Loading...
HomeMy WebLinkAboutSWP272862(6) V 4� � l III z v • ,y O � Z � O * 1908 South 180th Street Grade Separation Draft Technical Information Report Submitted to City of Tukwila Public Works Department Tukwila, Washington Submitted by BERGER/ABAM ' E N G I N E E R S I N C. Job No. A99002 April 1999 DRAFT TECHNICAL INFORMATION REPORT South 180th Street Grade Separation Submitted to I� City of Tukwila Public Works Department 1 Tukwila, Washington April 1999 Submitted by BERGER/ABAM Engineers Inc. 33301 Ninth Avenue South, Suite 300 Federal Way,Washington 98003-2600 ' Job No.A99002 DRAFT TECHNICAL INFORMATION REPORT SOUTH 180TH STREET GRADE SEPARATION TABLE OF CONTENTS SECTION PAGE 1.0 Project Overview ............................................................................................................ 1 2.0 Preliminary Conditions Summary and Off-Site Analysis ..................................... 6 3.0 Flow Control and Water Quality Facility Analysis and Design .......................... 10 4.0 Conveyance Systems Analysis and Design ............................................................... 14 5.0 Special Reports and Studies ........................................................................................ 19 6.0 Basin and Community Plan Areas .............................................................................. 20 7.0 Other Permits .................................................................................................................. 21 8.0 Erosion/Sedimentation Control Design .................................................................... 22 9.0 Bond Quantities Worksheet, Retention/Detention Facility Summary Sheet and Sketch, and Declaration of Covenant ................................................................ 23 10. Maintenance and Operations Manual ....................................................................... 24 i 1 Draft Technical Information Report ' South 180th Street Grade Separation ii April 1999 1� 1.0 PROJECT OVERVIEW South 180th Street, an east-west principal arterial located in the Tukwila, Renton, and Kent areas of the Green River Valley,will be reconstructed to provide a grade separation between vehicular traffic and railroad tracks. The proposed roadway with five lanes,Class III bicycle route,curb and gutter, and sidewalks will pass under the existing railroad tracks and Interurban Trail. The project location and project limits are shown on the vicinity map in Figure 1. A system of catch basins and closed lines is proposed to collect and convey runoff. The runoff collected from the depressed roadway will be pumped to a new stormwater facility. The project will add approximately 0.502 acre(21,867 square feet)of new impervious surface to the site. Following is the summary of the surface areas of the project. Existing Proposed Net (increase) Impervious area(sidewalk) 0.368 acre 0.439 acre 0.071 acre Impervious area(roadway) 2.017 acre 2.448 acre 0.431 acre Total impervious area 2.385 acre 2.877 acre 0.502 acre Pervious area 0.502 acre 0.0 acre Total project area 2.887 acres 2.887 acres Water quality and water quantity controls are required for this project. Draft Technical Information Report South 180th Street Grade Separation 1 April 1999 LU O � 405 AYE SIRBAN J` SW 16TH ST P �y dc 167 S� w