Loading...
HomeMy WebLinkAboutSWP272709(2) LcEcIrcIrEEa W TURSA OTML 2101 Fourth Avenue, Suite 600 DATE G JOB NO —711 Seattle,Washington 98121-2375 ATT TION L File NO tO�_�O3e TO 7 Q� / 1�j�L 7_8 rCi RE 5 L /1 ice WE ARE SENDING YOU XAttached ❑ Under separate cover via the following items: Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION Z l 4 t �✓ 3r� ��^t �i'! •� Lfl t� GCE14c�- /V v/Gltir G v � S C a C-_ THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Reviewed as submitted ❑ Resubmit copies for review ❑ For your use ❑ Reviewed as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS 0 COPY TO SIGNED: It enclosures are not as noted, kindly notify us at once. CITY OF RENTON Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator July 18, 1997 Mike Giseburt,P.E., Project Manager R. W. Beck, Inc. 2101 Fourth AVE S - STE 600 Seattle, WA 98121 SUBJECT: CONTRACT CAG-97-054 Dear Mike: Attached is an original, fully executed contract CAG-97-054 for the SW 43rd Street Drainage Improvement Project. You are authorized to proceed with the project and perform the services outlined in the contract. Attached is a computer disk with an AutoCad R12 drawing file "base.dwg" for your use. The drawing includes the City of Renton standard title block in paper space with a model space view of the project area at 1"=100'. A plot of this view is also enclosed. The title block may be edited by using the DDATTE command. The drawing includes contours at 1.64' intervals. The contours were created using the City's new 0.5 meter topography in the NAVD 1988 datum scaled by the appropriate conversion factor into feet. The NAVD 1988 datum is 3.58 feet higher than the NGVD 1929 datum. We need to use the NAVD 1988 datum for the plans as it has been adopted as the City's vertical datum. As we discussed, I have asked our mapping section to produce 1"=20' scale plots of the Lind and Oakesdale Avenue intersections of SW 43rd Street from the City's digital orthophoto drawings. These should be available at the end of next week. Please submit a traffic control plan as soon as possible for the geotechnical work. Since our other East Side Green River Watershed Projects are being delayed it is even more extremely important that we construct this project this year. Thank you for your efforts in the scope of work development and contract execution. I look forward to working with you toward the successful completion of this project. If you have any questions,please contact me at(206)277-5547. Sincerely, AA Scott Woodbury, P.E., Proje t Manager Surface Water Utility U:65230:SW43RD.ST:97-001:S W Enclosure CC: Ron Straka f 7 200 Mill Avenue South - Renton, Washington 98055 This paper contains 50%recycled material,20%post consumer CITY OF RENTON CITY CLERK'S OFFICE MEMORANDUM DATE: July 18, 1997 TO: Scott Woodbury FROM: Michele Neumann x2581 SUBJECT: RW Beck Contract/Drainage Improvement/CAG-97-054 The attached original document has been fully executed and is being returned to you. Please transmit the original to the contractor and retain a copy for your file. An original document is also retained by the City Clerk. Thank you. Enclosures: (1) s IL CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: June 24, 1997 TO: Gregg Zimmerman FROM: Ron Olsen ob STAFF CONTACT: Ron Straka(X-5548) Scott Woodbury(X-5547) SUBJECT: East Side Green River Watershed Project Proposed Consultant Contract With R. W. Beck SW 43rd Street Drainage Improvement Project ISSUE: The Surface Water Utility requests approval of a consultant contract authorizing R. W. Beck, Inc., to provide design assistance for the SW 43rd Street Drainage Improvement Project. RECOMMENDATION: The Surface Water Utility recommends approval of consultant contract authorizing R. W. Beck, Inc., to provide design assistance for the SW 43rd Street Drainage Improvement Project. R. W. Beck is on the Utility Systems Division's approved annual consultant contract roster for 1997. The contract amount is $29,072,which is less than $50,000, and may be signed by the Mayor and City Clerk. DISCUSSION: Several improvements are needed along SW 43rd Street between Oakesdale Avenue and Lind Avenue to improve drainage collection and conveyance. SW 43rd Street is subject to occasional flooding due to a combination of factors including an undersized conveyance system, high downstream water surface elevations in Springbrook Creek that create backwater conditions on the SW 43rd Street drainage system, and a lack of catch basin inlet capacity to collect street runoff into the system. The following elements shown on the attached map are intended to improve the collection and conveyance system to reduce flooding: I. Installing a parallel 54-inch diameter pipe system to connect the existing 54-inch diameter system along SW 43rd Street to the 54-inch diameter system along Oakesdale Avenue. This improvement would eliminate an existing hydraulic restriction (36-inch diameter) in the system. 2. Installing approximately 10 new catch basin frames and grates (through-curb inlets) along SW 43rd Street to increase the collection of street runoff. 3. Replacing a short section of undersized pipe that receives flow from a drainage ditch in the City of Kent, located at the southeast corner of SW 43rd Street at Lind Avenue SW. The existing pipe is 24-inches in diameter and approximately 30 feet in length. The pipe would be replaced with a 48-inch diameter pipe. As described in the draft East Side Green River Watershed Project Plan and EIS, a combination of lowering Springbrook Creek water surface elevations and major pipe system improvements will be required to achieve a 100-year level of protection for the South Renton Valley. The improvements to be designed under the X t Gregg Zimmerman Proposed Contract with R. W. Beck Page 2 proposed R. W. Beck contract are intended to be an interim measure that will help to reduce or mitigate the extent of flooding until the major improvements can be implemented. The contract will be funded out of the approved 1997 Adjusted Budget for the ESGRWP Flood Control Alternative account in the Surface Water Utility Capital Improvement Program. The 1997 Adjusted Budget for the project account is $427,588. Following is a summary of the current status of the ESGRWP account, including the cost of the proposed R. W. Beck contract. Description Amount 1997 Adjusted Budget $427,588 Staff cost through 4/97 -$ 8,289 Emergency storm system repair work (will be reimbursed by FEMA) -$ 18,061 R. W. Beck contract for permit assistance of SR-167 culvert improvements -$ 6,829 R. W. Beck contract for SW 23rd Street channel work -$ 49,821 Portion of Northwest Hydraulic Consultants contract for HSPF modeling -$ 17,760 Proposed SW 43rd Street Drainage Improvement Design contract -$ 29,072 Current Remaining Balance $297,756 The cost to construct the improvements along SW 43rd Street that will be designed by R. W. Beck under the proposed contract is estimated at$130,000, including staff time. 1-1:DOCS:97-533:SW:ps Attachments CC: City Clerk t CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: June 20, 1997 TO: C O N C U R E N C F DATE .._ FROM: n NAME uJ STAFF CONTACT: Ron Straka(X-5548) — Scott Woodbury(X-5547) SUBJECT: East Side Green River Watershed Project Proposed Consultant Contract With R. W. Beck _ ¢" SW 43rd Street Drainage Improvement Project ISSUE: The Surface Water Utility requests approval of a consultant contract authorizing R. W. Beck, Inc., to provide design assistance for the SW 43rd Street Drainage Improvement Project. RECOMMENDATION: The Surface Water Utility recommends approval of consultant contract authorizing R. W. Beck, Inc., to provide design assistance for the SW 43rd Street Drainage Improvement Project. R.W. Beck is on the Utility Systems Division's approved annual consultant contract roster for 1997. The contract amount is $29,072,which is less than $50,000, and may be signed by the Mayor and City Clerk. DISCUSSION: Several improvements are needed along SW 43rd Street between Oakesdale Avenue and Lind Avenue to improve drainage collection and conveyance. SW 43rd Street is subject to occasional flooding due to a combination of factors including an undersized conveyance system, high downstream water surface elevations in Springbrook Creek that create backwater conditions on the SW 43rd Street drainage system, and a lack of catch basin inlet capacity to collect street runoff into the system. The following elements shown on the attached map are intended to improve the collection and conveyance system to reduce flooding: 1. Installing a parallel 54-inch diameter pipe system to connect the existing 54-inch diameter system along SW 43rd Street to the 54-inch diameter system along Oakesdale Avenue. This improvement would eliminate an existing hydraulic restriction(36-inch diameter) in the system. 2. Installing approximately 10 new catch basin frames and grates (through-curb inlets) along SW 43rd Street to increase the collection of street runoff. 3. Replacing a short section of undersized pipe that receives flow from a drainage ditch in the City of Kent, located at the southeast corner of SW 43rd Street at Lind Avenue SW. The existing pipe is 24-inches in diameter and approximately 30 feet in length. The pipe would be replaced with a 48-inch diameter pipe. As described in the draft East Side Green River Watershed Project Plan and EIS, a combination of lowering Springbrook Creek water surface elevations and major pipe system improvements will be required to achieve a 100-year level of protection for the South Renton Valley. The improvements to be designed under ` Mayor Jesse Tanner Proposed Contract with R.W. Beck Page 2 the proposed R. W. Beck contract are intended to be an interim measure that will help to reduce or mitigate the extent of flooding until the major improvements can be implemented. The contract will be funded out of the approved 1997 Adjusted Budget for the ESGRWP Flood Control Alternative account in the Surface Water Utility Capital Improvement Program. The 1997 Adjusted Budget for the project account is $427,588. Following is a summary of the current status of the ESGRWP account, including the cost of the proposed R.W. Beck contract. Description Amount 1997 Adjusted Budget $427,588 Staff cost through 4/97 -$ 8,289 Emergency storm system repair work(will be reimbursed by FEMA) -$ 18,061 R.W. Beck contract for permit assistance of SR-167 culvert improvements -$ 6,829 R.W. Beck contract for SW 23rd Street channel work -$ 49,821 Portion of Northwest Hydraulic Consultants contract for HSPF modeling -$ 17,760 Proposed SW 43rd Street Drainage Improvement Design contract -$ 29,072 Current Remaining Balance $297,756 The cost to construct the improvements along SW 43rd Street that will be designed by R.W. Beck under the proposed contract is estimated at$130,000, including staff time. H:DOCS:97-533:SW:ps Attachments CC: City Clerk PLANNING/ BUILDING/ PUBLIC WORKS DEPARTMENT ����Y O� MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 V �� 0 UTILITY SYSTEMS DIVISION - 235-2631 NT TRANSPORTATION SYSTEMS DIVISION - 235-2620 TO: DATE: JOB NO. : RE• ATTN: GENTLEMEN: WE ARE SENDING YOU ❑ ATTACHED o UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ PRINTS ❑ REPRODUCIBLE PLANS ❑ SPECIFICATIONS ❑ COPY OF LETTER ❑ COPIES DATE NUMBER DESCRIPTION AND REMARKS THESE ARE TRANSMITTED AS CHECKED BELOW: o FOR APPROVAL ❑ APPROVED AS SUBMITTED ❑ RESUBMIT COPIES FOR APPROVAL ❑ FOR YOUR USE o APPROVED AS NOTED o SUBMIT COPIES FOR DISTRIBUTION ❑ AS REQUESTED ❑ RETURNED FOR CORRECTIONS ❑ RETURN CORRECTED PRINTS ❑ FOR REVIEW AND COMMENT o ❑ PRINTS RETURNED AFTER LOAN TO US COPIES TO: SIGNED TITLE IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE 10 ,T CITY OF RENTON � Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator June 18, 1997 Mike Giseburt, P.E., Project Manager R. W. Beck,Inc. 2101 Fourth AVE S - STE 600 Seattle, WA 98121 SUBJECT: INFORMATION FOR SW 43RD STREET AND OLYMPIC PIPELINE REPLACEMENT CONTRACTS Dear Mike: The following information is enclosed: • Sample contract document for Cedar River Utility Crossing project. For our projects we will not be attaching the WSDOT amendments. Also, our supplemental specifications have been updated since the Cedar River contract. I have enclosed a copy of the current supplemental. • Electric Lightwave 4/28/96 transmittal (fiber optic cable that we will need to have relocated at SW 23rd Street) • City of Renton water system maps for valley area • U.S. West conduit record map for along south side of Olympic Pipeline property at SW 23rd Street between Lind and East Valley Road • Puget Sound Energy (WA Natural Gas) gas system distribution maps for SW 23rd and SW 43rd Street project areas • Puget Power distribution system maps for SW 23rd and SW 43rd Street project areas Thank you for you help. If you have any questions, please contact me at(206)277-5547. Sincerely, r UNov i C 5- /5/ 1.21 .Z�/ 2 t9 ) Scott Woodbury, P.E., Prpect Manager Surface Water Utility U:65230:S W 23RD.ST:97-009:S W Enclosure 200 Mill Avenue South - Renton, Washington 98055 MThis caner rnntainc,n,recvcled