HomeMy WebLinkAboutSWP272704(10) . R
ti�Y o City of Renton
91 * PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENT
Utility Systems - Fifth Floor
1055 South Grady Way Date: 06/02/99
Renton, WA 98055
TO: Craig Hammett FROM: Allen Quynn
Olympic Pipeline
Phone: ( ) Phone: (425) 430-7247
Fax Phone: (425) 271-5320 Fax Phone: (425) 430-7241
SUBJECT: SW 23rd Street Drainage Number of pages including cover sheet
Improvement Project 2.
REMARKS: 0 Original to 0 Urgent E] Reply ® Please 0 For your
be mailed ASAP Comment review
Enclosed please find the plan sheet for SW 23rd Street Drainage Improvement Project showing the existing
utilities east of Lind Ave. Please identify those utilities that maybe yours. The utlities labeled as "FO" are
fiber optic and those labeled as "O" are petroleum lines.
..........
...............
(N:4. WATIE.'R VAIVE"'
12
........... SEE-0i'E'
.2
MART11
A .............. . .
. ... ..... ... .... . . .
............. (PARC
M 0 . .... ... . . . .. ... .. . . . . .
NUMQ T C .......I-L'"',.... .......... .EL ....... ..
w CEN.-TERLINt
.
21.32 "(PIN: INSIDE IE 12 . .. . . . . . . . . . .*. . . . . . . . .
..................
. ..... . ... ...
.. . . .. . ....... . .. . .
:CASE
MONUMENT
.............. ................ ........... ..........
................... ...........
.............. .............
.......... .......... I 1�.............. ............ ...............................
...........
..............................
.........
................
............
.... ...........
.................................
60" WATER. PIPELINE,
.............
.. ..... .......
............. ........I............................. ...................... .... ...... ..... .................... . ....................
.................. .....................
'RMN FR�, V?.x I _
S E ONDUIT....................
..............................
N "'i",
CULVERTi S
...... ........... ...........
... ........ ......SDMH N0.1........................
...... ..... .....
-CLASS.... ........... .......CH NNEL EXCAVATION.:- SS A
A ............. .................... ......... .......... . . ..............................................................
.................
EXCAVATE' AND'_'GRADE l'END OP"
... . ............. REPLACE AND RESTORE
WITH MAXIMUM 11 SLOPE
I.J
..................... .................... ..................
---------------- 1_4............... .......
.................... ...................... .......... .......
1 EXIST
N*�EDGE_,-OF A$PHi
. ............ ................
VAULT-4
CULVERT
24 DIA
.....................
..........
ID
Ld
unuTy, 0
SEE �_Olt 2 "Al
. .. . . . . . . .
. . . . . . . . . .
RIPRA . . . . . . . . . .
... . . . . . . . . . . . .
`CULVERT,
HIGH CL
EXIST' 14: 9 WIDE 9,
REMO EXISTING SE MENT . . . . . . . . . . . .
JE . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
IN CULVERT i i i /_ . . . . . •
. ._,. I A - ----- . . . . . . . . .
A
TION, CLAS'.
- EXCAVA CHANNEL. . .
j
EXCAVATE SEDIMENTS
-3' 4114-THIS AREA
.' 29
*..........
AT- DIRECTION OF ENGINEER
w `' j I, BO
UNDARY OF WET
IE
........ .....
i s w
'`
EXIST 14' WIDE x T, lzC
HIGH CUP
:S `DIMENT
REMO EXISTING :
IN CULVERT
3
Vlt
P
bi I PUGET WESTERN
(PARCEL #2193100(
R4110
CITY OF RENTON
Planning/Building/Public Works Department
J e Tanner,Mayor Gregg Zimmerman P.E.,Administrator
March 3, 1998
Shirley Lukhang
Seattle Public Utilities
Dexter Horton Building, 10th Floor
710 Second Avenue
Seattle, WA 98104
SUBJECT: PERMISSION TO ENTER CITY OF SEATTLE WATER LINE RIGHT-OF-
WAY FOR FIELD SURVEY AND WETLAND DELINEATION WORK
Dear Ms. Lukhang:
The purpose of this letter is to request permission for the City and its agents to enter upon City of
Seattle property adjacent to Springbrook in Renton for the purpose of conducting field surveys and
wetland delineation work. We have permission to enter Cedar River Pipeline No. 4 right-of-way in
Section 25, Township 23N, Range 4E per the attached Right-of-Entry dated November 17, 1987.
Therefore, what I am requesting is permission to also enter the pipeline right-of-way in Section 30,
Township 23N, Range 5E.
We anticipate that the field work will begin later this month and be completed before the end of
April. We can notify you of the specific times that our surveyor would be on site once our
schedule is better defined.
We plan to use the survey of the Seattle right-of-way and adjacent properties to create detailed base
maps for use in design of the next phase of conveyance and habitat improvements to Springbrook
Creek. We will provide you a copy of the base map drawings once they have been prepared.
Thank you for your assistance. Please sign in the space provided below to indicate your
concurrence of this request to enter upon the pipeline right-of-way in Section 30, Township 23N,
R5E, subject to the same terms and conditions of the 1987 Right-of-Entry for Section 25, Township
23N, R4E.
Please fax a signed copy to me at 425-235-2541. If you have any questions, please contact me at
425-277-5547.
Sincerely,
(� biav-A�
Scott Woodbury, Project M ager P-----
Surface Water Utility11Tr�,.
i
H:DOCS:98-176:SW:ps
Attachment
CC: Ron Straka
200 Mill Avenue South - Renton, Washington 98055
0 This paper contains 50%recycled material,20%post consumer
JUN 10 '97 00:03 FR OLYMPIC PIPE LINE 206 271 5320 TO 2352541 P.02i02
Project He: East Side Green Rivcr
Waxrshcd Proiccr
RIGHT-OF-ENTRY AGREEMENT Parcel Account#s: 1021059081
1023059101 g nd lQ2105 84
Grantor: Olympic PjW ine Co
RTSQ: NW and NE 114
lntcrscction: SW 23rd Strict Bctwccn
SR-167&150 Ft West of Lind Ave SW-
THIS AGREEMENT made this 18 day of ate_ 1997, by and between the City of Renton,
King County, Washington, a municipal corporation, hereinafter termed "Grantee", and Olympic Pipeline
Company, hereinafter termed "Grantor".
That the said Grantor does by these presents grant unto the Grantee and its agents Right-of-Entry over the
following described property for the purpose of field surveys and geotechnical/soil explorations:
All of Parcel ID#3023059083: The north 70 feet of the northeast quarter of the northwest
quarter of Section 30, Township 23 North, Range 5 East, W.M., in King County,
Washington, less street (Lind Avenue) and Primary State Highway #5 (East Valley Road)_
All of Parcel iD#3023059101: The north 100 feet of the northwest quarter of the
northwest quarter of Section 30, Township 23 North, Range 5 East, W.M.. in King
County, Washington, lying west of Primary State Highway #5 (East Valley Road) and east
of East Valley Highway (SR-167).
Portion of Parcel ID#3023059084. The south 100 feet of the north 280 feet of the
northwest quarter of the northwest quarter of Section 30, Township 23 North, Range 5
East, W.M., in King County, Washington, lying from 30 to 150 feet west of Lind Avenue,
except for that portion lying south and west of the existing security fencing.
That said Grantee agrees to indemnify and hold Grantor harmless against all claims, suits or actions and
cost thereof arising out of any damage or damages to any property, injury to or death of any person or
persons while on or about said premises as a result from any action or omission of Grantee in the
permission herein granted.
The Grantee is obligated to acknowledge in writing the termination of the agreement upon completion of
the work.
OLYMPIC PIPELINE COMPANY CITY OF RENTON
Q�- - P r!T-y f.- 7 -0 I Q�Y— (v/1(v/97
Signature Date ignature Date
eQ UJ Aasi 3.16L..2-1— Utility System Director
Title Title
U:65230:SW23R D.ST:97-003:S W
? C: W p
to M
to
µme,
J
W I
.. .... ..
<W.
LLjs
c�
to ci:
W
.. ]Z.`. {'.RCN: :
CZ ch
AN
010
ram. Y„ h i�.............. ...........
m -q ....
8
z
a: x
=g
Z . :
Ma
w
o wM w z•
® l
0
I
0
3
. . . .''1 ' _..... ... ..... Applicant: City of Renton Public Works Dept.
.. ......
0
Date: 6-23-97
Scale: 1"=400'
Datum: NAVD88
Y Project Name: City of Renton
SW 23rd Street Drainage Improvements
Figure 3, Location of proposed project elements along the SW 23rd Street channel
L--w._----..._....._...._.....