r �c 21ST ST J o + v+ + ' N SW 2TTH ST STB NNDDER PROJEC w LIMITS >' g_ : 0 � 101, W i < < w SW 34TH ST Ln J w TUKWILLA J O 181 SW 41ST ST �O $ S RENTON G 180TH — — SE 43RD ST (LR RD SE 5T —— �P �+ (S 180TH ST) 5 S {c V� < y W J KENT Source: Vicinity Map BERGER/ABAM Engineers, Inc. 1999 South 180th Street Grade Separation Figure 1 King County Department artment of Development and Environmental Services TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Project Owner Project Name City of Tukwiila Deot. of Public Works South 180"' Street Grade Seoaration Address Location 6300 Southcenter Blvd, Suite 100 Township 23N Tukwilla, WA 98118 Ranae 4E Phone (206) 433-0179 Section 36 Project Engineer Chris Walcott Company BERGER/ABAM Enaineers Inc. Address/Phone 206 431-2300 Part 3 >TYPE°'OIF PERI�+IiT �,� .�. < 5� PPLiCATI£ 1+ ::NOW RM's" . < Subdivison V DFW HPA Shoreline Management Short Subdivision ,/COE 404 Rockery vl Grading DOE Dam Safety Structural Vaults Commercial FEMA Floodplain Other Other JARPA COE Wetlands Fart 5 SiTEC ( IA F I i JY:AN0,DRAI�l AQE WtN x, € P. , Community N/A Drainage Basin Sorinabrook Creek 9� 9,10 Yz River Floodplain FEMA (see Fia. 2) Stream Sr)rinabrook Creek. and Mill Creek Wetlands See Wetlands Study Critical Stream Reach Seeps/Springs Depress ions/Swales High Groundwater Table Lake Groundwater Recharge Steep Slopes Other Draft Technical Information Report South 180th Street Grade Separation 3 April 1999 Soil Type Slopes Erosion Potential Erosive Velcoties Woodinville Silt Loan 0—3% moderate Puyallup Fine Sandy Loam 0—3% moderate Urban Land 0—3% moderate Additional Sheets Attached 0 ,. ., REFERENCE LIMITATION/SITE CONSTRAINT Ch. 4— Downstream Analysis jAdditional Sheets Attached . MINIMUM ESC REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION AFTER CONSTRUCTION ✓ Sedimentation Facilities Stabilize Exposed Surface ✓Stabilized Construction Entrance ✓ Remove and Restore Temporary ESC Facilities v/ Perimeter Runoff Control ✓ Clean and Remove All Silt and Debris Clearing and Grading Restrictions ✓ Ensure Operation of Permanent Facilities Cover Practices Flag Limits of SAO and open space Construction Sequence preservation areas Other . Other Draft Technical Information Report South 180th Street Grade Separation 4 April 1999 PURFGEiv A' R SYTII Grass Lined Tank Infiltration Method of Analysis Channel Vault Depression SBUH, RATIONAL Pipe System Energy Dissapator Flow Dispersal Compensation/ Mitigation of Open Channel Wetland Waiver Eliminated Site Dry Pond Stream Regional Storage Wet Pond Detention Brief Description of System Operation Catch basins and closed lines collect and convey runoff to pump station. Runoff is lifted to oond for WQ and flow control Facility Related Site Limitations Reference Facility Limitation Pam# # STRUCTURAL ANALYSIS Part t2 EASI~futl N'FSfTRAfT tCast in Place Vault Drainage Easement Retaining Wall Access Easement Rockery>4' High Native Growth Protection Easement Structural on Steep Slope Tract Other Other Part 13 SIGNATURE OF PROFESSIONAL ENGINEER I or a civil engineer under my supervision have visited the site. Actual site conditions as observed 1 were incorporated into this worksheet and the attachments. To the best of my knowledge the information provided here is accurate. Signed/Date Draft Technical