographs (New Section) ' The Contractor shall be required to provide comprehensive pre-construction and post construction photographs of the entire site and adjoining properties. The photographs shall provide complete coverage of all features. Before construction may start, one 3-inch x 5-inch color glossy print of each exposure, together with the negative, shall be delivered to the City. Photographs shall be taken in 1 and along the proposed project route where work is to be done, prior to commencing any construction activities to include, storing, staging, pipe stringing, etc. The Contractor shall have notified "one-call' and have all utilities marked in the field prior to and 1 immediately preceding pre-construction photograph activities. Special attention shall be given to depict existing access roadway conditions, fences, building, trees, ditches, culverts, meter boxes, etc. The photographs shall indicate the date, contract number, project number, and the location where the photograph was taken. The Contractor shall ' assume that for bidding purposes, as a minimum, pre and post construction photographs will be required at 50-foot intervals equating to approximately 30 total pictures. The photographs shall be delivered and submitted to the City in a suitable black plastic three- inch,three-ring binder equipped with plastic inserts specifically designed and manufactured for preserving photographs. The photographs shall not be randomly arranged, but the photographs shall be arranged in continuous fashion indicating topographical features from one end of the project to the other. The Contractor shall invite the Contracting Agency to the site during this work. After construction is complete, including the punch list items, the Contractor shall take photographs from the same vantage point and station as the pre-construction photographs. A typed index shall be provided which identifies the location (by station, street address, and direction) of each photograph. In addition, the date and time of the photographs shall be noted. The photographs shall be of commercial quality, taken in good light, and be clear in image. ' The cost of providing photographs shall be considered incidental to the lump sum price bid for"Mobilization, Cleanup, and Demobilization". ' 1-06 CONTROL OF MATERIAL 1-3 ' SPECIAL PROVISIONS - Continued ' 1-06.1 Source of Supply and Quality of Materials (Supplemental Section) ' No source has been provided for any materials necessary for the construction of this improvement. The Contractor shall arrange to obtain the necessary materials at this own expense, and all costs of acquiring, producing, and placing this material in the finished work shall be included in the unit contract prices for the various items involved. ' If the sources of materials provided by the Contractor necessitates hauling over roads other than City Streets, the Contractor shall, at his own cost and expense, make all arrangements for the use of the haul routes. ' 1-06.7 Shop Drawings and Submittals (Additional Section) 1-06.7(1) General (Additional Section) ' Shop drawings and submittal review will be limited to general design requirements only, and shall not relieve the Contractor from responsibility for errors or omissions, or ' responsibility for consequences due to deviations from the contract documents. No changes may be made in any submittal after it has been reviewed except with written notice and approval from the Owner. By approving shop drawings, submittals, and any samples, the Contractor thereby represents that he has determined and verified all field measurements, field construction criteria, materials, catalog numbers, and similar data, and that he has checked and ' coordinated each shop drawing with the requirements of the work and of the contract documents. Shop drawing and submittal data for each item shall contain sufficient information on each item to determine if it is in compliance with the contract requirements. Owner will pay the costs and provide review services for a first and second review of ' each submittal item. Additional reviews shall be paid for by the Contractor by withholding the appropriate amounts from each payment estimate. Shop drawings and submittal items that have been installed in the work but have not been approved through the review process shall be removed and an approved product shall be furnished, all at the Contractor's expense. The Contractor shall review each submittal and provide approval in writing or by stamping with a statement indicating that the submittal has been approved and the Contractor has verified dimensional information, confirmed that specified criteria has ' been met, and acknowledges that the product, method, or information will function as intended. ' 1-06.7(2) Required Information (New Section) Submit five copies of each submittal to the Engineer. Shop drawings and submittals shall be submitted on 8'/2"x 11", 11"x 17", or 22"04" sheets and shall contain the following information: ' 1-4 SPECIAL PROVISIONS - Continued ' 1. Project ' 2. Contractor 3. Engineer 4. Owner 5. Applicable specification and drawings reference ' 6. A stamp showing that the Contractor has checked the equipment for conformance with the contract requirements, coordination with other work on the job, and dimensional suitability ' 7. A place for the Engineer to place a 3-inch by 4-inch review stamp ' 8. Shop or equipment drawings, dimensions, and weights 9. Catalog Information ' 10. Manufacturer's specifications 11. Special handling instructions 12. Maintenance requirements ' 13. List of contract exceptions 14. Other information as required by the Engineer 1-06.7(3) Review Schedule (Additional Section) Shop drawings and submittals will be reviewed as promptly as possible and transmitted ' to Contractor not later than 30 working days after receipt by the Engineer. The Contractor shall revise and resubmit as necessary to obtain approval. Delays caused by the need for resubmittal may not be a basis for an extension of contract time or delay damages at the discretion of the Owner. At least one set of shop drawings will be returned to the Contractor after review. Additional sets will be returned to the Contractor, if remaining. ' 1-06.7(4) Substitutions (Additional Section) Any product or construction method that does not meet these specifications will be ' considered a substitution. Substitutions must be approved prior to their installation or use on this project. ' 1-06.7(4)A After Contract Execution (Additional Section) Within 30 days after the date of the contract execution, Owner will consider formal requests from Contractor for substitution of products in place of those specified. Submit ' two copies of request for substitution. Data shall include the necessary change in ' 1-5 ' SPECIAL PROVISIONS - Continued ' construction methods, including a detailed description of proposed method and related drawings illustrating methods. An itemized comparison of proposed substitution with product or method specified shall be provided. ' In making a request for substitution, Contractor represents that he has personally investigated proposed product or method and has determined that it is equal or superior to, in all respects, the product specified. Contractor shall coordinate installation of ' accepted substitutions into the work, making changes that may be required for work to be completed. Contractor waives all claims for additional costs related to substitutions that consequently become apparent. 1-06.7(5) Submittal Requirements (Additional Section) The Contractor shall provide the following submittal items to the Engineer. The ' Contractor shall provide additional submittal information to the Engineer if required by the Engineer. 1-06.7(4) Substitutions 5-04.2 Asphalt Concrete Pavement Materials 7-04.2 Storm Sewer Pipe Materials 7-17.3(1)B Pipe Bedding 7-17.3(1)C Pipe Foundation ' 7-17.3(3) Backfilling Storm Trenches 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ' 1-07.1(1) Archaeological Discoveries and Historic Preservation Clause (Addition) The Contractor shall adhere to the National Historic Preservation Act of 1966 and 36 CFR 800 which provide for the preservation of potential historical, architectural, archaeological, or cultural resources (herein called"cultural resources") and fair ' compensation to the Contractor for delays resulting from such cultural resources investigations. In the event that potential cultural resources are discovered during subsurface excavations at the site of construction,the following procedures shall be instituted: 1. The Owner shall issue a Work Suspension Order directing the Contractor to cease ' all construction at the location of such potential cultural resources find. 2. If archaeological findings include human remains, the Engineer shall contact a ' qualified archaeologist in consultation with the State Historic Preservation Officer (SHPO)to evaluate the remains. 3. Such Work Suspension Order shall be effective until such time as a qualified archaeologist can be called by the Engineer to assess the significance of these �l 16 t ' SPECIAL PROVISIONS - Continued ' potential cultural resources and make recommendations to the State Historic Preservation Officer. If the archaeologist, in consultation with the State Historic Preservation, determines that the potential find is a significant cultural resource, the Owner shall extend the duration of the Work Suspension Order. ' 4. Suspension of work at the location of the find shall not be grounds for any claim by the Contractor unless the suspension extends beyond the contract working days allowed for the project, in which case the Engineer will make an adjustment for increased cost of performance of the contract. 1-07.2(1) State Sales Tax Add the following to Section 1-07.2(1): The work on this contract is to be performed upon lands whose ownership obligates the Contractor to collect state sales tax from the City of Renton. Payment of sales tax to the Washington State Department of Revenue is, under this contract, required to be made by the Contractor. The Contractor shall, at the time of making payment of sales tax, identify the work as having been performed within the City ' of Renton and for the City of Renton. 1-07.5 Wildlife, Fisheries, and Ecology Regulations (Addition) ' The Contractor shall comply with all construction related provisions of all permits obtained by the City. The Contractor shall be responsible for making any changes required by the agencies, and payment of any fines, for violation of any construction related permit provisions. The City will not make additional compensation for any changes or fines due to the Contractor's violation of construction provisions. 1-07.6 Permits and Licenses ' Section 1-07.6 is supplemented with the following: The Contractor shall meet the required provisions of all permits, the cost of which is to be included in the various lump sum and unit prices bid. The Contractor shall not use, divert, obstruct, or change the natural flow or bed of any river or stream, or utilize any of the waters of the State or materials from gravel or sandbars, or from streambeds. The Contractor shall comply with all requirements in said permit documents and all costs shall be included in the various unit and lump sum prices bid. 1-07.13 Contractor's Responsibility for Work 1-07.13(1) General Add the following: Whether or not there appears here or elsewhere herein specific reference to guarantees of ' all items of materials, equipment, and workmanship, they nevertheless shall be so ' 1-7 SPECIAL PROVISIONS - Continued ' guaranteed against mechanical, structural, or other defects for which the Contractor is responsible that may develop or become evident within a period of one year from and after acceptance of the work by the Owner. Such guarantees shall include care of backfilling at structures should the fill settle to such extent as to require refilling or resurfacing roadway surfaces to restore the original or intended condition to grade. This guarantee shall be understood to imply prompt attention to any remedy of such defects as those mentioned above if and as they occur after the Contractor shall have written notice of their existence. If the defect, in the opinion of the Owner, is of such nature as to demand immediate repair, the Owner shall have the right to correct and cost thereof shall be borne by the Contractor. i 1 1 t i 1 1 1 1-8 i iSPECIAL PROVISIONS - Continued 1-07.16 Protection and Restoration of Property 1-07.16(3)A Protection and Restoration of Existing Markers and Monuments All existing survey monuments and property corner markers shall be protected from movement or damage by the Contractor. All existing markers and/or monuments that are damaged or removed for construction purposes shall be referenced by survey ties and then replaced by the Contractor. The Contractor shall coordinate work with the City Engineer and City staff to reference the markers and/or monuments and replace them, as required by state law. All existing property corner markers disturbed or removed by the Contractor's operations shall be replaced at the Contractor's own expense. 1-07.16(5) Utility Service (New Section) The Contractor shall maintain the operational service of storm drainage pipes at all times. 1-07.16(6) Restoration of Property (New Section) The Contractor shall protect property in the vicinity of the work site and in instances of destruction or damage, restore the item to pre-construction condition at the Contractor's expense. 1-07.17 Utilities and Similar Facilities iSection 1-07.17 of the APWA Division 1 General Requirements is supplemented per the Supplemental Specifications and with the following by the following: ' The locations and dimensions shown in the plans for existing buried facilities are in accordance with available information obtained without uncovering, measuring, or other verification. It shall be the Contractor's responsibility to verify and/or determine the correct location of all utilities, public and private, that may be affected by his/her work under this contract. The Owner assumes no responsibility for improper locations or failure to show in advance of pipe installation to verify that the required vertical and horizontal clearances exist. Any adjustment to pipe location and elevation must be approved by the Engineer prior to installation. The Contractor is alerted to the existence of Chapter 19.122 RCW, a law relating to underground utilities. Any cost to the Contractor incurred, as a result of this law shall be at the Contractor's expense. i1-07.18(1) General (Revised) The Owner shall be given 45 days prior written notice by certified mail of any ' cancellation, reduction or modification of the insurance. 1-07.18(3) Limits (Addition) iThe limits of liability for the insurance required shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations: ' 1-9 SPECIAL PROVISIONS - Continued A. Worker's Compensation: (under limits of liability stated on the City of Renton Insurance Information for enclosed within Attachment A). B. Comprehensive General Liability: (under limits of liability stated on the City of Renton Insurance Information for enclosed within Attachment A). Policies shall include premises/operations, products, completed operations, ' independent Contractors, Owners and Contractors protective, Explosion, Collapse, Underground Hazard, Broad for Contractual, Person Injury with employment exclusion deleted, and Broad From Property Damage. C. Comprehensive Automobile Liability: (under limits of liability stated on the City of Renton Insurance Information form enclosed within Attachment A) including Owned, Hired, and Non-owned Vehicles. D. The Contractor will be required as part of the insurance provided to complete and submit the attached City of Renton Insurance Information form, and Policy Declaration pages, Endorsement and Coverage Questionnaire forms included in Attachment A of these Contract Documents, prior to Notice to Proceed. Policies shall also specify insurance provided by Contractor will be considered primary and not contributory to any other insurance available to the Owner or the Engineer. All policies shall provide for 45 days written notice prior to any cancellation or non-renewable of insurance policies required under Contract. "Will endeavor" and "but failure to mail such notice shall impose no obligation or liability of any kind upon the Company, its agents or representatives"wording will be deleted from certificates. Policies shall be provided only by companies with an "Alfred M. Best Rating" of ' not less than Al2. 