1 ;................................_........_..-_ ..............................................-_._.....___.._.................. .................. �
::.. ....... ._...._..._.. ..............
^:
.w..................................................... ........... .......f..E.....:}:..
--_—._................... ._..._....................................................... .................__...._...,..,....:ryae:......b.._.....__................. _..................�......�..__
EXISTING ACCESS ROAD z,r.�{ - s•1.1
CITY OF SEATTLE. PROPERTY, PARCEL #3023059066)............... ......;..�................._._............. Q...
,
C�3 WETLAND-IMPACT AREA '__ '"" "
—i---
IE 6.5
..................
ROCK SURFACED r
;3 _.. —ACCES
S',,
,. > t •'��
--'--- — REMOVE EXISTING 18` CULVERTS
W10N—P3 EXCAVATE SEPIMENTS' ...... ;` '
2—3 WITHIN THIS AREA
RIPRAP, TYP
--------:::i
.� j WION- 014
BOUNDARY OF WETLAN :':':':':':':':':':'::
............................... �3
10' WIOE x 4' HIGH CULVERT::
-P1
' __....
W1 N—P2
0
{ J
^Y£ # .
J
................
,.
y`"' i
w
'.'.'.'CITY OF RENTON /;. :.a .'• BOUNDARY-4 Of..WETLAND
.(PARCEL #3023059007)
- -----.—
................
............
.;..,. ..
f.cn
r'?
_..._..
rn
OLYMPIC PIPELINE
N (PARCEL #3023059084)
o �
o
g Appicant�....City of Renton Public Works Departrfient
Date: 6—lo
23=9,7 f
Scale: 1"=30' '
Datum: NAVD98
Y
Project,,NO"Me: City of Renton SW 23rd Street Drainage Improvements
Figure 4, Plan View Box Culvert S.W. 23rd Street, West of Lind Avenue S.W.
31
\\� . \ }: , �
i. � \ � ��
i!M
�������� ! �\�� ��� � � � �
�� ���� ��� � ) /
\\\\ \j (9 (: ( � � �\
3NFl3dld 1011n:
LLJ z
0
Oc P
0 C.)
Ir LLI
EL
3Nn3dld M3 I \� :k ( |
0,
Hii
3141-13cild VM
0 W
KE
0
00
nruva AWN MA NOLLVA3M
Applicant: City of Renton Public Works Department
Date: 6-23-97
Ln
Scale: 1"=20
Datum: NAVD88
Project Name: City of Renton SW 23rd Street Drainage Improvements
Figure 5, Longitudinal section of 10, x box culvert we/ of Lind Avenue.
R V A. ...........
E)
5s,4
EASEMENT T4,CITY ......
.........
W7.S P2
MA
CENTERLINE MONUMENT.
. ...... -
(PARCEL #3340400285)
EL �1.32 PI !INI ... .
IE 11.47'-'-'-'
MONUMENTiCASE)i,-,21 ....... BOUNDARY OF WETLAND
.......... .... ......
................ ........ imp-ACT.
ARE
...........
.......................
................ ......... ............ .....................
... ... ........
-------1�....................... ....................... .................
..................
.......-------...................
................... ....................
............-—----------------------
DM
....................... ..........
............. -—----
............... ......................
. ......... ......... ............. .... .............
.......... ...... ................ ..............
.......................
XIST ELEC
E J CONDUIT EDGE OF ASPHALT PAVEMENT
PROPOSED 30' CULVERT
..............
........ ..... ..........-............
......................................... ........
..................
V ........... ..........
fPELINE..........
(PARCE1-.#3023059083.)
0h RI -T� ...................... ...................
PRAP,
144' WIDE x 9'�HIGH .. . . . . . . . . . . . . . . . . . . . .
CULVERT. REMOVE
.. . . . ... . . . . . I . . . . . . . . . . .
. . . .. . . .7. . . . . . . . . . . . . .
SILT IN CULVERT . . . . . . . . . . . . . . .
. . . .s. . . . . . .
. . . . . . . . . . -4P-WETLAND CONTINUES
. . . . . . . . . T
1 ; 0 EAST-..
EXCAVATEISEDIMENTS
2'-3'-WI11JIN-'T)q IS AREA
IE 6.5
................
W8N-P2 BOUNDARY OF WETLAND
UJ B,
X
14' WIDE x 9.' HIGH
L ;CULVERT. REMOVE
SILT IN CULVERT
LU
W8N-P1
LJ
PUET WESTERN(A G x
UJ (�'ARCEL #2193100010)
CURB
Applicant: Ciky of Rentoni
Date: 6-23 9:
Scale: 1' =30
Datum: NAV088:
o -vem.
Project Name: 'City of ';Renton SW 23�Street Drdp Irrf.....6 -ent
.,qge,-. pr s
Figure 6, Plan view of 30" culvert at the SW 23rd Street channel east of Lind Ave
F, I
O O w ,wz. Wm N
W W a y W
z z 1 d W N
3 F F 'Wa
30 F Z 5 30
7
........ ................... ........... ...
.. .. ... ..... .. pp ................
.................................................I
... ..... .... ........ :.y...................................................
............................................ ....................................................................... ..............................
G ...................................... .................................... ....................................................................
................................................................................................................... N...N.................................... ...........................................
EXISTJ6TC:.Y#tOli[iD:::::: :::::::':::::::..�::::::..�... ..................... .......................................................
920
................................................t..........................................�„ .................. 20
................................................. ........................................... ................................................................ .................. ... .... ................................................................... ..........
.......................................................................................................................... .......................... ... .............................. ............ ...................... ...............
._..... . .... ._.... _ _. .._
w ..___ ._.._.._._... ........_..._. __ �_..�...�._ _....._.._. ....._ _...
Z ..._. __ _ —. _. ....3 __..._ _ . .._..__ __ _ ___..___
10 10
.................................................................................................. .................._...':":':' .. .::::::.....:::::::::::::::::::..... ::::::.......:.. .....:::'�::::::::::::::::::::
t .............. ............................................................................. ............................. z w.
R9d0VE SIli MAIERFAE...................................................... ............................................... ... .� .......................................... -
0 -..................................................................................................................c . .................................................... 0
PRORLE PROPOSED 30' CULVERT W W
SECTION e
SCALE: 1"=20' C-2
M
r
m
I
O
I
n
4
0 Applicant: City of Renton
Date: 6-23-97
Scale: 1"=20'
no
Datum: NAVD88
Y
Project Name: City of Renton SW 23rd Street Drainage Improvements
Figure 7, Longitudinal section of 30" culvert east of Lind Avenue.
i
- -- - ---- - - -
---------------------------------------------------_____-----_- -
IR- "
II I 1 irri I wM
s-uanoll� _ awm I
II I 1
s f
4i rasa,
�� I G I s I= �6 I ��Yr•-ri�,rn
a
' ws s...ar
/ 8' aA iar.rWsr
K'iiievtl I ro r' 'sL.ti
II II i t nm
i
I/ sum m.
Ern� � - � -�' � ���� �- "�, "-� •�"' ,�,. Iz .t��r� I �s�„
N P-2250
7FO-40
I REY1510N PER PLAN CHECK P.AD. 5/28/98 I!llC11.lp®(T{ Engonawong9 �nc ' `F 9 sassE.so-. 1" = IOU' "°°`� �"'r �� VALLEY DISTRIBUTION ""5/2/96�
ILLLfffollllll( CITY _❑F
cxcu P.A.D. p� nnu000K:
CONSULTING ENGINEERS/CIVIL AND STRUCTURA (l 'a` T.O. _\ REN I ON CENTER
DATUM /�"s
MCtlfw' J.B.R. •T��7 Planning/Building/Public Works Dept. �-�/ PLAN
\i1.Z
NG- REVISION BY DATE APPR u+s w vaHy wss.ay K.0/s rm/r,w..va loom/zoo-azs-mo ,L srxt aram.n' Gregg mmermcn P.E., Administrator KEY I PLAN «
2 21
a I I I I I IZ I 1 1 Ij 1 1 i 1 I jl
9 18 17 18 15 14 .13 12 11 10 9 8 7 6 RI 0
X 6 7 8 9 10 11 12 13 14 15 16 17 18 1
King County: Assessor Property Characteristics Report Page 1 of 2
LQ, King try® EM i,x 4 °� �µ ,t . :
�wior
By law this information may not be used for commercial purposes.