Information Report South 180th Street Grade Separation 5 April 1999 2.0 PRELI IINARY CONDITIONS SUMMARY AND OFF-SITE ANALYSIS The existing drainage system consists of two separate closed pipe systems,one on either side of the tracks. On the west side,the runoff collected along South 180th Street is conveyed to the system on 72nd Avenue South. East of the tracks, all runoff is collected and eventually discharged to Springbrook Creek via a 36-inch outlet. There are no water quality or water quantity controls for the roadway runoff. The portion of the project adjacent to Springbrook Creek is in a FEMA floodplain. See Figure 2, FEMA Floodplain. The entire project lies within a watershed defined by the City of Kent as Springbrook, Mill, and Garrison Creek Watershed. See Figure 3 for the watershed boundary. Springbrook Creek crosses South 108th Street via a 12-foot by 19-foot elliptical metal culvert located about 500 feet east of the tracks. The subbasins and drainage systems are described in more details in the following sections. Schematics of existing and proposed subbasins boundary are shown on Figure 4. Subbasin West 72nd Avenue South. (Station 51+00) to Railroad Tracks (Station 56+10) Runoff from the roadway and few adjacent properties is collected along South 180th Street and conveyed to a 12-inch trunk line on 72nd Avenue South. This system flows south to South 182nd Street,then east under the railroad, and finally discharges to Mill Creek, a tributary to Springbrook Creek. Subbasin East Railroad Tracks (Station 56+10) to End of Project(Station 66+70) ( Roadway runoff from this section is collected by a system of catch basins and conveyed to a deep system of 36-inch RCP located on the north side of the road. The 36-inch RCP system also drains the off-site areas adjacent to South 180th Street. Flow from the 36-inch RCP system discharges to Springbrook Creek at a location about 30 feet north of South 180th Street. Draft Technical Information Report South 180th Street Grade Separation 6 April 1999 i N SoLRHWEsr T 39TH STREET Z3 z LL Z RM337 BOULEVARD S Q c South Center Pump Station ZONE AE / CITY OF TUKWILA Q � 530091 CITY OF RENTON w aa) 530088 Ei- cf) cz ZONE x cz ' ZONE AE � Al cn o AL 00 '---' Abarx*yied Ra*oW DRIVE 8R1DGE --a 'p Q SOUTHWEST 41SI STREET ! ,e s .A ORES ZONE X o QLl[ z Y Me Tha# l4,y i o � y = sw 27 a3Ra STREET RM339 SOUTH CITY 0�TUKWIIA ,_ 180TH CITY OF RENT 9 7Y OF KE ITY OF KENT RM347 CI ON S181SY Sya - S1REEt STREET ZONE AE H f z ! z , Foobidge P 'F= •pO ZONE AE w ,� N Y Kent Bike Trait r hh`'•nu+u SOUTH 182NO STREET 36 F' 31 CITY OF KENT jilt ZONE X 530480 ZONE ANC X. 40 (EL 17) � w� ZONE X Mill Creek ZONE X FLOODING EFFECTS FROM ZONE AE ZONE A PRINGIROOK CA K �q ZONE A _ _ ZONE AE EL 2 Ln JOINS PANEL 0988 22013'07°75 o Q 0 � U) LL m m m m rLN 7�. .�:m'i:�. '^• ;__ w, •f 5� I t L�� :/. M- y•d..�T 1�,�•;_:s•1:� .,,n..:'. ,-�, _ li; \•1► 7d %' 1s3rsw a s + v.. • ( �' s. . .J. t; �'�A �• 36 t v 1' '� i :� ,16- 1 f •w �i, s� :��: ::",:• ,.�+•r+4.r '» y�• ..�Cw•• � • d l _ •.t! �J'��t ,i.. �. �•` ate' r L `�—.` •'�++• ..� i.s 1 '~ '.� -;leDra�4n .,M�.F •�� �( :i �� .'��'� � �/.. �. it t��'-• �,..,<. , { 2Y to 0 + ry r + i a jr► 21' 22 ma IL A 14 I fu,•+•.on�/ .8 11 5 -l' 30 TY :F4 a Project ff 1 • - ^-- • '�� I.r••': , 'i. •�-�'�!r r.1'r tgn So. 184 A ! • • �t .33 _. -i ... . w_.. _ 33� 36 •;rT t '..r3 s a +(•'y ; se. r a _• ia' .. .: 11.; 1 4 '�� •` :, ! Ej /"' 1 Tea ,y�: ` v �-+ :` r {' l -• r '�i s"rt. •' i '�` ,_ _ .''sari.