1-07.18(4) Endorsement(Addition) The Contractor shall also name the Owner and Engineer, and their officers, directors, agents, and employees as "additional insureds" under the insurance policies. Subsequent to award of the contract the Contractor shall submit to the Owner the following: 1. City of Renton Insurance Information in the form Attachment A herein without modification and policy declaration pages obtained from the insurance carrier. 2. Insurance Questionnaire (enclosed within Attachment A herein) completely filled out and appropriate executed. 3. Insurance Endorsement(enclosed with Attachment A herein) executed by an appropriate representative of the insurance company(ies). i 1-10 SPECIAL PROVISIONS - Continued 1-07.28 Responsibility for Damage; Indemnification (New Section) ' The Contractor hereby agrees to indemnity and hold the City harmless from all loss or damage occasioned to the City, or to any third person (including Contractor's or subcontractors' employees), by reason of any acts or omissions on the part of the Contractors, subcontractors, agents, employees, or persons working directly of indirectly in the performance of the contract, including acts or omissions attributable jointly to the City, its officers, agents, or employees (but excluding those attributable solely to the negligence of the City, its officers, or employees) and shall, after reasonable notice thereof. defend and pay the expense of defending any suit which may be commenced against the City by any third person alleging injury by reason of such acts or omissions, and will pay any judgement which may be obtained against the City in such suit. The Contractor agrees to repair and replace all property of the City and all property of others damaged by itself, its employees, its subcontractors, and agents. In this regard, the Contractor recognizes that Contractor is waiving immunity under Industrial Insurance Law Title 51 RCW. This indemnification extends to the officials, officers, and employees of the City and also includes attorneys' fees and the costs of establishing the right to indemnification thereof in favor of the City of Renton. In the event Contractor fails, after receipt of timely notice from the City, to appear, defend, or pay as required by the first paragraph of this section, then in that event and in that event only, the City may in its sole discretion, deduct from the progress payments to the Contractor and pay any amount sufficient to pay any claim, or which the City may have knowledge and regardless of the informalities of notice of such claim, arising out of the performance of this contract, provided the City has therefore given notice of receipt of such claim to the Contractor and the Contractor has failed to act thereon. ' The Contractor acknowledges, and by signing this contract, agrees that the indemnification provisions set forth in this section, including the industrial insurance immunity waiver, are totally and fully a part of this contract and within the context of the ' competitive bidding laws have been mutually negotiated by the parties. It is understood that the whole of the work is to be done at the Contractor's risk, and that he has familiarized himself with the conditions of excavation, backfill, materials, climatic conditions and other contingencies likely to affect the work and has made his bid accordingly and that he is to assume the responsibility and risk of all loss or damage to materials of work which may arise from any cause whatsoever prior to completion. 1-08 PROSECUTION AND PROGRESS 1-08.1(3) Hours of Work(Addition) Work hours shall be limited to weekdays only, between the hours of 7:00 a.m. and 5:00 p.m. unless otherwise approved in advance by the City. The Contractor may request in writing permission to start before 7:00 a.m. The Engineer may revoke approval for work before 7:00 a.m. at any time if the City receives noise complaints. Truck hauling shall be limited to the hours of 7:00 a.m. to 5:00 p.m. on arterial streets. 1-11 SPECIAL PROVISIONS - Continued The Contractor shall give a minimum 48 hours notice to the City prior to work on any roadway and shall do no work on the roadway without a traffic control plan approved by the City Traffic Engineer. rWork on weekends will not be allowed, except as approved in writing by the Engineer. 1-08.3 Progress Schedule (Addition) Add the following: The order of work except as may otherwise be outlined herein will be at the Contractor's option, in keeping with good construction practice. The work shall be scheduled and constructed in accordance with the various permits and franchise requirements and/or conditions. Prior to starting construction, the Contractor shall furnish the Contracting Agency with a construction program, indicating thereon his/her proposed schedule and method of processing the work. As a first order of work, the Contractor shall prepare a detailed erosion control plan and ' project schedule and transmit then to the Owner three days prior to a pre-construction meeting. As a second order of work, the Contractor shall attend a mandatory pre-construction meeting. As a third order of work, the Contractor shall provide material submittals. rAs a fourth order of work, the Contractor shall call 1-CALL (1-800-424-5555) and have utilities "marked" in the field by the various utility owners. After the ground surfaces have been "marked", the Contractor shall, as a fifth order of work, provide for the photographing of the entire project site. This activity must be completed and the photographs and negatives delivered to the Contracting Agency as required and further specified in Section 1-04 prior to any excavation, asphalt cutting, mobilization, staging, or any other work items being performed. As a sixth order of work, the Contractor shall pothole existing utilities as specifically noted on the Plans or as otherwise may be required. The remaining order of work shall be at the Contractor's option, in keeping with generally accepted, good construction practice. However, the Contractor shall coordinate work "by others"which will effect mobilization and demobilization efforts. He/she shall additionally perform all underground utility construction prior to installing any aboveground features. As a second to last order of work, the Contractor shall submit As-built Drawings. After all preliminary and final "punch list" items have been satisfactorily completed, then, as a last order of work, the Contractor shall provide post-construction photographs. The Contractor shall so schedule his/her work such that all costs of complying with this "Order of Work" will be considered incidental to the Project, and as such, merged in the various items bid. 1-12 SPECIAL PROVISIONS - Continued The Contractor shall conduct the order of work to allow all existing facilities to remain operational except as noted herein during the construction of this Project. and to minimize disruption of any utility service. 1-08.5 Time for Completion (Additional Section) The Contractor shall complete all work within the working days specified in Section 1- 08.3 of these Special Provisions and within the Contract Documents. Failure to complete the work prior to the date specified shall be grounds for implementation of liquidated 1 damages in accordance with section 1-08.9 and may require termination of contract in accordance with section 1-08.10. 1-08.13 Compensation for Overtime Work(New Section) Add the following section: The Owner reserves the right to charge the Contractor and may deduct from periodical and final payment, labor expenses attributed to administrative, engineering, and inspection work incurred by the Owner for overtime work associated with the project construction. The Contractor shall pay to the Owner the costs of certain engineering and inspection expenses in the event that the Owner should grant an extension(s) of time because of avoidable delay. The amount of said expenses shall be computed and determined on the basis of an itemized schedule of engineering and inspection labor charges determined for the actual hours of labor performed beyond a forty-hour work week, or beyond the schedule date of ' completion. 1-09 MEASUREMENT AND PAYMENT 1 1-09.8 Payment for Material On Hand (Addition) Section 1-09.8 of the Standard Specifications is supplemented with the following: The Contractor is cautioned against placing orders for full quantities of materials until the work has advanced to a state permitting the determination of the exact quantities required. Estimates of quantities of materials furnished by the Engineer are understood to be approximate only and, unless otherwise specified,the City will in no way be responsible for any increased costs or extra expenses that the Contractor may have to bear on account of materials or work not being ordered at some earlier date. Payment for"Material on Hand" will be made only when considered desirable and appropriate by the City. The City reserves the right to make the final determination as to whether payment will be made for"Material on Hand". 1-13 SPECIAL PROVISIONS - Continued 1-09.9 Payments Supplemented this section with the following: "Basis of Payment" In consideration of the faithful performance of all the covenants, stipulations, and agreements of this Contract to be kept and performed by the Contractor, the City covenants and agrees to pay the Contractor the amount bid as adjusted when so ' stipulated in the Contractor's proposal for the work actually performed as determined by the final estimate of the Engineer, less any deductions for failure to complete the work within the time specified; and less any deductions for claims and damages paid by the City due to acts or omissions of the Contractor and for which he/she is liable under this Contract. Items or work clearly indicated in the Plans or in the Specifications as work under this Contract but for which an item has not been set forth in the proposal shall be included in other items of work. Failure to do so will not relieve the Contractor of his responsibility to perform the work indicated and no other compensation will be allowed. i1-09.9(2) Retainage Section 1-09.9(2) of the APWA Division 1 General Conditions is supplemented with the following: Upon completion of the project the retainage shall be returned to the Contractor when all of the following are satisfied: 1. The Contractor and each Subcontractor shall submit to the City of Renton, and to the Department of Labor and Industries, a"Statement of Intent to Pay Prevailing Wages." 2. Following the acceptance of the project, the Contractor and each Subcontractor shall submit to the City of Renton, and to the Department of Labor and Industries, and "Affidavit of Wages Paid". This affidavit certifies that all prevailing wage requirements have been met. 3. The Contractor shall submit a"Request to Release"to the Department of Labor and Industries. That agency provides the form. 4. At least 30 days have elapsed since final acceptance of the project by the City of Renton at one of its regularly scheduled meetings. ' 5. The City Clerk must have received a"Release" for the project from the Department of Labor and Industries and a "Release" from the Department of Revenue. 6. The City Clerk must have received a letter from the Contractor, on the Contractor's letterhead, stating that all bills and wages have been paid on this project. 1-14 SPECIAL PROVISIONS - Continued 1-09.14 Payment Schedule (New Section) GENERAL — Scope A. Payment for the various items of the Bid Sheets, as further specified herein, shall include all compensation to be received by the CONTRACTOR for furnishing all tools, equipment, supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items of work being described, as necessary to complete the various items of the WORK all in accordance with the requirements of the Contract Documents, including all appurtenances thereto, and including all costs of compliance with the regulations of public regulations of public agencies having jurisdiction, including Safety and Health Administration of the US Department of Labor(OSHA). B. The Owner shall not pay for material quantities that exceed the actual measured amount used and approved by the ENGINEER. C. It is the intention of these specifications that the performance of all work under the bid for each item shall result in the complete construction, in an accepted operating condition, of each item. D. Work and material not specifically listed in the proposal but required in the plans, specifications, and general construction practice, shall be included in the bid price. No separate payment will be made for these items. ' 1-09.14(1) Basic Bid (New Section) This section is an outline of the basic bid, which determines the low bidder for this proj ect. Bid Item 1: Mobilization, Cleanup and Demobilization (LS) Measurement of Mobilization, Cleanup and Demobilization shall be per lump sum. Seventy percent(70%) of this item will be included in the first monthly estimate provided the Contractor is fully in operation and construction of the Project has began; thirty percent (30%) of this item will be included in the estimate issued at the completion of the work provided that all equipment has been removed from the Project, as-built drawings are submitted and approved by the Owner,photographing is compete, and the cleanup is acceptable to the Owner. The contract price per lump sum for Mobilization, Cleanup and Demobilization shall be full compensation for providing, furnishing, and installing complete and in-place all work and materials necessary to move or organize equipment and personnel onto the site, provide and maintain support facilities and utilities, cleanup the project site once construction is completed,prepare the site for construction operations, obtain all necessary permits, licenses, and bonds, and maintain the site and surrounding areas during construction. The Contractor shall prepare a Mobilization and Demobilization Plan showing the proposed location for storage of all equipment and material proposed to be located at the site. Storage and staging areas shall be located within the City R/W or Maplewood Golf 1-15 SPECIAL PROVISIONS - Continued Course as designated by the City and shall not interfere with the golfing traffic such as pedestrians, golf carts, and maintenance equipment. The Contractor shall prepare a Work Plan, which shall include the following: A. Proposed construction sequence and schedule for all major items of work. B. Mobilization and Demobilization Plan showing the proposed location for storage of all equipment and materials, and the removal of all equipment and materials following the completion of construction and the removal of and erosion controls. C. Erosion Control Plan for all stages of the project. D. A plan to provide for cleaning and sweeping of any impacted roadways, parking lots, outside the limits of the construction area during construction and following completion of construction and the removal of erosion controls. The Work Plan shall be submitted to the City for review, revision, and approval within 10 ' days of the contract award. Bid Item 2: Locate and Protect Existing Utilities (LS) Measurement of Locate and Protect Existing Utilities shall be per lump sum. The contract price per lump sum for Locate and Protect Existing Utilities shall be full compensation for locating and/or protecting all existing utilities, as may be required during the course of the project. This shall include, but is not limited to all costs of digging exploratory pits and protecting/restraining existing utilities during excavation and grading for the Project. This bid item is further subject to Section 1-07.17 of the Supplemental Specifications and Special Provisions. Bid Item 3: Clearing and Grubbing (AC) Measurement of Clearing and Grubbing shall be per acre. The contract price per acre for Clearing and Grubbing shall be full compensation for all labor, tools, equipment, and materials necessary to complete the work as specified in Section 2-01 of the Special Provisions or as directed by the Engineer. Bid Item 4: Removal of Structure and Obstruction (LS) Measurement of Removal of Structure and Obstruction shall be per lump sum. The contract price per lump sum for Removal of Structure and Obstruction shall be full compensation for furnishing all tools, labor, equipment, materials, and incidentals necessary for removing, abandonment, relocating, wastehauling, and delivery of items as noted on the Plans. 