' South 180th Street Grade Separation
Final Technical Information Report
' Submitted to
City of Tukwila
Public Works Department
Tukwila, Washington
Submitted by
BERGER/ABAM
' E N G I N E E R S I N C.
rJob No. A00084 March 2001
1
FINAL TECHNICAL INFORMATION REPORT
South 180th Street Grade Separation
Submitted to
City of Tukwila
Public Works Department
Tukwila, Washington
March 2001
Submitted by
BERGEIUABAM Engineers Inc.
33301 Ninth Avenue South, Suite 300
Federal Way,Washington 98003-2600
Job No.A00084
FINAL TECHNICAL INFORMATION REPORT
SOUTH 180TH STREET GRADE SEPARATION
TABLE OF CONTENTS
SECTION PAGE
1.0 Project Overview ............................................................................................................ 1
2.0 Preliminary Conditions Summary and Off-Site Analysis ..................................... 6
3.0 Flow Control and Water Quality Facility Analysis and Design ........................... 10
4.0 Conveyance System Analysis and Design ................................................................. 15
5.0 Special Reports and Studies ........................................................................................ 20
6.0 Basin and Community Plan Areas .............................................................................. 21
7.0 Other Permits .................................................................................................................. 22
8.0 Erosion/Sedimentation Control Design ..................................................................... 23
9.0 Bond Quantities Worksheet, Retention/Detention Facility Summary Sheet,
andDeclaration of Covenant ....................................................................................... 24
10. Maintenance and Operations Manual ....................................................................... 25
Final Technical Information Report A00084
South 180th Street Grade Separation ii April 1999
1.0 PROJECT OVERVIEW
South 180th Street, an east-west principal arterial located in the Tukwila, Renton, and Kent areas of
the Green River Valley,will be reconstructed to provide a grade separation between vehicular traffic
and railroad tracks. The proposed roadway with four lanes, Class III bicycle route, curb and gutter,
and sidewalks will pass under the existing railroad tracks and Interurban Trail. The project location
and project limits are shown on the vicinity map in Figure 1.
A system of catch basins and closed lines is proposed to collect and convey runoff. The runoff
collected from the depressed roadway will be pumped to a new stormwater facility.
The project will add approximately 0.377 acres (16,422 square feet)of new impervious surface to the
site. Following is the summary of the surface areas of the project.
Existing Proposed Net (increase)
Impervious area(sidewalk+wall) 0.122 acres 0.458 acres 0.336 acres
Impervious area(roadway) 1.294 acres 1.335 acres 0.041 acres
Total impervious area 1.416 acres 1.793 acres 0.377 acres
Pervious area 0.502 acres 0.125 acres
Total project area 1.918 acres 1.918 acres
Water quality and water quantity controls are required for this project.
q Y q Y q P J
Final Technical Information Report A00084
South 180th Street Grade Separation 1 March 2001
\ W pY
K� RppY
J INTERURBAN ` J 405
AVE S P
�f �\ SW 16TH ST
Lrl
j s
`r'` 167
w .
a 21ST
o
ST
w j
z o + u
a �
+
' N SW 27TH ST
STRANDER
BLVD PROJECT }
LIMITS > CD
CD
_J D
41 O
\ ; ; 1
w Ao
' >� f w a >
a
' SW 34TH ST
t � w
w TUI(WILLA o
' ; a
O
Y
a f
a � I
I81
SW 41ST ST
w
s i RENTON
' 180TH — _ RD SE
ST
SE 43RD ST GpR�
5
+{ (S 180TH ST)
82n S �p
vAl
a j V
N
' z }
ti + j > a
1 a CY
t
� x F-
1 t H
o m
� � a
me
1 �
� 1
p ;U )
KENT , 1
I
source: Vicinity Map
BERGER/ARAM Engineers,Inc. 1999 Figure 1
South 180th Street Grade Separation
King County Department of Development and Environmental Services
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND Part 2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION,
Project Owner Project Name
City of Tukwilla Dept. of Public Works_ South 1801h Street Grade Separation
Address Location
_6300 Southcenter Blvd, Suite 100 Township 23N
Tukwilla, WA 98118 Range 4E
Phone 206 433-0179 Section 36
Project Engineer
Chris Walcott
Company
BERGER/ABAM Engineers Inc.
