HomeMy WebLinkAboutSWP272847(1) t 28-47
STORM DRAINAGE REPORT
FOR
LONG'S PLAT
UNION AV.NE.&"NE 28TH PLACE"
RENTON, WASHINGTON
STORM DRAINAGE REPORT
FILE NO. 773-001-001
PREPARED BY
TOUMA ENGINEERS
6632 SOUTH 191ST PLACE, SUITE E-10
KENT, WA. 98032
(425)251-0665
� o
0
February 2, 2000
3447
jONAL
�mamma 7112100_�
CrY OF REPITON
RECEIVED
FEB 0 0 7000
.,uo i vvio-aYsi ar�rd�tCla
2
TABLE OF CONTENTS
I. PROJECT OVERVIEW&FIGURES pp. 1-3..13
II. CORE& SPECIAL REQUIREMENTS pp. II-1..2
III. OFF-SITE ANALYSIS P. III-1
IV-a STORM WATER DETENTION DESIGN p. IVa-1..24
IV-b STORM WATER QUALITY DESIGN p.IVb-1..2
V. CONVEYANCE SYSTEM ANALYSIS p.V-1
VI. SPECIAL REPORTS and STUDIES P. VI-1
VII. BASIN and COMMUNITY PLANNING AREAS P. VI-I
VIII. OTHER PERMITS P. VI-1
IX. EROSION/SEDIMENTATION CONTROL DESIGN P. VI-I
X. BOND QUANTITIES WORKSHEET P. VI-I
XI. MAINTENANCE and OPERATIONS MANUAL P. VI-I
3
L PROJECT OVERVIEW
The subject property involved in this plat covers an area of approximately 3.81 acres. The property is
situated in the north end of the City. Bounded on the west by Union Avenue NE(132"d Avenue SE—King
County Street designation). It is bounded on north,east and south by fairly large single parcels. Access to
the property is made from Union Avenue NE via a cul-de-sac that would serve the proposed single lots.
The project area is hilly with slopes ranging from 12%to 28%, except for a small area with steep slopes
exceeding 40%. These areas exist along the northeast portion of the site.
The development is split into two small basins. There exist a knoll about the east third of the site which
directs surface water generated from the most easterly portion of the site to the east into another shallow
swale that eventually meets with the surface water generated from the westerly portion of the site
approximately 800 feet downstream of the site. The easterly basin covers the areas within the proposed Lots
10 through 14. The westerly basin covers the remaining lots. The easterly basin will be designed to control
flow release utilizing single family retention facility.
The soil type of the site is Alderwood AgD, glacial till. Existing groundcover consists mainly of forest.
The proposed plat will have 21lots with lot sizes ranging from 4500 square feet to overt 13,000 square feet.
The plat improvements will be designed to City of Renton Standards and requirements for streets, storm,
sewer,water and streetlights.
See the figures on following pages:
v 1 1 \ /
M
i O
f i ) X\�\
h
cr
a
* '+
l w t I
s�v�1L bCl
a f .• .
lvl
� � / �+a:,t�'�t � ��.k�n j ` �I�,�thvi''��^'�"� 1.)f� •i�-iS:O
_ e
r9
Lk
t v may,,,
Oro
�11 W
co
m f
C%j
cox
1
i ; I c
YA
I KING JQ0.
C-,J'
Is AV Itt'll,f is AV
H o
A Itlovi
fr
V INC V( 666
V! ON301
0-
'I Inn
c4 S Ay
HISCI
Is AV 3S
Ar HIRE t
IIIFAF I
IN AV
S
mal"lW389
m _'�0 iv Is W11131,3"
is AMA 3H3 IV S31WY�W
At f
I vi sf 7-(�
4. Is i I x - w, IN Iq &
It" AV iv v P ml
Ab "I,,1 7,11 "M 13"Of- 114M AV W"A
IN I
001,
I 3N t L)
3S ON 1 91 AV t; �,NOJNn
13011, AV
r SE
1 t N Y V(IJ 3s Ar � 8 AECtoN � y €
3s
l 1 -w dw Hiql7.1 St s AV HIRT
q Fill
mill AV'�7/ I - __ N31.-
"o
!L W
30
Ai J, AV 41 zi F:IV/
AV
30HNOH
iN AV 3OHNOW
w
IS _j
11 � x t; AV al) Nfl-
�ql�3 PIL SE
XT
51
IN A,
39
A ON Im"Im
. ...... 4�1" 11 'A VISE' 30 AV ml,t#jjjjp_ 3NINHIA
"'i" -, & �A, 1 13
AV i
X3a
t; AYJ 911118m
EF; No DNINN
1 5 AV
v,
is
e
34
0093 DO,
_UU99
SONOW031 arty
S A, -,Tg,wy P
A I I I
to
All
SVWV
WIF
via
jltA u
�d Hit,I I
A ilett
IN V WH V Y3
_ilup A*]
--Data
NI Nilnr Rroff
--a, * I_ IN 3"A-V 513 10H
S3* S3W
A t; -A HDIH
N
009c"I 7i
N -_t; t; yd J;; I
s N AV
AM
IJ
A
AV
DR
IS AV
is
RAPI
E AV ,A s
1;; , - �v
AV Omw ;I;I
--
IfUR
AV
IS is
9
�Af NIZIR
S, AV
F99
l
j R E E
S M 511 - l
AV
Is 8^llA
Is AV 0,; e
dVW wq 33,
ifff
AJ
' nl III t l! Ii (; II II II Lil-
� �: ' dnC 6 si : �'�• �...i••� BeD
Bec
a ' Bnl L, sm 22 :-:� .; 02 '•23 Be
1 t Nllla I
9 ��, .��� I 5�� .• •f.• AgC � I I /•
Ur-- - _��AmC 1 BeD
al" BeC
41�C it '�t! yj' f i I ' AgC I I
�• �i t j Bh .� „ , fa I AkF„ AgD A C BMA85
2 3z 'AgC' m r:. i BeC '
AgC z. Ag-
' lewpo
Pi rUr i
`�`� Hills - BeC I
AgC,
ti,:� :•' •1 `.w AmC - I �� , Ur i- -_- 8eD
/ It h I n O 68C Ur a 8 BeC
(l
KpDz,!' �� ; n G k f Q Newea �93
�Akq{ 3 I ,1 I
EvC BeD eC I
8 ArnCr." 1 i I ) •
AQC h T Bh f' .♦ AgC I
' AgC I, i I �-_ •�
AQB
KPO Y� •EvC
OvD �'0• to \ ------ ----8� -
y _ - I-- 78
-- --r° ------ -BMA ABM I ----- B
ASD • :z : • 690 692
A I�' 1• ' cn I, •AgC N� I .•� AgC
i, AQC BMA n I OvD
0 5 l 605 7 I
r• C'.• �j 1 Sm I Can�• �., BeC
e .�\
13
t 1 '''e,' yL AQD { 0�I ARD •,ii 34 I
rA D. -- F j n
Jj i
OvD
FF f ✓a'. AkF
f .M.� , . #.' I AkF ' AgC` Ev8 I : .M' BeG ' Ev 1 M ARC r
f,, ♦• ,�.s .� '•�• I GRAVEL '
Zvo
?<, Fly: wr
`AkF; •:+� 1 CJ� 306 IBM
!7r+ su ! Tlt s _ - 1 - c -- - - •k=- ?7= - ---- ---
.16
- 319. Ev8
EvC/II JL at a E�0 `AQC _ RdC
t, AkF _--
" l AmC
--- a- _ .• � AgC I,
f
•. ! ��. — -
11 '
Stn j.In i — •'1 C I �EvC'
<'✓9'A - t/. N- t AQD
-• '�r•��'+. }ql�" :,�. �r. � i 'i �-_- .AQCSm
-
t'
LW
T `° Amc• }, `ydG• .� �F1F Trailer ark•
�� r )'i •{• r�- Z, .,i .I I. Rnry in BII
• • TtJ
Evc ]I� ol.•JT
AgC .'� .
