HomeMy WebLinkAboutSWP272734 SwP• 2`� • Z7 34
CONCEPTUAL DRAINAGE REPORT
FOR
KIRKLAND COURT
Prepared for:
Treece&Company
320 Second Avenue South
Suite 200
Kirkland, WA 98033
Prepared by:
Peterson Consulting Engineers
320 Second Avenue South
Kirkland, WA 98033
9 F.A PET
10N AL gt�
l�XPtRES H 17/
September 10, 1997
� T
Page 1 of 2
King County Building and Land Development Division
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
PROJECTPART f. '.PROJECT OWNER AND
.- D�/
Project Owner ;l`, L9 f ti L' Project Name I' �ioez,z ND U12w/
Address IP9 ,f. ' O E 9 Location �7�;A/
Phone Township
Project Engineer AWZ- Range E
Section
Company � F �` � N �N Project Size ��/ETOF./L�� AC
Address Phone 'n0 J�U D U.�_ 9 Upstream Drainage Basin Size M� AC
PART 3 TYPE OF •
® Subdivision DOF/G HPA 0 Shoreline Management
Short Subdivision COE 404 0 Rockery
Grading 0 DOE Dam Safety 0 Structural Vaults
Commercial FEMA Floodplain 0 Other
Other COE Wetlands = HPA
PART 5 SITE COMMUNITY AND .
Community dIT 11 OF /-?EA,iTON
Drainage Basin
PART 6 SITE CHARACTERISTICS
0 River Floodplain
Stream Wetlands
Critical Stream Reach Seeps/Springs
0 Depressions/Swales High Groundwater Table
0 Lake F--] Groundwater Recharge
0 Steep Slopes Other 11-71—.4T
Lakeside/Erosion Hazard
SOILS
Soil Type Slopes Erosion Potential Erosive Velocities
Additional Sheets Attatched
1/90
TABLE OF CONTENTS
I. PROPOSED SITE CONSTRUCTION 1
II. EXISTING ON-SITE DRAINAGE FEATURES I
III. DEVELOPED ON-SITE DRAINAGE FEATURES 1
IV. CORE REQUIREMENTS 3
A. Core Requirement#1: Discharge at the natural location 3
B. Core Requirement#2: Off-site analysis 5
C. Core Requirement#3: Runoff control 5
D. Core Requirement#d: Conveyance System 5
E. Core Requirement#5: Temporary Erosion and Sediment Control Plan 5
V. DETENTION/RETENTION g
VI. WATER QUALITY g
VIi. OFF-SITE ANALYSIS 7
VIII. CONCLUSION 7
e '
Conceptual Drainage StudyJor Kirkland Court September 10, 1997
I. PROPOSED SITE CONSTRUCTION
The 4+/- acre Kirkland Court site is a proposed residential subdivision containing
approximately 19 single-family lots. The site is located within the City of Renton,
northeast of Kirkland Avenue NE and directly southwest of Honey Creek. More
specifically, the site is located within the Northeast quarter (NE 1/4) of the Southwest
quarter(SW 1/4) of Section 4, Township 23 North, Range 5 East, W.M.
Existing development adjacent to the site includes Renton Highlands No. 2 to the west
and north and two mobile homes to the south(see Figure 1).
Based on the results of an onsite detailed soil content analysis completed by Terra
Associates, the site contains Alderwood soils. This soil type is considered hydrologic
soil class C per the King County Surface Water Design Manual (SWDM). Curve
number calculations for the onsite hydrologic analysis are included in Appendix I.
II. EXISTING ON-SITE DRAINAGE FEATURES
The existing conditions within the project boundary consist of heavily wooded area
with many scattered trees ranging in diameter from 12" to 30". The onsite existing
runoff is divided into two drainage basins consisting of the northeast portion of the site
(approximately 1/3 of the total site area) and the southwest portion of the site
(approximately 2/3 of the total site area).