Assessor Real Property Records:
BIT HOLDINGS FIFTY- Parcel Number 2193100100
Taxpayer FIVE INC
Account Number 219310010000
Tax Year 2007 Levy Code 2110
Tax Status TAXABLE Taxable Value Reason NONE OR
UNKNOWN
Appraised Land Value $63,700 Taxable Land Value $63,700
Appraised Improvement $0 Taxable Improvement Value $0
Value
Assessor Property SalesRecords:
Tip: Use the Recorders Office: Excise Tax Affidavits Report
to see more sales records details
Sale Date 12/23/2004 ISale Price $0
Seller Name BIT INVESTMENT ELEVEN LP
Buyer Name BIT HOLDINGS FIFTY-FIVE INC
Sale Date 3/21/2001 1 Sale Price Iso
Seller Name BIT HOLDINGS THREE INC
Buyer Name MERCANTILE-SAFE DEPOSIT AND TRUST COMPANY
Sale Date 3/21/2001 1 Sale Price $0
Seller Name MERCANTILE-SAFE DEPOSIT AND TRUST COMPANY
Buyer Name BIT INVESTMENT ELEVEN LLC
Sale Date 3/21/2001 Sale Price $0
Seller Name BIT HOLDINGS TWENTY-TWO INC
Buyer Name BIT HOLDINGS THREE INC
Sale Date 5/27/1997 1 Sale Price $22,000,000
Seller Name PUGET WESTERN INC
Buyer Name BIT HOLDINGS TWENTY-TWO INC
Assessor Parcel Records:
District Name RENTON
VACANT LAND Property
Property Name (WETLANDS) Type COMMERCIAL
Plat Name EAST VALLEY COMMERCE Present Vacant
PARK - BSP Use (Industrial)
http://www5.metrokc.gov/reports/property report.asp?PIN=2193100100 03/22/2007
King County: Assessor Property Characteristics Report Page 2 of 2
Plat Block Water WATER
System DISTRICT
Plat Lot PARCEL 10 Sewer PUBLIC
System
Lot Area 398,621 SgFt(9.15 acres) Access PUBLIC
Section/Township/Range NW 30 23 5 Street PAVED
Surface
Assessor Legal Description Records:
Account Number 219310010000 Record 01
Number
Legal Description PARCEL 10 EAST VALLEY COMMERCE PARK-BSP
This report was generated:3/22/2007 9:00:40 AM
Related on-line reports:
King County GIS: Property information FAQ
King Gounty Assessor: Submit a_request to correct this information
DDES: Permit Applications Report
King County.* Districts and Development-Con ditions Report
Kind County Assessor: eReal Property Report(PDF format requires Acrobat)
King County�Assessor. quarter,Section_Map_Report(PDF_format requires
Acrobat
King County Treasury Operations: Property Tax Information
Recorders Office: Excise Tax Affidavits Report
Recorders Office: Scanned images of plats, surveys, and other map documents
Enter a 10 digit Parcel Number:
or Enter an address:
Search
King County I GIS Center I News I Services I Comments I Search
By visiting this and other King County web pages,
you expressly agree to be bound by terms and conditions of the site.
The details.
http://www5.metrokc.gov/reports/property report.asp?PIN=2193100100 03/22/2007
s
i
CITY OF RENTON
DEVELOPMENT!SERVICES DIVISION
ENI�ONMENTAL' CHECKLIST
PURPOSE OF CHECKLIST:
The State Environmental Policy Act(SEPA),Chapter 43.21C RCW,requires all governmental agencies to consider the
environmental impacts of a proposal before making decisions. An Environmental Impact Statement(EIS)must be
prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of
this checklist is to provide information to help you and the agency identify impacts from your proposal(and to reduce
or avoid impacts from the proposal, if it can be done)and to help the agency decide whether an EIS is required.
INSTRUCTIONS FOR APPLICANTS:
This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies
use this checklist to determine whether the environmental impacts of your proposal are significant,requiring
preparation of an EIS. Answer the questions briefly,with the most precise information known, or give the best
description you can.
You must answer each question accurately and carefully,to the best of your knowledge. In most cases,you should be
able to answer the questions from your own observations or project plans without the need to hire experts. If you really
do not know the answer,or if a question does not apply to your proposal,write "do not know" or"does not apply".
Complete answers to the questions now may avoid unnecessary delays later.
Some questions ask about governmental regulations,such as zoning, shoreline, and landmark designations. Answer
these questions if you can. If you have problems,the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal,even if you plan to do them over a period of time or on
different parcels of land. Attach any additional information that will help describe your proposal or its environmental
effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional
information reasonably related to determining if there may be significant adverse impact.
USE OF CHECKLIST FOR NONPROJECT PROPOSALS:
Complete this checklist for nonproject proposals,even though questions may be answered"does not apply." IN
ADDITION,complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS(part D).
For nonproject actions(actions involving decisions on policies,plans and programs),the references in the checklist to
the words "project," "applicant,"and "property or site"should be read as "proposal," "proposer,"and"affected
geographic area,"respectively.
A. BACKGROUND
1. Name of proposed project, if applicable: SW 23rd Street Drainage Improvement Project
2. Name of Applicant: City of Renton Surface Water Utility
3. Address and phone number of applicant and contact person: 200 Mill Avenue S,4th Floor
Renton,WA 98055
Contact: Scott Woodbury
Phone: 425-277-5547
4. Date checklist prepared: January 1998
5. Agency requesting checklist: City of Renton
6. Proposed timing or schedule (including phasing, if applicable):
Begin Construction June 1998
End Construction Sept. 1998
a
These activities are described in Section A8 of the attached JARPA application. SEPA
review for elements 1 and 2 was completed as part of the ESGRWP Plan and EIS. Please
refer to the ESGRWP Plan and EIS documents for detailed environmental review of
proposed elements 1 and 2.
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range if know. If a proposal would occur over a range of area, provide the range or boundaries
of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if
reasonably available. While you should submit any plans required by the agency,you are not
required to duplicate maps or detailed plans submitted with any permit applications related to
this checklist.
See Section A6 of the attached JARPA application.
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site: ® flat ❑ rolling hilly
❑ steep slopes ❑ mountainous
other
b. What is the steepest slope on the site(approximate percent slope?)
Portions of the side slopes of the channels affected by the project are estimated to slope
at 1.5H:IV.
c. What general types of soils are found on the site(for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any prime
farmland.
See Section Al2d of the attached JARPA application.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
Soils in the area are susceptible to liquefaction during an earthquake and to
compression when place under load. The project area does not contain erosion or
landslide hazard areas as defined by the City of Renton sensitive areas maps.
e. Describe the purpose, type, and approximate quantities of any filling or grading proposed.
Indicate source of fill.
Rock riprap and other granular material will be used to backfill excavations and to
protect some slope areas from erosion. An estimated 400 cubic yards of rock and
granular material will be used from local suppliers.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
Yes. Erosion of soils exposed by construction could occur.
g. About what percent of the site will be covered with impervious surfaces after project
construction(for example, asphalt or buildings)?
No change from pre-project conditions.
UASWOODBUR\1997-98\65230\SW23RD.ST\ECHKLIST.DOC Page 3
5) Does the proposal lie within a 100-year flood plain? ® Yes D No. If so, note location on
the site plan.
All of the work area is below the level of the 100-year FEMA floodplain of
Springbrook Creek.
6) Does the proposal involve any discharges of waste materials to surface waters? El Yes
No. If so, describe the type of waste and anticipated volume of discharge.
b. Ground Water:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description,purpose, and approximate quantities if known.
Well points and/or sumps may be needed to temporarily lower groundwater levels to
allow installation of the culverts under sufficiently dry conditions.
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any(for example: Domestic sewage; industrial, containing the following
chemicals...; agricultural; etc.). Describe the general size of the system,the number of such
systems, the number of houses to be served(if applicable), or the number of animals or
humans the system(s) are expected to serve.
Not applicable.
c. Water Runoff(including storm water):
1) Describe the source of runoff(including storm water)and method of collection and
disposal, if any(include quantities, if known). Where will this water flow? Will this water
flow into other waters, If so, describe.
The SW 23rd Street Drainage Improvement Project proposes to modify existing
drainage features as described in Section All above.
2) Could waste material enter ground or surface waters? If so, generally describe.
The proposed project will not produce any waste material,except possibly some
discharges of turbid water as a result of construction activities.
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
Best management practices will be used during construction to minimize erosion and
the discharge of turbid water into the downstream system. See also the mitigation
measures identified in the ESGRWP EIS Mitigation Document in Table 3 under
Alternative 23ST3,Element 2.