yoo I
:RdE _
Rdc 10,
1 cl AlTori 17 All,
\ I
KING C O 11 N 'F Y, WASH I N (; 'I' O N, S U It 1' A C 1 W A 'I' E R U E S I (► N MA N U A L
TABLE 3.5.211 SCS WES'FERN WASHING FON RUNOF CURVE;NUNIMRS
SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS (Published by SCS In 1982) I
Runoff curve numbers for selected agricultural, suburban and urban land use for Type 1A
rainfall distribution, 24-hour storm duration.
-----------�----------- -- CURVE NUMBERS BY
HYDROLOGIC SOIL GROUP I
LAND USE DESCRIPTION A B C D
Cultivated land(1): winter condition 86 91 94 95
Mountain open areas: low growing brush and grasslands 74 82 89 92
Meadow or pasture: 65 78 85 89
Wood or forest land: undisturbed 42 64 76 81 I
Wood or forest land: young second growth or brush 55 72 (:13-1) 86
Orchard: with cover crop 81 88 92 94
Open spaces, lawns, parks, Boll courses, cemeteries, —
landscaping.
good condition: grass cover on 75%
or more of the area 68 80 C8�6) 90 '
fair condition: grass cover on 50%
to 75% of the area 77 85 90 92
Gravel roads and parking lots 76 85 89 91
Dirt roads and parking lots 72 82 87 89 '
Impervious surfaces, pavement, roofs, etc. 98 98 13 98
Open water bodies: lakes, wetlands, ponds, etc. 100 100 100 100
Single Family Residential (2) '
Dwelling Unit/Gross Acre % Impervious (3)
1.0 DU/GA 15 Separate curve number '
1.5 DU/GA 20 shall be selected
2.0 DU/GA 25 for pervious and
2.5 DU/GA 30 Impervious portion
3.0 DU/GA 34 of the site or basin '
3.5 DU/GA 36
4.0 DU/GA 42
4.5 DU/GA 46
5.0 DU/GA 48 '
5.5 DU/GA 50
6.0 6UiG .__-- --- --- 52
6.5 DU/GA 54
7.0 DU/GA 56
Planned unit developments, % Impervious
condominiums, apartments, must be computed
commercial business and
Industrial areas.
(1) For a more detailed description of agricultural land use curve numbers refer to National Engineering
Handbook, Section 4, Hydrology, Chapter 9, August 1972.
(2) Assumes roof and driveway runoff is directed Into street/storm system.
(3) The remaining pervious areas (lawn) are considered to be In good condition for these curve numbers.
3.5.2-3 2/99
M
Sheet1
EAST SBU HYDROGRAPH METHOD: _
--------- - --
Existing Site Tc
SHEET Ts= 0.42*(L*ns)^0.8/(P2^0.5*S^0.4)
—_ _— L(ft) ns S P2 (in.) T min.) _
238 0.24 0.08 2.05 20.09
62 0.24 0.26 2.05 4.37
--
- — -- — T= L/(60*k*S^0.5)
L (ft) k S
_ CHAN_NEL __123 9 0.12 _ _0.66
TIME OF CONCENTRATION 25.13 25.1
Developed Site Tc
SHEET L (ft) ns S P2 (in.) T(min.)
146 0.15 0.02 2.05 16.57
CONCNT. L(ft) k S
158 42 0.02 0.44
162 42 0.15 0.17
_ 1 141 42 0.05 0.25
TIME OF CONCENTRATION 17.43 17.4
Page 1
Sheet 1
WEST SBU HYDROGRAPH METHOD:
Existing Site Tc
SHEET Ts=0.42`(L"ns)^0.8/(P2^0.5*S^0.4)
L (ft) ns S P2 (in.) T(min.)
48 0.24 0.25 2.05 3.61 _
66 0.24 _0.06 2.05 8.21
75 0.24 0.19 2.05 5.80
T= L/(60"k"S^0.5)
L ft) k S -
CHANNEL 93 17 0.16 0.23 _
- 64 17 0.02 0.49
18.33
TIME OF CONCENTRATION 18.3
Developed L(ft) ns S P2 (in.) T(min.)
SHEET 62 0.15 0.02 2.05 8.35
43 0.15 0.09 2.05 3.41
L (ft) k S
CONCNT. 109 42 0.15 0.11
29.5 42 0.05 0.05
0.11
104 42 0.13 _
_. 1. 11.93
TIME OF CONCENTRATION L 12
Pagel
-pi
\ •, j'/�' Jf J i' /� J 14i f ,l i' �:'!• ;• 1,t
J I ! f, t t!i J � ! .; J 1 ;,, tr ,�;• ,� ;,.�`iJ J l,• t i•
Vi• 11 f t !'•,,•t -,,.. - - - r; , ! J J r t/'�:
'•; t t J' � ft/' :`.. l.i!�,•t; t` r !: ,,: t/ ;' ,ir•r% i
�^ !•,,',� /t %11/t I t ..._-••.r ./�• rr• !' ✓ ti J%�-'�
ram•! } tt/,/ 1� 1 � /'.r� =�.r
t; j•I I it !� t• J _ .. _� - _
J ;
,y
:
i L?
i\
' ------ ___.__.._ _
\
'-
s —'
r:
%
i ^
( '`, '"'"'""=— —=-.'�->✓-•1J ,. ',t � `�S i i`ills--
, 4
a
t - --
yg s ,-•
•
lam
-� 4 a'► . ,-sic
I
•
t-
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
FIGURE 3.5.11D 5-YEAR 24-IIOUR ISOPLUVIALS
1.9
20
/ ~ µ 1 �,, :. �• � ".'3r:i' - � Ali
22 /`� �� /.. KlrklmW . 6u
2.