An existing ridge intersects the site from the northwest to the southeast and defines the
boundary by which the two aforementioned drainage basins are defined. Northeast of
the ridge, the existing on-site runoff discharges northeasterly into Honey Creek at a
steep slope of approximately 75% +/-. This area is within a native growth protection
area, and is not proposed to be used for development. Southwest of the ridge, the
onsite runoff is discharged at a relatively mild slope of approximately 5% +/-. Please
note that the site is only proposed to be developed within the southwest portion of the
site.
An analysis was completed utilizing the WaterWorks software to determine the
existing and proposed runoff rates produced by the 2, 10 and 100 year, 24-hour storm
event for the pre-developed conditions. All of the hydrologic parameters utilized in
the calculations are included in Appendix I and the results summarized in Table 1.
III. DEVELOPED ON-SITE DRAINAGE FEATURES
The proposed on-site drainage patterns are similar to those of the existing
conditions. The onsite development is only proposed to be located within the 2.73
Peterson Consulting Engineers Page 1
D.\DATA\PROJEC MTREC0003\TREE.DOC
Conceptual Drainage Study for Kirkland Court September 10, 1997
• Depth of Flow=0.23 feet
• Surface Area= 880 sq. ft.
• Velocity=0.20 fps
=> 100-year, 24 Hour Storm flowrate: =0.89 cfs
• Design Swale(100-year, 24-hour storm):
• Length=200 feet
• Width=3 feet
• Slope=2.00%
• 'V'Value=0.027
• Depth of Flow=0.14 feet
• Surface Area= 770 sq. ft.
• Velocity= 1.91 fps
Copies of the WaterWorks biofiltration Swale calculations are included in Appendix III.
VII. OFF-SITE ANALYSIS
The City of Renton Surface Water Drainage system plan was utilized to determine an
appropriate off-site discharge point for the proposed Kirkland Court development
storm sewer system As shown in Figure 3, an existing stormsewer is located within
Kirkland Avenue NE up to NE 16th Street. It is proposed to construct
approximately 450 LF of 12-inch storm sewer from the outfall of the detention
facility, southwest within NE 18th Street and south within Kirkland Avenue NE to
the existing stormsewer discussed above.
An alternative proposed alignment may include the construction of approximately 250
If of 12-inch storm sewer from the outfall of the detention vault to the south,
bypassing the existing mobile home detention pond and discharging into the existing
12-inch storm sewer within NE 16th Street. This alternative is dependent upon the
ability to achieve utility width requirements and easements along the entire alignment.
VIII. CONCLUSION
Based on the information contained within this Conceptual Drainage Report, the
construction of the proposed Kirkland Court subdivision is not expected to create a
negative impact on the existing adjacent areas. Runoff from the site will be routed
within the proposed on-site street section at an acceptable depth and velocity,
conveyed to a detention vault within a biofiltration swale, and discharged into an
existing off-site storm sewer system.
Peterson Consulting Engineers Page 7
D:\DATA\PROJEM\TR.FCON3\TR-EEJ30C
1
I
GRAPHIC SCALE
100 0 50 100 200 400
I
rRAc-r NE 1/4, SW 1/4, SEC.4, TWP.23N., RGE.5E., W.M. LAM-
RENTON SP 020-91 9303039001
_. ( IN FEET )
� 0� • 1 inch = 100 fl
Alp'? P51i £AR)15J3";ar ��l �Ti� �r .'
Y •K T �....�....
41
li 4 iS 10 9 ��' LOT 2
§ XCSp 108SO17-960126 86
Vr , s �17 , t♦ 11 i Je
rRACT's +, m�cr-c
�„ 19 e P. as A as er
•01..ar a ail ON—SITE
r.a' row.i
+~ a DRAINAGE 9....
TRACT-A' 3 Id ! LT 12 -
jp0 NCP• PROPOSED IO'DOE
pp [ A. ,p t: EYf11fQ/CY KWEI
a
• ��r 7R�Ci.
44
= y f
r ,Eloru6m AtSP IOB50I7- AC.,E SS ROAD fAOUTV
1
b o
AREA TO BE
_.YIgY fw[
,ally r•lm $. 1 8 ;2 IS �S ,4 8 s oa'.°.`.ars
/ VC
\ 3 /
4 ,•
5 6
\\ •\ '\\ / RENTON ICHLANDS NO 2
/01- PCS.92-98
lORRE TION PLAT
2 / HLCK4.
