Loading...
HomeMy WebLinkAboutSWP272816 (2) STORM DRAINAGE CALCULATIONS OPUS NORTHWEST L.L.C. OAKESDALE AVENUE,S.W. AND MONSTER ROAD S.W. RENTON,WASHINGTON K. eq4 OUR JOB NO. 6686 MAY 5, 1999 OIVAL EXPIRES Prepared By: BARGHAUSEN CONSULTING ENGINEERS, INC. 18215 72ND AVENUE SOUTH FBING OF RENTON KENT, WASHINGTON 98032 S IV E D �Hav (425) 251 -6222 1 8 1999 m z DIVISION z CIVIL ENGINEERING, LAND PLANNING, SURVEYING, ENVIRONMENTA 3G y T NG EN6 1.0 PROJECT OVERVIEW The proposed project site is located at the 1200 block of Monster Road S.W., Renton, Washington. A warehouse building, located on approximately 7.12 acres, will be constructed on the parcel. The developed site conditions consist of approximately 4.9 acres of impervious surface,as well 2.2 acres of pervious area. The conveyance system is composed of a series of catch basins with ADS N12 pipe. The stormwater collected by this conveyance system is routed to the southwest corner and split to accommodate treatment of the 2- .year peak flow rate. Water quality is proposed through a 200-foot biofiltration swale. Calculations for the bioswale have been included in the following pages. The remainder of the diverted flow will bypass the biofiltration swale and will eventually be routed to an existing drainage swale off-site. Calculations have been included for the conveyance system, based on the 25-year peak flow rate using Mannings Equation and the rational method. • 6686.004[NM\ph\g1c] • CONVEYANCE SYSTEM CALCULATIONS Pit BARGHAUSEN CONSULTING ENGINEERS-PIPE FLOW CALCULATOR using the Rational Method&Manning Formula KING COUNTY DESIGN FOR 25 YEAR STORM JOB NAMEOPUS NORTHWEST NOTE:ENTER DEFAULTS AND STORM DATA BEFORE BEGINNING JOB#: 6686 DEFAULTS C= 0.85 n= 0.013 REVISED: 4/5/99 d= 12 Tc= 6.3 A=Contributing Area(Ac) Qd=Design Flow(cfs) COEFFICIENTS FOR THE RATIONAL METHOD"Ir'-EQUATION C=Runoff Coefficient Qf=Full Capacity Flow(cfs) STORM Ar Br Tc=Time of Concentration(min) Vd=Velocity at Design Flow(fps) 2YR 1.58 0.58 1=Intensity at Tc(in/hr) Vf=Velocity at Full Flow(fps) 10YR 2.44 0.64 PRECIP= 3.4 d=Diameter of Pipe(in) s=Slope of pipe(%) 25YR 2.66 0.65 Ar- 2.66 L=Length of Pipe(ft) n=Manning Roughness Coefficient 50YR 2.75 0.65 Br- 0.65 D=Water Depth at Qd(in) Tt=Travel Time at Vd(min) 100YR 2.61 0.63 FROM TO A s L d Tc n C SUM A A'C SUM A'C I Qd Qf Qd/Qf D/d D Vf Vd Tt C131 CB2 0.54 0.50 168 12 6.3 0.013 0.7 0.54 0.38 0.38 2.73 1.03 2.52 0.410 0.447 5.36 3.21 3.06 0.91 CB2 CB3 0.96 0.50 107 15 7.2 0.013 0.9 1.5 0.86 1.24 2.50 3.11 4.57 0.681 0.604 9.06 3.72 4.00, 0.45 CB3 CB4 0.96 0.65 305 15 7.7 0.013 0.85 2.46 0.82 2.06 2.41 4.95 5.21 0.952 0.773 11.60 4.25 4.80 1.06 CB4 CB5 0.41 0.50 160 