material 9nol nest rnn—mar e 1-I Se d� obood(ock r �; P18/Pw CITY OF RENTON HUMAN RESOURCES & RISK MANAGEMENT DEPARTMENT MEMORANDUM DATE: June 16, 1997 CI7, OF Engin,e,i e 0, TO: Scott Woodbury, PB/PW Utility System Civil Engineer II Pt FROM: Beverly Nelson Glode, Administrator L SUBJECT: R.W. Beck Annual Consultant Contract Design Services for SW 43rd Street Drainage Improvement Project I have reviewed the Certificate of Insurance submitted for the above referenced contract. The insurance coverage provided for this project meets the City's risk management requirements. contract\p_b_pw\utltysys\rwbeck TY OF RENTON CITY OF "NTON RECEIVED PUBLIC WORKS DEPARTMENT UN 11 1997 REQUEST FOR INFORMATION OR CONCURRENCE HUMAN RESOURCES & RI K MANAGEMENT DATE: June 9, 1997 TO: Beverly Nelson Glode FROM: Scott Woodbury (X-5547) CONTACT PERSON: SUBJECT: R.W. Beck Annual Consultant Contract SW 43rd Street Drainage Improvement Project Design Services Attached for your review are copies of the following: • Draft scope of work, schedule, and budget for the proposed R.W. Beck contract. The contract is less than $50,000 and may be signed by the Mayor. The firm of R.W. Beck is on the Utility Systems Division's approved annual consultant contract roster for 1997. • Certificate of insurance for insurance coverage other than professional liability • Primary additional insured endorsement • Endorsement for wavier of transfer of rights of recovery against others to us • City of Renton insurance information form • Certificate of insurance for professional liability Under their annual contract, it is proposed that R.W. Beck provide design engineering services for the SW 43rd Street Improvement Project. The risk associated with the work under the contract is believed to be low. Surveying and geotechnical field work are included in the scope of the contract. If you have any questions or need more information, please call me at X-5547. Thank you for your assistance. CONCURRENCE Name Date Attachments ,VR-18-97 FR I 03;21 Phi RW BECK FAX NO, 2064414972 P, 02 s�C . � vvi l� nor 5 �►.�l y cf—('!�c EXJiIBrr A- SCOPE OF WORK City of Renton East Side Green River Watershed Project F` W 43rd Street Drainage Improvement Project General This project includes several improvements along SW 43rd Street between Oakesdale Avenue and Lind Avenue to improve drainage collection and conveyance. SW 43rd Street is subject to occasional flooding due to a combination of factors including an undersized conveyance system,high downstream water surface elevations in Springbrook Creek that create backwater conditions on the SW 43rd Street drainage system, and a lack catch basin inlet capacity to collect street runoff into the system. The following elements are intended to improve the collection and conveyance system to reduce flooding: 1. Instaiiing a parallel diameter pipe system to connect the existing 54-.inch diameter system along SW 43rd Street to the 54-inch diameter system along Oakesdale Avenue. This improvement would eliminate an existing hydraulic restriction(36-inch diameter) in the system, 2. Installing approximately 10 new catch basin frames and grates (through-curb inlets) along SW 43rd Street to increase the collection of street runoff q doid, 3. Replacing a short section of undersized pipe that receives flow from in °F Kent, located at the southeast corner of SW 43rd Street at Lind Avenue SW. The existing pipe is 24-inches in diameter and approximately 30 feet in length. The pipe would be replaced with a 48-inch diameter pipe. /I Cr As described in the East Side Crreen River Watershed Project Plan, a combing' n of lowering Springbrook Creek water surface elevations and major pipe system improveme will be required to �00_ NW ( The propgscd improvements are intended to be an interim measure thak will help to reduce or mitigate the extent of flooding. U„�,� �� ,�j i�✓or� The following scope of services is based on providing design assistance including development of base �ow�• maps; design of the improvements, and preparation of technical specifications. Permit assistance will rU� be provided by the City. Task 1 -Develop Base Maps and Collect Data The Consultant will review and compile available City A,�-_ u l to develop a project base map. The available information will be supplemented with a one-day field reconnaissance to confirm the presence of physical features shown by the mapping and to locate visible utilities not shown on existing mapping using a hand tape. As the proposed improvements are limited, it is believed that the base maps should be sufficiently adequate for design and construction. Because the base maps will be developed using available information without a detailed field survey,the location of physical features within the right-of-way will be considered approximate. All elevation information will be based upon the City's gift drawings. File: 12-00018.10101 0101 3008 (oAGISL•BURTlA4SG068doc APR-18-97 FRI 03:22 PM RW BECK FAX NO. 2064414972 P. 03 Page 2 The City will provide the Consultant with the best available information on the City's rights-of-way and utility locations within the project area. It is understood actual field conditions (especially buried utilities) may vary and some field adjustments to the design may be necessary as a result of unanticipated conditions. If deemed necessary or prudent,the City will pothole to verify existing utilities in the area. G,� �� , k,,Ik yj 60� ,K Base maps will be developed using AutoCadd by digiti ' g important information. Existing a information to be digitized will be limited to edges of rb, existing utilities, sidewalk, appro�dr/r travel lanes. Other non essential information, such information outside of the right-of-way, elauafi ^ iq=* rs will not be included. The City's drafting standards for AutoCadd overlay organization will be used. The base map will be developed for only those areas along SW 43rd where improvements are proposed- As a part of the Task 2 Geotechnicai Analysis,the 1-call utility locate service will be contacted to locate utilities in the vicinity of the 54-inch diameter crossing and the 48-inch diameter pipe installation. The one-day field survey will be done following the utility locate to collect utility information_ If the utility locating service will not locate the utilities in the entire area of interest, an additional cost to coordinate with the utility companies will be required or the City will coordinate this activity. Oth.envise,the Consultant will base the design on the best available information provided by the City and the field survey. G c i`4 do. he one day site visit will include a meeting with the Cie City's transportation e ent �fk,,,5 Awils, IfIk �3representative to collect information on construction restrictions related to traffic. v' Y r task 1 Deliverables: • 1-inch=20-foot scale base map showing several plan views along SW 43rd Street where 51 improvements are proposed. Uf` Task 2 - Geotechnical Investigation and Report This task will include subsurface explorations and review of foundation designs of area utilities in order to develop recommendations for construction and for foundation support for the new 54-inch culvert. This work will be done by Hong West and Associates as a subconsultant to R.W. Beck. 'Me work will include one boring, review of available geotechnical data from other studies in the immediate vicinity, and preparation a ettrer�r ort do u ri ing their findings. The report will include recommendations ford ' ulsta at�0on�approaches, g. The report will also identify ateri�ale�o endationsiid' excavation limitations, if any, backfill and compaction require. ents, s orin re4q A foundation preparation requirements, equipment recommendati ns, slope re}uirements, and . PiEa( as dewatering requirements. ft- A U Prior to the work being accomplished the Consultant shall notify the 1-call utility locating service to locate utilities in the area of the 54-inch and 48-inch pipe improvements, File: WW-1159•DAI-AA/3008 (o:1GISEBUR'I\M SG059.doc) APR-18.97 FR I 03;23 PH RW BECK FAX N0, 2064414972 P, 04 Page 3 Task 2 Deliverables: • better Report and Sampling Logs Task 3 - Analysis Task 1. - Construction Method Alternative Analysis for 54-inch Pipeline) The Consultant will p are a project description it to 5 construction contractors to be selected by the City for the ose g cost input on two construction methods (open cut during off peak traffic t and boring and jacking). The project description will be reviewed b The Consultant summarize the contractors' responses and evaluate the two ap es in a short technical memorandum 2 pages). i Task 3.Z- Capacity Analysis The Consultant will perform an analysis of one of the five 12-inch diameter storm drains crossing from the north side of SW 43rd Street to the south side. The specific storm drain shall be selected with input from the City, The purpose of the analysis is to confirm that the 12-inch street crossings do not represent a capacity restriction. The analy 's will be done by developing a one-subbasin HYD model and comparing the peak flow with the pipWn capaci backwater from the trunk storm drain. vw9' If the cross-culverts are found to be a restriction,the Consultant and City shall agree on the necessary improvements and a corresponding increase to the budget. 2 Task 3.�-Traffic Routing Plan S� S�s14, ✓��.,s�.� Based upon the s'0id construction metho , the Consultant a traffic control plan based upon input from the City's Transportation ent01develop he traffic control plan shall be illustrated on sketches to be included in the contract documents. The City shall provide example traffic control plans and specifications. SNb ,ta�S S G,G lai•�Gt d c w i f SP464c e� L.d(l bask � Task 3 Deliverables: limo an di cu ing tw lotema ' e installa ion ppr ac • Capacity analysis calculations and brief memorandum describing results • Traffic control plan and requirements (Su b� vj 1� (, oX/ Task 4 -Design Plans and Specifications File: WW-1159-DA1-AA/3005 (o:kGISEBURTIMSG039.doc) APR-18-97 FRI 03:23 PM RW BECK FAX NO. 2064414972 P. 05 �fY n �r r �' "' V Page 4 oo\A �(.a ° rfy 6" The Cons ant will prepare engineering design pl technical specifications and construction cost estimates. The Consultant shal lmeett pith the City Ug suhmittnl nf thetnictiaa-u� l �� nsere thq recommended ash. The meeting shall include a City representative from the transportation depn . Following this meeting the consultant shall prepare G °�o at�e design submittal( for City revum In addition to the plans,the ppewnmuy y design submittal shall include a set of draft technical specifications. The basis for the technical specifications will be the 1996 Standard Specifications prepared by the Washington State Department of Transportation and the American Public Works Association (Standard Specifications). The Consultant will write sections of the technical specifications for items not included in the Standard Specifications. Text will be in Word format. The City will be responsible for incorporating the technical specifications into complete Contract Documents. Go 7 The Consultant shall meet with the City following review of the terry design to obtain comments. The Consultant shall then prepare a pre-final design submittal for final review (90%) and approval. The City will.provide written comments to the Consultant for' the pr&Uminy and the pre-final design submittals. The Consultant will incorporate the City's comments and provide the final design package as described herein to the City. The City will complete and prepare the Contract Documents for bidding purposes. The Consultant will review the completed project documents (i.e., bid package) prepared by the City_ (1ur) Construction cost estimates will be prepared at the pr , , pre-finaX and final submittals. 11 It is anticipated that three (3) drawings A be sufficient to adequately describe the work and the engineering fee estimate is based on the following drawing list: i. Title sheet, location map, legend and index of drawings. 2. Plan and profile sheet for 54-inch and 48-inch pipe improvements at P=20' scale. This sheet would also include a general arrangement detail showing the locations of the work along SW 43rd Street. c�hsrn, �„ r4,-5; C-i 3. Plan and detail sheet for catch basin improvements. This sheet would also includejadditional details associated with the 54-inch and 48-inch pipe improvements, such as trenching detail, pavement patching detail_ To the extent possible, the City's standard drawings and details will be used(i.e., refer-enced). Qthcx assumptions include the following- Pile: WW-1159-DAI-AA/3008 (o:1GISEBURT\MSG039.doc) -APR-18-97 FRI 03:24 PM RW BECK FAX NO, 2064414972 P. 06 Page 5 l. No sizing analysis is required for�the 54-inch or 48-inch pipes. 2. A base map for the entire 1�gth of SW 43rd Street between Oakesd.ale and Lind Avenue SW is not required, "%-'®Illy ,Was where improvements are proposed (culverts and catch basin inlets) w,12 °�"""�s � r�y,,,d� . ,. 