BLOCK 3
5 / LEGEND NOTE:
TREECI— COMPANY
fNGINFFp:F.c. AIEV :iN:IiiPYE1+T 1':'Jl?�k15
S.J..'f"'.Itl•K' .vSr,r'J. )'w`:!
C'I'CY UF' TtfN'I'ON
DF_1'A Rl ME-Nil OI• PUt31.IC WOItK�
FIGURE 2
ON-SITE DRAINAGE BASINS AND PROPOSED FACIUTM
KIRKLAND COURT
as-c o J f Y i Art 9/0/ fllf6v D.•
At j
1 _ _
Y } y .—._. _ ND —_. i•M:rM ___ PI -�PIM - Mr-- P rN P _..______- IM 1
Conceptual Drainage Study for Kirkland Court September 10, 1997
acres located-to the southwest of the steep sloped area adjacent to Honey Creek.
The project will result in the construction of 19 single-family homes, and vehicular
roadways. As shown in Figure 2, the finished site will have approximately 2.27
acres of residential lots (48% impervious) and 0.46 acres of paved impervious
(inclusive of both roadway and private access tracts). An onsite hydrologic analysis
was completed utilizing the WaterWorks software to determine the 2, 10 and 100-
year, 24-hour flowrates generated by the post-developed conditions. The
parameters and calculations are included Appendix I and the results of the
calculations are included in Table 1.
A new storm drain collection and conveyance system will be constructed as part of
the project. A detailed discussion of the proposed storm drain system is discussed in
the section within this report entitled "offsite analysis." On-site storm detention will
be provided, as discussed in the next section, to limit the on-site runoff to quantities
defined by the existing drainage condition hydrologic analysis. To provide for water
quality treatment, runoff from paved and landscaped areas will be collected and
conveyed within a biofiltration Swale located after the detention vault discharge (see
Figure 2).
TABLE 1
FrequencN Area Volume
Pre-Development
2-year 0.18 1.95 2.73 0.12
10-year 0.51 2.85 2.73 0.26
100- ear 0.98 3.85 2.73 0.43
Post-Development
2-year 0.83 1.95 2.73 0.29
10-year 1.37 2.85 2.73 0.47
100-year 1.98 3.85 2.73 0.68
IV. CORE REQUIREMENTS
A. Core Requirement#1: Discharge at the natural location
The proposed onsite conditions and patterns emulate those of the existing site
conditions. The developed onsite runoff will be routed via surface flow within
the onsite street section and discharged at the historical location.
Peterson Consulting Engineers Page 3
n:\DATAT ROJ ECIS\TRECOM3\TREE-DOC
Conceptual Drainage Study for Kirkland Court September 10, 1997
B. Core Requirement#2: Off-site analysis
A storm sewer system is proposed to be constructed with the site which will
serve to capture the onsite surface flows and route them to an existing
downstream stormsewer system (see discussion within Section VII, entitled
ccoffsite analysis").
C. Core Requirement#3: Runoff control
Runoff control will be provided for the Kirkland Court subdivision with the
construction of an onsite detention basin capable of capturing the post-
development flow rates and releasing them at the existing conditions peak runoff
rates for the 2, 10 and 100-year, 24-hour storm events. Designing the system to
the 100-year event resulted in a storage volume of 6,830 cubic feet. A detailed
discussion of the design and calculations for the detention determination is
included in the next section.
D. Core Requirement#4: Conveyance System
There are two onsite proposed conveyance systems. The first system is the
onsite paved street section, which will route surface flows as shallow channel
flow to the southern edge of the site, discharging into a proposed biofiltration
swale. The second onsite conveyance is a proposed stormsewer system capable
of capturing a portion of the onsite developed flows, discharging into the
proposed onsite detention vault described above.