Address/Phone 206 431-2300
Part 3 TYPE OF PERMIT Part 4 OTHER REVIEWS AND PERMITS
APPLICATION
Subdivison DFW HPA V Shoreline Management
Short Subdivision ✓COE 404 Rockery
y/ Grading DOE Dam Safety Structural Vaults
Commercial FEMA Floodplain Other
Other JARPA COE Wetlands
Part 5 SITE COMMUNITY AND DRAINAGE BASIN
Community
N/A
Drainage Basin
Springbrook Creek
Part 6 SITE CHARACTERISTICS
River Floodplain_FEMA (see Fig. 2)_
Stream Springbrook Creek, and Mill Creek_ Wetlands See Wetlands Study
Critical Stream Reach Seeps/Springs
Depressions/Swales High Groundwater Table
Lake Groundwater Recharge
Steep Slopes Other
Final Technical Information Report A00084
South 180th Street Grade Separation 3 March 2001
Part 7 SOILS
Soil Type Slopes Erosion Potential Erosive Velcoties
P
Woodinville Silt Loan_ 0—3%_ moderate_
Puyallup Fine Sandy Loam 0—3%_ moderate
Urban Land 0—3% moderate
Additional Sheets Attached
Part 8 DEVELOPMENT LIMITATIONS
REFERENCE LIMITATION/SITE CONSTRAINT
Ch. 4— Downstream Analysis
r
Additional Sheets Attached
Part 9 ESC REQUIREMENTS
MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION AFTER CONSTRUCTION
Sedimentation Facilities ✓ Stabilize Exposed Surface
Stabilized Construction Entrance (/ Remove and Restore Temporary ESC Facilities
I/ Perimeter Runoff Control Clean and Remove All Silt and Debris
►/ Clearing and Grading Restrictions Ensure Operation of Permanent Facilities
Cover Practices Flag Limits of SAO and open space
1/ Construction Sequence
preservation areas
Other Other
L
Final Technical Information Report A00084
South 180th Street Grade Separation 4 March 2001
Part 10 SURFACE WATER SYSTEM
Grass Lined Tank Infiltration Method of Analysis
Channel Vault Depression SBUH, RATIONAL
I/ Pipe System Compensation/
Energy Dissapator Flow Dispersal Mitigation of
Open Channel Wetland Waiver Eliminated Site
Dry Pond Storage
Stream Regional
✓ Wet Pond Detention
' convey Brief Description of System Operation Catch basins and closed lines collect and v runoff
to pump station Runoff is lifted to pond for WQ and flow control
Facility Related Site Limitations
Reference Facility Limitation
Part 11 STRUCTURAL ANALYSIS Part 12 EASEMENTS/TRACTS
Cast in Place Vault Drainage Easement
✓ Retaining Wall /Access Easement
Rockery>4' High Native Growth Protection Easement
Structural on Steep Slope Tract
Other Other
Part 13 SIGNATURE OF PROFESSIONAL ENGINEER
I or a civil engineer under my supervision have visited the site. Actual site conditions as observed
were incorporated into this worksheet and the attachments. To the best of my knowledge the
information provided here is accurate.
Signed/Date
r
i�
Final Technical Information Report A00084
South 180th Street Grade Separation 5 March 2001
2.0 PRELIMINARY CONDITIONS SUMMARY AND OFF-SITE ANALYSIS
The existing drainage system consists of two separate closed pipe systems, one on either side of the
tracks. On the west side,the runoff collected along South 180th Street is conveyed to the system on
72nd Avenue South. East of the tracks, all runoff is collected and eventually discharged to
Springbrook Creek via a 36-inch outlet. There are no water quality or water quantity controls for
the roadway runoff.
The portion of the project adjacent to Springbrook Creek is in a FEMA floodplain. See Figure 2,
FEMA Floodplain.
The entire project lies within a watershed defined by the City of Kent as Springbrook,Mill, and
Garrison Creek Watershed. See Figure 3 for the watershed boundary. Springbrook Creek crosses
South 108th Street via a 12-foot by 19-foot elliptical metal culvert located about 500 feet east of the
tracks. The subbasins and drainage systems are described in more details in the following sections.
Schematics of existing and proposed subbasins boundary are shown on Figure 4.
Subbasin West
72nd Avenue South (Station 11+20) to Railroad Tracks (Station 16+10)
Runoff from the roadway and few adjacent properties is collected along South 180th Street and
conveyed to a 12-inch trunk line on 72nd Avenue South. This system flows south to South 182nd
Street,then east under the railroad, and finally discharges to Mill Creek,a tributary to Springbrook
Creek.
Subbasin East
Railroad Tracks (Station 16+10) to End of Project(Station 22+40)
Roadway runoff from this section is collected by a system of catch basins and conveyed to a deep
system of 36-inch RCP located on the north side of the road. The 36-inch RCP system also drains the
off-site areas adjacent to South 180th Street. Flow from the 36-inch RCP system discharges to
Springbrook Creek at a location about 30 feet north of South 180th Street.