• :7.._ ' _ s -i •�' �' .. �• ' - •IL � r '/-. � '� , wn. � ! ti '.�78- � , �• I i o t,s .s.r` .�•r , I i F ,...` all JE%t1 .k•1 ' 2 ,2 1` •1. ` �� i F '•� y � r �� s •. i 1 s •$ - '( ,d F � •� s • r �. . ��• 1 � � � ---Ni _1 0 PLAI A A-1131 JI 110- '� � � t _ W... !, •- '- � to I7-717-7 ye ri -. ,y .V•np•„ni .. s ��J x w .,�` _ _ j •-3 .st p �. _ _._ - 37 { a l 1 }4• r e'a..l 141 ! 1 ;.. �,, 16 ,1 `5 • 1}'1' Pared tot J-il 1WMl llwd --S' AI � � •. � jM' �IFi��1 ,�l - Mt 1j1As- - f l � ( r t � stc L-_ _• � ': 20 23 39i 391 .c -.. nano~ F^ ` Vn•! �',1: a ..! 'tii '" t, ? `,S -• ' :c' i; ....r,'~• o - '_.. . �.. -a-,- �:�. �rF�' � i+d'i`•`-�i; .�i `� �' - - � � 4+- -� r i---1. �^= 1M�, _ : ` _'•C; ..,� >,.42 16 wo IN fit" 30 1 t: GG ` ' K�• :'_ C .�� AA Z. 37 31 •� .rr,r' t` a ---------- Ile _� . •.�i { ," Thomm 3z '� 33 A+ North e3" ,• -"� , •1I �—� ..ISr f•.,38 . :f All • I .^• r ' Source: Springbrook Creek Watershed Boundary Harza Northwest Inc. 1994 South 180th Street Grade Separation Figure 3 Existing Subbas i ns caa* c� eex ti > a v discharges — to creek v° o S. 180th St / = N >, o - + �12'x19 0 ; + o Ln culvert L a N a a 'a LO_ L 4- o C a > m c o + c C + o a V1 N G1 ti }'� } p 'a -C3 VI } C N m IN W 0 0 Subbasin West I Subbasin East drain south then east to Mill Creek eOf GC Proposed Subbas i ns oo*�,�e` r 3 discharges to creek ai W0 & Flow a control y pond discharges to creek a v / Y O 180th St / 0 3 S. r.-,-- c-,j V) 12'x19'J O o 0 aU cuIvert +> P-jmp o C; a c W ° 0 F a > v C o ° C C > + c o + o ° o a - c } y N } + c +o In m N N W c0 Subbasin Subbasin East West drain south then east to Mill Creek ® Contributing area .—m.— Flow line Source: Subbasins BERGERBAM Engineers,Inc.1999 Figure 4 South 18Oth Street Grade Separation 3.0 FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN Flow Control The detention facility was designed to meet Level 1 Flow Control Standards as specified in the King County Surface Water Design Manual(KCSWDM). The detention pond was sized to detain the proposed peak discharge rates to the limit of the existing discharge rates for the two-year and ten- year storms. Hydrologic models for detention facility design were developed using the SBUH method with 24-hour storm events, and Type la Hyetograph as implemented by the WaterWorks computer program. Table 1 shows the peak flow rates for the existing and proposed condition of roadway in Subbasin East and the required detention volume. Table 1. Subbasin East Peak Flows Existing Proposed Pond Limits of drain area Station 56+10 to 62+70 Station 52+08 to 62+70 Pervious area 0.502 acre 0.000 acre Impervious area 0.909 acre 1.877 acres Two-year flow 0.44 cfs 0.83 cfs 0.43 cfs Ten-year flow 0.71 cfs 1.23 cfs 0.70 cfs Detention volume 3394 cf Right-of-way required 0.5 acre WaterWorks outputs are attached at the end of the section. Water Quality Roadway improvements will add 0.431 acre of roadway surface to the site. Water quality volume was determined for an area equal to 0.431 acre in Subbasin East using the method listed in the KCSWDM for basic wetpond. Computations for the required volume are attached at the end of