HomeMy WebLinkAboutSWP272867 • Short Plat'(SHPL#'
REQUEST FOR PROJECT# Prelim.Plat (PP#
CAG#
To: Technical Services Date —Z Y—00 WO# 68S�4rc Green#
From: Plan Review/Project Manager 61 L) L i1A I
Project Name
(70 char-ace=r.ax)
Description of Project: Z/ LO% ��,�I— SiS'�`��"�°f;;1✓ �t�,, -e� 5j�/�„t fiX4;1V< -F
sTi' T" .rvA 101 G T ern L S 4-,�r c
Circle Size of Waterline: (L,�` 10" 12° Circle One: New~ or Extension
Circle Size of Sewerline: 10" 12" Circle One: New; or Extension
Circle Size of Stormline: 24� Circle One: New or Extension
Address or Street Namc(s) pQ / �/ _y %
D v I p r/Co n trac to r/O wne r/Cn s I t:: �j C�O�Sj'�,+ C��•�� �L j I�;:� /�
�I C70 c.`iaractcrs uu-)
Check each discipline involved in Project Ltr Drwg # of sheel_s per discipline
O Trans-Storm ❑ �I
(Roadwcy/Drairugc) (Off siCc i.-provcrcntsX-inelude basin na-me) (include TESC sheds)
❑ Transportation (Sigrid ,adoa.a-L-nclizadon,Ughcing) ❑ ❑
O Wastewater ❑ X A'
Binh-.-y Scw•u Mun Cirdudc basin name)
O Water (Mains,Valve,Hydrants) ❑ X 13
(Icc:cdc cor posi;c f:Horizonul CUI SI,CCC:)
❑ Suface Water ❑ ❑
Improvements (CiP ONLY)(includc basin name)
TS Use Only j
_----
t -Y
2 9CP
DI L— 7--q 'J
CORE4205 148th Avenue N.E.Suite 200
DESIGN Bellevue,Washington 98007
ENGINEERING • PLANNING • SURVEYING 425.885.7877 Fox.425.885.7963
To......_City of Renton - - DATE August 21, 2000 �oB No. 94168
Planning/Building/Public Works,- 6"' Floor ATTN: _Paul Lumbert
- ----- -- ----- ------
1055 South Grady Way REF: Maplewood Estates
Renton, WA 98055
MAIL - ._ ...... ------ DELIVER .. -X - - PICKUP
TRANSMITTED FOR: YOUR USE -....... ------------------------ PER REQUEST..._ ---------------- --- ---- - INFORMATION ONLY --.----------_..---- --- --
ACTION REQUIRED: PROCESSING. X REPLY --- _ RETURN . - NONE -
QUANTITY DATED DESCRIPTION
1 set Revised Storm Drainage Plans
2 copies Additional storm calculations to insert into Section l ll-of your copies-of_---..
- --
theStorm Drainage Report-------------------------------------------....-------------------------------------------------------
-- -------- ------------------------------ -------------------------------
TgFgEt -
- -At - q�0
This plan set has been revised per Dan Carey's comments datedul� I 01V1�31a
COMMENTS --- -- _
8/17100. -....
------------
-------------------------- ---
....... ------------- - ---- - ..
--------------------
-...
- ---- - --
- -..... .....
- - .... ---- .... .
- ......-- - - ...
Ron Hughes, Bumstead Construction ' --
CC:-------- - --- -------------------------------------------------------------------------------------- BY:
David E. Ca on, P.E.
-------------------------------------------------------------------------------------
David E. Cayton,P.E.
Project Engineer
` / 4205 148th Ave.N.E.Suite 200
CORE Bellevue,Washington 98007
V DESIGN 425.885.7877 Fax 425.885.7963
E-mail.dec@coredesigninc.com
ENGINEERING - PLANNING - SURVEYING
4205 148th Ave.N.E.Suite 200
COREBellevue,Washington 98007
C�DESIGN 425.885.7877 Fax 425.885.7963
CITY OF RENTON
August 14, 2000
Core Design, Inc. Project No. 94168
tsU��uuvU UlV►61ON
Paul Lumbert, Planning &Development Services.
City of Renton
1055 South Grady Way
Renton, WA 98055
Subject: Maplewood Estates Drainage Plans
Dear Mr. Lumbert:
We have revised the Storm Drainage Plans and Calculations for the above-mentioned
project per your second review comments. Your review comments have been addressed
as follows:
Pipe System and Conveyance
1. The pipe sizes from CB 37 to CB 58 and CB 58 to CB59 have been increased to 24
inch to eliminate the overflow condition during the 25-year storm event.