3_ A separate temporary sediment and erosion control plan is not required. The temporary sediment and erosion control work will be described by notes on the drawings and in the specifications. in addition, it is assumed that design of a temporary water diversion for construction is not required. 4. A summary of quantities table will be provided by the City. 5. The base maps will not show contours. 6. The City will be responsible for printing and reproduction. 7. City will be responsible for all permitting associated with this project. 8. Any coordination required with the City of Kent, if required, shall be done by the City. 9. Construction easements, if required, shall be prepared and obtained by the City_ Task 4 Deliverables � �'�'� � �0 • Preliminary plans 50% submittal (1 full size and 1 half-size set of plans, 1 set of Technical Specifications, and cost estimate) • Pre-final plans 90% submittal (1 full size and 1 half-size set of plans, 1 set of Technical Specifications, and cost estimate) • Completed plans (1 full size and 1 half-size set of stamped, camera-ready original plans, 1 set of Technical Specifications, and cost estimate) • Two review meetings Task 5 -Project Management This task includes project management activities associated with the completion of the project. These activities include the following. (1) Project Management Plan. The Consultant will develop a Project Management Plan which describes this scope of work, staff assigiments, budgets,the project schedule, invoice requirements, and other important project requirements. (2) Project Administration. Project administration includes contract administration, monthly invoice preparation, monitoring progress by subconsultants, monthly project progress monitoring and reporting, Quality reviews,project filing, and project closeout. (3) Client Coordination. Client coordination includes miscellaneous coordination with the client as well as a kick-off meeting. File: wW-1159-DA1-AA/3008 , (o AGISFBURT�MSG039.doc) APR-18-97 FRI 03:24 PH RW BECK FAX N0, 2064414972 P. 07 Page 6 Additional Services The following services are not included in the scope of work or budget: • Field Surveying Services • Bidding Assistance, including preparation of addenda • Construction Management Services APR-18797 FRI 03:24 PH RW BECK FAX NO. 2064414972 P, 08 Page 7 EXHIBIT B -SCHEDULE City of Renton East Side Green River Watershed Project 'W 43rd Street Drainage Improvement Project Schedule The schedule is based upon the assumption that the construction will proceed in late 1997. This schedule is contingent upon the City securing the necessary permit approvals. Extension of the schedule to the 1998 construction season could result in additional project costs. The proposed schedule is as follows --��--- Notice to Proceed A� J1+17e- 211 195 7 Task 1 Base Map and Data Collection M�97 /ql 19 g 7 Task.2 Geotechnical Report ��^tr„ r`�'�7�1. 7u 7 �u(�y Z �� 155� 4,af Task 3. C _ 1- � - Pei �' l� y .5 "Task 3)Z/Cross-culvert Capacity Analysis Ju 97 Task 4 Design Plans and Specifications C-,(.,50 p%� Submittal �/����s -T 90/0 Submittal Au�7 4h h5 r Z' Final Plans and Specifications S 7 �u s �O - A ZI_ File: WW-1159-DA1-AA/3003 (o:1GISEBUR'r1MSG039.doc) RTVe-2218 - => ENGINEERING COST ESTIMATE Rev1/1(94 LABOR A N D EXPENSES PREPARED BY: MSG DATE: 4/18197 co CLIENT: City c(Renton,W&Wn9ton CHECKED BY: DATE: PROJ NA1AE: ESGMf/P-PwJec(No.3-SW 43rd Street Dralnale Improvements OPS APPROVAL: DATE. LY01tX ORDER: G6 APPROVAL: DATE: PROJ MR.! Mike Oiselwrt O DATE: 411 E97 STAFF LABOR HOVR6 REQUIRED BY TASK EXTENDED LABOR CDSTS TASK W 1.00 Bartfit Palo Profit 1.16 SUFAMARV LN Initials TA6Q RLCgSS PE RL TRJ AOMSV DRAFT 1Y PRO CLE11X Raw Labor Overhead Luba Profit labor ErrDensef Label Task TASK Description Salary 29.37 36.06 24,7a 22.00 22.50 18-71 19.50 14.80 12.23 Hoctrt Cori 1.77930 Overhead Revenue (2) Revenue Total "r Review lalorrrration 4.0 4.0 099 $175 $275 041 $317 Field Measurements and meeting 6.0 6.0 16.0 $433 $771 $1,204 $180 $1.306 r� Voli;-Coordii.Won 3.0 3.0 174 $132 $207 $31 -$238 Base Mao Development 1.0 4.0 12.0 17.0 1350 $-024 3974 314e 01.120 Subtotal 9.0 0.0 19.0 0.0 0.0 0.0 12.0 0.0 0.0 40.0 $967 11,700 02.660 $399 43.069 r� ......._ .. ..... ..:_........... .. .......:......... .........,....-...< ...... ...... ..... %ids .Gaol Mt Ra ................:.�:::::.,:,:.�..:::..:::,.:..-:.::.:::...,>_....,...,.,..,..........._::.:::.::...:..:,:.:,,::. . Re+:-n DamCoordimme 6.0 6.0 $176 1314 1490 073 s563 0.0 SO s0 60 So $O 0.0 :0 00 s0 to 00 0.0 $0 60 so to so Slablolel 0.0 0.0 0.0 0.0 0.0 0.0 0.0 OA _0.0_ .6.0.. 0176 $314 $490 $73 0563 N. 3.1 Coneuoclion Me(hod Analysis 16.0 4.0 1 A 21.0 $556 $0 0 31.546 $232 11.778 3.2 Capacity Amlyda 2.0 8.0 1.0 11,0 0269 6479 174E 5112 $860 3.3 Traffic Control Ran 4,0 12.0 12.0 1.0 29.0 $649 tl,155 11,1104 $271 $2,075 I 0.0 00 SO 00 s0 $0 Subtotal 220 0.0 20.0 00 0.0 0.0 16.0 0.0 J 0 61.0 01 474 12,023 04,096 0615 $4,713 ..:..... .::... .. .:., - :.r:: -..,;.::.: ••:...:•:<De :Plans and S 4aficednli! F Oesyt Wtdirnifmv aril Flml)13 She.els) 12.0 4.0 40.0 8.0 42.0 100.0 $2,461 14.414 $6 695 t 1 034 /7 929 --n Spocsicsliona 6.0 2.0 20.0 8.0 42.0 01.011 11,799 02.810 0421 $3,231 X TwoMteetings a,0 6.0 Ie.O $433 $771 $1.204 s191 $1,305 Rev61v of City and Pecka3e 0.0 1.0 7.0 0191 0340 6531 too I61 I Z Coe::Estimatfs(3) 1.0 8.0 9.0 $228 S40S $033 $95 $727 O 9abtotal 33.0 6.0 82.0 e.0 0.0 0.0 42.0 9.0 0.0 100.0 ".344 37.729 $12.073 $1,811 S 13,683 .......:...........:. •A 7: O Prtja:l Marra,temenl Ran 3.0 3.0 see $157 3245 $37 S2B2 ,p Pmb:l Admibistmtior. 0.0 to to so 30 so A SLtconsultanl Agreement 3.0 3.0 Cab 3157 1245 $37 3282 .A M-mlhiy lmvicinp(TtacMind(6rns) 9.0 8.0 e.0 21.0 $450 S801 11.251 1180 1;.439 co ProJ9:lCoarelnatirm 100 100 $294 $523 iota $122 0939 N Subtotal 250 00 0.0 00 00 00 00 00 EO 370 $920 11.637 s2,617 1383 $2940 0.0 so .o $0 $0 so 0.0 $0 to 60 to to Subtotals 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01 So ".i So 60 to TOTALS: hrt 95.D 0.0 121.0 8.0 0.0 6.0 70.0 9.0 9.0 324.0 97.871 314,006 $21,817 $3.282 $25,159 01,367 625,159 S26,545 Cheek sum o1 hours: 324 324 ok Wow oosic 2.790 216 2,998 216 0 112 1.295 133 11D Total Hours 324 labor rfvervje 0,173 834 0,783 833 0 329 3,793 380 322 Check strm of labor costa: 7.871 7,871 ok LABOR REVENUE 325,159 "p EXPENSES 0/.387 BVBCONSULTANTS 43) $3.150 TOTAL PROJECT REVEIOUE^329,SeS 0UD3.XL8 4110157 Page 1 of 3 +• ................ ............ ... ........................................................................ . ............. .................. ISSUE DATE(MM/DD/YY) 77 x. K ....... ....... P, E.R;;':i i Tv 1 F...:::1: i C i�:-i���A T: . ........ A04 ........ ............................................................ ..... 5/13/97 .... .......... ............... :X..................... ....... ........... . ........ ........ .......... ..... . PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHS UPON THE ATE HOLDER. THIS Marsh & McLennan, Incorporated DOES NOT AMEND,T EXTEND OR ALTER THECERTIFIC COVERAGE AFFORDED BY THCERTIFICATEE Marsh & McLennan Building POLICIES BELOW. 720 Olive Way, Suite #1900 Seattle, WA 98101 COMPANIES AFFORDING COVERAGE Gloria J. Iwata COMPARNY LEITEA HARTFORD CASUALTY INS CO COMPANY INSURED LETTER B TIG INSURANCE COMPANY R. W. BECK, INC. COMPANY 2101 FOURTH AVENUE LETTER C TWIN CITY FIRE INSURANCE CO SUITE 600 COMPANY SEATTLE, WA 98121-2375 LETTER D COMPANY LETTER E . .. ....... . ......................... . ......... . ...................... ................. ............. .... ........ CrlVCpA ....... .................. X� ""'I'l- ­­ .:::.:..: ­ . .......... ....... . ......... . .. ......... . ..... .......... ................... . ...................... . . ............... . . . .............................. ::.::: ....... .............. -­'....:.w.. . . ....... . . ..... ................. ......................... ........ . . ............................. ............. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED,NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO POLICY EFFECTIVE POLICY EXPIRATION LTR TYPE OF INSURANCE POLICY NUMBER DATE(MM/DD/YY) DATE(MM/DD/YY) LIMITS A GENERAL LIABILITY 52UUNKE2671 7/01/96 7/01/97 GENERAL AGGREGATE $ 2000000 X COMMERCIAL GENERAL LIABILITY PRODUCTS-COMP/OP AGG. $ 2000000 ......... CLAIMS MADE OCCUR. PERSONAL&ADV.INJURY $ 1000000 ........ Fx OWNER'S&CONTRACTOR'S PROT. EACH OCCURRENCE $ 1000000 FIRE DAMAGE(Any one fire) $ 300000 MED.EXPENSE(Any one person) $ 10000 AUTOMOBILE LIABILITY COMBINED SINGLE A 52UUNKE2671 7/0'1/96 7/01/97 X ANY AUTO LIMIT $ 1000000 ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY NON-OWNED AUTOS (Per accident) GARAGE LIABILITY PROPERTY DAMAGE $ B EXCESS LIABILITY XLB 926 24 --.68 7/01/96 7/01/97 EACH OCCURRENCE $ 1000000 UMBRELLA FORM AGGREGATE $ 1000000 ........................ ..................... . ........................... ........ .................. ........................ . ........... .......................... ............ ... . ...........:.:................ x OTHER THAN UMBRELLA FORM .. . ........ ..........­­­........... .............. X�STATU�TOR�L LIMITS . ................................................................ .................................... C WORKER'S COMPENSATION 52WBCZ9420 7/0 1/9 6 7/0 1/9 7 C 52WBCZ9421 (AOS) 7/01/96 7/01/97 EACH ACCIDENT $ 1000000 AND DISEASE-POLICY UMrT $ 1000000 EMPLOYERS'LIABILITY DISEASE-EACH EMPLOYEE $ 1000000 OTHER DESCRIPTION OF OPERATIONS/LOCATIONSfVEMCLES/SPECL4L ITEMS (SEE REVERSE AND/OR ATTACHED) . . ...................................................................................... ...: % . ...... ........... CANCELLATION ............... ................. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE City of Renton » EXPIRATION DATE THEREOF,THE ISSUING COMPANY WILXXKX)LXXX Planning/Building/Public Works MAIL 4 5 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE .... x Dept. Municipal Building LEFT.XXXX 1MXXXLTXxx'ZxxxxxLxxxxxxxm=xxxxxxx 200 Mill Avenue South Renton, WA 98055 AUTHOREED REPRESENTATIVE .............. DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS CERTIFICATE #38885 (CONTINUED) 688 INSURED : R. W. BECK, INC. HOLDER : City of Renton Planning/Building/Public Works Dept. Municipal Building 200 Mill Avenue South Renton, WA 98055 INSURED: R. W. BECK GROUP, INC. ; R. W. BECK, INC. (A WASHINGTON CORPORATION) ; AND R. W. BECK, INC. (A MASSACHUSETTS CORPORATION) ADDITIONAL INSURED WORDING DOES NOT APPLY TO WORKERS ' COMPENSATION POLICIES Project Reference: SW 43rd Street Drainage Improvement Project The Certificate Holder is Primary Additional Insured including Waiver of Subrogation and Severability of Interest Clause with respect to the above operations of the Named Insured. PAGE: 2 OF 2 PRIMARY ADDITIONAL INSURED Forming a part of Policy No. 52UUNKE2671 Issued to R. W. Beck, Inc. ENDORSEMENT This endorsement modifies insurance provided under the following: Commercial General Liability Coverage Part Name of Person or Organization: Project#/Location City of Renton SW 43rd Street Drainage Improvement Project WHO IS AN INSURED (Section II) is amended to include as an Insured the person or organization shown in the schedule, but only with respect to liability arising out of 'your work" for that Insured by or for you. The insurance provided by this endorsement is primary insurance. Any other insurance available to the Additional Insured shown in the schedule is excess and noncontributory with this insurance. This endorsement shall not increase the limits stated in Section III—Limits of Insurance. However, in the event that the limits of liability stated in the policy exceed the limits of liability required in the written contract, the insurance provided by this endorsement shall be limited to the limits of liability required by written contract. POLICY NUMBER: 52UUNKE2671 COMMERCIAL GENERAL LIABILITY CG 24 04 10 93 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Person or Organization: City of Renton (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement) The TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US Condition (Section IV - COM- MERCIAL GENERAL LIABILITY CONDITIONS) is amended by the addition of the following: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a contract with that person or organization and included in the "products-completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. CG 24 04 10 93 Copyright, Insurance Services Office, Inc., 1992 Ff20M :R W BECK 206 441 4960 1997,06-12 09ISS #166 P.02/02 Y CTrY OF RENTON HUMAN RESOURCES &RISK MANAGEMENT DEPARTMENT INSURANCE INFORMATION FORM CONTRACTOR/CONSULTANT: R. W. Beck, Inc. PROJECT NUMBER SW..43rd .St... [)rai na9$TAFF CONTACT• Mike Gi sebu rt- ImproveniLmt Project Certificate of Insurance indicates the coverages and limits specified in contract7 if no,explain below-. C Yes ❑ No is the Commercial General Liability policy form an ISO 1993 Occurrence Form or Equivalent? ® Yes ❑ No (If no,attach a copy of the policy with required coverages clearly identified) CG 0043 Amendatory Endorsement provided?'A ❑ Yes ❑ No CGL General Aggregate provided on a"per project basis(CG2503)7' 19 Yes ❑ No Additional Insured wording provided?' M Yes ❑ No All coverage on a primary basis and noncontributing basis?' M Yes ❑ No Waiver of Subrogation Clause applies" d Yes ❑ No Scverability of Interest Clause(Cross Liability)applies? M Yes ❑ No Notice of Canoellation/Non-Rentwal amended to 45 days?