Final Technical Information Report A00084
South 180th Street Grade Separation 6 March 2001
i >
soulHv, s�
,cr
ssTH sTReT
Z
— NM337 }I
BOUIf.VARD i
C
South Center ZONE AE
Pimp Station
i
CITY OF TUKVUILA } I ,�'�— w ca
0
530091 CITY OF RENTON
530088
+ � m
r z
ZONE X ZONE AE 1
=Q( f L
0
CID
o ALAt
cc
*— r BRIDGE
---
-
DRIVE -------------__ �._. _� 1 � / 0
Q i
SOUTHb"BEST 41ST STREET
��wu
S
7B S _
'A O
K ZONE X
U) W
Z R00K z
Y i Q
7-
Bike TrailI bpi
i Q
,Bridge
u �r Grp 2
P� Sw 27 aaRD CITY OF TUKWILA STREET 'RM339 Sautr+~ ._ 180TH CITY OF RENTON J
P� 9y a CITY OF KENT _ ` �«— RM347 CITY OF KENT STREET
U
S 181ST S 181ST N
STREET STREET ZONE AE �rti z
uj
roatxidge
70 ZONE AE
z
N� Kent Bike TfH,? � ?� "y 36 �
STREET 31
SOUTH 182ND �Q
CA a
a CITY OF KENT
—ZONE X 530080 ZONE AHD o°
(EL 17) J
a 40 1 s FLOODING EFFECTS FROM
eu w ZONE X ZONE AE SPRINGBROOK CREEK
ZONE X
c�z= 14fi11 Creek } r,� Y ' ZONE AE
ZONE AE
o ZONE AE-- s: ry
- !! EL 23 470z .t
JOINS PANEL 0986 Q200"07"
O Q
OW
fn U-
74i•nro•.AU�y %h'�\, l� eV'��' ' 1• .j .,�"� i,. a \ a'P� 1 � iia :�: Pry i•\J?.�IL'.:�i�.. a•1:... �.. .:-r_1_ _.-1'
14
13y7
, - ,�( 'i'3`(r�''j`�.' �`r qr �_• "g'�-.. -; .;18.:.• ,:._ :i .r. ; .,
'N�� :�� ,!� :,�, l:.a '`i.' '� , •� K'se Iy[ ■i l` LI— C:b�.Y Y r•- .,,•I
,'cw ' :;� �.T"°+v �_•:�- s k _ I •Vy. .I
qt f � -:-tr_L``1 •���I •I � sa• ��/17 .GIs •. .L � �\, � ji' 1.
;, y to ' d� i_ I• ,•.i \O n lr /
"" ,� •,. •( I 61ety P•.k 0 .i �_ .,:� ti T-7h-•?I r r - ..�`4 � .� ` ,k �-
_ i + '
-Wo*�"`' �• :•.•, ,: _ a e c
• / .. _:t
K , •\ '�..(p/ C 4 1�•w _.' '' •fr• 'r•, ,!. ; , �iearon �-F r Ott\�.�• -.. ,..G
i - � .,ii\ It�.r•. r �1 �Q �_ .. � � ...•w.r��LJ:. /s .. � r'�/,y i\�� � �`.,
`Rul
7Mnyy. a 23 .,L �� \w23 � J � .22
• `4 ✓
! m
41
C'•� _• �ui�• . �1 k_._! a - r •J ft�j,,kY / MrJ 'I #s i'•.. - - F"k
ly
tsy1 1 20 1.. • `'M, <�::k rs - �1 t • 1 : • ti �\ I \�
i s.w�lo !� iyl 30 _ a a i 7
t•�r ,•. �� od, ,, 3
Su�..\ '� .S ,t.• _.L � :". ��+ y, � �� �.� (Is. Project f - 6C" �? j ' ,� I, k A7YtI•�.�.:�ii`il�l, '
• �"
Area
*A I�.I a i '. a • 1 P••i'' .
x.
i'' so. 180tn st.'i . , , : j �: • 1
! / > •ra c3•si'p.+ �w d li'.� { SrwW ,• f .... ... r•s
1 ' -r
t 33
Uo
■�"y, 1•I f i 35 l�l13 3 36 y �.
�.�vNk t • .Y 'Y `'ri I /^uqS.. .`r... . i
�,� I� `/�i c ff, e•: , P 3j l s i �.PM
RO
\ � t i Lj lh--^• +w$ese �■ , •'].._ _.., ': {'i�
�r . '� r I L�•c I• I, _1 �' I � I I'�.� \-•
1 .
.��•rL 1-�y. , :- y •..1 i Il.� �S
' /�' 1 I // 11i111111111 . .Y , �• • '• 1 `�• �""'\•�ff_ \ `
i�+C-� � 0 2 I� � { I �."ryr.y�T"y cv�J i-a O S I•�r S � L 7 � i ii' S f l �\Ft I
LP M1^114 A A F s i
•• . , •t . - L t�I •
Cdn 'I�� { .� � r �( r,.,... . .• ' w _. f_ , ter!
•bew rP•.
t ... I- •--1---'-- ':.' •... a i' - - '. '
Pak _ I•• 7f it .LtT
to ��� it � ttl- ;� 12 � :Ir I ��t f.ti _ •c - � :m jl'•,`
pswiew. 1 4 . I �`• , •k aw e«.. ' I :.