E. Core Requirement#5. Temporary Erosion and Sediment Control Plan
An erosion and sediment control plan will be prepared for the final submittal of
the plans which will serve to minimise soil erosion/sedimentation during the
proposed site construction. Temporary erosion and sediment control BMP's will
be implemented during the project construction phase. BMP's will include
perimeter protection silt fencing (where necessary), stabilized construction
entrances, catch basin protection, and permanent cover protection (landscaping).
Peterson Consulting Engineers Page 5
D:\DATA\P ROJ ECCS\7RECOW 3\TREE.DOC
Conceptual Drainage Study for Kirkland Court September 10, 1997
V. DETENTION/RETENTION
A hydrologic analysis of the site was completed in order to determine the required
on-site detention necessary to eliminate negative downstream impacts due to
development. An analysis was completed utilizing the WaterWorks software to
determine the existing and proposed runoff rates produced by the 2, 10 and 100
year, 24-hour storm event and to determine the corresponding required detention
necessary to release rates equivalent to those produced by the pre-development
condition. Additionally, the WaterWorks software was utilized to determine the
required detention storage volume, as well as the required dimensions of the
discharge facility.
The WaterWorks output is included within Appendix H and indicates that the
required on-site detention volume is approximately 6,830 cubic feet. The proposed
detention vault outfall will be via a 12-inch pipe.
VI. WATER QUALITY
As previously mentioned, construction of the proposed Kirkland Court subdivision
will create approximately 0.46 acres (19600 so of impervious area subject to
vehicular travel (including roadway and private access tracts). Therefore, a
biofiltration swale will be placed within the utility easement at the southerly edge of
the subdivision at the terminus of the impervious area (see Figure 2). The
biofiltration swale will be sized according to the design criteria outlined in Section
4.6.4 within the S WDM. Specific design requirements are discussed below.
The proposed biofiltration swale for the Kirkland Court subdivision will be installed
at the outfall of the proposed peak rate runoff facility, therefore it will be designed to
capture the flowrate generated by the existing 2-year, 24-hour design storm The
swale is also capable of conveying the maximum flows generated for the developed
conditions within the velocity parameters specified in the S WDM. The swale is
proposed to be a grass-lined, trapezoidal channel with a 5-foot bottom width and 3:1
sideslopes. Preliminary biofiltration calculations were completed under the
assumption that that a 200 if swale will be achievable with future construction.
Biofiltration swale data is as follows:
=> 2-year, 24 Hour Storm flowrate: =0.17 cfs
• Design Swale(2-year, 24-hour design storm):
• Length=200 feet
• Width=3.0 feet
• Slope=2.00%
• "n"Value=0.35
Peterson Consulting Engineers Page 6
DADATA\PR0JECTS\TREC0003\1REE.D0C
NE Und S t `s � ..... t C�
P. s c
o. CL
TY �F RETON
_ PROPOSED t
OPOS D SITE r
61,
z; SURFACE WATER
............... aS�......
DRAINAGE SYSTEM
t71i 0 s t W
a = E ........ Z.. �.�...:....._. LEGEND
N N-
•tJ i
_ a
Oth-•St 4s- o W ' e� ra,.,4,
2. o
C
...............::...w,.«w............... T
NE 20th St �t
z
� )
�,
L
.. i STORM SEWER LDS
s f '•,� `'l,
D1TCH LINES
~�
'
4K-t NE 19th St ,. ",:;f,s :•�'` o BASKS
CATCH
.................. . ....v.......... :.- -..-.- -
M,
W
O MANHOLES
-IVLLS
NE 18th St a zi '
: -
i
4K- .. €....:v.�.........-.._.�..,,,,` � D�tECTION ARROWS
f ............ ..
i , .............,-.,.....a.....-n.. ... ...._ ........_ 6 _ ..
f : f a
+� >' ,
s f 6
•may ... a xt -� N�u
c
/4K-2 Yt 4Ci 6-J N-• - o w.... 9F6 ``"".'�../0 '---� CULVERT CROSJA\V' fi.C6 BL6 2 -(
i 17gI-•: - , 4E6+21 ?Z. .......... '�,••..,
in -.
7_11.. 4c6-6;d' { .kw---^•,- Z,ti,4 aK-1 6-- E - o ————_. REMON CITY LIMITS
__..:..
.l. Y ) �,r a �`,..