* 0 Yes ❑ No 'To be shown on certifrcaie of insurance A Not required if ISO Occurrence form is 1990 or earlier,may also be asrumed under contract. AM BE,ST'S RATING FOR CARRIEIL- CGL.A± V Auto A X y Umb A+S V Professional This Questionnaire is issued as a matter of information. This questionnaire IS not an rrrsarance policy and does not *mend, extend or alter the ooverage afforded by the policies indicated on the attached CERTIFICATE OF INSURANCE. -The C3IY OF RENTON, al its option, shall obtain copies of the policies and/or specific declararian pages FROM awarded bidder prior to execution of contract- Marsh & McLennan Gloria Iwata Agency/Broker Completed By(Type or Print Name) 20 Olive Way; Seattle ,�u� Address Completed By(Signature) Gloria Iwata 206-224-0552 Name of person to contact Telephone Number NOTE:THIS QUF.STIONNAIREMUST BE COMPLEZFD AND ATTACHED TO CERTIFICATE OF INSURANCE FOR EACH LINE OF COVEPAGE I,�ttv�c,,,tr.na;ed�a aN�Aw 32 a.�,m vss -Fi401`1' :•R W BECK 206 441 4960 1997,05-27 14:S2 #241 P.02/02 • - - .,r-< `.- '-+.�'l' :�.t21:��_s:`�si1.::aalII1[1 n'iti.: ip.��,•..:.�..A�w.' a�•��•:1 .•.::.•. "..fil v ISSVE DATE(MMIUDi"I CERT[FTEy;VF!•111iSVI1hIVCE ''=""rt`� rt'�'� �1...5 13 97 — MANAGEAS ; THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGWS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AMENO; M8rsh & McLennan Management EXTEND OW ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW-_^ — • ._.... Services ( Bermuda) Limited ---- - ---- -- ---- - Craig Appin House , Wesley Street ; COMPANIES AFFORDING COVERAGE P. 0. Box HM 1262 "--- Hamilton HM FX, Bermuda C0"P'"TA OLYMPIC NATIONAL INSURANCE COMPANY LTD. LETT�P _ --.- COMPANY B --— LETTER INEURED — R-W. Beck, Inc. COMPANY Fourth 6 Blanchard Building LETTER _C —_ 2101 Fourth Avenue, suite 600 COMPANY p Seattle, WA 9 8121-237 5 ( LETTER U. S ,A, ` COMrA LETTENr E xt rr VIER THIS IS TO CERTIFY TRAY THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THG INSURED NAMED ABOVE FOR THE PO WHICH THIS LICY PEF100 CERT FICDTE MAYIBESSSUEO OR MAY PERTAIN,THE NSURANCE AFFORDED BY THE POLICIES DETANDING ANY PEOvIEMENT,TERM OR CONDITION OF ANY CONTRACT OR OSCR BEDTHER OHE HEREIN IS SUBJECCUMENT WITH T O TO ALL HE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I POLICY EFFECTIVE POLICY EYPIAATIOM� Llurre COI TYPE OF INSU4114 POLICY MUNIDER CE I I DATE(MMIO"yI DATET. IwAnIDD/YY7 , _ --'------ i GENERaLAGGREGATE OCNEAAL LuBILITr PppOUCTS•COIIPlOp AGG. '�— COMIMCRC�wI GeNER.L L1AQILITY I ^^ DPER9OxALAADY.INJURVS ;S I GLAIY9 raAOE�OCCUR — L� I EACH OCCURRENCE �l$ OWNEF'6 a CONTA•CTOWS PROT_! 1 IRE NAAGE Wwr oA/6,a) S ^I j �,F IIAED.ED. EXPENSE(Any a,e person) '3 'Af1TOMOBR_£LIABILITY CDIAG NED SMCLF- ,IS �UYR JANY XUTO - -1 I I BODILY IeUUWY ALL OWNEO AUTOS I I(Vol pareonl SCHEDULED AUTOS 1— — — "COIrINJUAY 5 HIRED AUT06 81,eccid•nIt — NON.OWNED AUTOS , ^- - I GARAGE LIABILITY I -OPEP-DAMAGE �S ;EAC*OCCURRENCE J S _EXCESS LIAOILR7 - 1 UMORELLA FORM i OTHER NAN UUBRE.LA FOAM - . STATUTORY UMW$ JOAKRP'13 COMPE%EAT1014 , I FJICIa ACCIDENT _— ��.. 1 Aw WE►SE-POUCwU►ITT EYPLOYEAE'IIABIUT I �—_ J---+— � DISEASE—EACH EMPLOYEE I OTHER ; Professional 1 � 7 1r000 , 000 Liability � 7_P-0101-0o-1996 7/l/96 /1/9 $ I OESCRIMION OF;OPERATI0003ZCZAfi;5t &1CLl>VSPECIAL ITEMS SW 43rd Street Dratinage Improvemenz Project CA1ICELLA'nON. CERTIF_IC_ATE HOLDER:.. _ _: __- .•., .- _ _ _.__._. Cityof Renton Planning/Building/ :;'SHOULD ANY OF THE A50YE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION GATE THEREOF, THE ISSUING COMPANY WILL IXI �aX PL1b11C works Department MAIL LDAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO TH£ Municipal Building LEFT, aecxa rcx�o�Isl�sla�c�aaaar xAOL�� =ax�c 200 Mill Avenue SOutt .:;, g�tL� c Xxxx+�a!>c #xeI> xr�xtvl;sc Renton, WA 96055 AUTMOaaED PEPRESEN ATIV -•---.. 4CORD CORPORATION 1990 ACOAD 25.9(7/90) I ENGINEERING COST ESTIMATE RWO.222D Revl/1 EXPENSE ESTIMATE PREPARED BY: A15G DATE: co CHECKED BY: DATE: s 1 CLIENT: Chy of flemon,Washington OPS APPROVAL: DATE: PROD NAME: ESGRWP-Pf*et No.3•SW 43id Street Dreimige Improvements CS APPROVAL: DATE: O W WORK ORDER: 0 N PRDJ MGR.: Mike Giseburt Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 TOTALS rn EXPENSE ITEM Cost!U* Qly. S Oty. a Qty. s (Ity. 6 Qty. S Qty. S Qty.I Item 3 35 Hotel&Meals 100 9/pen.-day 0 s0 0 $0 0 $0 0 $0 0 s0 0 90 0 per:days $0 36 Travel• Surface Nliteage 0.29 S/mile 35 $10 0 00 0 $0 70 $20 0 SO 0 $0 105 miles $30 M-- Car Rental 40 0/dsy 0 00 0 40 0 00 0 s0 0 s0 0 60 0 days $0 M) r ri Taxi 20 S I day 0 60 0 SO 0 s0 0 SO 0 $0 0 00 0 days s0 n 37 Travol-Air 0 1 lit 0 $0 0 SO 0 $0 0 $0 0 s0 0 60 O rt $0 38 Travel-Mlsc.Exp.(Tta,etcl 10 9 I day 0 60 0 $0 0 40 0 60 0 $0 0 $0 0 days SO 39 Travel-Other 1 $0 $0 $0 $0 $0 $0 Travel-Other $0 45 Communications 2% labor rev. 061 $11 $94 4276 $59 s0 Comm.-Tere. $503 49 Printing and Reproduction Xerox Copies 0.08 1 ea 20 $2 0 $0 100 $8 200 $16 200 616 0 $0 520 coples 442 Blueine Pdnls 0.36 S ea 10 $4 0 $0 10 40 $14 0 90 0 $0 50 bluelns $18 Check Prints, Ilit97" 1 1 ea 10 610 0 00 $0 30 630 0 SO 0 60 40 1107s $40 Chk Prints,Large Band G 0 ea 0 $0 0 60 $0 10 0 $0 0 $0 0 bond pm 90 Plots,large Vellum 8 9 ea 0 $0 0 $0 $0 8 664 0 $0 0 $0 6 vellums $64 Plots,LnrgeMylar 14 S ea 0 60 0 $0 s0 $0 0 $0 0 s0 0 mylats s0 Photo Wor4 $0 10 $0 00 0 s0 $0 Photo Work $0 X Ogler $0 s0 60 1 $0 60 $0 Other 10 Z 50 Maps and Charts $0 $0 s0 $0 SO SO Maps/Charts $0 p 61 Books and Publications s0 $0 $0 10 60 s0 Books/Pub $0 53 Misoellaneow Expenses SO $0 $0 SO SO s0 MISC.Exp. SO CD 58 Equl"nl Rental s0 t0 $0 $0 SO $0 Equip.Rental 60 p 65 PC Charges CAD 111 5 S f hour 12 $60 0 $0 10 $50 42 1210 0 SO 0 10 64 CAD his $320 A Engr. PC 2 $f hour 25 950 6 012 38 $76 90 1180 26 152 0 10 105 PC his $370 CO Ward Pro(2) 4 S 1 hour 0 $0 0 SO 0 $0 0 $0 0 $0 (i $0 0 WP his $0 fV 67 Other Exponses $0 s0 $0 $0 $0 $0 Other Exp. $0 SUBTOTAL w/o,Matkup $196 123 $228 $812 $127 90 $1,387 w-/Markup 0196 $23 $228 $812 $127 10 NOTES: SUBTOTAL EXPENSES 01,387 1. Recommended catculation of CAD computer hours as follows: total CAD fin Ifrom labor ast.)x 0.80 IAarkup @ 0% 90 2, Word Pro computer hours should equal word prooessing labor hours from labor estimate. TOTAL $1,387 CD BU03.XLS 4!18!97 Page 2 of 3 New ENGINEERING COST ESTIMATE =>v SUB CONS ULTANT ESTIMATE I CLIENT. City of Renton.Washing(on CD ?AOJ NAME: ESGRWP-Pfr]Act No.3-SW 43rd Street Drainege Improvements TJ WORK ORDER: 0 r� PROD NIGR.: fAlks Gixbuil ,---, Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 TOTALS wo SUBCONSULTAHT H(e. Exp. Labor Hm ap. Lebo( His. Exp. Labor His. Exp. Leber His. Exp. Labor Hrs. Exp. Labor His. Exp. Labor N H"West and Aesodalas 0 80 s0 0 t0 $3.000 0 60 $O 0 60 SO 0 30 0 00 $O 0 0 3,000 0 10 60 0 30 00 0 SO 0 60 00 0 SO 00 0 60 60 0 0 0 r� E co lT7 0 t0 50 0 $0 0 t0 60 0 60 00 0 SO 60 0 10 10 0 0 0 n SUBTOTAL vi/o Markup 0 00 60 O s0 $3,000 0 60 $O 0 SO SO 0 30 s0 0 s0 00 0 t0 $3,000 wl markup $O 60 $O L3,150 60 60 60 s0 00 00 00 $O Exp wf mkcp 0 Lab wl mkup 3,150 SUBTOTAL EXPENSES 10 SUBTOTAL LABOR $3.000 SUBTOTAL $3,000 Markup @ 576 0160 TOTAL $3,150 X z 0 rN O (33 .A .A. .A. co N "-U 8L)D3.xLS 411 8!57 Papo 3 01 3 ' a 1 June 11, 1997 Mr. Scott Woodbury, P.E. JUN 1 1997 Project Manager Surface Water Utility CITY OF fzENTON City of Renton Engineering Dept 200 Mill Avenue S Renton, WA 98055 Subject: City of Renton- ESGRWP Valley Improvements Renton 1997 Annual Contract SW 43rd Street Drainage Improvement Project Dear Scott: Please find attached a revised scope of work and budget to provide design assistance on the SW 43rd Street Drainage Improvement Project. The scope of work is included as Exhibit A, the schedule is included as Exhibit B, and the budget is identified as Exhibit C. I have also included a marked up copy of the Consultant Agreement as well as the signed Fair Practices Policy forms for your use in preparing the originals. If you would like us to prepare the originals, please send me a copy of your digital file. Please give me a call at 727-4607 if you have any questions. Sincerely, R. W. BECK, I Michael S. Giseburt, P.E. Project Manager MSG/rhm/nak Enclosures 00-00000-60311-6905 0:\GISEBUR'MMSG410.D0C 2101 Fourth Avenue, Suite 600 Seattle,WA 98121-2375 Phone(206)441-7500 Fax (206)441-4962 ENGINEERING ANNUAL CONSULTANT AGREEMENT THIS AGREEMENT, made and entered into on this , day of , 19 , by and between the CITY OF RENTON, WASHINGTON, A MUNICIPAL CORPORATION HEREINAFTER CALLED THE "CITY," and whose address is Z io ¢o"-4-6, at which work will be available for inspection, hereinafter called the "CONSULTANT." t,ar 4 a Vz PROJECT NAME: `:5 LL.) WHEREAS, the City has not sufficient qualified engineering employees to prove e the engineering within a reasonable time and the City deems it advisable and is desirous of engaging the professional services and assistance of a qualified professional consulting firm to do the necessary engineering work for the project, and WHEREAS, the Consultant has represented and by entering into this Agreement now represents, that it is in full compliance with the statutes of the State of Washington for registration of professional engineers, has a current valid corporate certificate from the State of Washington or has a valid assumed name filing with the Secretary of State and that all personnel to be assigned to the work required under this Agreement are fully qualified to perform the work to which they will be assigned in a competent and professional manner, and that sufficient qualified personnel are on staff or readily available to Consultant to staff this Agreement. WHEREAS, the Consultant has indicated that it desires to do the work set forth in the Agreement upon the terms and conditions set forth below. NOW THEREFORE, in consideration of the terms, conditions, covenants and performances contained herein below, the parties hereto agree as follows: I SCOPE OF WORK The Consultant shall furnish, and hereby warrants that it has,the necessary equipment, materials, and professionally trained and experienced personnel to facilitate completion of the work described in Exhibit A, Scope of Work, which is attached hereto and incorporated into this Agreement as though fully set forth herein. The Consultant shall perform all work described in this Agreement in accordance with the latest edition and amendments to local and state regulations, guidelines and policies. The Consultant shall prepare such information and studies as it may deem pertinent and necessary, in order to pass judgment in a sound engineering manner on the features of the work. The Consultant shall make such minor changes, amendments or revisions in the detail of the work as may be required by the City. This item does not constitute an "Extra Work" item as related in Section VIII of the Agreement. The work shall be verified for accuracy by a complete check by the Consultant. The Consultant will be held responsible for the accuracy of the work, even though the work has been accepted by the City. H DESIGN CRITERIA The City will designate the basic premises and criteria for the work needed. Reports and plans,to the extent feasible, shall be developed in accordance with the latest edition and amendments of local and State regulations, guidelines, and specifications, including, but not limited to the following: H:forms/contract/97CONSUL.DOC 1 VI PAYMENT The Consultant shall be paid by the City for completed work for services rendered under this Agreement as provided hereinafter as specified in Exhibit C, Cost Estimate. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete the work. All billings for compensation for work performed under this Agreement will list actual time(days and/or hours)and dates during which the work was performed and the compensation shall be figured using the rates in Exhibit C. Payment for this work shall not exceed$ Z9 1072 without a written amendment to this contract, agreed to and signed by both parties. Cost Plus Net Fee Payment for work accomplished shall be on the basis of the Consultant's actual cost plus a net fee. The actual cost includes direct salary cost, overhead, and direct non-salary cost. I. The direct salary cost is the salary expense for professional and technical personnel and principals for the time they are productively engaged in the work necessary to fulfill the terms of this Agreement. The direct salary costs are set forth in the attached Exhibit C and by this reference made a part of this Agreement. ,��,93 2. The overhead costs as identified on Exhibit C are determined as percent of the direct salary cost and by this reference made a part of this Agreement. The overhead cost rate is an estimate based on currently available accounting information and shall be used for all progress payments over the period of the contract. 