this section. Combined Detention and Wetpond The new pond was designed using the guidelines listed in the KCSWDM for combined detention and wetpond with 3H:1V interior slopes, 2H:1V exterior slope, and 1 foot of freeboard. A permanent pool of water at the bottom of the pond will provide water quality treatment while a live storage at the upper level provides detention capacity. An emergency overflow was provided to discharge 100-year flow for developed condition. An access ramp of 12 feet wide was provided to the wetpool cell at a maximum grade of 15 percent. Draft Technical Information Report ' South 180th Street Grade Separation 10 April 1999 t SOUTH 180TH STREET GRADE SEPARATION DETENTION VOLUME (WaterWorks Outputs) Drainage Area: Existing Hyd Method: SBUH Hyd Loss Method: SCS CN Number Peak Factor: 484.00 SCS Abs: 0.20 Storm Dur 24.00 hrs Area CN TC Pervious 0.5020 ac 79.00 0.11 hrs Impervious 0.9090 ac 98.00 0.06 hrs Total 1.4110 ac Supporting Data: Pervious CN Data: 79.00 0.5020 ac Impervious CN Data: 98.00 0.9090 ac Pervious TC Data: Flow type: Description: Length: Slope: Coeff: Travel Time Sheet 20.00 ft 2.00% 0.1500 3.42 min Shallow 370.00 ft 2.00% 27.0000 1.61 min Channel 200.00 ft 0.50% 42.0000 1.12 min Channel 100.00 ft 2.00% 42.0000 0.28 min Impervious TC Data: Flow type: Description: Length: Slope: Coeff: Travel Time Sheet 32.00 ft 2.00% 0.0110 0.62 min Shallow 370.00 ft 2.00% 27.0000 1.61 min Channel 200.00 ft 0.50% 42.0000 1.12 min Channel 100.00 ft 2.00% 42.0000 0.28 min TC of 3.63 min<5 min, program will use a tc of 5 min in computations. Precipitation Flow Time Volume 2 yr 2.0 in 0.4392 cfs 7.83 hrs 6807.43 cf-0.1563 acft ' 10 yr 2.9 in 0.7075 cfs 7.83 hrs 10840.58 cf-0.2489 acft Drainage Area: Proposed Hyd Method: SBUH Hyd Loss Method: SCS CN Number Peak Factor: 484.00 SCS Abs: 0.20 Storm Dur 24.00 hrs Area CN TC Pervious 0.0000 ac 0.00 0.00 hrs Impervious 1.11770 ac 98.00 0.08 hrs Total 1.8770 ac Supporting Data: Impervious CN Data: ' PAVED 98.00 1.8770 ac Impervious TC Data: Flow type: Description: Length: Slope: Coeff: Travel Time Sheet 32.00 ft 2.00% 0.0110 0.62 min Shallow 260.00 ft 5.00% 27.0000 0.72 min Channel 180.00 ft 2.70% 42.0000 0.43 min Channel 150.00 ft 0.50% 42.0000 0.84 min TC of 2.61 min<5 min, program will use a tc of 5 min in computations. Draft Technical Information Report South 180th Street Grade Separation 11 April 1999 Precipitation Flow Time Volume 2 yr 2.0 in 0.8290 cfs 8.00 hrs 12088.10 cf-0.2775 acft ' 10-yr 2.9 in 1.2303 cfs 8.00 hrs 18182.18 cf-0.4174 acft 100 yr 4.0 in 1.7162 cfs 8.00 hrs 25651.81 cf-0.5889 acft RLPCOMPUTE [POND-3] SUMMARY 2 yr Match Q: 0.44 cfs Peak Out Q: 0.43 cfs Peak Stg: 1.31 ft Active Vol: 2616.30 cf 10 yr Match Q: 0.71 cfs Peak Out Q: 0.70 cfs Peak Stg: 1.51 ft Active Vol: 3394.02 cf DISCHARGE [D-003] Lowest Orif Elev 0.5 ft Orifice dia. 5 in. Distance to 2"d orif. 0.45 ft Orifice dia. 3.5 in Overflow opening: 0.5 ft x 1.5 ft ITS 1 y, N►�-s R14�VN�G(,<, rU IrU Vw � Yr�PY✓i��y / fir,_ � 7 S �iJ � /' ~l J J r r Draft Technical Information Report South 180th Street Grade Separation 12 April 1999 Project-S, I g n n-i CT. Sheet of Job Number A qq on 2 BERGER/ABAM S„bjw u l A T�.eez)u A Lj T Y Designer E N G I N E E R S I N c. iJ DBte�f�q�1 _ RED' KCS WDM G,.4.1. 1 BASIC WET POND kJETf00L VOLUME V6 V& = (MIA, -t 0.2S A+ t 0. 