4. PLANTS
a. Check types of vegetation found on the site:
® deciduous tree: alder,maple, aspen,other
evergreen tree: fir, cedar,pine,other
® shrubs
® grass
❑ pasture
crop or grain
® wet soil plants: cattail, buttercup, bullrush,skunk cabbage,other
UASWOODBUR\1997-98\65230\SW23RD.SnECHKL[ST.DOC Page 5
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of
fire and explosion, spill, or hazardous waste,that could occur as a result of this proposal? If
so, describe.
Fuel and oil spills could occur during construction. There are also three high pressure
underground petroleum product lines within the project area that will be exposed
during construction. The lines are owned by Olympic Pipe Line Company which has a
pumping and distribution facility adjacent to the project site.
Sediments proposed to be removed from the existing culverts under Lind Avenue and
the adjoining channel segments were sampled for contamination (see the attached
report). One sample was found to have petroleum contamination levels that would
require disposal at a municipal landfill. There is potential for these contaminants to
be discharged into the downstream system if not handled and disposed of properly.
1) Describe special emergency services that might be required.
A large scale emergency spill response may be necessary if a petroleum pipeline is
accidentally damaged by construction activities.
2) Proposed measures to reduce or control environmental health hazards, if any:
The identification,excavation, handling,and disposal of contaminated sediments will
need to be conducted in accordance with state and federal requirements.
Construction activities will be carefully coordinated with the Olympic Pipe Line
Company to ensure that the petroleum product lines are protected from damage.
Olympic Pipe Line Company personnel will be on-site during all construction in the
vicinity of their lines. Emergency spill response procedures will be reviewed with the
contractor for the project in coordination with the Olympic Pipe Line Company and
the City's Fire Department.
b. Noise
1) What types of noise exist in the area which may affect your project(for example: traffic,
equipment, operation, other)?
None.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis(for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
Increased noise levels from the operation of construction equipment is expected from
the hours of 7 AM to 6 PM. There are no residences in the vicinity of the proposed
project.
3) Proposed measures to reduce or control noise impacts, if any:
Construction equipment must have mufflers and exhaust systems in good operating
condition.
UASWOODBUR\1997-98\65230\SW23 RD.STIECHKL[ST.DOC Page 7
c. Proposed measures to reduce or control housing impacts, if any:
Not applicable.
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building material(s) proposed.
Not applicable.
b. What views in the immediate vicinity would be altered or obstructed?
Not applicable.
c. Proposed measures to reduce or control aesthetic impacts, if any:
Not applicable.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
Not applicable.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
Not applicable.
c. What existing off-site sources of light or glare may affect your proposal?
Not applicable.
d. Proposed measures to reduce or control light and glare impacts, if any:
Not applicable.
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate vicinity?
Not applicable.
b. Would the proposed project displace any existing recreational uses? El Yes ® No. If so,
describe.
Not applicable.
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Not applicable.
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally describe.
None known.
UASWOODBUMI997-98\65230\SW23RD.ST\ECHKLIST.DOC Page 9
b. Proposed measures to reduce or control direct impacts on public services, if any.
Not applicable.
16. Utilities
a. Circle utilities siiff=tvailable at the site electrici natural ga ater efuse service
elepho sanitary sewer eptic syste other
b. Describe the utilities that are proposed for the project,the utility providing the service, and
the general construction activities on the site or in the immediate vicinity which might be
needed.
Not applicable.
C. SIGNATURE
I,the undersigned,state that to the best of my knowledge the above information is true and complete.
It is understood that the lead agency may withdraw any declaration of non-significance that it might
issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of
full disclosure on my part.
Proponent:
Name Printed: �� 0 0'3 1 Date:
U:\SWOODBUR\1997-98\65230\SW23RD.SlI ECHKLIST.DOC Page I
t
CITY OF RENTON
MEMORANDUM
Date: January 28, 1998
To: Scott Woodbury/Surface Water Utility
From: J'Mark R. Pywell, AICP/Development Planning
Subject: SW 23rd Drainage Improvement Project
Project No. LUA-98-001,ECF,SM
On behalf of the Environmental Review Committee (ERC), I would like to inform you that they have
completed their review of your project. The Committee, on January 27, 1998, decided that the project
will be issued a Determination of Non-Significance (DNS).
The City of Renton ERC has determined that it does not have a probable significant adverse impact on
the environment. An Environmental Impact Statement (EIS) is not required under RCW
43.21C.030(2)(c). This decision was made by the ERC under the authority of Section 4-6-6, Renton
Municipal Code, after review of a completed environmental checklist and other information, on file with
the lead agency. This information is available to the public on request.
Comments regarding the environmental determination must be filed in writing on or before 5:00
PM February 16, 1998. Any aggrieved person feeling that the environmental determination of the
Environmental Review Committee is based on erroneous procedure, errors of law or fact, error in
judgment, or the discovery of new evidence which could not be reasonably available at the time of the
determination may submit written comments. After review of the comments, if Environmental Review
Committee finds there is not sufficient evidence to amend its original determination, then there will be no
further extension of the appeal period. Any person wishing to take further action would need to file a
formal appeal within the original 15-day timeframe. Written comments must be filed with: Jana Huerter,
Land Use Review Supervisor, City of Renton Development Services Division, 200 Mill Avenue South,
Renton, WA 98055. If an appeal of the environmental determination is also filed with the Hearing
Examiner during the same 15-day comment period, then the Environmental Review Committee will first
take action on the request for reconsideration and the appellant will be notified that the appeal is on hold
pending the Committee's decision on the reconsideration request. The City will notify the
appellant/person requesting reconsideration and parties of record and the Hearing Examiner of the
Environmental Review Committee's final determination. The appeal process will then be continued
unless the appellant notifies the Hearing Examiner in writing that he wishes to withdraw the appeal.
Appeals of the environmental determination must be filed in writing on or before 5:00 PM
February 16, 1998. Appeals must be filed in writing together with the required $75.00 application fee
with: Hearing Examiner, City of Renton, 200 Mill Avenue South, Renton, WA 98055. Appeals to the
Examiner are governed by City of Renton Municipal Code Section 4-8-11 B. Additional information
regarding the appeal process may be obtained from the Renton City Clerk's Office, (425)-235-2501.
The Shoreline Substantial Development Permit (SM) will be forwarded to DOE on February 12, 1998.
This will allow City and DOE comment periods to end on the same date.
If you have any questions or desire clarification of the above, please call me at 277-5586.
dnsmm
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
ADVISORY NOTES
APPLICATION NUMBER: LUA-98-001,ECF,SM
APPLICANT: City of Renton/Surface Water Utility
PROJECT NAME: SW 23rd Street Drainage Improvement Project
DESCRIPTION OF PROPOSAL: The project proposes to replace two existing 18" culverts under
the Olympic Pipe Line drainage channel crossing just west of Lind Avenue at SW 23rd Street with a box
culvert. The proposal includes installation of a new 24" culvert across a private access road at SW 23rd
Street just east of Lind Avenue. The project also proposes to perform routine maintenance (vegetation
and sediment removal) of the channel along SW 23rd Street from Springbrook Creek to East Valley
Road. A Shoreline Substantial Development Permit is required for this project. SEPA review for the box
culvert and the routine channel maintenance to be completed between Springbrook Creek and Lind
Avenue was completed as part of the East Side Green River Watershed Project Plan and EIS under
LUA-95-205, ECF (Final EIS, Sept. 1997).
LOCATION OF PROPOSAL: SW 23rd Street from Springbrook Creek to East Valley Road
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the environmental
determination. Because these notes are provided as information only, they are not subject to the appeal
process for environmental determinations.
1. Emergency access is to be maintained at all times.
CITY OF RENTON
MEMORANDUM
Date: February 19, 1998
To: Scott Woodbury/Surface Water Utility
From: ark R. Pywell, AICP
Development Planning Deg '
Subject: SW 23rd Drainage Improvement
Project No. LUA-98-001,ECF,SM
We just wanted to inform you that the comment and appeal periods have ended for the subject
project's Determination of Non-Significance.
No appeals were filed on the ERC determination. The Shoreline Permit was mailed to DOE on
February 5, 1998.
If you have any questions, please feel free to contact me at 277-5586.