3. The direct non-salary costs are those costs directly incurred in fulfilling the terms of this Agreement, including, but not limited to travel, reproduction,telephone, supplies, and fees of outside consultants. The direct non-salary costs are specified in Exhibit C,Cost Estimate. Billings for any direct non-salary costs shall be supported by copies of original bills or invoices. Reimbursement for outside consultants and services shall be on the basis of times the invoiced amount. 4. The net fee,which represents the Consultants profit shall be i50 percent of direct salary plus overhead costs. This fee is based on the Scope of Work and the estimated labor hours therein. In the event a supplemental agreement is entered into for additional work by the Consultant,the supplemental agreement will include provision for the added costs and an appropriate additional fee. The net fee will be prorated and paid monthly in proportion to the percentage of the project completed as estimated in the Consultant's monthly progress reports and approved by the City. Any portion of the net fee not previously paid in the monthly payments shall be included in the final payment, subject to the provisions of Section XI entitled TERMINATION OF AGREEMENT. 5. Progress payments may be claimed monthly for direct costs actually incurred to date as supported by detailed statements, for overhead costs and for a proportionate amount of the net fee payable to the Consultant based on the estimated percentage of the completion of the services to date. Final payment of any balance due the Consultant of the gross amount earned will be made promptly upon its verification by the City after completion and acceptance by the City of the work under this Agreement. Acceptance,by the Consultant of final payment shall constitute full and final satisfaction of all amounts due or claimed to be due. Payment for extra work performed under this Agreement shall be paid as agreed to by the parties hereto in writing at the time extra work is authorized. (Section VIII "EXTRA WORK"). Hlormskontracd97CONSUL.DOC 4 CITY OF "NTON PUBLIC WORKS DEPARTMENT REQUEST FOR INFORMATION OR CONCURRENCE DATE: June 9, 1997 TO: Beverly Nelson Glode FROM: Scott Woodbury (X-5547) CONTACT PERSON: SUBJECT: R.W. Beck Annual Consultant Contract SW 43rd Street Drainage Improvement Project Design Services Attached for your review are copies of the following: • Draft scope of work, schedule, and budget for the proposed R.W. Beck contract. The contract is less than $50,000 and may be signed by the Mayor. The firm of R.W. Beck is on the Utility Systems Division's approved annual consultant contract roster for 1997. • Certificate of insurance for insurance coverage other than professional liability • Primary additional insured endorsement • Endorsement for wavier of transfer of rights of recovery against others to us • City of Renton insurance information form • Certificate of insurance for professional liability Under their annual contract, it is proposed that R.W. Beck provide design engineering services for the SW 43rd Street Improvement Project. The risk associated with the work under the contract is believed to be low. Surveying and geotechnical field work are included in the scope of the contract. If you have any questions or need more information, please call me at X-5547. Thank you for your assistance. CONCURRENCE Name Date Attachments PLANNING/ BUILDING/ PUBLIC WORKS DEPARTMENT MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 y b" UTILITY SYSTEMS DIVISION - 235-2631 0 TRANSPORTATION SYSTEMS DIVISION - 235-2620 TO: elke X eLia DATE: JOB NO.: -F-1c. RE: -2101 a w.M ,< S �� )cc h c WA 98 121-23375' ATTN: GENTLEMEN: WE ARE,SENDING YOU ✓x ATTACHED ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ PRINTS ❑ REPRODUCIBLE PLANS ❑ SPECIFICATIONS ❑ COPY OF LETTER ❑ COPIES DATE NUMBER DESCRIPTION AND REMARKS ` 11-akr gr, in cr THESE ARE TRANSMITTED AS CHECKED BELOW: AFOR APPROVAL o APPROVED AS SUBMITTED o RESUBMIT COPIES FOR APPROVAL FOR YOUR USE o APPROVED AS NOTED ❑ SUBMIT COPIES FOR DISTRIBUTION ❑ AS REQUESTED ❑ RETURNED FOR CORRECTIONS ❑ RETURN CORRECTED PRINTS ❑ FOR REVIEW AND COMMENT ❑ o PRINTS RETURNED AFTER LOAN TO US COPIES TO: SIGNED TITLE IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE APR-18-97 FRI 03:21 PH RW BECK FAX NO, 2064414972 P. 01 April 19, 1997 Mr. Scott Woodbury,P.E. APR f Project Manager 1 r997 Surface Water Ublity City of Renton End OF REN�ON 200 Mill Avenue South ineering pip# Renton,Washington 98055 Dear Scott: Subject; City of Renton-ESGRWP Valley Improvements Renton 1997 Annual Contract Project No.3-SW 43rd Street Drainage Improvement Project Please find attached a draft scope of work and budget to provide design assistance on the SW 43rd Street Drainage Improvement Project. The scope of work is included as Exhibit A, the schedule is included as Exhibit B, and the budget is identified as Exhibit C. I appreciate the opportunity to continue providing engineering services to you and the City of Renton. Please give me a call at 727-4607 if you have any questions. Sincerely, R. E Michael . Gi eburt,RE, Project Manager MSG/rhm Enclosures Post-ir Fax Note 7671 puce q.-j g -J pages r To (,05vV0 Q- FromVA�f_ L vet Co,/Dept. �D w Co. )EZ44_'/a Phone 4; Phone* 3 �fc4o S liar- Fi1c: 12-00018.10101 0101 30US Fax# (o:\GISEBURP.N4S G068doc) 2101 Fourth Avenue,suite 600 Seattle,WA 9a121-237.5 Phone(206)441-7500 Fax(206)441-4962 l;;r APR-18-97 FRI 03:21 PM RW BECK FAX NO. 2064414972 P. 02 r Date/ paof Vol ges Post-ite Fax Note 7671 b From To r � Co. Co./Dept. Phone# Phone# Ea Fax# Fax# y WV.' feWieAd General This project includes several improvements along SW 43rd Street between Oakesdale Avenue and Lind Avenue to improve drainage collection and conveyance. SW 43rd Street is subject to occasional flooding due to a combination of factors including an undersized conveyance system,high downstream water surface elevations in Springbrook Creek that create backwater conditions on the SW 43rd Street drainage system, and a lack catch basin inlet capacity to collect street runoff into the system. The following elements are intended to improve the collection and conveyance system to reduce flooding: 1. Installing a parallel 54-inch diameter pipe system to connect the existing 54-inch diameter system along SW 43rd Street to the 54-inch diameter system along Oakesdale Avenue. This improvement would eliminate an existing hydraulic restriction(36-inch diameter) in the system. 2. Installing approximately 10 new catch basin frames and grates (through-curb inlets) along SW 43rd Street to increase the collection of street runoff q J"'t 3. Replacing a short section of undersized pipe that receives flow from in ati,- 4'r aF Kent, located at the southeast comer of SW 43rd Street at Lind Avenue SW. The existing pipe is 24-inches in diameter and approximately 30 feet in length, The pipe would be replaced with a 48-inch diameter pipe. �� ►� do t4der 4-4t3 co�W ram" _ _ . As described in the East Side Green River Watershed Project Plan, a combina' n of lowering Springbrook Creek water surface elevations and major pipe system improveme will be required to )�_ The premed improvements are intended to be an interim measure thak will help to reduce or mitigate the extent of flooding. �,� fit ,�J dr r11(?AA1 cck,l 1--w— hsn� The following scope of services is based on providing design assistance including development of base maps; design of the improvements, and preparation of technical specifications. Permit assistance will cur be provided by the City. Task 1 -Develop Base Maps and Collect Data P The Consultant will review and compile available City Ault to develop a project base map. The available information will be supplemented with a one-day field reconnaissance to confirm the presence of physical features shown by the mapping and to locate visible utilities not shown on existing mapping using a hand tape. As the proposed improvements are limited, it is believed that the base maps should be sufficiently adequate for design and construction. Because the base maps will be developed using available information without a detailed field survey,the location of physical features within the right-of-way will be considered approximate. All elevation information will be based upon the City's t drawings. File: 12.00018.10101 0101 3008 {o\GFSL•BTJRT\SSG068doc APR-18-97 FRI 03:22 Phi RW BECK FAX N0, 2064414972 P, 03 Page 2 The City will provide the Consultant with the best available information on the City's rights-of-way and utility locations within the project area. It is understood actual field conditions (especially buried utilities) may vary and some field adjustments to the design may be necessary as a result of unanticipated conditions. If deemed necessary or prudent,the City will pothole to verify existing I� utilities in the area. e;l&6A ItPr'(',,,kua(5 J 9 aJ information, Existing Base maps will be developed using AutoCadd by digiti ' g important inform information to be digitized will be limited to edges of rb, existing utilities, sidewalk, appro�mate travel lanes. Other non essential information, such in outside of the right-of-way,_ e s will not be included. The City's drafting standards for AutoCadd overlay organization will be used. The base map will be developed for only those areas along SW 43rd where improvements are proposed. As a part of the Task 2 Geotechnical Analysis,the I-call utility locate service will be contacted to locate utilities in the vicinity of the 54-inch diameter crossing and the 48-inch diameter pipe installation. The one-day field survey will be done following the utility locate to collect utility information. If the utility locating service will not locate the utilities in the entire area of interest, an additional cost to coordinate with the utility companies will be required or the City will coordinate this activity. Otherivise,the Consultant will base the design on the best available information provided by the City and the field survey. n The one day site visit will include a meeting with the� City's transportation dint Syoy s I/1N►Slo, representative to collect information on construction restrictions related to traffic. e^�41 Task 1 Deliverables; • 1-inch=20-foot scale base map showing several plan views along SW 43rd Street where 5• improvements are proposed. Task 2 - Geotechnical Investigation and Report This task will include subsurface explorations and review of foundation designs of area utilities in order to develop recommendations for construction and for foundation support for the new 54-inch culvert. This work will be done by Hong West and Associates as a subconsultant to R.W. Beck. -17he work will include one boring, review of available geotechnical data from other studies in the immediate vicinity, and preparation ka�etter�re�ort courrnting their findings. The report will include recommendations ford insta ration ipproaehes, :C = - 'ng. The report will also identifyAmaterial ;epommendations,,n CQ, excavation limitations, if any, backfill and compaction require enr_c tl;oring req�ir�rrferit�, foundation preparation requirements, equipment recommendati ns, slope re uirements, and dewatering requirements. 1 r 44 �4 Prior to the work being accomplished the Consultant shall notify the 1-call utility locating scrvicc to locate utilities in the area of the 54-inch and 48-inch pipe improvements, File: WW-1159-DA1-AA/3008 (o:1GISEB1URI\M SG039.doc) APR-18-97 FRI 03:23 PM RW BECK FAX N0, 2064414972 P. 04 Page 3 Task 2 Deliverables: • Letter Report and Sampling Lags Task 3 - Analysis Task - Construction Method Alternative Analysis for 54-inch Pi Reline) The Consultaiwill are a project description and 1t to 5 construction contractors to be selected by tor the ose of celleeting cost input on two construction methods (open cut during off pc peue&- t and boring and jacking), The project description willbe reviewed b The Consultant ' summarize the contractors' responses and evaluate the tw•o ap es itechnical memorandum 2 pages). i Task 3T a semis pacity Anal The Consultant will perform an analysis of one of the five 12-inch diameter storm drains crossing from the north side of SW 43rd Street to the south side. The specific storm drain shall be selected with input from the City, The purpose of the analysis is to confirm that the 12-inch street crossings do not represent a capacity restriction. The anal y 's will be done by developing a one-subbasin HYD model and comparing the peak flow with the pip nbPaTM capaci back-water from the trunk storm drain. W i l k �, ,r .., f If the cross-culverts are found to be a restriction,the Consultant and City shall agree on the necessary improvements and a corresponding increase to the budget. 