1 A t -t- 0.01 A, ) R O. 4 3 I 4c, 1 = 19, 774 Sic A = A = A = _ R _ p 47 // Vj� = O,q 19, 774) x 0,47 = 6 6 2 CF .. V6 _ VA 4COOI-L V = 3x 6G .2- = F1, C19G GF Draft Technical Information Report South 180th Street Grade Separation 13 April 1999 4.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN General The proposed conveyance system was analyzed and designed in accordance with the current guidelines listed in the KCSWDM. The Rational Method was used to compute peak discharges for all pipelines and to determine pump capacity. Table 2 shows the precipitation coefficients and calculated peak flows. Gutter flows and inlet spacing were determined by using the method listed in the Washington State Department of Transportation(WSDOT)Hydraulics Manual. The Backwater Analysis method was used to analyze the new system to verify adequate capacity. Computations are attached at the end of this section. Table 2. Precipitation Intensity Coefficients for Rational Method Precipitation a b Flow 3.4 inches 2.66 0.65 4.626 cfs 4.0 inches 2.61 0.63 5.543 cfs Source: King County Surface Water Design Manual Runoff from South 180th Street will be collected by catch basins along the gutter on both sides of the roadway. No modifications are proposed for the off-site lines. Subbasin West 72nd Avenue South (Station 51+00) to Station 52+08 No modifications are proposed to the existing system west of 72nd Avenue South. The existing roadway storm sewer system east of the intersection must be removed. New catch basins and 12- inch pipe will collect and convey runoff from Station 52+08 to the west. This system will be tied to the existing system on 72nd Avenue South. Subbasin East Station 52+08 to Springbrook Creek Culvert(Station 62+70) Runoff will be collected by catch basins along the gutter on both sides of the roadway. The mainline of 12-inch pipe will convey the flow to the underground pump station located approximately at Station 58+15, under the sidewalk on the north side of the road. The station will have two pumps that alternate pumping the runoff. This allows for even wear on both pumps and provides for a backup pump during the maintenance or replacement of one pump. The runoff then will be pumped to the new stormwater facility located 50 feet north of South 180th Street and east of the tracks for water quality and water quantity control. Discharges from the new facility will be conveyed via 12- inch pipe under the existing driveway to Springbrook Creek. The existing system west of the culvert will be removed. Springbrook Creek Culvert(Station 62+70) to End of Project(Station 66+70) No major modifications are proposed to the existing system. New catch basins will be connected to the existing system on both sides of South 180th Street. Draft Technical Information Report South 180th Street Grade Separation 14 April 1999 Prgect S 1 SC D T H �T sMW---L- of .lob N=bw /4 R w O .2 BERGER/ABAM « PEAK El n 1^1 t ;g„�- M , Date REFF—R,ENCi= KC,SWDM RATIONJAL METHOD i T = L (60 kR L = 607 ka- 20 S = O, O,2,7 I = P L A = 1. 09 Q Z 5 Q = G r A L = O,c/o T = 607 (6o x -ZO x O,o27) 3 .Og rnin . LET- T = 6 , 3 ►��-�,. FOR 25_yR r o.65 _ t, .2,661(r-. 3� D, g0¢ I = 3, 4 X 0, ?04 = 2, 734 Q = o,q X z,734 X 1. 8g = 4. 