2. A copy of Figure 4.3.41) "Backwater Calculation Sheet Notes" from the KCSWM has
been added to Section IV of the Storm Drainage Report. Our spreadsheet uses the
same format and formulas as the KCSWM.
Detention Pond Design
1. The Detail for CB 1 has been change to match the calculated orifice size.
2. A secondary overflow has been provided by adding an additional inlet pipe to CB 1.
This intake was set above the maximum water surface elevation, but below the
emergency spillway elevation.
3. A gravel access ramp and pad have been added to the pond. The pond volumes used
in the calculations have been revised to reflect a decrease in the available storage.
4. The riprap from the emergency spillway has been extended to the bioswale bottom
and across the bottom width.
ENGINEERING - PLANNING • SURVEYING
9416813.DOC
5. Backwater calculations for the pipe system downstream from the bioswale have been
provided at the end of the 100-year backwater calculation spreadsheet.
Other Items
1. The Storm Drainage Tract note has been changed as requested.
This revised plan set also includes revisions to the pipe sizing from Outfall 2A to CB 13.
Various pipe in this segment have been lowered to reduce the calculated hydraulic grade
line, therefore allowing a reduction in pipe size from 36 inches to 30 inches.
If you have any questions or need additional information, please do not hesitate to call me
at (425) 885-7877.
Sincerely,
CORE DESIGN, INC.
David E. Cayton, P.E.
Project Engineer
Cc Ron Hughes, Burnstead Construction
The routing results are summarized as follows:
ROUTING RESULTS 2 year 5-year 10 year 100 year
storm storm storm storm
Qp allowable release from site (cfs) 3.09 7.98 10.49 18.73
(adjusted 2 yr outflow by 50%)
Hydrographs, 1, 2, 3, 4
Qp developed(cfs) 12.51 18.75 22.45 33.86
Hydrographs 5, 6, 7, 8
Qp out of pond(cfs) 3.09 6.78 9.15 18.72
Hydrogra hs 9, 10, 11, 12
Pond live storage required(CF) 111,700 136,350 147,269 185,121
Pond live storage provided(CF)w/ 136,128 167,384 182,536 233,041
safety factor of 10%for 2-yr and
30% for remaining storms
See attached volume calculations spreadsheet for the actual pond to be constructed on the
following page.
Design of the emergency overflow spillway for the pond is calculated below.
The maximum water surface is at EL 399.19. The spillway will be placed at EL 400.20
with a berm located at EL 401.20 The depth of water over the spillway will be 0.70 feet.
The overflow elevation therefore will be equal to 400.20 plus 0.70 or 400.90.
L=(Q1oo/(3.21H"2))- 2AH
L=(33.86/(3.21(0.7)"2))-2.4(0.7)= 16.3 feet minimum=>USE 16.5 feet
A minimum of 0.3 feet of freeboard above the overflow elevation is required. Therefore,
the berm height for the pond needs to be greater than or equal to 400.70 plus 0.3 or