Flr DOC
STAFF City of Renton
REPORT Department of Planning/Building/Public Works
ENVIRONMENTAL REVIEW COMMITTEE
A. BACKGROUND
ERC MEETING DATE January 27, 1998
Project Name SW 23rd Street Drainage Improvement Project
Applicant City of Renton, Surface Water Utility
File Number LUA-98-001,ECF,SM Project Manager Scott Woodbury
Mark Pywell
Project Description The project proposes to replace two existing 18" culverts under the Olympic Pipe Line
drainage channel crossing just west of Lind Avenue at SW 23rd Street with a box
culvert. The proposal includes installation of a new 24"culvert across a private access
road at SW 23rd Street just east of Lind Avenue. The project also proposes to perform
routine maintenance (vegetation and sediment removal) of the channel along SW 23rd
Street from Springbrook Creek to East Valley Road. A Shoreline Substantial
Development Permit is required for this project.
SEPA review for the box culvert and the routine channel maintenance to be completed
between Springbrook Creek and Lind Avenue was completed as part of the East Side
Green River Watershed Project Plan and EIS under LUA-95-205, ECF (Final EIS,
Sept. 1997).
Project Location SW 23rd Street from Springbrook Creek to East Valley Road
Exist. Bldg. Area gsf N/A Proposed New Bldg. Area gsf N/A
Site Area N/A Total Building Area gsf N/A
RECOMMENDATION Staff Recommend that the Environmental Review Committee issue a Determination of
Non-Significance (DNS) for the proposed 24" culvert and the routine channel
maintenance between Lind Avenue and East Valley Road. SETA review for the
proposed box culvert and routine channel maintenance between Springbrook Creek
and Lind Avenue was already completed under the East Side Green River Watershed
Project(LUA-95-205,ECF).
Project Location Map ERCRPT.DOC
City of Renton PB/PWDepartment Environmental Review Committee Staff Report
SW 23RD STREET DRAINAGE IMPROVEMENTS L UA-98-001,ECF,SM
REPORTAND DECISION OFJANUARY 27,1998 Page3 of5
Vegetative maintenance along the channel south of the private road along SW 23rd Street between Lind Avenue and
East Valley Road would remove approximately 8,000 square feet of plants from the channel banks and bottom. The
vegetation removal would not affect the topography of the channel and wetland W-8N, of which the channel is a part.
The vegetation removal is needed to restore a defined channel and improve fish passage in the channel.
There is potential indirect impact to wetland W-7S from placement of the new 24" culvert. The new culvert would
restore drainage to an area on the north side of the private access road at SW 23rd Street between Lind Avenue and East
Valley Road. This would return the hydrology in the channel on the north side of the access road and Wetland W-7S to
conditions that existed before the 30-inch culvert that used to serve the area was plugged. This could result in a
potential loss of approximately 0.5 acre of wetland hydrology in the 1.75 acre wetland W-7S (the area of W-7S in the
City inventory is listed as 3.3 acres,but the wetland report submitted with the project concluded that original area was in
error and that the wetland is actually about 1.75 acres).
With the exception of the vegetation removed to restore a defined channel between Lind Avenue and East Valley Road,
any wetland area temporarily disturbed will be revegetated using shrubs common to the area. Where possible,
vegetation along the banks of the channel above the ordinary high water will be left in place to provide shade for the
channel. The shading would be helpful in keeping the vegetation from growing back and filling in the channel again.
Best management practices for temporary erosion control will be used during construction to minimize erosion and the
discharge of turbid water into the downstream system.
Mitigation Measures: No further mitigation is required.
Nexus: N/A
3. Plants
Impacts: Some vegetation will be temporily removed by the construction activities.With the exception of the vegetation
removed to restore a defined channel between Lind Avenue and East Valley Road, any vegetation temporarily disturbed
will be revegetated using shrubs and grasses common to the area.
Mitigation Measures: No mitigation is required.
Nexus: N/A
4. Animals
Impacts: The project will improve fish passage in the existing channel on the south side of the private road at SW 23rd
Street.
Mitigation Measures: None.
Nexus: N/A
5. Envirionmental Health
Impacts: Fuel and oil spills could occur during construction. There are also high pressure underground petroleum
product lines within the project area that will be exposed during construction. The lines are owned by Olympic Pipe
Line Company which has a pumping and distribution facility adjacent to the project site.
ERCRPT.DOC
City of Renton PB/PWDepartment Environmental Review Committee StaffReport
SW 23RD STREET DRAINAGE.IMPROVEAfENTS L UA-98-001,ECF,SM
REPORT AND DECISION OFJANUARY 27,1998 PogeS of S
Environmental Determination Appeal Process Appeals of the environmental determination must
be filed in writing on or before 5:00 PM February 16, 1998.
Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner,
City of Renton, 200 Mill Avenue South, Renton, WA 98055. Appeals to the Examiner are governed by
City of Renton Municipal Code Section 4-8-11 B. Additional information regarding the appeal process may
be obtained from the Renton City Clerk's Office, (425)-235-2501.
ERCRPT.DOC
PROJECT NARRATIVE
Project Name:
SW 23rd Street Drainage Improvement Project
Current Use of the Site and Any Existing Improvements:
See Section A7 of the attached JARPA application.
Name of Adjacent Water Area or Wetlands:
The project affects drainage channels along SW 23rd Street near Lind Avenue SW which are tributary
to Springbrook Creek Several wetlands are in the project vicinity as shown on Figure 2 and 3 of the
attached JARPA application. A wetland delineation report specifically prepared for the project is also
attached. All of the work area is below the level of the 100-year FEMA floodplain of Springbrook
Creek.
Nature of Existing Shoreline:
The channels, wetlands, and land use within and adjacent to the affected shoreline area are described
in detail on pages 5 to 9 of the attached wetland delineation report(Jones& Stokes, 1997).
Number and Location of Structures and/or Residential Units Which Might Have Views
Obstructed as a Result of the Proposed Project:
None.
Proposed Use of the Property and the Scope of the Proposed Improvements:
The purpose of the project is to reduce flooding and culvert maintenance problems, improve the
potential for fish passage, and add habitat and a high flow refuge for fish that is currently not
accessible.
The proposed project consists of the following 5 elements:
1. Replace existing 18" culverts under the Olympic Pipe Line Crossing of the SW 23rd Street
Channel with a new, large pre-cast concrete box culvert.
2. Remove an abandoned beaver dam at the mouth of the SW 23rd Street channel as it enters
Springbrook Creek west of Lind Avenue and south of the SW 23rd Street access road and
selectively remove debris and vegetation between Springbrook Creek and Lind Avenue.
3. Remove accumulated herbaceous and shrub vegetation along 1,180 linear feet of the SW 23rd
Street channel from East Valley Road to Lind Avenue.
4. Install a new 24-inch culvert parallel to and east of Lind Avenue to connect a small channel north
of the SW 23rd Street access road to the SW 23rd Street channel, south of the access road to
restore drainage system function.
5. Remove sediment from the twin 9-foot by 14-foot culverts under Lind Avenue at SW 23rd Street
and immediately upstream and downstream of the culvert openings.
CITY OF RENTON
DEVELOPMENT SERVICES'DIVISION
CERTIFICATION
OF NOTIFICATION OF PROPERTY OWNERS
within 300 feet of the subject site
***FOR OFFICIAL USE ONLY***
PROJECT NAME: SW 23RD STREET DRAINAGE IMPROVEMENT PROJECT
APPLICANT: CITY OF RENTON SURFACE WATER UTILITY
APPLICATION NO(S):
The following is a list of property owners within 300 feet of the subject site. The Development Services
Division will notify these individuals of the proposed development.
NAME ADDRESS ASSESSOR'S PARCEL
NUMBER
PLEASE SEE THE ATTACHED LIST.
w
Mr. Martin Seelig Puget Western, Inc Craig Hammett
PO Box 1925 19515 North Creek Parkway 9310 Olympic Pipe Line Co
Bellevue,WA 98009 Bothell,WA 98011 P.O. Box 236
Renton, WA 98055
Vickie Erickson Shirely Lukhang Strada Da Valle Partnership
WA State Department of Transportation Seattle Public Utilities 9125 1 Oth Ave S
15700 Dayton Avenue N, MS 122 Dexter Horton Building- 10th Floor Seattle, WA 98108
P.O. Box 330310 710 Second Avenue
Seattle, WA 98133-9710 Seattle, WA 98104
Allen Tosch Morris Piha Management Group 302305910002
Hunter Douglas Springbrook Industrial Site,Renton TOSCO CORP
7015 S 212th Street c/o Vickie Piha PO BOX 52085
Kent, WA 98032 3650 131st Ave SE, Ste 204 ATTN:R.S. DUTTON-DC-48
Bellevue, WA 98006-1334 PHOENIX AZ 85072
252304906404 192305909504 192305907607
FOUSHEE&ASSOCIATES STONEHENGE III LIMITED BENTALL INVESTMENTS L L C
3260 118TH AVE SE STE 1000 PARTNERSHIP 4 BENTALL CENTRE STE 1800
BELLEVUE WA 98009 3605 132ND AVE SE SUITE 300 VANCOUVER.BC CAN WX 1 B 0
BELLEVUE WA 98006
Jack Nelson 334040000609
Drainage District No. 1 SHURGARD INCORPORATED
601 W.Gowe OPERATIONS ACCOUNTING
Kent WA 98032-5745 1201 THIRD AVE#2200
SEATTLE WA 98101
CITY OF'RENTON
DEVELOPMENT SERVICES DIVISION
CERTIFICATION
OF NOTIFICATION OF PROPERTY OWNERS
within 300 feet of the subject site
***FOR OFFICIAL USE ONLY"'
PROJECT NAME: SW 23RD STREET DRAINAGE IMPROVEMENT PROJECT
APPLICANT: CITY OF RENTON SURFACE WATER UTILITY
APPLICATION NO(S):
The following is a list of property owners within 300 feet of the subject site. The Development Services
Division will notify these individuals of the proposed development.