6a6 CFS FOR 100-YR • O.6 3 I = 4 - 0 X OAII = 3 ,.276 Q = O,9 x 3,2 7C X I,8 8 = 5, 543 LFS Draft Technical Information Report South 180th Street Grade Separation 15 April 1999 Project Sheet d Job Number BERGER/ Subject� ABAM RA►1LAAF Designer Nt D E N G I N E E R rrUrTP—P FLOI,-1 Date__ 2�I11 yq R.EFf u •R� c.� � ws1>07 +fyD. M,4NUAC. S, 4, ) 5, 57 rnaac = 4 t O,5 CI1 � � = 9, 5 GI ae E T L, = O, 12' v p II TRAVE I.ED LA JE } d da /O e , d xs. s 0.19 x s.s • da c C. I.2 OK_ Draft Technical Information Report South 180th Street Grade Separation 16 April 1999 180inlet.xl5 HIGHWAY DRAINAGE (English Units) T= 5 Project Name: S. 180th St. Grade Separation m= 6.89 Project Number: A99002 n= 0.539 S.R.: NA C= 0.9 Designed By: MD I = 2.89384 (25-yr 24-hour storm) Date: 2/11/99 GW= 1.67 Width= 38.5 (1/2 of roadway width+sidewalk) dmax= 0.19' (depth of flow at face of curb) Zmax= 9.50' (from curb to 1/2 of lane) Sta. Width Distance I Delta QlSum Q1 Sloe I SuperIG.W.1 d I Zd I V 1 Q bp 1 52+00.00 ---- ------- ---- ---- ---- ---- --- --- --- --- ---- ------------ 54+60.00 38.5 260.00 0.598 0.598 0.0420 0.02 1.67 0.09 4.45 3.54 0.171 standard grate 56+40.00 38.5 180.00 0.414 0.585 0.0180 0.02 1.67 0.10 5.17 2.61 0.207 standard grate 57+07.00 38.5 67.00 0.154 0.361 0.0020 0.02 1.67 0.13 6.51 1.04 0.164 standard grate 57+27.57 38.5 20.57 0.047 0.211 0.0005 0.02 1.67 0.14 6.91 0.54 0.101 standard grate 62+70.00 ---- ------- ---- ---- ---- ---- --- --- --- --- ---- ------------ 59+80.00 38.5 290.00 0.668 0.668 0.0430 0.02 1.67 0.09 4.62 3.69 0.202 standard grate 58+15.00 38.5 165.00 0.380 0.581 0.0180 0.02 1.67 0.10 5.16 2.61 0.205 standard grate 57+48.00 38.5 67.00 0.154 0.359 0.0020 0.02 1.67 0.13 6.50 1.04 0.163 standard grate 57+27.57 38.5 20.43 0.047 0.210 0.0005 0.02 1.67 0.14 6.89 0.54 0.100 standard grate Reference: WSDOT Hydraulics Manual 5.4, 5.5 Draft Technical Information Report ' South 180th Street Grade Separation 17 April 1999 M am M � MEW M M M M M M M "M, M M, m im cn v A99002-South 180th Street Grade Separation _ x Backwater Calculation 25-yr 244vs Stan„ - Oo _ __ .__ _ _ _ _ _ BARREL _ ENiR. EXIT OUTLET INLET APPR. BEND JUNC. STRUCT.N DESIGN LAT. PIPE PIPE PIPE n K__e KA K( OUT IN- AREA VEL VEL d. (D.Q�2 TW FRICT. ENTR. HEAD HEAD CONTROL CONTROL VEL HEAD HEAD HW RIM FREE- t FROM TO O2 01 03 - SIZE LENGTH-_SLOPE ELEV. ELEV. __ HEAD (cir. -_ELEV. LOSS HGL RL LOSS LOSS ELEV. ELEV. HEAD LOSS LOSS ELEV. ELEV. BOARD as( as as ., _fin( Inn - - snL- (fe In,sl t In _ n n n n tl P.S. 12 2.018 2.018 -0.000 _12.00 70.00 0.008_ 0.012 _0.5 0.01 0.00 S.BD BEO 0.79__ 2.57 0.10 0.80 0.80 8.000 0.189 8.19 0.05 0.10 6.34 7.11 0.087 0.00 0.00 8.25 8.95 0.70 p _12 10 1.987 1.987 0.000 12.00 20.00 0.005 O.OE2 0.5 0.01 0-00 8.30 _8.40 0.79 2.50 0.10 0.59 0.79 7.095 0.051 7.15 0.05 0.10 7.29 7.27 0.092 0.00 0.00b,20 &92 1.72 8 1.918 1.918 0.000 f 2.00 20.00 0.005 O.O E 2 A-5- 8.50 B.EO 0.79 2.44 0.09 0.58 0.79 7.291 0.049 7.34 0.05 0.09 7.48 7.50 0.077 0.00 0.00 8.98 1.61 A� 8 8 1.749 1.719 0000 12.00 8500 0.005 0.012 8.70 7.00 0.79 2.23 0.08 056 0.78 7.478 0.132 7.810.04 0.08 7.73 7.83 0.042 0.00 0.00 9.51 1.72 288 1.289 0.000 12.00 180.00 0.023 0.0t2 7.10 I1.30 0.79 i.84 0.04 0.48 0.74 Z838 0199 8.04 0.02 0.W 8.10 11.98 0.000 000 000 tA.88 2.70 O p 't7 P.S. 18 1.535 t.535 0.000 12.00 186.00 0-031 0.012 5.80 f0.90 0.79 1.95 0.08 0.52 0.78 