I
-
F, T.LE �. _ LL V '
F.
ry
' L
1
,
, 1
1
r 99 f
i
j
r
• F NO
x-
'4"
-
5-YEAR 24-HOUR PRECIPITATION
3.4 ISOPLUVIALS OF 5-YEAR 24-HOUR
TOTAL PRECIPITATION IN INCHES �r, _ ?V
O 1 2 3 4 5 6 7 6 Mlles �• ••
1: 300,000 3.5.1-9 9
r
�;� ' 1/9n
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
FIGURE 3.5.1E 10-YEAR 24-1HOUR ISOPLUVIALS
23
24
26
I
0
a
,
me =_
Nor
33
I �-- � • . .> l`:.'.•.��_ i o'er' �.��
I _ (� ,r �tr•
.:146
:
tr-
9
10-YEAR 24-HOUR PRECIPITATION ,
3.4-' ISOPLUVIALS OF 10-YEAR 24-HOUR
TOTAL PRECIPITATION IN INCHES 3Q
0 1 2 3 4 5 6 7 8 Mlles �(L.✓ A 1 =- �`
3.s.I I 40
•
FAIR
Mm ism
a.erCOME
ir MIA
qf
�.
r ,
4
IIa. CORE REQUIREMENTS
CORE REQUIREMENT#1: DISCHARGE AT NATURAL LOCATION
The allowable outflow from the site will be discharged to its natural location. The lowest elevation for the
easterly basin is approximately 373.00;and the lowest elevation for the westerly basin is approximately 366.
Refer to topography map prepared for the site.
CORE REQUIREMENTS#2: OFF-SITE ANALYSIS
Refer to off-site analysis on subsequent pages.
CORE REQUIREMENTS#3: RUNOFF CONTROL
Preliminary calculations are provided on subsequent pages addressing peak runoff. The sizing for peak rate
runoff control facility and its routing calculations are included.
Water quality control will be provided most likely in a form of wet-vaults.
CORE REQUIREMENTS#4: CONVEYANCE SYSTEM
The conveyance system will be designed using the rational method as presented in the King County 1990
SWM Manual.
CORE REQUIREMENTS#5: EROSION/SEDIMENTATION CONTROL PLAN
The Erosion/Sedimentation control facilities will consist of filter fabric fences to be placed along the
northeast and northwest boundary of the site. Wet vaults will be considered for water quality control for this
plat.
Core Requirement#6. -Maintenance and operation
Maintenance involves having on-site catch basins cleared from sediments when necessary.
Core Requirement#7. -Bonds and liability
i
5
11b SPECIAL REQUIREMENTS—THOSE APLLICABLE TO THIS PROJECT
1. Critical Drainage Area-The drainage basin is not part of any critical drainage area.
2. Compliance with existing Master Drainage Plan—N/A
3. Conditions Requiring Master Drainage Plan—N/A
4. Adopted Basin or Community Plans—N/A,However,the site is located in the May Creek Basin.
Refer to attached Figures.
5. Special Water Quality Controls-The proposal will create 0.58 acres of new road. The special
water quality controls will be in the form of wet-vaults. See section IV-a of this report.
6. Coalescing Plate Oil-Water Separators—N/A
7. Closed Depression—N/A
8. Use of Lakes,Wetlands, or Depressions for Detention—N/A
9. Delineation of 100-year Flood Plain—N/A
10. Flood Protection for Type 1 and 2 Steam—N/A
11. Geotechnical Analysis and Report—Geotechnical study is being prepared in conjunction with this
application.
12. Soil Analysis and Report—Geotechnical report has been prepared for this site and addresses the
soil classifications and stability.
13. A Wetland Mitigation Report—N/A.
6
III OFF-SITE ANALYSIS
1. UPSTREAM
The site is the situated within a small drainage basin. The entire basin area is calculated at approximately 5.7
acres. This includes off-site area of 1.9 acres and 3.8 acres of site area. The off-site runoff will be intercepted
by adequate conveyance system and will be by-pass the site drainage. The storm detention facilities will be
designed to account for off-site runoff to by-pass the site.
2. DOWNSTREAM
Surface runoff from the site and tributary area is directed to the northwest of the site. The westerly basin is
directed to open ditches along the easterly side of Union Avenue NE. That portion of the easterly basin in
directed to a swale which conveys the surface water to north and west. The runoff from the two basins join
again at approximately the intersection of 132"d Avenue SE(Union Avenue NE)and SE 95d'Way(Also
known as Boss Blvd). The runoff from this point directed toward the existing 18-inch culvert under SE 95 h
Way. Thence it discharged into a defined drainage swale north of SE 95"'Way and directs the flow into Coal
Creek approximately300 to 350 feet.
No downstream erosion has been noted.
7
IV-a. STORM WATER DETENTION DESIGN
DESIGN SUMMARY
We restricted the runoff peak flows to the existing 100, 10,&5 year peak flows and to '/2 of the existing 2-
year peak flow for respective storms in developed conditions. We used the SB-Unit Hydrograph method
with the KC Hyd program for 24 hour storms. The isopluvials are found in section I.
Due to limited space available for detention facilities,we found underground detention vaults the best
available option. The site is steep, and thus it was too costly to propose one big detention vault for it would
have 40 feet of cover over one end. Therefore we divided the site up into two sub basins that we refer to as
"West"and"East",named as located.
The designed detention depth is 5 feet in both cases. Listing inside dimensions: the West vault will measure
35 feet by 18 feet, and the East vault will be 88 feet by 25 feet. Furthermore,the East vault has been
"stepped"in two 44 feet long sections, each with a restrictor riser.
The East vault was first sized as one vault and increased 30%at the 5 ft. design depth. Then we reason that
the cumulative detention volume of two vaults should cause the same attenuation as that same detention
volume of one vault behind the same orifice restrictor. While this reasoning is not exact we found,by
routing the design storms,that the two 44 ft. sections in series have the same peak outflows as a single 88 ft.
vault,within 0.02 cfs. This is within the estimated margin of error. We did the routing calculation for the
first 44 ft. vault having a 5 ft. riser with a 1.52"bottom orifice;followed by the second 44 ft. vault having a
5 ft. riser with a 1.52"bottom orifice and a second 5.72"orifice at a stage of 3.9. The 2-orifice riser design
with the 88 ft. single-vault-design by"HYD"is the same. Refer to the plans for the controlling riser and
vault details.