,Fk..\_ .. .... ...
ems_ a' —..-• ..__.-_ .�....—_-__ _ �_ 1 i , •, �1 i
37
RI -T
P.+ %r,� 7+-T t••r \ I L �,• i. Pa+d
j% ...111
i t .,..I ._C°u°Aru :.'..`� i,ii ii1 i.` , fI"' '*^ 3 , ;' IPO u> .rr' :ara.+-• I•
-1 � -.. 1 1 i •L �ie�iw_ P EarliillYl. �
Pe k W►T 1 - l .1. — -�- \ -
:. t .` 'ii':'!-'!-•.t• #- :IY'•?� a �>, ..� ;I:. _•r rr ii 1 ••1'':'•! 22
39! 4.,39 .ei i P�•ili_ •�- :aa ,i �irJ '1" '1 a "•• .' '• `y a._u`_•: C.••..;.,._
Z3, .. I •�'�' R {r' �4�i t � �,3 _�- .va - �k
I i G, �. •1)Dmnkr \M rl r� - S! .4 - 1 1 .- ...,.,.
'�.... O Ge■n• pi i'/'�%�+I'xPIL`7tih'� .:14 '��..II= �-".. 4 _1 S,d i� '�".'� .. ... _.-._ -- --" "- 2 c
f t i f
1•III E t` =r, 200 21
,_ ;Y cer .
t k •'16n: \ -+° •sh -- C _t _ min_ _ k - - - -
Rsrn
�' r I• I�� 4 Ll 1_, rtS�', 28- _T * :1 '.: 28 , I �o P27'^
I 30 L
I �1 ! S - In'•" 1 X
r' tt
:.. bdd 37 .. `t"' ir•:i -3. .-$"` c:. •r• .:i' `,. w 1• ...,aur _'i'
31
,r -•---•-- -
♦I' ••`,` Tlunea 32 ` '\ 33 3
North 43
source: Springbrook Creek Watershed Boundary
Harza Northwest Inc. 1994 South 180th Street Grade Separation Figure 3
eel
G�
Existing Subbasins tooµ 3
Cn
ai
a
discharges
to creek °
°
O
S. 180th St
r
= cn 0 0 2'x 19
oN•a + culvert u
Qi— > a- N O N
v Q
> o N a_ Q
O
Y c
° N g C: v o o r
o 03 V) o o
c Co
Nm N W
u asin es u asin as
drain south then
east to Mill Creek
G�
ee*
o`�
Proposed Subbasins SPt\�oa�o / N
°
WQ & Flow Q
copn nrdol discharges o
to creek
Pump o
S. 180th St444
}
= O a N 12'x19' �* t
N o N culvert + + .o
_ N
jQ _±a_ N N ai
C c 0 O O O Q
71 N O C
CD 0
N N (n LJ pia
cn m
Subbosin Subbasin East
West
drain south then
east to Mill Creek
® Contributing area
Flow line
Source: Subbasins
BERGER/ARAM Engineers,Inc. 1999 South 180th Street Grade Separation Figure 4
3.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
Flow Control
The detention facility was designed to meet Level 1 Flow Control Standards as specified in the King
County Surface Water Design Manual(KCSWDM, 1998). The detention pond was sized to detain
the proposed peak discharge rates to the limit of the existing discharge rates for the two-year and
ten-year storms.
Hydrologic models for detention facility design were developed using the SBUH method with 24-hour
storm events, and Type la Hyetograph as implemented by the WaterWorks computer program.
Table 1 shows the peak flow rates for the existing and proposed condition of roadway in Subbasin
East and the required detention volume.
Table 1. Subbasin East Peak Flows
Existing Proposed Pond
Limits of drain area Station 16+10 to 22+40 Station 12+24 to 22+40
Pervious area 0.502 acre 0.000 acre
Impervious area(roadway) 0.909 acre 1.516 acres
Impervious area(offsite) 0.280 acres
Two-year flow 0.44 cfs 0.84 cfs 0.44 cfs
Ten-year flow 0.71 cfs 1.26 cfs 0.71 cfs
100-year flow 1.05 cfs 1.75 cfs 0.96 cfs
Detention volume 2374 cf
Right-of-way required 0.5 acres
WaterWorks outputs are attached at the end of the section.
Water Quality
Water quality facility was designed to treat the runoff from the total roadway surface area using the
method listed in the KCSWDM for basic wetpond. Computations for the required volume are
attached at the end of this section.
Combined Detention and Wetpond
The new pond was designed using the guidelines listed in the KCSWDM for combined detention and
wetpond with 3H:1V interior slopes, 2H:1V exterior slope, and 1 foot of freeboard. A permanent pool
of water at the bottom of the pond will provide water quality treatment while a live storage at the
upper level provides detention capacity. An emergency overflow was provided to discharge 100-year
flow for developed condition. An access ramp of 12 feet wide was provided to the wetpool cell at a
maximum grade of 15 percent.