18 8.7 0.013 0.85 2.87 0.35 2.41 2.21 5.33 7.43 0.717 0.627 11.29 4.21 4.58 0.58 CB8 CB7 2.06 1.00 104 15 6.3 0.013 0.75 2.06 1.55 1.55 2.73 4.22 6.46 0.654 0.592 8.89 5.27 5.62 0,31 CB7 CB6 0.20 3.38 129 15 6.6 0.013 0.75 2.26 0.15 1.70 2.65 4.49 11.87 0.378 0.426 6.38 9.68 9.01 0.24 CB6 C135 0.77 3.67 163 15 6.8 0.013 0.85 3.03 0.65 2.35 2.59 6.08 12.37 0.492 0.495 7.43 10.09 10.10 0.27 CB5 C139 0.34 1.10 15 18 9.3 0.013 0.85 0.34 0.29 5.05 2.12 10.71 11.01 0.972 0.792 14.26 6.24 7.05 0.04 CB5 BIOSWAL 0.00 0.57 23 12 6.3 0.013 0.85 0 0.00 0.00 2.73 2.26 2.69 0.840 0.700 8.40 3.43 3.84 0.10 2.26 IS EQUAL TO THE 2 YR FLOW i Pagel \\ \ \\ \ x\ \ \\ \\ \\\\\\\\\\\\ 20•. \�\\\\\�\ ;•r.. \ g ...�o•...... �yy��� N -....... .................. • OZ CND ZN O \\ j r O•'•. .'•. `' ��-- -"`moo-�.-� Dm M u D D N n if GN.)00 V D (0 N nD n n . No. I Dote I By Ckd. Appr. Revision Job Number �r /f Designed BIDS Desi V' �Y 18215 72ND AVENUE SOUTH Title: CONVEYANCE BASIN MAP 6 6 8 6 V KENT, WA 98032 Drawn NJM Horizontal m Z (425)251-6222 (425)251-8782 FAX Checked — "=200' Sheet p � ` Approved DKB V Pe- `I�r ' S CIVIL ENGINEERING, LAND PLANNING, N/A For: OPUS NORTHWEST, L L C < � �� SURVEYING, ENVIRONMENTAL SERVICES Dote 4 5 99 of _1_ ENG BELLEVUE, WASHINGTON f ilr�: I':\SD'�KFI��i,;`•��;;;,;v\� NG1NEERING\6686—X2.DWG Date/Time: 05/05/1999 10:05 Scale: 1=100 Nathan Xrefs: Z6686—T,Z6686—S, SPLIT FLOW CONTROL STRUCTURE CALCULATIONS 5/6/99 2 : 32 :48 pm Shareware Release page 1 OPUS NORTHWEST, LLC SPLIT-FLOW CONTROL STRUCTURE FILE#6686 .BSN BASIN SUMMARY BASIN ID: Al NAME: 2YR/24HR DEVELOPED SBUH METHODOLOGY TOTAL AREA. . . . . . . : 7 . 12 Acres BASEFLOWS : 0 . 00 cfs_ RAINFALL TYPE. . . . : TYPEIA PERV IMP PRECIPITATION. . . . : 2 . 00 inches AREA. . : 2 .23 Acres 4 . 89 Acres TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 86 . 00 98 . 00 TC. . . . : 10 . 00 min 10 . 00 min ABSTRACTION COEFF: 0 . 20 PEAK RATE: 2 . 26 cfs VOL: 0 . 88 Ac-ft TIME: 480 min Split Flow Control Structure Calculations The 2yr/24hr Peak Storm event will be diverted into the Bioswale for treatment. From WaterWorks 4 calculations, Q=2.26 cfs Q=CA 2gH 2.26 cfs=0.62 *A 2(32.2 ft)(3 ft) A=0.262 ft2 A=7cd2/4 0.262 ft2=7c d2/4 d=0.578 ft d=6.93 in d=6 15/16 Riser Calculations: 25 yr flow—2 yr flow=Flow through By-Pass System 10.81 cfs—2.26 cfs=8.55 cfs (See figure 4.4.7J,Riser inflow curves attached) i15"Dia.Riser Required • KING COUNTY, WASI-IINGTON, SURFACE WATER DESIGN MANUAL FIGURE 4.4.7J RISER INFLOW CURVES Weir Flow -- Orifice Flow -----�- 100 .. 