Pages This Section:
DESIGN SUMMARY p.IV-1
AREAS,PEAK FLOWS&VAULT DIMENSIONS p.IV-2
BASIN MAP p.IV-3
HYD PRINT-OUTS: WEST VAULT DESIGN INPUT p.IV4
WEST VAULT DESIGN RESULTS p.IV-5
EAST VAULT DESIGN INPUT p.IV-6
EAST VAULT DESIGN RESULTS AS 1 VAULT p.IV-7
STAGE DISCHARGE FOR UPPER HALF OF EAST VAULT p.IV-8
ROUTE 100 YR STORM THROUGH UPPER HALF(="VALTI")OF EAST VAULT p.IV-9
ROUTE 100 YR"VALTI"OUTFLOW THROUGH LOWER HALF(="VALT2') p.IV-10
ROUTE 10 YR STORM THROUGH"VALTI" p.IV-11
ROUTE 10 YR"VALTI"OUTFLOW THROUGH"VALT2" p.IV-12
ROUTE 5 YR STORM THROUGH"VALTI" p.IV-13
ROUTE 5 YR"VALTI"OUTFLOW THROUGH"VALT2" p.IV-14
ROUTE 2 YR STORM THROUGH"VALTI" p.IV-15
ROUTE 2 YR"VALTI"OUTFLOW THROUGH"VALT2" p.IV-16
100 YR STORM,WEST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-17
100 YR STORM,EAST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-18
10 YR STORM,WEST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-19
10 YR STORM,EAST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-20
5 YR STORM,WEST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-21
5 YR STORM,EAST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-22
2 YR STORM,WEST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-23
2 YR STORM,EAST BASIN HYDROGRAPHS,EXISTING&DEVELOPED p.IV-24
Job#773001001 - LONG's Plat.
Return Period 2 yr 5 yr 10 yr 100 yr
24 HR Precip. (inch) 2.05 2.65 2.95 3.95
WEST SUB-BASIN EAST SUB-BASIN
Areas CN# Existing Developed Areas CN# lExisting Developed
acres acres acres acres
impervious 98 0.48 impervious 98 1.37
forest 81 1.09 forest 81 2.84
lawns 86 0.50 lawns 86 1.58
Totals 1.09 0.98 Totals 2.84 j 2.95
WEST SUB-BASIN EAST SUB-BASIN
Areas in Developed Conditions Areas in Developed Conditions
Impervious acres Impervious acres
on-site road 0.16 on-site road 0.40
roofs& driveways 0.23 roofs &driveways 0.97
off-site road 0.09 off-site road 0.00
Total Imp. 0.48 Total Imp. 1.37
Pervious Pervious
on-site lawns 0.47 on-site lawns 1.58
off-site lawns 0.03 off-site lawns 0.00
Total Perv. 0.50 Total Perv. 1.58
WEST SUB-BASIN: PEAK FLOWS, cfs INSIDE DIMENSIONS
INFLOW OUTFLOW WEST VAULT: 35 ft. length
EVENT EXIST. DEVPD. TARGET 130%VOL. 18 ft. width
2 YR 0.1 0.31 0.05 0.05 9 ft. depth
5YR 0.2 0.44 0.2 0.11
10 YR 0.26 0.51 0.26 0.14
100 YR 0.46 0.74 0.46 0.38
EAST SUB-BASIN: PEAK FLOWS, cfs EAST- "VALT1": 44 ft. length
INFLOW OUTFLOW 25 ft. width
EVENT EXIST. DEVPD. TARGET 130%VOL. 5.5 ft. depth
2 YR 0.23 0.84 0.12 0.12
5 YR 0.46 1.19 0.46 0.28 "VALT2": 44 ft. length
10 YR 0.59 1.38 0.59 0.37 25 ft. width
100 YR 1.07 2.01 1.07 0.87 9 ft. depth
S.93 acres total area I /�
17 LOTS x 2500 SF IMP./LOT
= 42500 SF IMPERVIOUS
= 0.97 ACRES
r 1 .09 acre Sub—basin
� I
Y � S
0.40 acres I
0.16 acres
Q i ;
4LOTS x 2500 SF IMP./LOT —
= 10000 SF IMPERVIOUS 2.84 acre Sub—basin
= 0.23 ACRES
I
I I I I I SITE BASIN MAP
5 ' 40 2 . 91 2604 . 6 . 0
5 .50 3 . 21 2652 . 8 . 0
AVERAGE VERTICAL PERMEABILITY: . 0 MINUTES/INCH
SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R - REVISE , S - STOP
R
SUMMARY OF INPUT ITEMS
1) TYPE OF FACILITY: VAULT
2) STORAGE DEPTH(ft) : 5 . 00
3 ) VERTICAL PERMEABILITY(min/in) : . 00
4) PRIMARY DESIGN HYDROGRAPH FILENAME : 773WXXDV.HYD
5 ) PRIMARY RELEASE RATE(cfs) : . 46
6) NUMBER OF TEST HYDROGRAPHS : 3
TEST HYD 1 FILENAME : 773W10DV.HYD TARGET RELEASE(cfs ) : . 26
TEST HYD 2 FILENAME : 7731W5DV.HYD TARGET RELEASE(cfs ) : . 20
TEST HYD 3 FILENAME : 7731W2DV.HYD TARGET RELEASE(cfs ) : . 05
7 ) NUMBER-OF-ORIFICES, RISER-HEAD(ft) , RISER-DIAM( in) : 2 , 5 . 00 , 12
8) ITERATION DISPLAY: NO
ENTER ITEM NUMBER TO BE REVISED (ENTER ZERO IF NO REVISIONS ARE REQUIRED) :
0
INITIAL STORAGE VALUE FOR ITERATION PURPOSES : 3609 CU-FT
BOTTOM ORIFICE : ENTER Q-MAX(cfs)
0 . 06
DIA. = . 99 INCHES
TOP ORIFICE : ENTER HEIGHT( ft)
3 . 7
DIA. = 3 . 60 INCHES
PERFORMANCE : INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE
DESIGN HYD : . 74 . 46 . 46 5 . 00 2409
TEST HYD 1 : . 51 . 26 . 25 4 . 02 1930
TEST HYD 2 : . 44 . 20 . 16 3 . 87 1860
TEST HYD 3 : . 31 . 05 . 05 3 . 70 1780
SPECIFY: D - DOCUMENT, R - REVISE , A - ADJUST ORIF, E - ENLARGE , S - STOP
E
ENLARGEMENT OPTION: ALLOWS FOR INCREASING STORAGE AT A SPECIFIED
STAGE HEIGHT, TO PROVIDE A FACTOR OF SAFETY.