401.20. The actual berm height for the pond is 401.20 which is equal to the minimum.
•
r�
��i��i�i��O�iRC.�til:•;:/J/�i���.il
�.�wwww�www��wwwwww.r����y�ww�we�ww
��w��wnwwwowww�rr�eo�wiw�•w��iwww �
��www�ww•wwwwiwww���i�r�w�w�a���www
��wuww�w■�awwawwvi�wi�w.�w�!raw�.�www�
www�w�.w�wwwl/l'tl I/�/ww/Li�w•15��•�w�w/�ww
� �ww�www.ww�w�wr.1�/II/.w�c.r•.��•.i�����/�/w •
�w�w•ww�www�ww•ww�/w/I.s//�wwrl�ww�/�wr���e�w.�•�ww
��•wwwwwwwr/uru./i.A w px�..•mwww•��aqrJ.www�w.www
wwwNw�w UW I/AFMU!Ow•lLJ1-_/y�www
w�w►y��www
�w��am���a�o.Ii,rwwa��wwrw.�wwrw•��wwo
��i��1/JJ1/1.►./wR���IAS/yii�w9■
w.wr/,.�tl�•/tl.I.tlw�AL fz•tlwwf/w
oN1/—��/.►tlL�wow www./�L.l� .7�w.w•�ww
�wwwr//i'///I/Awtrwwww�.��w�OMMM=wlw
�MVAI IZAWAWawww� ���wwwwr��w
�w�/III///./�►owlww:�:w•��wwwew�wr.��wiw
��._�I.���ii�i _mow/_��_�_�_�N_��s��w�_�w•�_��
ww��www.ww�w���wlww
/IIItl/// w ww��ww.www.ww.www.wwlw
1AWAI PI-/AM �wrawwwwr�w�www.w�ww��w�w�
��� �JI+I_I��r���i�����w���w���•ww—wj�w
"w 1� 0�� . Y. ��wwwww�■ww��■�.��ww"�
ww�J'Tip '.�iFA/��s.w.�wwwww�w�ww�w�rww�w�•�w•�
�i /ei►�r. wr.w►sww��wwwwww��w��w�� w
WwAFwww�w�www�w�www.�wiww
w ; / I/.�►���w�www�w���w�w��wl�ww
�iir i�/Ii.•� �wiww�w�wwwww�w�www�w�ww��www
• • . is /
1 -
t s �. IPv
y {
KING COUNTY, WASHINGTON, SURFACE WATER DESIGN MANUAL
FIGURE 4.35C HEADWATER DEPTH FOR SMOOTH INTERIOR PIPE CULVERTS WITH INLET CONTROL
180 10,000
i68 8,000 EXAMPLE (2) (3) ENTRANCE TYPE
6.
156 6,000 D•42 .nchos (3.5 toot) 6
5000 0•120 et: — 5 _ SQUARE EDGE WITH
,
144 HEADWALL
4,000 rtwe ttw 6 5.
132 D teat
4.
3,000 (1) 2.5 8.8 5' 4.
120 1
(z) 2.1 7.4 I 1
2,000
108 (3) 2.2 r,r
t
3. 1 ,
a0 in feet 3.
96 1,000 3. PLAN
e0o
`••^ GROOVE END WITH ,
- -. -- —► HEADWALL
84 2.__ :..,
— 600 %
500 /� I:.•: i
rn 72 400 / 2.
I
1
= 300
U
Z 60 200 / LJ 1.5 PLAN C2)
�
GROOVEEND
54 0 �/ / ® PROJECTING �t
Cr w 48 /0 100 Z
> ar 80
42 N 60 / a 1-0 1.0 ��•
_ 50/ W
O o HW SCALE ENTRANCE o 1.0
m 0 D TYPE ¢
W 36 W .9
W /1 30 (1) Square edge rith Q
33 / headrall 3 9
Q �
20 (2) Groove end rah Q
A W
30 / head■all = .8 .8
(3) Groove and •8
„7 _ projecting
10
24 8 .7 .7 7 HW _ 3R4.Z�-9?*3 ?
6 To use scale (2)or (3) project -Z
21 5 horizontally to scale(1),then
4 us• ttrol ht inclined line through
D and 0 scales,or reverse as •6
3 illustrolod. 6 .6
18 ( 341 c FS
2 ems\
)5 � 33.S6 s
.5 .5
1.0 •5 _
12
ro
ELA
rite
4.3.5-11 1/90
CORE4205 148th Avenue N.E.Suite 200
DESIGN Bellevue,Washington 98007
ENGINEERING - PLANNING • SURVEYING 425.885.7877 Fox.425.885.7963
TO City of Renton _ _ - _ DATE 03/03/00 JOB NO. 94168
- - - ATTN: Paul Lumbert
- _.._ REF: —Maplewood Estates
MAIL _ DELIVER -...X _ PICKUP
TRANSMITTED FOR: YOUR USE _.. X PER REQUEST___ __ INFORMATION ONLY.--
ACTION REQUIRED: PROCESSING...- X _ - -- REPLY. __ RETURN ----- _.. ........... NONE
QUANTITY DATED DESCRIPTION
1 - Permit Application ..
1 - - - Permit Cost Breakdown
1 Check for $31,717 -
1 _ Geotechnical Report
2 Storm Drainage Report - _. - --
2 Lift Station Report - - ...... . ......
3 sets Civil Engineering Plans
COMMENTS _ _ __
- .. .-_....._.-.. ---- - -------
----- -----
CC: Ron Hughes, Burnstead Construction BY: -- -....
David E. Cayton, P.E.