2 Task 3.1-Traffic Routing Plan � t�c. Sys ✓Jt�si•� Based upon the s- construction metho . the Consultant gill develop a traffic control plan based upon input from the City's Transportation ent. The traffic control plan shall be illustrated on sketches to be included in the contract documents. The City shall provide example traffic control plans and specifications. ��b�. �,s s G«� o(c w yk qP ACA, ,,F,. L.d(, �Mk Task 3 Deliverables: rr Technical memorandum discussing two alternative installation approaches • Capacity analysis calculations and brief memorandum describing results • Traffic control plan and requirements (5 U b^Y* Vj 1 k i eX ..d Src.cs�-�w. Si►�h,,��f J Task 4 -Design Plans and Specifications File; WW-1159-DAl-AA/3009 (o:1G1SEBURT\MSG039.doc) APR-18-97 FRI 03:23 PM RW BECK FAX NO. 2064414972 P. 05 Page 4 u�v�l A(ore i✓� / CIO 1 The Consu ant will prepare engineering design plans,technical specifications and construction cost estimates. The Consultant shall meet Lw rith the City fella subn ittal-Qfthc-const --c> I -(T-A"4 nse�Cect the recommended ash. The meeting shall include a City representative from the transportation depat-.rnen . Following this meeting the consultant shall prepare design su8inittal( -for City revue S,s!'�,,,• Oi ti�pray, 0 7, In addition to the plans,the ppekmnary design submittal shall include a set of draft technical specifications. The basis for the technical specifications will be the 1996 Standard Specifications prepared by the Washington State Department of Transportation and the American Public Works Association (Standard Specifications). The Consultant will write sections of the technical specifications for items not included in the Standard Specifications. Text will be in Word format. The City will be responsible for incorporating the technical specifications into complete Contract Documents. l� The Consultant shall meet with the City following review of the ptdim�nary design to obtain comments. The Consultant shall then prepare a pre-final design submittal for final review (90%) and approval. The City will provide written comments to the Consultant forte the pry and the pre-final design submittals. The Consultant will incorporate the City's comments and provide the final design package as described herein to the City_ The City will complete and prepare the Contract Documents for bidding purposes. The Consultant will review the completed project documents (i.e., bid package) prepared by the City. Construction cost estimates will be prepared at the preJi;ir6ry, pre-fina4 and final submittals. It is anticipated that three (3) drawings SA be sufficient to adequately describe the work and the engineering fee estimate is based on the following drawing list: 1. Title sheet, location map, legend and index of drawings. 2. Plan and profile sheet for 54-inch and 48-inch pipe improvements at 1"=20' scale. This sheet would also include a general arrangement detail showing the locations of the work along SW 43rdStreet. cohsrn,*. ^4C5; eq ;. Plan and detail sheet for catch basin improvements. This sheet would also includeadditional details associated with the 54-inch and 48-inch pipe improvements, such as trenching detail, pavement patching detail. To the extent possible, the City's standard drawings and details will be used(i.e., referenced). Qthcr assumptions include the following: File: NVIV-1159-DA1-AA13008 (o:\GISEBURT1hI S G039.doc) APR-18-97 FRI 03:24 PM RW BECK FAX NO. 2064414972 P. 06 Page 5 1. No sizing analysis is required for the 54-inch or 48-inch pipes. 2. Abase map for the entire 1 nth of SW 43rd Street between Oakesdale and Lind Avenue 5W eas where improvements are proposed (culverts and catch basin is not required, ice;;�r11y , inlets) t,"4 d'' 'n's 4'e /w,, 3. A separate temporary sediment and erosion control plan is not required. The temporary sediment and erosion control work will be described by notes on the drawings and in the specifications. In addition, it is assumed that design of a temporary water diversion for construction is not required. 4. A summary of quantities table will be provided by the City. 5. The base maps will not show contours_ 6. The City will be responsible for printing and reproduction. 7. City will be responsible for all permitting associated with this project. 8. Any coordination required with the City of Kent, if required, shall be done by the City. 9. Construction easements, if required, shall be prepared and obtained by the City. Task 4 Deliverables • Preliminary plans 50% submittal (1 full size and 1 half-size set of plans, 1 set of Technical Specifications, and cost estimate) • Pre-final plans 90% submittal (1 full size and 1 half-size set of plans, 1 set �f Technical Specifications, and cost estimate) • Completed plans (1 full size and 1 half-size set of stamped, camera-ready original plans, 1 set of Technical Specifications, and cost estimate) • Two review meetings Task 5 -Project Mang ement This task includes project management activities associated with the completion of the project. These activities include the following. (1) Project Management Plan. The Consultant will develop a Project Management Plan which describes this scope of work, staff assignments, budgets, the project schedule, invoice requirements, and other important project requirements. (2) Project Administration. Project administration includes contract administration, monthly invoice preparation.. monitoring progress by subconsultants, monthly project progress monitoring and reporting, Quality reviews,project filing, and project close-out. (3) Client Coordination. Client coordination includes miscellaneous coordination with the client as well as a kick-off meeting. File: WW-1159-DA1-AA/3008 , (o:1GISEBURTN SG039.doC) APR-18-97 FRI 03:24 PM RW BECK FAX N0, 2064414972 P. 07 Page 6 Additional Services The following services are not included in the scope of work or budget: • Field Surveying Services (ew-r& 14S �-:� ;„ wS(c • Bidding Assistance, including preparation of addenda • Construction Management Services APR-18-97 FRI 03:24 PH RW BECK FAX NO, 2064414972 P, 08 Page 7 EXHIBIT B - SCHEDULE City of Renton East Side Green River Watershed Project 'p, 1W 43rd Street Drainage Improvement Project Schedule The schedule is based upon the assumption that the construction will proceed in late 1997. This schedule is contingent upon the City securing the necessary permit approvals. Extension of the schedule to the 1998 construction season could result in additional project costs. The proposed schedule is as follows --��--- Notice to Proceed A� 21/ 179'7 Task 1 Base Map and Data Collection m 97 �u�p /q� 1 7 Task 2 Geotechnical Report �A�/s r���7 1� J7 �u I y Z�� 1557 (/,4) Task 3.1 C is J1 997 6e./ �'aa y s 1k414- Task 3, l Cross-culvert Capacity Analysis Junwi==0997 Task 4 Design Plans and Specifications C,(>,50% Submittal A-)-s P 7 90 9 Submittal 7 A Jh5t- Z I Final Plans and Specifications S >—�7 A k ju s t- 3G�a JU� 21 File: WW-1159-DA1-AA/3003 (o:\GISEBUR'r\MS G039.doc) RWB-221R - Rev 111f94 ENGINEER { NG COST ESTIMATE MELABOR AND EXPENSES PRFFARED BV: MSG DATE: anels7 CID CLIENT, City,:(Renton,V7erhinglon DATE: coC)IECKED BV: co PItOJ NAIAE: ESG RYlP-Pro;ecl No.3-6V!43rd Sueet Drainage Inprovonrente OPS APPROVAL: DATE` 'T7 CS APPROVAL: DATE: ;70 WORK ORDER: PROJ hIGR_: Mike Gisebun O DATE: VIEF97 W STAFF LABOR MURS REOU)RED 9V TASK EXTENDED LABOR COSTS TASK SUWAARV fV 1,00 6mifit Rato Profit 1.1E CJl lailials fAGG RLUSS PE RL TRJ AOId9V ORAFF 1V PRO CLERK Raw Labor Overhaad Labot Rofit Labor EKI)IM-1 Labor Task TASK Description Selary 29.37 36.0E 24.78 27.00 2250 1B 71 19.50 14.80 12 23 Hours Cost 1 77930 4 Overhead Revenue (2) ueTotal Review latorrrulton 4.0 4.0 199 1178 1275 141 1317 Field kleasnemeats and meeting 15.0 0.0 16.0 5433 $771 11 204 118: 51.365 £ tloli77Cocrdieasien 3.0 3.0 674 $132 $207 $31 -1238 Base map 00"elonrnenl 1.0 4.0 12.0 17.0 6250 3824 $074 5148 51,120 M CD Subtotal 9.0 0.0 19.0 0.0 0.0 0.0 12.0 0.0 0.0 40.0 $961 11,700 02.660 1399 $3.069 7C R4nv_rr Data.Ceord(n►te 6.0 0.0 $176 0314 1 $490 673 1563 0-01 30 s0 so 50 $O o_o so so $0 so to 0.0 $0 00 30 to $0 Subtotal 8.0 0.0 0.0 0.0 ....--0.0 0.0 0.0.___. 0.0 ._.0.0 .:'9A-_:.•_- -_$174 $314 0490 $73 $563 :..:.;:. J.1 Gbnstruetion Method Aaolytis E92 4.0 1.0 21.0 5556 3900 $1.546 $232 11.778 3.2CaPacityAnsllia 8.0 1.0 11.0 0269 6479 s748 $112 3860 3.3 Via Hic Control Me 12.0 12.0 2.0 29.0 $649 111155 11,504 4271 02,075 0.0 50 30 t0 10 s0 Subtotal 0.0 20.0 0.0 0.0 0.0 16 0 0.0 3.0 61.0 11,474 $2.623 54,090 S815 $4,713 _. ... ... 4:_.. .-.:Da :Plan:and_Syeafi4etknu�;.o;::.;,:.•: ....... .. ...::.:••::: .. .. ' Oes'yrlPrdirninary and Final)13 Sheets) 12.0 4.0 40.0 8.0 42.0 100.0 52,481 $4.414 16.898 11,034 17.929 -r7 Spee)icstiomt 6.0 7.0 20.0 8.0 42.01 61.011 41.799 $2,810 0421 $3.231 Two Meetings 8.0 8.0 11E.0 $433 $771 $1.204 $191 $1,305 X Review of City Bid Package e.0 1.0 7.0 $191 6340 $531 too I611 O Cos::Eslimates(2) 1.0 8.0 9.0 1228 140E $433 $95 4727 S•ebtoeal 33.0 8.0 02.0 8.0 0.0 0.0 42.0 9.0 0.0 180.0 $4.344 37.729 112.073 91 011 $13 653 6 P.. A�7saneleNArtt:-:, ..:;.: .,:,� rx,....:ax:., :-,..,....�.... . 3.0 3.0 $37 3262 Pic{gx ManWement Ran s90 157 O 'A Pmja:t Admiaislratior. 0.0 10 s0 s0 30 to 'A SLeconsultant Agreements 3.0 3.0 0s8 3157 1245 $37 3282 .A CD WaIttlylm fvicino fackinb 16rr*) 5.0 6.0 0.0 21.0 $460 4801 11.251 ties 1:.438 Projg:t Coordnaticn 10.0 10.0 $294 $523 sole 5122 $939 fv Subtotal 25.0 0.0 OD 00 00 80 0.0 0.0 6.0 37.0 $920 11.637 $2,557 13e3 $2.940 o.o so to $o to so 0.0 $0 50 EO to 10 Snbwlals 0.0 0.0 0.0 0.0 0.0 1 0.0 O.0 0.0 0.0 0.01 SO I s0 30 CO 50 70TALS: hro 95.0 6.9 121.0 8.0 0.0 6.0 70.0 9.0 9.0 324.0 67,871 114,006 $21,817 $3,202 025,159 51,387 525,159 ;26,545 Chock sum o1 hour): 324 324 of Mot toots 2.790 216 2,998 216 0 112 1,29E 133 )10 Total Hours 324 labor revenue 0.173 634 0,783 633 D 329 3.793 .190 322 Ckacs vum of Tenor caste: 7.071 7.671 ok LABOR REVENUE $15,159 ^p EXPENSES 41.387 O 9UBCONSULTANTS 43) $3.150 co TOTAL PROJECT REVENUE 529,685 sk)W.XLS 4118iy7 Page 1 of 3 —v ENGINEERING COST ESTIMATE RWO.2220 Rev1/1 tb EXPENSE ESTIMATE PREPARED BY. 6%SG DATE: co CHECKED BY: DATE: "T7 ME :70 CLIENT: City of Remon.Washinglon OPS APPROVAL: DATE: PROJ NAME: ESORWP-Project No.3-SW 43rd Streal Drainage Improvements CS APPROVAL: DATE: O W WORK ORDER: 0 fV FAOJ MGR.: Mike Giseburt Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 TOTALS rn EXPENSE ITEM Cost!Urit Gov. 9 Oty. 6 Illy. S Oty. 6 Gty. S City. S Qty.!Item 6 Z7 3 35 Hotel&Meads 100 6/pen.-day 0 60 O $U 0 60 0 90 0 SO 0 SO 0 per.-days s0 36 Travel• Surface Mileage 0.29 S/mile 35 $1() 0 $O 0 $O 70 $20 0 $0 0 $0 105 miter $30 :E-- Car Rental 40 9/day 0 90 0 SO 0 60 0 s0 0 SO 0 $O O days $O 17C7 m Text 20 S/day 0 60 0 s0 0 s0 0 40 0 $O 0 90 0 days 60 n X 37 Travel-Air 0 1 1 rl 0 60 0 $O 0 $0 0 s0 0 $O 0 60 O rt s0 36 Travel-Mist.Exp.(Tips,alcl 10 9 I day 0 60 0 $O 0 $O 0 60 0 $O 0 90 0 days s0 39 Travel-Other $0 s0 90 90 90 $O Travel-Other 40 45 Cornmunlc"oos 2% labor rev. $61 411 $94 $278 $59 s0 Comm.-Irate. $503 49 Printing errd Reproduction Xerox Copies 0.08 6 ea 20 42 0 $O 100 58 200 _ 616 200 616 0 90 52.0 copies 442 Blue&ie Prints 0.36 S ea 10 94 0 90 60 40 $14 0 SO 0 90 50 bluelns $18 Check Prints, t1x17- 1 6 ea 10 610 0 90 $O 30 630 0 SO 0 60 40 1107s "0 Chk Prints,Large Bad 6 s ea 0 SO 0 60 60 90 0 $O 0 90 0 bond pm SO Plots,large Vellum 8 9 ea 0 90 0 $O $O 6 6G4 0 $O 0 $O a vallams $64 Plots,LargeMyler 14 9 on 0 60 0 10 40 30 O 90 0 SO 0 myiars s0 —r1 Photo We& $O BO s0 90 0 $0 $O Photo Work s0 ::E> x Other 90 90 60 $O 60 SO Other 60 Z 50 Maps and Charts s0 60 SO $O $O $O Mapsicharts $O p 61 Books and Publications 90 40 $O 60 60 s0 Rooks/Pub 60 fv 53 Misoellaneous Expenses s0 90 $O SO s0 s0 MISC.Exp. SO p rn 58 Equipment Rental 60 60 s0 $O 40 40 Equip.Rental 80 p 65 PC Charges CAD 11) 5 4 1 hour 12 $60 0 90 10 950 42 $210 0 $O 0 90 64 CAD his $320 P Engr. PC 2 4 1 hour 25 950 6 612 38 $76 90 $180 26 652 U 90 165 PC hrs $370 <.O Ward Pro(2) 4 $!hour 0 $U 1 0 SO 1 0 90 0 90 0 90 0 90 0 Wp his 40 fv 67 OlherExpanses s0 SO 40 $O 90 90 Other Exp. s0 SUBTOTAL w/o Markup $196 $23 $228 $812 $127 90 $1,387 yr/Markup $196 $23 $228 $812 9127 60 NOTES: SUBTOTAL EXPENSES $1,387 1. Recommended cadculation of CAD computer hours as follows: total CAD firs(from Me(est.)x 0.80 Markup @ 0% 90 2. Word Pro computer hours should equal word processing labor hours from labor estimate. TOTAL $1,387 —v O BUD3.XLS 4/i 8!97 Page 2 of 3 ENGINEERING COST ESTIMATE SUBCONSULTANT ESTIMATE I cfl CLIENT. Cily of Renton,Washing(on --_l °AOJ IIAAIE: ESGRWP-P(olact No.3-SW 43ed Slreel Drainage Irrrprovemenfs 'T7 WORK ORDER: 0 TJ PROD Al GR.: Kke Gxceburl CD Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 TOTALS w SUBCONSULTANT H(e. Exp. Labor Hal. Exp. Lebo( Hu. C.P. Labor Hrs. Exp. labor Hra. Exp. Labor "rd. Exp. tabor Hra. Exp. Labor _ fV Hong West and Aasodalea 0 60 SO 0 s0 03,000 0 60 $O 0 00 SO 0 s0 0 s0 50 0 0 3,000 C7� TJ 3 0 s0 s0 0 30 60 0 $0 0 60 s0 0 s0 SO O s0 60 0 0 0 i0 lz'7 0 $0 60 0 SO 0 SO 60 0 60 s0 0 $O 60 0 60 60 0 0 0 n SUBTOTAL w/o Markup 0 00 60 0 SO $3,000 0 00 $0 0 $0 s0 0 $0 SO 0 s0 e0 0 60 $3,000 w/Markup $0 LO s0 $3.150 60 60 60 60 SO 60 60 $0 Frrp wl mklp 0 Lab wl mkLV 3.160 SUBTOTAL EXPENSES 60 SUBTOTAL LABOR 63.000 SUBTOTAL 03.O00 Markup 51e 0150 TOTAL 03,160 "T7 x z 0 fV CD M .A .A .P co N —o BUD3.XL5 4110!'97 Payu 3 of 3 Sheet1 TOM 3482 SW 43rd ST Volume Volume Total HOUR END K P EB P WB Eastbound Westbound Volume 0 100 0.5 0.61 0.39 86 55 141 100 200 0.3 0.6 0.4 51 34 84 200 300 0.3 0.58 0.42 49 35 84 300 400 0.4 0.26 0.74 29 83 113 400 500 0.7 0.2 0.8 39 158 197 500 600 2 0.17 ; 0.83 96 467 563 600 700 4.3 0.21 0.79 254 956 1210 700 800 5.8 0.21 0.79 343 1289 1631 800 900 4.8 0.3 0.7 405 945 1350 900 1000 5.5 0.32 0.68 495 1052 1547 1000 1100 6.4 0.38 0.62 684 1116 1800 1100 1200 6.9 0.45 0.55 873 1067 1941 1200 1300 7.5 0.44 0.56 928 1181 2110 1300 1400 7.1 0.43 0.57 859 1138 1997 1400 1500 7.2 0.46 0.54 932 1094 2025 1500 1600 7.2 0.47 0.53 952 1073 2025 1600 1700 7.4 0.5 0.5 1041 1041 2082 1700 1800 7.1 0.5 0.5 999 999 1997 1800 1900 5.8 0.47 0.53 767 865 1631 1900 2000 4.7 0.48 0.52 635 687 1322 2000 2100 3.2 0.58 0.42 522 378 900 2100 2200 2.4 0.67 0.33 452 223 675 2200 2300 1.3 0.61 0.39 223 143 366 2300 2400 1 0.63 0.37 177 104 281 100 28073 Page 1 ======================== = Electronic Card File = ======================== Subject HY P 06310-40 Title SW 43RD ST E/O OAKESDALE AV 3W Filed By TE1 07/13/90 Changed By TE1 08/09/96 HISTORY CARD - AWDT TOTAL (AXLES/2) COMMENTS: STATION NO. P 06310-40 MO/YR AWDT MO/YR AWDT MO/YR AWDT M(*/YR AWDT 86 06 92 30853 98 04 87 06 93 23927 99 05 88 07 94 24940 00 06 89 03 95 24892 01 07 07 90 25249 08 96 28129 02 08 08 91 24699 97 03 09 Indexed By H1 H SW 43RD ST HY P 06310-40 ============================================================================== (ENTER) Next (5) Remove (9) Change ( 12) Tag ( 13) Print ( 15} Info ( 16) Exit Ctrl/A Options; ALT/Z Help; Ctrl/End Exit L N 2110A ======================== = Electronic Card File = ======================== Subject KX P 06310-40 95 7itle K95 SW 43RD ST E/O OAKESDALE AV SW Filed By TE1 04/06/95 Cnanged By TY P RD# 06310 STA# 40 RD NAME SW 43RD ST DIR E/O X ST OAKESDALE AV SW K FACTORS: (End hours: 1st Line, 1-121 2nd Line, 13-24) --AWDT 24892 0. 