ENTER: STORAGE-INCREASE() , STAGE-HEIGHT( ft )
30 , 5
PERFORMANCE : INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE
DESIGN HYD: . 74 . 46 . 38 4. 54 2845
TEST HYD 1 : . 51 . 26 . 14 3 . 84 2400
TEST HYD 2 - . 44 _ 20 _ 11 3 . 79 2370
TEST. HYD 3 : . 31 . 05 . 05 3 . 13 1960
SPECIFY: D - DOCUMENT, R - REVISE, A - ADJUST ORIF, E - ENLARGE, S - STOP
D
PERFORMANCE : INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE
DESIGN HYD : . 74 . 46 . 38 4 . 54 2845
TEST HYD 1 : . 51 . 26 . 14 3 . 84 2400
TEST HYD 2 : . 44 . 20 . 11 3 . 79 2370
TEST HYD 3 : . 31 . 05 . 05 3 . 13 1960
STRUCTURE DATA: R/D-VAULT
RISER-HEAD VAULT-BOTTOM-AREA STOR-DEPTH STORAGE-VOLUME
5 . 00 FT 627 . 0 SQ-FT 5 . 00 FT 3135 CU-FT
DOUBLE ORIFICE RESTRICTOR: DIA( INCHES) HT(FEET) Q-MAX(CFS)
BOTTOM ORIFICE : . 99 . 00 . 060
TOP ORIFICE : 3 . 60 3 . 70 . 400
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS ) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 02 313 . 5 . 0
1 . 00 . 03 627 . 0 . 0
1 . 50 . 03 940 . 5 . 0
2 . 00 . 04 1254. 1 . 0
2 . 50 . 04 1567 . 6 . 0
3 . 00 . 05 1881 . 1 . 0
3 . 50 . 05 2194 . 6 . 0
3 . 70 . 05 2320 . 0 . 0
4. 00 . 25 2508 . 1 . 0
4 . 50 . 37 2821 . 6 . 0
5 . 00 . 46 3135 . 2 . 0
5 . 10 . 78 3197 . 9 . 0
5 . 20 1 . 36 3260 . 6 . 0
5 . 30 2 . 11 3323 . 3 . 0
5 . 40 2 . 91 3386 . 0 . 0
5 . 50 3 . 21 3448 . 7 . 0
AVERAGE VERTICAL PERMEABILITY: . 0 MINUTES/INCH
SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R - REVISE , S - STOP
F
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF ROUTING DATA:
773WVALT.DAT
SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R - REVISE, S - STOP
S
KING COUNTY DEPARTMENT OF PUBLIC WORKS
Surface Water Management Division
SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R - REVISE , S - STOP
R
SUMMARY OF INPUT ITEMS
1) TYPE OF FACILITY: VAULT
2) STORAGE DEPTH(ft ) : 5 . 00
3 ) VERTICAL PERMEABILITY(min/in) : . 00
4) PRIMARY DESIGN HYDROGRAPH FILENAME : 773EXXDV.HYD
5 ) PRIMARY RELEASE RATE(cfs ) : 1 . 07
6) NUMBER OF TEST HYDROGRAPHS : 3
TEST HYD 1 FILENAME : 773E10DV.HYD TARGET RELEASE(cfs ) : . 59
TEST HYD 2 FILENAME : 7731E5DV.HYD TARGET RELEASE(cfs) : . 46
TEST HYD 3 FILENAME : 7731E2DV.HYD TARGET RELEASE(cfs ) : . 12
7 ) NUMBER-OF-ORIFICES, RISER-HEAD( ft) , RISER-DIAM( in) : 2 , 5 . 00, 12
8) ITERATION DISPLAY: NO
ENTER ITEM NUMBER TO BE REVISED (ENTER ZERO IF NO REVISIONS ARE REQUIRED) :
0
INITIAL STORAGE VALUE FOR ITERATION PURPOSES : 10806 CU-FT
BOTTOM ORIFICE : ENTER Q-MAX(cfs )
0 . 14
DIA. = 1 . 52 INCHES
TOP ORIFICE : ENTER HEIGHT( ft )
3 . 9
DIA. = 5 . 72 INCHES
PERFORMANCE : INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE
DESIGN HYD: 2 . 01 1. 07 1 . 07 5 . 00 8407
TEST HYD 1 : 1 . 38 . 59 . 49 4 . 10 6900
TEST HYD 2 : 1 . 19 . 46 . 34 3 . 98 6690
TEST HYD 3 : . 84 . 12 . 12 3 . 90 6560
SPECIFY: D - DOCUMENT, R - REVISE, A - ADJUST ORIF, E - ENLARGE, S - STOP
E
ENLARGEMENT OPTION: ALLOWS FOR INCREASING STORAGE AT A SPECIFIED
STAGE HEIGHT, TO PROVIDE A FACTOR OF SAFETY.
ENTER: STORAGE-INCREASE() , STAGE-HEIGHT(ft)
30 , 5
PERFORMANCE : INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE
DESIGN HYD: 2 . 01 1 . 07 . 83 4. 51 9871
TEST HYD 1 : 1 . 38 . 59 . 38 3 . 99 8730
TEST HYD 2 : 1 . 19 . 46 . 29 3 . 96 8660
TEST HYD 3 : . 84 . 12 . 11 3 . 33 7290
SPECIFY: D - DOCUMENT, R - REVISE, A - ADJUST ORIF, E - ENLARGE, S - STOP
D
PERFORMANCE : INFLOW TARGET-OUTFLOW ACTUAL-OUTFLOW PK-STAGE STORAGE
DESIGN HYD : 2 . 01 1 . 07 . 83 4 . 51 9871
TEST HYD 1 : 1 . 38 . 59 . 38 3 . 99 8730
TEST HYD 2 : 1 . 19 . 46 . 29 3 . 96 8660
TEST HYD 3 : . 84 . 12 . 11 3 . 33 7290
STRUCTURE DATA: R/D-VAULT
RISER-HEAD VAULT-BOTTOM-AREA STOR-DEPTH STORAGE-VOLUME
5 . 00 FT 2187 . 8 SQ-FT 5 . 00 FT 10939 CU-FT
DOUBLE ORIFICE RESTRICTOR: DIA( INCHES) HT(FEET) Q-MAX(CFS)
BOTTOM ORIFICE : 1 . 52 . 00 . 140
TOP ORIFICE : 5 . 72 3 . 90 . 930
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 1093 . 9 . 0
1 . 00 . 06 2187 . 8 . 0
1 . 50 . 08 3281 . 7 . 0
2 . 00 . 09 4375 . 6 . 0
2 . 50 . 10 5469 . 5 . 0
3 . 00 . 11 6563 . 4 .0
3 . 50 . 12 7657 . 3 . 0
3 . 90 . 12 8532 . 4 . 0
4 . 00 .41 8751 . 2 . 0
4 . 50 . 82 9845 . 1 .0
5 . 00 1 . 07 10939 . 0 . 0
5 . 10 1 . 42 11157 . 8 . 0
5 . 20 2 . 02 11376 . 6 . 0
5 . 30 2 . 79 11595 . 4 . 0
5 . 40 3 . 62 11814 . 1 . 0
5 . 50 3 . 94 12032 . 9 . 0
AVERAGE VERTICAL PERMEABILITY: . 0 MINUTES/INCH
SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R - REVISE, S - STOP
F
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF ROUTING DATA:
773EVALT.DAT
SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R - REVISE, S - STOP
S
Sheet1
EAST VAULT- UPPER HALF = "VALT1" : STAGE-DISCHARGE TABLE
ORIFICE 1.52 INCH TOTAL RISER WEIR 6.283185 =L, P= 5
C H Q CFS H h C Q
0.62 0 0 0.00
A 0.5 0.044 0.04 5.1 0.1 3.278 0.649
0.012601 1 0.063 0.061 5.2 0.2 3.286 1.835
-+---
1.5 0.077 0.081 ORIFICE 12INCH
2 0.089 0.09 i C H h Q
2.5 0.099 0.10 0.62 5 0 0.000
3 0.109 0.11 A 5.1 0.1 1.236
3.5 0.117 0.12 0.785398 5.2 0.2 1.748
3.9 0.124 0.12 5.3 0.3 2.140
4 0.125 0.13 5.4 0.4 2.471
4.5 j 0.133 0.13 5.5 0.5 2.763
5 0.140 0.14
5.1 0.142 0.79
5.2 0.143 1.89
5.3 0.144 2.28
5.4 0.146 i 2.62
5.5 0.1471 2.91
Page 1
773VALT1 .DAT
DISPLAY ROUTING DATA (Y or N)?