NAME ADDRESS ASSESSOR'S PARCEL
NUMBER
PLEASE SEE THE ATTACHED LIST.
r
e
t
Mr.Martin Seelig Puget Western, Inc Craig Hammett
PO Box 1925 19515 North Creek Parkway 4310 Olympic Pipe Line Co
Bellevue, WA 98009 Bothell,WA 98011 P.O.Box 236
Renton, WA 98055
Vickie Erickson Shirely Lukhang Strada Da Valle Partnership
WA State Department of Transportation Seattle Public Utilities 9125 1 Oth Ave S
15700 Dayton Avenue N,MS 122 Dexter Horton Building- 10th Floor Seattle, WA 98108
P.O. Box 330310 710 Second Avenue
Seattle,WA 98133-9710 Seattle,WA 98104
Allen Tosch Morris Piha Management Group 302305910002
Hunter Douglas Springbrook Industrial Site, Renton TOSCO CORP
7015 S 212th Street c/o Vickie Piha PO BOX 52085
Kent, WA 98032 3650 131st Ave SE, Ste 204 ATTN:R.S. DUTTON-DC-48
Bellevue,WA 98006-1334 PHOENIX AZ 85072
252304906404 192305909504 192305907607
FOUSHEE&ASSOCIATES STONEHENGE III LIMITED BENTALL INVESTMENTS L L C
3260 118TH AVE SE STE 1000 PARTNERSHIP 4 BENTALL CENTRE STE 1800
BELLEVUE WA 98009 3605 132ND AVE SE SUITE 300 VANCOUVER-BC CAN V7X 1B O
BELLEVUE WA 98006
Jack Nelson 334040000609
Drainage District No. 1 SHURGARD INCORPORATED
601 W.Gowe OPERATIONS ACCOUNTING
Kent WA 98032-5745 1201 THIRD AVE#2200
SEATTLE WA 98101
CITY QF.RENTO
DEUELQPMENT SERVICES DNISION
MASTER .APPLICAT u.
.....
OWNER(S) PROJECT INFORMATION (cont.)
Note: if there is more than one legal owner,please attach an additional
notarized'Master Application for each owner. EXISTING LAND USE(S):
NAME: The project will take place primarily in existing drainage channel along
CITY OF RENTON SW 23rd Street near Lind Avenue. Industrial/office developments
occupy adjacent parcels as well as undeveloped fill pads and wetland
areas.
Municipal Building
ADDRESS:
200 Mill Avenue South
EXISTING ZONING:
CITY: ZIP: Industrial
Renton, WA 98055
PROPOSED LAND USE(S):
TELEPHONE NUMBER:
(206) 277-5547 No change proposed.
CONTACT PERSON/APPLICANT
PROPOSED ZONING:
NAME:
Scott Woodbury No change proposed.
Surface Water Utility
ADDRESS: SITE AREA (SQ. FT. OR ACREAGE):
200 Mill Avenue South
Less than 1 acre
CITY: ZIP:
Renton, WA 98055
PROJECT VALUE:
TELEPHONE NUMBER: Approximately $150,000- $250,000 construction cost
(425) 277-5547
PROJECT INFORMATION IS THE SITE LOCATED IN THE AQUIFER PROTECTION AREA?
PROJECT OR DEVELOPMENT NAME: No
SW 23rd Street Drainge Improvement Project
PROPERTY/PROJECT ADDRESS(S)/LOCATION: IS THE SITE LOCATED IN ANY OTHER TYPE OF ENVIRONMENTALLY
Existing drainage channels along SW 23rd Street from Springbrook SENSITIVE AREA?
Creek to East Valley Road
Several wetlands are in the project vicinity. The project is within a
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): shoreline area of conservancy designation.
3023059083, 3023059084, 3023059066, 3023059007,
2193100010
A CITY OF RENTON
Planning/Building/Public Works Department
J e Tanner,Mayor Gregg Zimmerman P.E.,Administrator
February 5, 1998
State Department of Ecology
Northwest Regional Office („414
3190 160th Ave. SE El
Bellevue, WA 98008-5452 FEB 51998
SUBJECT: Shoreline Management Substantial Development Permit for
File No. LUA-98-001;SM CT F '- ' ON
Jept.
Gentlemen:
Enclosed is the Shoreline Substantial Development Permit for the above referenced project. The permit was
issued by the City of Renton on February 4, 1998.
We are filing this action with the Department of Ecology and the Attorney General per WAC 173-14-090.
Please review this permit and attachments and call me at (425) 277-5586 if you have any questions or need
additional information.
Sincerely,
,z--57 /GI
Mark R.ianager
el I�CP
Project
Enclosures: Copy of Original Application
Affidavit of Public Notice/Publication
Site Plan
SEPA Determination
cc: Office of Attorney General
City of Renton, Transportation Systems
City of Renton, Utility Systems
Applicant
DocumenN
200 Mill Avenue South - Renton, Washington 98055
CITY OF RENTON
SHORELINE MANAGEMENT ACT OF 1971
PERMIT FOR SHORELINE MANAGEMENT
SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT
APPLICATION NO.: LUA-98-001,ECF,SM
DATE RECEIVED: January 5, 1998
DATE OF PUBLIC NOTICE: January 12, 1998
DATE APPROVED: January 27, 1998
DATE DENIED: N/A
TYPE OF ACTION(S): [X] Substantial Development Permit
[ ] Conditional Use Permit
[ ] Variance Permit
Pursuant to Chapter 90.58 RCW, the City of Renton has granted/denied a permit:
This action was taken on the following application:
APPLICANT: Surface Water Utility/City of Renton
PROJECT: SW 23rd Street Drainage Improvement Project
DEVELOPMENT DESCRIPTION: The City of Renton proposes to replace an existing 18"
culvert under the Olympic Pipeline crossing of SW 23rd
Street channel with a box culvert. Proposal includes
installation of a new 24" culvert near SW 23rd and East of
Lind Avenue and perform routine maintenance of the
channel. Location: SW 23rd Street from Springbrook
Creek to East Valley Road.
LEGAL DESCRIPTION: North 200 feet of Sec. 30, T23N, R5E
SEC-TWNP-R: Sec. 30, T23N, R5E
WITHIN SHORELINES OF: Springbrook Creek
APPLICABLE MASTER PROGRAM: City of Renton
The following section/page of the Master Program is applicable to the development:
Section Description Page
5.04 Urban Environment page 22.
7.06 Dredging page 28.
7.18.04 Local Utilities--Specifications page 40.
SHRLNPRM.DOC
• City of Renton P/B✓PW Department Shoreline Substantial Development Permit
Page 2 of 3
Development of this project shall be undertaken pursuant to the following terms and conditions:
1. The applicant shall maintain best management practices to prevent soil erosion to the extent
possible.
2. The applicant shall restore any designated wetland area disturbed by this construction of this
project.
3. The applicant shall coordinate construction services with Olympic Pipeline to ensure that the
project does not breech the existing line in this area.
This permit is granted pursuant to the Shoreline Management Action of 1971 and pursuant to the following:
1. The issuance of a license under the Shoreline Management Act of 1971 shall not release the
applicant from compliance with federal, state, and other permit requirements.
2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management Act of 1971 in
the event the permittee fails to comply with any condition hereof.