• i.i. .. : 7
. :. :`- tC61 NE 17th St �
-,• aK Jg
r `J ,. `...N i t6
4C6-7
C may.
s6
1 � f""•., V l V
N � : : 4C7-2 . XD6-6 R46-II 4E6 .».
-.-
:�; I
71�1 7 rr 7 t :a..... p Z FIGURE GORE 3
r �{¢• S t '
I Is 7 _,.
4 a16 z
' i •NI-y'. c ,t Y ..Z ...... ..?.... -• f:`.t..'. +Jr^"�' ,,..»�.a
:
•! ...
' t
2
_ c J z :} t ... i.' Z j '15t , i ............. ✓'r
C
0 Y i _ 4 t... c i 4q-1- 7-+
> > f
LA
-It 71w s: :0.P•] >i Irlfs,,.d4 Jsi $t QF7-10
a: —7 -
w _... _...... CLAIMER
.............. i >. ;.. .... �•`'''-.... ... .....
..° t•.- .-•L (3 ... .. NVE • 16 MATT F T STORM ANAGE SYSTEM
_� DISCLAIMER
.. ....................., +p+t .........,.;..........{ } ..... ...� THIS INVENTORY I DR ON OR HE OttM DR I
1 = "" "•'-'. "" 3 '- "y""' 4P-2 Zti 7 !S SCHEMATIC ONL':. IT VAS COMPILED FROM NUMEROUS SOURCES 7 ,
i - i IT IS THE lKSI' INFORMATION AVAILABLE AT THIS TIME. AND SHOULD
c; : s !
. r............: t t�y'1: -".>yi ..... BE USED FOR GEWRAL GUIDANCE ONLY. THE CITY OF RENTON
�•.•••:a•-i : L•} ..Y ........f OMISSIONS. VHEN THIS
t
v.,l[- f�. ....... t'... IN NOT INFORMATION
IS ULECFOR ERRORS
PURPOSES DESIGNERS
t ...........? i : , 7C..• f .' -: : :...i �f TION I U E FOR ENGINEERING
1,Z ARE TO FIELD VEf.I THIS INFORMATION.
_ E,:
> # ;
y i - i..
T- • t.
Y 2
1
i ++ i u .....
• CI i ° 4DB-2 4N-1 4CF. 4CD-)` `J ) 6'
r a 1�
�....,..Hk ._ ..} ...... Doe 1"
„:„ .�.., ,�.. N,.
.............. ....:...............,,,..,M..,,.-.:...r.,...........,,..:.:,...v,....... ....,...,..,�...CZ- .IDZ- - 1Lz I. 0
.. ...........
a 1
Iz�!t3............t IIEz-7
2 , IlE2-6 1 :4800
`.+ .. `y : u2 jjjj liE2 10.
• ^•w�., - t !•'-. IJ.CE-?" f..'lu2- 1 £ 2.....
i
Ey > ... ... } ...t i Ilt)1 .,....-..V..,...,.......,•..-..,..�,,...........,,..•.,....£ •�J
11C2-. �• .. .� ��. 1
£..
NE I I th PI
-
Itu 6 �� t tx.z J w ;' .112J_4 I D2 iu I A ♦ P/B/pa ,.ECHNICAL SERVICES
>, > ...._ f x NE 11th St
ff
{
O £ c of f I iiEJ z
t
�Nz 530 SW 1/4
tt
5309 NW 1/4 — —
APPENDIX I
HYDROLOGIC PARAMETERS AND CALCULATIONS
DRAINAGE CALCULATION INFORMATION
Precipitation
Site runoff, infiltration and water quality treatment rates were calculated using WaterWorks
software with the SCS Type 1-A, 24-hour storm event. Precipitation was determined from the
King County SWDM Manual Isopluvial Maps for the 2, 10 and 100-year, 24-hour storm
events. Precipitation rates are:
• 2 Year, 24 Hour Storm: 1.95 inches
• 10 Year, 24 Hour Storm: 2.85 inches
• 100 Year, 24 Hour Storm 3.85 inches
Soil Class
Based on a detailed onsite soils analysis completed by Terra Associates, the majority of
the site contains Alderwood soils. This soil type is considered hydrologic soil class "C
per the S WDM.