1-16 SPECIAL PROVISIONS - Continued Old asphalt, and other unsuitable excavated material will be disposed of offsite. Payment to haul and dispose of old asphalt and other unsuitable excavated material shall be included in the lump sum bid price. Bid Item 5: Tree Removal and Replanting (EAl Measurement for Tree Removal and Replanting shall be per each. The Contractor shall salvage, preserve, transport and replant any trees that are designated for removal and replanting on the Plans. The location of replanting each of the trees shall be as designated by the City. For any trees with a diameter exceeding 4 inches, the contractor shall use a tree spade. The unit price bid for Tree Removal and Replanting shall be full compensation for 1 furnishing all labor, tools, equipment, and materials necessary to complete the work as specified in Section 8-02 of the Standard Specifications or as directed by the City. Bid Item 6: Temporary Water Pollution /Erosion Control (LS) Measurement of Temporary Water Pollution/Erosion Control shall be per lump sum. The contract price per lump sum for Temporary Water Pollution/Erosion Control shall be full compensation for all materials, labor,tools, and equipment required to furnish, install, and maintain the temporary erosion control measures as shown on the plans, as directed by the Engineer, and as specified in the Special Provisions. Erosion control consists of all activities needed to prevent soil erosion on the project site, creation of sediment laden water, and migration of sediment laden water into the City drainage system, other water courses, or private property. Erosion control includes catch basin protection, filter fabric fences, placement of plastic sheets over exposed soil and stockpiles, seeding, mulching, netting, cleaning catch basins, ' sweeping, etc., and any other activities needed to control erosion from the project. The surface water control requirements of King County shall apply and the King County, Washington, Surface Water Design Manual shall be used for the design of all facilities. rThe Contractor shall develop a"red lined"erosion control plan and submit it to the City for review and approval. The plan shall be based on the King County Surface Water Design Manual, as adopted by the City of Renton, and proper construction practices. After the erosion control system is installed the Contractor shall make any field adjustments necessary to reduce or eliminate any erosion and discharge of sediment-laden i water.Bid Item 7: Construction Surveying, Staking, and As- built Drawings (LS) ' Measurement for Construction Surveying, Staking, and As-built Drawings shall be per lump sum. The contract price per lump sum for Construction Surveying, Staking, and As-built Drawings shall be full compensation for furnishing all materials, labor, tools, and equipment necessary as provided in the Supplemental Specifications Sections 1-05.5(4) and 1-05.5(5). All survey work shall be done under the direct supervision of a qualified surveyor licensed by the State of Washington, and in accordance with the City of Renton 1-17 ' SPECIAL PROVISIONS - Continued ' Surveying Standards. City of Renton Surveying Standards are found in Section 1-11 of the Supplemental Specifications. Two (2) survey markers have been provided in the field by the City, as shown on the Plans. The Contractor shall be provided with an electronic copy of the drawings. Said electronic copy shall contain all horizontal and vertical coordinates necessary for the Contractor to survey and set stakes for the grades and location of the new cart path and golf course features. It shall be the Contractor's responsibility to maintain the provided survey markers, or to place new markers as needed to perform the work. The Contractor's surveyor shall provide the City with field books, as-built drawing notes, prints with the existing utilities encountered and as-built locations, and surveyor's seal and signature per Supplemental Specification Section 1-05.5(5). The surveyor shall provide the as-built drawing stamp and signature on the City mylar plan sheets, after the City adds the as-built drawing information. The City will provide base grade plan sheets for the surveyor's use. Bid Item 8: CPEP Storm Sewer Pipe 4 In. Diam. (LF) Measurement of CPEP Storm Sewer Pipe 4 In. Diam. shall be per lineal foot along the invert of the pipe from the ends of the pipe. The pipe shall be placed inside an 8-inch diameter PVC sleeve provided by the Owner. Th unit contract price per lineal foot of CPEP Storm Sewer Pipe 4 In. Diam. shall be full compensation for all labor, materials, equipment, excavation, new pipe, installation, bedding, all appurtenances (such as special fittings, bends, connections, etc.), trench backfill, compaction, compaction testing, dewatering, disposal of excess materials, grading, erosion and sedimentation controls, cleaning and testing, and temporary bypass of all storm system flows during construction, etc. ' Bank run gravel will be used, as deemed necessary by the Engineer,to replace unsuitable trench excavation material. Payment for bank run gravel shall be included in the unit price. Pipe bedding shall be Bedding Material for Thermoplastic Pipe per Standard Specifications Section 9-03.16. Payment for bedding material shall be included in the unit price. Excavated soil shall be used as backfill for the project if it is a clean granular material meeting the general requirements for select borrow material,the maximum particle size shall not exceed 3 inches, and has a moisture content that will allow at least 92 percent compaction when placed. Imported backfill will be used only if native material is unsuitable for use as backfill. Payment for excavated soil backfill shall be included in the ' unit price. Excess excavated material will be disposed of offsite. This includes all soil, asphalt, concrete, existing stormwater pipe, and other excavated material. Payment to haul and ' dispose of excess excavated material shall be included in the unit bid price. f 1-18 C)"s i-his inc.ludc, 1- jteri31 -)VLVI a qudrr`{ :5plts -tv a13-4 ' SPECIAL PROVISIONS - Continued on --V'� 50 +ru ckS w<<e ne+ prcduee large rL45 aoa e2.rr) IYN&{U111 oA 5fire2+? Wha+ is p;ab1eM W1t1, ru�5 Bid Item 9: Structural Fill for Cart Path (TN) 0j,+5i4.0_ a� +he Sf-rI ppe4 r-e9'`r ' Measurement for Structural Fill for Cart Path shall be per ton. The contract price per ton for Structural Fill for Cart Path shall be full compensation for all materials, labor, tools, and equipment required to furnish, install, and compact fill material as shown on the plans, as directed by the Engineer, and as specified in Section 2- 03.3(14) of the Special Provisions. All material shall be weighed at a certified scale. Bid Item 10: Crushed Surfacing Top Course (TN) Measurement of Crushed Surfacing Top Course shall be per ton. ' The unit contract price per ton for Crushed Surfacing Top Course shall be full compensation for all materials, labor, tools, and equipment necessary for the fulfillment of all requirements of Standard Specification Section 9-03.9(3) in the execution of the work shown in the plans or as required by the Engineer. Measurement for furnishing and installing crushed surfacing top course will be based on actual tonnage weight as determined by measurement from a certified scale. The quantity for this item is included to provide a common proposal for bid purposes. The actual quantity used in construction may vary from that amount. The unit price will not be adjusted if the actual quantity used varies by more than 25 percent. Any water added to the aggregate at the plant or in the field for placement and compaction shall be considered incidental to this item. Bid Item 11: Asphalt Conc. Pavement Class "B" (TN) Measurement of Asphalt Conc. Pavement Class "B" shall be per ton with no deduction ' being made for the weight of liquid asphalt, blending sand, mineral filler, or any other component of the mixture. The unit contract price per ton for Asphalt Conc. Pavement Class "B", as specifically noted in the Proposal, shall include the cost of all labor, materials, equipment,tools, and incidental costs necessary for placing, compacting, hauling, notifications, aggregate, ' sweeping, furnishing and preparing subgrade, removal of existing asphalt, cleanup, and all other incidentals necessary for a complete paving system to the lines, cross-section and grades as shown on the Plans. All patches and repairs shall be joined to existing pavement with a clean, sawcut joint. Feathering of edges is not acceptable. Any damaged pavement will be restored by sawcutting and removing damaged asphalt, supplementing and compacting the base, and ' placing new asphalt. The cost for sawcutting shall be considered incidental to this item. Measurement for furnishing and installing asphalt concrete pavement will be based on actual tonnage weight as determined by measurement from a certified scale. The quantity for this item is included to provide a common proposal for bid purposes. The actual quantity used in construction may vary from that amount. The unit price will not be adjusted if the actual quantity used varies by more than 25 percent. 1-19 ' SPECIAL PROVISIONS - Continued Bid Item 12: Topsoil Type A (TN) Measurement of Topsoil Type A shall be per ton in haul conveyance at the point of delivery and as accepted by the Engineer. The unit contract price per ton for Topsoil Type A shall be full compensation for furnishing all materials, labor, equipment, and supplies necessary to furnish and place and ' compact topsoil to the depths as shown in the Plans. See also Section 8-01.3(2) of these Special Provisions. Bid Item 13: Sod Installation (SY) Measurement of Sod Installation shall be per square yard of actual ground slope of sod established, installed, and accepted by the Engineer. The unit contract price per square yard for Sod Installation shall be full compensation for all costs necessary for weed control within the seeding area and to prepare and sod the area as shown in the Plans and for furnishing all labor, tools, equipment, and materials, necessary to complete the work as specified. ' Bid Item 14: Irrigation Revisions (LS) Measurement of Imgation Revisions shall be per lump sum. The contract price per lump sum for Irrigation Revisions shall be full compensation for all labor, material, tools, and equipment required to adjust the existing irrigation system to finished grade. ' All work under this bid item shall be per Standard Specification Section 8-03. Any damage to irrigation system resulting from the Contractor's operation shall be repaired at no expense to the City. 1-20 N a d U W A, 1 r ' SPECIAL PROVISIONS 2-01 CLEARING, GRUBBING, AND ROADSIDE CLEANUP 2-01.1 Description Delete the first paragraph of this section and replace with the following: rThe Contractor shall furnish, install and maintain temporary orange construction fencing (min. 4' height) along the clearing limits of the project area between the fairway and construction area and around the dripline of any trees not identified for removal. The temporary fence shall remain in place until all construction within the clearing limits is completed. This work shall be included as part of the lump sum payment per acre for ' "Clearing and Grubbing". The Contractor shall clear and grub those areas shown on the Contract Plans that are required for the execution of construction activities. Trees and shrubs may be removed only after approval by the City. 2-01.2 Disposal of Usable Material and Debris The third paragraph of Section 2-01.2 is deleted and replaced with the following: Refuse and debris shall be hauled to a waste site secured by the Contractor and shall be disposed of in such a manner as to meet all requirements of state, county, and municipal regulations regarding health, safety and public welfare. All sod, topsoil, and shrubs removed as part of this work shall be hauled to an approved holding area on the golf course property. The cost of loading, hauling, and placement of sod, topsoil, and shrubs, shall be included in the per acre bid price for"Clearing and Grubbing". 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 2-02.1 Description Supplement this section with the following: rThe work shall consist of necessary removal and disposal of existing improvements, including pavements, concrete structures, abandoned pipe, and other items necessary for the completion of the project. All removal will be included under the lump sum bid price for"Removal of Structure and Obstruction". r r r 2-1 r ' SPECIAL PROVISION - Continued 2-02.3 Construction Details 2-02.3(1) General Requirements Supplement this section with the following: The removal(s) shall be conducted in such a manner as not to damage existing utilities, ' and other structures that are to remain in place. The Contractor shall repair, replace, or otherwise restore damage resulting from his/her activities. The limits of removal shall be either the edge of the structure, and existing construction joint, or a new sawcut. The depth of saw cuts shall be such as will accomplish the intended purpose, and will be determined in the field to the satisfaction of the engineer. Saw Cutting shall be considered incidental to the other bid items. 2-02.3(1)A Salvage (New Section) ' Unless otherwise indicated in the Plans or Specifications, all removed items of recoverable value shall be carefully salvaged and delivered to the City in good condition, and as directed by the City or Maplewood Golf Course. Materials and items deemed of ' no value by the City shall be removed by the Contractor, and shall become the Contractor's property to be disposed of at no additional cost to the City. 2-02.3(7)D Contractor Provided Disposal Site (Addition) Waste materials shall be hauled to a waste site secured by the Contractor and shall be disposed of in such a manner as to meet all requirements of state, county and municipal ' regulations regarding health, safety and public welfare. 2-02.3(4) Sawcutting (New Section) Where shown on the Plans or where directed by the Engineer, the Contractor shall make a neat vertical sawcut at the boundaries of the area to be removed. Care shall be taken sawcutting as not to damage any of the existing asphalt concrete to remain in place. Any pavement damage by the Contractor due to his/her operations shall be repaired or replaced by the Contractor at his/her own expense. ' Existing pavement shall be precut before commencing excavation, and shall be removed, as required, for the construction. All cuts shall be continuous, and shall be made with saws specifically equipped for this purpose. No skip cutting will be allowed. ' Wheel cutting or jack hammering will not be considered an acceptable means of pavement"cutting", unless pre-approved by the Engineer. However, even if pre- approved as a method of cutting or if the Engineer directs the contractor to utilize this method of cutting, no payment will be made for this type of work, but rather, it shall be considered incidental to the Contract bid items and no additional compensation will be allowed, and as such, merged in the various unit prices bid in the Proposal. ' 2-02.5 Payment ' See bid items descriptions for units of measure and payment. 