3. A construction permit shall not be issued until thirty (30) days after approval by the City of Renton
Development Services Division or until any review proceedings initiated within this thirty (30) day
review period have been completed.
i
z y�ys5
Plan n ing/buildi6glTul5lic Works Administrator Date
SHRLNPRM.DOC
City of Renton PB/PW Department Shoreline Substantial Development Permit
Page 3 of 3
THIS SECTION FOR DEPARTMENT USE ONLY IN REGARD
TO A CONDITIONAL USE OR VARIANCE PERMIT
DATE RECEIVED:
APPROVED:
DENIED:
If Conditional Use, Section of the City's Shoreline Master Program authorizing the use:
If Variance, Section(s) of the City's Shoreline Master Program being varied:
This Conditional Use/Variance permit is approved/denied by the Department pursuant to Chapter 90.58 RCW.
Development shall be undertaken pursuant to the following additional terms and conditions:
Date Signature of Authorized Department Official
cc: Attorney General's Office
City of Renton, Plan Review(Neil Watts)
City of Renton, Surface Water Utility(Ron Straka)
Applicant
SHRLNPRM.DOC
STATg o�
04 �
s yo2
,p o
-y' 1889 a
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008-5452 • (206) _649-7000
� .February 23, 1998
Scott Woodbury i:ngin eri RENTO""
Surface Water Utility !�anl
City of Renton
200 Mill Avenue South
Renton, WA 98055
Dear Mr. Woodbury:
Re: City of Renton Permit # LUA-98-001
CITY OF RENTON SURFACE WATER UTILITY- Applicant
Shoreline Substantial Development Permit # 1998-NW-40009
The subject Shoreline Management Substantial Development Permit, to replace two existing 18
inch culverts with one 24 inch box culvert and perform routine maintenance, has been filed
with this office by the City of Renton on February 6, 1998.
The development authorized by the subject permit may NOT begin until the end of the 21-day
appeal period, February 27, 1998. The Shorelines Hearings Board will notify you by letter if
this permit is appealed. Other federal, state, and local permits may be required in addition to
the subject permit.
If this permit is NOT appealed, this letter constitutes the Department of Ecology's final
notification of action on this permit.
Sincerely,
QVVVV11" L
. Kz-,��
Ann E. Kenny, Shorelands Specialist
Shorelands and Environmental
Assistance Program
AEK: aek
SDP.DOC
cc: James D. Hanson, City of Renton
i�
1IZ-dy9
STAFF City of Renton
REPORT Department of Planning/Building/Public Works
ENVIRONMENTAL REVIEW COMMITTEE
A. BACKGROUND
ERCMEETINGDATE January 27, 1998
Project Name SW 23rd Street Drainage Improvement Project
Applicant City of Renton, Surface Water Utility
File Number LUA-98-001,ECF,SM Project Manager Scott Woodbury
Mark Pywell
Project Description The project proposes to replace two existing 18" culverts under the Olympic Pipe
Line drainage channel crossing just west of Lind Avenue at SW 23rd Street with a
box culvert. The proposal includes installation of a new 24" culvert across a private
access road at SW 23rd Street just east of Lind Avenue. The project also proposes to
perform routine maintenance(vegetation and sediment removal) of the channel along
SW 23rd Street from Springbrook Creek to East Valley Road. A Shoreline
Substantial Development Permit is required for this project.
SEPA review for the box culvert and the routine channel maintenance to be
completed between Springbrook Creek and Lind Avenue was completed as part of
the East Side Green River Watershed Project Plan and EIS under LUA-95-205, ECF
(Final EIS, Sept. 1997).
Project Location SW 23rd Street from Springbrook Creek to East Valley Road
Exist. Bldg. Area gsf N/A Proposed New Bldg. Area gsf N/A
Site Area N/A Total Building Area gsf N/A
RECOMMENDATION Staff Recommend that the Environmental Review Committee issue a Determination of
Non-Significance (DNS) for the proposed 24" culvert and the routine channel
maintenance between Lind Avenue and East Valley Road. SEPA review for the
proposed box culvert and routine channel maintenance between Springbrook Creek
and Lind Avenue was already completed under the East Side Green River Watershed
Project(LUA-95-205,ECF).
Panther Creek
SX,{� \` \ I-405 Wetlands
Project
!i o
o SV 23rd Area
I St. �I
-
<Wlla
c/ I UI c I •1I Black River Water
----I Quality Management
w�a Plan Study Area
`'OW. 43rd St.� ` Panther
Project Location Map r�` �._..., 7 �-i Creek ERCRPT.DOC
P j ) i .
�\ d i
I Renton ! �ESGR
City of Renton PIBIPW Department Environmental Review Committee Staff Report
SW 23RD STREET DRAINAGE IMPROVEMENTS LUA-98-001,ECE,SM
REPORT AND DECISION OF JANUARY 27, 1998 Page2 of 4
B. RECOMMENDATION
Based on analysis of probable impacts from the proposal, staff recommend that the Responsible Officials
make the following Environmental Determination:
DETERMINATION OF DETERMINATION OF
NON-SIGNIFICANCE NON-SIGNIFICANCE-MITIGATED.
Issue DNS with 14 day Appeal Period. Issue DNS-M with 15 day Comment Period with
Concurrent 14 day Appeal Period.
X Issue DNS with 15 day Comment Period with Issue DNS-M with 15 day Comment Period followed
Concurrent 14 day Appeal Period. by a 14 day Appeal Period.
C. MITIGATIONMEASURES
No additional mitigation measures are required beyond those included with the applicant's proposal. Mitigation
measures previously required for the proposed box culvert are identified in the East Side Green River Watershed
Project's EIS Mitigation Document(Sept. 1997).
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the environmental determination. Because
these notes are provided as information only,they are not subject to the appeal process for environmental determinations.
1. Emergency access is to be maintained at all times.
D. ENVIRONMENTAL IMPACTS
Whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed
development?
The following discussion of environmental impacts is in regard to the proposed 24"culvert and the routine
channel maintenance between Lind Avenue and East Valley Road. SEPA review for the proposed box culvert
and routine channel maintenance between Springbrook Creek and Lind Avenue was already completed under
the East Side Green River Watershed Project(LUA-95-205,ECF).
1. Earth
Impacts: Erosion of soils exposed by construction activity could occur.
Mitigation Measures: Best management practices for temporary erosion control will be used during construction to
minimize erosion.
Nexus: N/A
2. Water
Impacts: Total direct impacts on existing wetlands from the proposed 24" culvert and removal of sediment from the
inlet and outlet of the twin 9 by 14-foot culverts under Lind Avenue would be less than 1,950 square feet,the majority
of which is only temporary disturbance.
Vegetative maintenance along the channel south of the private road along SW 23rd Street between Lind Avenue and
East Valley Road would remove approximately 8,000 square feet of plants from the channel banks and bottom. The
ERCRPT.DOC
City of Renton P/B/PW Department Environmental Review Committee Staff Report
SW 23RD STREET DRAINAGE IMPROVEMENTS L UA-98-001,ECF,SM
REPORT AND DECISION OF JANUARY 27, 1998 Page3 of 4
vegetation removal would not affect the topography of the channel and wetland W-8N, of which the channel is a part.
The vegetation removal is needed to restore a defined channel and improve fish passage in the channel.
There is potential indirect impact to wetland W-7S from placement of the new 24" culvert. The new culvert would
restore drainage to an area on the north side of the private access road at SW 23rd Street between Lind Avenue and
East Valley Road. This would return the hydrology in the channel on the north side of the access road and Wetland
W-7S to conditions that existed before the 30-inch culvert that used to serve the area was plugged. This could result
in a potential loss of approximately 0.5 acre of wetland hydrology in the 1.75 acre wetland W-7S (the area of W-7S in
the City inventory is listed as 3.3 acres, but the wetland report submitted with the project concluded that original area
was in error and that the wetland is actually about 1.75 acres).
Mitigation Measures: With the exception of the vegetation removed to restore a defined channel between Lind
Avenue and East Valley Road, any wetland area temporarily disturbed will be revegetated using shrubs common to
the area. Where possible,vegetation along the banks of the channel above the ordinary high water will be left in place
to provide shade for the channel. The shading would be helpful in keeping the vegetation from growing back and
filling in the channel again.
Best management practices for temporary erosion control will be used during construction to minimize erosion and
the discharge of turbid water into the downstream system.
Nexus: N/A
3. Plants
Impacts: Some vegetation will be temporily removed by the construction activities.
Mitigation Measures: With the exception of the vegetation removed to restore a defined channel between Lind
Avenue and East Valley Road, any vegetation temporarily disturbed will be revegetated using shrubs and grasses
common to the area.
Nexus: N/A
4. Animals
Impacts: The project will improve fish passage in the existing channel on the south side of the private road at SW
23rd Street.