50 0. 30 0. 30 0. 40 0. 70 2. 00 4. 30 5. 80 4. 80 5. 50 6. 40 6. 90 7. 50 7. 10 7. 20 7. 20 7. 40 7. 10 5. 60 4. 70 3. 20 2. 40 1. 30 1. 00 DIRECTIONAL PROPORTATION (P Factor) Enter Dir EB (NB or EB First ) 0. 61 0. 60 0. 58 0. 26 0. 20 0. 17 0. 21 0. 21 0. 30 0. 32 0. 38 0. 45 0. 44 0. 43 0. 46 0. 47 0. 50 0. 50 0. 47 0. 48 0. 58 0. 67 0. 61 0. 63 DIRECTIONAL PROPORTATION (P Factor) Enter Other D1r WB (3B or W8 2nd> 0. 39 0. 40 0. 42 0. 74 0. 80 0. 83 0. 79 0. 79 0. 70 0. 68 0. 62 0. 55 0. 56 0. 57 0. 54 0. 53 0. 50 0. 50 0. 53 0. 52 0. 42 0. 33 0. 39 0. 37 Indexed By K1 K SW 43RD ST KX P 06310-40 95 ============================================================================== (ENTER) Next (5) Remove (9)Change ( 12) Tag ( 13) Print ( 15) Info ( 16)Exit Ctrl/A Options; ALT/Z Help; Ctrl/End Exit L N 2110A PETRA Software 079 A Weather :SUNNY Cooyriuht (C) 1990. 1991 Site Code : 00000000 Counted by:HHN.E6F Samar Technolonies. Inc. Start Date: 07/30/96 Board # :D4-1028 Ivy I and. PA, g WM File I.D. : TMC079A Surface :Dry_ Pane : i Cars/Peels, Heavy Vehicles OAKESDALE AV SW ISW 43RD ST 10AKESDALE AV SW ISW 43RD ST 1 Southbound I West bound INorthbound !Eastbound I I i I I Other Riuht Thru Left I Other Rinht Thru Left 1 Other Rinht Thru Left I Other Rint Thru Left I Total Date 07/30/96 ----------------------------- -------_-_--_-------------- --------------------- 06:15 1 7 1 0 2 12 14 1 0 2 0 Al I U JJ 54 2U 1 .5J0 06:30 0 8 10 0 l 0 3 175 11 1 1 , 6 51 1 u 46 58 23 I 397 06:45 0 16 9 0 1 0 1 219 17 1 0 2 3 57 1 1 56 86 24 I 491 07.00 0 27 0 1 0 2 179 6 1 0 5 7 51 1 0 24 88 18 1 399 Hr,Total 1 43 28 2 I 0 8 725 48 1 1 14 16 200 1 1 155 286 85 1 1617 (17:15 0 11 8 0 1 0 3 217 10 1 0 4 7 64 1 0 24 83 19 1 450 07:30 0 13 5 0 1 1 4 259 16 1 0 9 3 57 1 0 38 108 21 1 534 07:45 0 20 6 0 1 0 li 312 19 1 0 4 7 62 1 1 51 110 19 1 622 sir Total 0 44 19 0 1 1 18 788 45 1 0 17 17 183 1 1 113 301 59 I 1606 *TOTAL* 1 87 47 2 1 1 26 1513 93 1 1 31 33 383 1 2 272 587 144 1 3223 7W ANG OK �t�7. K A) DA � 3u 6 PETRA Software Weather ;SUNNY Copyright (C) 1990, 1991 Site Code ; 00000000 Counted by:HHN,EGF Jamar Technologies, Inc. Start Date; 07/30/96 Board # 04-1028 Ivyland, PA. File I.D. : TNC079A Surface :Dry Page ; Cars/Peds, Heavy Vehicles OAKESDALE AV SW 1SW 43RD ST IOAKESDALE AV SW ISW 43RD ST I Southbound (Westbound INorthbound (Eastbound I ! 1 ! 1 Other Rinht Thru Left I Other RiA_ht Thru Left ! Other Rinht Thru Left I Other Rinht Thru Left I Total Date 07130/96 ------------------------ --_____ -------------------------------------------- Peak Hour Analysis By Entire Intersection for the Period: 06:15 to 05:00 on 07/30/96 Weak start 07:00 1 07;00 1 07;CIO 1 07;00 I Volume 0 56 K 0 ! 1 20 967 51 1 0 L� 24 1034 1 1 137 3K 77 1 Percent 0% 68% 32% 0% 1 0% 2% 93% 5% 1 0% 8% 9% 84% 1 0% "J3% 64% 13% 1 Pk total 80 1 1039 I 280 ! 604 I Hinhest 07,45 1 07:45 1 07:15 1 07;45 ! Volume 0 6 6 0 ! 0 11 312 19 1 0 4 7 64 1 1 Si 110 19 1 Hi total 26 ! 34i i 75 1 181 1 PHF .79 1 .76 1 .93 1 .K I u a�# I OS IOA1'ESDALE AVf itll , # 1 l ! # # 1 1 ! # 7 # • C1# • � I 6 ! 24 # # ! 1 1 > # ------# ------ I ------ I ------ I ------ # 1 # I 1 ! # y####################+----- yi -------- #################### +--------- C.f?� ---------+ + 1 7 43RD ST 1 ------------------- 9 F,7 1. ��7 1 Heavy Ven i c l es. I )M SG? ` ?5 + I 1 1 ------------------- • 77 1 1 4G 1, 449 ! Z=i 1 ------------------- I + -,a 53 Ek.�3 i I fit er=_ect i cors Tc,t a 1 1 f 1 411 3 53 -------------------- 1E, 1-37 ! SW 43RD ST + +--------- 4`34 ---------+ #;###################i +----- "u=> --------t-#################### 1 # I 1 I # ri 1 # 511 21211 mac ) 15# - C) # E61 v 1 z ! 7#• # 1�;7 1 1 1 # ## ------ ! ------ I ------1 ------# ------ # I ! 1 # # 1 ! I # # OAKESDALE AV SW I I # 7�).Ai TETRA Software Weather :Sunnv Cooyriont ?C1 1390, 1591 ,OW/� Site Coue . 00000C)C1C1 Counted bV:E6FIHHM Jamar Techno}ocies. Inc. Start Date: C1612515S Board t ':D4-1028 I Ifni iaria, PA. File I.D. : TMCC)75M Surface :DRY page ; 1 CARS1REDESTRIANS. HEAVY VEHICLES ---------------------------------------------------------- OAXESDALE AV SW 1SW 43RD ST iOWESDALE AV SW ISW 43RD ST 1 Soutnoounh 1 Westriouno Mortnbourid I Eastmuno 1 i i 1 i Other Riont Thru Left I Other Riont Thru Left I Other Riont Thru Left 1 Otner Rjont Thru Left 1 Tota1 Date06/25156 ----_—---—------------—-------_---------------------=---------------------------------------- }};00 C! 24 C1 2 1 C! 2 C6C! 11 1 G }6 2 24 1 G 16 171 SC! i 536 11:15 111 13 6 1 1 C1 7 215 17 1 C! 13 7 35 i 2 30 200 14 i 576 11:30 (+ 24 1t J 1 .1 CZJ 12 i 4 Cj '1 4J i �} JJ 157 13 1 553 11:45 111 22 2 U ! :! C 25C 16 ! J :8 J 'i1 t :t J7 1':4J hr iota1 U 95 16 6 1 :! 13 552 :;b 1 7 74 1'3 153 1 C 115 76 74 ! CJ96 12:ClC! 0 38 8 3 1 1 _� 22C1 }4 is 6 :i i C! 31 215 i 642 1C:10 1 14 4 1 1 0 d iU7 22 1 J 1a 3 a8 I C K �4C C8 1 b0't 12:3G 0 24 11 2 1 1 7 203 5 i C1 1`, 3 44 1 U :56 248 17 i 640 12.45 0 27 b 6 1 :! C1 2:10 3 1 :! J J J5 ! .! 43 242 i7 ! b23 r, o a1 I w 31 C 1 16 Ko :4 1 i3If 156 1 Ibb 30 34 1 n6i -------------------—----------------—----------------- - *TOTAL* 1 198 44 18 t 2 26 1802 110 1 15 133 34 321 t 4 234 1714 168 1 4574 F-WANG OK DA. ���_ L� it 1 1 ' EstETRA Software Weather ;Sunny Cocyriont 4C) 1950. 191-11 Site Coce : 00000000 Counted by:E6F/HHM damar Tecnnoiooies. Inc. Start Date; 06/25/56 Board # •:D4-1028 ivyiano, PA. File I.D. : TMC079M Surface :DRY Page i CARSlPEDESTRIANS. HEAVY VEHICLES --------—---—----- ------------------------------ ------------------------------ OAKESDALt AV SW !SW 43RD ST iOAKESDALE AV SW iSW 43RD ST 1 Soutnnouno 1Westaouno INortnoouno 1Eastoouno 1 1 1 1 i Other Right Thru Left 1 Omer Right Thru Left 1 Other Right Thru Left 1 Orner Right Thru Left ! Tot a1 Date06/25/56 ----------—------------------------------ ----------------- ------------------------------- Peak Hour Analysis by Entire Intersection for the Period: 11:00 to 13:00 on 06/E1/% Peak start 11;45 1 11:45 ! 11:45 1 11:45 1 Volume 1 98 5 6 1 15 &K 61 1 11 74 15 184 1 2 156 904 104 1 Percent i� 75x 1 0� S% 1 yX 26N 1 X 1 � &%, _.$ S Pk total 130 i 56.) 1 284 i 1166 i Hionest 1 -00 ! 11:45 1"3t) t volume 0 38 a 3 1 0 2<<G 16 1 3 is 6 ii 1 li 16 246 1 1 Hi total 43 i e70 1 63 i 331 { PHF .66 ,� 1 .89 -7 . / " 1 .86 7. J� H l� ## ! 0Ar;E'SDALE AV SW 1 # i 1 t # # i i 1 # I## - '_41 17 i , i 1C)4 # # i i i 15 ## #------�; -----_- 1 ------ 1 ------ i ------ �## ty ) iJt `• 1 1-3 4 # ! ! t ###############3########------ 1 L'=i -------+ #####3######fi#4#4#######1# - - - �i En'W 43RD ST i 184 -----+ CARS:,P,EDE3T R I AN3: +-----i ------------------ SS` 1. 1 t,4 ! HEAV'Y ''1EH 1 CLi='-::� i 4 6 • 1E 1C)4 i �. ��cy 1. -`►c ------------------- 1 + 1 5C)4 1 tY, 1 4 1 1•rst er=ect z rs T<<z a i t c 9;34 )4 /4 ------------------- ! 1 1 121 1 ----- +----- 1 c, ! G� 43RD i + +--------- ---------+ E,-- -------+ f) # 1211 # �� I �11 �•t 15##• :) # -"-1�t, i # - ! ------ i ------ ! ------# -----•- # 24 21 i i M•4 1 1 i 7 4# 11 # I i 1 ## # 1 ! 1 # ## 0Av-,ESDAi_E A�•) SW i i �# D-7•R PETRA Software J Weather :SLINKY. HOT Copyright (C) 1990, 1991 Site Code : 00000000 Counted by:IMN,RWM Jamar Technologies, Inc. M Start Date: 07125196 Board 11 :T- 919 Ivyland, PA. File I.D. ; TMC079P Surface :DRY Pan ; I CARS/PUL, HEAVY kOICLES - ---OAKSDALE AV SW ISW 43RD ST IOAKSDALE AV SW IN 43RD ST I Southbound (Westbound INorthbound (Eastbound I I I I 1 Other Right Thru Left I Other Right Thru Left k Other Right Thru Left k Other Right Thru Left I Total - ----Date 07/,:5/96 071c5196 ---____----------_--_ _ ---- 15:00 0 47 4 0 1 0 0 217 16 1 1 "s5 11 59 1 0 62 L071 23 ! 746 15:15 0 5 3 1 0 0 194 12 1 0 60 1 u 36 2-44 6 1 6;5 15:30 1 41 :F 0 1 (a 0 2 27 1:t 1 1 13 70 k 1 44 267 18 1 717 15.45 0 -'8 a 0 1 0 i 198 9 1 L 21 13 56 1 1 47 306 19 k 710 Hr,Total 1 14's 19 3 I 0836 49 1 4 102 49 245 1 C 189 1088 66 1 S79a 16:00 0 37 4 1 k 0 1 215 7 1 0 11 6 52 1 0 50 350 23 1 757 16:15 0 5 6 O l (� 180 9 k 0 14 8 47 1 0 43 232 14 1 640 16:30 � 34 8 0 1 1 0 275 14 1 1 17 1 54 1 1 48 L70 13 1 750 16.45 0 34 2 O i 0 1 198 3 1 0 17 7 48 i 4 66 15 k 677 Hr,Total S 20 20 1 I 1 4 868 33 1 1 59 33 201 1 5 207 1194 65 1 8824 TOTAL* — 3�273 33 4 1 1 6 1704 8j 1 5 161 88 446 k 7 396 K&O 131 1 56u' w G OK DA Nam• 1 I � PETRA Software Site Cade : 00000000 Weather :SUNNY. HOT Caayright (C) 1990, 1931 Start Date: 071'5196 Counted by:IMN,RWM Jamar Techr+c+lob es, Inc, File I.D. : TMC079P Ivyland, PA. Board # :T-0919 Wage Surface :DRY CARS/PEDS, HEAVY VEHICLES ----------------- --------------------------------------- ST --- ----�- l5W 43RD ST 10AKSDALE AV SW ISW 43RD OAKSDALE AV SW lEastbound 1 Southbound 1Westbountl INorthbourcd 1 I i I - ---------------- Other Right Thru Left I Other Right Tfiru Left 1 Other Right —Tfiru^Left 1 Other- Right-- Tfiru- Left 1 Total Date 07125l96 --------`-------- ____ Peak Hour Analysis by Entire Intersection for the Period: 15:00 to 17:00 on 07/25/96 1 15,45 1 l 15:45 1 15:9`s Peak start 15:45 �r 188 218 69 1 Volume 3 1�4 36 1 1 1 5 868 39 i 3 63 3j �.� 1 L Percent 1% al% 17% 1% 1 0% 1% g5% 4% 1 1% 0% 12% 67% 1 0% 13% 82% 5% 1 1 3f4 I l477 1 Pk total 153 1 j13 1 1 16:3u ! 15:45 I 16:00 Hignest 16:3E+ a L1 13 56 1 0 50 350 K I volume L 34 8 0 1 1 0 :75 14 1 l 4i3 1 Hi total 44 1 290 1 �� 1 .79 1 85 i .87 1 PHf ,a7 � q7. 53p # 9.7( 1 OAKSDALE Avlls9� i �, #I # ) 1 1 # # i ! 1 # # I 1 ! c # ------ ------ # 1 # 1y41 2 61 11 11 # I I I # # t################ � ----- 1= 1 -------+ #################### =64 ---------+ + 4 SW 4 RD ST i G9 -----+ - CARS/f='E:D6 +_ ———— ---------=--------- 1 _ `'6 866 1, : C>1 I HEAVY VEHICLES BE'S — l 1 — e� + 1 1 1 `. 676 _, 1'D4 I + ------------------- 1 1, 181 1 • 3,7 1, 18 1, 475 1 Ir+tersecticir+ Total i 1. SyS 1 , Ely I L� 849 1 E.3 ------------------- i I 164 I -----+ SW 4E3RD ST • y4 15� 1 _________ L - - + JL4 + + ---+#################### 4t################### i I I # # 3 S 1 57# - 3 # 1881 _ I i ------# ------ # `�`J i # # 1 1 I 1 I i # # 4# # OAKSDALE AV Sly) I ► , PETRA Software otl Weather :S11NNY Copyright (C) 13%, 1991 Site Code : 000(K)O(K) Counted by:E6F/HHN Jamar Techrsoion_ies, Inc. ,0�vm Start Date: (17/24/96 Board # :D4-1028 Ivyland, PA. I� File I.D. : TMCOI1A Surface :DRY Pne : 1 CARS/PEDESTRIANS, HEAVY VEHICLES ----------------—--------- LIND AV SW ISW 43PM ST ILIND AV SW ISW 43RD ST i Southbound (Westbound 1Northbound lEastbound 1 I 1 I I Other Right Thru Left I Other Right Thru Left I Other Right Thru Left 1 Other Right Thru Left 1 Total Date07i24/96 ---------------—---------------------- -----------------—------------------------------ 06.15 4 8 0 8 1 0 115 204 3 1 1 1 9 8 1 0 1 29 12 1 403 06:30 0 11 3 13 1 1 111 ZJ03 2 1 0 2 7 4 1 0 0 50 21 1 428 06:45 0 28 2 12 1 0 141 248 6 1 0 3 3 8 1 0 5 74 22 i 552 07:00 0 10 7 10 1 0 142 198 7 i 0 1 8 5 i 0 6 44 23 1 461 Hr Total 4 57 12 43 1 1 509 853 18 1 1 7 27 25 1 0 12 197 78 1 1844 07:15 0 21 4 4 1 0 120 237 5 1 1 1 6 10 1 1 4 56 27 1 497 07:30 1 19 0 3 1 0 78 173 1 1 0 0 10 8 1 0 1 34 11 1 339 07:45 0 42 4 19 i 0 121 279 6 1 0 1 12 11 1 0 7 71 26 1 599 Hr Total 1 82 a 26 1 0 319 689 12 I 1 2 28 29 i 1 12 161 64 1 1435 ----------—------— - ----------------- *TOTAL* 5 139 20 69 1 1 828 1542 30 1 2 9 55 54 1 1 24 358 142 1 3279 WAND V� pR �-JL DA 7 Z `f i PETRA Software Weather -SUNNY Copyright !Cl 1330, 1331 Site Code : f000000 Counted by:EGF/HHN Samar Technologies, Inc. Start Date: 07/014/96 Award # 04-1028 Ivyland, PA. File I.D. : TMC011A Surface :DRY Rage : CARS/PEDESTRIANS, NAVY VEHICLES -----—------------------------------------------------ LIND AV SW 1SW 43RD ST ILIND AV SW ISW 43RD ST I Southbound I West bound 1Ncmthbourd (Eastbound I I I I I Other Right Thru Left 1 Other Right Thru Left 1 Other Rig_nt Thru Left I Other Right Thru Left I Total Date 07/24/35 -------------------------------------------- -------------------------------------------------------- Peak Hour Analysis By Entire Intersection for the Period: 06:15 to 06:00 on 07124/96 Peak start 06:30 1 06:30 1 06:K 1 (16:30 I Volume 0 70 16 33 ! 