2-2 SPECIAL PROVISION - Continued ' 2-03 ROADWAY EXCAVATION AND EMBANKMENT 2-03.3 Construction Requirements Section 2-03.3 shall be supplemented with the following: The Contractor's material suppliers shall be required to furnish certification and aggregate gradation results from a qualified testing laboratory (approved by Owner) that the materials supplied are in conformance with these Specifications. The Contractor shall further be required to provide the services of a City-approved soils testing firm to conduct in place" density test of the materials to verify if the compaction requirements are in compliance with these Specifications. For bidding purposes the Contractor shall assume one test for every 150 tons of material used. Test results shall be given to directly to the ' Owner by the testing lab and not via the Contractor. All costs for furnishing the services of an approved testing laboratory to conduct testing shall be borne by the Contractor and merged in the various lump sum and unit prices listed in the Proposal. 2-03.3(14) Embankment Construction Supplement this section with the following: All structural fill to be utilized in construction of the earth berm as described in the Plans and Special Provisions shall consist of any available soil having a maximum particle size of 3 inches and a maximum fines content of 35 percent. Fill material shall be till-like soils containing 15 to 35 percent fines. All structural fill should be placed in 4- to 8-inch thick lifts and should be compacted to a dense and unyielding condition and at least 92 percent of its modified Proctor maximum density (ASTM D-1557). Upon completion of the rough grading and prior to placement of topsoil the Contractor shall request a grading inspection of the City. The City shall inspect the graded areas for general compliance with the plans and specifications. The City will most likely request some minor modifications of the slopes and grade transitions in order to accomplish a continuous rolling surface grade acceptable for the play of golf. The Contractor shall complete the requested minor grading revisions which shall then be inspected by the City. ' Placement of structural fill shall be accomplished so as to be at a level 6 inches below finished grade. The remaining 6 inches shall be filled with an approved topsoil, compacted upon approval of the finished grades. ' 2-03.3(19) Wet Weather Earthwork (New Section) The following items shall be followed if earthwork is to be accomplished in wet weather ' or in wet conditions: a. Earthwork shall be accomplished in small sections to minimize exposure ' to wet weather. Excavation or the removal of unsuitable soil shall be followed immediately by the placement and compaction of a suitable thickness (generally 8 inches or less) of clean structural fill. The size and/or type of construction equipment shall be selected as required to prevent soil disturbance. In some instances, it may be necessary to limit 2-3 ' SPECIAL PROVISION - Continued equipment size or to excavate soils with a backhoe, gradall, or equivalent to minimize subgrade disturbance caused by equipment traffic. b. The ground surface in the construction area shall be sloped to promote the rapid runoff of precipitation and to prevent ponding of water. C. No soil should be left uncompacted and exposed to moisture. A smooth drum vibratory roller, or equivalent, shall be used to seal the ground surface. Plastic sheeting shall be used to cover areas of finished work in order to avoid saturation of compacted soils. It shall be the Contractor's responsibility to protect the site and any work areas from damage due to inclement weather. Should any work area become damaged or require re- work due to inclement weather, it shall be at no additional cost to the City. ' d. Excavation and placement of fill or backfill material will be observed by the Engineer, to determine that all work is being accomplished in accordance with the project specifications. All costs associated with the above items shall be considered incidental to the project and merged into the various pay items involved. ' 2-07 WATERING Prior to placing new fills, sub-base course materials, all subgrade areas shall be proofrolled to locate any soft or pumping soils. Proofrolling can be completed using a piece of heavy tire-mounted equipment or a loaded dump truck. If soft or pumping soils are observed, such unsuitable sub,ade soils shall be overexcavated and replaced. After ' completing the proofrolling, the subgrade areas shall be recompacted. The subgrade shall be recompacted to at least 92 percent of the maximum dry density in accordance with the ASTM D1557 test procedure. 2-07.3 Construction Requirements Section 2-07.3 is supplemented with the following: During construction, the Contractor shall have dedicated to the Project a suitable water truck that shall be operated as necessary to control dust. Failure to have a water truck ' immediately accessible to the job and failure to use said water truck for dust control shall be adequate reason to "shut-down"the Project construction. Such shut down is herein agreed to by the Contractor upon submitting a bid for this Project. Water for this Project shall be obtained from the City of Renton at no cost to the Contractor. However, the City of Renton retains the exclusive right to operate all hydrants and valves. Prior to obtaining water from a City-owned hydrant, the Contractor ' shall obtain permission from the City. The City shall then provide the Contractor with a back-flow preventer device that the Contractor shall install prior to taking any water from a hydrant. Furthermore, if conditions warrant, the City can and may elect to restrict the use, amount, location, and time of removal to best comply with the City's own needs. 2-4 ' SPECIAL PROVISION- Continued 2-07.5 Payment ' Add the following: The cost of water placement shall be merged with the unit price bid for"Mobilization, Cleanup and Demobilization". 2-5 V W a � � � � � � � � � ■� � r � � � � � � � ' SPECIAL PROVISIONS 4-04 BALLAST AND CRUSHED SURFACING ' 4-04.1 Description Section 4-04.1 shall be supplemented with the following: Crushed surfacing shall be placed beneath the asphalt concrete pavement as shown on the plans and as directed by the Engineer. The 4-inch layer of crushed surfacing shall conform to Standard Specification Section 9- 03.9(3) for top course and placed in accordance with Standard Specification Section 4- ' 04.3. 4-04.3(5) Shaping And Compaction Section 4-04.3(5) shall be supplemented with the following: The Contractor's material suppliers shall be required to furnish certification and ' aggregate gradation results from a qualified testing laboratory (approved by Owner) that the materials supplied are in conformance with these Specifications. The Contractor shall further be required to provide the services of a City-approved soils testing firm to conduct "in place" density tests of the gravel materials to verify if the compaction requirements ' are in compliance with these Specifications. For bidding purposes the Contractor shall assume one test for every 50 cubic yards of material used. For qualities less than 50 cubic yards, a minimum of one test shall be performed. Test results shall be given directly to the Owner by the testing lab and not via the Contractor. All costs for furnishing the services of an approved testing laboratory to conduct testing shall be borne by the Contractor and merged in the various lump sum and unit prices listed in the Proposal. Crushed surfacing shall be compacted to at least 95% of maximum dry density using ASTM D1557. 4-04.5 Payment See bid items descriptions for units of measure and payment. ' 4-1 V W a SPECIAL PROVISIONS ' 5-04 ASPHALT CONCRETE PAVEMENT 5-04.1 Description ' Add the following: Asphalt concrete pavement (ACP) shall be Class B. 5-04.3(2) Hauling Equipment Add the following to the first paragraph: If truck has not used canvas to protect asphalt from weather during haul the Engineer, or its representative, reserves the right to reject the load. No compensation will be made for rejection of a load due to non-protection. 5-04.3(5)C Crack Sealing ' Delete the first sentence and replace with the following: Contractor shall seal all asphalt concrete pavement joints. Prior to sealing the cracks and joints, they shall be cleaned with a stiff-bristled broom and compressed air. ' 5-04.3(5)D Soil Residual Herbicide Section 5-04.3(5)D shall be supplemented with the following: ' Before placement of asphalt on untreated surfaces, the Contractor shall apply soil residual herbicides. Cost shall be incidental to the bid item Asphalt Conc. Pavement Cl. `B". 5-04.3(9) Spreading and Finishing Section 5-04.3(9) shall be supplemented with the following: ' Asphalt Concrete Pavement(ACP) Class B ACP Class B shall be placed to the compacted depths specified herein as shown on the ' Contract Plans. Placement shall be in accordance with applicable provisions of Section 5-04. ' 5-04.3(11) Joints The first Sentence of Paragraph 5 of Section 5-04.3(11) is revised to read as follows: ' The longitudinal joint in any one layer shall be offset from the layer immediately below by less than 12 inches. ' Section 5-04.3(11) shall be supplemented with the following: 5-1 ' SPECIAL PROVISIONS - Continued The Contractor shall provide butt Joints where the new asphalt concrete pavement meets the existing pavement as shown on the Plans or as directed by the Engineer in a manner ' to produce a smooth riding connection to the existing pavement. The depth of butt joint required shall be determined by the depth of new asphalt concrete pavement specified on the Plans. The surface elevation of new and existing asphalt concrete pavement shall be the same as all butt joints, see detail in plans. All asphalt concrete joints shall be sealed with asphalt cement AR-4000W per Section 9-02 Bituminous Materials, or as directed by the Engineer. After sealing, a sand blanket shall be hand applied to the surface to help prevent tracking. Excess sand shall be removed and wastehauled. All costs associated with providing, placing and sealing butt joints shall be considered incidental to and included in the unit contract prices for the various items involved. Existing pavement shall be sawcut before commencing excavation and shall be removed, ' as required, for the construction. The width of pavement cuts shall be approved in the field by the Resident Inspector before cutting or removal of the pavement. 5-04.5 Payment See bid items descriptions for units of measure and payment. ' S-2 U W a � � � v � � � � � � � � � � � SPECIAL PROVISIONS 7-04 STORM SEWERS 7-04.2 Materials Add the following: The CPEP stormwater pipe shall be the size indicated on the Plans. Unless otherwise indicated on the Plans, smooth interior CPEP storm sewer pipe shall be used. CPEP stormwater pipe shall meet the specifications detailed in Section 9-05.12(3) of the Special Provisions and Standard Specifications. Watertight joints shall be used. 7-04.3 Construction Requirements 7-04.3(1) Cleaning and Testing Section 7-04.3(1) is supplemented with the following: 1 Water for flushing shall be made available and obtained from the City. However, the City reserves the right to operate all hydrants at times and locations convenient to their schedule and available personnel. 1 All storm sewer installed shall be inspected with television inspection equipment by the City prior to final acceptance. Any deficiencies noted in the installation shall remedied by the Contractor at the Contractor's expense. 7-04.5 Payment ' See bid items descriptions for units of measure and payment. 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 7-08.3(1)A Trenches Section 7-08.3(1)A shall be supplemented with the following: Trench excavation shall include removal and wastehaul of all excess and/or unsuitable material encountered, including but not limited to, abandoned pipelines, concrete, asphalt, tree stumps, trees, logs, abandoned rail ties,piling, riprap, and other deleterious material. ' It shall also include dewatering. If the Contractor purposely or neglectfully excavates trenches to a width beyond the maximum payment limit lines of the trench, as detailed on the Plans, then payment for import trench backfill, and any additional surface restoration (temporary and permanent) of the type warranted shall be limited to the maximum payment width specified on the Plans for that size of pipe and depth of bury. All trench backfill, bedding, and surface restoration required beyond the maximum payment limits, shall be merged in the various items bid and include the additional compaction and testing of same. ' 7-1 SPECIAL PROVISIONS - Continued 1 The width of the trench in the vicinity of the pipe shall be carefully controlled and maintained to insure the structural strength of the pipe is not jeopardized. See details on the Plans. f7-08.3(1)C Pipe Zone Bedding Add the following: ' All references to "Standard Plan" shall be deleted, and replaced with the details shown on the Plans. rBedding shall be placed in more than one lift. Pipe installation shall be in the first lift of bedding, consisting of compacted (minimum of 90% of modified Proctor maximum density per ASTM D1557-70) granular material. This bedding layer shall extend the full width of the trench bottom after being consolidated by the use of a"flat tamper". This lift shall be spread smoothly and bell ' holes dug, where necessary, to insure uniform support along its full length of the pipe barrel. Subsequent lifts of not more than six inches shall be placed up to the horizontal diameter of the pipe, carefully placed and firmly compacted to provide a firm, uniform cradle for the pipe. These lifts shall be consolidated first by the use of tamping bars, taking care to work the material under the pipe haunches so that no voids are left. Then a flat tamping bar shall be used to compact the bedding material along the side of the pipe to the trench walls to provide lateral support for the pipes. These lifts shall be individually compacted to 90% of modified Proctor maximum density for the full width of the trench, as determined by ASTM D1557-70. Further lifts of compacted bedding material shall be placed in lifts of not more than 6 ' inches thickness to a minimum of 6 inches above the crown of the pipe. There shall be at least one-foot of cover over the top of the pipe before the trench is wheel-loaded and three feet of cover before utilization of a hydro-hammer during compaction. 7-08.3(3) Backfilling Section 7-08.3(3) shall be supplemented with the following: It is the intent of these Specifications to utilize suitable excavated material where ' available. However, for bidding purposes, it shall be the responsibility of the Contractor to estimate the amount of excavated material that will be suitable for backfill purposes, as best determined from the information available. Imported trench backfill shall conform to the requirements of Section 9-03.19 as backfill. Import material will be utilized when necessary, as called out on the Plans and further pre-approved by the Engineer. Trench backfill shall be compacted to at least 92% of modified Proctor maximum density for the full width of the trench, as determined by ASTM D1557-70. If the subgrade soils are soft, become disturbed, or are otherwise unsuitable, a separate ' 12-inch thick foundation material leveling course shall be placed to protect the subgrade ' 7-2 SPECIAL PROVISIONS - Continued i 1 and provide uniform support. If organic silt is found at subgrade, the organic silt layers shall be overexcavated if they are present within two feet below the pipe invert or base of manhole structures. The overexcavated area shall be backfilled with foundation material. If the organic silt is deeper than two feet below the pipe, no overexcavation shall be necessary. 