Y'
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 547 . 0 . 0
1 . 00 . 06 1093 . 9 . 0
1 . 50 . 08 1640 . 9 . 0
2 . 00 . 09 2187 . 8 . 0
2 . 50 . 10 2734. 8 . 0
3 . 00 . 11 3281 . 7 . 0
3 . 50 . 12 3828 . 7 . 0
3 . 90 . 12 4266. 2 . 0
4. 00 . 13 4375 . 6 . 0
4. 50 . 13 4922 . 6 . 0
5 . 00 . 14 5469 . 5 . 0
5 . 10 . 79 5578. 9 . 0
5 . 20 1 . 89 5688 . 3 . 0
5 . 30 2 . 28 5797 . 7 . 0
5 . 40 2 . 62 5907 . 1 . 0
5 . 50 2 . 91 6016. 5 . 0
AVERAGE PERM-RATE: . 0 MINUTES/INCH
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
773EXXDV.HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
2 . 01 1 . 91 32670
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 7 . 83 5 . 21
PEAK STORAGE : 5690 CU-FT
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773XX01 .HYD
FILE ALREADY EXIST; OVERWRITE (Y or N) ?
Y
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
C
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
773VALT2 .DAT
DISPLAY ROUTING DATA (Y or N)?
Y
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 547 . 0 . 0
1 . 00 . 06 1093 . 9 . 0
1 . 50 . 08 1640 . 9 . 0
2 . 00 . 09 2187 . 8 . 0
2 . 50 . 10 2734 . 8 . 0
3 :'00 . 11 3281 . 7 . 0
3 . 50 . 12 3828 . 7 , 0
3 . 90 . 12 4266 . 2 . 0
4 . 00 . 41 4375 . 6 , 0
4 . 50 . 82 4922 . 6 , 0
5 . 00 1 . 07 5469 . 5 . 0
5 . 10 1 . 42 5578. 9 , 0
5 . 20 2 . 02 5688 . 3 . 0
5 . 30 2 . 79 5797 . 7 . 0
5 . 40 3 . 62 5907 . 1 , 0
5 . 50 3 . 94 6016 . 5 . 0
AVERAGE PERM-RATE : . 0 MINUTES/INCH
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
773XX01 .HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
1 . 91 . 87 32593
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 8. 67 4 . 61
PEAK STORAGE : 5030 CU-FT
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773EXX02 .HYD
FILE ALREADY EXIST; OVERWRITE (Y or N) ?
N
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773XX02 .HYD
FILE ALREADY EXIST; OVERWRITE (Y or N) ?
Y
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
N
RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE
SPECIFY [d: ] [path]filename[ . ext] OF ROUTING DATA
773VALTI .DAT
DISPLAY ROUTING DATA (Y or N)?
N
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
773ElODV.HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
1 . 38 . 88 22627
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 8. 33 5 . 11
PEAK STORAGE : 5580 CU-FT
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
77310O1 .HYD
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
N
RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE
SPECIFY [d: ] [path]filename[ .ext] OF ROUTING DATA
773VALT2 .DAT
DISPLAY ROUTING DATA (Y or N)?
Y
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 547 . 0 . 0
1 . 00 . 06 1093 . 9 . 0
1 . 50 . 08 1640 . 9 . 0
2 . 00 . 09 2187 . 8 . 0
2 . 50 . 10 2734. 8 . 0
3 . 00 . 11 3281 . 7 . 0
3 . 50 . 12 3828 . 7 . 0
3 . 90 . 12 4266 . 2 . 0
4 . 00 . 41 4375 . 6 . 0
4 . 50 . 82 4922 . 6 . 0
5 . 00 1 . 07 5469 . 5 . 0
5 . 10 1 . 42 5578. 9 . 0
5 . 20 2 . 02 5688. 3 . 0
5 . 30 2 . 79 5797 . 7 . 0
5 . 40 3 . 62 5907 . 1 _ 0
5 . 50 3 . 94 6016 . 5 . 0
AVERAGE PERM-RATE : . 0 MINUTES/INCH
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
7731001 .HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
. 88 . 37 22571
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 10 . 67 3 . 99
PEAK STORAGE : 4360 CU-FT
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731002 .HYD
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
N
L
R`ESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE
SPECIFY [d: ] [path]filename[ . ext] OF ROUTING DATA
773VALTI .DAT
DISPLAY ROUTING DATA (Y or N)?
Y
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 547 . 0 . 0
1 . 00 . 06 1093 . 9 . 0
1 . 50 . 08 1640 . 9 . 0
2 . 00 . 09 2187 . 8 . 0
2 . 50 . 10 2734. 8 . 0
3 . 00 . 11 3281 . 7 . 0
3 . 50 . 12 3828. 7 . 0
3 . 90 . 12 4266 . 2 , 0
4 . 00 . 13 4375 . 6 , 0
4. 50 . 13 4922 . 6 , 0
5 . 00 . 14 5469 . 5 . 0
5 . 10 . 79 5578 . 9 . 0
5 . 20 1 . 89 5688 . 3 . 0
5 . 30 2 . 28 5797 . 7 . 0
5 . 40 2 . 62 5907 . 1 , 0
5 . 50 2 . 91 6016. 5 . 0
AVERAGE PERM-RATE: . 0 MINUTES/INCH
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
773EB5DV.HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
1 . 19 . 62 19771
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 8 . 67 5 . 07
PEAK STORAGE : 5550 CU-FT
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7735O1 .HYD
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
C
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
^C
4
RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE
SPECIFY [d: ] [path]filename[ . ext] OF ROUTING DATA
773VALT2.DAT
DISPLAY ROUTING DATA (Y or N)?