Final Technical Information Report A00084
South 180th Street Grade Separation 10 March 2001
SOUTH 180TH STREET GRADE SEPARATION
DETENTION POND DESIGN
(65' ROADWAY SECTION)
Project Precips
[6-month] 1.28 in
[2 yr] 2.00 in
[10 yr] 2.90 in
[25 yr] 3.40 in
[100 yr] 4.00 in
[other] 1.27 in
BASLIST2
[Existing] Using [TYPEIA] As [2 yr]
[Existing] Using [TYPEIA] As [10 yr]
[Existing] Using [TYPE IA] As [100 yr]
[Proposed] Using [TYPEIA] As [2 yr]
[Proposed] Using [TYPEIA] As [10 yr]
[Proposed] Using [TYPEIA] As [100 yr]
LSTEND
BasinlD Peak 0 Peak T Peak Vol Area Method Raintype Event
------- (cfs) (hrs) (ac-ft) ac /Loss
Existing 0.44 7.83 0.1563 1.41 SBUH/SCS TYPEIA 2 yr
Existing 0.71 7.83 0.2489 1.41 SBUH/SCS TYPEIA 10 yr
Existing 1.05 7.83 0.3674 1.41 SBUH/SCS TYPEIA 100 yr
Proposed 0.84 7.83 0.2662 1.80 SBUH/SCS TYPEIA 2 yr
Proposed 1.26 7.83 0.4004 1.80 SBUH/SCS TYPEIA 10 yr
Proposed 1.75 7.83 0.5649 1.80 SBUH/SCS TYPEIA 100 yr
BASLIST [TYPE1 A] AS [2 yr] DETAILED
[Existing] [Proposed]
LSTEND
Drainage Area: Existing
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur 24.00 hrs
1 Area CN TC
Pervious 0.5020 ac 79.00 0.11 hrs
Impervious 0.9090 ac 98.00 0.06 hrs
Total 1.4110 ac
Supporting Data:
Pervious CN Data:
79.00 0.5020 ac
Impervious CN Data:
98.00 0.9090 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet 20.00 ft 2.00% 0.1500 3.42 min
Shallow 370.00 ft 2.00% 27.0000 1.61 min
Channel 200.00 ft 0.50% 42.0000 1.12 min
Channel 100.00 ft 2.00% 42.0000 0.28 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet 32.00 ft 2.00% 0.0110 0.62 min
Shallow 370.00 ft 2.00% 27.0000 1.61 min
Final Technical Information Report A00084
South 180th Street Grade Separation 11 March 2001
Channel 200.00 ft 0.50% 42.0000 1.12 min
Channel 100.00 ft 2.00% 42.0000 0.28 min
TC of 3.63 min <5 min, program will use a tc of 5 min in computations.
100 yr Flow Time Volume
Summary: 1.0530 cfs 7.83 hrs 16003.29 cf - 0.3674 acft
Drainage Area: Proposed
Hyd Method: SBUH Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur 24.00 hrs
Area CN TC
Pervious 0.0000 ac 0.00 0.00 hrs
Impervious 1.8000 ac 98.00 0.04 hrs
Total 1.8000 ac
>� Supporting Data:
Impervious CN Data:
PAVED 98.00 1.8000 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Sheet 32.00 ft 2.00% 0.0110 0.62 min
Shallow 260.00 ft 5.00% 27.0000 0.72 min
Channel 180.00 ft 3.00% 42.0000 0.41 min
Channel 150.00 ft 0.50% 42.0000 0.84 min
TC of 2.59 min <5 min, program will use a tc of 5 min in computations.
6-month Flow Time Volume
Summary: 0.5033 cfs 8.00 hrs 7249.07 cf - 0.1664 acft
HYDLIST SUMMARY
[out-2yr] [out-10yr] [out-100yr]
LSTEND
HydID Peak Q Peak T Peak Vol Cont Area
(cfs) (hrs) (ac-ft) (ac)
out-2yr 0.44 8.17 0.2661 1.8000
out-10yr 0.71 8.17 0.4004 1.8000
out-100yr 0.96 8.17 0.5648 1.8000
STORLIST
1 [POND1]
LSTEND
Node ID: POND1
Desc: DETENTION POND - DOE
Start El: 23.0000 ft Max El: 50.0000 ft
Contrib Basin: Contrib Hyd:
Length ssi ss2 Width ss3 ss4
70.0000 ft 3.00h:1 v 3.00h:1 v 34.0000 ft 3.00h:1 v 3.00h:1 v
DISCHLIST
[D-001]
LSTEND
Control Structure ID: D-001 - Multiple Orifice Structure
Descrip: POND1 MULT. ORIFICE
Start El Max El Increment
22.9000 ft 50.0000 ft 0.10
Orif Coeff: 0.62
Final Technical Information Report A00084
South 180th Street Grade Separation 12 March 2001
Lowest orifice: 5.0 in IE 20.90
out to 2nd: 0.44 ft Second orifice: 3.0 in IE 23.34
2nd to 3rd: 0.20 ft Third orifice: 2.5 in IE 23.54
Oulet elevation 22.90
Top of 12" Dia. Riser elev 24.0
RLPCOMPUTE [POND1-RLP] SUMMARY
2 yr Match Q: 0.44 cfs Peak Out Q: 0.44 cfs - Peak Stg: 23.33 ft -Active Vol: 820.01 cf
10 yr Match Q: 0.71 cfs Peak Out Q: 0.71 cfs - Peak Stg: 23.58 ft-Active Vol: 1489.54 cf
100 yr Match Q: 1.05 cfs Peak Out Q: 0.96 cfs - Peak Stg: 23.89 ft-Active Vol: 2374.47 cf
Final Technical Information Report A00084
South 180th Street Grade Separation 13 March 2001
Project 5, 190 TP ST- Sheet of