7-08.5 Payment See various bid items descriptions for units of measure and payment. i i 1 1 i i 1 1 i i 1 7-3 00 V W a rr rr irr rr ri r rr rr rr rr �r ry �r r rr rr rr� �r r SPECIAL PROVISIONS 8-01 EROSION CONTROL 8-01.1 Description Supplement this section with the following: Work shall include the placement of temporary and permanent erosion control facilities during the duration of this project. The Contractor will be held solely responsible for maintenance of all erosion control facilities necessary during the duration of this Contract. Work shall include but not be limited to the following: • Storm Dram Inlet Protection • Sediment Control Fencing • Sandbags and Hay Bales ' • Topsoil • Covering Soil with Plastic Covering ' • Miscellaneous Erosion Control ' It shall be the Contractor's responsibility to protect the site and any work areas from damage due to inclement weather. Should any work area become damaged or require re- work due to inclement weather, it shall be at no additional cost to the City. ' 8-01.3(2) Topsoil Section 8-01.3(2) is supplemented with the following: Topsoil shall be a mixture of Pacific Garden Mulch 30% and Loamy Sand 70% screened through a 3/8" screen. Installation Topsoil shall be installed to a compacted depth of 6"minimum in all areas. Topsoil shall be installed as detailed in the plans. 8-01.5 Payment Payment for all construction associated with this item of work shall be under the unit contract price for the various bid items described in the Proposal. ' See bid items descriptions for units of measure and payment. i 8-1 SPECIAL PROVISIONS - Continued i j8-02 ROADSIDE PLANTING This section shall describe all planting within the construction limits as described in these Special Provisions and shown on the Plans. 8-02.1 Description Section 8-02.1 shall be supplemented with the following: This work shall include all planting of trees, shrubs and sod on the site. The planting shall be installed using the materials shown on the Plans and/or as specified in these Special Provisions. The planting shall be installed to grades and conform to the areas and ' locations as shown on the Plans, or as directed by the City. 8-02.2 Materials Section 8-02.2 shall be supplemented with the following: Fertilizer: ' Fertilizer for sodded areas: Application: 10-20-20 at the rate of fifteen (15) pounds per 1,000 square feet. Sod: ' Provide sod as follows: Mixture: 60 % Perennial Turf Type Ryegrass 40 % Hybrid Kentucky Bluegrass Ryegrass: 60 %by weight TARA perennial ryegrass ' DANDY perennial ryegrass SHERWOOD perennial ryegrass Sod shall: • contain no more than 1% other grasses, none of which is coarse or of undesirable variety. ' • be non-netted. • be free of weeds, pests, and diseases. • be not less than 10 months old and no more than 14 months old; healthy ' and with a dense, vigorous, well-developed root structure. • be grown on fumigated soil with intensive care and cultivation under rigid quality control. ' 8-2 i SPECIAL PROVISIONS - Continued • be cut from fields no more than 24 hours before delivery to job site. 8-02.3 Construction Requirements Section 8-02.3 shall be supplemented with the following: Sod: ' Prior to laying sod, the application of the 10-20-20 fertilizer shall be spread and raked into the topsoil. Sod shall be placed in accordance with standard horticultural practices. Dry soil shall be moistened by sprinkling. All butt joints shall be staggered. On sloped areas, the sod shall be laid with the long dimension parallel to the toe or top of slope. After placing, the sod shall be rolled and heavily watered by sprinkler. Watering the sod shall be coordinated with the golf course superintendent. 8-02.5 Payment ' Payment for all construction associated with this item of work shall be under the unit contract price for the various bid items described in the Proposal. See bid items descriptions for units of measure and payment. 8-3 O� V W PLO r� r� �r rr rr rr rr r� r rr rr rr r rr rr i 1 ' SPECIAL PROVISIONS 9-03 AGGREGATES 9-03.10 Aggregate For Gravel Base Section 9-03.10 shall be supplemented with the following: ' Gavel Base material shall be free of rock fragments larger than three inches. 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS 9-05.19 Corrugated Polyethylene Culvert Pipe (CPEP) 9-05.19(1) Description Corrugated Polyethylene Pipe (CPEP) shall be corrugated high-density polyethylene pipe ' with smooth internal wall manufactured by Advanced Drainage Systems (ADS), or approved equivalent. ' 9-05.19(2) Pipe Material and Fabrication CPEP shall be in conformance with the latest version of ASTM F 667 or AASHTO M ' 294, Type S. 9-05.19(3) Fittings and Gaskets Fittings shall be gasketed PVC fittings. Gaskets shall conform to ASTM F 477. Fittings shall conform to ASTM F 1536 or ASTM D 3212. Fittings shall be manufactured by Nyloplast USA, Inc., or approved equivalent. 9-05.19(4) Installation Pipe and fittings shall be installed per the manufacturer's recommendations. Lubricate ' gasket and fitting socket with manufacturer-approved lubricant prior to pushing pipe into fitting. 9-14 EROSION CONTROL AND ROADSIDE PLANTING 9-14.1(1) Topsoil Type A Section 9-14.1(1) shall be supplemented with the following: Topsoil shall have a pH value between 6 and 7, and shall be capable of sustaining ' vigorous lawn growth. Topsoil shall not be used while in a frozen or muddy condition. All topsoil shall be furnished as necessary to complete the required restoration and seeding. A certified analysis of the topsoil from each source shall be submitted to the Engineer before delivery to the site. If deficiencies in the topsoil are found as a result of this analysis, they shall be corrected 1 at no expense to the Contracting Agency. 9-1 SPECIAL PROVISIONS - Continued Prior to placement of topsoil, the Contractor shall call for a final inspection of the rough graded areas as described in Special Provisions 2-03.3(14). Upon approval of the graded areas, topsoil shall be placed and compacted to a depth no less than 6 inches. Prior to placement of sod, the Contractor shall call for a final inspection of the topsoil areas. The City will most likely request some minor modifications of the transition areas. The Contractor shall complete the requested minor revisions which shall be inspected by the City. 9-2 ' CITY SURVEY CONTROL INFORMATION 1 City of Renton Surveying Standards i City of Renton Standard Plans & Supplemental Specifications Section 1-11 Adopted December 16, 1996 ' Effective January,21, 1997 TS SERVER//SYS2\MAPS\83m\control\scn.doc I-I l-I 2 May 2000 Vertical Datum of 1988, and tied to at least one ' 1-11 Renton Surveying Standards of the City of Renton Survey Control Network benchmarks. If there are two such benchmarks 1-11.1(1) Responsibility for surveys(RC) within 3000 feet of the project site a tie to both ' All surveys and survey reports shall be prepared shall be made. The benchmark(s) used will be under the direct supervision of a person shown on the drawing. If a City of Renton registered to practice land surveying under the benchmark does not exist within 3000 feet of a ' provisions of Chapter 18.43 RCW. project,one must be set on or near the project in All surveys and survey reports shall be prepared a permanent manner that will remain intact in accordance with the requirements established throughout the duration of the project. Source of by the Board of Registration for Professional elevations (benchmark) will be shown on the ' Engineers and Land Surveyors under the drawing, as well as a description of any bench provisions of Chapter 18.43 RCW. marks established. 1-11.1(2) Survey Datum and Precision 1-11.1(3) Subdivision Information(RC) ' (RC) Those surveys dependent on section subdivision The horizontal component of all surveys shall shall reveal the controlling monuments used and have as its coordinate base: The North the subdivision of the applicable quarter section. American Datum of 1983/91. Those surveys dependent on retracement of a All horizontal control for projects must be plat or short plat shall reveal the controlling referenced to or in conjunction with a minimum monuments, measurements, and methodology of two of the City of Renton's Survey Control used in that retracement. Network monuments. The source of the 1-11.1(4) Field Notes(RC) coordinate values used will be shown on the Field notes shall be kept in conventional format ' survey drawing per RCW 58.09.070. in a standard bound field book with waterproof The horizontal component of all surveys shall pages. In cases where an electronic data meet or exceed the closure requirements of collector is used field notes must also be kept WAC 332-130-060. The control base lines for with a sketch and a record of control and base ' all surveys shall meet or exceed the requirements line traverses describing station occupations and for a Class A survey revealed in Table 2 of the what measurements were made at each point. Minimum Standard Detail Requirements for Every point located or set shall be identified by a ' ALTA/ACSM Land Title Surveys jointly number and a description. Point numbers shall established and adopted by ALTA and ACSM in be unique within a complete job. The preferred 1992 or comparable classification in future method of point numbering is field notebook, ' editions of said document. The angular and page and point set on that page. Example: The linear closure and precision ratio of traverses fast point set or found on page 16 of field book used for survey control shall be revealed on the 348 would be identified as Point No. 348.16.01, face of the survey drawing, as shall the method the second point would be 348.16.02,etc. , of adjustment. Upon completion of a City of Renton project, The horizontal component of the control system either the field notebook(s)provided by the City for surveys using global positioning system or the original field notebook(s) used by the , methodology shall exhibit at least 1 part in surveyor will be given to the City. For all other 50,000 precision in line length dependent error work, analysis at a 95 percent confidence level and surveyors will provide a copy of the notes anal Y P to the City upon request. In those cases where performed pursuant to Federal Geodetic Control an electronic data collector is used, a hard copy Subcommittee Standards for GPS control print out in ASCII text format will accompany surveys as defined in Geometric Geodetic the field notes. Accuracy Standards & Specifications for Using , GPS Relative Positioning Techniques dated 1-11.1(5) Corners and Monuments(RC) August 1, 1989 or comparable classification in Corner A point on a land boundary, at the future editions of said document.. juncture of two or more boundary lines. A ' The vertical component of all surveys shall be monument is usually set at such points to based on NAVD 1988, the North American TS_SERVER//SYS2\MAPS\83m\control\scn.doc 1-11-5 2 May 2000 ' physically reference a corner's location on the requirements of the project, the original will be ground. recorded with the King County Recorder. ' If recording is not required, the survey drawing Monument Any physical object or structure of record which marks or accurately references: shall be prepared on 22 inch by 34 inch mylar, and the original or a photographic mylar thereof • A corner or other survey point established will be submitted to the City of Renton. by or under the supervision of an individual The survey drawings shall meet or exceed the per section 1-11.1(1) and any corner or requirements of WAC 332-130-050 and shall monument established by the General Land conform to the City of Renton's Drafting ' Office and its successor the Bureau of Land Standards. American Public Works Association Management including section subdivision symbols shall be used whenever possible, and a corners down to and including one-sixteenth legend shall identify all symbols used if each corners;and point marked by a symbol is not described at ' each use. • Any permanently monumented boundary, An electronic listing of all principal points right of way alignment, or horizontal and shown on the drawing shall be submitted with ' vertical control points established by any each drawing. The listing should include the governmental agency or private surveyor point number designation (corresponding with including street intersections but excluding that in the field notes), a brief description of the dependent interior lot corners. point, and northing, casting, and elevation (if applicable) values, all in ASCII format, on IBM 1-11.1(6) Control or Base Line Survey PC compatible media. (RC) ' Control or Base Line Surveys shall be 1-11.1(7) Precision Levels(RC) established for all construction projects that will Vertical Surveys for the establishment of bench create permanent structures such as roads, marks shall satisfy all applicable requirements of sidewalks,bridges,utility lines or appurtenances, section 1-05 and 1-11.1. signal or light poles, or any non-single family Vertical surveys for the establishment of bench building. Control or Base Line Surveys shall marks shall meet or exceed the standards, consist of such number of permanent monuments specifications and procedures of third order ' as are required such that every structure may be elevation accuracy established by the Federal observed for staking or "as-builting" while Geodetic Control Committee. occupying one such monument and sighting Bench marks must possess both permanence and another such monument. A minimum of two of vertical stability. Descriptions of bench marks these permanent monuments shall be existing must be complete to insure both recoverablilty monuments, recognized and on record with the and positive identification on recovery. City of Renton. The Control or Base Line Survey shall occupy each monument in turn,and 1-11.1(8) Radial and Station — Offset Topography(RC) shall satisfy all applicable requirements of Topographic surveys shall satisfy all applicable Section 1-11.1 herein. requirements of section 1-11.1 herein. ' The drawing depicting the survey shall be neat, All points occupied or back sighted in legible, and drawn to an appropriate scale. developing radial topography or establishing North orientation should be clearly presented baselines for station — offset topography shall ' and the scale shown graphically as well as noted. pp y meet the requirements of section 1-11.1 herein. The drawing must be of such quality that a The drawing and electronic listing requirements reduction thereof to one-half original scale set forth in section 1-11.1 herein shall be remains legible. observed for all topographic surveys. If recording of the survey with the King County Recorder is required, it will be prepared on 18 1-11.1(9) Radial Topography(RC) inch by 24 inch mylar and will comply with all Elevations for the points occupied or back ' provisions of Chapter 58.09 RCW. A sighted in a radial topographic survey shall be photographic mylar of the drawing will be determined either by 1) spirit leveling with submitted to the City of Renton and, upon their misclosure not to exceed 0.1 feet or Federal review and acceptance per the specific TS_SERVER//SYS2\MAPS\83m\control\.scndoc 1-11-5 2 May 2000 Geodetic Control Committee third order relationship between the witness monuments and ' elevation accuracy specifications, OR 2) their respective corners shall be shown or trigonometric leveling with elevation differences described on the face of the plat or survey of determined in at least two directions for each record, e.g., "Tacks in lead on the extension of ' point and with misclosure of the circuit not to the lot side lines have been set in the curbs on exceed 0.1 feet. the extension of said line with the curb." In all other cases the corner shall meet the 1-11.1(10) Station—Offset Topography requirements of section 1-11.2(1)herein. (RQ All non comer monuments, as defined in 1- Elevations of the baseline and topographic points 11.1(5), shall meet the requirements of section shall be determined by spirit leveling and shall 1-11.2(2)herein. If the monument falls with in a , satisfy Federal Geodetic Control Committee paved portion of a right of way or other area,the specifications as to the turn points and shall not monument shall be set below the ground surface exceed 0.1 foot's error as to side shots. and contained within a lidded case kept separate ' 1-11.1(11) As-Built Survey(RC) from the monument and flush with the pavement All improvements required to be "as-built" (post surface,per section 1-11.2(3). construction survey) per City of Renton Codes, In the case of right of way centerline monuments ' TITLE 4 Building Regulations and TITLE 9 all points of curvature (PC), points of tangency Public Ways and Property, must be located both (PT), street intersections, center points of cul de horizontally and vertically by a Radial survey or sacs shall be set. If the point of intersection, PI, by a Station offset survey. The "as-built" survey for the tangents of a curve fall within the paved must be based on the same base line or control portion of the right of way, a monument can be survey used for the construction staking survey set at the PI instead of the PC and PT of the for the improvements being "as-built". The "as- curve. ' built" survey for all subsurface improvements For all non comer monuments set while under should occur prior to backfilling. Close contract to the City of Renton or as part of a City cooperation between the installing contractor and of Renton approved subdivision of property, a , the"as-builting"surveyor is therefore required. City of Renton Monument Card (furnished by All "as-built" surveys shall satisfy the the city) identifying the monument; point of requirements of section 1-11.1(1) herein and intersection(PI),point of tangency(PT),point of shall be based upon control or base line surveys curvature (PC), one-sixteenth corner, Plat ' made in conformance with all of section 1-11.1 monument, street intersection, etc., complete and 1-11.3(1)herein. with a description of the monument, a minimum The field notes for "as-built" shall meet the of two reference points and NAD 83/91 ' requirements of section 1-11.1(4) herein and coordinates and NAVD 88 elevation shall be submitted with stamped and signed "as-built" filled out and filed with the city. drawings which includes a statement certifying ' 1-11.2 Materials the accuracy of the"as built". The drawing and electronic listing requirements set forth in section 1-11.1(6) herein shall be 1-11.2(1) Property/Lot Corners(RC) observed for all"as-built"surveys. Corners per 1-11.1(5) shall be marked in a , permanent manner such as 1/2 inch diameter 1-11.1(12) Monument Setting and rebar 24 inches in length,durable metal plugs or Referencing(RC) caps, tack in lead, etc. and permanently marked , All property or lot corners, as defined in I- or tagged with the surveyor's identification 11.1(5), established or reestablished on a plat or number. The specific nature of the marker used other recorded survey shall be referenced by a can be determined by the surveyor at the time of permanent marker at the corner point per 1- installation. 