BSBO 0.258 8.82 0.03 008 891 11.88 0000 000 0.00 11.88 14.28RMerenoea: K' Suiaoe Water Manuel and WSDOT i s p co a b to 5.0 SPECIAL REPORTS AND STUDIES Because there are no new roadway developments proposed within the floodplain, a flood hazard study is not needed for this project. However,the project will impact the wetlands located within the project site thus impacting their flood storage capacity. The impacts to these wetlands will be analyzed in the following sections. See South 180th Street Grade Separation Wetlands Study, (BERGER/ABAM Engineers Inc., 1999)for detailed descriptions of the wetlands. The project proposes to fill part of the wetlands located between the existing tracks to construct the shooflies for the railroad tracks. Approximately 1.09 acres of Wetland B,which is located north of South 180th Street,will be filled. Assuming that the displaced volume of 170,000 cubic feet of water in this impacted area is added to the remaining of 24.5 acres of Wetland B and the connecting wetlands,the water level would be raised by 1.9 inches. This small change in water elevation will not create or aggravate any existing drainage problem in the Springbrook Creek floodplain. Wetland C,which is located between the existing tracks and south of South 180th Street will be completely filled. Because Wetland C is less than 0.1 acre in size,and its flood storage capacity is low,impacts to downstream flooding is minimal. A wetland mitigation plan was developed for the project to compensate for impacts on Wetland B and Wetland C at a ratio of 1.5 to 1 (area created to area impacted). The impacted flood storage capacity is thus compensated. Other Studies A geotechnical engineering report, studies of wetlands, streams, and wildlife were completed for this project. r t Draft Technical Information Report South 180th Street Grade Separation 19 April 1999 6.0 BASIN AND COMMUNITY PLAN AREAS Not applicable for this project. r Draft Technical Information Report South 180th Street Grade Separation 20 April 1999 r7.0 OTHER PERNUTS The required permits needed for this project are listed below. Grading DFW HPA COE 404 JARPA Draft Technical Information Report South 180th Street Grade Separation 21 April 1999 8.0 EROSION/SEDIMENTATION CONTROL DESIGN A Temporary Erosion and Sediment Control Plan will be submitted with the final construction plans to the City of Tukwila for approval with the construction permit application. At a minimum,filter fabric fences will be installed downslope of all construction areas and sediment traps will be used to protect new and existing catch basins. Further measures will be considered when construction methods and schedules are set. M 1 Draft Technical Information Report South 180th Street Grade Separation 22 April 1999 f9.0 BOND QUANTITIES WORKSHEET,RETENTION/DETENTION FACILITY SUMMARY SHEET AND DECLARATION OF COVENANT Bond Quantities Worksheet The stormwater facilities will be bonded per the requirements of the City of Tukwila. w Draft Technical Information Report South 180th Street Grade Separation 23 April 1999 10.0 MAINTENANCE AND OPERATIONS MANUAL A Maintenance and Operations Manual will be prepared for the stormwater facilities as outlined the KCSWDM. r Draft Technical Information Report ' South 180th Street Grade Separation 24 April 1999 e i i i