1 514 886 L') 1 1 7 24 87 1 1 15 2L4 33 1 Percent 0% 56% 13% 31% 1 0% 35% 62% 1% ! 1% 1�% 41% 46x 1 0% 5% 67% i8% 1 Pk total 125 1 1421 1 55 1 333 1 Highest 06:45 1 06:45 1 07:15 1 6:45 1 Volume 0 L8 E 18 1 0 141 248 6 1 1 1 6 10 I 0 5 74 iE 1 Hi total 42 1 35 1 18 I 101 I RHF .74 I .30 I •`S�' I •8` 1 - r - # v I L I ND AV SW ! # # 1 ! I # # 1 1 1 # r')#• 5 1 1 t t 0- # # ! 1 1 514 # ------# ------ 1 ------ 1 ------ 1 ------ # 1 G# 7:) 1 1G1 3� 1 831 # 1 - -) # 1 1 1 # ## ik#################+----- 1 � -------+ #################### _: S,S4t 43RD CT 1 514 - G -----+ CARS:P'EDEST R I ANS ------ I -------------- --- 886 983 1 HEAVY VEHICLES 1 856 + 1 l i ------------------- ------------------- i + 2_24 2 1 Ir,tersecticor, Tc,taI I 3- - -. 1 1. `335 ! ::?f) c`4 -------------------- ! 1 ! 1 -----+ +----- • 1 1 SW 4�RD S F ---------+ #################### +------ 58 -------+###################### 1 # { l 1 # _) 1 # _) ! 1 - 1 ! G# - 1 # I G I 31 C1 - 1##• _) # 15 i 1 1 # # --1 ------1 ------ I ------# -----•- 51 7# 1 # ► I 1 # # ! I 1 ## ## L I ND A'•) W 1 ! # PETRA Software Al eather :RAINY Copyright !C) ITKI, 1991 Site Code : OOOOOUM ousted by:E6F/HHN Jamar Technctlogie5. Inc. n WM Start Date; 07/18/96 .,ard # ;D4-1028 I'gIarid, PA. /` File I.D. TMC011M Cher :WET SURFACE Pan 1 CARS/PEDESTRIANS, HEAVY VEHICLES -- ---------------—----------------------—--------------- LIND AV SW !SW 43RD ST ILIND AV SW )SW 43RD 'ST 1 5outhbourcd 1 West bound 1 Northboursd l East bound l 1 1 ► ! Other Right Thru Left I Other Right Tnru Left ! Other Right Thru Left I Other Right Thru Left 1 Total ate 07118/96 ------------------------------- — 1:00 0 28 8 30 1 1 22 207 3 1 0 6 9 5 1 0 9 128 18 1 474 1;15 Q lJ 7 JJ ! i' 1L LL6 L 1 U 4 6 7 1 0 9 172 31 1 536 1:3U 0 32 13 4U I 0 28 208 7 1 U 6 IU 9 k U 15 210 K 1 604 1:45 8 15 5 11 1 21 196 1 1 U 4 7 10 i 0 3 160 9 1 472 r Total 8 100 33 137 1 83 837 13 ! U 20 32 31 1 U 36 670 84 k 2086 2:UU U 36 7 24 1 2 33 210 1 1 U 5 4 8 1 0 6 2 's 17 ! 598 2:15 Cs 15 8 27 1 3 3U i'C�fi 3 ! 0 0 10 4 1 0 10 173 22 k 511 2:30 U 30 7 15 1 U 34 199 2 1 0 5 10 8 1 0 8 191 35 1 544 2;45 0 14 3 17 i 0 2Q J27 3 1 0 2 2 6 1 U 4 211 34 1 543 r Total 0 95 25 83 I 5 117 842 9 1 0 12 26 26 k 0 28 810 108 l 2196 ---------—--------____-------------------------—------� — TOTAL* 8 195 58 220 ! 7 2EK) 1679 22 0 32 58 57 1 U 64 1450 192 1 4282 I . PETRA Software Weather :RAINY Coayright (C) 1990, 1991 Site Code : MO(KIM Coursted bv•EGF/HHN damar Technologies, IrIc. Start Date: 07/18/96 Board # 04-1028 Ivylarla, PA. File I.D. : TMC011M Other :WET SURFACE Page : L CARS/PEDESTRIANS, HEAVY VEHICLES LIND AV SW !SW 43RD ST ILIND AV SW ISW 43RD ST I Southbound IWestboursd (Northbound !Eastbound 1 I I I ! Other Right Thru Left ! Other Right Thru Left } Other Right Thru Left 1 Other Riant Thru Left ! Total Date 07/18/96 ------------------—----------- - --------------------------------------------------- Peak Hour Analysis By Entire Intersection for the Period: 11:00 to 13:00 on 07/18/96 Peak start 11:15 I 11:15 ! 11:15 l 11:15 i Volume 8 108 310 131 1 3 94 840 11 1 0 19 27 34 1 0 33 7,8783 1 Percent 3% 39% 11% 47% ! 0% 10% 85% 1% 1 0% 4X 34% 4�% 1 G% 4% 87% 9% l Pk total 279 l 948 l 50 } 903 1 Highest 11:30 ! 12:06 1 11:30 1 12:00 ! Volume 0 32 13 40 1 8 33 210 1 1 0 6 10 91 0 6 345 17 1 Hi total 85 I �45 1 35 1 i68 1 PHF .82 1 ,96 1 .80 ! .84 # ! L I ND AV Sb1 I # # ! I 1 it # i ! 1 # 1# 1 )1I ! 181 8' # #; 1 1 1 4 # ------ # 1 ------ 1 ------ ! ------ # ------ # 1 1 1 # ##'` ,�'################------- "I � -------{ ################�#### +--------- 475 ---------i- + G`t SW 43RD ST 1 4 - S I 3,4 ------E- CARS/P,EDESTRIAhI'o +----- 1 ------------------- HEAVY VEHICLES l S`, 945 84r) - 45 + I1 1 ------------------- 1 1, 885 1, `) ---•---------------- I + 744 43 757 1303 1 Intersection Tc,tal ------------------- I l I IS +----- " 3 - 1 c 43RD S F "E- ##F################## -1------- `{i> --------+#################### :) # 1 i I # # 1 1 1 41 # _3 i 1 1 # # ------ ! ---- --! ------- I ------# ------ # 7 E, 1 3 4 1 L i I 1 S# 0 # ! I l # # 1 1 1 # ## L I!',4 D AV W I i # PETRA Software Weather :SUNNY Copyright (C) 1990, 1591 Site Code : 000(+(+4()0 Counted by:INN.DMV Jamar Technologies. Inc. Start Date: 07/15/96 Board # :T-0919 Ivy!and, PA. Ke File I.D. : TMC013p Surface :DRY pane I Cars/peds, Heavy Vehicles ---------- LIND AV SW ISW 43RD ST ILIND AV SW ISW 43RD ST I Southbound lWestbouna !Northbound (Eastbound I 1 I I I Other Right Thru Left I Other Right Thru Left I other Riant Thru Left I Other Rignt Thru Left I Total Date07/15/9fi -- -------------------------------------—------------------------------------ 15:00 0 28 8 74 1 0 23 215 4 1 1 4 4 1 0 9 261 37 l 673 15:15 0 28 8 61 1 1 18 165 6 l 0 7 4 10 1 0 11 253 29 1 601 15:30 0 19 5 79 1 5 43 149 8 1 1 4 2 4 1 1 10 292 21 l 643 15:45 1 JJ 9 65 i 1 15 205 � 1 J 5 6 7 1 0 8 245 27 1 633 Hr Total 1 308 30 279 I 7 10£+ 734 ;'C► I 5 20 17 25 I 1 38 1051 114 1 2550 16:00 0 31 19 87 l 0 17 196 6 1 0 6 5 6 1 0 12 274 26 1 685 16:15 0 36 10 78 1 1 15 172 4 l 0 1 7 4 1 0 4 284 26 1 642 16:30 0 36 15 88 1 3 47 173 7 1 1 5 4 8 1 0 15 308 33 1 741 16:45 1 37 9 85 1 1 27 159 8 1 0 15 2 7 1 0 9 254 K 1 646 Hr Total 1 140 53 338 1 5 106 700 25 1 1 27 18 25 i 0 40 1120 115 1 2714 ------ *TOTAL* 2 248 83 617 1 12 206 1434 45 1 6 47 35 50 1 1 78 2271 229 1 5264 4 W AEG OK pA PETRA Software ,ather :SUNNY Coayright (M 1990, 1991 Site Cade ; O(K)(10000 ,ursted by:IMN,DMV .Tamar Technologies, Ire, Start Date: 07/15/96 yard # :T-0919 Ivyland. PA. File I.D. ; TMC011P rrface ;DRY Pane ; 2 Cars/Peds, Heavy Vehicles - ,IND AV SW ISW 43K ST ILIND AV SW !SW 43RD ST } Southbournd I West bourca 1 Nortmouna I East boor+a I I 1 I I Other Right Thru Left I Other Right Thru Left 1 Other Rinht Thru Left I Other Right Thru Left ! Total ;te (17/15/96 ------------------------------------------------------------------ �ak Hour Analysis By Entire Intersectiar, for the Period: 15:00 to 17:00 on 07/15/96 sk start 16:W 1 16:00 ! 16.00 1 16:00 1 'lame 1 140 53 338 l 5 106 700 5 1 1 27 18 25 k 0 40 1120 115 1 lreent 0% 26% 10% 64% 1 1% 13% 84% 3% 1 1% 38% 25% 35% 1 0% 3% 88% 9% l total 532 1 836 1 71 1 1275 1 chest 16:30 1 16:30 1 16:45 1 16;30 1 flume 0 36 15 88 1 3 47 173 7 1 0 15 7 l 0 15 308 31 1 total 139 1 E0 1 24 1 354 1 iF .96 1 .91 1 .74 u 1 .90 I # 1 L I i!D Ail SW ! # # 1 1 1 ## # 1 1 I # 1# - 1311 - 441 - 3331 115 # # I ! } 1 C:_)6 # ------# ------ i ------ ! ------ 1 ------ # 1# 140 1 53.1 3138 1 39 # # I l k # #1 ###############+----- 531 --------E- #################### 770 9E A 43RD Sl- 1 1 -)6 10 I a` -----+ Cars I Pled s +----- ! 1 86 Hea%,,y Vehicles I E•8; 14;1 1 1 831 7 f)0 18 i 08 + ! ! 1 -------------------- 7 115 1 ! 1 `, 140 L. 316 l � 3 --———————————————--— l + c�• 1. 1 cf> 1. i i ! I nt er'sect i c-rl Tc,t a l I 1 2, 7 0 7 1 1, 485 1 . 120 -------------------- 1 k 1 4U I EtW 43-RD S"f + +--------- 188 ---------+ #################### +------ --------F#################### -> # ! l l # # a ! ;=41 17 1 ' 2,E,## 1 # 5 31 ' 11 11 1#- 0 # 40 1 1 I # # ------- I ------ i ------ i ------# ------ # # 1 # 1 l I # # ! l ! # it L I ht D AV SW ! } # OLYMPIC NATIONAL INSURANCE COMPANY, LTD. Craig Appin House, Wesley Street, Hamilton HM 11, Bermuda Telephone: (441)295-3278 P. O.Box HM 1262 Facsimile: (441)292-3793 Hamilton HM FX, Bermuda May 13, 1997 Mr. Scott Woodbury City of Renton Planning/Building/ MY 21 Public Works Department 1997 Municipal Building CITY OF 200 Mill Avenue South RENTOt, Renton, WA 98055 Engineering OePt, U.S.A. Dear Mr. Woodbury: Re: R.W. Beck/Certificate of Insurance Drainage Improvement Proiect In connection with the SW 43rd Street Drainage Improvement Project, we are pleased to provide you with a certificate of insurance as evidence of R.W. Beck's Professional Liability coverage for the period July 1, 1996 through July 1, 1997. We trust that the enclosed is in order with your requirements. Yours sincerely, MARSH&McLENNAN MANAGEMENT SERVICES (BERMUDA)LIMITED (Managers 4 udy 0.udy O. Hendrickson Insurance Officer JOH/1d:OLY Encl. cc: Patricia K. Corbin- 206-441-4960 Mike Giseburt- 206-441-4962 LET0097S CERTIFICATE OF INSURANCE ISSUE DATE(MM/DD/YY) .: 5/13/97 MANAGERS THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS Marsh & McLennan Management NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AMEND, Services ( Bermuda ) Limited EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW Craig Appin House , Wesley Street COMPANIES AFFORDING COVERAGE P. 0. Box HM 1262 _ Hamilton HM FX, Bermuda COMPANYA OLYMPIC NATIONAL INSURANCE COMPANY LT . LETTER COMPANY B INSURED LETTER R.W. Beck, Inc. COMPANY G. Fourth & Blanchard Building LETTER 2101 Fourth Avenue , Suite 600 Seattle, WA 98121-2375 LEETTERNY D U.S.A. COMPANY E LETTER COVERAGES THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMBS TR DATE(MM/DD/YY) DATE(MM/DD/YY) GENERAL LIABILITY GENERAL AGGREGATE $ COMMERCIAL GENERAL LIABILITY PRODUCTS-COMP/OP AGG. $ CLAIMS MADE OCCUR. PERSONAL&ADV.INJURYS $ OWNER'S&CONTRACTOR'S PROT. EACH OCCURRENCE $ FIRE DAMAGE(Any one fire) $ MED.EXPENSE(Any one person) $ AUTOMOBILE LIABILITY W COMBINED SINGLE $ ANY AUTO LIMIT ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS i'; !71 \? ;q BODILY INJURY $ NON-OWNED AUTOS D -� " `�`FF t -.. (Per accident) GARAGE LIABILITYr PROPERTY DAMAGE 1 1=7 1 _.. EXCESS LIABILITY EACH OCCURRENCE $ UMBRELLA FORM � I AGGREGATE $ OTHER THAN UMBRELLA FORM OF �� (O WORKER'S COMPENSATION Englneenn STATUTORY LIMITS AND EACH ACCIDENT $ i _ EMPLOYERS'LIABILITY DISEASE-POLICY LIMIT $ DISEASE-EACH EMPLOYEE $ OTHER A Professional_ Liability � 2.P-0101-00-1996 7/1/96 7/1/97 $1, 000 , 000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS SW 43rd Street Drainage Improvement Project CERTIFICATE HOLDER CANCELLATION City of Renton Planning/Building/ SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE Public Works Department EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO Municipal_ Building MAILS_DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE 200 Mill Avenue South LEFT, BUT FAILURE TO MAIL WCH NOTICE SHALL IMPOSE NO OBLIGATION OR Renton, WA 98055 LIABILITY OF ANY KIN PO ME COMPANY, ITS AGENTS OR REPRESENTATIVES. U.S.A. AUTHORIZED REPRESEN ATIV ACORD 25-S(7/90) CACORD CORPORATION 1990 CERTIFICATE OF INSURANCE ISSUE DATE(MM/DD/YY) MANAGERS THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS M, & McLennan Management NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW Services (Bermuda) Limited Craig Appin House, Wesley Street COMPANIES AFFORDING COVERAGE P. O. Box HM 1162 Hamilton HM T'X, Bermuda COMPAN LETTER Y A OLYMPIC NATIONAL INSURANCE COMPANY LT ..___._---....____.....__....._---_...____-:___._._..............._.............. COMPANY B INSURED LETTER R.W. Beck, Tnc. COMPANY `+ Fourth & Blanchard Building LETTER 1 1.01 Fourth Avenue , Suite 600 Seattle, WA 981?1-737) LEETTERNY D U.S.A. COMPANY LETTER E COVERAGES THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD I INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS LTR DATE(MM/DD/YY) DATE(MM/DD/YY) GENERAL LIABILITY GENERAL AGGREGATE $ COMMERCIAL GENERAL LIABILITY PRODUCTS-COMP/OP AGG. $ CLAIMS MADE OCCUR. PERSONAL&ADV.INJURYS $ OWNER'S&CONTRACTOR'S PROT. EACH OCCURRENCE $ FIRE DAMAGE(Any one fire) $ MED.EXPENSE(Any one person) $ AUTOMOBILE LIABILITY COMBINED SINGLE $ ANY AUTO LIMIT ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY $ NON-OWNED AUTOS (Per accident) GARAGE LIABILITY PROPERTY DAMAGE $ EXCESS LIABILITY EACH OCCURRENCE $ UMBRELLA FORM AGGREGATE $ OTHER THAN UMBRELLA FORM - WORKER'S COMPENSATION - STATUTORY LIMITS EACH ACCIDENT- $ AND DISEASE-POLICY LIMIT $ EMPLOYERS'LIABILITY DISEASE-EACH EMPLOYEE $ OTHER �. lessional LiAb _litv kp-010I-00-1996 7./1/96 7/1/97 $i, 000, 000 DESCRIPTION OF OPERATIONS/LOCATION SNEH ICLES/SPECIAL ITEMS - IcT,J 41rrl prainage Tmnrovement Project ' CERTIFICATE HOLDER CANCELLATION ity of Renton P.ianning/Bullding; SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE Public, Works Department EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO Municina1_ Building MAIL DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE 200 Mill Avenue South LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR Renton, WA 98099 LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. TT.S.A. AUTHORIZED REPRESENTATIVE ACORD 25-S (7/90) `ACORD CORPORATION 1990