Y
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 547 . 0 . 0
1. 00 . 06 1093 . 9 . 0
1 . 50 . 08 1640 . 9 . 0
2 . 00 . 09 2187 . 8 . 0
2 . 50 . 10 2734 . 8 . 0
3 . 00 . 11 3281 . 7 . 0
3 . 50 . 12 3828. 7 . 0
3 . 90 . 12 4266 . 2 . 0
4 . 00 . 41 4375 . 6 . 0
4 . 50 . 82 4922 . 6 . 0
5 . 00 1 . 07 5469 . 5 . 0
5 . 10 1 . 42 5578. 9 . 0
5 . 20 2 . 02 5688 . 3 . 0
5 . 30 2 . 79 5797 . 7 . 0
5 . 40 3 . 62 5907 . 1 . 0
5 . 50 3 . 94 6016 . 5 . 0
AVERAGE PERM-RATE : . 0 MINUTES/INCH
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
7735O1 .HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
. 62 . 28 19727
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 12 . 67 3 . 96
PEAK STORAGE : 4320 CU-FT
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7735O2 .HYD
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
N 4.
RtSERVOIR ROUTING INFLOW/OUTFLOW ROUTINE
SPECIFY [d: ] [Path]filename[ . ext] OF ROUTING DATA
773VALTI .DAT
DISPLAY ROUTING DATA (Y or N)?
Y
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 547 . 0 . 0
1 . 00 . 06 1093 . 9 .0
1 . 50 . 08 1640 . 9 . 0
2 . 00 . 09 2187 . 8 . 0
2 . 50 . 10 2734. 8 . 0
3 . 00 . 11 3281 . 7 . 0
3 . 50 . 12 3828 . 7 . 0
3 . 90 . 12 4266 . 2 . 0
4 . 00 . 13 4375 . 6 . 0
4 . 50 . 13 4922 . 6 . 0
5 . 00 . 14 5469 . 5 . 0
5 . 10 . 79 5578 . 9 . 0
5 . 20 1 . 89 5688. 3 .0
5 . 30 2 . 28 5797 . 7 . 0
5 .40 2 . 62 5907 . 1 . 0
5 . 50 2 . 91 6016 . 5 . 0
AVERAGE PERM-RATE : . 0 MINUTES/INCH
ENTER [d: ] [Path]filename[ . ext] OF COMPUTED HYDROGRAPH:
773EE2DV.HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
• 84 . 18 14076
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 13 . 50 5 . 01
PEAK STORAGE : 5470 CU-FT
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773201 .HYD
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
N , k
RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE
SPECIFY [d: ] [path]filename[ . ext] OF ROUTING DATA
773VALT2 .DAT
DISPLAY ROUTING DATA (Y or N)?
Y
ROUTING DATA:
STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT)
. 00 . 00 . 0 . 0
. 50 . 04 547 . 0 . 0
1 . 00 . 06 1093 . 9 . 0
1 . 50 . 08 1640 . 9 . 0
2 . 00 . 09 2187 . 8 . 0
2 . 50 . 10 2734 . 8 . 0
3 . 00 . 11 3281 . 7 . 0
3 . 50 . 12 3828 . 7 . 0
3 . 90 . 12 4266. 2 . 0
4. 00 . 41 4375 . 6 . 0
4. 50 . 82 4922 . 6 . 0
5 . 00 1 . 07 5469 . 5 . 0
5 . 10 1 . 42 5578. 9 . 0
5 . 20 2 . 02 5688 . 3 . 0
5 . 30 2 . 79 5797 . 7 . 0
5 . 40 3 . 62 5907 . 1 . 0
5 . 50 3 . 94 6016 . 5 . 0
AVERAGE PERM-RATE : . 0 MINUTES/INCH
ENTER [d: ] [path]filename[ . ext] OF COMPUTED HYDROGRAPH:
7732O1 .HYD
INFLOW/OUTFLOW ANALYSIS :
PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT)
. 18 . 12 14070
INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT)
. 00 27 . 67 3 . 30
N
STORM OPTIONS :
1 '- S.C . S. TYPE-1A
2 - 7-DAY DESIGN STORM
3 - STORM DATA FILE
SPECIFY STORM OPTION:
1
S .C . S. TYPE-lA RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES)
100 , 24,3 . 95
----------------------------------------------------------------------
******************** S .C. S. TYPE-1A DISTRIBUTION ********************
********* 100-YEAR 24-HOUR STORM **** 3 . 95" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1
1 . 09 ,81 , 0 ,98, 18. 3
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 1 1 . 1 81 . 0 . 0 98 . 0 18. 3
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 46 7 . 83 8196
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773WXXEX.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 2
0 , 50 ,86, 0 . 48,98, 12
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 0 . 5 86 . 0 . 5 98 . 0 12 . 0
PEAK-Q(CFS) T-PEAK(HRS ) VOL(CU-FT)
. 74 7 . 83 11001
ENTER [d: ] [Path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773WXXDV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
S,C. S. TYPE-1A RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES)
100 , 24, 3 . 95
----------------------------------------------------------------------
******************** S.C . S . TYPE-1A DISTRIBUTION ********************
********* 100-YEAR 24-HOUR STORM **** 3 . 95" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1
2 . 84,81 , 0 , 98 , 25 . 1
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
2 . 8 2 . 8 81 . 0 . 0 98 . 0 25 . 1
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
1 . 07 7 . 83 21336
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773EXXEX.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 2
1 . 58,86, 1 . 37 ,98, 17 . 4
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES )
A CN A CN
3 . 0 1 . 6 86. 0 1 . 4 98 . 0 17 . 4
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
2 . 01 7 . 83 32735
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773EXXDV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
N
STORM OPTIONS :
1 - S .C . S. TYPE-1A
2 - 7-DAY DESIGN STORM
3 - STORM DATA FILE
SPECIFY STORM OPTION:
1
S .C . S . TYPE-lA RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES)
10 , 24, 2 . 95
----------------------------------------------------------------------
******************** S .C. S. TYPE-IA DISTRIBUTION ********************
********* 10-YEAR 24-HOUR STORM **** 2 . 95" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1
1. 09 ,81 ,0 , 98 , 18 . 3
DATA PRINT-OUT :
AREA(ACRES ) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 1 1 . 1 81 . 0 . 0 98. 0 18. 3
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 26 7 . 83 5033
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773W10EX.HYD
SPECIFY: C - CONTINUE , N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 2
0 . 50 ,86, 0 . 48,98 , 12
DATA PRINT-OUT:
AREA(ACRES ) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 0 . 5 86. 0 . 5 98 . 0 12 . 0
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 51 7 . 83 7668
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773W10DV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 3
2 .84,81 . ,0,98, 25 . 1
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
2 . 8 2 . 8 81 . 0 . 0 98 . 0 25 . 1
PEAK-Q(CFS ) T-PEAK(HRS) VOL(CU-FT)
. 59 7 . 83 13076
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773E10EX.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 4
1. 58, 86, 1 . 37 ,88, 17 . 4
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
3 . 0 1 . 6 86 . 0 1 . 4 98 . 0 17 . 4
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
1 . 38 7 . 83 22747
ENTER [d: ] [path]filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773E10DV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
NP. 8,�,81 ,0,98 , 25 . 1
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
2 . 8 2 . 8 81. 0 . 0 98. 0 25 . 1
PEAK-Q(CFS ) T-PEAK(HRS) VOL(CU-FT)
. 46 7 . 83 10792
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731E5EX.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 4
1 . 58,86, 1337 ,98 , 17 . 4
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
3 . 0 1 . 6 86 . 0 1 . 4 98. 0 17 . 4
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
1 . 19 7 . 83 19820
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731E5DV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
N r
STQRM OPTIONS :
1 - S.C . S . TYPE-lA
2 - 7-DAY DESIGN STORM
3 - STORM DATA FILE
SPECIFY STORM OPTION:
1
S .C . S . TYPE-1A RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES)
5 , 24, 2 . 65
----------------------------------------------------------------------
******************** S .C . S. TYPE-1A DISTRIBUTION ********************
********* 5-YEAR 24-HOUR STORM **** 2 . 65" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1
1 . 09 ,81 , 0 ,98 , 18 . 3
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 1 1 . 1 81 . 0 . 0 98 . 0 18. 3
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 20 7 . 83 4147
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731W5EX.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 2
0 . 50 ,86, 0 . 48,98, 12
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 0 . 5 86. 0 . 5 98.0 12 . 0
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
.44 7 . 83 6690
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731W5EX.HYD
FILE ALREADY EXIST; OVERWRITE (Y or N) ?