11.2(1). In situations where such markers are 1-11.2(2) Monuments(RC) impractical or in danger of being destroyed,e.g., Monuments per 1-11.1(5) shall meet the the front corners of lots, a witness marker shall requirements as set forth in City of Renton ' be set. In most cases, this will be the extension Standard Plans page H031 and permanently of the lot line to a tack in lead in the curb. The TS_SERVER//SYS2\MAPS\83m\control\scn.doc 1-11-5 2 May 2000 ' marked or tagged with the surveyor's identification number. ' 1-11.2(3) Monument Case and Cover (RC) Materials shall meet the requirements of section 9-22 and City of Renton Standard Plans page H031. r TS_SERVER//SYS2\M"S\83m\control\scn.doc I-11-5 2 May 2000 �\ PLAN MON,, �► , e2455C4P i 4.0 CL.G i COMPAC e0 ELEV14T/011/ SANG I ''�� �► MONUME�t/TGL�TAIL SEGT/QV _ice NOTE: Monument Case & Cover 1. STANDARD MONUMENT CASE AND COVER WASHINGTON STATE DEPARTMENT OF HIGHWAYS 1976. 2. THE CASTINGS SHALL BE GRAY-IRON CASTINGS, AST14 DESIGNATION A-48, CLASS 40, THE COVER AND SEAT SHALL DE MACHINED SO AS TO HAVE PERFECT CONTACT AROUND THE ENTIRE CIRCUMFERENCE AND FULL WIDTH OF BEARING SURFACE. 3. WHEN THE MONUMENT CASE AND COVER ARE PLACED IN CONCRETE PAVEMENT, A CEMENT CONCRETE BASE WILL NOT BE NECESSARY. ADOPTED 4. SEE CITY OF RENTON SUPPLEMENTAL SPECIFICATION SECTION 7-05.3(1) FOR Utie O� CITY OF RENTON ADJUSTMENTS TO GRADE. STANDARD PLANS LST DATE:1-Feb-89 DWG NAME: HR•04 SP PAGE: I10')' --- - ---------------- i :.:.. ' :_: 18 T24N R5E 16 T24N R5E 16 T24N R5E 15 T24N R5E 14 T24N R5E ---------- ----------------- ---------- 13 T24N R5E —- ------A==- A3 IA A6 A7 A8 1 T E 19 T24N E 23 T24N Fo��- -- ----- R5E 5E 21 T24N JR ------- 22 T24N R5E ---------------- 23 T24N R5E 24 T24N R5E ......... ...... --- ------ 2 B B- 5 B6 B7 B8 ------- -- 26T R4E 30 T24N...... 28 T24N R5E 7 T24N R5E 26 T24N R5E 25 T24N R5E ------- ----- .... �C6 C7 C8 35 T24N 32 T24 R5 5E E 35 T24N R5E 36 T24N R5E ------- -,- ----------- -------------- ------------ D D8 —----------- 2 T23N R4E I T23N R4 - 3N 5E 4 T2*AE 3 R 2 T23N R5E I T23N R5E 31 2 E5 E8 12 T23N E 8 r.WN R5 10 N 1§7 %TM23N E 9 T23N F,5E R5E 12 T23N R5E �s 5 6 7 F8 \14 T23N R E !l2m T23N R5E 16 TZ E ni T23N R5E 14 T23N R5E 13 T23N R5E uu � Rp�, 3 G 2 N k.y 4 3 R4E it 3N 3 E 21 T23 22 T23N R5E 23 T23N R5E 24 T23N R5E iw st Ix I i H5 6 H7 H8 T2 N R4E23 1 R4E NO,T23 5E 23N 5E E 26 T23N R5E 25 T23N R5Fp,,-N- s I r. s, 12 14 1 L"" 17 18 =___ 35 T23 E 36 T23N R4E 31 T2 R5E 32 T2311 5E 33 T23N 34 T23N Z5E 35 T23N F� 36 T23N R5E 1 J 2 3 J ij "o i ==- ______ -_ --- —------ _ _ 6 T72 R51 2 N R4E I T22N R4E E A R5E 3 R5E T22N R5E CITY OF RENTON SURVEY CONTROL NETWORK MONUMENT' & BENCHMARKS INDEX IFS - 16 T23N ME BE L4 \� ) t 0 3 � ~`1589 \\ ^ 2663 \\/ 2 65+ 70 1883 + 22 2 26 + 26yQQ fills Dr. t\ 2206+72 7 }� + �36d +it262,5 1 LEGEND CITY OF RENTON 1111 ® Horz«ntd & Vwrwd SURVEY CONTROL NETWORK 2222 MONUMENTS & BENCHMARKS 0 Hwizoi" ordy TECHNICAL SERVICES 3®3 • • PLANNING/BUiLDINO/PUBLIC WORKS OL1000 ♦"01-" Momment ---Renton City limih Gr*l 5 I 1:5 21 T23N R5E NE 1/4 SECTION 21 T23N R5E W.M. ' 28-Apr-00 Horizontal: NAD 1983/91 Meters Vertical: NAVD 1988 Meters ' 2677 Location: Set a 2" brass disc on a 4"x 4"concrete monument in case in the center of the Cedar River Trail approximately 350 west of the intersection of SR 169 ' and 131 st Avenue SE Monument: BRASS DISC W/PUNCH ON CONC MON, IN CASE, DN. 0.3' NORTHING: 53272.320 EASTING: 399638.943 ELEVATION: 24.817 ' 2678 Location: Set a 2" brass disc on the concrete deck over the fish ladder on the Cedar Rvier Trail 11 00'West of 2677 Monument: BRASS SURFACE DISC NORTHING: 53439.488 EASTING: 399342.748 ELEVATION: 22.888 ' G5-3 F6 - 15 T23N RSE SW 114 18 5t'--- 11 2663 1883 + 7 A267-4 2664 .01 z \oe c, < 69 Al 0 Qy cl:) j LEGEND CITY OF RENTON ® Horizontcl & Varfied SURVEY CONTROL NETWORK 2222 MONUMENTS & BENCHMARKS ® Ho&cod only 3333 TECHNICAL SERVICES 0 Vertical OrJy pLANNING/BuILDiNo/PUBLIC WORKS 02n4= Monument 0 450 9w Renton City Lbnbs GN 6 11111 MENEM 1:54W 22 T23N R5E NW 1/4 F6 15 T23N R5E SE 1/4 c7) (35511 U SE 1415 It 0 z ftfte.. Valley 2192 LEGEND_ CITY OF RENTON 1111 0 Horizorid & Vwficci ■ SURVEY CONTROL NETWORK 2222 ■ MONUMENTS & BENCHMARKS ® Kw=" 0* TECHNICAL SERVICES 3 333 PLANNING/BUILDUM/PUBLIC WORKS 6 vertical Only 02/14/W Monument 0 4W Raton CityLWft GO` 6 1:54M 22 T23N R5E NE 1/4 SECTION 22 T23N R5E W.M. 28-Apr-00 Horizontal: NAD 1983/91 Meters Vertical: NAVD 1988 Meters 1860 Location: Found a 1/2" brass plug on a 5" diameter concrete post monument down 0.6' in a monument case at the constructed intersection of SE 160th Place& ' 132nd Place SE. Monument: 1/2 IN BRASS PLUG ON CONC MON, IN CASE, DN. 0.6' NORTHING: 51912.600 EASTING: 399694.996 ELEVATION: 121.364 1885 Location: Set PK nail on as-built centerline of Union Avenue Northeast. 175 feet south of intersection of Northeast 2nd. Monument PK NAIL NORTHING: 54738.893 EASTING: 399706.928 ELEVATION: 2192 W 1/4 Comer 23 T23N R5E Location: Found a stone with"X"down 1.5'below the ground surface, approximately 9.5' westerly of a 6'chain link fence, approximately 70'southerly of the ' southeasterly comer of an old red bam and approximately 360' northerly of the constructed intersection of Maple Valley Way&Jones Road. Monument: STONE MON W/ [X], DN. 1.5' NORTHING: EASTING: ELEVATION: 29.931 G6-1 CONSTRUCTION PLANS 1 1 � Y CITY OF RE- N TON KING COUNTY �� °� WA HINGTON 1 N�o� 1 CMAPLE ALF COUMOE RL. GRAD 1 PROJECT 1 1 L__ 0 fig - - r WHATCOM � tJ�PEND I OKANOGAN OREILL FERRY y SKACiT STEVENSf \ — ' NO CLALLAM SNOHOMISH JEFFERSON TTLE CHELAN I \ PR E 1 SP ANE �2 CIT TON DoucLAs {uNcoLN i \ L ` GRAYS MASON GRANT KING SPOKANE -_~,__f"" H ~ { ARBOR \�- KITTITAS MAPLEWOOD OLYM A PIERCE ADAMS WHITMAN { \1 l Q TH RS70N � r PACIFIC LEWIS FRANKLIN -____' GOLF COURS / f WAHKIAKU ARFIEL M YAKIMA ^ � C WllTZ OIUMBIA y� `\ \ SKAMANIA BENTON WA WALLA ASOTIN' i LI _ ' LARK KLICKITAT VICINITY MAP LOCATION MAP NOT TO SCALE SCALE: 1'=1000' CHECKED FOR COMPLIANCE TO CITY STANDARDS Sy: Dats: Data By:_ Date: �G� Dab.C�t-1L- By: Datr. Data By: Date: CONSULTING ENGINEERS 701 DEX'T R AVENUE NORTH SUITE 20D SEATTLE,WA3HINGTON 98100 (206)284-0860 SYMBOL LEGEND ' ABBREVIATIONS EXISTING PROPOSED DESCRIPTION EXISTING PROPOSED DESCRIPTION AVE AVENUE AC ASBESTOS CEMENT PIPE �. _ FFII w ADJ ADJUST ASPHALT PAVEMENT MAIL BOX (NOTED) Z a INDEX ALT ALTERNATE GRAVEL SURFACING w z ' ALUM ALUMINUM _ g ANSI AMERICAN NATIONAL STANDARDS INSTITUTE � SIGN ASPH ASPHALT SHEET NO. DESCRIPTION z ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS CONCRETE SURFACING RIP RAP F, -j COVER VICINITY& LOCATION MAPS � z BF BLIND FLANGE � ASSY ASSEMBLY u BLDG BUILDING EMBANKMENT EMBANKMENT 1 ABBREVIATIONS, SYMBOL LEGEND AND INDEX z CONCRETE SIDEWALK BLK BLOCK 2 OVERALL SITE PLAN O 3 BO BLOW OFF 3 PLAN AND PROFILE - STATION 0+00 TO 4+00 I o CTR CENTER — — — — RIGHT-OF-WAY LINE CAP CORRUGATED ALUMINUM PIPE 4 PLAN AND PROFILE - STATION 4+00 TO 7+80 CB CATCH BASIN TREE (CONIFER) 5 CROSS SECTIONS CC CONCRETE - CENTERLINE OF RIGHT-OF-WAY CI CAST IRON g MISCELLANEOUS DETAILS CL ' — — —CENTER LINE CENTERLINE OF ROADWAY 0 TREE (DECIDUOUS) 7 MISCELLANEOUS DETAILS CLR CLEARANCE SHRUBS CMP CORRUGATED METAL PIPE ,--�-s CO CLEANOUT PROPERTY LINE CNC CONCRETE o 3 s ' C CONDUIT = — — — PERMANENT EASEMENT LINE `I' `I' WET LANDS . w ti � CONN CONNECTION �' `�' < Z W o CNTR CONTRACTOR TEMPORARY EASEMENT LINE GEN RA CONSTRU TIN NOTES• Y o CONT CONTINUOUS a. CPLG COUPLING ---10 --- —10 CONTOUR LINE 77-7�I' � BUILDINGS ACCESS LIMITATIONS ACCESS TO AND WITHIN WORK AREA IS LIMITED. NO AREA FOR CY CUBIC YARD TURN AROUND IS AVAILABLE WITHIN THE CN o o STRUCTION UMITS. a CNT CONTINUED .E BURIED ELECTRICAL o CL CLASS STAGING AREA CONTRACTOR SHALL COORDINATE WITH THE GOLF COURSE FOR IL CF CUBIC FEET T BURIED TELEPHONE CCCL�'xzC1 ROCK WALL ACCESS AND STAGING AREA. 0. CFS CUBIC FEET PER SECOND DC DEGREE OF CURVATURE CONSTRUCTION LIMIT CONSTRUCTION LIMITS AS SHOWN N THE PLANS SHALL BE MARKED H- DI DUCTILE IRON W WATER MAIN (SIZE AS NOTED) 'Sv ELEVATION POINT BY FILTER FENCE UNLESS DIRECTED OTHERWISE IN THE FIELD. o DIA DIAMETER DOT DEPARTMENT OF TRANSPORTATION G GAS MAIN DIM DIMENSION MONUMENT ELECTRONIC FILE THE CONTRACTOR LA S TOLBE USED PROVIDED WITH AN STAKING THE PROJECT.OF DWGS DRAWING(S) S---+- SANITARY SEWER D DRAIN ® BORING AND TEST D --D STORM DRAIN SIZE AS NOTED EOA EDGE OF ASPHALT ( PIT LOCATIONS zo E EAST p—� SANITARY SEWER FORCE MAIN L SECTION CORNER w EA EACH ((��' EL ELEVATION cr EL ELBOW .TV_ BURIED TV CABLE ELEC ELECTRICAL 1/4 CORNER EXIST EXISTING FIG FIGURE FIN FINISHED = POWER VAULT ANGLE POINT/ FL FLANGE CONTROL POINT ' FT FEET TELEPHONE VAULT z° F FORCE MAIN F BENCH MARK GA GAUGE + GALV GALVANIZED TO TELEPHONE MANHOLE DITCH Z GI GALVANIZED IRON GV GATE VALVE ' ID INSIDE DIAMETER Q MANHOLE D—� CULVERT (SIZE & IE INVERT ELEVATION TYPE AS NOTED) INV INVERT CLEANOUT IN INCH --x—x FENCE (TYPE AS NOTED) 1 0 o a L LENGTH LB POUND 0 TYPE 1 CATCH BASIN OR CURB INLET LF LINEAR FEET ,-x-- MAX MAXIMUM Qo TYPE 2 CATCH BASIN / FENCE (WITH GATE) !� MFR MANUFACTURER — — — MH MANHOLE �( MIN MINIMUM �}- POLE WITH GUY WIRE CLEARING LIMIT (CONSTRUCTION FENCE) L 4a, MJ MECHANICAL JOINT a° " Nr.� MISC MISCELLANEOUS FILTER FENCE ' N NORTH -0- POWER /TELEPHONE /GUY POLE - r NO NUMBER w o 0 NTS NOT TO SCALE >e.° OC N CENTER LUMINAIRE OD OUTSIDE DIAMETER �300 F PI POINT OF INTERSECTION YARD LIGHT PP POWER POLE PM POINT OF VERTICAL INTERSECTION PE PLAIN END ® JUNCTION BOX PERF PERFORATED SURVEY BENCHMARK TABLE w o PVC POLYVINYL CHLORIDE to PVMT PAVEMENT GATE VALVE == PVT POINT OF VERTICAL TANGENT Z a Z PC POINT OF CURVATURE BUTTERFLY VALVE POINT i NORTHING EA8TiN8 ELEV. DESCRIPTION O PT POINT OF TANGENCY _ u W CITY QUANTITY ® WATER METER HV-13 EXIST. KING CO. BRASS CAP IN PAINTED PREMARK IN S.W. CORNER OF x O() J RET RETAINING (KC 3961) 172428.46 1317746.29 106.42 INT'X OF SR-169 AND 152ND AVE. S.E. Lu 3 V-1) O RR RAILROAD FIRE HYDRANT SET PK NAIL IN PAINTED PREMARK IN N.W. CORNER OF OLD BRIDGE OVER R RADIUS HV-16 174018.15 1312407.86 90.60 CEDAR RIVER, 130' EAST OF IN-'X OF S. 149TH ST. AND 135TH AVE. S.E. Q J Q W RED REDUCER 0 REDUCER O IL >-o REINF REINFORCE Q CO 2 REOD REQUIRED LL W R/W RIGHT-OF-WAY 4 THRUST BLOCK G G SL SLOPE O:R O< SCH SCHEDULE CAP/PLUG z O Q ~ SF SQUARE FEET }o W > ' SHT SHEET SPECS SPECIFICATIONS Y BLOW-OFF z a'W m CHECKED FOR COAWLIANCE FOR A PPROYAL STQA STTA71ON C] STRAW BALE SQUARE TO CITY STANDARDS BY: Date. V Y < STD STANDARD Data By. Date. TC TOP OF CURB Date By. Date. ' - TEL TELEPHONE Date BI y� Data. THRD THREADED THRU THROUGH SHEET: 1 TYP TYPICAL VERT VERTICAL W WEST 0 1" 2" OF: 7 3 W/ WITH W/0 WITHOUT TWO INCHES AT FULL SCALE. JOB NO.: 01657 IF NOT, SCALE ACCORDINGLY DWG: LEGEND 40' 20' 0 40' 80' 1" = 40': c PARKING LOT M w uj WLIS CONTRACTO TO INSTALL �!` /' !`-"--- Li AND MAINTA TEMPORARY _y y ' CONSTRUCT] ENTRANCE \ o _ Z AT TRANSIT101�FROM j ���` O I, PAVED PARKINS AREA TO ` z STAGING AREA/. i'/ 'Oro �'a \'\ ai Z a p i N \ � FAIRWAY � G o a ' °"""" ORANGE CONSTRUCTION \ FENCING (TYPICAL) \ \ 6 SEE NOTE ON THIS PAGE. A \ E �'1_. �$_�. ' - / TEES —�► O ORANGE CONSTRUCTION FENCING (TYPICAL) ,�� SEE NOTE ON THIS ♦AGE• GREEN �� t `�,�i � J �/f I / 1 g a 3 If Li cr TO�0R189 V1* ,� A / A' �w � rw..CLUO HOUSE' /— e. ��°w Ems" i I i v R 0 a 0 It x a PARKING LOT''•, / sue°, / ", ; 1 ' 1 t �R k a a w a � 3 Y, / •-•-` __� °mna,rom / .--� -_ -�ao� ! ata.: _ tea , 1 � 1 ` \, � 1 1 8TAGING __ — _ AREA C� t/ n ■�' / / _//ice_ �_`�- _ `' ���;\■ ��' i { t ORANGE CONSTRUCTION B FILTER FABRIC D \�� w _ L ' _ —=___==--�! �/ FENCING (TYPICAL) FENCE (TYPICAL) _ °°=!� "��/ SEE NOTE ON THIS PAGE. CONTRACTOR SHALL PROTECT EXISTING CART PATH AND MAINTAIN A SAFE AND — FILTER FABRIC CLEAR PATH FOR PEDESTRIANS, GOLF CARTS, AND GOLF COURSE MAINTENANCE FENCE (TYPICAL) WATER SURFACE ELEVATION EQU PER 2000 AERIAL SURVEY IPMENT AT ALL TIMES. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING DAMAGE ALL AREAS NOT DESIGNATED FOR CONSTRUCTION. 4 ILI r- w zz SITE PLAN O ' SCALE: 1"=40` ~z O U a Z< U W HORIZONTAL AND VERTICAL CONTROL 3 _j NOTES as 6 1. CONTRACTOR SHALL INSTALL ORANGE CONSTRUCTION LL 093 PNT NORTHING EASTING ELEVATION ELEVATION FENCING BETWEEN THE FAIRWAY AND CONSTRUCTION AREA O AND MAINTAIN FENCING UNTIL CONSTRUCTION IS COMPLETE. 0Ir W NO DISTURBANCE IS ALLOWED BEYOND THE CONSTRUCTION D �0 > i OA 174309.6250 1312299.1020 80.16 SURVEY SET NAIL, WEST OF GREEN LIMITS IDENTIFIED ON THESE PLANS. IN EXISTING CART PATH W O ' UB J CC 174717.7180 1312906.8860 82.50 SURVEY SET NAIL IN EXISTING CART 2. CONTRACTOR SHALL INSTALL FILTER FABRIC FENCING IL BETWEEN THE CONSTRUCTION AREA AND RIVER AND z PATH APPROX. STA. 6+95, 8' FIT CHECKED FOR COMPLIANCE F V MAINTAIN UNTIL CONSTRUCTION IS COMPLETE. NO TO CITY STANDARDS _, OC 174257.1528 1312473.1909 STA. 0+00 DISTURBANCE IS ALLOWED BEYOND THE CONSTRUCTION By, Data, LIMITS IDENTIFIED ON THESE PLANS. Data By, Data, OD 174760.4010 1312983.0150 87.05 STA. 7+80 HORIZONTAL: NAD83 (1991 ADJ) Data By, Data, ' o VERTICAL NAVD88 3. ALL GRADING SHALL BE APPROVED BY THE CITY PRIOR TO Dala BY, Data, THE PLACEMENT OF TOPSOIL. MINOR ADJUSTMENTS TO w GRADING CAN BE EXPECTED. SHEET: 2 4. ALL FINISHED GRADES, INCLUDING TOPSOIL SHALL BE APPROVED BY THE CITY PRIOR TO PLACEMENT OF SOD. 0 1" 2" OF: 7 MINOR ADJUSTMENTS TO TOPSOIL CAN BE EXPECTED. ' F TWO INCHES AT FULL SCALE. JOB NO.: 01657 IF NOT, SCALE ACCORDINGLY DWG: SITEPLAN ORANGE 20' 10' 0 20' 40' NSTRUCiiON FENCING \ �--- H�Ap�KLFR� /� FENCING \� \ CONS COON LIMITS- To A R TO SP�KLFR INSTALL %?� 8 ORANGE I i-�� _ \) ^ 78 � O R - \��\ GRAN TRUCTION FENCING. CONSTRUCTION 'FENCING_ / q // \\ 1 1a" DIA. MAPLE \ \ w }qA A €F OAR KLER \\ rHE� \ Re1001 (� I R==50 1 PRINKLER ` \\• - --- �`. Y z se LLJ o- SPRINKLER O CONI7ROLER \ \ -' 8�1 _.� l \. �B/\ 0 CI? gp� CONTROL BOX L BOX I V '� '"?.,..