Job Number.. 4
BERGER/ABAM Subject�)ATF_R- (,?4UA L 1 T Y Designer_ I A D
Date 2.�20'01
V, ( o,q A 0,�s �} � 0, 1 A{ + 0, 01 A R
) 1�
KC D ► t3 IC- E Doti,e sw M �,4 � , � as � T t
A; = 5S , 170 SF PROPOSED POA-bWA\i OUFFIC-E J
A _ At, _ AO = 0
P,, _ 0 47
Vl2 = 0, � C 5$ , 170) x 4-7 = �2 , 05 1 CCF
Vb = x V,
3 X o2, 0 51 4 = 3 , VOL-U A4-E FA(-TOY2
F'GR B/ISI C- f aN D
G, 1 S 3 G1=
PO►JD C,ALCULATON AND ACAJ MFA �UX-F, -IE1VT
Via = 6 , / 9am LF > V6
�{L-L- SLOPS S = 3 ; ►
Final Technical Information Report A00084
South 180th Street Grade Separation 14 March 2001
4.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
General
The proposed conveyance system was analyzed and designed in accordance with the current
guidelines listed in the KCSWDM. The Rational Method was used to compute the 25-year peak
discharges for all pipelines, and the 100-year peak flow for the pump capacity. Table 2 shows the
precipitation coefficients and calculated peak flows. Gutter flows and inlet spacing were determined
by using the method listed in the Washington State Department of Transportation(WSDOT)
Hydraulics Manual. The Backwater Analysis method was used to analyze the new system to verify
adequate capacity. Computations are attached at the end of this section.
Table 2. Precipitation Intensity Coefficients for Rational Method
Recurrence Interval 24-Hr Precipitation aR bR Flow
25-Year 3.4 inches 2.66 0.65 4.183 cfs
100-Year 4.0 inches 2.61 0.63 5.012 cfs
Source: King County Surface Water Design Manual
Runoff from South 180th Street will be collected by catch basins along the gutter on both sides of the
roadway. No modifications are proposed for the off-site lines.
Subbasin West
72nd Avenue South (Station 11+20) to Station 12+25
No modifications are proposed to the existing system west of 72nd Avenue South. The existing
roadway storm sewer system east of the intersection must be removed. New catch basins and 12-
inch pipe will collect and convey runoff from Station 12+25 to the west. This system will be tied to
the existing system on 72nd Avenue South.
Subbasin East
Station 12+25 to Springbrook Creek Culvert(Station 21+84)
Runoff will be collected by catch basins along the gutter on both sides of the roadway. The mainline
1 of 12-inch pipe will convey the flow to the pump station located on the north side of the road,
approximately at Station 18+00. The station will have two pumps that alternate pumping the
runoff. This allows for even wear on both pumps and provides for a backup pump during the
maintenance or replacement of one pump. The runoff then will be pumped to the new stormwater
facility located 50 feet north of South 180th Street and east of the tracks for water quality and water
quantity control. Flows from the new facility will be conveyed via 12-inch pipe to the existing
36-inch RCP system and discharge to Springbrook Creek at the original outfall.
Springbrook Creek Culvert(Station 21+84) to End of Project(Station 22+40)
No major modifications are proposed to the existing system.
Final Technical Information Report A00084
South 180th Street Grade Separation 15 March 2001
400 Project 1 S6 TH Sheet _ of
Job Number4-
BERGER/ABAM Subject PFA K F L- 1) Designer >✓1
E N G I N E E R S I N C.
FOK CO M EYA•QC E Date��O 1
;>E . KC,SW DM lC119)
kA DOM A L ME rHOb
T = L/ Coo KR � ) L = 4f220
_ bR KR a0
L _ ap,/(T)
L = PU S
A = I,7 Ac,
CIA
G o, c/o
T = 4.60 (GO x 20 x �Ir�, 04�. � = 1, S 7 M/til,
LET T - G , 3 MW-
c, r P= S,4 inlcff
r = 3 4 x 0, �<Od = . 73 4
= o, q X 73 4 x . 7 - 4 . 19 3 CPS
Z =
4 , 0 X 0, S11 = 3,27&
C� = ago x 3, 2,7r x 1, 7 FS
z z so 6-PNI
Final Technical Information Report A00084
South 180th Street Grade Separation 16 March 2001
Project Sheet of
7 Job Number A 3 , r
BERGERIABAM Subject t>P,,A I /A Designer
E N G I N E E R S I N C.
�
T T Date � 11 /Ic'I
R F-F*FKFQC�E �1!,A�JUAL- 4,
F- T L
LL I I TfZAv -AVE.