Mitigation Measures: None.
Nexus: N/A
S. Envirionmental Health
Impacts: Fuel and oil spills could occur during construction. There are also high pressure underground petroleum
product lines within the project area that will be exposed during construction. The lines are owned by Olympic Pipe
Line Company which has a pumping and distribution facility adjacent to the project site.
Sediments proposed to be removed from the existing culverts under Lind Avenue and the adjoining channel segments
were sampled for contamination. One sample was found to have petroleum contamination levels that would require
disposal at a municipal landfill. There is potential for these contaminants to be discharged into the downstream
system if not handled and disposed of properly.
ERCRPT.DOC
City of Renton P/B/PW Department Environmental Review Committee Staff Report
SW 23RD STREET DRAINAGE IMPROVEMENTS L UA-98-001,ECF,SM
REPORT AND DECISION OF JANUARY 27, 1998 Page4 of 4
Mitigation Measures: The identification, excavation, handling, and disposal of contaminated sediments will need to
be conducted in accordance with state and federal requirements.
Construction activities will be carefully coordinated with the Olympic Pipe Line Company to ensure that the
petroleum product lines are protected from damage. Olympic Pipe Line Company personnel will be on-site during all
construction in the vicinity of their lines. Emergency spill response procedures will be reviewed with the contractor
for the project in coordination with the Olympic Pipe Line Company and the City's Fire Department..
Nexus: N/A
E. COMMENTS OF REVIEWING DEPARTMENTS
The proposal has been circulated to City Departmental/Divisional Reviewers for their review. Where applicable,these comments have been incorporated
into the text of this report as Mitigation Measures and/or Notes to Applicant
_X Copies of all Review Comments are contained in the Official File.
— Copies of all Review Comments are attached to this report.
ERCRPT.DOC
CITY OF RENTON
MEMORANDUM
Date: January 08, 1998
To: Scott Woodbury/Surface Water Utility JAIL 91998
From: afk R. Pywell, AICP/Development Planning CITY LF RENTON
Subject: SW 23rd Street Drainage Improvement Engineering Opt
Project No. LUA-98-001,SM,ECF
The Development Planning Section of the City of Renton has received the above-referenced application
for environmental review.
A presentation of the proposed amendment to the Environmental Review Committee (ERC) is scheduled
for January 27, 1998. At that meeting, you will present staff recommendations for the Committee's
review and environmental determination. The ERC staff report is due to Karen Codiga one week prior
to the scheduled ERC date. There is a template for the ERC staff report available on the "h" drive.
Please contact me with any questions you may have regarding the staff report.
Following the ERC meeting, I will send you copies of the ERC determination along with the timeframes
for the public comment and appeal periods for your files.
Please provide a charge number for the publication of the Shoreline Substantial Development
Permit (SM) and the Environmental determination.
ACCPTMM.DOC
0 200' TAPER
O
M II I I M
t
N � � t
t I In, t
cn I t I o t h ^
00
U \p•�p TYPE D CUR M ?
LIND STA 25+ 38.58 A.P i i ' Q _ — 0)
rn = SW 23rd 10 + 00 I i �. , I 7 9 w
Z
R/W J 9a_
W 6 - l i t _ TYPE A CURB -a W W
w '" � Ld
W N Q w
II W
z 0 12 ° w �, I p �= w Ii l
I iI l _ I I 8 8 � S 48 - 40
N 2 3 8 o� " S 1 3 13 W N 24
m 3 dM
c=cwwnn
S1° 22 13N S
S S w -400'
<w - o S
S S3 N25 I 0'
S
o J — 8„- 515 I s \I IId S I $ S cJ
18" CMP TO DITCH
�w 8" 400 S S W 48 05
-r w Mal) 12
� to
N 361 -389 I 22 CC E t
IB
N
Cr CURB N - R to END
I I 36 O th 4. M END CURB
i- o N o t1 1 0) ow
05 a)N � in 1 - Nco
(nb +
Imo• Ul)
E (n cD � -} Z M I I 0 0O o0 ` N MEOl 22 po
N U)`D 00
ODN Z = j N I I
t �
o w 16"0 3 �� OLYMPIC PIPELINE CO.
II N
III z � � N
I �I 0 Z °
I it/ Q I 1 OD
1 +80 0h = 20" M I z
ICI c�° 0
II O
1•+ 80 END 18" CULV. �'S I t
I N V. 3.5' U_ M N o
BEGIN CHANNEL
TO SPRINGBROOK 2 60" CO NC. PIPE WATER MAIN
SEATT!E WATER DEPT.
CRPL "4
DETAILS IN AREA • 25
SEE SHEET PS 2 FOR 2�-OO 33100 34 0i01
- 29+00 �0�00 SI 00 o 140' V. C.
2600 27+00 • 2800
2 5 +00 2 5�-0 0 O 12 0' v C. o N N o A m .
23+00 24 1ao v. C. N10, _
12 0' V.C. `_ m b O v cp > m > c0 ° 20
+ OQ> rN NN Ot M > M � w -6.4 /o
to t � — N m O m - OD m
m UN � � > ADO rn > � - +0.4 %
{ ao co
CID ft:
m 4
C\j a wto J p two I I 15
Cr w SEE AS-BUILT DWG. ,o C\i N - -- -
w z LOWER RT. HAND
FILLf __�_-_ - - - - -- -- --- - - - - - - - --- - - - - - - -- - - -- - -!--s-
Il _.,,I CORNER THIS PAGE to ZXNJ -- 24 WATER_ MAIN_ _ _
N-- -- -3 - -- -------- --- -------- j - -- �- - - y - - - - _
15 4 FORCE MAIN _ S_0001 _ - ------- - --- — - - ._ - - - - -- - _ _ _ _ - .- _ __- _ _ _ _y _ _ ,- _ - _ - ---- -- - -i------ -- - - - ---- -
- - ----- ------- ----- - -__- - - -- - -.y -�- - --- ---- - --- - _OD
EpI F, ORGANIC 10
-------- ---- -- ------ --- ---------- ---- -- 1N JOINT 8- 515
- - - - - all
i - 00134 - -- -
_
i
SOILT, PEATY _
0 _ 36 = . 389 _ y 8 400 S= 0.004
36 60 ORGANIC SILL'
= 22 �� LOOSE SILTY 5AND� LOOSE` 'SILTY
S 0.00 �� S = 0. 0011
8"-40d S= o.004 / / 48 - 400 FINE SAND
o co / 5
r O J to V b ;
� \ � z �
- 3141 Slo' s 9
5 i __ __ I _-V 1 _ > Z
i LOOSE TO 48 - 1 04 _ I i 0
DENSE SAND T6(E)= 2,9I
w7, �� � .13 M - -- -- - -- -- 2-111/4° BENDS
_� vJ)-_ gt M 2-111/4° 13540S � � I I dub
J 0 vZ 30 �E( - - - - - . _ - - - - -
ED
0 • Q J W Z _ _ _ -� -' TO O
ALLOW RI ARCHSPIPE ' j
v w I-(n - . '� . _ - - - - _ NEI ! REVISED PER
w > _ _ _ _ _ _ WATER MAIN ARE I AS CONSTRUCTION RECOt?DS
j o a. w W o DESIGN ELEVA710NS. ; DY....:....Sy1 "
rno cna w� ;
o a _.....
— cn a ' DATI~........�:�.y .
cv `� See P-9 channel Basin Detail,Sheet PS 2 '
Y j
DATUM
• > 1•MEw,",r I CITY OF RENTON
d z Remove 6 t �3 ���`` �m, s DEPARTMENT OF PUBLIC WORKS
Remove 6 , 6
USGS ( MSL= o ) Surcharge rc h a r e 56 Surcharge
, LIND AVE LID #302- -- -_---
ARCH PIPE AS- BUILT
�`ss%oN AL STREET PLAN - PROFILE
--- - - -- - - -• 22 + 50 T 0 34+ 5 0 _
1_- --� ___ - -----•-. DFsicNFD ._M_H7.8
_ -
S U RC H ARSE REMOVAL SECTION
SECTION ION ._—._ _ _ _--_ -_-_-- A __. _ FIELD NOOK
R CHAR GE REMOVAL DRAWN _ - H I =
SURCHARGE — --- M HT40
_.. .._ -4_•
c �E _.V_
- .----- -- -- -- _ CHECKED
— — ---
Ll
+ � 0 -- --- -- '!J`'�-7G� 4 H F F T P3 O r I S
I I + �� 1 O 5 + FIY /�FFR DAfF
nr : rn --
ww -
� q11%00 03 40OX0