Curve Numbers
The pre and post-development flow rates for the Kirkland Court site were calculated to
determine the required onsite detention. Runoff for the pre-developed site is based on
approximately 2.73 acres of heavily wooded area and the developed site is based on 0.46 acres
of pavement and 2.27 acres of residential lots (calculated as 48% impervious). Curve number
values for the pre and post-development calculations are:
Pre-Developed Condition
• Pervious(heavily wooded) 2.73 acres @ CN= 81
Post-Developed Condition
• Impervious(Pvmt): 0.46 acres @ CN=98
• Pervious: 1.18 acres @ CN= 86
• Impervious (roofs and driveways) 1.09 acres @ CN=98
9/5/97 3 : 40 : 49 pm Peterson Engineering Consulting page 1
KIRKLAND COURT
HYDROLOGIC CALCULATIONS
2, 10 AND 100-YEAR, 24-HOUR STORM EVENTS
BASIN SUMMARY
BASIN ID: D-002 NAME: Developed 2 Yr Storm
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 73 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE . . . . : TYPEIA PERV IMP
PRECIPITATION. . . . : 1 .95 inches AREA. . : 1 . 18 Acres 1 .55 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 86 . 00 98 . 00
TC. . . . . 16 .56 min 1 . 75 min
ABSTRACTION COEFF: 0 .20
TcReach - Sheet L: 100 . 00 ns : 0 . 1500 p2yr: 1 . 95 s : 0 . 0100
impTcReach - Sheet L: 20 . 00 ns : 0 . 0110 p2yr: 1 . 95 s : 0 . 1000
impTcReach - Shallow L: 350 . 00 ks :27 . 00 s : 0 . 0200
PEAK RATE : 0 . 83 cfs VOL: 0 .29 Ac-ft TIME: 510 min
BASIN ID: D-010 NAME: Developed 10 Yr Storm
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 73 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPElA PERV IMP
PRECIPITATION. . . . : 2 . 85 inches AREA. . : 1 .18 Acres 1 .55 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 86 . 00 98 . 00
TC. . . . . 16 .56 min 1 . 75 min
ABSTRACTION COEFF: 0 .20
TcReach - Sheet L: 100 . 00 ns : 0 . 1500 p2yr: 1. 95 s : 0 . 0100
impTcReach - Sheet L: 20 . 00 ns : 0 . 0110 p2yr: 1 . 95 s : 0 . 1000
impTcReach - Shallow L: 350 . 00 ks :27 . 00 s : 0 . 0200
PEAK RATE: 1 .37 cfs VOL: 0 .47 Ac-ft TIME: 510 min
BASIN ID: D-0100 NAME: Developed 100 Yr Storm
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 2 .73 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPEIA PERV IMP
PRECIPITATION. . . . : 3 .85 inches AREA. . : 1 . 18 Acres 1 .55 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 86 . 00 98 . 00
TC. . . . . 16 . 56 min 1 . 75 min
ABSTRACTION COEFF: 0 .20
TcReach - Sheet L: 100 . 00 ns : 0 . 1500 p2yr: 1 . 95 s : 0 . 0100
impTcReach - Sheet L: 20 . 00 ns : 0 . 0110 p2yr: 1 . 95 s : 0 . 1000
impTcReach - Shallow L: 350 . 00 ks : 27 . 00 s : 0 . 0200
PEAK RATE: 1 . 98 cfs VOL: 0 . 68 Ac-ft TIME : 510 min
9/5/97 3 : 40 :49 pm Peterson Engineering Consulting page 2
HYDROLOGIC CALCULATIONS KIRKLA ND COURT
2, 10 AND 100-YEAR, 24-HOUR STORM EVENTS
-----------------------
BASIN SUMMARY
BASIN ID: E-002 NAME: Existing 2 Yr Storm
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 73 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPElA PERV IMP