77
JO-
q. 5
x x C. It
�15 115
< 0, 12, OK
Final Technical Information Report A00084
South 180th Street Grade Separation 17 March 2001
HIGHWAY DRAINAGE(English Units)
T= 5 Project Name: S. 180th St.Grade Separation
m= 6.89 Project Number: A00084
n = 0.539 S.R.: NA
C= 0.9 Designed By: MD
I= 2.89384 (25-yr 24-hour storm) Date: 1/5/2001
GW= 1.67
Width= 32.5 (1/2 of roadway width+sidewalk) dmax= 0.19' (depth of flow at face of curb)
Zmax= 9.5 (from curb to 1/2 of lane)
Sta. Width Distance Delta Q I Sum Q1 Sloe ISuperIG.W.1 d I Zd I V I Q bp 1
12+15.00 ---- ------- ---- ---- ---- ---- --- --- --- --- ---- ------------
14+11.00 32.5 196.00 0.381 0.381 6.00% 0.02 1.67 0.07 3.51 3.50 0.068
15+70.00 32.5 159.00 0.309 0.377 3.50% 0.02 1.67 0.08 3.87 2.89 0.084
16+60.00 32.5 90.00 0.175 0.259 1.00% 0.02 1.67 0.09 4.25 1.67 0.068
16+90.00 32.5 30.00 0.058 0.127 0.10% 0.02 1.67 0.10 5.01 0.60 0.043
22+80.00 ---- ------- ---- ---- ---- ---- --- --- --- --- ----
20+50.00 32.5 230.00 0.447 0.447 3.75% 0.02 1.67 0.08 4.07 3.12 0.109
18+07.00 32.5 243.00 0.472 0.582 3.50% 0.02 1.67 0.09 4.56 3.30 0.172
17+20.00 32.5 87.00 0.169 0.341 0.75% 0.02 1.67 0.10 4.98 1.64 0.115
16+90.00 32.5 30.00 0.058 0.173 0.10% 0.02 1.67 0.11 5.63 0.66 0.068
Reference: WSDOT Hydraulics Manual 5.4,5.5
Final Technical Information Report A00084
South 180th Street Grade Separation 18 March 2001
m �
� a
0
m�.
'-1
(D r3
CD
O
♦y
(D
o ..
�o
m �
'Cl
w
0 0 0
_ ---Street Grade Separation _ ENTR ENTR. EXIT OUTLET INLET�APPR I BEND
Backwater Calculation t- Y
- South 180th � I
P FREE-
BARREL - - IJUNC
I
A00 +
STRUCT M DESIGN - LAT. PIPE 25-PIPE PIPE -n__ -Ke Kb F. Kj OUT IN AREA! L �-_ -Wt1 - I--- - __-* -�-ELEV. ELEV. HEAD I LOSS HW RIM FREE-
Y _ ` O -. {� HEAD I HEAD HEADFROM TO 02 Ot O3 - ( ft VE; VEL ' tt D+n /2 TWRIn T.` EL: LOSS LOSS, LOSS EL. EL BOARD
SIZE LENGTH SLOPEI EL. EI HEAD ar. ELLOSS EL tt tt CNRL CNnRL (tt) t (tt) ( ) (ft)
(CIS) ) I ) -SIZE
! { ). ( ). ------ VEL HEAD
crs i (Crs crs in tt rue e) ltt) -1 ) (TM�s {tt) O _{ ) ( L� { ) O ---{) , ..-
1 0.01 0.00' 1.30 t 74 ' 0.22 r 0.14 _ 2.95 3.45 0.139 0.00 0 00 3.31 7 18 5.85
P.S. 15 4.140 d.140 0 00 12 15 001 0.013 0 012 0 5 1 50. 0.79 5.27 0 43 0.85 0.93 y 2 50 0.171 2.67 0.22 - 0 43 3 32-� 3.20 0 139 0.00 0 00 3.18 9 03
0 00�..-.12 l_ 87 001 0,010 0.012 0 5 0.01 0 00 1,60 2 50 0.79 1 2.99 0 14 0.64 0.82_ 2 42 0 319 2 _.. 3.87
15 13, 2.350 2.350 -
0.62 _ 3 42_I 0.110 3.53 0.07 0 1.4 I 3.74 3.95 0.026 0.00 0.00 3_.92 7.05 3.13
13 11 1.010 1.010'0,00 12 30.W 0.010 0.012 0.013 0.012�.0 5,0.01''.0.001 3.60 3 90 0.79 1 29 I 0 03 0.42 _ _. � I _ , 7.18' 2.72
�-' 1 1 9 - 0.71 4.31 0.020 4.33 0.01 0.03 4 37 !"4 50 0.042 0.00 0.00 4.46 -
900 0.79 1.22 002 _0.41 0.71 4.71 0.055 4.76 0.01 0.02 _ 4.80 6.30 0.0161 0.00 000 6.28 9.16 2.88
�. 7 0.960_ 0.960 0�', 12 159001 0059 0.012 OS 0.01 01 I'000 5.80 390 1,.. -. f_658_+ 14.50 :_ _ 1144617.61� 3.15
7 5 0.800 0.800 0.00 _ 1 0.79 1.02 1 0 02 0.38 0.69 1 6.49 0 068 6.56 0.01 0 02 0.042 0 00 0 00 __
0.79 I 1 64 i-0.04 0.48, _0.74 15 74 0 094 {15.83 0 02. 0 04_1_15 90 20.50. 0.000 j 0.00 �) 0 00 20 50 22 61 2.11
0.059 0,012 O S 0 01 0 00 15 Do 20 00 4
0 00 r 12 1 B5 00'1 0.010 1 0.012 O S O Ot l_0 00 4.50 5.00 0.79 1 27 1o.63
t ._ _t _ - , ' 3 55
5 3 0.500 L289 5.481 9.03'i
15 16 1.000 1.000 0 00 12 50 30 0 03 0.42 0.71 2 50 0 033 2.53 0 01 0 03 2 57 5 50 0.016 0 00 0 00
13.10 0.79 1.02 0.02 0.38 0.69 5.79 0.060 t 5.85 0.01 0 02 5.87 13 60 0.002 0.00 0.00 13.60 16.23 2 63
a _
0,800 1 0.800 1 0.00 I 12 141 00� 0.057 0.012 0 5}0.01 0 00 5 10 f r -0.00' - +
0.500 0.300 0.20 12 102 00 0.044 0 012 i 0 5 0.01 0 d2 L13780118.30 0.79 0.38. _0.23�0.6.2_ 14 42� 0.008�14.42 0.00 0.00 14.422?�1 B 80 0.000 0.00 0.00 18 B01 20.9 2.10