H >
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 3
2 . 84, 81, 0 ,98, 25 . 1
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
2 . 8 2 . 8 81 . 0 . 0 98 . 0 25 . 1
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 23 7 . 83 6534
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731E2EX.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 4
1 . 58, 86, 1337 ,98 , 17 . 4
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
3 . 0 1 . 6 86. 0 1. 4 98. 0 17 . 4
PEAK-Q(CFS ) T-PEAK(HRS) VOL(CU-FT)
. 84 7 . 83 14117
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731E2DV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
S .C . S . TYPE-1A RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES)
2 ,24 , 2 . 05
----------------------------------------------------------------------
******************** S .C. S . TYPE-lA DISTRIBUTION ********************
********* 2-YEAR 24-HOUR STORM **** 2 . 05" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1
1 . 09 ,81 , 0 ,98, 18 . 3
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 1 1. 1 81 . 0 . 0 98 . 0 18 . 3
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 10 7 . 83 2511
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731W2EX.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 2
0 . 50 , 86 , 0 . 48 ,98, 12
DATA PRINT-OUT:
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 0 . 5 86 . 0 . 5 98 . 0 12 . 0
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 31 7 . 83 4782
ENTER [d: ] [Path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7731W2DV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
8
IV-b. WETVAULT DESIGN
MINIMUM VOLUMES AND SURFACE AREAS PER 1995 KCSWDM;
WEST SUB BASIN :
1 YEAR STORM=957 cf, AND 1%OF 0.48ac.=209 sf.
Thus CELL1 =21 sf., 84 cf
CELL2=CELL3 =94 sf.,437 cf.
EAST SUB BASIN :
1 YEAR STORM=2763 cf, AND 1%OF 1.37 ac.=597 sf.
Thus CELL1 =60 sf.,240 cf.
CELL2=CELL3 =269 sf., 1262 cf.
WETVAULT DESIGN BASED ON DETENTION VAULT DIMENSIONS;
WEST SUB BASIN : Width= 18 ft. Length=35 ft. SO A=630 sf. OK.
CELL 1 =63 sf. = 18' x 4'
CELL2=CELL3 = 18' x 15'
VOLUME= 18' x 34' x 3' = 1836 cf. OK.
EAST SUB BASIN : Width= 18 ft. Length=35 ft. SO A=630 sf. OK.
CELL 1 =63 sf. = 18' x 4'
CELL2=CELL3 = 18' x 15'
VOLUME= 18' x 34' x 3'= 1836 cf. OK.
See 1-Year Storm Hydrograph data for East and West on next page.
PF,A{ STORAGE : 3610 CU-FT
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
7732O2 .HYD
SPECIFY: C - CONTINUE, N - NEWJOB, P - PRINT, S - STOP, R - REVISE
1
S .C . S . TYPE-lA RAINFALL DISTRIBUTION
ENTER: FREQ(YEAR) , DURATION(HOUR) , PRECIP( INCHES)
1 , 24 ,0 . 68
----------------------------------------------------------------------
******************** S.C . S . TYPE-1A DISTRIBUTION ********************
********* 1-YEAR 24-HOUR STORM **** . 68" TOTAL PRECIP. *********
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 1
0 . 50 ,86,0 . 48,98, 12
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
1 . 0 . 5 86 . 0 . 5 98 . 0 12 . 0
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 06 7 . 83 957
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773W1DV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
C
----------------------------------------------------------------------
ENTER: A(PERV) , CN(PERV) , A( IMPERV) , CN( IMPERV) , TC FOR BASIN NO. 2
1 . 58,86, 1. 37 , 98, 17 .4
DATA PRINT-OUT :
AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES)
A CN A CN
3 . 0 1. 6 86 . 0 1 .4 98 . 0 17 . 4
PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT)
. 15 7 . 83 2763
ENTER [d: ] [path]filename[ . ext] FOR STORAGE OF COMPUTED HYDROGRAPH:
773E1DV.HYD
SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP
fl 10
fi
J
9
V. CONVEYANCE SYSTEM ANALYSIS
Applying the manning equation to full flow in pipes,table below shows the minimum slopes for a 12"
diameter CPEP, smooth wall pipe to convey at least the 100 yr. developed peak flow of 2.01 cfs. All of
the 12"CPEP have a greater slope, sothat they convey over 2.01 cfs.
DRAIN PIPE CAPACITY I Q = 1.49/n *A*RA(2/3) *S^(1/2)
FULL FLOW, SO THAT R=A/P = D/4
-------- - -
Showing minimum slopes for 12"pipes _
n S D (ft) R_ V(fps) A(sf) Q (cfs)
0.012 0.003 _ 1 0.25 2.70 0.79 2.12 smooth wall CPEP _
0.024 0.012 1 0.25 2.70 0.79 2.12 single wall
Showing minimum slopes for 6"roof drain pipes _
0.01 0.02 0.50 0.13 5.27 0.20 1.03 PVC
0.01 0.01 0.50 0.13 3.73 0.20 0.73 PVC _
0.01 0.005 0.50 0.13 2.63 0.20 0.52 PVC
0.011 0.00251 0.50 0.13 1.86 0.201 0.371 PVC
s
10
Vl. SPECIAL REPORTS and STUDIES:
"Geotechnical Engineering Study",MAY 27 1999,by TERRA ASSOCIATES, INC.
VII. BASIN and COMMUNITY PLANNING AREAS
V1II. OTHER PERMITS
IX. EROSION/SEDIMENTATION CONTROL
See Section II,core requirement 5.
X. BOND QUANTITIES WORKSHEET
XI. MAINTENANCE and OPERATIONS MANUAL