36 33 30 v 27 � c 24 d U 21 C a w — 18 E cz Ir 15 W d Mn it 12 10VJ 10 Al Z Ar lzfzll 1 0.1 1.0 10.0(3.D'� HEAD IN FEET (measured from crest of riser) SOURCE: USDA-SCS QwiER =9.739 DHW "2 QoRiFicE =3.782 D 2 H Q in cfs, D and H in feet 4.4.7-10 1/90 RIM EL=73.0t ROUND SOLID COVER MARKED "DRAIN" 4" ADJUSTMENT BRICKS (12" MAX) STANDARD GALVANIZED STEEL LADDER STEPS TOP SLAB W/ Z l-x27" HOLE (6" THICK) G ° d � G ' d ° d 18" SD 12" CAP WITH p RUBBER GASKET IE=62.34 SHORT NIPPLE (LUBRICATE a °. .a BOTH ENDS) A.C. OR G.P.K. 6' a MANHOLE ADAPTOR 5" MIN. MIN. a.. s .. PVC—SDR-35 LOCATED IN NARROW SIDE OF CB 12" SD 2 YR STORM TO BIOSWALE a IE=59.34 PVC TEE W/ RUBBER d a 18" d GASKET JOINTS ° ° a RUBBER GASKET PLUG ORIFICE 0 6 15/16" CATCH BASIN TYPE II-60" CB # 9, TYPE II-60" SPLIT FLOW CONTROL STRUCTURE NOT TO SCALE �9 d d MWA. -PA1rSD t tisv,o SS d. Q. Q d d. O d, d d d CB # 9, TYPE II-60� SPLIT FLOW CONTROL STRUCTURE 1' = 2' i BIOSWALE CALCULATIONS Opus Northwest, BCE#6686 Worksheet for Trapezoidal Channel Project Description Project File c:\haestad\fmw\6686.fm2 Worksheet Bioswale worksheet Flow Element Trapezoidal Channel Method Manning's Formula Solve For Bottom Wdth Input Data Mannings Coefficient 0.350 Channel Slope 0.020000 ft/ft Depth 0.67 ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Discharge 2.26 cfs Results Bottom Width 6.55 ft Flow Area 5.74 ft2 Wetted Perimeter 10.79 ft Top Width 10.57 ft Critical Depth 0.15 ft Critical Slope 3.453058 ft/ft Velocity 0.39 ft/s Velocity Head 0.24e-2 ft Specific Energy 0.67 ft Froude Number 0.09 Flow is subcritical. 05/06/99 FlowMaster v5.15 02:49:02 PM Haestad Methods, Inc 37 Brookside Road Waterbury,CT 06708 (203)755-1666 Page 1 of 1 Short Plat'(SHPL-#" ) REQUEST FOR PROJECT# Prclin Plat (PP# ) CAG# ) To: Technical Services Date WO# j � S Green# LUA 'T-] From: Plan Review/Project Manager ]/TTIZfUG Project Name 012L s G(1AI,t,Q-Y,6 c.�cA� 13cir C'OFyC� (70 chamc(=max) Description of Project: J&eG-RcUSC 11JSTA(.-i.Ano�-) AT �(C�/USjZ=l2 R-yA-6 i tic uw DCS WkTIE12, SNQM�y1V 'r, all Circle Size of Waterline: 8" 10" 12" Circle One: ew or Extension Circle Size of Sewerline: O 101, 12" Circle One: ew or Extension Circle Size of StorTnline: 121, 015- 181, 24" Circle One: ew or Extension Address or Street Name(s) ptJSR�R Dvlpr/Contractor/Owner/Cnslt:: _ 1�yzC�1�{� =1.1NSy��lt.�iC,ItJti C C70 acaaus max) Check each discipline involved in Project Ltr Dnvg of sheets per discipline ✓ ✓ Trans-Storm ❑ O (?oadwny/Drainagc) (Off siic impmYcn=Ls)Cincludc basin namc) (includc T SC shccts) Transportation (Signaliza¢on,Channclizaoon,Lighting) ❑ ❑ / XWastewater ❑ ❑ Sanitary Scwu Main(includc basin namc) Water (Mains,Valve,Hydrants) ❑ ❑ (Includc compositc crc�il Cui$I CC LS) l=] Suface Water ❑ ❑ Improvements (CP ONLY)(includc basin namc) TS Use Only cd—