PRECIPITATION. . . . : 1 . 95 inches AREA. . : 2 . 73 Acres 0 . 00 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 81 . 00 0 . 00
ABSTRACTION COEFF: 0 . 20 TC. . . . : 46 . 64 min 0 . 00 min
TcReach - Sheet L: 100 . 00 ns : 0 .4000 p2yr: 1 . 95 s : 0 . 0100
TcReach - Channel L: 120 . 00 kc:5 . 00 s : 0 . 0258
TcReach - Shallow L: 200 . 00 ks:3 . 00 s : 0 . 0200
PEAK RATE: 0 . 17 cfs VOL: 0.13 Ac-ft TIME: 530 min
BASIN ID: E-010 NAME: Existing 10 Yr Storm
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 73 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPEIA PERV IMP
PRECIPITATION. . . . : 2 . 85 inches AREA. . : 2 . 73 Acres 0 . 00 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 81. 00 0 . 00
ABSTRACTION COEFF: 0 .20 TC. . . . : 46 . 64 min 0 . 00 min
TcReach - Sheet L: 100 . 00 ns : 0 .4000 p2yr: 1 .95 s : 0 . 0100
TcReach - Channel L: 120 . 00 kc:5 . 00 S : 0 . 0258
TcReach - Shallow L: 200 . 00 ks :3 . 00 S : 0 . 0200
PEAK RATE: 0 .49 cfs VOL: 0 .26 Ac-ft TIME: 530 min
BASIN ID: E-100 NAME: Existing 100 Yr Storm
SCS METHODOLOGY
TOTAL AREA. . . . . . . : 2 . 73 Acres BASEFLOWS : 0 . 00 cfs
RAINFALL TYPE. . . . : TYPEIA PERV IMP
PRECIPITATION. . . . : 3 . 85 inches AREA. . : 2 . 73 Acres 0 . 00 Acres
TIME INTERVAL. . . . : 10 . 00 min CN. . . . : 81 . 00 0 . 00
ABSTRACTION COEFF: 0 . 20 TC. . . . : 46 . 64 min 0 . 00 min
TcReach - Sheet L: 100 . 00 ns : 0 .4000 p2yr: 1 . 95 s : 0 . 0100
TcReach - Channel L: 120 . 00 kc :5 . 00 s : 0 . 0258
TcReach - Shallow L: 200 . 00 ks :3 . 00 S : 0 . 0200
PEAK RATE: 0 . 90 cfs VOL: 0 .44 Ac-ft TIME: 520 min
9/5/97 3 :40 :49 pm Peterson Engineering Consulting page 3
KIRKLAND COURT
HYDROLOGIC CALCULATIONS
2, 10 AND 100-YEAR, 24-HOUR STORM EVENTS
---------------------------
HYDROGRAPH SUMMARY
PEAK TIME VOLUME
HYD RUNOFF OF OF Contrib
NUM RATE PEAK HYDRO Area
cfs min. cf\AcFt Acres
------------------
1 0 . 174 530 5454 cf 2 .73
2 0 .487 530 11452 cf 2 . 73
3 0 . 902 520 19098 cf 2 . 73
4 0 . 828 510 12763 cf 2 .73
5 1 .365 510 20650 cf 2 .73
6 1 . 985 510 29735 cf 2 .73
7 0 . 174 740 12763 cf 2 . 73
8 0 .487 580 20650 cf 2 . 73
9 0 . 903 550 29735 cf 2 . 73
APPENDIX II
DETENTION CALCULATIONS
9/5/97 3 :40 : 51 pm Peterson Engineering Consulting page 6
KIRKLAND COURT
HYDROLOGIC CALCULATIONS
2, 10 AND 100-YEAR, 24-HOUR STORM EVENTS
--------------------------
LEVEL POOL TABLE SUMMARY
MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE
<--------DESCRIPTION---------> (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf)
2-yr release ................. 0.17 0.83 Vaultl Orificel 104.91 7 3679.35 cf
10-yr release ............ .... 0.49 1.37 Vaultl Orificel 106.86 8 5142.81 cf
100-year release ........... .. 0.90 1.98 Vaulti Orificel 109.11 9 6830.50 cf
9/5/97 3 : 40 :49 pm Peterson Engineering Consulting page 5
KIRKLAND COURT
HYDROLOGIC CALCULATIONS
2, 10 AND 100-YEAR, 24-HOUR STORM EVENTS
---------------------------
DISCHARGE STRUCTURE LIST
MULTIPLE ORIFICE ID No. Orificel
Description: Vaultl outlet
Outlet Elev: 100 . 00
Elev: 98 . 00 ft Orifice Diameter: 1 . 7036 in.