�-
- __ 1 i
16jjI
18 20 }
Re Ina Coun Surface Water Design Manual,and WSDOT Hydraulics Manual
I
>n
�a
8�
5.0 SPECIAL REPORTS AND STUDIES
Because there are no new roadway developments proposed within the floodplain, a flood hazard
study is not needed for this project. However,the project will impact the wetlands located within the
project site thus impacting their flood storage capacity. The impacts to these wetlands will be
analyzed in the following sections. See South 180th Street Grade Separation Wetlands Study,
(BERGER/ABAM Engineers Inc., 1999)for detailed descriptions of the wetlands.
The project proposes to fill part of the wetlands located between the existing tracks to construct the
shooflies for the railroad tracks. Approximately 1.09 acres of Wetland B,which is located north of
South 180th Street,will be filled. Assuming that the displaced volume of 170,000 cubic feet of water
in this impacted area is added to the remaining of 24.5 acres of Wetland B and the connecting
wetlands, the water level would be raised by 1.9 inches. This small change in water elevation will
not create or aggravate any existing drainage problem in the Springbrook Creek floodplain.
Wetland C,which is located between the existing tracks and south of South 180th Street will be
completely filled. Because Wetland C is less than 0.1 acre in size, and its flood storage capacity is
low,impacts to downstream flooding is minimal.
A wetland mitigation plan was developed for the project to compensate for impacts on Wetland B and
Wetland C at a ratio of 1.5 to 1 (area created to area impacted). The impacted flood storage capacity
is thus compensated.
Other Studies
A geotechnical engineering report, studies of wetlands, streams, and wildlife were completed for this
project.
Final Technical Information Report A00084
' South 180th Street Grade Separation 20 March 2001
6.0 BASIN AND COMMUNITY PLAN AREAS
Not applicable for this project.
i
1
Final Technical Information Report A00084
South 180th Street Grade Separation 21 March 2001
7.0 OTHER PERMITS
The required permits needed for this project are listed below.
Grading
DFW HPA
COE 404
JARPA
Final Technical Information Report A00084
South 180th Street Grade Separation 22 March 2001
8.0 EROSION/SEDIMENTATION CONTROL DESIGN
' A Temporary Erosion and Sediment Control Plan will be submitted with the final construction plans
to the City of Tukwila for approval with the construction permit application. Construction phasing
will minimize the extent and duration of areas exposed. Mulching and seeding disturbed areas will
be done as soon as grading is completed. Filter fabric fences will be installed downslope of all
construction areas and sediment traps will be used to protect new and existing catch basins. Runoff
from the construction site will be conveyed to the sediment pond for settling before discharge to the
existing outfall.
r
1
i
1
1
Final Technical Information Report A00084
South 180th Street Grade Separation 23 March 2001
' 9.0 BOND QUANTITIES WORKSHEET, RETENTION/DETENTION FACILITY SUMMARY
SHEET AND DECLARATION OF COVENANT
' Bond Quantities Worksheet
The stormwater facilities will be bonded per the requirements of the City of Tukwila.
1
i
1
1
1
1
1
1
1
i
Final Technical Information Report A00084
South 180th Street Grade Separation 24 March 2001
10.0 MAINTENANCE AND OPERATIONS MANUAL
' A Maintenance and Operations Manual will be prepared for the stormwater facilities as outlined the
KCSWDM. The Maintenance and Operations Manual for the pump station will be prepared
according to the manufacturer requirements.
Final Technical Information Report A00084