�_ `v 5 p\ �\ Z \ SPR1A O/A. Z °` 6 I �0' CONSTRUCTION NOTES z- ` -' \\\ ' 1 13 \ ) O/A. O 6 3l R= $2�\ oSPRI .R,_ ` 25 VgCKCE'R g KLE ,0 MgPLf A'DL�� U ' HEgD \\ i ONTR r, I 85 i \ '1�+f O7 CONTRACTOR SHALL ADJUST EXISTING VALVE BOX,, SPRINKLER VALVE, ; 1/`�'�'�� 2 O 5 t� SPRINKLER HEAD TO FINISHED GRADE. SPRINKLE TEST AND LINE s 1 2 FLUSHING SHALL BE REQUIRED UPON COMPLETION OF CONSTRUCTION. ! 12^ r O� O CONTRACTOR SHALL REMOVE AND REPLANT EXISTING TREE AT THE ygpD/y 0,.D A DIRECTION OF GOLF COURSE MANAGER AT ALTERNATE LOCATION ON \ \ R-100 / -- .v- .,--fir - 1 I I LL i M'�F;LF• s/~ SHALL WO OD COLF COURSE OVED WITH A TREE ALL REESELARGER THAN 4• IN DIAMETER BE k \\ - \ 1 O3 CONTRACTOR SHALL SAWCUT EXISTING PAVEMENT, SEAL JOINT WITH _ 81 g AR4000W THEN APPLY SAND BLANKET TO THE SURFACE JOINT. o NTV 1- Y R'100 t kLf � ®CONTRACTOR SHALL REMOVE AND WASTEHAUL EXISTING PAVEMENT. cd •- w � 4p O5 CONTRACTOR To USE CAUTION WHEN WORKING AROUND EXISTING TREE. o --- \ J PLC I I C No FILLING OR EXCAVATION BEYOND THAT SHOWN IS ALLOWED. < w a - ¢ w 0 \ d? A < S a "-�d�81��� ,_ 5 1 �% ©CONTRACTOR TO INSTALL NEW CART PATH AS SHOWN. N > _ 6p., t ' >6 & ORANGE\ CONSTRUCTION pO R�100??0rA. \ / o IL `� - FENCING NwOpD `\ \\ ` ��• a �4 o k 6• CEDARS ORANGE `CQNSIRUCC��T10�1-MITS. __` 83 CONSTRUCTION 6" M v SUPPLEMENTAL NOTES: LIMIT OF 2001 FIELD +`� CONTRACTOR--V INSTALL ` \ FENCING pfpgRS FILTER FA C FLTICING_ V 1. CONTRACTOR SHALL USE PVC PIPE EXTENSION TO RAISE SURVEY AT EDGE OF \•. BRL -84 1`` \ AZ EXISTING 'RAINBIRD• SPRINKLER HEADS TO FINISHED GRADE. VEGETATION ` \ usLIMIT OF 2001 FIELD Q' THE TOP OF ALL ADJUSTED SPRINKLER HEADS SHALL BE� SURVEY AT EDGE OF FLUSH WITH THE FINISHED GROUND SURFACE. ww 8- - - -`\ ! _,___VEGETATION ---- _ - _- 2. CONTRACTOR SHALL EDRDINATE ADJUSTMENT BOXES EOF S &O,81--_ - � � SPRINKLER VALVES, HEADS, AND CONTROL BOXES WITH >fi ._ MAPLEWOOD GOLF COURSE. CONSTRUCTION LIMITS 3. CONTRACTOR SHALL SMOOTH ALL TRANSITION AREAS. SEE ' WATER SURFACE ELEVATION / CONTRACTOR TO INSTALL TYPICAL SECTION DETAIL ON SHEET 6. o PER 2000 AERIAL SURVEY FILTER FABRIC FENCING. Z 4. CONTRACTOR TO LAYOUT CART PATH BASD ON A BEST FIT USING THE CURVE RADII PROVIDED ON THE DRAWING. ............................. .. . .:.. ......:. . J ow r 0 ..:. ..... . .........:.........:.........:.........:.........:........... ... ....... ....... ....... 1 v. ,n ......... ......... ......... .........o...... :.........:.........:.........:.........:........:i::::.....:.........:.........:.........:.........:.........•......:�CART Pr4TH;FB.NSHED GRADE........;... 84 F .........:.........:.........:.........:.........:.........:.........:.........:.........:.........:........ :.............. ....:.........:....... ....... .........................................................................................................................:................. j W .. ..... .... 4 .... ........ :.. :.... .. .. ... :.... :.........:...................:............................. ........................... ... ....... .. :......... ..... .,.........;.........I.........:....... .. :.........:....... ....... .........;.........;...................:......... .........:...................: .......:1................ .. ...... ... .. N 82 :................... .:.............................:.................................................... f .... . .. ... ..:... .....:... ... ......................................................................... ......................................................... .................................. .................................................................................................................................:.............. .... .... .... ............ .. .. ......... O CART-PATH-EXIST1NCz GROUND..;........ ; .. .. .. ...... .... .. ... ..... ... ...... ....... ...........: '" .. .... ....... ...... ....... ....... .... .. ....... .. . x ..... . z . .... ..... .. o 0 .. ....:. .. .. . .. .. ..... ..... .. ....... ..... .. .. .. ....... ... 4 a y 6 e 0 w ti ........ .. ...........................................:. ... .. ............ ................... ........... .......... ................. ............ .1�. / //Y .. ....... ....... ...... ....... ..... ... .. . . _ ..... ...... ....... ....... ... ... .•'.. ....... ....." ..... ....... .....". ......: ....... ....... ....... 7 .. .. .... .. ...... ..... . ....... 8 :.... ' ....N :... :... :.........:.........:...... ... ":':'.. ...'.'... .:':':':'.': ..'..... .'.':':':':' ...:'.: W .... ..... .. .. .. .. ... .. .. ... .. ...... ....... .... .. .... ....... ....... ... . OC O .........:.........:.........:.........:.........:.........:.........:.........:.........:... .....:.........:.... .... .. ..... . .. .. W H L. O O Z ...................:.:. ,,..............................................,...................,...................:...................,............................................................................................................................................................................................................................................. < O w J 0 a .......:.........:...................:.........:................... .........:............................... ......:.........:......... U. .........:.........:.........:.........:.........:.........:.........:.........:.......... s:.......: :.......: :.......: :....... o o .........:.........:.........:.........:......... .........:.........:.........:.........:.........:.........:.........:.........:...................:...................:.... w .....................................................................:.........:.........:............................ ....... ....... ....... ....... :...................:................. .....:...................:.. .. ..::: .........:.........:.........:.........:.........:...................:...................:.........:.........:.......................... :.........:.........:..... :......................................................................................................:>Y► :........ .........:..... ...:......::::.......:::... .....I... O S ................ ........ ....... ....... ....... ....... ....... ....... ..... :.........:................... .........:.........:.........:.........:........... .. .. .... ...... .. .... ....... .. . o < .:. ......:::..... F W T2 :.............................:...................:...................;.................................................:...................;......... .............................;...................:.........:......... .............................:.........:.................... .jw W . H ................. .. .... r, .... ......... IL ..........:.......... .. .... ... ..... ......... ... :......................................:............................... ................................. .........:.........:.... Y .. ........m m........ .........:...�m... .........;........On n........ .........:...c0 tD...:......... ... ....�4D........ ......... ...0.�...:........ .......ut H.......:........: .:n P .:.. .:0. ^ .........� �7...:.........:.. O M........:.........;...� •...:.........:........ri�........:.........:...��...;.........;........ �........:.........:... ..... .. .. ....... ..... ....... ...... o] ..... .. .. O 17 .� •. ; ........ .........:.........:....Im...:.........:..:....:��::........ a0 : ..... :: III : :�. ..:�I ::::'.:.: :'1 Q:::.:::::::.::::::.::�I .:::::..:::.::.::.:..�I .:.:.:.: .::::.::::.:::.::::::........:.........:........1:.. 70 ........ ...... ......... .. ..... ...... ... ..... .. .... .... ....... ....... ......... ....... ....... ....... ....... .. ....... ....... ....... ....... ' o :.. ......:..... .:.. .:.. .;.........:...... ..;. .;.... .:?::. .. ..... .. ... .......'::....... .. :..:....: :.......: :.......: :. .. ..... ...... ..... .... .. .......Gi SHEET S +00 1+00 2+00 3+00 4+00 CHECKED FOR COMPLIANCE ` TO CITY STANDARDS By. Data. 0 1• 2• OF: 7 Date By._ Date. Date By. Ode. Dd� By, TWO INCHES AT FULL SCALE. JOB NO.: 01857 IF NOT,SCALE ACCORDINGLY DWG: PLAN1 20' 10' 0 20' 40' ORANGE 41� CONSTRUCTION LIMITS. 1 ` ` 1 , \ '..,, \ " `\ " A CONSTR oSS \ FENCING CONTRACTOR PMIDPU^ _— �+ SP DK1-•- 1 CONTRACTOR TO INSTALL y \ \ ys S P 82 �,yiEP� ORANGE CONSTRUCTION FENCING. 7 cp\ SpR1NK�� s •\\\\ \�92 93\ �\`\/\y p� Z�i 8 \ Z 9 / 4 C\P W yp` DI A. MAPLE ��. \ \ \ :�0' \ \ \� �� O J 2 / 5 - i J r}1R ®� \ 3. 01 " \� CONSTRUCTION NOTES �►U N F 84 81` ..- A Ak'♦g0� (DCONTRACTOR SHALL ADJUST EXISTING V VALVE, SPRINKLER HEAD TO FINISHED GRADE. SPRINKLER TEST A CJ LINE FLUSHING SHALL BE REQUIRED 2 p1A MA -__ _._;.g�._.--fig' _, - -T-}-� ,o FL W RED UPON COMPLETION OF CONSTRUCTION. 3 CONTRACTOR SHALL REMOVE AND REPLANT EXISTING TREE AT THE o - 83 83 3 B6 �0 DIRECTION OF GOLF COURSE MANAGER AT ALTERNATE LOCATION ON PIP LF' \ 4 SURVEY 0�i MAPLEWOOD GOLF COURSE ALL TREES LARGER THAN 4' IN DIAMETER S WI o Y d $2 MARKER P / SHALL BE REMOVED NTH A TREE SPADE. N s. 3 83 t ej� �_X X\ X X X X P X ./ �" _ O3 CONTRACTOR SHALL SAWCUT EXISTING PAVEMENT, SEAL JOINT NTH � �_ Ld � b a I)c—_ X - __g2 X -- — 8g AR4000W THEN APPLY SAND BLANKET TO THE SURFACE JOINT. < > y o 82 —_X X��X X' `CED—RS_ _ __87 64 O4 CONTRACTOR SHALL REMOVE AND WASTEHAUL EXISTING PAVEMENT. w a 81 X ��X T V _ - — CONTRACTOR SHALL REPLACE < 0 z 0. Z in CEDARS — — -` -- gp pC1571NCL4' ABS STORM — - J OS CONTRACTOR TO USE CAUTION WHEN WORKING AROUND EXISTING TREE. N 6" COAS?�UCTION LIMITS. DRAIN WITH NAP/4`CPEP NO FILLING OR EXCAVATION BEYOND THAT SHOWN IS ALLOWED. ` - — — CONTRACTOR TO INS _ -- 76 STORM DRAIN AND 8' PVC - — .� a --FItTER-F'ABRR; FEtVGNG. 7g SLEEVE TO OR12'JNAt LINE — / - �'-" ©CONTRACTOR TO INSTALL NEW CART PATH AS SHOWN. < SUPPLEMENTAL NOTES: 1. CONTRACTOR SHALL USE PVC PIPE EXTENSION TO RAISE LIMIT OF 2001 FIELD LIMIT OF 2001 FIELD SURVEY EXISTING'RAINBIRD' SPRINKLER HEADS TO FINISHED GRADE. Is /� SURVEY AT EDGE OF WATER SURFACE ELEVATION AT CONTOUR BREAK THE TOP OF ALL ADJUSTED SPRINKLER HEADS SHALL BE �- -�`r VEGETATION PER 2000 AERIAL SURVEY FLUSH WITH THE FINISHED GROUND SURFACE j6 J 2. CONTRACTOR SHALL COORDINATE ADJUSTMENT OF 7A SPRINKLER' VALVES, HEADS, AND CONTROL BOXES WITH w�� MAPLEWOOD GOLF COURSE. 3. CONTRACTOR SHALL SMOOTH ALL TRANSITION AREAS. SEE TYPICAL SECTION DETAIL ON SHEET 6. 4. CONTRACTOR TO LAYOUT CART PATH BASED ON A BEST FIT USING THE CURVE RADII PROVIDED ON THE DRAWING. - d z ..... ....... .. .... ....... .... ..... ...... ..... .. .. ....... ....... .... ..... ..: .... ... ...... ..... .. .... .. ..... . oN !.....................................................................:.......................................:.........:.........:.........:.........:...................:........ ....... .. ... ...... ... ......... P T . a .. .. .. .. .. .. .... ...... ... ... ...... .. ....... .. .. .... ..:.........:.. :....................................... .. . 4� ..........:.... ............:... _ o. . ...... .................. ............. .. . .... .........:.........:.........:.........:.............................:.........:.........:.............:..........:............ .......H. .. .....8b0.......:......... . ...... .. .. .... .. .. ... . g :.........:.........:.........:.........:...................:.........:... ...... .... ......... ....... .... ................... ...................................................... . J :.........:.........:.......................r......CAR.T......F.IN[9iEIl ORADE.:.........:.........:.........:.........:...................:... .....:......:..........: :....... 1P .........:.........:.........:................ ............:...................:.........:.........:...................:.........:.. ......:... ...............:...................:.........• :.............................:.........:.........:.........:...................:.........:.........:.........:.........:.........:.. ......:.........:.........:........ ..... ..... ......84 :.........:.........:........ •... .....:.... 4 ...........................................................:...................:........ ..:.:.:........:...:.:...:.:.:.:.:.:.:.......:.:.:.:.:.:.:...:...:.:.............:.....:........... .:::.................:.:.:.::.:.....:.........:.. .. .. ................. ..... .. .. ....... ...... ......... .........:.........:.........:.........:... .....:.........:.........:.........:.........:.........:........ . ..................:....................................:...................: ... . ..... ......:::::: o N o � O p p .. ...... .. .... ............. . .. CARTRATHEXISTINC•GROUND - ... x �.............. •.........:.........:.........:... ........:......... S2 :.................................................... pP o ..................:...................:.............................. ...................:...................:...................:....................................... .. .•......................................:.... 1 o :...........................................................:.........:.........:.........:.........:.........: ....-.........:.........:... .... :.........:.........:..... o ....:. ... ....... ....... ....... ... ... .. ....... ...... .... ... to ' ....................:.........:.........:........ :.........:.........:.........:....... .... .. .. .. ..... .... .. ... ....... .. .... .. .. .... .. ... ... ....... ....... .... .. .. ..... ....... 8 :.. ......:.........:.........:.... ............. .../ .......:........... :.. ` -- . o :...................:.........:.........: ....;.........;.........:.........:.........:.........:... .....;.........;........I..........;...... EXISTNVG 4':ABS:STORM:P.IPE: :..:....:i:.. ...... ... ... ................................ o :;..! ...::: .........:.........:.........:.........:......::::::: .....:........ ....... ......: :.. DEPTF{ RND 19CAT�ON ARE APFROXIMAiE .:...:.::::::::::: ....... ....... . ♦ ...:...................:...................:...... .. 80 :.........:.........:.............................:...................:................:::::::::::::::::::::::::::::::::i::::::...;.........:.........:........::......:..: ....... CONTRACTOR TO i PLA.. ....IN.4r.ABS:PIPE::...: ........ ..... ...................: . ..... ,... ,.... :.........:......................:........................ ........... '':pj':.AND..g...p .:.:.:.:.:.:.:.:...................i........I..................................:.:.:.:.:.:.:.�............... ....:...................:.............................................................................................:...................:...................:...................:... ••?F•••GPF3+•�STa1tM-OftAM} PE v, ..........:.................................................:.::::::::i:::::::::::::::::::::::....:: :::::::::::::......:.........:.........;...... ...... .. PROVIDED: BY: ........ ..... ....... ..... 5tJ1• xb .c...................:...................:.........:.........:..... .....:.........;.........:.................E .... SLEEw TO: .. .... ... .. . .... ....... ... . ........:.........:.........:....... ... ....... .... . ... .. ....... ....... ....... ....... .. .... ... ...... z c :::.......:...................:.........:...................:.........:.........:.........:.........:......... .........:.........:.........:........ .. .... ....... ...... ....... ....... ....... ....... ....... ....... ....... ....... ....... ....... H fi 78 :.............................:...........................................................:......................................:::..:....: :.......::::......:::.......: :.......: :.......: ........: :.......: :.......: :........ ......... ......... ......... ...................:...................:...................:...................:...................:...................:...................:...................:...................:...................:...................:...................:...................:.............. ... O 2 :...................:...................:..................:..... .. ......... z o :...................:.........:.........:.........:.........:......—,.........:.........;.........,.........:.........:..... ... .. .. ....... .........:.... ............:... ....... ...: ....:. ......... ......... .... .. ... .. ... ....... ..... .... . _ ...... ........:.........:...................:.........:... .....:.........:.........:.... . .. .... H 0 ............................ .. .. .... ....... ...... ..... . ...... ....... ......................................:.........:.........:.........:.........:.........:............... a :.........:...................:.........:.........:.........:.........:.........:.........:.........:. ............................:...................:.........:.........:................... W .........:.........:...................:.........:... .....:.........:............... .. .......:. . Ir IL 780 IL .. ... z .............................................:.........:.........:.........:... ..:.........:.........:.........:.........:.........:.........:....... .:. ..:.. . z :.........:.........:...................:.........:........... .... Q W IaL z 0 w .........:.........:...................:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:....:.:::s::::: < .........:.........:.........:.........:.........:.........:...................:.........:.........:.........:.........:.........:.........:.........:.........:.........:...................•. :.........:.........:.........:.........:.........:...................:.........:.........:.........:.........:.........:.........:.........:.........:.........:.........:........ p Ic zo :.........:.........:.........:.........:.........:.........:.........:.... W jo IL O O M —. :.........:.........I...................;....I..............:........ .:::::::::� ........:.........:.........;......... .........:.........;........: .......: ........................... U Y : . .....:........ :.........:.........:.........:.................. : : ......:.........:................. :.........: .. . : :.. : : :...::: :I ::: :::::: :: :: : : ::: ':: I . : :: 72 ....... ....... ... ...:.........:.........:.........: 4+00 6+00 8+00 7+00 7+80 ' o CHECKED FOR GOUNJANCE IMCQMWQ D FOR APPROVALSHEET: 4 TO CITY STANDARDS sy, Dot*. 2 Date Sys Data, 0 1. 2- OF: 7 Dote By. ' s Dato Sys D to TWO INCHES AT FULL SCALE. JOB NO.: 01857 IF NOT,SCALE ACCORDINGLY DWG: PLAN2 w SECTION A - STA. 1+00 SECTION D - STA. 3+50 SECTION G - STA. 6+00 W PROPOSED CART PATH PROPOSED CART PATH PROPOSED CART PATH Zo�8 ' QAW 88. eso i 88 88 �— — - 88 88 �aro rA (PM r us) 88 W S IEmma IV FM _ - CArr W 84 84 O - - -- -- -- +---- --- - F r J Z 84 " - - 84 84 I cAR m 84 LS ' - 80 - - -- 80 V b 4t 80 === -�- 80 -- - -- - --- 80 - 80 d 76 - ( - --- i 76 1 - - I ' 76 7g 76 76 i -60 -40 -20 0 20 40 60 -60 -40 -20 0 20 40 -60 ;40 -20 0 20 40 a d u vi ; 1 u s p �w a 0 ' SECTION B - STA. 1+50 SECTION E - STA. 4+50 SECTION H - STA. 6+50 88 PROPOSED CART PATH 88 vA M w 0 8a G PROPOSED CART PATH PROPOSED CART PATH 05 r ��T r n o i w ' I TM PAIN a ) ;- 88 - Y?An�Ou+.4 euq rArn 88 84 v" 84 r I I FM 4D am c 84 84 — --.—I r i PAl'HI 84 —�- j 64 so so _ J � 80 � 60 I i 80 — -- 80 76 76 76 76 -60 -40 =20 0 20 40 -60 -40 -20 0 20 40 -60 -40 -20 0 20 40 60 k x` � ,1^� pL a 1.11l..LY SON �a'f ALL TRANSITION AREAS SHALL BE °m ' SMOOTH. SEE TYPICAL SECTION W 9 a DETAIL ON SHEET 6 FOR w 0 v d 'h ' SECTION C - STA. 2+50 PROPOSED CART PATH i o — SECTION F — STA. 5+50 z z 0) 88 i 88 PROPOSED CART PATH Q PAWN .EL h I 88 = 66 Z O F PAm r 9L ) S 0W Qum p Sa 84 F� IL- - J C F pIMF 84 — 84 QIL am r ,w q ' o — PAlll O W A Won r 80 vAm 80 O C G aD 80 ' BO C ixOD: `f ter {{3{��a c 76 76 J Q 76 76 CNECKED FOR COMPLIANCE ED FOR APOROVAL i IL -60 -40 -20 0 20 40 TO CITY STANDARDS V x -60 -40 -20 0 20 40 60 By. out*. D 1: BTU Dot*. Dob Bye Date. ' o Date _ By: oft« SHEET-. S 0 1 �2' OF: 7 ' > TWO INCHES AT FULL SCALE. JOB NO.: 01657 IF NOT,SCALE ACCORDINGLY DWG: SECTION FINISHED GRADE OR SUBGRADE o w } TREE AS SPECIFIED BACKFILL MATERIAL a W PR Li CONSISTING OF STRUCTURAL Z a FILL FOR CART PATH z�v w z w WIRES AND RUBBER HOSE a AT 3 POINTS SPECIAL PRECAUTIONS TO W 0 PROTECT PIPE TO THIS LEVEL 4- N ,) QQ55 Z F (2) 2"x 2"x 8'-0" TYPICAL STAKES 1� ; 4" FLEXIBLE PIPE WITH 1 � U WATERING BASIN B' PVC SLEEVE926 d tlS P78 'c ' GRAVEL BACKFILL FOR BREAK SIDES OFAL PIPE BEDDING y PLANT PIT TO LOW a FOR BETTER ROOT io i - TOP SOIL AS SPECIFIED y O �' `3 ` PENETRATION I� S o y 1'-0" MINIMUM COMPACTED TOP / A a0 r+ � 3 .< SOIL UNDER ROOT BALL i � z O1 VARIES < z w a NOTES: FOUNDATION MATERIAL w AS REQUIRED w a 1. PLANT ALL TREES SUCH THAT FINAL SOIL LEVEL IS 2.5' o ONE INCH HIGHER THAN NURSERY SOIL LEVEL. ' 2. TAKE CARE TO AVOID ROOTS WITH STAKES o 3. PLANT PIT 3'-0" 0 OR 1'-0" LARGER (ON ALL SIDES) a THAN ROOT SPREAD, WHICHEVER IS GREATER. a TREE REPLACEMENT AND STAKING DETAIL TRENCH SECTION - FLEXIBLE PIPE NOT TO SCALE NOT TO SCALE S CART PATH (SEE DETAIL THIS SHEET) ' 6" COMPACTED TOPSOIL z6 TYPE "A". ALL FINISHED GRADES ARE TO TOP OF 10' VC- 10' VC TOPSOIL. MIN. 2 SLOPE 2 MIN. `% VARIES 5_% Soo Q s o _10' VC 10' VC MIN. MIN. 0` STRUCTURAL FILL 0-5' � 1 FOR CART PATH VARIES..,. � VARIES Q nIL 0, NOTES UNDISTURBED GROUND 1. THE CONTRACTOR SHALL GRADE ALL AREAS TO ELEVATION VARIES ' c CREATE SMOOTH TRANSITIONS BETWEEN DIFFERENT GRADES. VERTICAL CURVES HAVE BEEN NOTED ON THE DRAWING TO ILLUSTRATE THIS REQUIREMENT. ITIS OR COARY FOR THE VERTICAL CURVES CONTRACTOR DESIGN FOR PROJEC T.CT. TYPICAL SECTION THE CITY RESERVES THE RIGHT TO REQUEST MINOR REVISIONS TO THE GRADING IN ORDER TO NOT TO SCALE ACCOMPLISH A CONTINUOUS, ROLLING SURFACE SUITABLE FOR GOLF PLAY. 2. THE CONTRACTOR SHALL INSTALL NEW 4" CPEP _ STORM DRAIN PIPE AND 8" PVC SLEEVE TO ORIGINAL W LINE AND GRADE AT APPROXIMATELY STA. 7+20 AS Z z ' SHOWN ON SHEET 4. Q z O 8 ~ _ - 2" COMPACTED ASPHALT CONC. Z a V W H PAVEMENT(ACP) CLASS "B" W 3 W 0 p SLOPE 1 TO 2%FOR DRAINAGE J¢ W 6' COMPACTED DEPTH C9lL < ' - TOPSOIL TYPE "A" c C Z Aaa O O< c STRUCTURAL FRILLo CQ FOR CART PATH-- - 4" COMPACTED DEPTH CRUSHED z 3s' W Q SURFACING TOP COURSE }c� J 2 O CART PATH SECTION ~" a Z NOT TO SCALE ' CHECKED FOR COMPLIANCE RECOMMENDED FOR APPROVAL TO CITY STANDARDS By. Deta Oak% / SHEET: Date By. Dote. ' 3 Date By.= Date. 0 1" 2" OF: 7 Date By.— Date. TWO INCHES AT FULL SCALE. JOB NO.: 01657 IF NOT,SCALE ACCORDINGLY DWG: DETAILI ' FILTER FABRIC MATERIAL 60" WIDE ROLLS. a. USE STAPLES OR WIRE RINGS TO ATTACH w FABRIC TO WIRE. to 8 2" BY 2" 14 GA. WIRE w FABRIC OR EQUIV. a z 8 00 U ge }W W 2g NOTES: EXISTING GROUND 3 O 2'-0" i 1. FOR SHEET RUNOFF OR FOLLOWING DISCHARGE FROM A 11 SEDIMENT TRAP OR POND. rt2" o% N 5'-0" BURY BOTTOM OF FABRIC 2. MAXIMUM SLOPE STEEPNESS PERPENDICULAR TO FENCE o ' MATERIAL IN 8" BY 12" TRENCH LINE IS 1:1. v 2'-6. --tt------------it-- II 6' MAX--1 3. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO ll U THE FENCE OF 100 FT. ' 4. IF 50% OR LESS OF THE SOIL, BY WEIGHT, IS FINE PARTICLES EXISTING GROUND 1. Use 4" to 8" iuPrry spoils or crushed rock for surfacing as shown. SMALLER THAN THE U.S. STANDARD SIEVE NO. 200, THE EOS 100' MIN. Material with fines is not acceptable. SHOULD BE EQUAL TO OR SMALLER THAN THE SIEVE SIZE (MAY BE REDUCED TO 50' MIN 2. The 100' minimum length shall be lengthened as necessary to insure THAT 85X OF THE SOIL CAN PASS THROUGH. FOR SITES WITH LESS THAN 1 material is not tracked into the public right-of-way or golf course parking lot. o ACRE OF EXPOSED SOIL.) o o y FILTER FABRIC MATERIAL 5. THE TRENCH SHALL BE BACKFILLED WITH NATIVE SOILS. k ' 6" R=25'MIN D z 6. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE < W w 2" BY 2" BY 14 GA. WIRE o FABRIC OF EQUIV. SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE o ki `� o UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. a '' a 2'-0" 15, MIN. Z ' 7. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY o 5'-0" AFTER EACH RAINFALL AND AT LEAST DAILY DURING a PROVIDE NATIVE SOIL PROLONGED RAINFALL. ANY REPAIRS SHALL BE MADE a_ BACKFILL IN TRENCH AND 12" IMMEDIATELY. ON BOTH SIDES OF I o FILTER FENCE FABRIC ON 8" MIN. EXISTING DRIVEWAY THE SURFACE. RAMP OR SITE ACCESS ROAD 2" BY 4" WOOD POST ALT- STEEL FENCE POSTS. FILTER FABRIC FENCE DETAIL ELAN TEMPORARY CONSTRUCTION ENTRANCE � BRUSH BARRIER NOT To SCALE NTs NOT TO SCALE W ' NTS 6 z _a�3kr ' EROSION/SEDIMENTATION CONTROL NOTES +m" 4 - 1. CONTRACTOR SHALL SUBMIT TEMPORARY WATER POLLUTION/EROSION CONTROL PLAN PER THE 7jiy Y ' CONTRACT SPECIFICATIONS. GRATE EXISTING F - GROUND N 77- 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION SHALL BE OBSERVED DURING CONSTRUCTION. J' pLL a 0* IJ 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER » ,, ' THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, `�`•tc �'�0°j REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. FILTER SACK 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO o. BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND AS UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHOULD ANTICIPATE o THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WALL BE NECESSARY TO ENSURE NOTE: CONTRACTOR TO INSTALL FILTER SACK t- COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT n AND PERIODICALLY REMOVE AND CLEAN W 2 SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW FILTER SACK Z co W aWp CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER ° u Q 11E F ' AND ABOVE THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES CATCH BASIN FILTERS TO BE INSTALLED z a f- AND THE WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. IN PARKING LOT AREA BASINS. 00 a p Z 5. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMUL%TE WITHIN A W 3 CATCH BASIN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND DISPOSING OF THE d" 5 0 11'< SEDIMENT. ALL CATCH BASINS, CONVEYANCE LINES AND DITCHES SHALL BE CLEANEDIt COMPLETION OF CONSTRUCTION. Q AFTER CATCH BASIN FILTER ' IL C J NOT TO SCALE 2 6. THE CONTRACTOR SHALL REMOVE MATERIAL DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO V. 00 C f THE CITY RIGHT-OF-WAY OR PARKING LOTS. DEBRIS SHALL NOT BE WASHED INTO THE STORM Q DRAINAGE SYSTEM. 0 IC W J 7. TEMPORARY EROSION CONTROL FACIUTIES SHALL BE INSPECTED WEEKLY AND MAINTAINED WITHIN 24 z W ' HOURS FOLLOWING A STORM EVENT, SEDIMENT SHALL BE REMOVED TO INSURE THE FACILITIES VALE 8 W ITC �F FUNCTION PROPERLY. THE FACILITIES SHALL BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS H d ¢_ COMPLETED AND THE POTENTIAL FOR ON-SITE EROSION HAS PASSED. z t g O CHECKED FOR COMPLIANCE lIIDED FOR APPROVAL TO CITY STANDARDS V Y V 8. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT By. Dab. 912y� 111 STORMWATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED Data — BY. Dats. F ' o OR OTHERWISE TREATED TO REMOVE SEDIMENT. Date By. Data. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING PLACED FILL AND TOPSOIL MATERIAL FROM Data By. Data. RAINFALL. FAILURE TO DO THIS MAY RESULT IN REMOVAL AND REPLACEMENT OF SATURATED MATERIAL AT NO COST TO THE OWNER. ANY COST ASSOCIATED WITH DELAY IN WORK CAUSED BY SHEET. T SUCH REMOVAL AND REPLACEMENT SHALL BE AT NO COST TO THE OWNER. 0 i` 2" OF: TWO INCHES AT FULL SCALE. JOB NO.: 01657 IF NOT,SCALE ACCORDINGLY DWG: DETAIL2 CITY OF RENTON $ ,o U PLANNINGBUILDING/PUBLIC WORKS DEPT. Tax$ Z, PUBLIC WORKS SECTION Total $ 3U PLAN HOLDERS LIST Project Name: -l'�C�D�e�n/ood GOI� Coor-Se keg,--? ale Project Manager: y SLLj Telephone: X- 7 Z 0$' Bid Date: Bid Time: //-00 Bid Place: O' fi�ti/� Ipoo.ti 5'// Consultant: (�'rat� 4 05 6o,n e- Telephone: ,206- Z8If-0960 Engineer's Estimate: 5/ZS 000 Name: do, L- Mailing Address: Sz1l CI s N-1 Street Address: jYl� C.0 �,t.� L,,-J 1,0,, 1 City/State/Zip Code: 71 �'J Telephone No. (,2S3, -7 1 -f 7 C) Fax No. (` ��31 '75-P - 7G(,;✓ Date Received: Receipt#: Signature: 174. Name: bova ,� t3?1 L�yc; Mailing Address: ': Street Address: City/State/Zip Code: y A 9 9;--,. Telephone No. &VZT- 32 -ZzC�z Fax No. =(`� -L13s- Date Received: Receipt#: Signature: Name: Mailing Address: ( Street Address: AX&v4 1 , �k ay' w<,4 City/State/Zip Code: ,z_ S. I (J # ith r 9 Telephone No. 2U 6 -c 3? S / Sze Fax No. 3 Date Received: p Receipt#: Signature: Name: © . �C Mailing Address: Street Address: City/State/Zip Code: Telephone No. �- 039— (* 5 3 a Fax No. 2 s,3 :g3ot ] Date Received: �'� j ' - I Receipt#: Signature: PLNLIST.DOC/ CITY OF RENTON $ TE PLANNING/BUILDING/PUBLIC WORKS DEPT. Tax$ PUBLIC WORKS SECTION Total $ 3 L), , PLAN HOLDERS LIST Project Name: /11dd1ei4/ooa/ GOI� Coorse ���rd ale Project Manager: �It r y SC y���,� Telephone: X- 7205 Bid Date: s�� // Bid Time: //=00 Bid Place: Consultant: (�'rot� U� 60�n Telephone: ,206-Z 8 4{-0 960 Engineer's Estimate: /ZS 000 -f-o 4, �v S, Oo0 Name: G r 2-c , t4 0 CO-14 9 /cIJ Al Mailing Address: aJ Z S p� ✓� S Street Address: CCity/State/Zip Code: 5 E A71--I L rZ- ��,�A Telephone No. ZOO -76,2--91 Fax No. 7� Date Received: �)�y�p / Receipt#: T Signature: Name: jr * �,�► c �,e, Mailing Address: po Y, l Street Address: City/State/Zip Code: Telephone No. �j - J 3 j Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: ICity/State/Zip Code: Telephone No. - '7 ldc� / Fax No. - �✓ -d0� Date Received: '' c Receipt#: Signature: Name: �C' �� � �1 t,t;�✓(�� i Mailing Address: 0 Sueet Address: City/State/Zip Code: -�n U;` ( >� cl O�� Telephone No. 42S , '7 f 2-- 121 L Fax No. -Z j- -7 b L 1 / Date Received: j- y I Receipt#: Signature: PLNLIST.DOC/ CITY OF RENTON $ U v PLANNINGBUILDING/PUBLIC WORKS DEPT. Tax$ 2, 1/6 PUBLIC WORKS SECTION Total $ So," PLAN HOLDERS LIST Project Name: �CeD�e�n/ood 45-61rl roorS"e de Project Manager: G d e y 5C y „7 f- Telephone: X- 7 Z 0$' Bid Date: set // Bid Time: //=00 Bid Place: Consultant: (�rat�/ 4 05 60,-n e- Telephone: ,20(o-Ze q-0 860 Engineer's Estimate: S/ZS, 000 Name: Mailing Address: 1 V X C- Street Address: City/State/Zip Code: �;1'-�-�+ , Telephone No. Fax No. Date Received: j- Receipt#: Signature: Name: Mailing Address: Street Address: f City/State/Zip Code: 6fvD,jg Telephone No. !Kz S _ Z-7 7- 3 / 3 Fax No. yZs- 2-5`/g 9� Date Received: - - a/ Receipt#: Signature: Name: Mailing Address: _j1-7 1- 574 Street Address: l 1 l 1 City/State/Zip Code: y'{ �J Telephone No. 53 f 2 2—1G 73 Fax No. U A--Alo 741 Date Received. Receipt#: Signature: Name: -- ✓ Mailing Address: Street Address: 7oZO - FA5f- 6,'X1 �c �� y 'e5t5 ^ - �7i City/State/Zip Code: )e7E,-4y-, l�z Y,3 ! O Telephone No. s'3 - DSO- l 7 7 Fax No. 9s3 -95--o-17 2 7 Date Received: o o Receipt#: Signature: , PLNLIST.DOC/ CITY OF RENTON $ PLANNINGBUILDING/PUBLIC WORKS DEPT. Tax$ Zo PUBLIC WORKS SECTION Total $ 3L), PLAN HOLDERS LIST Project Name: /f11&d/ek41,Qod G61� COO kegld de Project Manager: GIx SLh ;y, ,- Telephone: X— 72 o 5- Bid Date: j�� // Bid Time: //=00 Bid Place: Gj f hW/. Q06'" Consultant: (gol f 4 05 60,-n C Telephone: ,706- Z8 q-0 960 Engineer's Estimate: 45/2-51- oo0 o Name: Mailing Address: Street Address: (V5, City/State/Zip Code: "✓� S �y, C1/y!� ���j r Telephone No. c �� ` Fax No. S' Date Received: Q Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: PLNLIST.DOC/ CITY OF RENTON $ PLANNINGBUILDING/PUBLIC WORKS DEPT. Tax$ 2 (� PUBLIC WORKS SECTION Total $ 8 U, /�J PLAN HOLDERS LIST Project Name: X2dlen/ood GQ oUrSe kc 9�d o% Project Manager: G cc�y ,SC/7 Telephone: X— 7 Z o Bid Date: Se-ip // Bid Time: //=00 Bid Place: Gi�, f //� /poo.ti vim// Consultant: (��a� os he -n e_ Telephone: _7o(0- Z8 q--0 860 Engineer's Estimate: 6/.ZS 0o0 Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: PLNLIST.DOC/ CITY OF RENTON $ ,00 PLANNINGBUILDING/PUBLIC WORKS DEPT. Tax$ 2, PUBLIC WORKS SECTION Total $ 30 PLAN HOLDERS LIST Project Name: /�Ctd�ev✓ooa� GOI� �oC��Se /CG�9�d aie Project Manager: �cc�y SLGj �,� Telephone: X 7Z 0 Bid Date: set // Bid Time: //=00 Bid Place: Gi i, QO6," 5-1/ Consultant: (�i ot� O�60�n Telephone: ,20(0- Z8 q-0960 Engineer's Estimate: /ZS 0o0 Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: PLNLIST.DOC/ CITY OF RENTON $ PLANNINGBUILDING/PUBLIC WORKS DEPT. Tax$ Z �� PUBLIC WORKS SECTION Total $ PLAN HOLDERS LIST Project Name: /f11d,,d/ei.✓ooa/ GQI� oUrs� �Qeg d de Project Manager: 5L h Telephone: X- 7 Z O 5- Bid Date: s�� // Bid Time: //=00 Bid Place: Gi f-, Alfi/, Roo.ti 511 Consultant: � 4 05 60,-n e- Telephone: Engineer's Estimate: 6/ZS 000 -7'-0 0 Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: Name: Mailing Address: Street Address: City/State/Zip Code: Telephone No. Fax No. Date Received: Receipt#: Signature: PLNLIST.DOC/ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1