Elev: 105 . 00 ft Orifice 2 Diameter: 2 .7539 in.
Elev: 107 . 00 ft Orifice 3 Diameter: 2 .5078 in.
9/5/97 3 : 40 :49 pm Peterson Engineering Consulting page 4
KIRKLAND COURT
HYDROLOGIC CALCULATIONS
2 , 10 AND 100-YEAR, 24-HOUR STORM EVENTS
-------------------------------
STORAGE STRUCTURE LIST
RECTANGULAR VAULT ID No. Vaultl
Description: Storage Vault
Length: 50 . 00 ft . Width: 15 . 00 ft . voids : 1 . 000
APPENDIX III
BIOFILTRATION SWALE CALCULATIONS
9/9/97 1 :42 : 11 pm Peterson Engineering Consulting page 1
KIRKLAND COURT
BIOFILTRATION SWALE CALCULATIONS
EXISTING 2-YEAR, 24-HOUR STORM EVENT
--------------------
REACH SUMMARY
DITCH REACH ID No. BIO1
Ditch Length: 200 . 00 ft Ditch Width: 3 . 00 ft
Side Slopes : 3 . 00 Ditch Slope: 0 . 0200 ft/ft
Side Slope2 : 3 . 00 Contrib Bas :
Mannings n : 0 . 3500 Dn Invert 100 . 00 ft
Dn W.S . Elev: 100 . 2500 NUM Steps : 10
Trib Area: 2 . 73 Ac. Design Flow 0 . 17 cfs
Depth 0 . 23 ft Vel 0 . 20 fps
Upstream W. S . Elev: 0 . 00 ft .
9/9/97 1 :41 : 51 pm Peterson Engineering Consulting page 1
KIRKLAND COURT
BIOFILTRATION SWALE CALCULATIONS
EXISTING 100-YEAR, 24-HOUR STORM EVENT
--------------
REACH SUMMARY
DITCH REACH ID No . BIO2
Ditch Length: 200 . 00 ft Ditch Width: 3 . 00 ft
Side Slopel 3 . 00 Ditch Slope: 0 . 0200 ft/ft
Side Slope2 3 . 00 Contrib Bas :
Mannings n : 0 . 0270 Dn Invert 100 . 00 ft
Dn W.S . Elev: 100 . 1000 Num Steps : 10
Trib Area: 2 . 73 Ac. Design Flow 0 . 89 cfs
Depth 0 . 14 ft Vel 1 . 91 fps
Upstream W. S . Elev: 0 . 00 ft .
0^70CI7
osooCIO
NNNNNN
2�iltL fi!W W
W W W A V-o V&i
=WWwjj
R NCI r/=lWW
m
K�2 K�Aiv] Coo 2-f-
Ilk
24 2Zq Sc 22 +�l S+-
dak may Z91 19 9
I /
{ u2KLJW-b COURT
Or J i rul(l suI i 4r- d �xna C e /s o n 16 r s) ux.S
aQa«R
Co��a
Dept VI0A s, s dam .
AIAI
�33
wee
Pa d1
wur V
0
a
•_� 'sr5v AN 12Q2S-�
��I�rsOn (�%c� ✓�rf-9 otzF � � , ( �r�ov ✓ j
Dr*L � �Pcv Vol u� 0 v ( f- lieu �.
lg 1 39 83.
3 ►o? 15250
Z J
2(ter.F2 117
5 •
AA OrLf< <e d t ai'VA
vr► Sa� ,m
"MR,
o
z
2. vo
i
i
i
i
i
i
i
i
i